Optimized scheduling control method and system for accessing full-category power supply

By making a difference in the sum of the predicted output value and load value, the uncontrollability and accuracy problems in the optimized scheduling of the power grid are solved, and accurate and rapid scheduling of access to all categories of power sources is achieved, and new energy utilization rate and grid stability are improved. sex.

CN118983787APending Publication Date: 2024-11-19GUANGDONG POWER GRID CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411069641.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-06
Publication Date
2024-11-19

AI Technical Summary

Technical Problem

In the existing technology, in the grid optimization scheduling after new energy generation, there is a high uncontrollability of the model training process and the effect is constrained by the accuracy of the model, making it difficult to achieve the optimization scheduling of instant power resources.

Method used

By making a difference between the sum of the predicted output value and the sum of the predicted load value, we can solve the minimum value, and realize the optimization scheduling of the entire category of power supply, directly use the predicted value of the existing technology to avoid iterations falling into the local optimal solution. The pre-built power load combination mode set is used for precise and fast scheduling control.

Benefits of technology

It realizes more accurate and fast power resource scheduling, makes full use of the existing technology, avoids complex modeling operations and local optimal solutions, and improves new energy utilization and grid stability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118983787A_ABST
    Figure CN118983787A_ABST
Patent Text Reader

Abstract

The embodiment of the invention provides an optimal scheduling control method and system for accessing a full-category power supply. The method comprises the following steps: acquiring a current load combination mode at the current moment; a pre-constructed power supply load combination mode set is inquired, an optimal power supply load combination mode corresponding to the current load combination mode is obtained, a power supply combination mode in the power supply load combination modes serves as a current power supply combination mode, and the power supply load combination mode set stores at least one power supply load combination mode; the power supply load combination mode is determined according to the minimum difference value between the sum of the predicted output values of all the power supply combination modes and the sum of the predicted load values of all the types of loads; and performing scheduling control by taking the current load combination mode and the current power supply combination mode as a current optimal power supply load combination mode. By using the method, the sum of the predicted output values and the sum of the predicted load values are subtracted to solve the minimum value, so that the optimal scheduling of the connected full-category power supply is realized.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of power systems, and in particular to an optimization scheduling control method and system for accessing all types of power sources. Background Art

[0002] As an indispensable resource in today's society, the stability of electric power resources affects all aspects of social production and life. However, electric power resources are different from storable resources such as oil resources. They are difficult to store, that is, electric power resources need to be used immediately. Therefore, it is necessary to optimize the scheduling of electric power resources. With the development of new energy technologies and the improvement of environmental awareness, the proportion of renewable energy power generation in electric power resources is increasing. Different from traditional thermal power and other forms of electric power resources, renewable energy power generation is constrained by various environmental factors, that is, the difficulty of using the electric power resources generated by renewable energy power generation immediately is further increased. Therefore, it is necessary to study the optimal scheduling of all types of power sources after access to renewable energy power generation.

[0003] A method, device and storage medium for optimizing and dispatching a large-scale power grid containing new energy are disclosed, including the following steps: Step 1, constructing a large-scale power grid model containing new energy nodes, predicting the power generation and required load of new energy based on historical operation data, and constructing a wind power, photovoltaic and load forecasting data set of the time scale required for day-ahead dispatching; Step 2, improving the standard nodes, and transforming the optimization dispatching problem into a Markov decision process; Step 3, constructing an intelligent agent based on a parameter-adaptive neural network, and establishing an optimization dispatching framework based on the TD3 algorithm (the TD3 algorithm is a reinforcement learning algorithm); Step 4, based on the optimization dispatching framework based on the TD3 algorithm established in step 3, completing the training and testing of the intelligent agent, and obtaining a unit output plan for meeting the goal of new energy consumption. It can effectively increase the power generation of new energy, reduce the operation of thermal power units, improve the utilization rate of new energy, and save power generation costs under the premise of stable operation of the power grid. This method aims to give priority to the use of new energy power generation as much as possible, but a large number of model training processes are inevitably present in the process, and the uncontrollability is too large and the effect that can be achieved is constrained by the accuracy of the model. Summary of the invention

[0004] The embodiment of the present invention provides an optimized scheduling control method and system for accessing all categories of power sources, which realizes optimized scheduling of accessing all categories of power sources by subtracting the sum of predicted output values ​​from the sum of predicted load values ​​to solve the minimum value.

