Equipment management system and method
Through the information module, identification module, approval module and inventory module of the equipment management system, the problem of duplication of equipment encoding and unclear inventory is solved, and the efficient management and inventory of equipment information is realized, ensuring the consistency of equipment status and clear responsible persons, and improving Equipment utilization and inventory efficiency are provided.
Patent Information
- Application Number
- CN202411070378.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-06
- Publication Date
- 2024-11-19
AI Technical Summary
The problems of duplicate device encoding, mismatch numbering and unclear inventory in the existing equipment management system have led to difficulties in equipment management, time-consuming and labor-intensive inventory, and the inability to accurately calculate the loss.
Provide a device management system, including information module, identification module, approval module and inventory module, generate unique identifiers through encryption algorithms, associate basic information of the device, realize the approval process for device status changes, ensure the consistency of device information, and pass unique identifiers. Conduct equipment verification.
It improves the efficiency and accuracy of equipment management, clarifies the responsible persons of equipment, ensures clear equipment allocation and allocation, reduces the difficulty of equipment inventory, and improves equipment utilization and inventory efficiency.
Smart Images

Figure CN118982198A_ABST
Abstract
Description
Background Art
[0002] In environments related to medical treatment, educational research, and industrial production, relevant equipment will be used to carry out actual production or auxiliary work. These equipment are usually of various types and quantities. The processes of purchasing, repairing, and scrapping of equipment need to be recorded. In addition, some of the equipment can be borrowed between departments, such as lighting equipment in hospitals and microscopes in laboratories.
[0003] The current management of equipment usually involves the financial department generating an asset code for each device, and each department manages the equipment within the department on its own. If the equipment is transferred, scrapped, or idled, and if the update is not timely, various equipment items will not correspond to the inventory during the equipment inventory.
[0004] During the equipment management process, manual equipment coding is often performed, which results in duplicate equipment numbers and mismatches between numbers and actual equipment, making it impossible to claim or find equipment. Departments manage equipment on their own, and the processes for borrowing and scrapping equipment are not followed, resulting in mismatches between the department's physical inventory and the financial list, making it impossible to clearly calculate equipment shortages. Moreover, annual equipment inventory is very difficult, requiring a lot of time and effort to conduct equipment inventory, and the cause of some equipment shortages cannot be found. Summary of the invention
[0005] The technical problem to be solved by the present invention is to address the deficiencies of the prior art, specifically to address the problems of difficult department equipment management, unclear inventory, and time-consuming and labor-intensive problems, and specifically to provide an equipment management system and method, as follows:
[0006] 1) In a first aspect, the present invention provides an equipment management system, and the specific technical scheme is as follows: comprising: an information module, an identification module, an approval module and an inventory module;
[0007] The information module is used to input basic information and first status information of the device to be processed, wherein the basic information represents the identification characteristics of the device, and the first status information represents whether the device meets the usage conditions;
[0008] The identification module is used to encrypt the basic information by using a preset encryption algorithm to obtain encrypted basic information, determine a unique identifier corresponding to the device to be processed, and associate the unique identifier with the encrypted basic information;
[0009] The approval module is used to generate an approval request according to the state change requirement of the device to be processed, and update the first state information to obtain the second state information according to the approval result of the person in charge of the device to be processed approving the approval request;
[0010] The inventory module is used to check the device to be processed according to the unique identifier and the second status information to obtain a checking result.
[0011] The beneficial effects of a device management system provided by the present invention are as follows:
[0012] The information of the equipment is linked to the equipment, and the current status of the equipment is clear at a glance, which enables efficient equipment management. The equipment change information is approved through the approval method to ensure that the equipment information is consistent with the current one, and the person responsible for the equipment can be identified. There are traces to be traced for the changes in the equipment, making the allocation and deployment of the equipment clearer, improving the utilization rate of the equipment, and taking inventory of the equipment to clarify the department where the equipment is located and the current status of the equipment, reducing the difficulty of equipment inventory.
[0013] Based on the above solution, the present invention can also be improved as follows.
[0014] Furthermore, the basic information includes:
[0015] At least one of the manufacturer of the equipment to be processed, the model of the equipment to be processed, the main and auxiliary types of the equipment to be processed, the picture of the equipment to be processed, the applicable projects of the equipment to be processed, the department to which the equipment to be processed belongs, and the company to which the equipment to be processed belongs.
