Substation patrol scheme generation method and system based on necessity assessment

Through the necessity evaluation method and the generation of adaptive inspection solutions combined with multiple algorithms, the problem of inadaptive inspections in the existing technology is solved, the pertinence and efficiency of inspections are improved, and the safe operation of the power system is ensured.

CN118982249AActive Publication Date: 2024-11-19STATE GRID JIBEI ELECTRIC POWER CO LTD TANGSHAN POWER SUPPLY CO +1

Patent Information

Application Number
CN202410974697.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-19
Publication Date
2024-11-19
Estimated Expiration
2044-07-19

AI Technical Summary

Technical Problem

The substation inspection plan in the prior art ignores the necessity and risk differences of secondary equipment, resulting in the inspection being not adaptable enough and unable to effectively ensure the stable operation of the power grid.

Method used

A method based on necessity assessment is adopted to generate highly targeted inspection plans by collecting operation, risk, failure, redundancy and technical update information, combining BWM, CRITIC, game theory, gray correlation method and TOPSIS algorithm.

Benefits of technology

The pertinence and efficiency of inspections have been improved, and substations with great impact on the stable operation of the power system have been given priority, so as to promptly discover and solve potential problems and ensure the safe operation of the power system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118982249A_ABST
    Figure CN118982249A_ABST
Patent Text Reader

Abstract

The invention discloses a substation patrol scheme generation method and system based on necessity evaluation. The method comprises the following steps: acquiring operation necessity, operation risk, fault information, operation state, equipment redundancy and technology update information of each transformer substation to construct a transformer substation inspection index set; standardizing the substation inspection index set, determining the subjective influence weight of each index by using a BWM analysis method, and determining the objective influence weight of each index by using a CRITIC analysis method; combining the subjective influence weight and the objective influence weight according to a game theory to obtain a combined weight of each index; comprehensively evaluating the patrol necessity of the transformer substation by using a grey correlation method and a TOPSIS decision algorithm; and generating a patrol scheme based on the evaluation result and the available patrol resources, and optimizing the patrol scheme according to the execution effect of the patrol scheme. According to the invention, by evaluating the inspection necessity of the secondary equipment, the optimal inspection scheme is formulated, the inspection pertinence and efficiency are improved, and the safe operation of a power system is ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of substation inspection, and in particular relates to a method and system for generating a substation inspection plan based on necessity assessment. Background Art

[0002] Substations are a vital component of the power system, undertaking the important tasks of power conversion, transmission and distribution. However, with the continuous development and changes of the power system, the operating status and safety of substation equipment are also facing increasingly complex challenges. In order to ensure the normal operation and safety of substation equipment, regular inspections are required to promptly discover and solve potential problems and ensure the stable operation of the power grid.

[0003] Secondary equipment in substations plays a vital role in monitoring, controlling and protecting the normal operation of the power system. However, due to the wide variety and diverse functions of secondary equipment in substations, traditional substation inspection plans are usually based on fixed periodic inspections, ignoring the differences in factors such as the necessity and risk level of secondary equipment in the station. Summary of the invention

[0004] In order to solve the deficiencies in the prior art, the present invention provides a method and system for generating a substation inspection plan based on necessity assessment, so as to solve the technical problem of adaptive generation of secondary equipment inspection plans in a substation.

[0005] In order to solve the above technical problems, the present invention adopts the following technical solutions.

[0006] The present invention first discloses a method for generating a substation inspection plan based on necessity assessment, the method comprising the following steps:

[0007] Step 1: Collect the operation necessity information, operation risk information, fault information, operation status information, equipment redundancy information and technology update information of each substation to build a substation inspection indicator set;

[0008] Step 2: Standardize the substation inspection indicator set, use the BWM analysis method to determine the subjective influence weight of each indicator in the substation inspection indicator set, and use the CRITIC analysis method to determine the objective influence weight of each indicator in the substation inspection indicator set;

[0009] Step 3: Combining the subjective influence weight and the objective influence weight according to game theory to obtain a combined weight of each indicator;

[0010] Step 4: Based on the combined weight, the necessity of patrol of multiple substations is comprehensively evaluated by using the grey correlation method and the TOPSIS decision algorithm to obtain the evaluation result of the necessity of patrol;

[0011] Step 5: Generate an inspection plan based on the inspection necessity evaluation result and available inspection resources, and optimize the inspection plan according to the execution effect of the inspection plan.

[0012] The present invention further includes the following preferred embodiments:

[0013] The collecting of operation necessity information, operation risk information, fault information, operation status information, equipment redundancy information and technology update information of each substation further includes:

[0014] Based on the operation necessity information, the operation risk information is determined based on the safety and compliance index of each device and the equipment importance index, the fault information is determined based on the equipment failure degree index and the equipment importance index, the operation status information is determined based on the adaptability of a single device, the life index of a single device and the equipment importance index, the equipment redundancy information is determined based on the number of redundant and spare devices and the total number of devices, and the technology update information is determined based on the technology update and elimination risk index of a single device and the equipment importance index.