[0005] In a first aspect, an embodiment of the present invention provides an optimization scheduling control method for accessing all types of power sources, including:

[0006] Get the current load combination mode at the current moment;

[0007] Query a pre-built power-load combination mode set, obtain an optimal power-load combination mode corresponding to the current load combination mode, and use a power combination mode in the power-load combination mode as the current power combination mode, wherein the power-load combination mode set stores at least one power-load combination mode, and the power-load combination mode is determined based on the minimum difference between the sum of the predicted output values ​​of each power combination mode and the sum of the predicted load values ​​of each type of load;

[0008] The current load combination mode and the current power supply combination mode are used as the current optimal power supply load combination mode for scheduling control.

[0009] In a second aspect, an embodiment of the present invention provides an optimized dispatching control system for accessing all types of power supplies, including:

[0010] A mode acquisition module is used to obtain the current load combination mode at the current moment;

[0011] A mode determination module is used to query a pre-built power-load combination mode set, obtain an optimal power-load combination mode corresponding to the current load combination mode, and use a power combination mode in the power-load combination mode as the current power combination mode, wherein the power-load combination mode set stores at least one power-load combination mode, and the power-load combination mode is determined based on the minimum difference between the sum of the predicted output values ​​of each power combination mode and the sum of the predicted load values ​​of each type of load;

[0012] The optimization scheduling module is used to schedule and control the current load combination mode and the current power supply combination mode as the current optimal power supply load combination mode.

[0013] The embodiment of the present invention provides an optimized scheduling control method and system for accessing all categories of power supplies, the method comprising: obtaining the current load combination mode at the current moment; querying a pre-constructed power load combination mode set to obtain the optimal power load combination mode corresponding to the current load combination mode, using the power combination mode in the power load combination mode as the current power combination mode, the power load combination mode set storing at least one power load combination mode, the power load combination mode is determined based on the minimum difference between the sum of the predicted output values ​​of each power combination mode and the sum of the predicted load values ​​of each type of load; and using the current load combination mode and the current power combination mode as the current optimal power load combination mode for scheduling control. The above technical scheme achieves optimized scheduling of accessing all categories of power supplies by subtracting the sum of the predicted output values ​​from the sum of the predicted load values ​​to solve the minimum value. There is no need to perform complex modeling operations, and the predicted values ​​that can be performed by the existing technology can be directly used, and the optimal solution can be found therein, which makes full use of the existing technology and avoids iterating and falling into the local optimal solution. During actual scheduling, you only need to query the power combination that best matches the current load combination from the pre-built power-load combination set, thereby achieving more accurate and faster scheduling control.

[0014] It should be understood that the contents described in this section are not intended to identify the key or important features of the embodiments of the present invention, nor are they intended to limit the scope of the present invention. Other features of the present invention will become easily understood through the following description. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0016] Figure 1 A flowchart of an optimization scheduling control method for accessing all types of power supplies provided in the first embodiment of the present invention;

[0017] Figure 2 A schematic diagram of the structure of an optimized dispatching control system for accessing all types of power supplies provided in the second embodiment of the present invention;

[0018] Figure 3 A schematic diagram of the structure of an electronic device provided in Embodiment 3 of the present invention. DETAILED DESCRIPTION

[0019] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.

[0020] It should be noted that the terms "original", "target", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present invention described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.

[0021] Embodiment 1

[0022] Figure 1 The present invention provides a flowchart of an optimized scheduling control method for accessing all types of power supplies provided in the first embodiment of the present invention. The method can be applied to the case of optimizing the scheduling of accessing all types of power supplies. The method can be executed by an optimized scheduling system for accessing all types of power supplies. The system can be implemented in the form of hardware and / or software and can be configured in an electronic device. Figure 1 As shown, the optimization scheduling control method for accessing all types of power supplies provided in the first embodiment may specifically include the following steps:

[0023] S101. Obtain the current load combination mode at the current moment.