[0016] Further, when the status information is: the allocation status of the equipment to be processed, the maintenance status of the equipment to be processed, the scrap status of the equipment to be processed, and the idle status of the equipment to be processed, the first status information and the second status information are at least one of the status information.
[0017] Furthermore, the state change requirement includes:
[0018] At least one of an allocation requirement corresponding to the allocation status of the equipment to be processed, a maintenance requirement corresponding to the maintenance status of the equipment to be processed, a scrapping requirement corresponding to the scrapping status of the equipment to be processed, and an idle requirement corresponding to the idle status of the equipment to be processed.
[0019] Furthermore, the approval module specifically includes:
[0020] When the state change requirement is a transfer requirement, an transfer approval request is generated according to the transfer requirement of the pending device, and the transfer status of the pending device is updated according to the transfer approval result of the transfer approval request approved by the person in charge of the pending device;
[0021] When the state change requirement is a maintenance requirement, a maintenance approval request is generated according to the maintenance requirement of the device to be processed, and the maintenance state of the device to be processed is updated according to the maintenance approval result of the maintenance approval request approved by the person in charge of the device to be processed;
[0022] When the state change requirement is a scrapping requirement, a scrapping approval request is generated according to the scrapping requirement of the equipment to be processed, and the scrapping state of the equipment to be processed is updated according to the scrapping approval result of the person in charge of the equipment to be processed approving the scrapping approval request;
[0023] When the state change requirement is an idle requirement, an idle approval request is generated according to the idle requirement of the pending device, and the idle state of the pending device is updated according to the idle approval result of the idle approval request approved by the person in charge of the pending device.
[0024] Furthermore, it also includes:
[0025] An export module is used to export the basic information, the first status information and the second status information to obtain an export list of the device to be processed.
[0026] 2) In the second aspect, the present invention also provides a device management method, and the specific technical solution is as follows:
[0027] S1, inputting basic information and first status information of the device to be processed, wherein the basic information represents the identification characteristics of the device, and the first status information represents whether the device meets the usage conditions;
[0028] S2, encrypting the basic information by a preset encryption algorithm to obtain encrypted basic information, determining a unique identifier corresponding to the device to be processed, and associating the unique identifier with the encrypted basic information;
[0029] S3, generating an approval request according to the state change requirement of the device to be processed, and updating the first state information to obtain second state information according to the approval result of the person in charge of the device to be processed on the approval request;
[0030] S4: Verify the device to be processed according to the unique identifier and the second status information to obtain a verification result.
[0031] Based on the above solution, the present invention can also be improved as follows.
[0032] Furthermore, the basic information includes:
[0033] At least one of the manufacturer of the equipment to be processed, the model of the equipment to be processed, the main and auxiliary types of the equipment to be processed, the picture of the equipment to be processed, the applicable projects of the equipment to be processed, the department to which the equipment to be processed belongs, and the company to which the equipment to be processed belongs.
[0034] Further, when the status information is: the allocation status of the equipment to be processed, the maintenance status of the equipment to be processed, the scrap status of the equipment to be processed, and the idle status of the equipment to be processed, the first status information and the second status information are at least one of the status information.
[0035] Furthermore, the state change requirement includes:
[0036] At least one of an allocation requirement corresponding to the allocation status of the equipment to be processed, a maintenance requirement corresponding to the maintenance status of the equipment to be processed, a scrapping requirement corresponding to the scrapping status of the equipment to be processed, and an idle requirement corresponding to the idle status of the equipment to be processed.
[0037] Further, the S3 specifically includes:
[0038] When the state change requirement is a transfer requirement, an transfer approval request is generated according to the transfer requirement of the pending device, and the transfer status of the pending device is updated according to the transfer approval result of the transfer approval request approved by the person in charge of the pending device;
[0039] When the state change requirement is a maintenance requirement, a maintenance approval request is generated according to the maintenance requirement of the device to be processed, and the maintenance state of the device to be processed is updated according to the maintenance approval result of the maintenance approval request approved by the person in charge of the device to be processed;
[0040] When the state change requirement is a scrapping requirement, a scrapping approval request is generated according to the scrapping requirement of the equipment to be processed, and the scrapping state of the equipment to be processed is updated according to the scrapping approval result of the person in charge of the equipment to be processed approving the scrapping approval request;
[0041] When the state change requirement is an idle requirement, an idle approval request is generated according to the idle requirement of the pending device, and the idle state of the pending device is updated according to the idle approval result of the idle approval request approved by the person in charge of the pending device.
