By establishing a DC current distribution model and entropy weight method-hierarchical analysis method in the AC system, the DC bias risk of grid transformers is evaluated, which solves the problem that the vulnerability of grid transformers cannot be evaluated in advance in the existing technology, and the risk of DC bias is realized. effective prevention and improvement of power grid stability.
Patent Information
- Application Number
- CN202410975729.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-19
- Publication Date
- 2024-11-19
AI Technical Summary
The prior art cannot evaluate and prevent the vulnerability of power grid transformers in advance during the planning period, resulting in the inability to effectively prevent the risk of DC bias.
By establishing a DC current distribution model in the AC system based on soil parameters, grid parameters and geographical location parameters, combining the earth conductivity information and historical geomagnetic storm data, the DC bias risk of transformer caused by geomagnetic storm is evaluated; at the same time, the entropy weight method is used- The hierarchical analysis method deals with the DC bias risk index of transformer caused by mono-maximum operation of DC transmission and subway operation, and obtains the comprehensive vulnerability assessment results of the power grid transformer.
The advance assessment and prevention of the transformer's DC bias risk is achieved, providing theoretical support for power grid planning, and reducing the risk of equipment failure caused by DC bias.
Smart Images

Figure CN118982227A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the field, and in particular to a method, system, device and medium for evaluating the vulnerability of a transformer. Background Art
[0002] The development of the power system has entered the era of large power grids, large units, and ultra-high voltage. The quality of power supply directly affects the speed of economic development. Therefore, ensuring the reliability of power supply is a hot research issue in the current power system. The biggest impact on the stability and reliability of the power system is equipment failure, which will not only cause huge economic losses, but also seriously affect people's production and life safety.
[0003] The DC bias problem of AC power grid is a series of problems caused by the rapid development of high-voltage / ultra-high-voltage DC transmission in recent years. The DC bias risk is mainly manifested in the phenomenon of core saturation caused by the intrusion of DC current in the ground when the power transformer of the grounded power system is subjected to the DC current in the ground, as well as a series of abnormal working conditions such as overexcitation, vibration, heating and noise. In addition to the large return current of DC transmission single pole, some other factors can also lead to the risk of DC bias of transformer. The more prominent examples include the geomagnetic induction current generated by solar storms interfering with the geomagnetic field, urban rail transit, photovoltaics, new energy systems and stray currents of other traction systems. On the one hand, the AC power grid will be subject to a high risk of DC bias due to the large number of DC projects. On the other hand, other popular industries and emerging industries may also cause DC bias risks to the AC system.
[0004] The identification method and evaluation process of the vulnerable links of the power system are called grid vulnerability assessment. Risk refers to the comprehensive measurement of the probability of an event and its consequences. For the power system, conducting risk assessment in advance can reduce the possibility of system failure to a certain extent. Due to the different causes of DC bias magnetization of power system transformers, the indicators of DC bias magnetization in the system should also be calculated and calibrated according to different causes. At present, the grid vulnerability analysis based on complex network theory often identifies the key lines and nodes of the power grid, and improves the overall reliability and power supply stability of the power grid by enhancing the resilience of the lines and nodes. For important infrastructure settings of the power grid, such as the DC bias magnetization risk assessment of power transformers, it is generally evaluated by online monitoring, including monitoring the noise, vibration, neutral point current, etc. of the transformer. The defect of this method is that there is no way to arrange and prevent it in advance during the planning period. Summary of the invention
[0005] In order to solve the problems existing in the prior art, the present invention provides a method, system, device and medium for evaluating transformer vulnerability, which is used to solve the problem in the prior related technology that it is impossible to arrange and preventively evaluate the vulnerability of power grid transformers in advance during the planning period.
[0006] To achieve the above object, the present invention provides the following technical solutions:
[0007] A method for assessing transformer vulnerability comprises the following steps:
[0008] Establish a DC current distribution model in the AC system based on the soil parameters, power grid parameters and geographical location parameters of the target area;
[0009] Based on the DC current distribution model in the AC system, as well as the earth's electrical conductivity information and historical geomagnetic storm data, the vulnerability assessment index of the transformer DC bias risk caused by geomagnetic storms is obtained;
[0010] When the DC transmission is operated in a single pole, the node voltage and bias current of any two transformers are obtained based on the DC current distribution model in the AC system. The node entropy and line entropy of the power grid system are obtained based on the bias current. Based on the node entropy and line entropy, the evaluation index of the DC bias risk of transformers caused by the single pole operation of the DC transmission is obtained.
[0011] Based on the subway stray current distribution and the DC current distribution model in the AC system, the distribution entropy of the bias current caused by subway operation is obtained. Based on the distribution entropy of the bias current and the probability distribution of the rail-to-ground potential and stray current, the DC bias risk assessment index of the transformer caused by subway operation is obtained.
[0012] The entropy weight method-hierarchy analysis method is used to process the transformer DC bias risk vulnerability assessment indicators caused by the geomagnetic storm, the transformer DC bias risk assessment indicators caused by the DC transmission single pole operation and the transformer DC bias risk assessment indicators caused by the subway operation to obtain the comprehensive vulnerability assessment results of the power grid transformer.
[0013] Furthermore, the grid parameters include line information, busbar operation information, grid connection information and substation grounding resistance information;
[0014] The geographical location parameters include the geographical location of the substation and the geographical location of the DC grounding electrode.
[0015] Furthermore, the process of obtaining the transformer DC bias magnetic risk vulnerability assessment index caused by geomagnetic storms based on the DC current distribution model in the AC system, the earth conductivity information and the historical geomagnetic storm data is as follows:
[0016] The risk of geomagnetic storm disaster in power system is defined as: the comprehensive measurement relationship between the possibility of geomagnetic storm disaster and the severity of power system fault disaster caused by it, and the comprehensive measurement relationship between the possibility of geomagnetic storm disaster and the severity of power system fault disaster caused by it is the vulnerability assessment index of transformer DC bias magnetic risk caused by geomagnetic storm;
[0017] The comprehensive measurement relationship between the possibility of the occurrence of the geomagnetic storm disaster and the severity of the power system failure disaster caused is:
[0018] R(E SD )=P(E SD )S(x,y,E SD );
[0019] In the formula, P(E SD ) is the geomagnetic storm induced electric field E SD Probability of occurrence; S(x,y,E SD ) is the degree of power system failure under geomagnetic storm disaster, where x and y are the power system state quantity and generation quantity, respectively, representing the current operation mode of the system.
