Park electric power-traffic coupling network planning and operation optimization method and system

By building a power-transportation coupling network planning and operation optimization model, and optimizing the configuration of power and transportation facilities in the park, the problem of mismatch in demand during construction and operation stages is solved, and efficient resource utilization and cost reduction are achieved.

CN118982369AActive Publication Date: 2024-11-19ECONOMIC & TECH RES INST OF HUBEI ELECTRIC POWER COMPANY SGCC

Patent Information

Application Number
CN202410948249.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-16
Publication Date
2024-11-19
Estimated Expiration
2044-07-16

AI Technical Summary

Technical Problem

During the construction of the park, it is difficult for existing technology to effectively optimize the allocation of power and transportation facilities, resulting in mismatch in the construction and operation stages, resulting in waste of resources and duplicate construction.

Method used

A park power-traffic coupling network planning and operation optimization method is proposed. By constructing a power-traffic coupling network planning and operation optimization model with the lowest comprehensive construction operation cost, considering different power consumption and transportation needs, and adopting a cascade expansion strategy to optimize power distribution Configuration and operation of network and transportation network.

Benefits of technology

Reduce resource waste from the construction stage to the operation stage, reduce planning and operation costs, ensure the meeting of electricity and transportation needs, and avoid duplicate construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118982369A_ABST
    Figure CN118982369A_ABST
Patent Text Reader

Abstract

The invention discloses a park power-traffic coupling network planning and operation optimization method and system, and the method comprises the steps: firstly, carrying out the planning and operation optimization of a park power-traffic coupling network based on the initial traffic flow data of the park power-traffic coupling network in the construction and operation stages; constructing a power-traffic coupling network planning and operation optimization model which takes the minimum comprehensive construction operation cost as a target and considers different power consumption and traffic demands of the park power-traffic coupling network in construction and operation stages; and solving the optimization model to obtain a configuration and operation optimization scheme of a charging facility, a power distribution network and a traffic network in the construction and operation stages of the network planning park. According to the invention, on the premise of ensuring power utilization and traffic demands, resource waste caused by repeated construction from a construction stage to an operation stage is reduced, and the minimization of the comprehensive construction operation cost of the park is realized.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the field of power-transportation coupling network planning, and specifically relates to a park power-transportation coupling network planning and operation optimization method and system. Background Art

[0002] With the advent of the electric vehicle era, the field of engineering machinery is also accelerating the pace of electrification. Traditional engineering machinery such as transport vehicles, excavators, bulldozers, etc. use fossil energy functions, and due to their unstable working conditions, incomplete combustion of fossil fuels will cause huge waste and pollution. Therefore, more and more engineering machinery manufacturers and construction units are vigorously promoting and using electrified engineering machinery, and the large-scale use of these equipment will also generate new demands on the distribution network during the construction process.

[0003] During the construction of the park, on the one hand, it is necessary to ensure the power and transportation needs during the construction period, and at the same time, it is also necessary to consider the related needs after the park is put into operation. If the relevant facilities of the distribution-transportation network are optimized and expanded according to the construction needs first, and then configured according to user needs when it is about to be put into operation, it may cause the facilities configured in the early stage to be unsuitable for the needs after the commissioning, resulting in duplicate construction; if the facilities that meet the two stages are configured at one time, some facilities will be restricted during the construction process, which also leads to a waste of resources. Summary of the invention

[0004] The purpose of the present invention is to provide a method and system for planning and optimizing the operation of a power-transportation coupling network taking into account the dual stages of park construction and operation in order to solve the above problems in the prior art.

[0005] To achieve the above objectives, the technical solution of the present invention is as follows:

[0006] In a first aspect, the present invention proposes a method for planning and optimizing operation of a park power-transportation coupling network, comprising:

[0007] S1. Based on the initial traffic flow data of the park power-transportation coupling network during the construction and operation stages, a power-transportation coupling network planning and operation optimization model is constructed. The power-transportation coupling network planning and operation optimization model aims to minimize the comprehensive construction and operation cost, and takes into account the different electricity consumption and traffic demands of the park power-transportation coupling network during the construction and operation stages;

[0008] S2. Solve the power-transportation coupling network planning and operation optimization model to obtain the configuration and operation optimization plan of the charging facilities, distribution network and transportation network in the network planning park during the construction and operation stages.

[0009] The objective function of the power-transportation coupling network planning and operation optimization model includes:

[0010] min(CP +C T +C D )[(1+α) γ -1] / αγ 2 +C E +C A

[0011]

[0012]

[0013] C A =(C TO +C TF ) / γ

[0014] In the above formula, C P is the cost of expanding the distribution network; C T is the cost of expanding the transportation network; C D Cost of charging facilities construction; C E The electricity cost of construction equipment / transport vehicles; C A is the incremental travel time cost, which is positive in the construction phase and negative in the operation phase after the expansion is completed; α is the discount rate; γ is the investment period; J h,c K is the binary decision variable for the expansion of the distribution network line c at stage h. When the park is in the construction stage, h = 1; when the park is in the operation stage, h = 2. h,l is the binary decision variable for the expansion of road l in the transportation network at stage h; PR J , PR K They are the unit costs of expanding the capacity of distribution network lines and the expansion of transportation network roads; The usage time of the facilities constructed in phase h within an investment period γ; is the number of charging piles for transport vehicles configured at the distribution network node e; is the active power output from the distribution network to the park in period t of stage h; is the charging load of transport vehicles connected to the distribution network node e during time period t; is the charging price in time period t; d W is the number of days in the construction phase; C TO is the incremental travel time cost of the park during the construction phase; C TF The incremental travel time cost of the park during the operation phase;

[0015] The constraints of the power-transportation coupling network planning and operation optimization model include park construction phase constraints and park operation phase constraints.

[0016] The constraints during the park construction phase include energy demand constraints for electric construction equipment and transport vehicles during the park construction phase, traffic constraints during the park construction phase, and distribution network operation constraints during the park construction phase;

[0017] The park operation phase constraints include traffic constraints during the park operation phase and distribution network operation constraints during the park operation phase.