[0042] Furthermore, it also includes:
[0043] S5: Export the basic information, the first status information, and the second status information to obtain an export list of the devices to be processed.
[0044] It should be noted that the beneficial effects achieved by the technical solution of the second aspect of the present invention and the corresponding possible implementation methods can be found in the above-mentioned technical effects of the first aspect and its corresponding possible implementation methods, and will not be repeated here. BRIEF DESCRIPTION OF THE DRAWINGS
[0045] Other features, objects and advantages of the present invention will become more apparent from the detailed description of non-limiting embodiments made with reference to the following drawings:
[0046] Figure 1 The present invention is a flowchart of a device management system according to an embodiment of the present invention. DETAILED DESCRIPTION
[0047] In order to make the objectives, technical solutions and advantages of the present invention more clear, the embodiments of the present invention will be further described in detail below with reference to the accompanying drawings.
[0048] like Figure 1 As shown, a device management system according to an embodiment of the present invention includes: an information module, an identification module, an approval module and an inventory module;
[0049] The information module is used to input basic information and first status information of the device to be processed, wherein the basic information represents the identification characteristics of the device, and the first status information represents whether the device meets the usage conditions;
[0050] The identification module is used to encrypt the basic information by using a preset encryption algorithm to obtain encrypted basic information, determine a unique identifier corresponding to the device to be processed, and associate the unique identifier with the encrypted basic information;
[0051] The approval module is used to generate an approval request according to the state change requirement of the device to be processed, and update the first state information to obtain the second state information according to the approval result of the person in charge of the device to be processed approving the approval request;
[0052] The inventory module is used to check the device to be processed according to the unique identifier and the second status information to obtain a checking result.
[0053] The beneficial effects of a device management system provided by the present invention are as follows:
[0054] The information of the equipment is linked to the equipment, and the current status of the equipment is clear at a glance, which enables efficient equipment management. The equipment change information is approved through the approval method to ensure that the equipment information is consistent with the current one, and the person responsible for the equipment can be identified. There are traces to be traced for the changes in the equipment, making the allocation and deployment of the equipment clearer, improving the utilization rate of the equipment, and taking inventory of the equipment to clarify the department where the equipment is located and the current status of the equipment, reducing the difficulty of equipment inventory.
[0055] Embodiment 1:
[0056] The information module is used to input basic information and first status information of the device to be processed, wherein the basic information represents the identification characteristics of the device, and the first status information represents whether the device meets the usage conditions.
[0057] Equipment to be processed refers to all equipment in a company or department that has not been entered into the equipment management system. For example, in a hospital, the equipment may be diagnostic equipment (X-ray diagnostic equipment, ultrasonic diagnostic equipment, functional inspection equipment, etc.); in a laboratory, the equipment may be a balance, microscope, test tube, beaker, etc.; in the field of industrial production, the equipment may be machine tools, lifting equipment, conveying equipment, etc.
[0058] Basic information includes:
[0059] At least one of the manufacturer of the equipment to be processed, the model of the equipment to be processed, the main and auxiliary types of the equipment to be processed, the picture of the equipment to be processed, the applicable project of the equipment to be processed, the department to which the equipment to be processed belongs, and the company to which the equipment to be processed belongs. Among them:
[0060] Manufacturer refers to: the manufacturer of the equipment to be processed, for example, a manufacturer, company or consignor that can produce X-ray diagnostic equipment.
[0061] The model refers to the production model of the device to be processed, for example, the 01 model of a certain X-ray diagnostic device or the 02 model of a certain X-ray diagnostic device.
[0062] The primary and secondary types refer to the working type of the device to be processed. Generally speaking, there may be backup devices for devices with the same function. The current main working device is the primary type device, and the corresponding backup device is the secondary type device.
