Automatic water cooling system suitable for semiconductor equipment and control method thereof

By designing an automatic water cooling system inside the semiconductor equipment, using the PLC control system and dual pump fault diagnosis function, the large area and maintenance problems of the external water cooling system are solved, efficient and stable automatic cooling is achieved, and the safety of the equipment is improved. and operational reliability.

CN118980210APending Publication Date: 2024-11-1948TH RES INST OF CHINA ELECTRONICS TECH GROUP CORP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411177000.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-26
Publication Date
2024-11-19

AI Technical Summary

Technical Problem

The external water cooling system of existing semiconductor equipment has problems such as large area, complex pipeline wiring, and difficult maintenance, making it difficult to achieve cooling solutions with compact structure, simple operation, stable operation and high degree of automation.

Method used

An automatic water cooling system integrated into semiconductor equipment is designed, including a water tank, heat exchanger, No. 1 water pump and No. 2 water pump. Automatic control is achieved through the PLC control system, with liquid level perception, liquid replenishment, liquid discharge, and dual pump failures. Diagnostic and automatic switching functions are integrated into the UPS loop to ensure the power supply is stable.

Benefits of technology

It realizes efficient automatic cooling of semiconductor equipment, reduces the equipment footprint, simplifies operation, improves the safety and stability of the system, avoids the high temperature and cooling state caused by a single water pump failure, and ensures the safe operation of the equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118980210A_ABST
    Figure CN118980210A_ABST
Patent Text Reader

Abstract

The invention discloses an automatic water cooling system suitable for semiconductor equipment and a control method thereof, and the system is characterized in that a water tank is provided with a pipeline for connecting factory service pure water in and out, a heat exchanger is provided with a pipeline for connecting factory service cooling water in and out, the water tank is connected to the heat exchanger through a pipeline with double pumps, and the double pumps are arranged in parallel; the double pumps are both connected with the PLC control system, and the total input power of the double pumps is connected to a UPS loop; the water inlet end of the high-temperature component is connected with the heat exchanger through a water inlet header pipe, the water outlet end of the high-temperature component is connected with the water tank through a water return header pipe, under the control of the PLC control system, pure water in the water tank is conveyed into the heat exchanger through the water pump and exchanges heat with factory service cooling water, and the cooled pure water enters the high-temperature component to exchange heat. And the heated pure water discharged by the high-temperature part enters the water tank again, and the circulation is repeated, so that the high-temperature part is continuously and automatically cooled. The device has the characteristics of compact structure, simplicity in operation, stability in operation, high automation degree and the like.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of semiconductor equipment cooling, and in particular relates to an automatic water cooling system suitable for semiconductor equipment and a control method thereof. Background Art

[0002] The heat dissipation problem of semiconductor equipment has always been a key challenge in the research and engineering fields. As semiconductor devices continue to shrink and power density continues to increase, the demand for heat dissipation is becoming increasingly urgent. Traditional heat dissipation methods, such as air cooling and external water cooling. Among them, the external water cooling system is a common solution. It removes heat by installing the radiator outside the device and connecting it to the inside of the semiconductor device through pipes. However, the external water cooling system has certain shortcomings, such as large footprint, complex pipe wiring, and difficult maintenance. Summary of the invention

[0003] The technical problem to be solved by the present invention is to provide an automatic water cooling system and a control method thereof suitable for semiconductor equipment, which has a compact structure, simple operation, stable operation and a high degree of automation, in view of the deficiencies in the prior art.

[0004] To achieve the above object, the present invention can adopt the following technical solutions:

[0005] An automatic water cooling system suitable for semiconductor equipment comprises a water tank, a heat exchanger, a first water pump and a second water pump arranged inside the semiconductor equipment; the water tank is provided with a pipe connected to the inlet and outlet of pure water for factory services, the heat exchanger is provided with a pipe connected to the inlet and outlet of cooling water for factory services, the water tank is connected to the heat exchanger through a pipe with a first water pump and a second water pump, the first water pump and the second water pump are arranged in parallel, and the first water pump and the second water pump are both connected to a PLC control system, and the total power supply of the first water pump and the second water pump is connected to a UPS circuit; the water inlet end of the high-temperature component in the semiconductor equipment is connected to the heat exchanger through a water inlet main pipe, and the water outlet end of the high-temperature component is connected to the water tank through a return water main pipe, under the control of the PLC control system, the pure water in the water tank is transported to the heat exchanger through the first water pump and / or the second water pump, and heat is exchanged with the cooling water for factory services, the cooled pure water enters the high-temperature component for heat exchange, and the heated pure water discharged from the high-temperature component enters the water tank again, and this cycle is repeated to achieve continuous automatic cooling of the high-temperature component.

