Energy-saving management and control method and equipment based on digital twinning and intelligent agent technology, and medium
Through the energy-saving control method of digital twin and intelligent technology, the relationship between energy consumption and environmental data in the building is analyzed and the target environmental data is adjusted, and the energy waste caused by excessive use of users in traditional energy-saving solutions is solved, achieving more efficient energy-saving effects .
Patent Information
- Application Number
- CN202411051347.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-01
- Publication Date
- 2024-11-19
Smart Images

Figure CN118981886A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of computers, and specifically to an energy-saving management and control method, device and medium based on digital twin and intelligent agent technology. Background Art
[0002] With the development of social economy and the improvement of human living standards, the construction industry is facing more and more challenges and opportunities. Traditional buildings have many problems in energy consumption and environmental impact, such as large amounts of energy waste and excessive carbon emissions. These problems have become the focus of global attention. In response to these challenges, smart building technology has emerged, which provides new solutions for buildings by integrating advanced information technology, automation control technology and energy-saving technology.
[0003] Smart buildings are architectural forms that use information technology to sense, monitor, manage and optimize the internal and external environments of buildings. The core of smart buildings is to achieve efficient integration and intelligent management of various systems inside buildings through various sensors, automated control systems, and data analysis and decision support systems to improve the operating efficiency, comfort and safety of buildings.
[0004] Traditional smart building energy-saving solutions are often based on user needs. For example, the air conditioner is controlled to reach or maintain the user's set temperature in a more energy-efficient way. However, users may overuse energy-consuming devices due to convenience and habit, which often limits the energy-saving effect achieved. Summary of the invention
[0005] In order to solve the above problems, this application proposes an energy-saving control method based on digital twin and intelligent agent technology, including:
[0006] Determine the control target and the related equipment installed in the control target, and perform entity 3D modeling to obtain a three-dimensional model including the control target and the related equipment; wherein the related equipment includes: energy consumption monitoring equipment and environmental monitoring equipment;
[0007] For the relevant equipment, the relevant data corresponding to the relevant equipment is collected in real time based on the Internet of Things, and the relevant equipment in the three-dimensional model is simulated according to the relevant data; wherein the relevant data includes: the actual energy consumption data corresponding to the energy consumption monitoring equipment and the actual environment data corresponding to the environment monitoring equipment;
[0008] Performing data analysis on the relevant data to obtain a mapping relationship between changes in the actual energy consumption data and the actual environmental data within a specified time period;
[0009] Based on the mapping relationship, the currently set target environment data is modified to reduce the actual energy consumption data required to achieve the target environment data.
[0010] On the other hand, the present application also proposes an energy-saving control device based on digital twin and intelligent agent technology, including:
[0011] at least one processor; and,
[0012] a memory communicatively connected to the at least one processor; wherein,
[0013] The memory stores instructions that can be executed by the at least one processor, and the instructions are executed by the at least one processor so that the at least one processor can execute the energy-saving management and control method based on digital twin and intelligent agent technology as described in the above example.
[0014] On the other hand, the present application also proposes a non-volatile computer storage medium storing computer executable instructions, wherein the computer executable instructions are set to: the energy-saving control method based on digital twin and intelligent agent technology described in the above example.
[0015] The energy-saving control method based on digital twin and intelligent agent technology proposed in this application can bring the following beneficial effects:
[0016] Based on the set mapping relationship, the relationship between the changes in actual energy consumption data and actual environmental data can be obtained, so that the change in actual environmental data can be obtained, and how much actual energy consumption data is required, so as to determine whether it is necessary to change the target environmental data set by the user based on the actual energy consumption data, thereby reducing the actual energy consumption data, preventing energy waste caused by excessive user demand, and achieving energy-saving effects. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] The drawings described herein are used to provide a further understanding of the present application and constitute a part of the present application. The illustrative embodiments of the present application and their descriptions are used to explain the present application and do not constitute an improper limitation on the present application. In the drawings:
[0018] Figure 1 It is a flowchart of an energy-saving control method based on digital twin and intelligent agent technology in an embodiment of the present application;
[0019] Figure 2 This is a schematic diagram of an energy-saving management and control device based on digital twin and intelligent agent technology in an embodiment of the present application. DETAILED DESCRIPTION
[0020] In order to make the purpose, technical solution and advantages of the present application clearer, the technical solution of the present application will be clearly and completely described below in combination with the specific embodiments of the present application and the corresponding drawings. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present application.
[0021] The technical solutions provided by various embodiments of the present application are described in detail below in conjunction with the accompanying drawings.
