Urban power grid load management optimization method for coping with extreme high temperature weather

By building incentive and price-oriented demand response models, combined with the orderly power consumption strategies of industry and commerce, a two-stage robust optimization model is formed, which solves the problems of insufficient demand response and low prediction accuracy of traditional grid load management systems in extreme high temperature weather, and improves the The stability and coping ability of the power grid.

CN118982158APending Publication Date: 2024-11-19SICHUAN UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410819364.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-24
Publication Date
2024-11-19

AI Technical Summary

Technical Problem

Traditional grid load management systems have insufficient demand response mechanisms, low load prediction accuracy, lack of incentive measures and insufficient ability to deal with uncertainty in extreme high temperature weather, resulting in the power grid facing power supply pressure and operation uncertainty during peak load periods.

Method used

Build an incentive demand response model, a price demand response model and an orderly power consumption model of industrial and commercial air conditioning load, form a load management system based on a two-stage robust optimization model, and optimize the grid load through incentive measures and flexible demand response strategies. Scheduling.

Benefits of technology

It significantly improves the flexibility and effectiveness of the demand response mechanism, improves load prediction accuracy, improves incentive measures and orderly power consumption strategies, enhances the stability and reliability of the power grid in extreme high temperature weather, and reduces supply and demand contradictions and Operational risk.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118982158A_ABST
    Figure CN118982158A_ABST
Patent Text Reader

Abstract

The invention discloses an urban power grid load management optimization method for coping with extreme high-temperature weather, and relates to the technical field of power grid load management. Comprising the steps that excitation type demand response modeling of resident air conditioner loads is carried out based on the excitation type demand response cost of resident nodes, response constraints and resident air conditioner load reduction potential under differentiated demand response willingness; various types of users are guided to autonomously adjust power demands through price signals, and node loads under time-of-use electricity prices are obtained; constructing time interval peak shifting, peak shifting and valley filling and time interval peak avoiding orderly power utilization measures, and calculating the load variation of the industrial and commercial users after orderly power utilization; carrying out demand response uncertainty modeling; and constructing a power and electric quantity double-shortage power grid load management two-stage robust optimization model, and obtaining power grid load scheduling strategies in different power supply shortage scenes. The power supply challenge caused by extremely high temperature weather can be effectively handled, the energy utilization efficiency is improved, and the reliability and stability of power grid operation are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of power grid load management, and in particular to a method for optimizing urban power grid load management in response to extreme high temperature weather. Background Art

[0002] With the acceleration of urbanization and economic development, the load of urban power grids is increasing. Especially in extremely hot weather, the demand for electricity from residents and industrial and commercial users has surged, bringing huge challenges to the stable operation of the power grid. The traditional power grid load management system mainly relies on fixed electricity price policies and simple load forecasting models, which have the following major technical defects:

[0003] Insufficient demand response mechanism: Traditional power grid load management systems have limited use of demand response mechanisms and lack flexible demand-side management methods. They mainly rely on fixed electricity prices and mandatory power restrictions, which cannot fully mobilize users' enthusiasm for participating in load regulation, resulting in power supply pressure on the power grid during peak load periods.

[0004] Low load forecasting accuracy: The load forecasting models of existing systems are often relatively simple and lack accurate predictions of load fluctuations under extreme weather conditions, resulting in the inability of dispatching strategies to respond to actual demand changes in a timely and effective manner, increasing the uncertainty and risk of power grid operation.

[0005] Lack of incentives: The current load management system lacks effective incentives to guide residential and commercial users to participate in demand response. Users lack a clear understanding of the costs and benefits of participating in demand response, making it difficult to form an effective demand-side response mechanism.

[0006] Imperfect orderly electricity consumption measures: Industrial and commercial users usually need to take orderly electricity consumption measures in extremely hot weather, but the existing system lacks a scientific and reasonable measure model, resulting in unsatisfactory implementation effects of peak shifting, peak shifting and valley filling, and peak avoidance, and unable to achieve the expected load peak shaving and valley filling effect.

[0007] Insufficient ability to cope with uncertainty: Traditional power grid load management systems lack effective response measures and robust optimization strategies when faced with uncertainty in demand response and fluctuations in the electricity market, resulting in low robustness and reliability of load scheduling strategies. Summary of the invention

[0008] In view of the above-mentioned technical defects, the present invention proposes a method for optimizing load management of urban power grids in response to extreme high temperature weather. By constructing an incentive-type demand response model for residential air-conditioning load, a price-type demand response model, an industrial and commercial orderly power consumption model, and a demand response uncertainty model, a load management system based on a two-stage robust optimization model is formed. This method can significantly improve the flexibility and effectiveness of the demand response mechanism, enhance the accuracy of load forecasting, improve incentive measures, optimize the orderly power consumption strategy, and enhance the ability to cope with uncertainty, thereby achieving safe and stable operation of the power grid in extremely high temperature weather.