[0006] As a further improvement of the present invention, a low liquid level sensor and a high liquid level sensor are provided in the water tank, and both the low liquid level sensor and the high liquid level sensor are connected to the PLC control system; the water tank is connected to the plant pure water end through a pipeline with a liquid replenishment solenoid valve, and the water tank is connected to the plant drainage pipeline through a pipeline with a liquid discharge solenoid valve, and both the liquid replenishment solenoid valve and the liquid discharge solenoid valve are connected to the PLC control system; a liquid discharge manual valve is provided at the bottom of the water tank.

[0007] As a further improvement of the present invention, the heat exchanger is connected to the plant cooling water end through an inlet pipe with a total inlet manual valve, and the heat exchanger is connected to the plant drainage pipe through a drainage pipe with a total return water manual valve; a first total inlet pressure gauge is provided on the inlet pipe, and a first total return water pressure gauge is provided on the drainage pipe, and the first total inlet pressure gauge and the first total return water pressure gauge are both connected to the PLC control system.

[0008] As a further improvement of the present invention, a first water temperature sensor and a second total water inlet pressure gauge are provided on the water inlet main pipe, and a second total return water pressure gauge is provided on the parallel main pipeline of the No. 1 water pump and the No. 2 water pump, and the first water temperature sensor, the second total return water pressure gauge and the second total water inlet pressure gauge are all connected to the PLC control system.

[0009] As a general technical concept, the present invention also provides a control method based on the above automatic water cooling system applicable to semiconductor equipment, comprising the following steps:

[0010] Step S1: Before the automatic water cooling system performs water cooling cycle, the PLC control system determines whether there is water in the water tank and whether the water level reaches the preset value. If the liquid level in the water tank reaches the preset value, step S2 is performed. If the water level in the water tank is lower than the preset value, liquid replenishment is performed.

[0011] Step S2: When the water volume in the water tank reaches a preset value, a safety test is performed to determine whether the water pump is safe, and a corresponding dual-pump test is performed according to whether the current automatic water cooling system is in a safe startup state;

[0012] Step S3: If the dual pump test is passed, it proves that the automatic water cooling system is in a safe state and the semiconductor equipment can be cooled.

[0013] As a further improvement of the present invention, it also includes step S4, if a water flow alarm occurs during the operation of the automatic water cooling system, it indicates that there may be a water pump failure, and the dual-pump operation mode is turned on; the dual-pump operation mode is: after receiving the instruction to start water cooling, if the automatic water cooling system is currently in maintenance mode, the PLC control system automatically determines whether there is a component alarm at present. If there is an alarm, the dual-pump operation mode is turned on until manual intervention occurs, and the water pump is not turned off.

[0014] As a further improvement of the present invention, the present invention further includes step S5: if the automatic water cooling system is to be repaired and maintained, it needs to be drained, and the power drainage and / or gravity drainage mode is started;

[0015] The process of power drainage is as follows: the PLC control system determines whether the automatic water cooling system is currently in maintenance mode. If it is in maintenance mode, power drainage is performed, and "power drainage" is selected in the PLC control system. The PLC control system opens the drainage solenoid valve, closes the replenishment solenoid valve, and opens the No. 1 water pump for auxiliary drainage. The water level in the water tank is continuously monitored during the drainage process. When the water level in the water tank is continuously lower than the low liquid level and the delay is 10±2s, the power drainage is terminated. If the drainage process exceeds half an hour, the PLC control system issues an alarm "drainage timeout" and terminates the power drainage.

[0016] The process of gravity drainage is: open the drainage hand valve, rely on the dead weight of the water in the water tank to drain, observe the water level manually, and close the drainage hand valve after the drainage is completed.

[0017] As a further improvement of the present invention, it also includes step S6. If the automatic water cooling system performs automatic water change, when water pump No. 1 is fault-free and the automatic water cooling system is in maintenance mode, the number of automatic water changes is set in the PLC control system, and the "automatic water change" button is clicked. The automatic water cooling system first drains water and then replenishes water, and repeats the cycle of draining water first and then replenishing water.

[0018] As a further improvement of the present invention, in step S1, the method of fluid replenishment includes automatic fluid replenishment and manual fluid replenishment.