[0018] The energy demand constraints for electric construction equipment and transport vehicles during the park construction phase include:

[0019]

[0020]

[0021] In the above formula, is the active power output from the distribution network to the park during period t of the construction phase; is the charging power of offline construction equipment in the park during period t; is the power consumption of online construction equipment in the park during period t; T UN is the duration of the unit period; E W To meet the charging needs of offline construction equipment within a day; E is the charging load of transport vehicles connected to the distribution network node e during period t; VT is the total charging demand of transport vehicles in a typical day during the construction phase; V t,k is the number of transport vehicles with path k in time period t; P is the average electric energy consumed by the transport vehicle with path k per transport; CP is the maximum power of a single charging pile; is the binary decision variable for configuring a transport vehicle charging station at the distribution network node e; δ M is a large M constant; N VT N is the upper limit of the number of charging stations for transport vehicles; MP The upper limit of the number of charging posts in a single transport vehicle charging station;

[0022] The traffic constraints during the park construction phase include:

[0023]

[0024] In the above formula, D 1,t,od is the total traffic demand of the starting and ending points for od during the construction period t; F 1,t,od,k is the traffic demand of the starting and ending point pair od using path k during the construction period t; k,l is the binary association coefficient between path k and road l; I l is the traffic capacity of road l; kis the percentage of traffic capacity reduction during road construction; is the average travel time of road l; PR T is the unit time cost; is the travel time cost during the construction phase;

[0025] The distribution network operation constraints during the park construction phase include:

[0026]

[0027] In the above formula, are respectively the active and reactive power on the distribution network line w during the period t of the construction phase; κ w,e is the binary correlation coefficient between line w and distribution network node e; are the basic active and reactive loads connected to the node e of the distribution network in time period t; e is the binary coefficient of the campus access point of the distribution network node e; LC w is the configuration capacity of line w; ΔLW is the capacity of the distribution network line expansion; ΔU 1,t,w is the voltage drop on line w during period t of the construction phase; are the resistance and reactance of line w respectively; U N is the rated voltage of the distribution network bus; U 1,t,a , U 1,t,b , U 1,t,e are the bus voltages of nodes a, b, and e in the construction phase during period t, where nodes a and b are the two endpoints of line w, and e is an arbitrary node; U m , U M They are the lower and upper limits of the distribution network bus voltage respectively;

[0028] The traffic constraints during the park operation phase include:

[0029]

[0030] In the above formula, D 2,t,od is the total traffic demand of the starting and ending points for od during the operation period t; F 2,t,od,k is the traffic demand of the starting and ending point pair od using path k during the operation phase period t; K It is the increase ratio of traffic capacity after road expansion; is the travel time cost during the operation phase;

[0031] The distribution network operation constraints during the park operation phase include:

[0032]

[0033]

[0034] In the above formula, are the active and reactive power on the distribution network line w in the period t of the operation phase respectively; are respectively the active and reactive loads of the park during the operation phase; ΔU 2,t,w The voltage drop on line w during the period t of the operation phase; U 2,t,a , U 2,t,b and U 2,t,e are the bus voltages of nodes a, b, and e in time period t during the operation phase, nodes a and b are the two endpoints of line w, and e is an arbitrary node.

[0035] The initial traffic flow data of the park power-traffic coupling network during the construction and operation phases is obtained based on the following traffic flow optimization allocation model:

[0036]

[0037] In the above formula, is the travel time cost of stage h, when the park is in the construction stage, h = 1, when the park is in the operation stage, h = 2; D h,t,od is the total traffic demand of the starting and ending points for od in period t of stage h; FO h,t,od,k is the initial traffic demand of the origin and destination pair od using path k in period t of stage h; k,l is the binary association coefficient between path k and road l; I l is the traffic capacity of road l; is the average travel time of road l; PR T is the unit time cost; d W The number of days for the construction phase.

[0038] In a second aspect, the present invention proposes a park power-transportation coupling network planning and operation optimization system, including a power-transportation coupling network planning and operation optimization model construction module and a power-transportation coupling network planning and operation optimization model solution module;

[0039] The power-transportation coupling network planning and operation optimization model construction module is used to construct a power-transportation coupling network planning and operation optimization model based on the initial traffic flow data of the park power-transportation coupling network during the construction and operation stages. The power-transportation coupling network planning and operation optimization model aims to minimize the comprehensive construction and operation cost, and takes into account the different electricity consumption and traffic demands of the park power-transportation coupling network during the construction and operation stages;

[0040] The power-transportation coupling network planning and operation optimization model solving module is used to solve the power-transportation coupling network planning and operation optimization model to obtain the configuration and operation optimization plan of the charging facilities, distribution network and transportation network of the network planning park during the construction and operation stages.

[0041] The power-transportation coupling network planning and operation optimization model includes an objective function construction unit and a constraint condition construction unit;

[0042] The objective function construction unit is used to construct the following objective function:

[0043] min(C P +C T +C D )[(1+α) γ -1] / αγ 2 +C E +C A

[0044]

[0045] C A =(C TO +C TF ) / γ

[0046] In the above formula, C P is the cost of expanding the distribution network; C T is the cost of expanding the transportation network; C D Cost of charging facilities construction; C E The electricity cost of construction equipment / transport vehicles; C A is the incremental travel time cost, which is positive in the construction phase and negative in the operation phase after the expansion is completed; α is the discount rate; γ is the investment period; J h,c K is the binary decision variable for the expansion of the distribution network line c at stage h. When the park is in the construction stage, h = 1; when the park is in the operation stage, h = 2. h,l is the binary decision variable for the expansion of road l in the transportation network at stage h; PR J , PR K They are the unit costs of expanding the capacity of distribution network lines and the expansion of transportation network roads; The usage time of the facilities constructed in phase h within an investment period γ; is the number of charging piles for transport vehicles configured at the distribution network node e; is the active power output from the distribution network to the park in period t of stage h; is the charging load of transport vehicles connected to the distribution network node e during time period t; is the charging price in time period t; d W is the number of days in the construction phase; C TO is the incremental travel time cost of the park during the construction phase; C TF The incremental travel time cost of the park during the operation phase;

[0047] The constraint condition construction unit is used to construct park construction phase constraints and park operation phase constraints.

[0048] The constraints during the park construction phase include energy demand constraints for electric construction equipment and transport vehicles during the park construction phase, traffic constraints during the park construction phase, and distribution network operation constraints during the park construction phase;

[0049] The park operation phase constraints include traffic constraints during the park operation phase and distribution network operation constraints during the park operation phase.