[0009] The technical solution adopted by the present invention is as follows:

[0010] The present invention provides a method for optimizing urban power grid load management in response to extreme high temperature weather, comprising the following steps:

[0011] S1: Construct an incentive demand response model for residential air conditioning load, including incentive demand response cost, incentive demand response capacity constraint and incentive demand response time constraint;

[0012] S2: Construct a price-based demand response model based on the original electricity price, electricity price change, electricity price self-elasticity coefficient and electricity price mutual elasticity coefficient;

[0013] S3: Construct an orderly electricity consumption model for industry and commerce, including a model for orderly electricity consumption measures during peak-shifting periods, a model for orderly electricity consumption measures during peak-shifting and valley-filling periods, and a model for orderly electricity consumption measures during peak-avoidance periods. The model for orderly electricity consumption measures during peak-shifting periods includes constraints on peak-shifting costs and peak-shifting hours. The model for orderly electricity consumption measures during peak-shifting and valley-filling periods includes constraints on the cost of shifting peaks and the number of categories of shifting peaks and valley-filling schemes. The model for orderly electricity consumption measures during peak-avoidance periods includes constraints on the cost of peak-avoidance periods and the number of peak-avoidance levels.

[0014] S4: Demand response uncertainty modeling is performed based on the deviation level of price-based demand response, the deviation level of the responsive capacity of each gear of incentive-based demand response, and the load after the uncertainty of price-based demand response;

[0015] S5: Based on the incentive-based demand response model of residential air-conditioning load, the price-based demand response model, the orderly industrial and commercial electricity consumption model and the demand response uncertainty model, a two-stage robust optimization model of power grid load management under extreme high temperature weather with both electricity and power shortage is constructed. Based on the two-stage robust optimization model of power grid load management, the power grid load dispatching strategy under extreme high temperature weather with both electricity and power shortage is obtained. The two stages are the real-time dispatching stage and the day-ahead dispatching stage respectively.

[0016] As a further description of the above technical solution: the calculation formula of the incentive demand response cost is:

[0017]

[0018] Among them, N K The total number of residents’ air conditioning preference types, N D is the total number of tiered compensation price levels, is the compensation price for the first tier of incentive-based demand response, is the air conditioning response of the k-th user in the incentive demand response at the l-th level.

[0019] As a further description of the above technical solution: the response constraint includes a response capacity constraint and a response time constraint;

[0020] The capacity constraint of incentive-based demand response is:

[0021]

[0022] The time constraint of incentive demand response is:

[0023]

[0024] in, is the calling state of the k-th user in the incentive-type demand response of the l-th level; is the upper limit of the response capacity of the first gear incentive demand response of the kth user, which is related to the adjustment range of the temperature setting value of this gear; T l AC ,max It is the upper limit of the cumulative response time of the first-tier incentive demand response within the scheduling cycle.

[0025] As a further description of the above technical solution: the price-based demand response model is:

[0026]

[0027] Among them, P i,t and are the node loads before and after price-based demand response, respectively; ε uu and ε uv They are the self-elasticity coefficient of electricity price and the mutual elasticity coefficient of electricity price, which represent the sensitivity of load to electricity price and are described as P u and are the original node load and load change in time period u respectively; π v and are the original electricity price and the change in electricity price in time period v, respectively. As a further description of the above technical solution: Assume that the tolerable peak-shifting hours of industrial and commercial user i are Then the peak shifting cost F i stag The specific formula is:

[0028]

[0029] Among them, N T is the total number of scheduling periods; h i The number of hours for staggered time periods; To implement h i The loss coefficient of hourly peak shifting; P i,t and They are respectively the active power of users before and after the implementation of peak shifting;

[0030] The number of hours for staggered peak hours is constrained as follows:

[0031] Assume that the total number of peak shifting and valley filling solutions for industrial and commercial user i is The cost of shifting peaks and filling valleys is F i shift The specific formula is:

[0032]

[0033] Among them, b i is the number of peak shifting and valley filling scheme categories; To implement the peak shifting and valley filling plan b i The loss coefficient of Peak shifting and valley filling solution b i The change in active power generated during period t;

[0034] The number of categories of the peak shifting and valley filling scheme is constrained as follows:

[0035] Assume that the maximum peak avoidance level of industrial and commercial user i is r i max , then the peak avoidance cost F i clip The specific formula is:

[0036]

[0037] Among them, r i is the peak avoidance level of the time period; π clip The loss coefficient for implementing the peak avoidance level in a unit period; is the change in active power generated by the peak avoidance level in unit period during period t;

[0038] The peak avoidance level of the time period is constrained to be 0≤r i ≤r i max .