[0020] Furthermore, when the DC power transmission unit is in operation, bias currents are generated in surrounding transformers. Based on the DC current distribution model in the AC system, the node voltages and bias currents of any two transformers are obtained, including the following steps:
[0021] Assuming there are n substations and power plants, and m buses, the transformer DC current is solved by the node voltage method based on the field-circuit coupling principle:
[0022] I=G·V
[0023] Where, I is the DC grounding electrode injection current, G is the conductivity; V is the node voltage;
[0024] Then the transformer node injection current column vector and the bus node injection current column vector are:
[0025]
[0026] Where, I1 is the column vector of the current injected into the transformer node; I2 is the column vector of the current injected into the bus node; V1 is the induced potential at the grounding electrode of the substation; V2 is the bus node voltage;
[0027] Among them, the busbar node is used for communication, then I2=0, and it is deduced that:
[0028] I1=G 11 V1+G 12 ·G 22 -1 G 21 V1;
[0029] The higher the semi-saturation degree of the transformer's core excitation curve, the more serious its DC bias is. The estimation of the transformer's DC bias current limit is related to the transformer's flux model.
[0030] When the transformer flux model is an autotransformer, the magnitude of the neutral point current takes into account the DC flux generated by the DC current flowing through the series winding and the common winding. Based on the DC magnetomotive force borne by the phase column core and the equivalent current converted from the equivalent number of turns of the winding, the magnitude of the DC bias current is defined as:
[0031]
[0032]
[0033] Where: F MMdc is the DC magnetomotive force of the transformer; n w is the number of transformer windings; n k and i k are the number of winding turns and DC current respectively; I DC is the DC bias current; n eq is the equivalent number of winding turns.
[0034] Furthermore, the process of obtaining the node entropy and line entropy of the power grid system based on the bias current, and obtaining the evaluation index of the risk of DC bias magnetic field of the transformer caused by the DC transmission unit operation based on the node entropy and line entropy is as follows:
[0035] The node entropy is expressed as:
[0036]
[0037] Among them, the node entropy H N ∈(0, 1), the larger the value of node entropy, the more uneven the node current distribution; I Dc (k) is the number of node values falling in the kth continuous interval, that is, the DC bias current of the kth transformer; is the total node bias current; C onst4 is a constant whose value makes H N Falls between 0 and 1;
[0038] The line entropy is expressed as:
[0039]
[0040] Among them, the line entropy H E ∈(0, 1), the larger the value, the more uneven the line current distribution; The number of line current values falling in the kth continuous interval is the DC bias current of the kth transformer; is the total bias current of the line; C onst5 is a constant whose value makes H E Falls between 0 and 1;
[0041] The risk assessment index of transformer DC bias magnetic field caused by DC transmission single pole operation is H I for:
[0042] H I =β1H N +β2H E ;
[0043] Among them, β1 and β2 are weight coefficients, which are determined by the tomographic analysis method and the entropy weight method;
[0044] Based on node entropy and line entropy, as well as the probability of single pole operation of DC grounding electrode, the risk assessment index of transformer vulnerability caused by single pole operation of DC transmission is obtained. SPO )for:
[0045] R(E SPO )=P(E SPO )S(x,y,E SPO );
[0046] In the formula, P(E SPO ) is E( SPO ) occurs, which is generally determined by counting the number of single pole operation of the DC pole: S(x,y,E SPO ) is the degree of power system failure caused by the large-scale operation of DC transmission units, where x and y are the power system state quantity and operation quantity, respectively, representing the current operation mode of the system. At this time, S(x, y, E SPO ) is based on the transformer DC bias risk assessment index H I , that is, H N With H E express:
[0047] S(x,y,E SPO )={H N ,H E}.
[0048] Furthermore, the transformer DC bias risk assessment index R(E ST )for:
[0049] R(EST)=P(E ST )S(x,y,E ST );
[0050] In the formula, P(E ST ) is E( ST) occurs: S(x,y,E ST ) is the degree of power system failure caused by subway operation, where x and y are the power system state quantity and operation quantity, respectively, representing the current operation mode of the system.
[0051] Furthermore, the comprehensive vulnerability assessment result of the power grid transformer is:
[0052] R = α1R(E SD )+α2R(E SPO )+α3R(E ST );
[0053] In the formula, α1, α2, α3, β1 and β2 are weight coefficients, which are determined by the entropy weight method-hierarchy analysis method. SD ) is the risk vulnerability assessment index of transformer DC bias caused by geomagnetic storm, R(E SPO ) is the risk assessment index of transformer vulnerability caused by single-stage operation of DC transmission, R(E ST ) is the risk assessment index of transformer DC bias magnetic field caused by subway operation.
[0054] A system for assessing transformer vulnerability, comprising:
[0055] The preprocessing unit is configured as follows:
[0056] Used to establish a DC current distribution model in an AC system based on soil parameters, power grid parameters and geographic location parameters of the target area;
[0057] The first evaluation indicator unit is configured as:
[0058] It is used to obtain the DC bias risk vulnerability assessment index of transformers caused by geomagnetic storms based on the DC current distribution model in the AC system, the earth conductivity information and the historical geomagnetic storm data;
[0059] The second evaluation indicator unit is configured as follows:
[0060] When the DC transmission is operated in a single pole, the bias voltage and bias current of any two transformers are obtained based on the DC current distribution model in the AC system, the node entropy and line entropy of the power grid system are obtained based on the bias current, and the DC bias risk assessment index of the transformer caused by the single pole operation of the DC transmission is obtained based on the node entropy and line entropy;
[0061] The third evaluation indicator unit is configured as follows:
[0062] It is used to obtain the distribution entropy of the bias current caused by subway operation based on the static distribution of subway stray current and the DC current distribution model in the AC system. Based on the distribution entropy of the bias current and the probability distribution of the rail-to-ground potential and stray current, it is used to obtain the DC bias risk assessment index of the transformer caused by subway operation.
[0063] Output unit, configured as:
[0064] It is used to use the entropy weight method-hierarchy analysis method to process the transformer DC bias magnetic risk vulnerability assessment index caused by the geomagnetic storm, the transformer DC bias magnetic risk assessment index caused by the DC transmission single pole operation and the transformer DC bias magnetic risk assessment index caused by the subway operation, so as to obtain the comprehensive vulnerability assessment result of the power grid transformer.