[0050] The energy demand constraints for electric construction equipment and transport vehicles during the park construction phase include:

[0051]

[0052] In the above formula, is the active power output from the distribution network to the park during period t of the construction phase; is the charging power of offline construction equipment in the park during period t; is the power consumption of online construction equipment in the park during period t; T UN is the duration of the unit period; E W To meet the charging needs of offline construction equipment within a day; E is the charging load of transport vehicles connected to the distribution network node e during period t; VT is the total charging demand of transport vehicles in a typical day during the construction phase; V t,k is the number of transport vehicles with path k in time period t; P is the average electric energy consumed by the transport vehicle with path k per transport; CP is the maximum power of a single charging pile; is the binary decision variable for configuring a transport vehicle charging station at the distribution network node e; δ M is a large M constant; N VT N is the upper limit of the number of charging stations for transport vehicles; MP The upper limit of the number of charging posts in a single transport vehicle charging station;

[0053] The traffic constraints during the park construction phase include:

[0054]

[0055]

[0056] In the above formula, D 1,t,od is the total traffic demand of the starting and ending points for od during the construction period t; F 1,t,od,k is the traffic demand of the starting and ending point pair od using path k during the construction period t; k,lis the binary association coefficient between path k and road l; I l is the traffic capacity of road l; k is the percentage of traffic capacity reduction during road construction; is the average travel time of road l; PR T is the unit time cost; is the travel time cost during the construction phase;

[0057] The distribution network operation constraints during the park construction phase include:

[0058]

[0059] In the above formula, are respectively the active and reactive power on the distribution network line w during the period t of the construction phase; κ w,e is the binary correlation coefficient between line w and distribution network node e; are the basic active and reactive loads connected to the node e of the distribution network in time period t; e is the binary coefficient of the campus access point of the distribution network node e; LC w is the configuration capacity of line w; ΔLW is the capacity of the distribution network line expansion; ΔU 1,t,w is the voltage drop on line w during period t of the construction phase; are the resistance and reactance of line w respectively; U N is the rated voltage of the distribution network bus; U 1,t,a , U 1,t,b , U 1,t,e are the bus voltages of nodes a, b, and e in the construction phase during period t, where nodes a and b are the two endpoints of line w, and e is an arbitrary node; U m , U M They are the lower and upper limits of the distribution network bus voltage respectively;

[0060] The traffic constraints during the park operation phase include:

[0061]

[0062]

[0063] In the above formula, D 2,t,od is the total traffic demand of the starting and ending points for od during the operation period t; F 2,t,od,k is the traffic demand of the starting and ending point pair od using path k during the operation phase period t; K It is the increase ratio of traffic capacity after road expansion; is the travel time cost during the operation phase;

[0064] The distribution network operation constraints during the park operation phase include:

[0065]

[0066]

[0067]

[0068] In the above formula, are the active and reactive power on the distribution network line w in the period t of the operation phase respectively; are respectively the active and reactive loads of the park during the operation phase; ΔU 2,t,w The voltage drop on line w during the period t of the operation phase; U 2,t,a , U 2,t,b and U 2,t,e are the bus voltages of nodes a, b, and e in time period t during the operation phase, nodes a and b are the two endpoints of line w, and e is an arbitrary node.

[0069] The system also includes a traffic flow data acquisition module, which is used to obtain initial traffic flow data of the park power-traffic coupling network during the construction and operation stages, including a traffic flow optimization allocation model construction unit and a traffic flow optimization allocation model solution unit;

[0070] The traffic flow optimization allocation model construction unit is used to construct the following traffic flow optimization allocation model:

[0071]

[0072]

[0073] In the above formula, is the travel time cost of stage h, when the park is in the construction stage, h = 1, when the park is in the operation stage, h = 2; D h,t,od is the total traffic demand of the starting and ending points for od in period t of stage h; FO h,t,od,k is the initial traffic demand of the origin and destination pair od using path k in period t of stage h; k,l is the binary association coefficient between path k and road l; I l is the traffic capacity of road l; is the average travel time of road l; PR T is the unit time cost; d W The number of days for the construction phase.

[0074] Compared with the prior art, the present invention has the following beneficial effects:

[0075] 1. A method for planning and optimizing the operation of a park power-transportation coupling network proposed in the present invention is first based on the initial traffic flow data of the park power-transportation coupling network in the construction and operation stages, to construct a power-transportation coupling network planning and operation optimization model with the goal of minimizing the comprehensive construction and operation cost and considering the different electricity consumption and traffic demands of the park power-transportation coupling network in the construction and operation stages, and then by solving the power-transportation coupling network planning and operation optimization model, the configuration and operation optimization scheme of the charging facilities, distribution network and transportation network of the network planning park in the construction and operation stages is obtained. On the one hand, the method takes into account the different electricity consumption and traffic demands in the power-transportation coupling network of the park in the construction and use stages, and considers the impact of road expansion construction and after expansion on traffic capacity at the system level of the traffic system, and reasonably describes the traffic distribution characteristics at different stages; on the other hand, the method adopts the strategy of step-by-step expansion of distribution network lines and traffic network roads, and uses the relevant facilities in the construction stage in the operation stage, thereby reducing the waste of resources caused by repeated construction from the construction stage to the operation stage on the premise of ensuring electricity consumption and traffic demands, and saving planning and operation costs.

[0076] 2. The method for planning and operating optimization of a park power-transportation coupling network proposed in the present invention proposes a strategy for optimizing the allocation of traffic flows during the construction and operation stages of the park based on a specific traffic flow optimization allocation model, thereby obtaining the initial traffic flow data of the park power-transportation coupling network during the construction and operation stages. This strategy effectively ensures the accuracy of the acquired initial traffic flow data. BRIEF DESCRIPTION OF THE DRAWINGS

[0077] Figure 1 It is a schematic diagram of the structure of the park power-transportation coupling network described in the present invention.

[0078] Figure 2 The present invention is a flowchart of the method.

[0079] Figure 3 This is a topological diagram of the 14-node distribution network-17-node transportation network used in Example 1.

[0080] Figure 4 This is a schematic diagram of the time-of-use electricity price used in Example 1.

[0081] Figure 5 This is a schematic diagram of the capacity expansion plan for distribution network lines and transportation network roads obtained in Example 1.

[0082] Figure 6 The structure diagram of the system of the present invention is shown in FIG. DETAILED DESCRIPTION

[0083] The present invention is further described in detail below in conjunction with specific implementations and drawings.