[0039] As a further description of the above technical solution: Each industrial and commercial user can only adopt one orderly power consumption measure during the dispatch cycle. The specific formula is:

[0040] 0≤min(1,|h i |)+min(1,b i )+min(1,r i )≤1

[0041] Among them, h i When it is 0, it means that the user does not take measures to use electricity in an orderly manner during peak hours. i When it is 0, it means that the user does not take the measures of peak shifting and valley filling orderly electricity consumption. i When it is 0, it means that the user does not take measures to avoid peak hours and use electricity in an orderly manner;

[0042] Active load change of industrial and commercial users after orderly power consumption The specific formula is:

[0043]

[0044] As a further description of the above technical solution:

[0045] Price-based demand response deviation level The specific formula is:

[0046]

[0047] Among them, α is the error level parameter; and They are the starting value, inflection point value and saturation value of electricity price change respectively;

[0048] Each gear of incentive-based demand response can respond to capacity deviation levels The specific formula is:

[0049]

[0050] in, and are the proportional coefficients for calculating the incentive-based demand response deviation; d AC,max The maximum deviation level of residential air conditioning demand response; and They are the starting value, inflection point value and saturation value of the incentive compensation price respectively;

[0051] Load after price-based demand response uncertainty The specific formula is:

[0052]

[0053] As a further description of the above technical solution: In step S5, the method of constructing a two-stage robust optimization model for power grid load management with dual shortage of power and electricity under extreme high temperature weather specifically includes:

[0054] The objective function of constructing the two-stage robust optimization model for power grid load management is:

[0055]

[0056] Among them, F da (·) and F rt (·) are the cost functions of the day-ahead stage and the real-time stage respectively; x and y are the optimization variables of the day-ahead scheduling stage and the real-time scheduling stage respectively; u is an uncertain variable; X, U and Ω(x, u) are the feasible domains of x, u and y respectively;

[0057] The box uncertainty set is used to characterize the uncertainty of demand response, distributed wind power output and distributed photovoltaic output. The specific formula is:

[0058]

[0059] in, and are the power values ​​before and after considering uncertainty, include Distributed wind power output forecast and distributed photovoltaic output forecast include Distributed wind power output and distributed photovoltaic output and are the maximum values ​​of downward and upward power fluctuations, respectively; and It is a 0-1 binary variable introduced after considering the uncertainty, which is used as a sign of whether the power fluctuation value reaches the lower or upper bound of the interval; Γ uct A time uncertainty budget is used to control the conservatism of robust uncertainty;

[0060] The specific formula of the objective function of the design model for the day-ahead scheduling phase is:

[0061]

[0062] Among them, N B is the total number of urban power grid nodes; and They are the day-ahead load shedding cost coefficient and active shedding power, respectively. The load shedding cost coefficient for residential users will be set to a higher value; The total cost of orderly electricity consumption is The constraints include residential air conditioning demand response constraints, industrial and commercial orderly power consumption constraints, day-ahead load shedding constraints, distributed wind power output constraints, distributed photovoltaic output constraints, mobile energy storage configuration constraints, and grid operation constraints;

[0063] The objective function of designing the real-time scheduling stage model is:

[0064]

[0065] in, is the residential air conditioning demand response cost after considering the uncertainty of actual response; and They are the real-time load shedding cost coefficient and the active load shedding power respectively. The cost coefficient of real-time load shedding will be much larger than the day-ahead load shedding. The constraints include residential air-conditioning demand response constraints, real-time load shedding constraints, distributed wind power output constraints, distributed photovoltaic output constraints and urban power grid operation constraints.

[0066] Compared with the prior art, the present invention has the following beneficial effects:

[0067] 1) By constructing an incentive-based demand response model for residential air-conditioning loads, a price-based demand response model, and an orderly power consumption model for industry and commerce, the power supply pressure of the power grid under extremely high temperature weather can be effectively alleviated, and the overall reliability and stability of the power grid can be improved.

[0068] 2) A two-stage robust optimization model is adopted, including the real-time scheduling stage and the day-ahead scheduling stage. It can optimize the dual shortage allocation of electric power according to the changes in power demand at different time nodes, improve resource utilization efficiency, and reduce the contradiction between supply and demand.

[0069] 3) Through demand response uncertainty modeling, the deviation level of price-based demand response, the deviation level of responsive capacity at each level of incentive-based demand response and its uncertainty are taken into consideration, which enables flexible response to uncertainties in actual operations in power load dispatching strategies and ensures safe operation of the power grid.

[0070] 4) The incentive-based demand response model and the price-based demand response model take into account the response cost and capacity constraints. Reasonable design of incentives and price adjustment strategies can reduce the user's participation cost and increase the user's enthusiasm for participating in demand response.

[0071] 5) The orderly industrial and commercial electricity consumption model can reasonably distribute the power load during peak hours through measures such as peak shifting, peak filling and peak avoidance, avoid overload of the power grid, and ensure the normal production and operation activities of industrial and commercial users.

[0072] 6) Based on the two-stage robust optimization model, make full use of the data and information of day-ahead dispatch and real-time dispatch to improve the scientificity and accuracy of power dispatch decisions, reduce the risk of power supply shortages, and ensure the safe and stable operation of the power system.