[0024] It should be noted that each category of power supply is divided into new energy power generation and conventional power generation, and each type of load is divided into necessary load and non-essential load. New energy power generation, such as photovoltaic power generation, conventional power generation, such as thermal power generation, necessary loads, such as hospitals, and non-essential loads, such as entertainment venues. When all categories of power supplies are connected to the power grid, new energy power supplies should be used first. New energy power supplies (such as light, wind, electricity, etc.) will be affected by environmental factors. For example, A is a conventional power supply, B is a new energy power supply (such as photovoltaic power generation), and C is a conventional power supply. During the day, the combination of A+B can be used to supply power, but at night, only A+C can be used for power supply. In this embodiment, the power supply and load connected to the system are optimized and dispatched and controlled on a daily or monthly basis. Among them, new energy power generation is subject to various environmental factors, that is, the difficulty of using the power resources generated by new energy power generation immediately is further increased. Therefore, it is necessary to study the optimized scheduling of all categories of power supplies after connecting to new energy power generation. This step is used to obtain the load combination mode at the current moment, which is recorded as the current load combination mode.

[0025] S102: query a pre-built power-load combination set to obtain an optimal power-load combination corresponding to a current load combination, and use a power combination in the power-load combination as a current power combination.

[0026] The power-load combination set stores at least one power-load combination, and the power-load combination is determined based on the minimum difference between the sum of predicted output values ​​of each power combination and the sum of predicted load values ​​of each type of load.

[0027] In this embodiment, the optimization scheduling problem of accessing all categories of power sources is transformed into the problem of solving the minimum value of the difference between the sum of the predicted output values ​​and the sum of the predicted load values, that is, it can be used immediately. In this embodiment, a power supply load combination mode set is pre-constructed, and the power supply load combination mode set stores at least one power supply load combination mode. The power supply load combination mode can be understood as the most matching power supply combination mode and load combination mode, and the power supply under the power supply combination mode is used as the load under the load combination mode for output.

[0028] In this embodiment, the steps of constructing the power supply load combination set can be described as follows: First, the various types of power supplies and various types of loads connected to the power grid can be considered to be known, and further, the predicted output value of each type of power supply and the predicted load value of each type of load can be calculated based on the existing method. Secondly, the various types of power supplies and various types of loads are arranged and combined respectively, so as to obtain various power supply combinations on the power supply side and various load combinations on the load side.

[0029] Continuing with the above description, for each load combination, the predicted load value of each load in the load combination is added to obtain the sum of the predicted load values. Then for each power supply combination, the predicted output values ​​of each power supply in the power supply combination are added to obtain the sum of the predicted output values. This step is used to select the power supply combination that best matches each load combination. When screening the best matching power supply combination, matching can be performed based on the minimum difference between the sum of the predicted output values ​​and the sum of the predicted load values. The minimum difference between the sum of the predicted output values ​​and the sum of the predicted load values ​​is taken as the optimal power-load combination. The power supply combination corresponding to the sum of the predicted output values ​​with the smallest difference is taken as the power supply combination that best matches the load combination. Each optimal power-load combination is stored in a set, recorded as a power-load combination set.

[0030] In this embodiment, during actual scheduling and control, a pre-built power-load combination set can be queried to obtain the optimal power-load combination corresponding to the current load combination, and the power combination in the power-load combination can be used as the current power combination.

[0031] S103: taking the current load combination mode and the current power supply combination mode as the current optimal power supply load combination mode for scheduling control.

[0032] Specifically, the current load combination mode and the current power supply combination mode are dispatched and controlled as the current optimal power supply load combination mode.

[0033] An embodiment of the present invention provides an optimized scheduling control method for accessing all categories of power sources, the method comprising: solving the minimum value by subtracting the sum of the predicted output values ​​from the sum of the predicted load values, thereby achieving optimized scheduling for accessing all categories of power sources. There is no need to perform complex modeling operations, and the predicted values ​​that can be performed by the existing technology can be directly used, and the optimal solution can be found therein, making full use of the existing technology and avoiding iteratively falling into a local optimal solution. In actual scheduling, it is only necessary to query the power combination method that best matches the current load combination method from the pre-constructed power-load combination method set, thereby achieving more accurate and rapid scheduling control.

[0034] As an optional embodiment of the embodiment of the present invention, based on the above embodiment, the steps of constructing the power supply load combination mode set can be optimized, including:

[0035] a1) Obtain the predicted output value of each type of power supply and the predicted load value of each type of load.