[0084] The present invention proposes a method for planning and optimizing the operation of a park power-transportation coupling network. Figure 1 The park construction-operation dual-stage power-transportation coupling network shown in the figure is used to optimize the configuration and operation of charging facilities, distribution networks, and transportation networks during the park construction and operation stages. This method takes into account the different power and transportation needs of the park during the construction and operation stages, and adopts a step-by-step configuration strategy to optimize the expansion planning of distribution network lines and transportation network roads. It also fully considers the additional travel time cost caused by road expansion at different stages, establishes a power-transportation coupling network planning and operation optimization model, and minimizes the comprehensive construction and operation costs of the park.

[0085] Embodiment 1:

[0086] In this embodiment, the topology structure is as follows Figure 3 The 14-node distribution network and 17-node transportation network shown in the figure (parameters: unit time cost is 20 yuan / hour; the number of days in the construction phase is 400 days; the unit cost of expanding the distribution network line capacity and the transportation network road expansion is 6×10 6 Yuanhe 2×10 7 RMB; investment cycle is 10 years; discount rate is 0.05; unit time is 1 hour; investment period is 10 years; typical days in a year are 365 days; rated voltage of distribution network is 10 kV, upper and lower limits of bus voltage of distribution network are 10.5 kV and 9.5 kV respectively; capacity of distribution network line expansion is 1 MW; charging demand of offline construction equipment in the park within one day is 10 MWh; total charging demand of transport vehicles in a typical day during the construction phase of the park is 10 MWh; upper limit of the number of charging stations for transport vehicles is 2; upper limit of the number of charging piles in a single charging station for transport vehicles is 5; decrease ratio of traffic capacity during road construction is 0.3; increase ratio of traffic capacity after road expansion is 0.2; maximum power of single charging pile for transport vehicles is 100 kW) as an object, implement the park power-transportation coupling network planning and operation optimization method of the present invention, the specific process is as follows Figure 2 As shown, including:

[0087] 1. Constructing traffic flow optimization allocation model

[0088] In order to calculate the incremental travel time cost during the construction and operation phases of the park, it is first necessary to obtain the travel time cost when the same traffic demand is met during this phase without capacity expansion. As well as initial traffic flow data. To this end, this embodiment optimizes the traffic flow allocation during the park construction and operation phases by constructing an independent traffic flow optimization allocation model. The traffic flow optimization allocation model is shown in formulas (1)-(4):

[0089]

[0090]

[0091] Formula (1) is the objective function of the traffic flow optimization allocation model, formula (2) is the traffic time cost constraint, formula (3) is the traffic demand constraint, and formula (4) is the road traffic capacity constraint. is the travel time cost of stage h, when the park is in the construction stage, h = 1, when the park is in the operation stage, h = 2; D h,t,od is the total traffic demand of the starting and ending points for od in period t of stage h; FO h,t,od,k is the initial traffic demand of the origin and destination pair od using path k in period t of stage h; k,l is the binary correlation coefficient between path k and road l. When path k includes road l, σ k,l =1, excluding the time σ k,l =0;I l is the traffic capacity of road l; is the average travel time of road l; PR T is the unit time cost; d W The number of days for the construction phase.

[0092] 2. Solve the above traffic flow optimization allocation model to obtain the initial traffic flow optimization results during the park construction and operation stages (including initial traffic flow data, travel time costs at each stage, and the cost of traffic flow at each stage). ).

[0093] 3. Based on the initial traffic flow optimization results obtained in step 2, a power-transportation coupling network planning and operation optimization model is constructed with the goal of minimizing the comprehensive construction and operation cost. The objective function of the power-transportation coupling network planning and operation optimization model includes:

[0094] min(C P +C T +C D )[(1+α) γ -1] / αγ 2 +C E +C A Formula (5)

[0095]

[0096] C A =(C TO +C TF ) / γ Formula (10)

[0097] In the above formula, C P is the cost of expanding the distribution network; C T is the cost of expanding the transportation network; C DCost of charging facilities construction; C E The electricity cost of construction equipment / transport vehicles; C A is the incremental travel time cost, which is positive in the construction phase and negative in the operation phase after the expansion is completed; α is the discount rate; γ is the investment period; J h,c is the binary decision variable for the expansion of distribution network line c in stage h. When the distribution network line c is expanded, J h,c =1, when no capacity expansion is performed J h,c =0; K h,l is the binary decision variable for the expansion of road l in the transportation network at stage h. h,l =1, no expansion K h,l =0;PR J , PR K They are the unit costs of expanding the capacity of distribution network lines and the expansion of transportation network roads; The usage time of the facilities constructed in phase h within an investment period γ; is the number of charging piles for transport vehicles configured at the distribution network node e; is the active power output from the distribution network to the park in period t of stage h; is the charging load of transport vehicles connected to the distribution network node e during time period t; is the charging price in time period t; d W is the number of days in the construction phase; C TO is the incremental travel time cost of the park during the construction phase; C TF It is the incremental travel time cost of the park during the operation phase.

[0098] The constraints include the park construction phase constraints and the park operation phase constraints, among which:

[0099] Constraints during the park construction phase include:

[0100] (1) Energy demand constraints for electric construction equipment and transport vehicles during the park construction phase

[0101] In the scenario considered by the present invention, all the engineering equipment used in the park construction process is electrified, that is, electric construction equipment and transport vehicles are used. Among them, since electric construction equipment is not convenient to move long distances, the mode of on-site charging inside the park is adopted; electric transport vehicles have long-distance movement capabilities and are more flexible to charge, so they can be charged during the transportation journey. To this end, the energy demand constraints of electric construction equipment and transport vehicles during the park construction phase are specifically set as follows:

[0102]

[0103]

[0104]

[0105]

[0106]

[0107] In the above formula, is the active power output from the distribution network to the park during period t of the construction phase; is the charging power of offline construction equipment in the park during period t; is the power consumption of online construction equipment in the park during period t; T UN is the duration of the unit period; E W To meet the charging needs of offline construction equipment within a day; E is the charging load of transport vehicles connected to the distribution network node e during period t; VT is the total charging demand of transport vehicles in a typical day during the construction phase; V t,k is the number of transport vehicles with path k in time period t; P is the average electric energy consumed by the transport vehicle with path k per transport; CP is the maximum power of a single charging pile; is the binary decision variable for configuring a transport vehicle charging station at the distribution network node e. When not configured δ M is a large M constant; N VT N is the upper limit of the number of charging stations for transport vehicles; MP The upper limit of the number of charging piles in a single transport vehicle charging station.