[0073] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the embodiments of the present invention are specifically cited below and described in detail with reference to the attached drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0074] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments are briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without creative work.

[0075] Figure 1 A flow chart of a method for optimizing urban power grid load management in response to extremely high temperature weather provided by the present invention.

[0076] Figure 2 1 is a schematic diagram of the topological structure of an urban power grid in a specific embodiment, in which nodes represent loads, edges represent lines, and dotted lines represent normally open interconnection lines.

[0077] Figure 3 The figure is a schematic diagram of orderly power consumption measures that can be implemented for industrial and commercial loads in a specific embodiment. The dotted lines represent time period peak avoidance measures, and the solid lines and dashed lines represent different peak shifting and valley filling schemes. Among them, sub-figure (1) indicates that industrial user 1 can perform time period peak avoidance throughout the day, with a value not exceeding 0.2 (per unit value); sub-figure (2) indicates that industrial user 2 can perform time period peak avoidance in the afternoon and peak shifting and valley filling in the afternoon, shifting the load to the early morning; sub-figure (3) indicates the orderly power consumption measures of industrial user 3, which are similar to those of industrial user 2; sub-figure (4) indicates that industrial user 4 only has the peak shifting and valley filling orderly power consumption measures; sub-figure (5) indicates that commercial users only have time period peak avoidance orderly power consumption measures.

[0078] Figure 4 1 is a load management optimization result (adjustment result) of an urban power grid under different situations of a specific embodiment, wherein sub-graph (1) is a load adjustment result that only considers the peak shifting and peak filling of industrial and commercial users; sub-graph (2) is a load adjustment result that considers the peak shifting, peak filling of industrial and commercial users and the peak avoidance of industrial and commercial users; sub-graph (3) is a load adjustment result that considers the incentive-based demand response of residential air conditioning, the peak shifting and peak filling of industrial and commercial users; sub-graph (4) is a load adjustment result that considers the incentive-based demand response of residential air conditioning, the price-based demand response of industrial, commercial and residential users, and the peak shifting and peak filling of industrial and commercial users. DETAILED DESCRIPTION

[0079] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments.

[0080] Please refer to Figure 1 The embodiment of the present invention discloses a method for optimizing urban power grid load management in response to extreme high temperature weather, which is as follows:

[0081] 1. Incentive demand response modeling of residential air conditioning load

[0082] In the present invention, for the incentive-type demand response of residents' air-conditioning load, the differences in comfort requirements of different residents are taken into consideration, a reasonable step compensation mechanism is formulated to encourage residents to adjust the air-conditioning temperature settings, and the potential for reducing residents' air-conditioning load under differentiated demand response intentions is clarified.

[0083] 1) Residential users’ air conditioning usage preferences are divided into comfort preference type and economic preference type.

[0084] Users with a comfort preference focus more on cooling needs in hot environments, and their air-conditioning temperature setting adjustable range is smaller; users with an economy preference usually have a higher heat tolerance, are willing to sacrifice comfort to a certain extent in exchange for economic benefits, and can accept a higher air-conditioning temperature setting adjustment.

[0085] 2) Consider all air conditioners in a single resident node as a whole and calculate the air conditioner cluster power of the resident node (Air conditioning response amount of incentive demand response), the specific formula is:

[0086]

[0087] Among them, N K Total number of residents’ preferred air conditioning types; is the total number of air conditioners for the kth user in resident node i; R is the equivalent thermal resistance of the room; η AC is the air conditioning energy efficiency ratio; is the outdoor temperature; is the air conditioning temperature setting value; E(·) is the mathematical expectation of the variable.

[0088] 3) Air conditioning incentive contracts provide tiered price compensation according to the air conditioning temperature setting adjustment amount, and calculate the incentive demand response cost The specific formula is:

[0089]

[0090] Among them, ND is the total number of tiered compensation price levels, is the compensation price for the first tier of incentive-based demand response, is the air conditioning response of the k-th user in the incentive demand response at the l-th level.

[0091] 4) The air conditioning demand response of residential users should not exceed the single-stage response capacity and response time limit agreed in the contract. Therefore, the response constraint formula model is designed as follows:

[0092] Response capacity constraint formula:

[0093] Response time constraint formula:

[0094] in, is the calling state of the k-th user in the incentive-type demand response of the l-th level; is the upper limit of the response capacity of the first gear incentive demand response of the kth user, which is related to the adjustment range of the temperature setting value of this gear; T l AC ,max It is the upper limit of the cumulative response time of the first-tier incentive demand response within the scheduling cycle.

[0095] 5) Design the total air conditioning response of the resident node It is the sum of the responses of each category of users. The specific formula is:

[0096]

[0097] 2. Price-based demand response modeling

[0098] In the present invention, price-based demand response is to guide various types of users to autonomously adjust their power demand through price signals to obtain node loads under time-of-use electricity prices, specifically:

[0099] The specific formula for designing node load under time-of-use electricity price (price-based demand response model) is:

[0100]

[0101] Among them, P i,t and are the node loads before and after price-based demand response, respectively; ε uu and ε uv They are the self-elasticity coefficient of electricity price and the mutual elasticity coefficient of electricity price, which represent the sensitivity of load to electricity price and are described as P u and are the original node load and load change in time period u respectively; π v and are the original electricity price and the change in electricity price in time period v respectively.