[0015] The standardization of the substation inspection indicator set further includes:

[0016] Establish the original evaluation index matrix X = (x ij ) m×n ; where x ij is the measured value or score value of the jth evaluation index of the i-th substation, m is the number of substations to be evaluated, and n is the number of evaluation indicators;

[0017] The elements in the original evaluation index matrix X are standardized to obtain the standardized matrix X*=(x ij * ) m × n :

[0018]

[0019] is the average value of the evaluation index j, s j is the mean square error of the evaluation index j;

[0020]

[0021] The method of using the BWM analysis method to determine the subjective influence weight of each indicator in the substation inspection indicator set further includes:

[0022] Select the most important indicator C from n indicators B and the least important indicator C w, using the 1 to 9 digital scale to compare and display C B For other indicators, other indicators for C w The relative importance of B =(a B 1, a B2 , a B3 , …a Bn ) and A w =(a 1w , a 2w , a 3w , …a nw ) T ;

[0023] Among them, a Bi Represents the most important indicator C B Compared with other indicators C i The relative importance of a iw Represents other indicators C i Relative to the least important indicator C w the relative importance of

[0024] Performing a preliminary consistency check based on the judgment vector;

[0025] The optimal weight calculation is completed by constructing a nonlinear programming model. The objective function and constraints are as follows:

[0026] minξ * ≥0

[0027] W j ≥0

[0028]

[0029]

[0030] ∑W j =1

[0031] According to the above objective function and constraints, the optimal weight value W is obtained. j and consistency index ξ * .

[0032] The method of using the CRITIC analysis method to determine the objective impact weight of each indicator in the substation inspection indicator set further includes:

[0033] Define v j Is the correlation coefficient of each evaluation index:

[0034]

[0035] Using the standardized matrix X*, the Pearson correlation coefficients between the evaluation indicators are calculated, and the correlation coefficient matrix R = (r kj ) n×n (k=1,2,…8;j=1,2,…8), and then use the matrix R to calculate the independence coefficient η of each evaluation index j :

[0036]

[0037] Calculate the necessity coefficient C of each evaluation indicator based on the correlation coefficient and independence coefficient of each evaluation indicator j :

[0038]

[0039] Calculate the weight W of the jth evaluation indicator j :

[0040]

[0041] The combining of the subjective influence weight and the objective influence weight according to the game theory to obtain the combined weight of each indicator further includes:

[0042] The indicator weights obtained by the BWM method and the improved CRITIC method are respectively denoted as w1=(w 11 , w 12 , ..., w 1n ) and w2=(w 21 , w 22 , ..., w 2n ), and then construct the initial combination weight by the linear combination of w1 and w2:

[0043]

[0044] α1 and α2 are the combination coefficients of subjective and objective weights respectively;

[0045] Minimize the deviation between the initial combined weight and the subjective and objective weights. The objective function and constraints are:

[0046]

[0047]

[0048] By solving the model, the optimal combination weight is obtained. The problem is to solve the minimum value under the equality constraint and construct the Lagrangian function, where λ is the penalty factor:

[0049]

[0050] The optimal first-order derivative condition is:

[0051]

[0052] The corresponding linear equations are:

[0053]

[0054] Calculate the combination coefficients α1 and α2 and perform normalization:

[0055]

[0056] The final combined weights are:

[0057]

[0058] The comprehensive evaluation of the necessity of patrolling multiple substations by using the grey correlation method and the TOPSIS decision algorithm further includes:

[0059] Step 4.1: Eliminate the dimension of the indicator data and perform standardization to obtain a standardized matrix:

[0060]

[0061] R ij is the standard value of the jth indicator of the i-th substation; x ij is the original value of the jth indicator of the i-th substation;

[0062] Step 4.2: Multiply the n-row and 1-column weight matrix obtained by game theory combination weighting with the standardized matrix R to calculate the standardized matrix V and calculate the positive ideal solution V + and the sub-ideal solution V-;

[0063]

[0064] v j + and v j - is the optimal and worst value of the jth indicator in each substation;

[0065] Step 4.3: Calculate the distance from the substation to the positive ideal solution and the sub-ideal solution:

[0066]

[0067] d i + and d i - are the Euclidean distances from the ith substation to the positive ideal solution and the sub-ideal solution respectively;

[0068] Step 4.4: Calculate the grey correlation coefficient ζi(j) of the jth indicator of the i-th substation + , ζi(j) - :

[0069]

[0070] i is the number of substations; j is the index; λ is the resolution coefficient; max n 、min n Calculate the maximum and minimum values ​​for dimension n respectively, max m 、min m Calculate the maximum and minimum values ​​for dimension m respectively;

[0071] Step 4.5: Calculate the correlation:

[0072]

[0073] Step 4.6: Calculate the gray distance T i + 、T i - and comprehensive closeness C i ;

[0074]

[0075]

[0076]

[0077]

[0078] a and b are the evaluator’s preference values ​​for the substation location, satisfying a+b=1.

[0079] The present invention also discloses a system for generating a substation inspection plan based on necessity assessment using the above-mentioned method for generating a substation inspection plan based on necessity assessment, comprising:

[0080] Comprehensive data integration module, used to collect operational necessity information, operational risk information, fault information, operating status information, equipment redundancy information and technology update information of each substation to build a substation inspection indicator set;

[0081] The inspection necessity evaluation index calculation module is used to standardize the substation inspection index set, determine the subjective influence weight of each indicator in the substation inspection index set by using the BWM analysis method, and determine the objective influence weight of each indicator in the substation inspection index set by using the CRITIC analysis method; combine the subjective influence weight and the objective influence weight according to game theory to obtain the combined weight of each indicator;

[0082] A patrol necessity comprehensive evaluation module is used to comprehensively evaluate the patrol necessity of multiple substations based on the combined weights using a grey correlation method and a TOPSIS decision algorithm to obtain a patrol necessity evaluation result;

[0083] The patrol plan generation and optimization module is used to generate a patrol plan based on the patrol necessity evaluation result and the available patrol resources, and optimize the patrol plan according to the execution effect of the patrol plan.

[0084] Accordingly, the present application also discloses a terminal, including a processor and a storage medium;

[0085] The storage medium is used to store instructions;

[0086] The processor is used to operate according to the instructions to execute the steps of the aforementioned method for generating a substation patrol plan based on necessity assessment.