[0108] In this constraint, the power balance constraint in the park is shown in formula (11). It should be noted that the main load in the park is DC load, and the power factor of the overall load of the park is relatively high. On-site reactive power compensation can be used. Therefore, the impact of the reactive load of the park is not considered at this stage. Formula (12) is the charging demand constraint of offline construction equipment. This type of construction equipment is equipped with a battery pack and can be operated independently offline after charging. Therefore, its charging period is more flexible. In contrast, online construction equipment can only be operated online according to construction needs and cannot adjust its operation and power consumption time. Formulas (13)-(14) are the charging demand constraints of electric transport vehicles. Since this type of vehicle has greater charging flexibility in time and space, its charging location and time window can be adjusted according to the situation. Therefore, it is only necessary to build a small number of charging stations on the candidate roads near the park that can cover part of its transportation routes to meet its charging needs. Formulas (15)-(18) are the configuration constraints of charging facilities for electric transport vehicles.

[0109] (2) Traffic constraints during the park construction phase

[0110]

[0111] In the above formula, D 1,t,od is the total traffic demand of the starting and ending points for od during the construction period t; F 1,t,od,k is the traffic demand of the starting and ending point pair od using path k during the construction period t; k,l is the binary association coefficient between path k and road l, σ k,l =1, excluding the time σ k,l =0;I l is the traffic capacity of road l; k is the percentage of traffic capacity reduction during road construction; is the average travel time of road l; PR T is the unit time cost; is the travel time cost during the construction phase.

[0112] (3) Distribution network operation constraints during the park construction phase

[0113] In order to ensure the safe and stable operation of the distribution network during construction, it is necessary to consider the power constraints of the distribution network lines and node voltage constraints after the project load is connected, including:

[0114]

[0115] In the above formula, are respectively the active and reactive power on the distribution network line w during the period t of the construction phase; κ w,e is the binary correlation coefficient between line w and distribution network node e. When line w is connected to distribution network node e, κ w,e =1, when not connected w,e =1; are the basic active and reactive loads connected to the node e of the distribution network in time period t; e is the binary coefficient of the campus access point of the distribution network node e. When the distribution network node e is the campus access point, υ e =1, otherwise e =0;LC w is the configuration capacity of line w; ΔLW is the capacity of the distribution network line expansion; ΔU 1,t,w is the voltage drop on line w during period t of the construction phase; are the resistance and reactance of line w respectively; U N is the rated voltage of the distribution network bus; U 1,t,a , U 1,t,b , U 1,t,eare the bus voltages of nodes a, b, and e in the construction phase during period t, where nodes a and b are the two endpoints of line w, and e is an arbitrary node; U m , U M They are the lower and upper limits of the distribution network bus voltage respectively.

[0116] In this constraint, equations (22)-(23) are the active and reactive power balance constraints of the distribution network, equation (24) is the upper and lower power limit constraints of the distribution network lines, and equations (25)-(27) are the voltage constraints of the distribution network.

[0117] The constraints during the park operation phase include:

[0118] (1) Traffic constraints during the park operation phase

[0119]

[0120] In the above formula, D 2,t,od is the total traffic demand of the starting and ending points for od during the operation period t; F 2,t,od,k is the traffic demand of the starting and ending point pair od using path k during the operation phase period t; K It is the increase ratio of traffic capacity after road expansion; is the travel time cost during the operation phase.

[0121] In this constraint, formula (28) is the traffic demand constraint during the park operation, formula (29) is the road traffic capacity constraint during the park operation, and formula (30) is the incremental travel time cost constraint during the park operation.

[0122] (2) Distribution network operation constraints during the park operation phase

[0123]

[0124] In the above formula, are the active and reactive power on the distribution network line w in the period t of the operation phase respectively; are respectively the active and reactive loads of the park during the operation phase; ΔU 2,t,w The voltage drop on line w during the period t of the operation phase; U 2,t,a , U 2,t,b and U 2,t,e are the bus voltages of nodes a, b, and e in time period t during the operation phase, nodes a and b are the two endpoints of line w, and e is an arbitrary node.

[0125] S2. Solve the above power-transportation coupling network planning and operation optimization model to obtain the following Figure 5The expansion plan of the distribution network lines and traffic network roads is shown in Table 1. The two transport vehicle charging stations are located at P4 (T11) and P6 (T10), and the number of charging piles is 4.

[0126] Table 1 Expansion plan for distribution network lines and transportation network roads

[0127]

[0128]

[0129] In order to verify the effectiveness of the method proposed in the present invention, the method described in Example 1 is used as Method 1, and the single-stage power-transportation coupling network planning and operation optimization method is applied to the 14-node distribution network-17-node transportation network described in Example 1 as Method 2 (the method does not consider the different electricity and transportation demands in the park construction and operation stages, and completes the capacity expansion and hardware configuration at one time). The economic indicators of the two methods are compared, and the results are shown in Table 2 (where the annualized capacity expansion and hardware costs include the distribution network line capacity expansion cost, the transportation network road expansion cost, and the construction / transportation vehicle charging facility cost):

[0130] Table 2 Comparison of economic performance of the two methods

[0131]

[0132] As can be seen from Table 2, the sub-item costs and annualized comprehensive construction and operation costs are lower when using method 1. In terms of annualized capacity expansion and hardware costs, the cost of using method 1 is reduced by 4.93% compared to using method 2; in terms of annual electricity costs, the cost of using method 1 is reduced by 1.88% compared to using method 2; in terms of annual incremental travel time costs, the cost of using method 1 is reduced by 13.57% compared to using method 2. From the perspective of annualized comprehensive construction and operation costs, the cost of using method 1 is reduced by 6.62% compared to using method 2. The above results show that the park power-transportation coupling network planning and operation optimization method proposed in the present invention has achieved the effect of reducing the waste of resources caused by repeated construction from the construction stage to the commissioning stage, and minimizing the comprehensive construction and operation costs of the park.

[0133] Embodiment 2:

[0134] like Figure 6 As shown, a park power-transportation coupling network planning and operation optimization system includes a traffic flow data acquisition module, a power-transportation coupling network planning and operation optimization model construction module, and a power-transportation coupling network planning and operation optimization model solution module.