[0036] In this embodiment, the various categories of power supplies and various types of loads connected to the power grid can be considered to be known, and the predicted output values ​​of various categories of power supplies and the predicted load values ​​of various types of loads can be further calculated based on existing methods. Alternatively, the predicted output value and the predicted load value can also be the predicted output value and the predicted load value formulated by the power grid according to the operation plan. At this time, this embodiment can be used to guide the power supply side and the load side to make corresponding adjustments. This step is used to obtain the predicted output value of each category of power supply and the predicted load value of each type of load. The obtained predicted output value and the predicted load value can be the predicted output value and the predicted load value that can be obtained in various existing technologies. This embodiment aims to find the permutation and combination method that best matches the predicted output value and the predicted load value among these values ​​through permutations and combinations.

[0037] b1) Arrange and combine each category of power supply and each type of load respectively to obtain various power supply combination modes on the power supply side and various load combination modes on the load side.

[0038] In this embodiment, each category of power supply and each type of load are arranged and combined respectively, so as to obtain various power supply combinations on the power supply side and various load combinations on the load side. For example, when performing the arrangement and combination, the arrangement and combination of new energy power generation and necessary loads are given priority, and the arrangement and combination are numbered after completion. For example, assuming that there are three charging stations A, B, and C on the power supply side, the power supply combinations obtained after the arrangement and combination are AB, AC, BC, and ABC.

[0039] c1) For each load combination, determine the power supply combination that best matches the load combination and satisfies the scheduling constraints based on the sum of the predicted output values ​​corresponding to the load combination and the sum of the predicted load values ​​corresponding to each power supply combination, and take the load combination and the best matching power supply combination as the optimal power-load combination.

[0040] Among them, the scheduling constraint condition is that the difference between the sum of the predicted output values ​​and the sum of the predicted load values ​​is minimized.

[0041] In this embodiment, for each load combination, the predicted load value of each load in the load combination is added to obtain the sum of the predicted load values. Then, for each power supply combination, the predicted output values ​​of each power supply in the power supply combination are added to obtain the sum of the predicted output values. This step is used to select the power supply combination that best matches each load combination. When screening the best matching power supply combination, matching can be performed based on the minimum difference between the sum of the predicted output values ​​and the sum of the predicted load values. The minimum difference between the sum of the predicted output values ​​and the sum of the predicted load values ​​is taken as the optimal power supply load combination.

[0042] Continuing with the above description, after the most matching power supply combination is selected for the load combination according to the scheduling constraint condition, the load combination and the most matching power supply combination are taken as the optimal combination, which is recorded as the optimal power supply load combination. For each load combination, the most matching power supply combination is determined, thereby obtaining the optimal power supply load combination corresponding to the load combination.

[0043] For example, assuming that there are 5 combinations on the power supply side and 4 combinations on the load side, for each load combination on the load side, it is necessary to find the power supply combination with the smallest difference between its output value and its load value from the output values ​​of the 5 combinations.

[0044] As a specific implementation method, for each load combination mode, according to the sum of the predicted output values ​​corresponding to the load combination mode and the sum of the predicted load values ​​corresponding to each power source combination mode, a power source combination mode that best matches the load combination mode and satisfies the scheduling constraint conditions is determined, including:

[0045] c11) For each load combination, determine the sum of the predicted load values ​​of the load combination.

[0046] Specifically, for each load combination, the predicted load values ​​of the loads included in the load combination are added together to obtain the sum of the predicted load values ​​of the load combination.

[0047] c12) Determine the sum of the predicted output values ​​of each power supply combination.

[0048] Specifically, for each power supply combination, the predicted output values ​​of the power supplies included in the power supply combination are added together to obtain the sum of the predicted output values ​​of the power supply combination.

[0049] c13) According to the sum of the predicted load values ​​and the sum of the predicted output values, in combination with a preset iteration method, determine the sum of the predicted output values ​​that has the smallest difference with the sum of the predicted load values.

[0050] In this embodiment, after obtaining the sum of the predicted load values ​​of the load combination methods and the sum of the predicted output values ​​of the power supply combination methods, the sum of the predicted load values ​​of the load combination methods and the sum of the output values ​​of the power supply combination methods are traversed in turn, and the difference between the sum of the predicted output values ​​and the sum of the predicted load values ​​is iteratively calculated, and the sum of the predicted output values ​​with the smallest difference with the sum of the predicted load values ​​is determined.