[0102] 3. Modeling of orderly electricity consumption in industry and commerce

[0103] In the present invention, the orderly electricity consumption model for industrial and commercial users includes three orderly electricity consumption measures, namely, peak shifting, peak shifting and valley filling, and peak avoidance orderly electricity consumption measures (such as Figure 3 ), calculate the load change of industrial and commercial users after orderly power consumption, as follows:

[0104] 1) Model of measures for staggered and orderly electricity consumption during time periods

[0105] Peak shifting is to avoid the peak period of grid load by advancing or postponing electricity consumption plans as a whole without causing electricity loss.

[0106] Assume that the tolerable peak hours for industrial and commercial user i are Then the peak shifting cost F i stag The specific formula is:

[0107] Assume that the tolerable peak hours for industrial and commercial user i are Then the peak shifting cost F i stag The specific formula is:

[0108]

[0109] Among them, N T is the total number of scheduling periods; h i The number of hours for staggered time periods; To implement h i The loss coefficient of hourly peak shifting; P i,t and They are respectively the active power of users before and after the implementation of peak shifting;

[0110] The number of hours for staggered peak hours is constrained as follows:

[0111] 2) Model of orderly power consumption measures for shifting peak loads and filling valleys

[0112] Peak shifting and valley filling refers to transferring the electricity load during peak hours to other periods, while the total load of the entire cycle remains unchanged.

[0113] Assume that the total number of peak shifting and valley filling solutions for industrial and commercial user i is The cost of shifting peaks and filling valleys is F i shift The specific formula is:

[0114]

[0115] Among them, bi is the number of peak shifting and valley filling scheme categories; To implement the peak shifting and valley filling plan b i The loss coefficient of Peak shifting and valley filling solution b i The change in active power generated during period t;

[0116] The number of categories of the peak shifting and valley filling scheme is constrained as follows:

[0117] 3) Model of measures for avoiding peak hours and orderly power consumption during certain periods of time

[0118] Peak load avoidance refers to irreparable load reduction during peak electricity demand periods. This measure not only helps alleviate power shortages during peak hours, but also reduces total load demand over a longer period of time.

[0119] Assume that the maximum peak avoidance level of industrial and commercial user i is r i max , then the peak avoidance cost F iclip The specific formula is:

[0120]

[0121] Among them, r i is the peak avoidance level of the time period; π clip The loss coefficient for implementing the peak avoidance level in a unit period; is the change in active power generated by the peak avoidance level in unit period during period t;

[0122] The peak avoidance level of the time period is constrained to be 0≤r i ≤r i max .

[0123] 4) Each industrial and commercial user can only adopt one orderly power consumption measure during the dispatch cycle. The specific formula is:

[0124] 0≤min(1,|h i |)+min(1,bi)+min(1,r i )≤1

[0125] Among them, h i When it is 0, it means that the user does not take measures to use electricity in an orderly manner during peak hours. i When it is 0, it means that the user does not take the measures of peak shifting and valley filling orderly electricity consumption. i When the value is 0, it means that the user does not take measures to avoid peak hours and use electricity in an orderly manner.

[0126] 5) Change in active load of industrial and commercial users after orderly power consumption The specific formula is:

[0127]

[0128] 4. Demand Response Uncertainty Modeling

[0129] In the present invention, demand response uncertainty modeling is based on the trend that the actual demand response deviation range "first increases, then decreases" with the electricity price difference or incentive compensation price, and a model is constructed for the price-type demand response deviation level and the responsive capacity deviation level of each gear of the incentive-type demand response.

[0130] 1) Design price-based demand response deviation level The specific formula is:

[0131]

[0132] Among them, α is the error level parameter; and They are the starting value, inflection point value and saturation value of electricity price change respectively.

[0133] 2) Design the capacity deviation level that can be responded to at each gear of the incentive-based demand response The specific formula is:

[0134]

[0135] in, and are the proportional coefficients for calculating the incentive-based demand response deviation; d AC,max The maximum deviation level of residential air conditioning demand response; and They are the starting value, inflection point value and saturation value of the incentive compensation price respectively.

[0136] 3) Calculate the load after considering the uncertainty of price-based demand response The specific formula is:

[0137]

[0138] Calculate the upper limit of the response capacity of the first tier after considering the uncertainty of incentive-based demand response The specific formula is:

[0139]

[0140] 5. Construct a robust optimization model for power grid load management and obtain power grid load dispatching strategies under different power supply shortage scenarios.