[0065] A computer device comprises a memory, a processor and a computer program stored in the memory and executable on the processor. When the processor executes the computer program, the steps of the method for assessing transformer vulnerability are implemented.
[0066] A computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps of the method for assessing transformer vulnerability are implemented.
[0067] Compared with the prior art, the present invention has the following beneficial technical effects:
[0068] The present invention provides a method, system, device and medium for evaluating transformer vulnerability, comprising the following steps: establishing a DC current distribution model in an AC system based on soil parameters, power grid parameters and geographical location parameters of a target area; obtaining a DC bias magnetic risk vulnerability assessment index of a transformer caused by a geomagnetic storm based on the DC current distribution model in the AC system, as well as earth conductivity information and historical geomagnetic storm data; when DC transmission is operated in a single pole, obtaining the bias magnetic voltage and bias magnetic current of any two transformers based on the DC current distribution model in the AC system, obtaining the node entropy and line entropy of the power grid system based on the bias magnetic current, and obtaining the DC bias magnetic risk assessment index of the transformer caused by the single pole operation of DC transmission based on the node entropy and line entropy; obtaining the bias magnetic current distribution entropy caused by subway operation based on the static distribution of subway stray current and the DC current distribution model in the AC system, and obtaining the bias magnetic current distribution entropy based on the bias magnetic current distribution The entropy, as well as the probability distribution of rail-to-ground potential and stray current, are used to obtain the transformer DC bias magnetic risk assessment index caused by subway operation; the entropy weight method-hierarchy analysis method is used to process the transformer DC bias magnetic risk vulnerability assessment index caused by the geomagnetic storm, the transformer DC bias magnetic risk assessment index caused by DC transmission single pole operation and the transformer DC bias magnetic risk assessment index caused by subway operation to obtain the comprehensive vulnerability assessment result of the power grid transformer; the application first establishes the transformer DC bias magnetic risk vulnerability assessment index caused by geomagnetic storm, DC transmission single pole operation and urban rail transit respectively, and then confirms the comprehensive weight of each indicator through the hierarchical analysis method-entropy weight method, and finally obtains the comprehensive transformer vulnerability index considering the DC bias magnetic risk, which can reflect the DC bias magnetic risk of the transformer to a certain extent, and provide theoretical support and basis for transformer planning and DC bias magnetic prevention. BRIEF DESCRIPTION OF THE DRAWINGS
[0069] Figure 1 A flow chart of a method for evaluating transformer vulnerability according to an embodiment of the present disclosure is shown;
[0070] Figure 2 A schematic diagram showing a DC current distribution model in an AC system according to an embodiment of the present disclosure is shown;
[0071] Figure 3 The current distribution of surrounding substations when the grounding current of the grounding electrode in a certain area is 5000A is shown in the embodiment of the present disclosure;
[0072] Figure 4 A schematic diagram of a system for evaluating transformer vulnerability according to an embodiment of the present disclosure is shown. DETAILED DESCRIPTION
[0073] In the following, only some exemplary embodiments are briefly described. As those skilled in the art will appreciate, the described embodiments may be modified in various ways without departing from the spirit or scope of the present invention. Therefore, the drawings and descriptions are considered to be exemplary and non-restrictive in nature.
[0074] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present invention, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.
[0075] It should be understood that when used in this specification and the appended claims, the terms "include" and "comprises" indicate the presence of described features, integers, steps, operations, elements and / or components, but do not exclude the presence or addition of one or more other features, integers, steps, operations, elements, components and / or combinations thereof.
[0076] It should also be understood that the terms used in the present specification are only for the purpose of describing specific embodiments and are not intended to limit the present invention. As used in the present specification and the appended claims, unless the context clearly indicates otherwise, the singular forms "a", "an" and "the" are intended to include plural forms.
[0077] It should be further understood that the term "and / or" used in the present description and the appended claims refers to and includes any and all possible combinations of one or more of the associated listed items.
[0078] Various structural schematic diagrams of the embodiments disclosed in the present invention are shown in the accompanying drawings. These figures are not drawn to scale, and some details are magnified and some details may be omitted for the purpose of clear expression. The shapes of various regions and layers shown in the figures and the relative sizes and positional relationships therebetween are only exemplary, and may deviate in practice due to manufacturing tolerances or technical limitations, and those skilled in the art may additionally design regions / layers with different shapes, sizes, and relative positions according to actual needs.
[0079] The embodiments of the present invention are described in detail below with reference to the accompanying drawings.
[0080] Figure 1 A method for evaluating transformer vulnerability according to an embodiment of the present disclosure is shown. Figure 1 As shown, the following steps are included:
[0081] Step S1: establishing a DC current distribution model in the AC system based on soil parameters, power grid parameters and geographical location parameters of the target area;
[0082] Preferably, in the embodiment of the present disclosure, the grid parameters include line information, busbar operation information, grid connection information and substation grounding resistance information;
[0083] The geographical location parameters include the geographical location of the substation and the geographical location of the DC grounding electrode.
[0084] Specifically, the simulation system is used to establish the DC current distribution model in the AC system based on the soil parameters, power grid parameters and geographical location parameters of the target area. In the embodiment disclosed in the present invention, the simulation system is used to calculate the DC distribution in the AC power grid. The most important thing is to understand the factors related to the DC distribution, including the geographical location distribution of substations, power plants and traction stations, the topological relationship of the power grid, and the parameters of each device after the DC enters the power grid, such as the DC resistance of the transformer, the grounding resistance of the substation, etc.; it should be noted that the geographical location of the substation, power plant and traction station will not change, the topological relationship of the power grid has been determined, and the DC resistance and grounding resistance of the transformer are specified as typical values as the DC parameters of the transformer for calculation.
[0085] Step S2: Based on the DC current distribution model in the AC system, the earth conductivity information and the historical geomagnetic storm data, the DC bias risk vulnerability assessment index of the transformer caused by the geomagnetic storm is obtained;
[0086] Preferably, in the embodiment of the present disclosure, the process of obtaining the transformer DC bias magnetic risk vulnerability assessment index caused by geomagnetic storms based on the DC current distribution model in the AC system, the earth conductivity information and the historical geomagnetic storm data is:
[0087] The risk of geomagnetic storm disaster in power system is defined as: the comprehensive measurement relationship between the possibility of geomagnetic storm disaster and the severity of power system fault disaster caused by it, and the comprehensive measurement relationship between the possibility of geomagnetic storm disaster and the severity of power system fault disaster caused by it is the vulnerability assessment index of transformer DC bias magnetic risk caused by geomagnetic storm;
[0088] The comprehensive measurement relationship between the possibility of the occurrence of the geomagnetic storm disaster and the severity of the power system failure disaster caused is:
[0089] R(E SD )=P(E SD )S(x,y,E SD );
[0090] In the formula, P(E SD ) is the geomagnetic storm induced electric field E SDProbability of occurrence; S(x,y,E SD ) is the degree of power system failure under geomagnetic storm disaster, where x and y are the power system state quantity and generation quantity, respectively, representing the current operation mode of the system.