[0022] like Figure 1 As shown, the embodiment of the present application provides an energy-saving control method based on digital twin and intelligent agent technology, including:
[0023] S101: Determine the control target and the related equipment installed in the control target, and perform entity 3D modeling to obtain a three-dimensional model including the control target and the related equipment; wherein the related equipment includes: energy consumption monitoring equipment and environmental monitoring equipment.
[0024] The control target may include buildings to be controlled, and physical 3D modeling can be performed directly to obtain the corresponding three-dimensional model. If the control target includes an area to be controlled, and the area may include multiple buildings, physical 3D modeling is performed for each building to obtain the corresponding three-dimensional model. The 3D modeling process may include: the need to obtain relevant data of the building, such as floor plans, elevations, cross-sections, structural drawings, etc., which can be obtained through design drawings or on-site measurements. 3D modeling is performed through the corresponding modeling software, and the corresponding three-dimensional model is obtained from the basic framework to detail optimization (including doors, windows, and position lights of related equipment). Of course, material, texture, lighting settings, etc. can also be performed based on needs.
[0025] Energy consumption monitoring equipment and environmental monitoring equipment may include corresponding sensors or metering equipment. For example, energy consumption monitoring equipment may include smart electricity meters and smart water meters, which are used to monitor the amount of electricity and water respectively. Environmental monitoring equipment may include: temperature sensors, gas concentration sensors, etc., which are used to monitor the temperature, gas concentration, etc. in environmental data respectively.
[0026] S102: For the related equipment, corresponding related data are collected in real time based on the Internet of Things, and the related equipment in the three-dimensional model is simulated according to the related data; wherein the related data include: actual energy consumption data corresponding to the energy consumption monitoring equipment and actual environment data corresponding to the environment monitoring equipment.
[0027] The actual energy consumption data may include actual electricity volume data and actual water volume data, and the actual environmental data may include actual temperature data, actual gas concentration data, etc.
[0028] The simulation of relevant equipment may include the simulation of the location and operating status of the equipment. After collecting relevant data through the Internet of Things, it will be simulated in real time on the corresponding relevant equipment vendors to complete the simulation of the three-dimensional model.
[0029] S103: Perform data analysis on the relevant data to obtain a mapping relationship between changes in the actual energy consumption data and the actual environment data within a specified time period.
[0030] After collecting relevant data, the relevant data is preprocessed, where data preprocessing includes: data cleaning (including data outlier processing, missing value processing), data conversion, and data standardization. For actual environmental data, data preprocessing also includes: data discretization processing, so as to facilitate the calculation of its changes.
[0031] The specified time period can be divided artificially, for example, each hour is set as a specified time period. Of course, it can also be set based on the actual situation of the control target, so that the statistics of the mapping relationship are more accurate. Among them, each time period corresponds to a mapping relationship, and the mapping relationship is used to represent the relationship between the actual energy consumption data and the changes in the actual environmental data. For example, the mapping relationship can be that in the specified time period from 7 am to 8 am, when the actual environmental data changes from value A to value B, the actual energy consumption data consumed is value C.
[0032] Specifically, the relevant equipment also includes: energy-consuming equipment, such as air conditioners, lamps, water tanks, etc. In the embodiment of the present application, an air conditioner is taken as an example. The relevant data also includes: the equipment operation status corresponding to the energy-consuming equipment. Taking the air conditioner as an example, the corresponding equipment operation status may include: standby mode, 1 to 5 gear modes (the higher the gear, the higher the power of the air conditioner), strong mode, etc., which correspond to different working powers. The higher the working power, the higher the energy consumption.
[0033] At this time, the area is divided according to the three-dimensional model to obtain multiple room areas, wherein each room area can be isolated from other room areas. The isolation method can be complete isolation, or isolation after closing doors, windows, etc., or only retaining a small interconnected area such as a vent or ventilation port.
[0034] For each type of energy-consuming device in each room area, a mapping relationship is set in each specified time period. In other words, the mapping relationship is that each type of energy-consuming device in each room area has an independent mapping relationship in each specified time period.
[0035] Furthermore, for each room area, a collection cycle and a minimum unit time are set. The collection cycle is usually longer than the specified time period. For example, when the specified time period is usually 1 hour or half an hour, the collection cycle can be one day, and the minimum unit time is usually shorter than the specified time period. For example, it can be 1 minute or 5 minutes.