[0141] In the present invention, the robust optimization model of power grid load management takes into account the uncertainty of demand response and renewable energy output, and introduces power grid reconstruction strategies and mobile energy storage emergency dispatch measures to establish a two-stage robust optimization model for power grid load management with dual shortages of electricity and power under extreme high temperature weather, thereby obtaining power grid load dispatch strategies under different power supply shortage scenarios.

[0142] 1) Considering the uncertainty of demand response and renewable energy output, a two-stage robust optimization model for power grid load management is established with the objective function of minimizing the comprehensive load loss including the residential air-conditioning demand response cost, the industrial and commercial orderly electricity consumption cost and the load removal cost. The first stage is the day-ahead scheduling stage, which adopts the deterministic scheduling method to determine the day-ahead optimal decision and transfers the decision result to the second stage, which is the real-time scheduling stage, aiming to minimize the comprehensive load loss of the power grid under the worst uncertainty scenario.

[0143] The specific formula of the objective function of the robust optimization model of power grid load management is:

[0144]

[0145] Among them, F da (·) and F rt (·) are the cost functions of the day-ahead stage and the real-time stage respectively; x and y are the optimization variables of the day-ahead scheduling stage and the real-time scheduling stage respectively; u is an uncertain variable; X, U and Ω(x, u) are the feasible domains of x, u and y respectively.

[0146] 2) The box-type uncertainty set is used to characterize the uncertainty of demand response, distributed wind power output and distributed photovoltaic output. The specific formula is:

[0147]

[0148]

[0149] in, and are the power values ​​before and after considering uncertainty, include Distributed wind power output forecast and distributed photovoltaic output forecast include Distributed wind power output and distributed photovoltaic output and are the maximum values ​​of downward and upward power fluctuations, respectively; and It is a 0-1 binary variable introduced after considering the uncertainty, which is used as a sign of whether the power fluctuation value reaches the lower or upper bound of the interval; Γ uct It is the time uncertainty budget used to control the conservatism of robust uncertainty.

[0150] 3) The specific formula of the objective function of the day-ahead scheduling model is:

[0151]

[0152] Among them, N B is the total number of urban power grid nodes; and They are the day-ahead load shedding cost coefficient and active shedding power respectively. The load shedding cost coefficient for residential users will be set to a higher value. The total cost of orderly electricity consumption is The constraints include residential air conditioning demand response constraints, industrial and commercial orderly power consumption constraints, day-ahead load shedding constraints, distributed wind power output constraints, distributed photovoltaic output constraints, mobile energy storage configuration constraints and grid operation constraints. Day-ahead load shedding will have a severe negative impact on social production and life and is regarded as the last resort. The specific formula is:

[0153]

[0154] The specific formulas for distributed wind power output constraints and distributed photovoltaic output constraints are:

[0155] and

[0156] 4) The specific formula of the objective function of the real-time scheduling stage model is:

[0157]

[0158] in, is the residential air conditioning demand response cost after considering the uncertainty of actual response; and are the real-time load shedding cost coefficient and the active shedding power, respectively. The cost coefficient of real-time load shedding will be much greater than the day-ahead load shedding. The constraints include residential air conditioning demand response constraints, real-time load shedding constraints, distributed wind power output constraints, distributed photovoltaic output constraints, and urban power grid operation constraints.

[0159] The specific formula for the residential air conditioning demand response constraint in the real-time stage is:

[0160]

[0161] The specific formula of real-time load shedding constraint is:

[0162]

[0163] The specific formulas for the distributed wind power output constraint and distributed photovoltaic output constraint in the real-time stage are:

[0164] and

[0165] 5) According to the input power shortage data of the power grid, the robust optimization model of load management is solved to obtain the power grid load dispatching strategy under the dual shortage of power and electricity in extreme high temperature weather.

[0166] After the above-mentioned specific implementation steps, the optimization of urban power grid load management in response to extreme high temperature weather can be completed.

[0167] Figure 2 1 is a schematic diagram of the topological structure of an urban power grid in a specific embodiment, in which nodes represent loads, edges represent lines, and dotted lines represent normally open interconnection lines.

[0168] Figure 3 for Figure 2 The orderly power consumption measures that can be implemented by industrial and commercial loads in the embodiment shown in the figure are as follows: Figure 3 In the sub-graph (1), peak load avoidance can be implemented throughout the day, and the magnitude does not exceed 0.2 (unit value); the orderly power consumption measures that industrial user 2 can implement are as follows: Figure 3 As shown in sub-figure (2) in , it can implement peak avoidance in the afternoon and peak shifting and valley filling in the afternoon, shifting the load to the early morning; the orderly power consumption measures that industrial user 3 can implement are as follows: Figure 3 As shown in sub-figure (3) in , it is similar to industrial user 2; the orderly electricity consumption measures that industrial user 4 can implement are as follows Figure 3 As shown in sub-figure (4) in the figure, there is only the orderly electricity consumption measure of shifting peak loads and filling valley loads; the orderly electricity consumption measures that commercial users can implement are as follows Figure 3 As shown in sub-figure (5) in , there are only measures to avoid peak hours and use electricity in an orderly manner during certain periods of time.