[0135] The traffic flow data acquisition module is used to obtain the initial traffic flow data of the park power-traffic coupling network during the construction and operation stages, including a traffic flow optimization allocation model construction unit and a traffic flow optimization allocation model solution unit. The traffic flow optimization allocation model construction unit is used to construct the following traffic flow optimization allocation model:

[0136]

[0137]

[0138] In the above formula, is the travel time cost of stage h, when the park is in the construction stage, h = 1, when the park is in the operation stage, h = 2; D h,t,od is the total traffic demand of the starting and ending points for od in period t of stage h; FO h,t,od,k is the initial traffic demand of the origin and destination pair od using path k in period t of stage h; k,l is the binary association coefficient between path k and road l; I l is the traffic capacity of road l; is the average travel time of road l; PR T is the unit time cost; d W The number of days for the construction phase.

[0139] The power-transportation coupling network planning and operation optimization model construction module is used to construct a power-transportation coupling network planning and operation optimization model with the goal of minimizing the comprehensive construction and operation cost and taking into account the different electricity consumption and traffic demands of the park power-transportation coupling network in the construction and operation stages based on the initial traffic flow data of the park power-transportation coupling network in the construction and operation stages, including an objective function construction unit and a constraint condition construction unit. The objective function construction unit is used to construct the following objective function:

[0140] min(C P +C T +C D )[(1+α) γ -1] / αγ 2 +C E +C A

[0141]

[0142] C A =(C TO +C TF ) / γ

[0143] In the above formula, C P is the cost of expanding the distribution network; C T is the cost of expanding the transportation network; CD Cost of charging facilities construction; C E The electricity cost of construction equipment / transport vehicles; C A is the incremental travel time cost, which is positive in the construction phase and negative in the operation phase after the expansion is completed; α is the discount rate; γ is the investment period; J h,c K is the binary decision variable for the expansion of the distribution network line c at stage h. When the park is in the construction stage, h = 1; when the park is in the operation stage, h = 2. h,l is the binary decision variable for the expansion of road l in the transportation network at stage h; PR J , PR K They are the unit costs of expanding the capacity of distribution network lines and the expansion of transportation network roads; The usage time of the facilities constructed in phase h within an investment period γ; is the number of charging piles for transport vehicles configured at the distribution network node e; is the active power output from the distribution network to the park in period t of stage h; is the charging load of transport vehicles connected to the distribution network node e during time period t; is the charging price in time period t; d W is the number of days in the construction phase; C TO is the incremental travel time cost of the park during the construction phase; C TF The incremental travel time cost of the park during the operation phase;

[0144] The constraint condition construction unit is used to construct park construction phase constraints and park operation phase constraints.

[0145] The constraints during the park construction phase include:

[0146] Energy demand constraints for electric construction equipment and transport vehicles during the park construction phase

[0147]

[0148] In the above formula, is the active power output from the distribution network to the park during period t of the construction phase; is the charging power of offline construction equipment in the park during period t; is the power consumption of online construction equipment in the park during period t; T UN is the duration of the unit period; E W To meet the charging needs of offline construction equipment within a day; E is the charging load of transport vehicles connected to the distribution network node e during period t; VT is the total charging demand of transport vehicles in a typical day during the construction phase; V t,k is the number of transport vehicles with path k in time period t; P is the average electric energy consumed by the transport vehicle with path k per transport; CP is the maximum power of a single charging pile; is the binary decision variable for configuring a transport vehicle charging station at the distribution network node e; δ M is a large M constant; N VT N is the upper limit of the number of charging stations for transport vehicles; MP The upper limit of the number of charging posts in a single transport vehicle charging station;

[0149] Traffic constraints during the park construction phase

[0150]

[0151] In the above formula, D 1,t,od is the total traffic demand of the starting and ending points for od during the construction period t; F 1,t,od,k is the traffic demand of the starting and ending point pair od using path k during the construction period t; k,l is the binary association coefficient between path k and road l; I l is the traffic capacity of road l; k is the percentage of traffic capacity reduction during road construction; is the average travel time of road l; PR T is the unit time cost; is the travel time cost during the construction phase;

[0152] Distribution network operation constraints during the park construction phase

[0153]

[0154] In the above formula, are respectively the active and reactive power on the distribution network line w during the period t of the construction phase; κ w,e is the binary correlation coefficient between line w and distribution network node e; are the basic active and reactive loads connected to the node e of the distribution network in time period t; e is the binary coefficient of the campus access point of the distribution network node e; LC w is the configuration capacity of line w; ΔLW is the capacity of the distribution network line expansion; ΔU 1,t,w is the voltage drop on line w during period t of the construction phase; are the resistance and reactance of line w respectively; U N is the rated voltage of the distribution network bus; U 1,t,a , U 1,t,b , U 1,t,e are the bus voltages of nodes a, b, and e in the construction phase during period t, where nodes a and b are the two endpoints of line w, and e is an arbitrary node; Um , U M They are the lower and upper limits of the distribution network bus voltage respectively;

[0155] The park operation phase constraints include:

[0156] Traffic constraints during the park operation phase

[0157]

[0158] In the above formula, D 2,t,od is the total traffic demand of the starting and ending points for od during the operation period t; F 2,t,od,k is the traffic demand of the starting and ending point pair od using path k during the operation phase period t; K It is the increase ratio of traffic capacity after road expansion; is the travel time cost during the operation phase;

[0159] Distribution network operation constraints during the park operation phase

[0160]

[0161] In the above formula, are the active and reactive power on the distribution network line w in the period t of the operation phase respectively; are respectively the active and reactive loads of the park during the operation phase; ΔU 2,t,w The voltage drop on line w during the period t of the operation phase; U 2,t,a , U 2,t,b and U 2,t,e are the bus voltages of nodes a, b, and e in time period t during the operation phase, nodes a and b are the two endpoints of line w, and e is an arbitrary node.

[0162] The power-transportation coupling network planning and operation optimization model solving module is used to solve the power-transportation coupling network planning and operation optimization model to obtain the configuration and operation optimization plan of the charging facilities, distribution network and transportation network of the network planning park during the construction and operation stages.

Claims

1. A method for planning and optimizing the operation of a park power-transportation coupling network, characterized in that: The method comprises: S1. Based on the initial traffic flow data of the park power-transportation coupling network during the construction and operation stages, a power-transportation coupling network planning and operation optimization model is constructed. The power-transportation coupling network planning and operation optimization model aims to minimize the comprehensive construction and operation cost, and takes into account the different electricity consumption and traffic demands of the park power-transportation coupling network during the construction and operation stages; S2. Solve the power-transportation coupling network planning and operation optimization model to obtain the configuration and operation optimization plan of the charging facilities, distribution network and transportation network in the network planning park during the construction and operation stages.