[0051] Further, according to the sum of the predicted load values ​​and the sum of the predicted output values, in combination with a preset iteration method, the sum of the predicted output values ​​having the smallest difference with the sum of the predicted load values ​​is determined, including:

[0052] c131) Match the load combination mode with each power supply combination mode respectively to obtain each power supply load combination mode.

[0053] Specifically, the load combination mode is matched and combined with each power supply combination mode to obtain several power supply load combination modes.

[0054] c132) Calculate the difference between the sum of the predicted output values ​​and the sum of the predicted load values ​​under each power load combination, record it as the output load difference, and filter out the power load combinations with output load differences less than zero.

[0055] For each power load combination, the sum of the predicted output values ​​under each power load combination is calculated, and the sum of the predicted output values ​​is subtracted from the sum of the predicted load values, and the obtained difference is recorded as the output load difference. From a practical point of view, when the power grid is operating normally, the assumption that the sum of the predicted output values ​​should always be greater than or equal to the sum of the predicted load values ​​should be met. Therefore, the power load combinations with output load differences less than zero are filtered out.

[0056] c133) Substitute the filtered output load differences under each power load combination into the preset combination iteration formula to obtain the sum of the predicted output values ​​with the smallest difference from the sum of the predicted load values.

[0057] Among them, the iterative formula for the permutation and combination of the power supply side and the load side is specifically:

[0058]

[0059] Where t represents the tth iteration, t-1 represents the t-1th iteration, and t+1 represents the t+1th iteration; hour It means that the result of the t-1th iteration is inferior to the result of the tth iteration, and the result of the tth iteration is output as the result of the t+1th iteration; when hour or Indicates that the result of the t-1th iteration is equal to the result of the tth iteration, and the result of the tth iteration or the result of the t-1th iteration is output as the result of the t+1th iteration; when hour It means that the result of the t-1th iteration is better than the result of the tth iteration, and the result of the t-1th iteration is output as the result of the t+1th iteration.

[0060] In this embodiment, the sum of the predicted output values ​​with the smallest difference from the sum of the predicted load values ​​can be determined by the following formula: Among them, min() is the minimum operator. It means that the permutation and combination mode of the power supply side of the predicted output corresponding to the smallest difference between the sum of the predicted output value and the sum of the predicted load value is the permutation and combination mode numbered m, and the permutation and combination mode of the load side of the predicted output is the permutation and combination mode numbered n, The arrangement and combination mode on the power supply side indicating the final output is the arrangement and combination mode numbered m, and the arrangement and combination mode on the load side indicating the predicted output is the arrangement and combination mode numbered n.

[0061] Specifically, the output load differences under the filtered power load combinations are substituted into a preset combination iteration formula, and iteration is performed in sequence to determine the sum of the predicted output values ​​with the smallest difference from the sum of the predicted load values.

[0062] c14) The power supply combination corresponding to the sum of the predicted output values ​​with the smallest difference is taken as the power supply combination that best matches the load combination.

[0063] Specifically, the power supply combination corresponding to the sum of the predicted output values ​​with the smallest difference is taken as the power supply combination that best matches the load combination.

[0064] d1) The optimal power-load combination modes are combined to form a power-load combination mode set.

[0065] Specifically, each optimal power-load combination mode is stored in a set, which is recorded as a power-load combination mode set.

[0066] The above technical solution specifies the steps for determining the power supply load combination set, and provides basic data for subsequent actual scheduling and control.

[0067] As an optional embodiment of the embodiment of the present invention, based on the above embodiment, after the current load combination mode and the current power supply combination mode are scheduled as the current optimal power supply load combination mode, the method further includes:

[0068] a2) Record the load combination mode and power supply combination mode at the next moment as the next load combination mode and the next power supply combination mode respectively.

[0069] In this embodiment, the next time point can be understood as the next scheduling time point corresponding to the current time point after a scheduling cycle.

[0070] b2) If the next load combination changes compared to the current load combination or the next power combination changes compared to the current power combination, the next load combination or the next power combination is adjusted to determine the next optimal power-load combination, and scheduling control is performed based on the next optimal power-load combination.