[0169] right Figure 2 The specific embodiment shown considers the following four situations:

[0170] 1) Only consider the peak-shifting and valley-filling measures for industrial and commercial users;

[0171] 2) Consider the time shifting, peak filling and time avoidance measures for industrial and commercial users;

[0172] 3) Based on Option 2, add incentive demand response for residential air conditioning;

[0173] 4) Based on Scheme 3, add price-based demand response for industrial, commercial and residential users.

[0174] In this embodiment, the method of the present invention is used to obtain the optimization result of urban power grid load management. Figure 4 As shown, Figure 4 Sub-graph (1) in the figure corresponds to situation 1, which only considers the peak-time shifting and peak-to-valley shifting of industrial and commercial users. Part of the load during the peak electricity consumption period in the afternoon is transferred to the low electricity consumption period in the early morning. However, due to insufficient power supply, power outages are still required in the afternoon. Figure 4 Sub-diagram (2) in the figure corresponds to situation 2. Since the peak avoidance measures are added during the period, the passive shedding of load is avoided. Figure 4 Sub-figure (3) in the figure corresponds to situation 3. Due to the increase of incentive demand response for residential air conditioning, the peak shifting, peak filling and peak avoidance of industrial and commercial users are reduced, thus reducing economic losses. Figure 4 Sub-figure (4) in the figure corresponds to situation 4. Price-based demand response reduces electricity consumption during peak hours and further reduces peak-shifting, peak-filling and peak-avoidance for industrial and commercial users.

[0175] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A method for optimizing urban power grid load management in response to extreme high temperature weather, characterized in that: The following steps are involved: S1: Construct an incentive demand response model for residential air conditioning load, including incentive demand response cost, incentive demand response capacity constraint and incentive demand response time constraint; S2: Construct a price-based demand response model based on the original electricity price, electricity price change, electricity price self-elasticity coefficient and electricity price mutual elasticity coefficient; S3: Construct an orderly electricity consumption model for industry and commerce, including a model for orderly electricity consumption measures during peak-shifting periods, a model for orderly electricity consumption measures during peak-shifting and valley-filling periods, and a model for orderly electricity consumption measures during peak-avoidance periods. The model for orderly electricity consumption measures during peak-shifting periods includes constraints on peak-shifting costs and peak-shifting hours. The model for orderly electricity consumption measures during peak-shifting and valley-filling periods includes constraints on the cost of shifting peaks and the number of categories of shifting peaks and valley-filling schemes. The model for orderly electricity consumption measures during peak-avoidance periods includes constraints on the cost of peak-avoidance periods and the number of peak-avoidance levels. S4: Demand response uncertainty modeling is performed based on the deviation level of price-based demand response, the deviation level of the responsive capacity of each gear of incentive-based demand response, and the load after the uncertainty of price-based demand response; S5: Based on the incentive-based demand response model of residential air-conditioning load, the price-based demand response model, the orderly industrial and commercial electricity consumption model and the demand response uncertainty model, a two-stage robust optimization model of power grid load management under extreme high temperature weather with both electricity and power shortage is constructed. Based on the two-stage robust optimization model of power grid load management, the power grid load dispatching strategy under extreme high temperature weather with both electricity and power shortage is obtained. The two stages are the real-time dispatching stage and the day-ahead dispatching stage respectively.

2. The method for optimizing urban power grid load management in response to extreme high temperature weather according to claim 1 is characterized in that: The cost of incentive-based demand response is: Among them, N K The total number of residents’ air conditioning preference types, N D is the total number of tiered compensation price levels, is the compensation price for the first tier of incentive-based demand response, is the air conditioning response of the k-th user in the incentive demand response at the l-th level.

3. The method for optimizing urban power grid load management in response to extreme high temperature weather according to claim 2 is characterized in that: The capacity constraint of incentive-based demand response is: The time constraint of incentive demand response is: in, is the calling state of the k-th user in the incentive-type demand response of the l-th level; is the upper limit of the response capacity of the first gear incentive demand response of the kth user, which is related to the adjustment range of the temperature setting value of this gear; T l AC,max It is the upper limit of the cumulative response time of the first-tier incentive demand response within the scheduling cycle.

4. The method for optimizing urban power grid load management in response to extreme high temperature weather according to claim 3 is characterized in that: The price-based demand response model is: Among them, P i,t and are the node loads before and after price-based demand response, respectively; ε uu and ε uv They are the self-elasticity coefficient of electricity price and the mutual elasticity coefficient of electricity price, which represent the sensitivity of load to electricity price and are described as P u and are the original node load and load change in time period u respectively; π v and are the original electricity price and the change in electricity price in time period v respectively.