[0036] Determine the equipment operating status and actual energy consumption data of the energy-consuming equipment in the room area in each minimum unit time during the collection cycle. Still taking the above example as an example, that is, in a single room area, determine the operating status and actual energy consumption data of the energy-consuming equipment every minute of the day. Among them, if the operating status changes, the operating status of most of the time in the minimum unit time shall prevail. If there are multiple energy-consuming devices of the same type in a room area, the operating status of most of the energy-consuming devices shall prevail.
[0037] At this time, in chronological order, the current minimum unit time is used as the starting point of the specified time period, and the remaining minimum unit times are traversed in sequence until the next minimum unit time that meets the preset requirements is found, and the minimum time unit before the next minimum unit time is used as the end point of the specified time period to obtain a specified time period. For example, when the minimum unit time is 1 minute, 7:00:00 to 7:00:59 is used as the starting point of the specified time period, and the minimum unit times of 7:01:00 to 7:01:59, 7:02:00 to 7:02:59, etc. are traversed in sequence. Until the minimum unit time of 7:55:00 to 7:55:59 is found, which meets the preset requirements, the minimum time unit before it, that is, 7:54:00 to 7:54:59, is used as the end point of the specified time period. At this time, the specified time period is: 7:00:00 to 7:54:59.
[0038] Among them, the preset requirements include: the time interval between the next minimum unit time and the current minimum unit time is higher than the preset minimum time interval (for example, the minimum time interval can be half an hour, which is used to delete particularly fast time periods to prevent noise), and the difference in actual energy consumption data is higher than the preset minimum difference.
[0039] At this time, the actual energy consumption data in each minimum unit time can be made basically consistent in the obtained designated time period, that is, the actual energy consumption data in the entire designated time period remains basically stable.
[0040] By maintaining the stability of the actual energy consumption data, compared to the situation where the actual energy consumption data changes significantly within a period of time, it can more clearly understand the impact of the actual energy consumption data on the actual environmental data, and more confidently infer the mapping relationship between the two.
[0041] Of course, the division method of the designated time period obtained through only one collection cycle may not be universal. Therefore, the division method of the designated time period corresponding to multiple collection cycles can be used to obtain the final division method of the designated time period, which can indicate the impact of this type of energy-consuming equipment on the actual environmental data in the room area during each time period when the actual energy consumption data is relatively stable.
[0042] Furthermore, when there are multiple collection cycles (for example, the collection cycle is one day, and the division methods of the specified time periods of multiple days are obtained), the division methods of the specified time periods corresponding to the multiple collection cycles can be obtained.
[0043] At this time, for each division method, it is rounded; wherein, rounding means modifying the starting time or ending time of the specified time period in the division method to the nearest hour or half hour. For example, a specified time period is: 7:00:00-7:54:59, then after rounding, it becomes: the specified time period is: 7:00:00-7:59:59, wherein, for the convenience of representation, the end point is set to the second before the hour or half hour. Of course, the minimum time interval mentioned above is usually set to more than half an hour to prevent the time period from being repeated or disappearing after rounding.
[0044] The partitioning method after rounding is regarded as an item set, and each specified time period in the partitioning method is regarded as an item in the item set. The support of each item set is calculated, and the minimum support threshold is set.
[0045] Among them, support refers to the ratio of the number of times a certain item set is included to the total number of times. Here, support indicates the frequency of an item set (i.e. a certain partitioning method) appearing in multiple partitioning results. If a partitioning method often appears in multiple partitionings, then its support is higher. The minimum support threshold is to determine which partitioning methods are frequent, and a minimum support threshold needs to be set. Only partitioning methods with support not lower than this threshold are considered frequent.
[0046] At this time, a frequent item set is searched in the item set based on a data mining algorithm based on frequent patterns (e.g., Apriori algorithm or FP-Growth algorithm). The appearance of frequent item sets indicates that this type of division method often appears in the room area of the control target for this type of energy consumption equipment. Therefore, the division method corresponding to the frequent item set with the highest support is taken as the division method that best adapts to the current scenario, and thus is used as the final division method for the specified time period.
[0047] S104: Based on the mapping relationship, modify the currently set target environment data to reduce the actual energy consumption data required to achieve the target environment data.
[0048] Specifically, based on the mapping relationship, the actual energy consumption data required for each fixed degree of change in the actual environmental data in the specified time period corresponding to the mapping relationship is determined. For example, when the actual environmental data is temperature data, the actual energy consumption data required for each fixed degree of change (for example, 0.1 degrees) can be determined. Generally speaking, for the change of the actual environmental data, when it just starts to change, the actual energy consumption data required for each fixed degree of change is relatively low. When the actual environmental data reaches a certain level, if the energy-consuming device wants to continue to change the actual environmental data, it needs to use higher power, which is likely to result in higher actual energy consumption data.