[0087] Correspondingly, the present application also discloses a computer-readable storage medium on which a computer program is stored. When the program is executed by a processor, the steps of the aforementioned method for generating a substation inspection plan based on necessity assessment are implemented.

[0088] The beneficial effect of the present invention is that, compared with the prior art, the present invention provides a method and system for generating a substation inspection plan based on necessity assessment, which comprehensively considers factors such as the necessity, historical fault conditions, and operating environment of each secondary device, and provides a reasonable and efficient inspection plan for the inspectors. By evaluating the necessity of secondary equipment inspections, priority is given to substations that have a greater impact on the stable operation of the power system, so that the optimal inspection plan can be formulated under limited resources, the pertinence and efficiency of the inspection can be improved, and quality and efficiency can be improved, which helps to timely discover and solve potential problems and ensure the safe operation of the power system. BRIEF DESCRIPTION OF THE DRAWINGS

[0089] Figure 1 It is a structural diagram of the substation inspection system based on necessity assessment in the present invention.

[0090] Figure 2 It is a schematic diagram of the substation inspection indicator system in the present invention.

[0091] Figure 3 It is a comprehensive evaluation flow chart of substation inspection indicators in the present invention.

[0092] Figure 4 It is a flow chart of patrol scheme generation and optimization in the present invention. DETAILED DESCRIPTION

[0093] In order to make the purpose, technical solution and advantages of the present invention more clear, the technical solution of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention.

[0094] The embodiments described in this application are only some embodiments of the present invention, not all embodiments. Based on the spirit of the present invention, other embodiments obtained by ordinary technicians in this field without creative work are all within the protection scope of the present invention.

[0095] In view of the shortcomings of the prior art, the present invention proposes a method and system for generating a substation inspection plan based on necessity assessment, which comprehensively considers the necessity, historical fault conditions, operating environment and other factors of each secondary equipment to provide a reasonable and efficient inspection plan for the inspectors. By evaluating the necessity of secondary equipment inspection, priority is given to substations that have a greater impact on the stable operation of the power system, so as to formulate the best inspection plan under limited resources, improve the pertinence and efficiency of the inspection, achieve quality improvement and efficiency increase, help to timely discover and solve potential problems, and ensure the safe operation of the power system.

[0096] The method for generating a substation inspection plan based on necessity assessment disclosed in the present invention comprises the following steps:

[0097] Step 1: Collect the operation necessity information, operation risk information, fault information, operation status information, equipment redundancy information and technology update information of each substation to build a substation inspection indicator set.

[0098] See also Figure 1The comprehensive data integration module is used to collect, integrate and process data from various sources, aiming to ensure that the data obtained by the system is comprehensive, accurate and real-time, and provide reliable data support for subsequent analysis and decision-making. Take network security measures, use access encryption, and deploy independently and isolate from the external network to prevent data leakage and unauthorized access. Comply with data privacy regulations and standards when processing operational data. Summarize the rules and regulations related to substation inspections as a basis for data collection and indicator formulation and calculation. Collect information such as the commissioning time, historical maintenance records, fault history records, and maintenance response time of each equipment in each substation. Real-time monitoring of the number, operation status, existing defects, technical conditions, safety and compliance status, geographical conditions and external environment, equipment redundancy and standby status of secondary equipment in the substation. Clean the collected data and eliminate irrelevant, erroneous or duplicate information. Integrate data from different sources to ensure data consistency and integrity. Convert data into a standard format for easy processing and analysis.

[0099] First, preset the equipment importance index and equipment failure degree index.

[0100] For the equipment importance index, relay protection and AC / DC equipment are greater than automation equipment, and automation equipment is greater than auxiliary equipment. The equipment importance index ki of the three types of equipment are 3, 2, and 1, respectively, as shown in Table 1:

[0101] Equipment Importance Index Relay protection equipment Automation Equipment Auxiliary equipment ki 3 2 1

[0102] Table 1

[0103] For the equipment failure degree index, according to the State Grid Corporation of China, the equipment failure types are divided into critical, serious, and general. The equipment failure degree index kf of the three types of failures are 3, 2, and 1 respectively, as shown in Table 2:

[0104] Equipment Failure Index critical serious generally kf 3 2 1

[0105] Table 2

[0106] The operational necessity information comprehensively considers the position and role of the substation in the entire power network, including whether it is a primary or secondary node, the geographical scope and number of users supplied by the substation, the total transformer capacity and transmission capacity of the substation, the key users supplied by the substation, the geographical location of the substation, the fragility of the environment in which it is located, and other factors. The necessity of the substation is scored by experts on a scale from 0 to 2, with 2 being the most important.

[0107] The operational risk information is used to assess whether the equipment meets current safety and compliance standards and whether domestic chips are used. Equipment that does not meet the standards may need to be upgraded or replaced with a higher priority. Experts score the safety and compliance of substations, and the safety and compliance of each device is scored from 2 to 0, with the best safety and compliance (i.e., the least necessary for inspection) being 0.

[0108] Multiply the security and compliance index of a single device by the device importance ki, and then add up all devices to calculate the security and compliance index of the entire site:

[0109] Substation safety and compliance index = ∑ single equipment safety and compliance * equipment importance ki

[0110] The fault information includes the current fault index and the historical fault index of the equipment.