[0019] The process of automatic refilling is as follows: check the "automatic refilling" button in the PLC control system, the PLC control system opens the refilling solenoid valve for refilling, during the refilling process, the PLC control system continuously determines whether the current water level in the water tank reaches the preset high liquid level and lasts for 5±1s, if it is satisfied, the automatic refilling is terminated, if the refilling process exceeds half an hour, the PLC control system pops up an alarm "refilling timeout" and terminates the automatic refilling;

[0020] The manual refilling process is as follows: the PLC control system first determines whether the automatic water cooling system is in maintenance mode. If in maintenance mode, click the "manual refilling" button to determine whether the water tank has not reached the high liquid level delay and lasts for 10±2s. If the high liquid level has not been reached, manually open the refilling solenoid valve for refilling. Continuous monitoring is carried out during the refilling process. After the water tank reaches the high liquid level and delays for 10±2s, the manual refilling is ended. If the refilling time exceeds 30 minutes, the host computer pops up an alarm "refilling timeout" to end the manual refilling.

[0021] As a further improvement of the present invention, in step S2, the dual pump detection includes dual pump detection under safe startup and dual pump detection under non-safe startup.

[0022] The process of double pump detection under safety start is as follows: if double pump detection has not been carried out within one month and there is a water flow alarm, the double pump detection process will be automatically entered. During the detection, first turn on the No. 1 water pump for 5±1 minutes to detect whether there is a water flow alarm. If there is no water flow alarm for more than 3±1s, the PLC control system prompts that the No. 1 water pump is normal and starts to detect the No. 2 water pump. Turn on the No. 2 water pump for 5±1 minutes to detect whether there is a water flow alarm. If there is no water flow alarm that lasts for 3±1s, the PLC control system prompts that the No. 2 water pump is normal and exits the double pump detection process;

[0023] The process of dual pump detection under non-safety startup is as follows: during the operation of the automatic water cooling system, the PLC control system continuously detects whether a water flow alarm is generated. After the process is completed, if a water flow alarm occurs during operation, it indicates that one of the water pumps has failed. At this time, the PLC control system prompts "Perform dual pump detection" and manual dual pump detection is required. The detection process is consistent with the dual pump detection under safety startup.

[0024] Compared with the prior art, the advantages of the present invention are:

[0025] The automatic water cooling system and control method for semiconductor equipment of the present invention are intended to replace the external water cooling machine in the prior art, reduce costs and reduce the equipment footprint. The automatic water cooling system of the present invention can automatically sense the liquid level of the water tank and perform automatic liquid replenishment or automatic liquid drainage operations. In addition, the automatic water cooling system is integrated in the PLC control system, which can realize the fault diagnosis and automatic switching of the dual pumps. If a water pump failure occurs during the operation of the equipment, the dual pumps can also be automatically started to cool down to prevent single failure, thereby improving the safety of the equipment. In addition, an automatic water replacement function is integrated. During operation, the interlocking program can be triggered according to the operation of the semiconductor equipment to ensure the safe and stable operation of the semiconductor equipment. In the event of an emergency power outage in the system, the UPS continues to provide output. Even if an emergency stop occurs, the power supply of the water pump will not be cut off, thereby avoiding the semiconductor equipment from running in a high-temperature and uncooled state, further improving the safety of the semiconductor equipment. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 It is a schematic diagram of the structural principle of an automatic water cooling system applicable to semiconductor equipment in a specific embodiment of the present invention;

[0027] Figure 2 It is a schematic diagram of the process of double pump operation in a specific embodiment of the present invention;

[0028] Figure 3 It is a schematic diagram of the dual pump detection process under safe startup in a specific embodiment of the present invention;

[0029] Figure 4It is a schematic diagram of the double pump detection process in the process of a specific embodiment of the present invention;

[0030] Figure 5 It is a schematic diagram of the power drainage process in a specific embodiment of the present invention;

[0031] Figure 6 It is a schematic diagram of the gravity drainage process in a specific embodiment of the present invention;

[0032] Figure 7 This is a schematic diagram of the automatic liquid replenishment process in a specific embodiment of the present invention;

[0033] Figure 8 This is a schematic diagram of the manual fluid replenishment process in a specific embodiment of the present invention;