[0063] The picture refers to: a high-definition picture taken of the equipment to be processed or a product picture of the equipment.
[0064] Applicable projects refer to projects in which the equipment to be processed can play a role in the field in which it is located. For example, the applicable project of a certain X-ray diagnostic equipment in the field of hospital medicine is radiation detection.
[0065] The department to which the device to be processed belongs refers to: the department to which the device to be processed belongs. For example, if an X-ray diagnostic device belongs to the radiology department, then the department to which the X-ray diagnostic device belongs is the radiology department.
[0066] The company to which the equipment to be processed belongs refers to: the company to which the equipment to be processed belongs, for example, an X-ray diagnostic equipment belongs to a first community hospital, or an X-ray diagnostic equipment belongs to the head office of a medical testing institution or a subsidiary of a medical testing institution.
[0067] The beneficial effects of adopting the above scheme are as follows:
[0068] By entering the basic information of the equipment to be processed, you can basically understand the overview and characteristics of the equipment. By entering the department and company to which the equipment to be processed belongs, you can record and transfer the equipment between subsidiaries, and clearly present the current status of the equipment, so that you can see the current status of the equipment at a glance.
[0069] The first status information may be:
[0070] At least one of the allocation status of the equipment to be processed, the maintenance status of the equipment to be processed, the scrap status of the equipment to be processed, and the idle status of the equipment to be processed.
[0071] The transfer status refers to whether the pending equipment is in the process of transfer. Transfer refers to the allocation of equipment. For some equipment that can be used between departments or companies, the equipment can be allocated from one department to another. If the current equipment is in the department to which it belongs, the equipment is in the unallocated state. If the current equipment is in another department due to transfer or loan, the equipment is in the allocated state.
[0072] The maintenance status refers to whether the device to be processed is under maintenance. If the current device needs maintenance or is under maintenance, the device is in maintenance status (including waiting for maintenance, under maintenance, etc.); if the current device does not need maintenance, the device is in normal use status.
[0073] The scrap status refers to whether the equipment to be processed is scrapped. If the current equipment meets the scrap conditions, the equipment is in a scrap state (including to be scrapped, scrapped, etc.); if the current equipment does not meet the scrap conditions and can be used normally, the equipment is in a normal operating state.
[0074] The idle status refers to whether the device to be processed is in use. If there is an auxiliary type device in the department, the auxiliary type device is in an idle state. The main type device is in an idle state during non-use time and in a non-idle state during use time because the user is extremely rare or even non-user.
[0075] The beneficial effects of adopting the above scheme are as follows:
[0076] By checking the status of the equipment to be processed, we can clearly understand the current operating status and idle status of all equipment, and can better schedule equipment when equipment is limited to meet the equipment needs of production or work, and the status and situation of the equipment can be clearly seen at a glance.
[0077] The identification module is used to encrypt the basic information using a preset encryption algorithm to obtain the encrypted basic information, determine the unique identification corresponding to the device to be processed, and associate the unique identification with the encrypted basic information.
[0078] Encryption algorithm refers to: a common computer algorithm that can be used for decryption.
[0079] Unique identification refers to: unique marking information that can represent device information, which can be a unique laser-printed QR code for each device, or a unique asset code for each device. By associating the unique identification with the encrypted basic information, the encrypted basic information can be obtained based on the unique identification, thereby obtaining the basic information of the device.
[0080] In this process, the unique identifier corresponding to the device is attached to the corresponding device casing by printing or pasting. By associating the unique identifier with the basic information, it can be matched one-to-one with the unique identifier on the department's equipment in the device management system. The unique identifier can also be identified through the terminal, and the basic information associated with it can be obtained through the unique identifier. The terminal can be a mobile phone, and the process corresponds to scanning the QR code through the mobile phone, jumping to the web page (or mini program / APP page) to view the basic information of the associated device, so as to understand the device's picture, department, and status. It avoids multiple manual device coding, resulting in repeated numbers of some equipment and numbers that do not match the actual number.
[0081] The approval module is used to generate an approval request according to the status change requirement of the device to be processed, and update the first status information to obtain the second status information according to the approval result of the person in charge of the device to be processed for the approval request.