[0091] Specifically, in some embodiments, the process of calculating the comprehensive measure of the possibility of geomagnetic storm disaster and the severity of power system failure disaster caused by it is:
[0092] First, in order to obtain the possibility of geomagnetic storm disasters, that is, the probability of the occurrence of geomagnetic induced electric fields, the corresponding geoelectric field probability distribution model is established using historical geomagnetic storm data in combination with earth conductivity information, as shown in Formula 2.
[0093] Secondly, in order to judge the severity of the impact of geomagnetic storm disasters on transformers in the power grid, the entropy theory is used to measure the degree of power system failure under geomagnetic storm disasters, and the indicators such as transformer reactive loss, reactive power supply and compensation device overload entropy, and node over-limit entropy are calculated respectively as shown in formulas (2)-(10); the calculation results can reflect the severity of the impact of geomagnetic storm disasters on transformers in the power grid, as shown in formula (11), and finally the vulnerability assessment index of the risk of DC magnetic bias of transformers caused by geomagnetic storms is obtained;
[0094] Specifically, the process of establishing a geomagnetic storm disaster risk assessment model for power grids is as follows:
[0095] Combined with the earth's electrical conductivity information, using historical geomagnetic storm data, the geomagnetic storm-induced geoelectric field set is calculated. According to the small probability characteristics of geomagnetic storms, the extreme value theory can be used to establish a probability model of the geomagnetic storm-induced geoelectric field; the geoelectric field amplitude E generated by the geomagnetic storm is SD Assuming that E(SD) obeys the generalized Pareto distribution (GPD) as a random variable, the corresponding geoelectric field probability distribution model is:
[0096]
[0097] In formula (2), ξ∈R is the shape parameter, σ is the scale parameter, and It can characterize the probability that the geoelectric field E(s)>μ induced by a magnetic storm.
[0098] Secondly, determine the severity of the impact of geomagnetic storm disasters on power grid transformers:
[0099] In order to reflect the extensiveness and cluster characteristics of geomagnetic storm disturbances in the power system, the entropy theory is used to measure the overload degree of reactive power sources and compensation equipment, the over-limit degree of bus node voltage and the severity of the overload risk of transmission lines. The reactive loss impact index is:
[0100]
[0101] In formula (3), T and L are the number of transformers and lines respectively; Q Tlass and Q Llossj is the reactive power loss of transformer and line caused by GIC; Q s It is the sum of reactive power generated by all reactive power sources or reactive power compensation equipment; D Q It is an indicator of the degree of influence of magnetic storm on the reactive power of the power grid. The larger the value, the more serious the influence of magnetic storm on the reactive power of the power grid.
[0102] Pick As the maximum reactive power loss caused by GIC in transformer t and T transformers Reactive power loss ratio, Q GIIt is the GIC reactive loss of transformer t. Given n0 continuous intervals [0, u0), [u0, 2u0), ... [(n0-1)u0, n0, u0), the system GIC reactive loss entropy can be defined as:
[0103]
[0104] In formula (4), l0(k) is μ t The number of transformers falling in the kth interval, C0 is a constant, the minimum value of HQacc is 0, and the maximum value is C0lgn0. The larger the value, the more uneven the distribution of transformer reactive loss. A few transformers are likely to have large GIC reactive loss. Qacc The smaller it is, the smaller the difference in reactive power loss of each transformer is.
[0105] The overload value of reactive power supply and compensation device in power system under similar geomagnetic storm disturbance O Q It can be defined as:
[0106]
[0107] Where: Q Q is the overload set of reactive power source and compensation device, obtained by simulating magnetic storm disturbance in power system; C Q The jth element C in Q,j =C Qj / C Qe,j , C Qj is the load of reactive power source or compensation device j, C Qe,j is its rated capacity;
[0108] Given n1 continuous intervals [0,u1), [u1,2u1), …, [(n1-1)u1,n1u1), the overload entropy of reactive power sources and compensation devices in the power grid system is defined as:
[0109]
[0110] Where: l1(k) is C j The number of reactive power sources or compensation devices falling in the kth continuous interval; T1 is the total number of overloaded reactive power sources or compensation devices; C onst1 is a constant.
[0111] HO Q The minimum value is 0 and the maximum value is The larger the value, the more uneven the overload state distribution is. A few reactive power sources or compensation devices are likely to have large overload values. Q Smaller ones may also cause individual reactive power sources or compensation devices to stop operating; HO Q The smaller the value, the smaller the difference in overload conditions of reactive power sources or compensation devices. Q When it is large, it is easy to cause the reactive power supply or compensation device cluster to exit operation; similarly, the node voltage over-limit value Q can be defined V , node voltage over-limit entropy Line overload value O1 and line overload entropy The node voltage exceeds the limit value and defines Q V for:
[0112]
[0113] Where: Q V is the node voltage overload set, which can be obtained by simulating geomagnetic storm disturbance in power system; C V The jth element C in V,j =|C ve,j -C Vj |,C Vj is the operating voltage of node j, C ve,j is its rated voltage; ||C v ||1 is C v 1-norm, given n2 continuous intervals [0,u2), [u2, 2u2,), …, [(n2-1)u2, n2u2,), then the voltage limit entropy of the node in the system can be defined as:
[0114]
[0115] Where: l2(k) is the number of nodes where Cv,j falls in the kth continuous interval; T2 is the total number of nodes with voltage exceeding the limit; C onst2 is a constant.