[0034] Legend: 1. Water tank; 2. Heat exchanger; 3. Quartz tube; 4. Liquid replenishment solenoid valve; 5. Liquid discharge solenoid valve; 6. Liquid discharge manual valve; 7. Main water inlet manual valve; 8. Main water return manual valve; 9. No. 1 water pump; 10. No. 2 water pump; 11. First water temperature sensor; 12. Second water temperature sensor; 13. Third water temperature sensor; 14. Fourth water temperature sensor; 15. Low liquid level sensor; 16. High liquid level sensor; 17. First total water inlet pressure gauge; 18. First total water return pressure gauge; 19. Second total water return pressure gauge; 20. Second total water inlet pressure gauge; 21. Main water inlet pipe; 211. First water inlet branch pipe; 212. Second water inlet branch pipe; 213. Third water inlet branch pipe; 22. Main water return pipe; 221. First water return branch pipe; 222. Second water return branch pipe; 223. Third water return branch pipe. DETAILED DESCRIPTION

[0035] The present invention is further described below in conjunction with the accompanying drawings and specific preferred embodiments, but the protection scope of the present invention is not limited thereby.

[0036] In the description of the present invention, it should be understood that the terms "side", "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the present invention.

[0037] In addition, the terms "first" and "second" are used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present invention, "multiple" means two or more, unless otherwise clearly and specifically defined.

[0038] Example 1

[0039] like Figure 1 As shown, the automatic water cooling system for semiconductor equipment of the present invention comprises a water tank 1, a heat exchanger 2, a first water pump 9 and a second water pump 10 arranged inside the semiconductor equipment. The water tank 1 is provided with a pipe connecting the inlet and outlet of the factory pure water, and the heat exchanger 2 is provided with a pipe connecting the inlet and outlet of the factory cooling water. The water tank 1 is connected to the heat exchanger 2 through a pipe with the first water pump 9 and the second water pump 10. The first water pump 9 and the second water pump 10 are arranged in parallel, and the first water pump 9 and the second water pump 10 are both connected to the PLC control system, and the total power supply of the first water pump 9 and the second water pump 10 is connected to the UPS circuit. The water inlet of the high-temperature components in the semiconductor equipment is connected to the heat exchanger 2 through the water inlet main pipe 21, and the water outlet of the high-temperature components is connected to the water tank 1 through the return water main pipe 22. Under the control of the PLC control system, the pure water in the water tank 1 is transported to the heat exchanger 2 through the No. 1 water pump 9 and / or the No. 2 water pump 10, and exchanges heat with the factory cooling water. The cooled pure water enters the high-temperature components for heat exchange, and the heated pure water discharged from the high-temperature components enters the water tank 1 again. This cycle is repeated to achieve continuous automatic cooling of the high-temperature components.

[0040] In this embodiment, the total power supply of the two water pumps is connected to the UPS circuit. If an unexpected power outage occurs, the water pumps will continue to be powered. In the case of a power outage, the equipment is prevented from running at high temperatures and causing unexpected situations. If the equipment is shut down in an emergency, the electric shock of the main contactor will not cut off the power supply to the water pump, which meets the requirements of SEM I S2 and has higher safety performance than that specified.

[0041] like Figure 1 As shown, a low liquid level sensor 15 and a high liquid level sensor 16 are provided in the water tank 1, and both the low liquid level sensor 15 and the high liquid level sensor 16 are connected to the PLC control system. The two liquid level sensors are used to detect and alarm the liquid level in the water tank 1 to improve the safety of system operation.

[0042] The water tank 1 is connected to the factory pure water end through a pipeline with a liquid replenishment solenoid valve 4 to perform liquid replenishment operation of the water tank 1; the water tank 1 is connected to the factory drainage pipeline through a pipeline with a liquid discharge solenoid valve 5 to perform liquid discharge operation of the water tank 1. The liquid replenishment solenoid valve 4 and the liquid discharge solenoid valve 5 are both connected to the PLC control system. A liquid discharge hand valve 6 is provided at the bottom of the water tank 1.

[0043] like Figure 1 As shown, the heat exchanger 2 is connected to the plant cooling water end through an inlet pipe with a total inlet hand valve 7, and the heat exchanger 2 is connected to the plant drainage pipe through a drainage pipe with a total return water hand valve 8. A first total inlet pressure gauge 17 is provided on the inlet pipe, and a first total return water pressure gauge 18 is provided on the drainage pipe. Both the first total inlet pressure gauge 17 and the first total return water pressure gauge 18 are connected to the PLC control system. The first total inlet pressure gauge 17 is in the form of an electric contact, and its signal is connected to the safety PLC. If an alarm occurs, the equipment heating and special gas will be cut off to prevent the single failure of the first total return water pressure gauge 18, thereby improving the safety level and stability of the equipment.