2. A method for planning and optimizing the operation of a park power-transportation coupling network according to claim 1, characterized in that: The objective function of the power-transportation coupling network planning and operation optimization model includes: min(C P +C T +C D )[(1+a) γ -1] / ag 2 +C E +C A C A =(C TO +C TF ) / γ In the above formula, C P is the cost of expanding the distribution network; C T is the cost of expanding the transportation network; C D Cost of constructing charging facilities; C E The electricity cost of construction equipment / transport vehicles; C A is the incremental travel time cost, which is positive in the construction phase and negative in the operation phase after the expansion is completed; α is the discount rate; γ is the investment period; J h,c K is the binary decision variable for the expansion of the distribution network line c at stage h. When the park is in the construction stage, h = 1; when the park is in the operation stage, h = 2. h,l is the binary decision variable for the expansion of road l in the transportation network at stage h; PR J , PR K They are the unit costs of expanding the capacity of distribution network lines and the expansion of transportation network roads; The usage time of the facilities constructed in phase h within an investment period γ; is the number of charging piles for transport vehicles configured at the distribution network node e; is the active power output from the distribution network to the park in period t of stage h; is the charging load of transport vehicles connected to the distribution network node e during time period t; is the charging price in time period t; d W is the number of days in the construction phase; C TO is the incremental travel time cost of the park during the construction phase; C TF The incremental travel time cost of the park during the operation phase; The constraints of the power-transportation coupling network planning and operation optimization model include park construction phase constraints and park operation phase constraints.

3. A method for planning and optimizing the operation of a park power-transportation coupling network according to claim 2, characterized in that: The constraints during the park construction phase include energy demand constraints for electric construction equipment and transport vehicles during the park construction phase, traffic constraints during the park construction phase, and distribution network operation constraints during the park construction phase; The park operation phase constraints include traffic constraints during the park operation phase and distribution network operation constraints during the park operation phase.

4. A method for planning and optimizing the operation of a park power-transportation coupling network according to claim 3, characterized in that: The energy demand constraints for electric construction equipment and transport vehicles during the park construction phase include: In the above formula, is the active power output from the distribution network to the park during period t of the construction phase; is the charging power of offline construction equipment in the park during period t; is the power consumption of online construction equipment in the park during period t; T UN is the duration of the unit period; E W To meet the charging needs of offline construction equipment within a day; E is the charging load of transport vehicles connected to the distribution network node e during period t; VT is the total charging demand of transport vehicles in a typical day during the construction phase; V t,k is the number of transport vehicles with path k in time period t; P is the average electric energy consumed by the transport vehicle with path k per transport; CP is the maximum power of a single charging pile; is the binary decision variable for configuring a transport vehicle charging station at the distribution network node e; δ M is a large M constant; N VT N is the upper limit of the number of charging stations for transport vehicles; MP The upper limit of the number of charging posts in a single transport vehicle charging station; The traffic constraints during the park construction phase include: In the above formula, D 1,t,od is the total traffic demand of the starting and ending points for od during the construction period t; F 1,t,od,k is the traffic demand of the starting and ending point pair od using path k during the construction period t; k,l is the binary association coefficient between path k and road l; I l is the traffic capacity of road l; k is the percentage of traffic capacity reduction during road construction; is the average travel time of road l; PR T is the unit time cost; is the travel time cost during the construction phase; The distribution network operation constraints during the park construction phase include: In the above formula, are respectively the active and reactive power on the distribution network line w during the period t of the construction phase; κ w,e is the binary correlation coefficient between line w and distribution network node e; are the basic active and reactive loads connected to the node e of the distribution network in time period t; e is the binary coefficient of the campus access point of the distribution network node e; LC w is the configuration capacity of line w; ΔLW is the capacity of the distribution network line expansion; ΔU 1,t,w is the voltage drop on line w during period t of the construction phase; are the resistance and reactance of line w respectively; U N is the rated voltage of the distribution network bus; U 1,t,a , U 1,t,b , U 1,t,e are the bus voltages of nodes a, b, and e in the construction phase during period t, where nodes a and b are the two endpoints of line w, and e is an arbitrary node; U m , U M They are the lower and upper limits of the distribution network bus voltage respectively; The traffic constraints during the park operation phase include: In the above formula, D 2,t,od is the total traffic demand of the starting and ending points for od during the operation period t; F 2,t,od,k is the traffic demand of the starting and ending point pair od using path k during the operation phase period t; K It is the increase ratio of traffic capacity after road expansion; is the travel time cost during the operation phase; The distribution network operation constraints during the park operation phase include: In the above formula, are the active and reactive power on the distribution network line w in the period t of the operation phase respectively; are respectively the active and reactive loads of the park during the operation phase; ΔU 2,t,w The voltage drop on line w during the period t of the operation phase; U 2,t,a , U 2,t,b and U 2,t,e are the bus voltages of nodes a, b, and e in time period t during the operation phase, nodes a and b are the two endpoints of line w, and e is an arbitrary node.

5. A method for planning and optimizing the operation of a park power-transportation coupling network according to any one of claims 1 to 4, characterized in that: The initial traffic flow data of the park power-traffic coupling network during the construction and operation phases is obtained based on the following traffic flow optimization allocation model: In the above formula, is the travel time cost of stage h, when the park is in the construction stage, h = 1, when the park is in the operation stage, h = 2; D h,t,od is the total traffic demand of the starting and ending points for od in period t of stage h; FO h,t,od,k is the initial traffic demand of the origin and destination pair od using path k in period t of stage h; k,l is the binary association coefficient between path k and road l; I l is the traffic capacity of road l; is the average travel time of road l; PR T is the unit time cost; d W The number of days for the construction phase.

6. A park power-transportation coupling network planning and operation optimization system, characterized in that: The system includes a power-transportation coupling network planning and operation optimization model construction module, a power-transportation coupling network planning and operation optimization model solution module; The power-transportation coupling network planning and operation optimization model construction module is used to construct a power-transportation coupling network planning and operation optimization model based on the initial traffic flow data of the park power-transportation coupling network during the construction and operation stages. The power-transportation coupling network planning and operation optimization model aims to minimize the comprehensive construction and operation cost, and takes into account the different electricity consumption and traffic demands of the park power-transportation coupling network during the construction and operation stages; The power-transportation coupling network planning and operation optimization model solving module is used to solve the power-transportation coupling network planning and operation optimization model to obtain the configuration and operation optimization plan of the charging facilities, distribution network and transportation network of the network planning park during the construction and operation stages.