[0082] The state change requirements include:
[0083] At least one of an allocation requirement corresponding to the allocation status of the equipment to be processed, a maintenance requirement corresponding to the maintenance status of the equipment to be processed, a scrapping requirement corresponding to the scrapping status of the equipment to be processed, and an idle requirement corresponding to the idle status of the equipment to be processed.
[0084] The person responsible for the device to be processed refers to: the person or department responsible for the device to be processed, and may be the person in charge of the department to which the device to be processed belongs or a member of the department involved in the work, or may be the leader of the company to which the device belongs, or the manager of the laboratory.
[0085] When the state change requirement is a transfer requirement, an transfer approval request is generated according to the transfer requirement of the pending device, and the transfer status of the pending device is updated according to the transfer approval result of the transfer approval request approved by the person in charge of the pending device;
[0086] When the state change requirement is a maintenance requirement, a maintenance approval request is generated according to the maintenance requirement of the device to be processed, and the maintenance state of the device to be processed is updated according to the maintenance approval result of the maintenance approval request approved by the person in charge of the device to be processed;
[0087] When the state change requirement is a scrapping requirement, a scrapping approval request is generated according to the scrapping requirement of the equipment to be processed, and the scrapping state of the equipment to be processed is updated according to the scrapping approval result of the person in charge of the equipment to be processed approving the scrapping approval request;
[0088] When the state change requirement is an idle requirement, an idle approval request is generated according to the idle requirement of the pending device, and the idle state of the pending device is updated according to the idle approval result of the idle approval request approved by the person in charge of the pending device.
[0089] The second status information may be:
[0090] At least one of the allocation status of the device to be processed, the maintenance status of the device to be processed, the scrap status of the device to be processed, and the idle status of the device to be processed. For specific states, please refer to the introduction of the first state information, which will not be repeated here.
[0091] The beneficial effects of adopting the above scheme are as follows:
[0092] Through approval processes with different statuses, we can avoid the situation where departments manage equipment on their own and fail to go through the equipment loan, scrapping and other processes, which leads to mismatches between the department's physical and financial lists and unclear equipment statistics. We can also make departmental equipment allocation clearer, ensure the consistency between equipment information and departmental physical objects, clarify the person responsible for equipment, realize the online transfer process between equipment subsidiaries, and improve equipment utilization.
[0093] The inventory module is used to check the device to be processed according to the unique identifier and the second status information to obtain a check result.
[0094] The verification result refers to whether there is a difference between the basic information and status information of the device to be processed and the system, and the content of the difference. For example, the device is being transferred.
[0095] The basic information of the device can be obtained based on the unique identification, and the device can be matched based on the unique identification and the second status information to check whether the current device information and status match the content in the system. This can avoid the energy consumption of device verification during device management. By matching the information in the system with the actual status of the device, the current status of the device and the reason for the shortage can be quickly found, and the comparison process is more time-saving and labor-saving, reducing the difficulty of device inventory.
[0096] Furthermore, it also includes:
[0097] An export module is used to export the basic information, the first status information and the second status information to obtain an export list of the device to be processed.
[0098] When taking inventory of the equipment to be processed according to the export list, the inventory process can be accelerated. And based on the export list, the equipment information and status at the time of export can be recorded, which provides direct data support for the statistics of subsequent equipment usage. For example, if the basic information and status information of the equipment is exported every other month, at the end of the year, the equipment transfer and maintenance status can be counted based on the 12 export lists of the year. New management directions can be proposed for the equipment management of the next year based on the statistical results. For example, if there are too many equipment transfers this year, whether there is manpower consumption in the equipment transportation process, and whether new equipment can be considered for comparison.
[0099] Embodiment 2:
[0100] In this embodiment, the present invention is explained in combination with the actual operation process. The actual operation is as follows:
[0101] (1) Log in to the system according to the user's account password;
[0102] The user's account password can be assigned according to different identity permissions. For example, the account of the department manager is assigned the equipment operation management permission of the current department, and the corresponding permission is assigned to the overall person in charge (laboratory manager).
[0103] During the account and password login process, the account and password can be encrypted using an encryption algorithm, which can be an asymmetric encryption algorithm, such as RSA, etc. After the user account and password are successfully verified, the corresponding cookie can be assigned to the user to save user information and verify whether the user login is valid.