[0116] Ho v The minimum value is 0 and the maximum value is C onst2 The larger the lgn2 value, the more uneven the voltage distribution of the over-limit nodes is, and a few nodes are likely to have large over-limit values.v If the value is smaller, some voltage protection devices may be activated and the line may be out of operation. v The smaller the value, the smaller the difference between the voltage limits of each node. v When it is large, it is easy to cause the voltage of the entire system to collapse due to the collective node voltage exceeding the limit. The line overload value Ol is defined as:
[0117]
[0118] Where: Q1 is the line overload set, which can be obtained by simulating the geomagnetic storm disturbance of the power system; the jth element C in C1 is 1,j =C 1,j / C lej ,C 1j is the load of node j, C le,j is its rated capacity. Given n3 continuous intervals [0,u3), [u3,2u3), …, [(n3-1)u3, n3u3), the line overload entropy in the system can be defined as:
[0119]
[0120] Where: l3(k) is the number of lines where C1,j falls in the kth continuous interval; T3 is the total number of overloaded lines; C onst3 is a constant. Ol The minimum value is 0 and the maximum value is C onst3 l gn3, the larger the value, the more uneven the distribution of line overload status is. A few lines are likely to have large overload values. l Smaller ones may also cause individual lines to be overloaded and cut off; H Ol The smaller it is, the smaller the difference in line overload conditions is. l When the magnitude is large, it is easy to cause overload of most lines and lead to large-scale power outages in the system. The severity of the impact of geomagnetic storm disasters on power grid transformers:
[0121]
[0122] Step S3: When the DC transmission is operated in a single pole, the bias voltage and bias current of any two transformers are obtained based on the DC current distribution model in the AC system, the node entropy and line entropy of the power grid system are obtained based on the bias current, and the DC bias risk assessment index of the transformer caused by the DC transmission single pole operation is obtained based on the node entropy and line entropy, and the vulnerability risk assessment index of the transformer caused by the DC transmission single pole operation is obtained in combination with the probability of the DC grounding pole single pole operation;
[0123] Preferably, in the embodiment of the present disclosure, when the DC power transmission unit is operating, a bias current is caused in the surrounding transformers, and the bias current of the surrounding transformers is determined by the distribution of the geoelectric field around the grounding electrode current and the AC power grid structure parameters;
[0124] Assuming there are n substations and power plants, and m buses, the transformer DC current is solved by the node voltage method based on the field-circuit coupling principle:
[0125] I=G·V(11)
[0126] Where: I is the DC grounding electrode injection current, G is the conductivity; V is the node voltage,
[0127] The transformer node injection current column vector and the bus node injection current column vector are:
[0128]
[0129] Where, I1 is the column vector of the current injected into the transformer node; I2 is the column vector of the current injected into the bus node; V1 is the induced potential at the grounding electrode of the substation; V2 is the bus node voltage;
[0130] Among them, the busbar node is used for communication, then I2=0, and it is deduced that:
[0131] I1=G 11 V1+G 12 ·G 22 -1 G 21 ·V1(13)
[0132] It is generally believed that the larger the neutral point current, the more serious the DC bias of the transformer. This evaluation method actually has certain misunderstandings. For a transformer, the higher the semi-saturation degree of the core excitation curve, the more serious the DC bias. The estimation principle of the transformer DC bias current limit is related to the transformer flux model.
[0133] For example, when the transformer flux model is an autotransformer, the magnitude of the neutral point current cannot reflect the DC bias level of the transformer. Instead, the DC magnetic flux generated by the DC current flowing through the series winding and the common winding should be considered comprehensively. The magnitude of the DC bias current is defined based on the DC magnetomotive force borne by the phase column core and the equivalent current converted from the equivalent number of turns of the winding:
[0134]
[0135] In the formula, F MMdc is the DC magnetomotive force of the transformer; n w is the number of transformer windings; n k and i k are the number of winding turns and DC current respectively; IDC is the DC bias current; n eq is the equivalent number of winding turns.
[0136] Preferably, in the embodiment of the present disclosure, the process of obtaining the node entropy and line entropy of the power grid system based on the bias current, and obtaining the DC bias risk assessment index of the transformer caused by the single-stage operation of the DC transmission system based on the node entropy and line entropy is as follows:
[0137] The node entropy is expressed as:
[0138]
[0139] Among them, the node entropy H N ∈(0, 1), the larger the value of node entropy, the more uneven the node current distribution; I Dc (k) is the number of node values falling in the kth continuous interval, that is, the DC bias current of the kth transformer; is the total node bias current; C onst4 is a constant whose value makes H N Falls between 0 and 1;
[0140] The line entropy is expressed as:
[0141]
[0142] Among them, the line entropy H E ∈(0, 1), the larger the value, the more uneven the line current distribution; The number of line current values falling in the kth continuous interval; is the total bias current of the line; C onst5 is a constant whose value makes H E Falls between 0 and 1; I dc is the bias current;
[0143] The risk assessment index of transformer DC bias magnetic field caused by DC transmission single pole operation is H I for:
[0144] H I =β1H N +β2H E ;
[0145] Among them, β1 and β2 are weight coefficients, which are determined by tomography analysis method and entropy weight method.
[0146] Preferably, in the embodiment of the present disclosure, the node entropy and line entropy of the power grid system are obtained based on the bias current, and the risk assessment index R(E) of the transformer vulnerability caused by the single pole operation of the DC transmission is obtained based on the node entropy and line entropy, and the probability of the DC grounding electrode to have a single pole operation.SPO )for:
[0147] R(E SPO )=P(E SPO )S(x,y,E SPO );
[0148] In the formula, P(E SPO ) is E( SPO ) occurs, which is generally determined by counting the number of single pole operation of the DC pole: S(x,y,E SPO ) is the degree of power system failure caused by the large-scale operation of DC transmission units, where x and y are the power system state quantity and operation quantity, respectively, representing the current operation mode of the system. At this time, S(x, y, E SPO ) can be evaluated by the transformer DC bias risk assessment index H I , that is, H N With H E Indicates that:
[0149] S(x,y,E SPO )={H N ,H E}.
[0150] Step S4: based on the static distribution of subway stray current and the DC current distribution model in the AC system, the distribution entropy of the bias current caused by the subway operation is obtained; based on the distribution entropy of the bias current and the probability distribution of the rail-to-ground potential and the stray current, the DC bias risk assessment index of the transformer caused by the subway operation is obtained;
[0151] Preferably, in the disclosed embodiment, the degree of transformer DC bias caused by subway operation is mainly related to the magnitude of the current flowing into the neutral point of the grounding transformer, and the magnitude of the current flowing into the neutral point of the transformer depends on the magnitude of the stray current leaked from the rail. Therefore, the possibility of transformer DC bias caused by subway operation can be measured by the dynamic probability distribution of stray current. According to the definition of risk, the power system risk caused by subway operation can be defined as a comprehensive measure of the possibility of transformer DC bias caused by subway operation and the severity of the power system fault disaster caused by it:
[0152] R(EST)=P(E ST )S(x,y,E ST )(15)
[0153] In the formula, P(E ST ) is E( ST ) occurs: S(x,y,E ST ) is the degree of power system failure caused by subway operation, where x and y are the power system state quantity and operation quantity, respectively, representing the current operation mode of the system.