7. A park power-transportation coupling network planning and operation optimization system according to claim 6, characterized in that: The power-transportation coupling network planning and operation optimization model includes an objective function construction unit and a constraint condition construction unit; The objective function construction unit is used to construct the following objective function: min(C P +C T +C D )[(1+a) γ -1] / ag 2 +C E +C A C A =(C TO +C TF ) / γ In the above formula, C P is the cost of expanding the distribution network; C T is the cost of expanding the transportation network; C D Cost of constructing charging facilities; C E The electricity cost of construction equipment / transport vehicles; C A is the incremental travel time cost, which is positive in the construction phase and negative in the operation phase after the expansion is completed; α is the discount rate; γ is the investment period; J h,c K is the binary decision variable for the expansion of the distribution network line c at stage h. When the park is in the construction stage, h = 1; when the park is in the operation stage, h = 2. h,l is the binary decision variable for the expansion of road l in the transportation network at stage h; PR J , PR K They are the unit costs of expanding the capacity of distribution network lines and the expansion of transportation network roads; The usage time of the facilities constructed in phase h within an investment period γ; is the number of charging piles for transport vehicles configured at the distribution network node e; is the active power output from the distribution network to the park in period t of stage h; is the charging load of transport vehicles connected to the distribution network node e during time period t; is the charging price in time period t; d W is the number of days in the construction phase; C TO is the incremental travel time cost of the park during the construction phase; C TF The incremental travel time cost of the park during the operation phase; The constraint condition construction unit is used to construct park construction phase constraints and park operation phase constraints.

8. A park power-transportation coupling network planning and operation optimization system according to claim 7, characterized in that: The constraints during the park construction phase include energy demand constraints for electric construction equipment and transport vehicles during the park construction phase, traffic constraints during the park construction phase, and distribution network operation constraints during the park construction phase; The park operation phase constraints include traffic constraints during the park operation phase and distribution network operation constraints during the park operation phase.

9. A park power-transportation coupling network planning and operation optimization system according to claim 6, characterized in that: The energy demand constraints for electric construction equipment and transport vehicles during the park construction phase include: In the above formula, is the active power output from the distribution network to the park during period t of the construction phase; is the charging power of offline construction equipment in the park during period t; is the power consumption of online construction equipment in the park during period t; T UN is the duration of the unit period; E W To meet the charging needs of offline construction equipment within a day; E is the charging load of transport vehicles connected to the distribution network node e during period t; VT is the total charging demand of transport vehicles in a typical day during the construction phase; V t,k is the number of transport vehicles with path k in time period t; P is the average electric energy consumed by the transport vehicle with path k per transport; CP is the maximum power of a single charging pile; is the binary decision variable for configuring a transport vehicle charging station at the distribution network node e; δ M is a large M constant; N VT N is the upper limit of the number of charging stations for transport vehicles; MP The upper limit of the number of charging posts in a single transport vehicle charging station; The traffic constraints during the park construction phase include: In the above formula, D 1,t,od is the total traffic demand of the starting and ending points for od during the construction period t; F 1,t,od,k is the traffic demand of the starting and ending point pair od using path k during the construction period t; k,l is the binary association coefficient between path k and road l; I l is the traffic capacity of road l; k is the percentage of traffic capacity reduction during road construction; is the average travel time of road l; PR T is the unit time cost; is the travel time cost during the construction phase; The distribution network operation constraints during the park construction phase include: In the above formula, are respectively the active and reactive power on the distribution network line w during the period t of the construction phase; κ w,e is the binary correlation coefficient between line w and distribution network node e; are the basic active and reactive loads connected to the node e of the distribution network in time period t; e is the binary coefficient of the campus access point of the distribution network node e; LC w is the configuration capacity of line w; ΔLW is the capacity of the distribution network line expansion; ΔU 1,t,w is the voltage drop on line w during period t of the construction phase; are the resistance and reactance of line w respectively; U N is the rated voltage of the distribution network bus; U 1,t,a , U 1,t,b , U 1,t,e are the bus voltages of nodes a, b, and e in the construction phase during period t, where nodes a and b are the two endpoints of line w, and e is an arbitrary node; U m , U M They are the lower and upper limits of the distribution network bus voltage respectively; The traffic constraints during the park operation phase include: In the above formula, D 2,t,od is the total traffic demand of the starting and ending points for od during the operation period t; F 2,t,od,k is the traffic demand of the starting and ending point pair od using path k during the operation phase period t; K It is the increase ratio of traffic capacity after road expansion; is the travel time cost during the operation phase; The distribution network operation constraints during the park operation phase include: In the above formula, are the active and reactive power on the distribution network line w in the period t of the operation phase respectively; are respectively the active and reactive loads of the park during the operation phase; ΔU 2,t,w The voltage drop on line w during the period t of the operation phase; U 2,t,a , U 2,t,b and U 2,t,e are the bus voltages of nodes a, b, and e in time period t during the operation phase, nodes a and b are the two endpoints of line w, and e is an arbitrary node.

10. A park power-transportation coupling network planning and operation optimization system according to any one of claims 6-9, characterized in that: The system also includes a traffic flow data acquisition module, which is used to obtain initial traffic flow data of the park power-traffic coupling network during the construction and operation stages, including a traffic flow optimization allocation model construction unit and a traffic flow optimization allocation model solution unit; The traffic flow optimization allocation model construction unit is used to construct the following traffic flow optimization allocation model: In the above formula, is the travel time cost of stage h, when the park is in the construction stage, h = 1, when the park is in the operation stage, h = 2; D h,t,od is the total traffic demand of the starting and ending points for od in period t of stage h; FO h,t,od,k is the initial traffic demand of the origin and destination pair od using path k in period t of stage h; k,l is the binary association coefficient between path k and road l; I l is the traffic capacity of road l; is the average travel time of road l; PR T is the unit time cost; d W The number of days for the construction phase.

Citation Information

Patent Citations

  • Reliability-oriented power traffic coupling network electric vehicle charging station planning method

    CN111460627A

  • Power-traffic coupling network expansion planning method considering traffic balance

    CN114722714A

  • Cooperative operation strategy of electric power traffic coupling network

    CN117013552A

  • Active power distribution network planning model establishment method taking into consideration site selection and capacity determination of electric vehicle charging stations

    WO2021098352A1

Cited By

  • Collaborative optimization method for charging load and industrial load in zero-carbon park for intersection energy fusion

    CN122267799A