[0104] If the terminal used by the method or system is a device such as a mobile phone, the user's identity can also be verified by means of an authorization token.
[0105] (2) Query the existing equipment in each department according to department classification;
[0106] In the existing equipment list, classify the equipment according to the department, enter the department information in the search box, and click Search to query the equipment list under the current department conditions.
[0107] In this process, the algorithm used in the classification process may be: decision tree, random forest, logistic regression, support vector machine (SVM), etc. The above algorithms are all public technical features and therefore will not be explained in detail in this embodiment.
[0108] During the query and search process, you can use a search engine to speed up the search and display the search results. Common search engines include: Elasticsearch. This search engine can also be combined with a visual interface (such as kibana) to display and analyze the search process.
[0109] (3) Under the department module, equipment is divided into in-use equipment and idle equipment;
[0110] The status of the device can be divided into in-use devices and idle devices. If the current device is in use, the device is set to the in-use state. If the current device is not in use, the device is set to the idle state.
[0111] (4) Department managers can upload equipment-related information and pictures;
[0112] Department managers can upload relevant information about the equipment through a form on the system's equipment upload page. After uploading the equipment information and pictures, department managers can select the department to which the equipment belongs. If no selection is made, the system obtains the basic information of the currently logged-in department manager and automatically assigns the equipment to the department to which the currently logged-in department manager belongs.
[0113] (5) Department managers can explain the situation and raise the need for equipment transfer / scrapping / idleness, which will take effect after approval by laboratory managers;
[0114] When it is necessary to adjust the equipment to transfer, scrap or idle, you can initiate corresponding approval process sheets for different adjustment needs. For example, initiating an equipment transfer approval process sheet for transfer needs, where the transfer approval process sheet may include the original department of the equipment, the changed department of the equipment, the reason for the equipment's transfer, the equipment's transfer period, the equipment's transfer time, and the person in charge of the transfer; initiating an equipment scrapping approval process sheet for scrapping needs, where the scrapping approval process sheet may include the original department of the equipment, the reason for the equipment's scrapping, the equipment's scrapping time, the way to deal with the equipment's scrapping, and the person in charge of the scrapping.
[0115] After the corresponding approval process sheet is generated, the laboratory manager approves the corresponding approval process sheet to obtain the corresponding approval result, and updates the status of the equipment according to the approval result.
[0116] (6) It is possible to query the equipment information between different subsidiaries of the same company and initiate the transfer process within the idle equipment pool;
[0117] (7) It has an export function that can export the equipment list information of each module;
[0118] The list of device detailed information can be exported on a regular or quantitative basis. For example: regular means exporting the device list after a fixed period of time, which can be a month or a quarter; quantitative means exporting the device list in fixed quantities, such as exporting 1,000 devices at a time. After exporting the device list, the export list file can be automatically uploaded to the static file storage server according to the system settings and the identification key of the export list file can be obtained. The identification key of the export list can be stored in the system server. The purpose of this is to centrally save and process large files to avoid system jams caused by excessive data usage caused by large files being stored in the system. Large files can be obtained and loaded separately to improve the system response speed.
[0119] The present invention also provides a device management method, and the specific technical solution is as follows:
[0120] S1, inputting basic information and first status information of the device to be processed, wherein the basic information represents the identification characteristics of the device, and the first status information represents whether the device meets the usage conditions;
[0121] S2, encrypting the basic information by a preset encryption algorithm to obtain encrypted basic information, determining a unique identifier corresponding to the device to be processed, and associating the unique identifier with the encrypted basic information;
[0122] S3, generating an approval request according to the state change requirement of the device to be processed, and updating the first state information to obtain second state information according to the approval result of the person in charge of the device to be processed on the approval request;
[0123] S4: Verify the device to be processed according to the unique identifier and the second status information to obtain a verification result.
[0124] Based on the above solution, the present invention can also be improved as follows.
[0125] Furthermore, the basic information includes:
[0126] At least one of the manufacturer of the equipment to be processed, the model of the equipment to be processed, the main and auxiliary types of the equipment to be processed, the picture of the equipment to be processed, the applicable projects of the equipment to be processed, the department to which the equipment to be processed belongs, and the company to which the equipment to be processed belongs.