[0044] In this embodiment, by connecting the signal of the first total water inlet pressure gauge 17 of the total water inlet electrical contact of the factory water to the safety PLC, the safety of equipment failure is guaranteed. In terms of circuit design, the water pump is still kept running in the event of an emergency stop or power outage of the equipment, thereby enhancing the safety of the equipment.

[0045] like Figure 1 As shown, the first water temperature sensor 11 and the second total water inlet pressure gauge 20 are provided on the water inlet main pipe 21, and the second total return water pressure gauge 19 is provided on the parallel main pipeline of the No. 1 water pump 9 and the No. 2 water pump 10. The first water temperature sensor 11, the second total return water pressure gauge 19 and the second total water inlet pressure gauge 20 are all connected to the PLC control system.

[0046] In this embodiment, the high-temperature component in the semiconductor device is a quartz tube 3. The main water inlet pipe 21 from the heat exchanger 2 to the quartz tube 3 is divided into three branches, namely, the first water inlet branch pipe 211, the second water inlet branch pipe 212 and the third water inlet branch pipe 213, which are respectively connected to different inlets in the quartz tube 3, and then flow from the three outlets to the first return water branch pipe 221, the second return water branch pipe 222 and the third return water branch pipe 223, and finally converge to the return water main pipe 22 and return to the water tank 1. The second water temperature sensor 12 is used to detect the water flow temperature in the first return water branch pipe 221, the third water temperature sensor 13 is used to detect the water flow temperature in the second return water branch pipe 222, and the fourth water temperature sensor 14 is used to detect the water flow temperature in the third return water branch pipe 223. By observing the reading of the second main water inlet pressure gauge 20 and the detection data of the first water temperature sensor 11, the second water temperature sensor 12, the third water temperature sensor 13 and the fourth water temperature sensor 14, it can be determined whether the current water flow condition is abnormal.

[0047] In this embodiment, an automatic water cooling system is formed by arranging water tanks, dual pumps, liquid level detection, water flow detection, water temperature detection and heat exchangers in the semiconductor equipment to replace the water chiller. The water cooling system can not only cool the quartz tube, but also cool other high-temperature parts of the equipment. The water cooling system is built-in, which saves the space of the external water chiller, reduces the total equipment footprint, and greatly saves the cost of the external water chiller. At the same time, the safety PLC is used to connect the pressure gauge signal of the main water inlet electrical contact of the factory water to the safety PLC, which ensures the safety of equipment failure. In terms of circuit design, the water pump is still kept running in the case of emergency stop and power failure of the equipment, which enhances the safety of the equipment.

[0048] Example 2

[0049] like Figures 2 to 8 As shown, the clamping control method of the present invention is implemented based on the automatic water cooling system applicable to semiconductor equipment in Example 1, and includes the following steps:

[0050] Step S1. Before the automatic water cooling system performs water cooling circulation, the PLC control system determines whether there is water in the water tank 1 and whether the water level reaches the preset value. If the liquid level in the water tank 1 reaches the preset value, step S2 is performed. If the water level in the water tank 1 is lower than the preset value, liquid is replenished.

[0051] Step S2: When the water volume in the water tank 1 reaches a preset value, a safety test is performed to determine whether the water pump is safe, and a corresponding dual-pump test is performed according to whether the current automatic water cooling system is in a safe startup state;

[0052] Step S3: If the dual pump test is passed, it proves that the automatic water cooling system is in a safe state and the semiconductor equipment can be cooled.

[0053] In this embodiment, step S4 is also included, if a water flow alarm occurs during the operation of the automatic water cooling system, indicating that there may be a water pump failure, the dual pump operation mode is turned on. Figure 2 As shown in the figure, the dual-pump operation mode is: after receiving the command to start water cooling, if the automatic water cooling system is currently in maintenance mode, the PLC control system automatically determines whether there is a component alarm. If there is an alarm, the dual-pump operation mode is turned on until manual intervention occurs and the water pump is turned off. The alarm situations include reaction chamber overtemperature, quartz tube wall overtemperature, cabinet overtemperature, quartz tube total water inlet leakage alarm, quartz tube branch 1 water outlet alarm, quartz tube branch 2 water outlet alarm, and quartz tube branch 3 water outlet alarm.