[0071] In this embodiment, if the next load combination mode changes compared to the current load combination mode or the next power supply combination mode changes compared to the current power supply combination mode, then from a practical point of view, under the normal operation of the power grid, the assumption that the sum of the predicted output values ​​should always be greater than or equal to the sum of the predicted load values ​​should be satisfied, but under extreme conditions, this assumption does not hold true, and the problem is still to find the minimum value of the difference between the sum of the predicted output values ​​and the sum of the predicted load values. There may be a situation where the difference between the sum of the predicted output values ​​of the next power supply combination mode and the sum of the predicted load values ​​of the next load combination mode is less than zero, or the difference between the sum of the predicted output values ​​of the next power supply combination mode and the sum of the predicted load values ​​of the next load combination mode is greater than a set threshold value. At this time, the power supply, load and energy storage device can be adjusted according to different situations, so as to obtain the optimal power supply load combination mode, which is recorded as the next optimal power supply load combination mode, and the scheduling control is performed based on the next optimal power supply load combination mode.

[0072] For example, suppose there are two power stations A and B at the current moment, corresponding to two loads C and D, and their output values ​​and load values ​​are balanced. At this time, their difference is equal to zero and does not need to be updated. Then in the next iteration (such as in units of days), it is found that the load side has become C+D+E. At this time, the output value is less than the load value. The output needs to be changed to a combination of A+B+F to meet the needs of the load side. A+B+F and C+D+E are the power supply load combinations that should be output in the next iteration. Another possibility is that the C+D load side has not changed, but at this time the power side, that is, the output measurement, has an additional output value. For example, when it is dawn, there is an additional photovoltaic power generation, and the output value increases. At this time, the output value is greater than the load value, which is equivalent to having surplus electricity. At this time, an energy storage device is established on the load side, and the electricity is first stored in the energy storage device G. Then the load side is C+D+G.

[0073] As a specific implementation method, if the next load combination mode changes compared to the current load combination mode or the next power supply combination mode changes compared to the current power supply combination mode, the next load combination mode or the next power supply combination mode is adjusted to determine the next optimal power supply load combination mode, including:

[0074] b21) If the difference between the sum of the predicted output values ​​of the next power combination and the sum of the predicted load values ​​of the next load combination is less than zero, then based on the sum of the predicted output values ​​and the sum of the predicted load values, combined with the preset predicted output value sum formula or the predicted load value sum formula, the optimal power-load combination at the next moment is determined and recorded as the next optimal power-load combination.

[0075] Among them, the formula for the sum of the predicted output values ​​is expressed as:

[0076]

[0077] Wherein, way_m represents the arrangement and combination of each type of power supply numbered m. It represents the sum of the predicted output values ​​of each renewable energy power generation in the permutation and combination of each type of power source numbered m, pp TYPE It is the priority parameter when calculating the sum of the predicted output values. When the sum of the predicted output values ​​is less than or equal to the sum of the predicted load values, pp TYPE =1, when the sum of the predicted output values ​​is greater than the sum of the predicted load values, pp TYPE =0, It represents the sum of the predicted output values ​​of each conventional power generation in the permutation and combination of each type of power source numbered m, It represents the sum of the predicted output values ​​of the permutations and combinations of power sources of each category numbered m.

[0078] Among them, the formula for the sum of the predicted load values ​​is expressed as:

[0079]

[0080] Wherein, way_n represents the arrangement and combination of each type of load numbered n. It represents the sum of the predicted load values ​​of each required load in the permutation and combination of each type of load numbered n, pp KIND is the priority parameter for calculating the sum of the predicted load values. When the sum of the predicted load values ​​is less than or equal to the sum of the predicted output values, pp KIND =1, when the sum of the predicted load values ​​is greater than the sum of the predicted output values, pp KIND =0, It represents the sum of the predicted load values ​​of each non-essential load in the arrangement and combination of each type of load numbered n. It represents the sum of the predicted load values ​​of the permutations and combinations of each type of load numbered n.

[0081] It should be noted that, from a practical point of view, when the power grid is operating normally, the assumption that the sum of the predicted output values ​​should always be greater than or equal to the sum of the predicted load values ​​should be met. However, under extreme conditions, this assumption does not hold true, and the corresponding situation is the one described above. At this time, the method is still valid, and the problem of solving the minimum value of the difference between the sum of the predicted output values ​​and the sum of the predicted load values ​​is still to be solved. The only difference is that the technical effect achieved is transformed into allowing the sum of the predicted output values ​​to only meet the sum of the predicted load values, thereby ensuring the electricity demand on the load side.