[0127] Further, when the status information is: the allocation status of the equipment to be processed, the maintenance status of the equipment to be processed, the scrap status of the equipment to be processed, and the idle status of the equipment to be processed, the first status information and the second status information are at least one of the status information.
[0128] Furthermore, the state change requirement includes:
[0129] At least one of an allocation requirement corresponding to the allocation status of the equipment to be processed, a maintenance requirement corresponding to the maintenance status of the equipment to be processed, a scrapping requirement corresponding to the scrapping status of the equipment to be processed, and an idle requirement corresponding to the idle status of the equipment to be processed.
[0130] Further, the S3 specifically includes:
[0131] When the state change requirement is a transfer requirement, an transfer approval request is generated according to the transfer requirement of the pending device, and the transfer status of the pending device is updated according to the transfer approval result of the transfer approval request approved by the person in charge of the pending device;
[0132] When the state change requirement is a maintenance requirement, a maintenance approval request is generated according to the maintenance requirement of the device to be processed, and the maintenance state of the device to be processed is updated according to the maintenance approval result of the maintenance approval request approved by the person in charge of the device to be processed;
[0133] When the state change requirement is a scrapping requirement, a scrapping approval request is generated according to the scrapping requirement of the equipment to be processed, and the scrapping state of the equipment to be processed is updated according to the scrapping approval result of the person in charge of the equipment to be processed approving the scrapping approval request;
[0134] When the state change requirement is an idle requirement, an idle approval request is generated according to the idle requirement of the pending device, and the idle state of the pending device is updated according to the idle approval result of the idle approval request approved by the person in charge of the pending device.
[0135] Furthermore, it also includes:
[0136] S5: Export the basic information, the first status information, and the second status information to obtain an export list of the devices to be processed.
[0137] In the above embodiments, although the steps are numbered S1, S2, etc., these are only specific embodiments given by the present invention. Those skilled in the art may adjust the execution order of S1, S2, etc. according to actual conditions, which is also within the protection scope of the present invention. It can be understood that in some embodiments, some or all of the above embodiments may be included.
[0138] It should be noted that the beneficial effects of a device management system provided by the above embodiment are the same as the beneficial effects of the above device management method, which will not be repeated here. In addition, when the system provided by the above embodiment realizes its functions, it only takes the division of the above functional modules as an example. In actual applications, the above functions can be assigned to different functional modules as needed, that is, the system can be divided into different functional modules according to actual conditions to complete all or part of the functions described above. It should be noted that the terms "first", "second", etc. in the specification and claims of the present application are used to distinguish similar objects, and represent the limitation of a specific order or sequence. Where appropriate, the order of use of similar objects can be interchangeable so that the embodiments of the present application described here can be implemented in an order other than the order shown or described.
[0139] Those skilled in the art know that the present invention can be implemented as a system, method or computer program product. Therefore, the present disclosure can be specifically implemented in the following forms, namely: it can be complete hardware, it can be complete software (including firmware, resident software, microcode, etc.), or it can be a combination of hardware and software, which is generally referred to as "circuit", "module" or "system" herein. In addition, in some embodiments, the present invention can also be implemented in the form of a computer program product in one or more computer-readable media, and the computer-readable medium contains computer-readable program code.
[0140] Any combination of one or more computer-readable media may be used. A computer-readable medium may be a computer-readable signal medium or a computer-readable storage medium. A computer-readable storage medium may be, for example, but not limited to, an electrical, magnetic, optical, electromagnetic, infrared, or semiconductor system, device, or device, or any combination thereof. More specific examples (a non-exhaustive list) of computer-readable storage media include: an electrical connection with one or more wires, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination thereof. In this document, a computer-readable storage medium may be any tangible medium containing or storing a program that may be used by or in conjunction with an instruction execution system, device, or device.
[0141] Although the embodiments of the present invention have been shown and described above, it is to be understood that the above embodiments are exemplary and are not to be construed as limitations of the present invention. A person skilled in the art may change, modify, replace and vary the above embodiments within the scope of the present invention.