[0054] In this embodiment, step S5 is also included. If the automatic water cooling system is to be repaired and maintained, it needs to be drained, and the power drainage and / or gravity drainage mode is started.

[0055] like Figure 5As shown, the process of power drainage is as follows: the PLC control system determines whether the automatic water cooling system is currently in maintenance mode. If it is in maintenance mode, power drainage is performed. "Power drainage" is selected in the PLC control system. The PLC control system opens the drainage solenoid valve 5, closes the replenishment solenoid valve 4, and opens the No. 1 water pump 9 for auxiliary drainage. During the drainage process, the water level of water tank 1 is continuously monitored. When the water level of water tank 1 is continuously lower than the low liquid level and the delay is 10s, the power drainage is terminated. If the drainage process exceeds half an hour, the PLC control system issues an alarm "drainage timeout" and terminates the power drainage;

[0056] like Figure 6 As shown, the process of gravity drainage is: open the drainage manual valve 6, rely on the deadweight of the water in the water tank 1 to drain, observe the water level manually, and close the drainage manual valve 6 after the drainage is completed.

[0057] In this embodiment, step S6 is also included. If the automatic water cooling system automatically changes water, when the No. 1 water pump 9 is fault-free and the automatic water cooling system is in maintenance mode, the number of automatic water changes is set in the PLC control system, and the "automatic water change" button is clicked. The automatic water cooling system first drains water and then replenishes liquid, and repeats the cycle of first draining water and then replenishing liquid. Figure 8 as shown in .

[0058] In step S1 of this embodiment, the fluid replenishment method includes automatic fluid replenishment and manual fluid replenishment.

[0059] like Figure 7 As shown, the process of automatic refilling is as follows: check the "automatic refilling" button in the PLC control system, the PLC control system opens the refilling solenoid valve 4 for refilling, and during the refilling process, the PLC control system continuously determines whether the current water level in the water tank 1 has reached the preset high liquid level and lasts for 5 seconds. If it is satisfied, the automatic refilling is terminated. If the refilling process exceeds half an hour, the PLC control system pops up an alarm "refilling timeout" and terminates the automatic refilling.

[0060] The process of manual fluid replenishment is as follows: the PLC control system first determines whether the automatic water cooling system is in maintenance mode. If in maintenance mode, click the "manual fluid replenishment" button to determine whether water tank 1 has not reached the high liquid level delay and lasts for 10 seconds. If it has not reached the high liquid level, manually open the fluid replenishment solenoid valve 4 for fluid replenishment. Continuous monitoring is carried out during the fluid replenishment process. After water tank 1 reaches the high liquid level and delays for 10 seconds, the manual fluid replenishment is ended. If the fluid replenishment time exceeds 30 minutes, the host computer pops up an alarm "Fluid Replenishment Timeout" to end the manual fluid replenishment.

[0061] In step S2 of this embodiment, the dual pump detection includes the dual pump detection under safe startup and the dual pump detection under unsafe startup.

[0062] like Figure 3As shown in the figure, the process of double pump detection under safe start is: if double pump detection has not been carried out within one month and there is an overflow alarm, the double pump detection process will be automatically entered. During the detection, first turn on the No. 1 water pump 9 ( Figure 3 The water pump 1 in the control panel is turned on for 5 minutes to detect whether there is a water flow alarm. If there is no water flow alarm for more than 3 seconds, the PLC control system prompts that the first water pump 9 is normal. Then the second water pump 10 ( Figure 3 Water pump 2) in the circuit, turn on water pump No. 2 10 for 5 minutes to detect whether there is a water flow alarm. If there is no water flow alarm that lasts for 3 seconds, the PLC control system prompts that water pump No. 2 10 is normal and exits the dual pump detection process.

[0063] like Figure 4 As shown in the figure, the process of dual pump detection under non-safety startup is as follows: during the operation of the automatic water cooling system, the PLC control system continuously detects whether a water flow alarm is generated. After the process is completed, if a water flow alarm occurs during the operation, it indicates that one of the water pumps has failed. At this time, the PLC control system prompts "Perform dual pump detection" and manual dual pump detection is required. The detection process is consistent with the dual pump detection under safety startup.

[0064] In this embodiment, the automatic water cooling system uses dual pump detection in safety mode, dual pump detection in non-safety mode, dual pump operation, automatic fluid replenishment, manual fluid replenishment, gravity drainage, power drainage and automatic water change and other program modules to ensure the safe and stable operation of the equipment cooling system, with high operability and configurability.