[0111] The existing fault index is the accumulation of all existing faults and defects of all equipment, and the fault degree index of the existing faulty equipment is calculated and multiplied by the equipment importance index, and the sum is obtained to obtain the existing fault degree of the secondary equipment of the whole station: Substation existing fault index = ∑ existing faulty equipment fault degree index kf × the equipment importance index ki

[0112] The historical fault index is used to analyze the historical fault records of the equipment, including the number of faults and fault types within three years. The fault history records of all equipment in the substation are accumulated, and the fault degree index of the historical fault equipment is calculated and multiplied by the equipment importance index, and the sum is obtained to obtain the historical fault degree of the secondary equipment of the whole station:

[0113] Substation historical fault index = ∑ historical fault equipment fault degree index kf × the equipment importance index ki

[0114] The operating status information includes environmental adaptability and equipment life index. Environmental adaptability considers the environmental factors of equipment operation, such as temperature, humidity, pollution, etc., which affect equipment performance. The environmental adaptability of the equipment is rated, taking into account the manufacturer's design standards and actual operating conditions.

[0115] The rating ranges from 0 to 2, with 2 indicating poor adaptability and 0 indicating strong adaptability. The formula for calculating the adaptability of a substation environment is as follows:

[0116] Substation environmental adaptability = ∑ adaptability of a single device * equipment importance index ki.

[0117] The equipment life index takes into account the service life of the equipment. Aging equipment may require more frequent maintenance and earlier replacement. The equipment life index of a single device = service life / design life. The equipment life index calculation formula is as follows:

[0118] Substation secondary equipment life index = ∑ single equipment life index * equipment importance index ki

[0119] The equipment redundancy information is the equipment redundancy and backup ratio, which is used to evaluate whether the equipment has redundancy or backup facilities. Equipment with high redundancy has a lower necessity for inspection:

[0120] Secondary equipment redundancy and backup ratio = 1-number of redundant and backup equipment / total number of equipment

[0121] The technology update information is the technology update and obsolescence risk index, which is used to consider the impact of technological progress on equipment and evaluate the risk of technological obsolescence faced by equipment. Comprehensive consideration is given to determine the stage of the life cycle of the technology used by the equipment (such as introduction, growth, maturity or decline), evaluate the compatibility of existing equipment with emerging technologies (such as new software and hardware standards), and compare the performance parameters of the equipment (such as efficiency, speed, capacity) with the current industry standards or the latest equipment.

[0122] Rating from 0 to 2, with 2 indicating high risk of technology refresh and obsolescence and 0 indicating low risk of technology refresh and obsolescence:

[0123] Technology update and obsolescence risk index =

[0124] ∑Individual equipment technology update and obsolescence risk index×equipment importance index ki.

[0125] Step 2: Standardize the substation inspection indicator set, use the BWM analysis method to determine the subjective influence weight of each indicator in the substation inspection indicator set, and use the CRITIC analysis method to determine the objective influence weight of each indicator in the substation inspection indicator set.

[0126] Specifically, step 2 further includes:

[0127] Step 2.1: Establish the original evaluation index matrix X = (x ij ) m×n Among them, x ij is the measured value or score value of the jth evaluation index of the ith substation, m is the number of substations to be evaluated, n is the number of evaluation indexes, and n is 8 in this embodiment.

[0128] The elements in the original evaluation index matrix X are standardized according to the following formula to obtain the standardized matrix X*=(x ij * ) m×n ,in:

[0129]

[0130] Where: is the average value of the evaluation index j, s j is the mean square error of the evaluation index j.

[0131]

[0132] Step 2.2: Determine the subjective impact weight of each indicator based on the BWM method.

[0133] Compared with other subjective weighting methods, the weighting process of the BWM method greatly simplifies the data, which provides a guarantee for the accuracy of the final weighting results. The process of determining the weights for the selected indicators based on the BWM method is as follows:

[0134] Step 2.21: Select the most important indicator C from n indicators B and the least important indicator C w , using the 1 to 9 digital scale to compare and display C B For other indicators, other indicators for C w The relative importance of B =(a B 1, a B2 , a B3 , …a Bn ) and A w =(a 1w , a 2w , a 3w , …a nw ) T .

[0135] Among them, a Bi Represents the most important indicator C B Compared with other indicators C i The relative importance of a iw Represents other indicators C i Relative to the least important indicator C w the relative importance of .

[0136] Step 2.22: Perform a preliminary consistency check based on the judgment vector.

[0137] Theoretically, the judgment vector obtained in step 1 should satisfy a Bj ×a jw =a Bw , so a preliminary one-time test can be carried out based on this. Bj ×a jw The results are similar to a Bw If the values ​​of are equal or differ very little, the judgment vector passes the consistency check, otherwise the judgment vector needs to be reconstructed.

[0138] Step 2.23: The optimal weight calculation is completed by constructing a nonlinear programming model. The objective function and constraints are as follows:

[0139] minξ * ≥0

[0140] W j ≥0

[0141]

[0142]

[0143] ∑W j =1

[0144] According to the above objective function and constraints, the optimal weight value W is obtained. j and consistency index ξ * .

[0145] Step 2.24: By calculating the consistency ratio Perform a final one-time test, where maxξ is obtained from

[0146] Table 3 obtained:

[0147] <![CDATA[a Bw ]]> 1 2 3 4 5 6 7 8 9 maxξ 0.00 0.44 1.00 1.63 2.30 3.00 3.73 4.47 5.23

[0148] Table 3

[0149] Step 2.3 Determine the subjective impact weight of each indicator based on the CRITIC method.