[0082] Specifically, if the sum of the predicted output values ​​of the next power combination is less than the sum of the predicted load values ​​of the next load combination, it means that the power supply cannot meet the load demand, and the power supply needs to be increased. The formula for the sum of predicted output values ​​can be used to determine the power supply that needs to be increased, thereby obtaining the power supply combination and load combination at the next moment after the update, and obtaining the optimal power-load combination at the next moment, which is recorded as the next optimal power-load combination.

[0083] If the sum of the predicted output values ​​of the next power source combination and the conventional power source that can be output at the next moment is still less than the sum of the predicted load values ​​of the next load combination, that is, even if all the dispatchable power sources at the next moment are used as output, the load demand cannot be met, and one or more loads need to be disconnected. In this embodiment, non-essential loads can be disconnected first. The formula for the sum of predicted load values ​​can be used to determine the non-essential loads that need to be disconnected, thereby obtaining the next optimal power source combination at the next moment after the update.

[0084] Further, according to the sum of the predicted output values ​​and the sum of the predicted load values, combined with a preset formula for the sum of the predicted output values ​​or the formula for the sum of the predicted load values, an optimal power supply load combination at the next moment is determined and recorded as the next optimal power supply load combination, including:

[0085] b211) Obtain the available normal power supply at the next moment.

[0086] It should be noted that, from a practical point of view, when the power grid is operating normally, the assumption that the sum of the predicted output values ​​should always be greater than or equal to the sum of the predicted load values ​​should be met. If the sum of the predicted output values ​​of the next power source combination is less than the sum of the predicted load values ​​of the next load combination, it means that the power source cannot meet the load demand, and additional power sources need to be added.

[0087] Considering that new energy power sources are generally affected by environmental factors and new energy power sources are used preferentially, in this embodiment, when the power output value does not meet the load demand, a conventional power source that can be output can be called. Specifically, a conventional power source that can be output at the next moment is obtained and recorded as the conventional power source that can be output.

[0088] b212) According to the formula for the sum of predicted output values, determine the difference between the sum of the predicted output values ​​of the next power combination and each conventional power source that can output power and the sum of the predicted load values ​​of the next load combination.

[0089] Specifically, the sum of the predicted load values ​​of the next load combination is subtracted from the sum of the predicted output values ​​of the next power supply combination to determine how many predicted load values ​​cannot be met, and then determine which power supply needs to be added as output based on the determined predicted load values ​​that cannot be met.

[0090] b213) The outputtable conventional power source corresponding to the time when the difference is greater than or equal to zero and is the minimum value is taken as the conventional power source to be added.

[0091] Specifically, under the premise that the difference is greater than or equal to zero, the outputtable conventional power source corresponding to the minimum difference is selected as the conventional power source to be added.

[0092] b214) Add the conventional power supply to be added to the next power supply combination mode to obtain the updated next power supply combination mode.

[0093] Specifically, the conventional power source to be added is added to the next power source combination mode, and then an updated next power source combination mode can be obtained.

[0094] b215) The updated next power supply combination and the next load combination are used as the next optimal power supply load combination.

[0095] The above technical solution specifies the situation where additional power sources are required when the sum of the predicted output values ​​of the next power source combination is less than the sum of the predicted load values ​​of the next load combination.

[0096] Furthermore, the method further comprises:

[0097] b211') If the sum of the predicted output values ​​of the next power combination and the conventional power sources that can be output at the next moment is still less than the sum of the predicted load values ​​of the next load combination, the non-essential load to be disconnected is determined based on the formula for the sum of the predicted load values.

[0098] In this embodiment, if the sum of the predicted output values ​​of the next power combination and the conventional power sources that can be output at the next moment is still less than the sum of the predicted load values ​​of the next load combination, that is, even if all the dispatchable power sources at the next moment are used as output, it still cannot meet the load demand, then one or more loads need to be disconnected. In this embodiment, non-essential loads can be disconnected first.