[0065] Although the present invention is disclosed as above with preferred embodiments, it is not intended to limit the present invention. Any technician familiar with the art can use the above disclosed methods and technical contents to make many possible changes and modifications to the technical solutions of the present invention without departing from the spirit and technical solutions of the present invention, or modify them into equivalent embodiments of equivalent changes. Therefore, any simple modification, equivalent replacement, equivalent change and modification made to the above embodiments according to the technical essence of the present invention without departing from the content of the technical solutions of the present invention still fall within the scope of protection of the technical solutions of the present invention.

Claims

1. An automatic water cooling system suitable for semiconductor equipment, characterized in that: The invention comprises a water tank (1), a heat exchanger (2), a first water pump (9) and a second water pump (10) arranged inside a semiconductor device; the water tank (1) is provided with a pipeline connected to the inlet and outlet of pure water for factory services, the heat exchanger (2) is provided with a pipeline connected to the inlet and outlet of cooling water for factory services, the water tank (1) is connected to the heat exchanger (2) via a pipeline with the first water pump (9) and the second water pump (10), the first water pump (9) and the second water pump (10) are arranged in parallel, and the first water pump (9) and the second water pump (10) are both connected to a PLC control system, and the first water pump (9) and the second water pump (10) are connected in parallel. The main power supply is connected to the UPS circuit; the water inlet end of the high-temperature component in the semiconductor equipment is connected to the heat exchanger (2) through the water inlet main pipe (21), and the water outlet end of the high-temperature component is connected to the water tank (1) through the return water main pipe (22). Under the control of the PLC control system, the pure water in the water tank (1) is transported to the heat exchanger (2) through the first water pump (9) and / or the second water pump (10), and heat is exchanged with the factory cooling water. The cooled pure water enters the high-temperature component for heat exchange, and the heated pure water discharged from the high-temperature component enters the water tank (1) again. This cycle is repeated to achieve continuous automatic cooling of the high-temperature component.

2. The automatic water cooling system for semiconductor equipment according to claim 1, characterized in that: The water tank (1) is provided with a low liquid level sensor (15) and a high liquid level sensor (16), and both the low liquid level sensor (15) and the high liquid level sensor (16) are connected to the PLC control system; the water tank (1) is connected to the factory pure water end through a pipeline with a liquid replenishment solenoid valve (4), and the water tank (1) is connected to the factory liquid discharge pipeline through a pipeline with a liquid discharge solenoid valve (5), and both the liquid replenishment solenoid valve (4) and the liquid discharge solenoid valve (5) are connected to the PLC control system; a liquid discharge manual valve (6) is provided at the bottom of the water tank (1).

3. The automatic water cooling system for semiconductor equipment according to claim 2, characterized in that: The heat exchanger (2) is connected to the plant cooling water end via a water inlet pipe with a total water inlet manual valve (7), and the heat exchanger (2) is connected to the plant drainage pipe via a drainage pipe with a total water return manual valve (8); a first total water inlet pressure gauge (17) is provided on the water inlet pipe, and a first total water return pressure gauge (18) is provided on the drainage pipe, and the first total water inlet pressure gauge (17) and the first total water return pressure gauge (18) are both connected to a PLC control system.

4. The automatic water cooling system for semiconductor equipment according to claim 3, characterized in that: The water inlet main pipe (21) is provided with a first water temperature sensor (11) and a second total water inlet pressure gauge (20); the parallel main pipe of the first water pump (9) and the second water pump (10) is provided with a second total return water pressure gauge (19); the first water temperature sensor (11), the second total return water pressure gauge (19) and the second total water inlet pressure gauge (20) are all connected to a PLC control system.

5. A control method for an automatic water cooling system for semiconductor equipment according to any one of claims 1 to 4, characterized in that: The following steps are involved: Step S1: Before the automatic water cooling system performs a water cooling cycle, the PLC control system determines whether there is water in the water tank (1) and whether the water level has reached a preset value. If the liquid level in the water tank (1) has reached the preset value, step S2 is performed; if the water level in the water tank (1) is lower than the preset value, liquid replenishment is performed; Step S2: when the water volume in the water tank (1) reaches a preset value, a safety test is performed to determine whether the water pump is safe, and a corresponding dual pump test is performed according to whether the current automatic water cooling system is in a safe startup state; Step S3: If the dual pump test is passed, it proves that the automatic water cooling system is in a safe state and the semiconductor equipment can be cooled.