[0150] The results of the subjective weighting method are greatly affected by human factors. In order to reduce the workload of determining the weights of evaluation indicators and increase the objectivity of the weight coefficients of evaluation indicators, the present invention adopts the CRITIC method improved by the correlation coefficient to determine the weight coefficient of each evaluation indicator. The main steps are as follows:

[0151] Define v j Is the correlation coefficient of each evaluation index:

[0152]

[0153] Using the standardized matrix X*, the Pearson correlation coefficient between the evaluation indicators is calculated, that is, the quotient of the covariance and standard deviation between the indicators, and the correlation coefficient matrix R = (r kj ) n×n (k=1,2,…8;j=1,2,…8), and then use the matrix R to calculate the independence coefficient η of each evaluation index j :

[0154]

[0155] Calculate the necessity coefficient C of each evaluation indicator based on the correlation coefficient and independence coefficient of each evaluation indicator j :

[0156]

[0157] The above formula shows that C j The larger the value, the more central the evaluation indicator j is in the evaluation indicator system, the more necessary it is, and the greater the weight should be given to it. Therefore, the weight W of the jth evaluation indicator is calculated as j :

[0158]

[0159] Step 3: Combine the subjective influence weight and the objective influence weight according to game theory to obtain a combined weight of each indicator.

[0160] Drawing on the ideas of game theory, the subjective and objective weights are regarded as decision-making subjects in non-cooperative games. Both parties seek a balance of interests in constant conflict and achieve the optimal weight combination, making the indicator weighting more scientific and reasonable. The specific process is as follows:

[0161] The indicator weights obtained by the BWM method and the improved CRITIC method are respectively denoted as w1=(w 11 , w 12 , ..., w 1n ) and w2=(w 21 , w 22 , ..., w 2n ), and then construct the initial combination weight by the linear combination of w1 and w2, the formula is

[0162]

[0163] Where: α1 and α2 are the combination coefficients of subjective and objective weights respectively.

[0164] According to the principles of game theory, the Nash equilibrium point is solved, that is, to find a balance between different weights and minimize the deviation between the initial combination weight and the subjective and objective weights. The objective function and constraints are:

[0165]

[0166]

[0167] By solving the model, the optimal combination weights that comprehensively consider subjective human factors and objective data laws are obtained. This problem is to solve the minimum value under the equality constraint and construct the Lagrangian function, where λ is the penalty factor:

[0168]

[0169] According to the differential principle, the optimal first-order derivative condition of the above formula is:

[0170]

[0171] The corresponding linear equations are

[0172]

[0173] Calculate the combination coefficients α1 and α2 and perform normalization:

[0174]

[0175] The final combined weight is

[0176]

[0177] Step 4: Based on the combined weight, the necessity of patrolling multiple substations is comprehensively evaluated using the grey correlation method and the TOPSIS decision algorithm to obtain a patrol necessity evaluation result.

[0178] The TOPSIS method is a multi-objective decision-making method based on ranking the proximity between substations and the optimal solution, that is, judging the relative advantages and disadvantages of substations. The core of the grey correlation method (GRA) is to use grey correlation to describe the strength, size and order of evaluation indicators. The GRA-TOPSIS method can more systematically and accurately reflect the proximity between alternative solutions and the ideal solution, providing a basis for the final decision. The specific steps are as follows:

[0179] Step 4.1: Eliminate the dimension of the indicator data and perform standardization to obtain a standardized matrix:

[0180]

[0181] Where: R ij is the standard value of the jth indicator of the i-th substation; x ij is the original value of the jth indicator of the ith substation.

[0182] Step 4.2: Multiply the n-row and 1-column weight matrix obtained by game theory combination weighting with the standardized matrix R to calculate the standardized matrix V and calculate the positive ideal solution V + and the sub-ideal solution V - .

[0183]

[0184] v j + and v j -is the optimal and worst value of the jth indicator in each substation.

[0185] Step 4.3: Calculate the distance from the substation to the positive ideal solution and the sub-ideal solution:

[0186]

[0187] d i + and d i - are the Euclidean distances from the i-th substation to the positive ideal solution and the sub-ideal solution respectively.

[0188] Step 4.4: According to the convergence or divergence of the grey correlation method, describe the development trend of each substation through the correlation degree. Calculate the grey correlation coefficient ζi(j) of the jth indicator of the i-th substation + , ζi(j) - .

[0189]

[0190] i is the number of substations; j is the index; λ is the resolution coefficient, which is 0.5, max n 、min n Calculate the maximum and minimum values ​​for dimension n respectively, max m 、min m Calculate the maximum and minimum values ​​for dimension m respectively.

[0191] Step 4.5: Calculate the correlation:

[0192]

[0193] Step 4.6: Calculate the gray distance T i + , T i - and comprehensive closeness C i .

[0194]

[0195]

[0196]

[0197]

[0198] a and b are the evaluator's preference values ​​for the substation location, satisfying a+b=1. Preferably, a is 0.5 and b is 0.5. The comprehensive closeness indicates how close the substation is to the optimal value in terms of location and dynamic changes. The greater the comprehensive closeness, the better the substation.

[0199] The method of the present invention is described below with a specific example. Ten 110kV substations in a certain regional power grid are selected for patrol necessity evaluation. There are 10 substations to be evaluated, 8 evaluation indicators, and the original calculated values ​​of the indicators are as follows:

[0200]

[0201] Table 4

[0202] The subjective weights are calculated using the BWM method, and the results are as follows:

[0203]

[0204] The objective weights are calculated using the improved CRITIC, and the results are as follows:

[0205]

[0206]

[0207] Table 5 uses game theory to calculate the combination weights, and the results are as follows:

[0208]

[0209] Table 6

[0210] GRA-TOPSIS is used for comprehensive evaluation to obtain the necessity ranking of substation inspections. The relative proximity of each substation is calculated as follows:

[0211] Substation S_positive Substation 1 0.4008 Substation 2 0.4432 Substation 3 0.3457 Substation 4 0.6012 Substation 5 0.5678 Substation 6 0.4910 Substation 7 0.3254 Substation 8 0.4758 Substation 9 0.3703 Substation 10 0.3179

[0212] Table 7 The results of the comprehensive evaluation and ranking of substations are as follows:

[0213]

[0214]

[0215] Table 8

[0216] According to the evaluation results, the necessity of inspection of substations 4, 5 and 6 is relatively high, and they need to be given priority and paid more attention. It is recommended to inspect at least once a month to speed up defect handling and equipment transformation; the necessity of inspection of substations 8, 2, 1 and 9 is medium, and they can be considered to be inspected once a quarter; the necessity of inspection of substations 7 and 10 is relatively low, and they can be considered to be inspected once a quarter.