[0154] Specifically, the operation process of subway trains is dynamically simulated. Based on the traditional static distribution model of subway stray current, a dynamic distribution model of subway stray current is established. Then, the dynamic distribution law of subway stray current is analyzed through the DC current distribution model in the AC system. Then, the probabilistic flow calculation in the power system is used for reference. The train current is taken as the input random variable. Based on the dynamic distribution model of subway stray current, a dynamic probability distribution model of stray current is established. Monte Carlo simulation is used to simulate and analyze the probability distribution characteristics of subway rail potential to ground and stray current.
[0155] According to the analysis, the probability distribution of rail-to-ground potential and stray current is not a normal distribution or other common distribution. Its probability density function is a single-peak convex shape, and the probability of taking values near the mean is the highest. When a single train is running, the probability distribution of rail-to-ground potential is symmetrical, while the probability distribution of stray current is right-skewed; when multiple trains are running at the same time, the probability distribution of rail-to-ground potential and stray current is approximately symmetrical. The dynamic probability distribution of stray current can be obtained by the kernel density estimation tool provided in the Matlab simulation software.
[0156] Analogous to the risk index of geomagnetic storm disaster, given n continuous intervals [0,u5), [u5,2u5), …, [(n-1)u5,nu5), the distribution entropy of the magnetic bias current caused by subway operation can be defined as:
[0157]
[0158] In the formula, I DT (k) is the number of transformers in the substation whose neutral point bias DC falls within the kth continuous interval; T is the total number of transformers with neutral point DC limit; C onst6 is a constant.
[0159] H IDT The minimum value is 0 and the maximum value is C onst The larger the value of Ign, the more uneven the distribution of DC over-limit state at the neutral point of the substation is, and the DC of a few substations is likely to have a large over-limit value.
[0160] It should be noted that, in this embodiment, the H IDC That is, S(x,y,E ST ), that is, the extent of power system failure caused by subway operation.
[0161] Step S5: using the entropy weight method-hierarchy analysis method to process the transformer DC bias magnetic risk vulnerability assessment index caused by the geomagnetic storm, the transformer DC bias magnetic risk assessment index caused by the DC transmission single pole operation, and the transformer DC bias magnetic risk assessment index caused by the subway operation to obtain a comprehensive vulnerability assessment result of the power grid transformer.
[0162] Preferably, in the embodiment of the present disclosure, the comprehensive vulnerability assessment result of the power grid transformer is:
[0163] R = α1R(E SD )+α2R(E SPO )+α3R(E ST );
[0164] Among them, α1, α2, α3, β1 and β2 are weight coefficients, which are determined by the entropy weight method-hierarchy analysis method. SD ) is the risk vulnerability assessment index of transformer DC bias caused by geomagnetic storm, R(E SPO ) is the risk assessment index of transformer vulnerability caused by single-stage operation of DC transmission, R(E ST ) is the risk assessment index of transformer DC bias magnetic field caused by subway operation.
[0165] The present disclosure also provides an embodiment:
[0166] Based on the soil parameters, grid parameters and geographical location parameters of a certain area, a DC current distribution model in the AC system is established; the grid parameters include line information, busbar operation information, grid connection information and substation grounding resistance information; the geographical location parameters include the substation geographical location and the DC grounding electrode geographical location; the established DC current distribution model in the AC system is as follows Figure 2 As shown;
[0167] When the current flowing through the MYG grounding electrode is 6000A, it is found that the neutral point current of 8 plants and stations exceeds the limit, namely SYH substation, SLQ substation, SSH Yuheng power plant, SHS substation, SYL-S1 substation, SYL-W substation, SYL-S2 traction transformer, and SZM 330 kV substation. The station with the most serious DC bias is SYH substation, with the absolute value of the current reaching 37.59A, which is a serious over-limit. If no control measures are taken, the main transformer of SYH substation will be in a severely saturated operating state, the temperature rise of the transformer will increase, the harmonic noise will increase, and the reactive power loss will increase, seriously affecting the safe and stable operation of the transformer. Except for SYH substation, the absolute value of the neutral point DC current of SLQ substation and the main transformer of SSHYH power plant is greater than 10A, which is more than twice the over-limit current value. The stations with DC bias current exceeding 3A are shown in the following table. , as shown in Table 1; Figure 3 The figure shows the current distribution of surrounding substations when the grounding current of the grounding electrode in a certain area is 5000A.
[0168] Table 1. Calculation results of DC bias current in substation
[0169]
[0170]
[0171] In this embodiment, the selection principle of the transformer DC bias current limit is as follows:
[0172] (1) For 1000kV transformers, the DC bias current limit is 2A;
[0173] (2) For 750kV transformers, the DC bias current limit is 4A;
[0174] (3) For 500kV transformers, the DC bias current limit is 5A;
[0175] (4) For 330kV transformers, the DC bias current limit is 6A;
[0176] (5) For 220kV transformers, the DC bias current limit is 7A;
[0177] (6) No requirements are currently made for 110kV transformers.
[0178] The disclosed embodiment also provides a system for evaluating transformer vulnerability, such as Figure 4 As shown, including:
[0179] The preprocessing unit is configured as follows:
[0180] Used to establish a DC current distribution model in an AC system based on soil parameters, power grid parameters and geographic location parameters of the target area;
[0181] The first evaluation indicator unit is configured as:
[0182] It is used to obtain the DC bias risk vulnerability assessment index of transformers caused by geomagnetic storms based on the DC current distribution model in the AC system, the earth conductivity information and historical geomagnetic storm data;
[0183] The second evaluation indicator unit is configured as follows:
[0184] When the DC transmission is operated in a single pole, the bias voltage and bias current of any two transformers are obtained based on the DC current distribution model in the AC system, the node entropy and line entropy of the power grid system are obtained based on the bias current, and the DC bias risk assessment index of the transformer caused by the single pole operation of the DC transmission is obtained based on the node entropy and line entropy;
[0185] The third evaluation indicator unit is configured as follows:
[0186] It is used to obtain the distribution entropy of the bias current caused by subway operation based on the static distribution of subway stray current and the DC current distribution model in the AC system. Based on the distribution entropy of the bias current and the probability distribution of the rail-to-ground potential and stray current, it is used to obtain the DC bias risk assessment index of the transformer caused by subway operation.