Claims
1. A device management system, characterized in that: include: Information module, identification module, approval module and inventory module; The information module is used to input basic information and first status information of the device to be processed, wherein the basic information represents the identification characteristics of the device, and the first status information represents whether the device meets the usage conditions; The identification module is used to encrypt the basic information by using a preset encryption algorithm to obtain encrypted basic information, determine a unique identifier corresponding to the device to be processed, and associate the unique identifier with the encrypted basic information; The approval module is used to generate an approval request according to the state change requirement of the device to be processed, and update the first state information to obtain the second state information according to the approval result of the person in charge of the device to be processed approving the approval request; The inventory module is used to check the device to be processed according to the unique identifier and the second status information to obtain a checking result.
2. A device management system according to claim 1, characterized in that: The basic information includes: At least one of the manufacturer of the equipment to be processed, the model of the equipment to be processed, the main and auxiliary types of the equipment to be processed, the picture of the equipment to be processed, the applicable projects of the equipment to be processed, the department to which the equipment to be processed belongs, and the company to which the equipment to be processed belongs.
3. The equipment management system according to claim 1, characterized in that: When the status information is: the allocation status of the device to be processed, the maintenance status of the device to be processed, the scrap status of the device to be processed, and the idle status of the device to be processed, the first status information and the second status information are at least one item of the status information.
4. A device management system according to claim 3, characterized in that: The state change requirements include: At least one of an allocation requirement corresponding to the allocation status of the equipment to be processed, a maintenance requirement corresponding to the maintenance status of the equipment to be processed, a scrapping requirement corresponding to the scrapping status of the equipment to be processed, and an idle requirement corresponding to the idle status of the equipment to be processed.
5. A device management system according to claim 4, characterized in that: The approval module specifically includes: When the state change requirement is a transfer requirement, an transfer approval request is generated according to the transfer requirement of the pending device, and the transfer status of the pending device is updated according to the transfer approval result of the transfer approval request approved by the person in charge of the pending device; When the state change requirement is a maintenance requirement, a maintenance approval request is generated according to the maintenance requirement of the device to be processed, and the maintenance state of the device to be processed is updated according to the maintenance approval result of the maintenance approval request approved by the person in charge of the device to be processed; When the state change requirement is a scrapping requirement, a scrapping approval request is generated according to the scrapping requirement of the equipment to be processed, and the scrapping state of the equipment to be processed is updated according to the scrapping approval result of the person in charge of the equipment to be processed approving the scrapping approval request; When the state change requirement is an idle requirement, an idle approval request is generated according to the idle requirement of the pending device, and the idle state of the pending device is updated according to the idle approval result of the idle approval request approved by the person in charge of the pending device.
6. The equipment management system according to claim 1, characterized in that: Also includes: An export module is used to export the basic information, the first status information and the second status information to obtain an export list of the device to be processed.
7. A device management method, characterized in that: include: S1, inputting basic information and first status information of the device to be processed, wherein the basic information represents the identification characteristics of the device, and the first status information represents whether the device meets the usage conditions; S2, encrypting the basic information by a preset encryption algorithm to obtain encrypted basic information, determining a unique identifier corresponding to the device to be processed, and associating the unique identifier with the encrypted basic information; S3, generating an approval request according to the state change requirement of the device to be processed, and updating the first state information to obtain second state information according to the approval result of the person in charge of the device to be processed on the approval request; S4: Verify the device to be processed according to the unique identifier and the second status information to obtain a verification result.
8. A device management method according to claim 7, characterized in that: The basic information includes: At least one of the manufacturer of the equipment to be processed, the model of the equipment to be processed, the main and auxiliary types of the equipment to be processed, the picture of the equipment to be processed, the applicable projects of the equipment to be processed, the department to which the equipment to be processed belongs, and the company to which the equipment to be processed belongs.
9. A device management method according to claim 7, characterized in that: When the status information is: the allocation status of the device to be processed, the maintenance status of the device to be processed, the scrap status of the device to be processed, and the idle status of the device to be processed, the first status information and the second status information are at least one item of the status information.
10. A device management method according to claim 9, characterized in that: The state change requirements include: At least one of an allocation requirement corresponding to the allocation status of the equipment to be processed, a maintenance requirement corresponding to the maintenance status of the equipment to be processed, a scrapping requirement corresponding to the scrapping status of the equipment to be processed, and an idle requirement corresponding to the idle status of the equipment to be processed.