[0217] Step 5: Generate an inspection plan based on the inspection necessity evaluation result and available inspection resources, and optimize the inspection plan according to the execution effect of the inspection plan.

[0218] Specifically, the generation of the inspection plan specifically includes:

[0219] Step 5.1 Determine the type of inspection. This includes comprehensive inspection and special inspection. Comprehensive inspection is used to inspect all secondary equipment in the substation. Special inspection is a special inspection of the secondary system of the substation, such as special inspection of relay protection, automation, network security equipment, inspection of old equipment, inspection of fault conditions, etc.

[0220] Step 5.2: Determine the frequency of inspections. Conduct a comprehensive evaluation of the necessity of substation inspections every quarter and rank the necessity of substation inspections. Substations with high necessity should be inspected more frequently. Other factors should also be considered: such as special power supply tasks, technical demonstration sites, and other factors. High necessity (ranking the top 30%) should be inspected at least once a month; medium necessity (ranking 30%-80%) should be inspected at least once a quarter; low necessity (bottom 20%): at least once every six months.

[0221] Step 5.3 calculates the total patrol time requirement. The personnel capability coefficient is quantified according to the personnel's technical level, ranging from 0 to 1, with 1 being the strongest capability and 0 being the weakest capability. The required personnel are allocated according to the complexity and safety requirements of the patrol task.

[0222] Calculate the inspection time required for each substation, the calculation formula is:

[0223] T 基本 =N 设备 ×T 单个 / (number of patrols*capacity coefficient)+T 交通 +T 额外

[0224] N 设备 =The number of equipment that needs to be inspected in the substation. 单个 = Average time required to inspect a single device, including recording time. 交通 = time on the road. 额外 =Includes extra time such as rest time.

[0225] The patrol times for all substations are aggregated to determine the total patrol time per day, week, or month.

[0226] Step 5.4: Plan the most efficient patrol route based on geographic location to reduce travel time. Consider flexibility for emergencies and temporary assignments.

[0227] Step 5.5: Calculate additional factors, including the impact of weather and seasonal changes on the inspection schedule, such as inclement weather may require more frequent inspections. Incorporate equipment maintenance and upgrade plans into the inspection schedule to ensure optimal performance of the equipment.

[0228] Step 5.6: Use a database or management software to track inspection records and results. Use automated tools and technologies, such as drones and robotic inspections, to improve efficiency.

[0229] Step 5.7: Create a detailed inspection plan, including the inspection date, inspection time, inspection route, and inspection personnel for each substation.

[0230] Through the above steps, a patrol plan can be developed that takes into account the necessity of each substation and effectively allocates time and resources.

[0231] Step 5.8 The inspection plan execution effect includes inspection completion, defect detection rate and inspection coverage. Inspection completion is used to check the inspection report submitted by the inspector, including the inspection route, inspected equipment, problems found, etc. Confirm that all planned inspection points have been covered and all problems have been properly recorded and responded to. The defect detection rate is the ratio of potential or actual defects found during the inspection to total defects. A high defect detection rate indicates that the inspection work can effectively identify and prevent problems. The inspection coverage rate is the ratio of successfully inspected equipment or areas to the total number of planned inspections. A high coverage rate ensures that all critical equipment and substations are properly inspected.

[0232] Based on the implementation results of the inspection plan, the entire process of formulating the above inspection plan will be improved and optimized.

[0233] The beneficial effect of the present invention is that, compared with the prior art, the present invention provides a method and system for generating a substation inspection plan based on necessity assessment, which comprehensively considers factors such as the necessity, historical fault conditions, and operating environment of each secondary device, and provides a reasonable and efficient inspection plan for the inspectors. By evaluating the necessity of secondary equipment inspections, priority is given to substations that have a greater impact on the stable operation of the power system, so that the optimal inspection plan can be formulated under limited resources, the pertinence and efficiency of the inspection can be improved, and quality and efficiency can be improved, which helps to timely discover and solve potential problems and ensure the safe operation of the power system.

[0234] The present invention may be a system, a method and / or a computer program product. The present invention also discloses a system for generating a substation inspection plan based on necessity assessment based on the aforementioned method for generating a substation inspection plan based on necessity assessment, comprising:

[0235] Comprehensive data integration module, used to collect operational necessity information, operational risk information, fault information, operating status information, equipment redundancy information and technology update information of each substation to build a substation inspection indicator set;

[0236] The inspection necessity evaluation index calculation module is used to standardize the substation inspection index set, determine the subjective influence weight of each indicator in the substation inspection index set by using the BWM analysis method, and determine the objective influence weight of each indicator in the substation inspection index set by using the CRITIC analysis method; combine the subjective influence weight and the objective influence weight according to game theory to obtain the combined weight of each indicator;

[0237] A patrol necessity comprehensive evaluation module is used to comprehensively evaluate the patrol necessity of multiple substations based on the combined weights using a grey correlation method and a TOPSIS decision algorithm to obtain a patrol necessity evaluation result;

[0238] The patrol plan generation and optimization module is used to generate a patrol plan based on the patrol necessity evaluation result and the available patrol resources, and optimize the patrol plan according to the execution effect of the patrol plan.