[0187] Output unit, configured as:
[0188] It is used to use the entropy weight method-hierarchy analysis method to process the transformer DC bias magnetic risk vulnerability assessment index caused by the geomagnetic storm, the transformer DC bias magnetic risk assessment index caused by the DC transmission single pole operation and the transformer DC bias magnetic risk assessment index caused by the subway operation, so as to obtain the comprehensive vulnerability assessment result of the power grid transformer.
[0189] In another embodiment of the present invention, a computer device is provided, the computer device comprising a processor and a memory, the memory being used to store a computer program, the computer program comprising program instructions, and the processor being used to execute the program instructions stored in the computer storage medium. The processor may be a central processing unit (CPU), or may be other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gates or transistor logic devices, discrete hardware components, etc., which are the computing core and control core of the terminal, and are suitable for implementing one or more instructions, and are specifically suitable for loading and executing one or more instructions in a computer storage medium to implement a corresponding method flow or corresponding function; the processor described in the embodiment of the present invention can be used for the operation of the method for evaluating transformer vulnerability.
[0190] In another embodiment of the present invention, the present invention further provides a storage medium, specifically a computer-readable storage medium (Memory), which is a memory device in a computer device for storing programs and data. It is understandable that the computer-readable storage medium here can include both built-in storage media in the computer device and, of course, extended storage media supported by the computer device. The computer-readable storage medium provides a storage space, which stores the operating system of the terminal. In addition, one or more instructions suitable for being loaded and executed by the processor are also stored in the storage space, and these instructions can be one or more computer programs (including program codes). It should be noted that the computer-readable storage medium here can be a high-speed RAM memory or a non-volatile memory (non-volatile memory), such as at least one disk memory. The processor can load and execute one or more instructions stored in the computer-readable storage medium to implement the corresponding steps of the method for evaluating transformer vulnerability in the above embodiment.
[0191] Those skilled in the art will appreciate that embodiments of the present invention may be provided as methods, systems, or computer program products. Therefore, the present invention may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Moreover, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.
[0192] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (systems), and computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0193] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0194] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process in the computer or other programmable device. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.
[0195] The above shows and describes the basic principles and main features of the present invention and the advantages of the present invention. It is obvious to those skilled in the art that the present invention is not limited to the details of the above exemplary embodiments, and the present invention can be implemented in other specific forms without departing from the spirit or basic features of the present invention. Therefore, no matter from which point of view, the embodiments should be regarded as exemplary and non-restrictive. The scope of the present invention is defined by the attached claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims are included in the present invention. Any figure mark in the claims should not be regarded as limiting the claims involved.
[0196] In addition, it should be understood that although this specification is described in accordance with the implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment can also be appropriately combined to form other implementation modes that can be understood by those skilled in the art. The above content is only to illustrate the technical idea of the present invention, and cannot be used to limit the protection scope of the present invention. Any changes made on the basis of the technical solution according to the technical idea proposed by the present invention shall fall within the protection scope of the claims of the present invention.
Claims
1. A method for assessing transformer vulnerability, comprising the following steps: Establish a DC current distribution model in the AC system based on the soil parameters, power grid parameters and geographical location parameters of the target area; Based on the DC current distribution model in the AC system, as well as the earth's electrical conductivity information and historical geomagnetic storm data, the vulnerability assessment index of the transformer DC bias risk caused by geomagnetic storms is obtained; When the DC transmission is operated in a single pole, the node voltage and bias current of any two transformers are obtained based on the DC current distribution model in the AC system. The node entropy and line entropy of the power grid system are obtained based on the bias current. Based on the node entropy and line entropy, the evaluation index of the DC bias risk of transformers caused by the single pole operation of the DC transmission is obtained. Based on the subway stray current distribution and the DC current distribution model in the AC system, the distribution entropy of the bias current caused by subway operation is obtained. Based on the distribution entropy of the bias current and the probability distribution of the rail-to-ground potential and stray current, the DC bias risk assessment index of the transformer caused by subway operation is obtained. The entropy weight method-hierarchy analysis method is used to process the transformer DC bias risk vulnerability assessment indicators caused by the geomagnetic storm, the transformer DC bias risk assessment indicators caused by the DC transmission single pole operation and the transformer DC bias risk assessment indicators caused by the subway operation to obtain the comprehensive vulnerability assessment results of the power grid transformer.
2. The method for assessing transformer vulnerability according to claim 1, characterized in that: The grid parameters include line information, busbar operation information, grid connection information and substation grounding resistance information; The geographical location parameters include the geographical location of the substation and the geographical location of the DC grounding electrode.
3. The method for assessing transformer vulnerability according to claim 1, characterized in that: The process of obtaining the DC bias magnetic risk vulnerability assessment index of the transformer caused by geomagnetic storms based on the DC current distribution model in the AC system, the earth conductivity information and the historical geomagnetic storm data is as follows: The risk of geomagnetic storm disaster in power system is defined as: the comprehensive measurement relationship between the possibility of geomagnetic storm disaster and the severity of power system fault disaster caused by it, and the comprehensive measurement relationship between the possibility of geomagnetic storm disaster and the severity of power system fault disaster caused by it is the vulnerability assessment index of transformer DC bias magnetic risk caused by geomagnetic storm; The comprehensive measurement relationship between the possibility of the occurrence of the geomagnetic storm disaster and the severity of the power system failure disaster caused is: R(E SD )=P(E SD )S(x,y,E SD ); In the formula, P(E SD ) is the geomagnetic storm induced electric field E SD Probability of occurrence; S(x,y,E SD ) is the degree of power system failure under geomagnetic storm disaster, Among them, x and y are the power system state quantity and generation quantity, respectively, representing the current operation mode of the system.