[0049] Based on this, if in the process of reaching the target environment data from the current actual environment data, there are actual energy consumption data corresponding to more than a preset number of fixed-degree changes, and all of them are higher than the preset energy consumption data (that is, when the actual energy consumption data required for multiple fixed-degree changes are all high), it is considered that the user has excessive demands, and the target environment data is adjusted to the current actual environment data until the number of actual energy consumption data higher than the preset energy consumption data is lower than the preset number, or the adjusted fixed-degree value exceeds the preset threshold, so as to prevent too many modifications to the target environment data set by the user.
[0050] Based on the set mapping relationship, the relationship between the changes in actual energy consumption data and actual environmental data can be obtained, so that the change in actual environmental data can be obtained, and how much actual energy consumption data is required, so as to determine whether it is necessary to change the target environmental data set by the user based on the actual energy consumption data, thereby reducing the actual energy consumption data, preventing energy waste caused by excessive user demand, and achieving energy-saving effects.
[0051] like Figure 2 As shown, the embodiment of the present application also provides an energy-saving control device based on digital twin and intelligent agent technology, including:
[0052] at least one processor; and,
[0053] a memory communicatively connected to the at least one processor; wherein,
[0054] The memory stores instructions that can be executed by the at least one processor, and the instructions are executed by the at least one processor so that the at least one processor can execute the energy-saving management and control method based on digital twin and intelligent agent technology as described in any of the above embodiments.
[0055] An embodiment of the present application also provides a non-volatile computer storage medium storing computer executable instructions, wherein the computer executable instructions are configured to be: an energy-saving control method based on digital twin and intelligent agent technology as described in any of the above embodiments.
[0056] Each embodiment in this application is described in a progressive manner, and the same or similar parts between the embodiments can be referred to each other, and each embodiment focuses on the differences from other embodiments. In particular, for the device and medium embodiments, since they are basically similar to the method embodiments, the description is relatively simple, and the relevant parts can be referred to the partial description of the method embodiments.
[0057] The devices and media provided in the embodiments of the present application correspond one-to-one to the methods. Therefore, the devices and media also have similar beneficial technical effects as the corresponding methods. Since the beneficial technical effects of the methods have been described in detail above, the beneficial technical effects of the devices and media will not be repeated here.
[0058] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented in one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that include computer-usable program code.
[0059] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1A device that provides the functions specified in a block or multiple blocks.
[0060] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0061] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 A step that specifies a function in one or more boxes.
[0062] In a typical configuration, a computing device includes one or more processors (CPU), input / output interfaces, network interfaces, and memory.
[0063] The memory may include non-permanent storage in a computer-readable medium, random access memory (RAM) and / or non-volatile memory in the form of read-only memory (ROM) or flash RAM. The memory is an example of a computer-readable medium.
[0064] Computer readable media include permanent and non-permanent, removable and non-removable media that can be implemented by any method or technology to store information. Information can be computer readable instructions, data structures, program modules or other data. Examples of computer storage media include, but are not limited to, phase change memory (PRAM), static random access memory (SRAM), dynamic random access memory (DRAM), other types of random access memory (RAM), read-only memory (ROM), electrically erasable programmable read-only memory (EEPROM), flash memory or other memory technology, compact disk read-only memory (CD-ROM), digital versatile disk (DVD) or other optical storage, magnetic cassettes, magnetic tape magnetic disk storage or other magnetic storage devices or any other non-transmission media that can be used to store information that can be accessed by a computing device. As defined herein, computer readable media does not include temporary computer readable media (transitory media), such as modulated data signals and carrier waves.
[0065] It should also be noted that the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, commodity or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, commodity or device. In the absence of more restrictions, the elements defined by the sentence "comprises a ..." do not exclude the existence of other identical elements in the process, method, commodity or device including the elements.
[0066] The above is only an embodiment of the present application and is not intended to limit the present application. For those skilled in the art, the present application may have various changes and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application should be included in the scope of the claims of the present application.
Claims
1. An energy-saving management and control method based on digital twin and intelligent agent technology, characterized in that: include: Determine the control target and the related equipment installed in the control target, and perform entity 3D modeling to obtain a three-dimensional model including the control target and the related equipment; wherein the related equipment includes: energy consumption monitoring equipment and environmental monitoring equipment; For the relevant equipment, the relevant data corresponding to the relevant equipment is collected in real time based on the Internet of Things, and the relevant equipment in the three-dimensional model is simulated according to the relevant data; wherein the relevant data includes: the actual energy consumption data corresponding to the energy consumption monitoring equipment and the actual environment data corresponding to the environment monitoring equipment; Performing data analysis on the relevant data to obtain a mapping relationship between changes in the actual energy consumption data and the actual environmental data within a specified time period; Based on the mapping relationship, the currently set target environment data is modified to reduce the actual energy consumption data required to achieve the target environment data.