[0239] Based on the spirit of the present invention, those skilled in the art can easily think that a computer program product can be obtained based on the aforementioned method for generating a substation patrol plan based on necessity assessment. The computer program product may include a computer-readable storage medium, which carries computer-readable program instructions for enabling a processor to implement various aspects of the present disclosure. That is, the present application also includes a terminal, including a processor and a storage medium; the storage medium is used to store instructions; the processor is used to operate according to the instructions to execute the steps of the aforementioned method for generating a substation patrol plan based on necessity assessment.

[0240] Computer readable storage medium can be a tangible device that can keep and store the instructions used by the instruction execution device. Computer readable storage medium can be, for example, - but not limited to - electrical storage device, magnetic storage device, optical storage device, electromagnetic storage device, semiconductor storage device or any suitable combination of the above. More specific examples (non-exhaustive list) of computer readable storage medium include: portable computer disk, hard disk, random access memory (RAM), read-only memory (ROM), erasable programmable read-only memory (EPROM or flash memory), static random access memory (SRAM), portable compact disk read-only memory (CD-ROM), digital versatile disk (DVD), memory stick, floppy disk, mechanical encoding device, for example, punch card or groove protrusion structure with instructions stored thereon and any suitable combination of the above. Computer readable storage medium used here is not interpreted as instantaneous signal itself, such as radio wave or other free propagating electromagnetic wave, electromagnetic wave propagated by waveguide or other transmission medium (for example, light pulse by optical fiber cable) or electrical signal transmitted by wire.

[0241] The computer-readable program instructions described herein can be downloaded from a computer-readable storage medium to each computing / processing device, or downloaded to an external computer or external storage device via a network, such as the Internet, a local area network, a wide area network, and / or a wireless network. The network can include copper transmission cables, optical fiber transmissions, wireless transmissions, routers, firewalls, switches, gateway computers, and / or edge servers. The network adapter card or network interface in each computing / processing device receives the computer-readable program instructions from the network and forwards the computer-readable program instructions for storage in the computer-readable storage medium in each computing / processing device.

[0242] The computer program instructions for performing the operation of the present disclosure may be assembly instructions, instruction set architecture (ISA) instructions, machine instructions, machine-related instructions, microcode, firmware instructions, state setting data, or source code or object code written in any combination of one or more programming languages, including object-oriented programming languages-such as Smalltalk, C++, etc., and conventional procedural programming languages-such as "C" language or similar programming languages. Computer-readable program instructions may be executed completely on a user's computer, partially on a user's computer, as an independent software package, partially on a user's computer, partially on a remote computer, or completely on a remote computer or server. In the case of a remote computer, the remote computer may be connected to the user's computer via any type of network-including a local area network (LAN) or a wide area network (WAN), or may be connected to an external computer (e.g., using an Internet service provider to connect via the Internet). In some embodiments, an electronic circuit, such as a programmable logic circuit, a field programmable gate array (FPGA), or a programmable logic array (PLA) may be personalized by utilizing the state information of a computer-readable program instruction, and the electronic circuit may execute a computer-readable program instruction, thereby realizing various aspects of the present disclosure.

[0243] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the above embodiments, ordinary technicians in the relevant field should understand that the specific implementation methods of the present invention can still be modified or replaced by equivalents, and any modifications or equivalent replacements that do not depart from the spirit and scope of the present invention should be covered within the scope of protection of the claims of the present invention.

Claims

1. A method for generating a substation inspection plan based on necessity assessment, characterized in that: The following steps are involved: Step 1: Collect the operation necessity information, operation risk information, fault information, operation status information, equipment redundancy information and technology update information of each substation to build a substation inspection indicator set; Step 2: Standardize the substation inspection indicator set, use the BWM analysis method to determine the subjective influence weight of each indicator in the substation inspection indicator set, and use the CRITIC analysis method to determine the objective influence weight of each indicator in the substation inspection indicator set; Step 3: Combining the subjective influence weight and the objective influence weight according to game theory to obtain a combined weight of each indicator; Step 4: Based on the combined weight, the necessity of patrol of multiple substations is comprehensively evaluated by using the grey correlation method and the TOPSIS decision algorithm to obtain the evaluation result of the necessity of patrol; Step 5: Generate an inspection plan based on the inspection necessity evaluation result and available inspection resources, and optimize the inspection plan according to the execution effect of the inspection plan.

2. The method for generating a substation inspection plan based on necessity assessment according to claim 1, characterized in that: The collecting of operation necessity information, operation risk information, fault information, operation status information, equipment redundancy information and technology update information of each substation further includes: Based on the operation necessity information, the operation risk information is determined based on the safety and compliance index of each device and the equipment importance index, the fault information is determined based on the equipment failure degree index and the equipment importance index, the operation status information is determined based on the adaptability of a single device, the life index of a single device and the equipment importance index, the equipment redundancy information is determined based on the number of redundant and spare devices and the total number of devices, and the technology update information is determined based on the technology update and elimination risk index of a single device and the equipment importance index.

3. The method for generating a substation inspection plan based on necessity assessment according to claim 2 is characterized in that: The standardization of the substation inspection indicator set further includes: Establish the original evaluation index matrix X = (x ij ) m×n ; where x ij is the measured value or score value of the jth evaluation index of the i-th substation, m is the number of substations to be evaluated, and n is the number of evaluation indicators; The elements in the original evaluation index matrix X are standardized to obtain the standardized matrix X*=(x ij * ) m × n : is the average value of the evaluation index j, s j is the mean square error of the evaluation index j; 4. The method for generating a substation inspection plan based on necessity assessment according to claim 3 is characterized in that: The method of using the BWM analysis method to determine the subjective influence weight of each indicator in the substation inspection indicator set further includes: Select the most important indicator C from n indicators B and the least important indicator C w , using the 1 to 9 digital scale to compare and display C B For other indicators, other indicators for C w The relative importance of B =(a B 1, a B2 , a B3 , …a Bn ) and A w =(a 1w , a 2w , a 3w , …a nw ) T ; Among them, a Bi Represents the most important indicator C B Compared with other indicators C i The relative importance of a iw Represents other indicators C i Relative to the least important indicator C w the relative importance of Performing a preliminary consistency check based on the judgment vector; The optimal weight calculation is completed by constructing a nonlinear programming model. The objective function and constraints are as follows: minξ * ≥0 W j ≥0 ∑W j =1 According to the above objective function and constraints, the optimal weight value W is obtained. j and consistency index ξ * .