5. The method for optimizing urban power grid load management in response to extreme high temperature weather according to claim 4 is characterized in that: Assume that the tolerable peak hours for industrial and commercial user i are Then the peak shifting cost F i stag The specific formula is: Among them, N T is the total number of scheduling periods; h i The number of hours for staggered time periods; To implement h i The loss coefficient of hourly peak shifting; P i,t and They are respectively the active power of users before and after the implementation of peak shifting; The number of hours for staggered peak hours is constrained as follows: Assume that the total number of peak shifting and valley filling solutions for industrial and commercial user i is The cost of shifting peaks and filling valleys is F i shift The specific formula is: Among them, b i is the number of peak shifting and valley filling scheme categories; To implement the peak shifting and valley filling plan b i The loss coefficient of Peak shifting and valley filling solution b i The change in active power generated during period t; The number of categories of the peak shifting and valley filling scheme is constrained as follows: Assume that the maximum peak avoidance level of industrial and commercial user i is r i max , then the peak avoidance cost F i clip The specific formula is: Among them, r i is the peak avoidance level during the time period; π clip The loss coefficient for implementing the peak avoidance level in a unit period; is the change in active power generated by the peak avoidance level in unit period during period t; The peak avoidance level of the time period is constrained to be 0≤r i ≤r i max .

6. The method for optimizing urban power grid load management in response to extreme high temperature weather according to claim 5 is characterized in that: Each industrial and commercial user can only adopt one orderly power consumption measure during the dispatch cycle. The specific formula is: 0≤min(1,|h i |)+min(1,b i )+min(1,r i )≤1 Among them, h i When it is 0, it means that the user does not take measures to use electricity in an orderly manner during peak hours. i When it is 0, it means that the user does not take the measures of peak shifting and valley filling orderly electricity consumption. i When it is 0, it means that the user does not take measures to avoid peak hours and use electricity in an orderly manner; Active load change of industrial and commercial users after orderly power consumption The specific formula is:

7. The method for optimizing urban power grid load management in response to extreme high temperature weather according to claim 6 is characterized in that: Price-based demand response deviation level The specific formula is: Among them, α is the error level parameter; and They are the starting value, inflection point value and saturation value of electricity price change respectively; Each gear of incentive-based demand response can respond to capacity deviation levels The specific formula is: in, and are the proportional coefficients for calculating the incentive-based demand response deviation; d AC,max The maximum deviation level of residential air conditioning demand response; and They are the starting value, inflection point value and saturation value of the incentive compensation price respectively; Load after price-based demand response uncertainty The specific formula is:

8. The method for optimizing urban power grid load management in response to extreme high temperature weather according to claim 7 is characterized in that: In step S5, the method for constructing a two-stage robust optimization model for power grid load management with dual shortage of power and electricity under extreme high temperature weather specifically includes: The objective function of constructing the two-stage robust optimization model for power grid load management is: Among them, F da (·) and F n (·) are the cost functions of the day-ahead stage and the real-time stage respectively; x and y are the optimization variables of the day-ahead scheduling stage and the real-time scheduling stage respectively; u is an uncertain variable; X, U and Ω(x, u) are the feasible domains of x, u and y respectively; The box uncertainty set is used to characterize the uncertainty of demand response, distributed wind power output and distributed photovoltaic output. The specific formula is: in, and are the power values ​​before and after considering uncertainty, include Distributed wind power output forecast and distributed photovoltaic output forecast include Distributed wind power output and distributed photovoltaic output and are the maximum values ​​of downward and upward power fluctuations, respectively; and It is a 0-1 binary variable introduced after considering the uncertainty, which is used as a sign of whether the power fluctuation value reaches the lower or upper bound of the interval; Γ uct A time uncertainty budget is used to control the conservatism of robust uncertainty; The specific formula of the objective function of the design model for the day-ahead scheduling phase is: Among them, N B is the total number of urban power grid nodes; and They are the day-ahead load shedding cost coefficient and active shedding power, respectively. The load shedding cost coefficient for residential users will be set to a higher value; The total cost of orderly electricity consumption is The constraints include residential air conditioning demand response constraints, industrial and commercial orderly power consumption constraints, day-ahead load shedding constraints, distributed wind power output constraints, distributed photovoltaic output constraints, mobile energy storage configuration constraints, and grid operation constraints; The objective function of designing the real-time scheduling stage model is: in, is the residential air conditioning demand response cost after considering the uncertainty of actual response; and They are the real-time load shedding cost coefficient and the active load shedding power respectively. The cost coefficient of real-time load shedding will be much larger than the day-ahead load shedding. The constraints include residential air-conditioning demand response constraints, real-time load shedding constraints, distributed wind power output constraints, distributed photovoltaic output constraints and urban power grid operation constraints.

9. A load management system for urban power grids to cope with extreme high temperature weather, characterized in that: include: one or more processors; A storage device for storing one or more modules; When the one or more modules are executed by the one or more processors, the one or more processors implement the urban power grid load management optimization method for coping with extreme high temperature weather as described in any one of claims 1-8.