2. The method according to claim 1, characterized in that The related equipment also includes: energy consumption equipment, and the related data also includes: equipment operation status corresponding to the energy consumption equipment; Before performing data analysis on the relevant data, the method further includes: Performing area division according to the three-dimensional model to obtain a plurality of room areas; wherein each room area can be isolated from other room areas; For each type of energy-consuming device in each of the room areas, a mapping relationship is set within each specified time period.
3. The method according to claim 2, characterized in that The method further comprises: For each room area, a collection cycle and a minimum unit time are set, and the device operation status and actual energy consumption data of the energy-consuming devices in the room area are determined in each minimum unit time within the collection cycle; In chronological order, the current minimum unit time is taken as the starting point of the specified time period, and the remaining minimum unit times are traversed in sequence until the next minimum unit time that meets the preset requirements is found, and the minimum time unit before the next minimum unit time is taken as the end point of the specified time period to obtain a specified time period; wherein the preset requirements include: the time interval between the next minimum unit time and the current minimum unit time is higher than the preset minimum time interval, and the difference between the actual energy consumption data is higher than the preset minimum difference; The final division method of the designated time period is obtained according to the division methods of the designated time period respectively corresponding to the plurality of acquisition cycles.
4. The method according to claim 3, characterized in that The final division method of the designated time period is obtained according to the division methods of the designated time period respectively corresponding to the plurality of acquisition cycles, specifically including: Obtaining a division method of the specified time periods respectively corresponding to the plurality of acquisition cycles; For each division method, rounding is performed; wherein the rounding refers to modifying the starting time or the ending time of the specified time period in the division method to the nearest hour or half hour; The partitioning method after rounding is regarded as an item set, and each specified time period in the partitioning method is regarded as an item in the item set; Calculate the support of each item set and set the minimum support threshold; Based on the frequent pattern data mining algorithm, searching for frequent item sets in the item set; The division method corresponding to the frequent item set with the highest support is used as the final division method for the specified time period.
5. The method according to claim 2, characterized in that: Based on the mapping relationship, the currently set target environment data is modified, specifically including: Based on the mapping relationship, determining the actual energy consumption data required for each fixed degree of change in the actual environmental data during a specified time period corresponding to the mapping relationship; If, in the process of reaching the target environmental data from the current actual environmental data, there are actual energy consumption data corresponding to changes of a fixed degree exceeding a preset number, and all of them are higher than the preset energy consumption data, the target environmental data will be adjusted toward the current actual environmental data until the number of actual energy consumption data higher than the preset energy consumption data is lower than the preset number, or the value of the adjusted fixed degree exceeds a preset threshold.
6. The method according to claim 1, characterized in that Before performing data analysis on the relevant data, the method further includes: Performing data preprocessing on the relevant data, wherein the data preprocessing includes: data cleaning, data conversion, and data standardization; Wherein, for the actual environment data, the data preprocessing also includes: data discretization processing.
7. The method according to claim 1, characterized in that Perform entity 3D modeling to obtain a three-dimensional model containing the control target and the related equipment, specifically including: Obtaining relevant drawings of the control target, wherein the relevant drawings include: at least one of a plan view, an elevation view, a cross-sectional view, and a structural view; 3D modeling is performed through modeling software, and the basic framework and details are optimized to obtain a three-dimensional model, and the material, texture, and lighting of the three-dimensional model are set.
8. The method according to claim 1, characterized in that If the control target is a building to be controlled, then perform entity 3D modeling according to the control target to obtain a corresponding three-dimensional model; If the control target is an area to be controlled, then for each building to be controlled in the area to be controlled, physical 3D modeling is performed to obtain a corresponding three-dimensional model.
9. An energy-saving control device based on digital twin and intelligent agent technology, characterized in that: include: at least one processor; as well as, a memory communicatively connected to the at least one processor; wherein, The memory stores instructions that can be executed by the at least one processor, and the instructions are executed by the at least one processor so that the at least one processor can execute the energy-saving management and control method based on digital twin and intelligent agent technology as described in any one of claims 1 to 8.
10. A non-volatile computer storage medium storing computer executable instructions, characterized in that: The computer executable instructions are set to: the energy-saving management and control method based on digital twin and intelligent agent technology as described in any one of claims 1 to 8.