5. The method for generating a substation inspection plan based on necessity assessment according to claim 4 is characterized in that: The method of using the CRITIC analysis method to determine the objective impact weight of each indicator in the substation inspection indicator set further includes: Define v j Is the correlation coefficient of each evaluation index: Using the standardized matrix X*, the Pearson correlation coefficients between the evaluation indicators are calculated, and the correlation coefficient matrix R = (r kj ) n×n (k=1,2,…8;j=1,2,…8), and then use the matrix R to calculate the independence coefficient η of each evaluation index j : Calculate the necessity coefficient C of each evaluation indicator based on the correlation coefficient and independence coefficient of each evaluation indicator j : Calculate the weight W of the jth evaluation indicator j :

6. The method for generating a substation inspection plan based on necessity assessment according to claim 5, characterized in that: The combining of the subjective influence weight and the objective influence weight according to the game theory to obtain the combined weight of each indicator further includes: The indicator weights obtained by the BWM method and the improved CRITIC method are respectively denoted as w1=(w 11 , w 12 , ..., w 1n ) and w2=(w 21 , w 22 , ..., w 2n ), and then construct the initial combination weight by the linear combination of w1 and w2: α1 and α2 are the combination coefficients of subjective and objective weights respectively; Minimize the deviation between the initial combined weight and the subjective and objective weights. The objective function and constraints are: By solving the model, the optimal combination weight is obtained. The problem is to solve the minimum value under the equality constraint and construct the Lagrangian function, where λ is the penalty factor: The optimal first-order derivative condition is: The corresponding linear equations are: Calculate the combination coefficients α1 and α2 and perform normalization: The final combined weights are:

7. The method for generating a substation inspection plan based on necessity assessment according to claim 6, characterized in that: The comprehensive evaluation of the necessity of patrolling multiple substations by using the grey correlation method and the TOPSIS decision algorithm further includes: Step 4.1: Eliminate the dimension of the indicator data and perform standardization to obtain a standardized matrix: R ij is the standard value of the jth indicator of the i-th substation; x ij is the original value of the jth indicator of the i-th substation; Step 4.2: Multiply the n-row and 1-column weight matrix obtained by game theory combination weighting with the standardized matrix R to calculate the standardized matrix V and calculate the positive ideal solution V + and the sub-ideal solution V-; v j + and v j - is the optimal and worst value of the jth indicator in each substation; Step 4.3: Calculate the distance from the substation to the positive ideal solution and the sub-ideal solution: d i + and d i - are the Euclidean distances from the ith substation to the positive ideal solution and the sub-ideal solution respectively; Step 4.4: Calculate the grey correlation coefficient of the jth indicator of the i-th substation i is the number of substations; j is the index; λ is the resolution coefficient; max n 、min n Calculate the maximum and minimum values ​​for dimension n respectively, max m 、min m Calculate the maximum and minimum values ​​for dimension m respectively; Step 4.5: Calculate the correlation: Step 4.6: Calculate the gray distance T i + , T i - and comprehensive closeness C i ; a and b are the evaluator’s preference values ​​for the substation location, satisfying a+b=1.

8. A substation inspection plan generation system based on necessity assessment, characterized in that: include: Comprehensive data integration module, used to collect operational necessity information, operational risk information, fault information, operating status information, equipment redundancy information and technology update information of each substation to build a substation inspection indicator set; The inspection necessity evaluation index calculation module is used to standardize the substation inspection index set, determine the subjective influence weight of each indicator in the substation inspection index set by using the BWM analysis method, and determine the objective influence weight of each indicator in the substation inspection index set by using the CRITIC analysis method; combine the subjective influence weight and the objective influence weight according to game theory to obtain the combined weight of each indicator; A patrol necessity comprehensive evaluation module is used to comprehensively evaluate the patrol necessity of multiple substations based on the combined weights using a grey correlation method and a TOPSIS decision algorithm to obtain a patrol necessity evaluation result; The patrol plan generation and optimization module is used to generate a patrol plan based on the patrol necessity evaluation result and the available patrol resources, and optimize the patrol plan according to the execution effect of the patrol plan.

9. A terminal comprising a processor and a storage medium; characterized in that: The storage medium is used to store instructions; The processor is used to operate according to the instructions to execute the steps of the method for generating a substation inspection plan based on necessity assessment according to any one of claims 1-7.

10. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the program is executed by a processor, the steps of the method for generating a substation inspection plan based on necessity assessment as described in any one of claims 1 to 7 are implemented.

Citation Information

Patent Citations

  • A comprehensive assessment method for the operation effect of a power grid side energy storage power station

    CN109829604A

  • Game weight method-based power grid system comprehensive evaluation index system optimization method

    CN114757392A

  • Power cable state evaluation method and system based on combined empowerment

    CN117611003A

  • Photovoltaic power generation electric energy quality evaluation method and system

    CN117634965A

  • Method, device and equipment for evaluating priority of to-be-recovered substation node and storage medium

    CN118228910A

Cited By

  • Method and device for determining monitoring points in foundation pit, storage medium and program product

    CN119831144A