4. The method for assessing transformer vulnerability according to claim 1, characterized in that: When the DC power transmission unit is in operation, bias currents are generated in the surrounding transformers. Based on the DC current distribution model in the AC system, the node voltages and bias currents of any two transformers are obtained, including the following steps: Assuming there are n substations and power plants, and m buses, the transformer DC current is solved by the node voltage method based on the field-circuit coupling principle: I=G·V Where, I is the DC grounding electrode injection current, G is the conductivity; V is the node voltage; Then the transformer node injection current column vector and the bus node injection current column vector are: Where, I1 is the column vector of the current injected into the transformer node; I2 is the column vector of the current injected into the bus node; V1 is the induced potential at the grounding electrode of the substation; V2 is the bus node voltage; Among them, the busbar node is used for communication, then I 2=0, and it is deduced that: I1=G 11 ·V1+G 12 ·G 22 -1 G 21 ·V1; The higher the semi-saturation degree of the transformer's core excitation curve, the more serious its DC bias is. The estimation of the transformer's DC bias current limit is related to the transformer's flux model. When the transformer flux model is an autotransformer, the magnitude of the neutral point current takes into account the DC flux generated by the DC current flowing through the series winding and the common winding. Based on the DC magnetomotive force borne by the phase column core and the equivalent current converted from the equivalent number of turns of the winding, the magnitude of the DC bias current is defined as: Where: F MMdc is the DC magnetomotive force of the transformer; n w is the number of transformer windings; n k and i k are the number of winding turns and DC current respectively; I DC is the DC bias current; n eq is the equivalent number of winding turns.
5. The method for assessing transformer vulnerability according to claim 1, characterized in that: The process of obtaining the node entropy and line entropy of the power grid system based on the bias current, and obtaining the evaluation index of the risk of DC bias magnetic field of the transformer caused by the DC transmission unit operation based on the node entropy and line entropy is as follows: The node entropy is expressed as: Among them, the node entropy H N ∈(0, 1), the larger the value of node entropy, the more uneven the node current distribution; I Dc (k) is the number of node values falling in the kth continuous interval, that is, the DC bias current of the kth transformer; is the total node bias current; C onst4 is a constant whose value makes H N Falls between 0 and 1; The line entropy is expressed as: Among them, the line entropy H E ∈(0, 1), the larger the value, the more uneven the line current distribution; The number of line current values falling in the kth continuous interval is the DC bias current of the kth transformer; is the total bias current of the line; C onst5 is a constant whose value makes H E Falls between 0 and 1; The risk assessment index of transformer DC bias magnetic field caused by DC transmission single pole operation is H I for: H I =β1H N +β2H E ; Among them, β1 and β2 are weight coefficients, which are determined by the tomographic analysis method and the entropy weight method; Based on node entropy and line entropy, as well as the probability of single pole operation of DC grounding electrode, the risk assessment index of transformer vulnerability caused by single pole operation of DC transmission is obtained. SPO )for: R(E SPO )=P(E SPO )S(x,y,E SPO ); In the formula, P(E SPO ) is E( SPO ) occurs, which is generally determined by counting the number of single pole operation of the DC pole: S(x,y,E SPO ) is the degree of power system failure caused by the large-scale operation of DC transmission units, where x and y are the power system state quantity and operation quantity, respectively, representing the current operation mode of the system. At this time, S(x, y, E SPO ) is based on the transformer DC bias risk assessment index H I , that is, H N With H E express: S(x,y,E SPO )={H N ,H E }。 6. The method for assessing transformer vulnerability according to claim 1, characterized in that: The transformer DC bias risk assessment index R(E ST )for: R(EST)=P(E ST )S(x,y,E ST ); In the formula, P(E ST ) is E( ST ) occurs: S(x,y,E ST ) is the degree of power system failure caused by subway operation, where x and y are the power system state quantity and operation quantity, respectively, representing the current operation mode of the system.
7. The method for assessing transformer vulnerability according to claim 1, characterized in that: The comprehensive vulnerability assessment results of the power grid transformer are as follows: R=α1R(E SD )+α2R(E SPO )+α3R(E ST ); In the formula, α1, α2, α3, β1 and β2 are weight coefficients, which are determined by the entropy weight method-hierarchy analysis method. SD ) is the risk vulnerability assessment index of transformer DC bias caused by geomagnetic storm, R(E SPO ) is the risk assessment index of transformer vulnerability caused by single-stage operation of DC transmission, R(E ST ) is the risk assessment index of transformer DC bias magnetic field caused by subway operation.
8. A system for assessing transformer vulnerability, characterized in that: The method for assessing transformer vulnerability according to any one of claims 1 to 7 comprises: The preprocessing unit is configured as follows: Used to establish a DC current distribution model in an AC system based on soil parameters, power grid parameters and geographic location parameters of the target area; The first evaluation indicator unit is configured as: It is used to obtain the DC bias risk vulnerability assessment index of transformers caused by geomagnetic storms based on the DC current distribution model in the AC system, the earth conductivity information and the historical geomagnetic storm data; The second evaluation indicator unit is configured as follows: When the DC transmission is operated in a single pole, the bias voltage and bias current of any two transformers are obtained based on the DC current distribution model in the AC system, the node entropy and line entropy of the power grid system are obtained based on the bias current, and the DC bias risk assessment index of the transformer caused by the single pole operation of the DC transmission is obtained based on the node entropy and line entropy; The third evaluation indicator unit is configured as follows: It is used to obtain the distribution entropy of the bias current caused by subway operation based on the static distribution of subway stray current and the DC current distribution model in the AC system. Based on the distribution entropy of the bias current and the probability distribution of the rail-to-ground potential and stray current, it is used to obtain the DC bias risk assessment index of the transformer caused by subway operation. Output unit, configured as: It is used to use the entropy weight method-hierarchy analysis method to process the transformer DC bias magnetic risk vulnerability assessment index caused by the geomagnetic storm, the transformer DC bias magnetic risk assessment index caused by the DC transmission single pole operation and the transformer DC bias magnetic risk assessment index caused by the subway operation, so as to obtain the comprehensive vulnerability assessment result of the power grid transformer.
9. A computer device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the computer program, the steps of the method for assessing transformer vulnerability according to any one of claims 1 to 7 are implemented.
10. A computer-readable storage medium storing a computer program, characterized in that: When the computer program is executed by a processor, the steps of the method for assessing transformer vulnerability according to any one of claims 1 to 7 are implemented.
Citation Information
Cited By
Transformer DC magnetic bias suppression system and method
CN121769787A
Dynamic risk assessment method for transformer DC magnetic bias caused by subway stray current
CN122159230A