6. The control method according to claim 5, characterized in that: It also includes step S4. If a water flow alarm occurs during the operation of the automatic water cooling system, it indicates that there may be a water pump failure, and the dual-pump operation mode is turned on; the dual-pump operation mode is: after receiving the instruction to start water cooling, if the automatic water cooling system is currently in maintenance mode, the PLC control system automatically determines whether there is a component alarm at present. If there is an alarm, the dual-pump operation mode is turned on until manual intervention, and the water pump is not turned off.

7. The control method according to claim 6, characterized in that: The step S5 is also included. If the automatic water cooling system is to be repaired and maintained, it needs to be drained, and the power drainage and / or gravity drainage mode is started; The process of the power drainage is as follows: the PLC control system determines whether the automatic water cooling system is currently in the maintenance mode. If it is in the maintenance mode, the power drainage is performed, and "power drainage" is selected in the PLC control system. The PLC control system opens the drainage solenoid valve (5), closes the replenishment solenoid valve (4), and opens the No. 1 water pump (9) for auxiliary drainage. During the drainage process, the water level of the water tank (1) is continuously monitored. When the water level of the water tank (1) is continuously lower than the low liquid level and the delay is 10±2s, the power drainage is terminated. If the drainage process exceeds half an hour, the PLC control system issues an alarm "drainage timeout" and terminates the power drainage. The process of gravity drainage is as follows: opening the drainage manual valve (6), draining the liquid by relying on the deadweight of the water in the water tank (1), manually observing the water level, and closing the drainage manual valve (6) after the drainage is completed.

8. The control method according to claim 7, characterized in that: The method further comprises step S6, wherein if the automatic water cooling system automatically changes water, when the No. 1 water pump (9) is not faulty and the automatic water cooling system is in maintenance mode, the number of automatic water changes is set in the PLC control system, and the "automatic water change" button is clicked, the automatic water cooling system first drains water and then replenishes water, and the cycle of first draining water and then replenishing water is repeated.

9. The control method according to claim 8, characterized in that: In step S1, the fluid replenishment method includes automatic fluid replenishment and manual fluid replenishment. The process of automatic liquid replenishment is as follows: the "automatic liquid replenishment" button is checked in the PLC control system, and the PLC control system opens the liquid replenishment solenoid valve (4) to replenish liquid. During the liquid replenishment process, the PLC control system continuously determines whether the water level of the current water tank (1) reaches a preset high liquid level and lasts for 5±1s. If the water level reaches a preset high liquid level, the automatic liquid replenishment is terminated. If the liquid replenishment process exceeds half an hour, the PLC control system pops up an alarm "liquid replenishment timeout" and terminates the automatic liquid replenishment. The manual refilling process is as follows: the PLC control system first determines whether the automatic water cooling system is in the maintenance mode. If in the maintenance mode, click the "manual refilling" button to determine whether the water tank (1) has not reached the high liquid level and the delay lasts for 10±2s. If the high liquid level has not been reached, manually open the refilling solenoid valve (4) to refill the liquid. Continuous monitoring is carried out during the refilling process. After the water tank (1) reaches the high liquid level and the delay lasts for 10±2s, the manual refilling is terminated. If the refilling time exceeds 30 minutes, the host computer pops up an alarm "refilling timeout" to terminate the manual refilling.

10. The control method according to claim 8, characterized in that: In step S2, the dual pump detection includes dual pump detection under safe start and dual pump detection under non-safe start. The process of double pump detection under safety start is as follows: if double pump detection has not been carried out within one month and there is a water flow alarm, the double pump detection process is automatically entered. During the detection, the No. 1 water pump (9) is first turned on for 5±1 minutes to detect whether there is a water flow alarm. If there is no water flow alarm for more than 3 seconds, the PLC control system prompts that the No. 1 water pump (9) is normal and starts to detect the No. 2 water pump (10). The No. 2 water pump (10) is turned on for 5±1 minutes to detect whether there is a water flow alarm. If there is no water flow alarm that lasts for 3±1 seconds, the PLC control system prompts that the No. 2 water pump (10) is normal and exits the double pump detection process; The process of dual pump detection under non-safety startup is as follows: during the operation of the automatic water cooling system, the PLC control system continuously detects whether a water flow alarm is generated. After the process is completed, if a water flow alarm occurs during operation, it indicates that one of the water pumps is faulty. At this time, the PLC control system prompts "Perform dual pump detection" and manual dual pump detection is required. The detection process is consistent with the dual pump detection under safety startup.