[0099] Specifically, the sum of the predicted load values ​​of the next load combination is subtracted from the sum of the predicted output values ​​of the next power supply combination to determine how many predicted load values ​​cannot be met, and then determine which non-essential load needs to be disconnected based on the determined predicted load values ​​that cannot be met.

[0100] b212') Remove the non-essential loads to be disconnected from the next load combination mode to obtain an updated next load combination mode.

[0101] Specifically, by removing the non-essential loads to be disconnected from the next load combination mode, an updated next load combination mode can be obtained.

[0102] b213') The next power supply combination and the updated next load combination are used as the next optimal power supply load combination.

[0103] It should be noted that, from a practical point of view, under the normal operation of the power grid, the assumption that the sum of the predicted output values ​​should always be greater than or equal to the sum of the predicted load values ​​should be satisfied. However, under extreme conditions, this assumption does not hold true, which corresponds to the pp mentioned above. KIND =0, the method is still valid, and the problem is still to find the minimum value of the difference between the sum of the predicted output values ​​and the sum of the predicted load values. The only difference is that the technical effect is changed to make the sum of the predicted output values ​​only meet the sum of the predicted load values, thereby ensuring the power demand on the load side.

[0104] The above technical solution specifies the situation where the load needs to be disconnected when the sum of the predicted output values ​​of the next power combination and the conventional power source that can be output at the next moment is still less than the sum of the predicted load values ​​of the next load combination.

[0105] b22) If the difference between the sum of the predicted output values ​​of the next power combination and the sum of the predicted load values ​​of the next load combination is greater than the set threshold, the next optimal power-load combination is determined based on the sum of the predicted output values ​​and the sum of the predicted load values, combined with the preset energy storage device calling formula.

[0106] In this embodiment, the preset threshold of the difference between the sum of the predicted output values ​​and the sum of the predicted load values ​​indicates that the predicted output value is too surplus, and the surplus output value can be stored in the energy storage device to avoid waste. Specifically, the energy storage device call formula can be used to calculate the sum of the energy storage values ​​of the energy storage devices that need to be called. The energy storage device call formula is specifically:

[0107]

[0108] in, It represents the sum of the energy storage values ​​of each energy storage device in the arrangement and combination of energy storage devices numbered q.

[0109] Continuing with the above description, after determining the surplus predicted output value, the surplus predicted output value can be stored in the energy storage device. When scheduling the energy storage device, considering that each energy storage device has a service life, the less the energy storage device is used, the better the device is, so you should find a suitable energy storage device and try to avoid scheduling too many energy storage devices.

[0110] Furthermore, the next optimal power supply load combination can be determined based on the sum of the predicted output value and the sum of the predicted load value, combined with the preset energy storage device calling formula, including:

[0111] b221) According to the sum of the predicted output values ​​and the sum of the predicted load values, combined with the preset energy storage device calling formula, determine the sum of the energy storage values ​​of the energy storage devices that need to be called.

[0112] Specifically, by substituting the sum of the predicted output values ​​and the sum of the predicted load values ​​into the energy storage device calling formula, surplus output values ​​can be obtained, and these surplus output values ​​are used as the sum of the energy storage values ​​of the energy storage devices that need to be called.

[0113] b222) Determine the energy storage device to be called based on the sum of the energy storage values.

[0114] In this embodiment, after the sum of the energy storage values ​​to be stored is determined, an energy storage device that can store the surplus output value is selected from the available energy storage devices as the energy storage device to be called. Exemplarily, an energy storage device with a storage capacity greater than or equal to the sum of the energy storage values ​​can be selected.

[0115] b223) The next power source combination, the next load combination and the energy storage device to be called are used as the next optimal power source load combination.

[0116] Specifically, the next power combination is used as the power combination on the power side, the next load combination and the energy storage device to be called are used as the updated load combination on the load side, and the power combination and the updated load combination on the load side are further combined as the next optimal power-load combination. It can be understood that when scheduling and controlling is performed based on the next optimal power-load combination, it is only necessary to schedule the determined energy storage device to be called.

[0117] The above technical solution specifies the step of adding energy storage equipment on the load side when the difference between the sum of the predicted output values ​​of the next power combination and the sum of the predicted load values ​​of the next load combination is greater than a set threshold, providing a basis for scheduling control at the next moment.

[0118] c2) If the next load combination does not change compared to the current load combination and the next power supply combination does not change compared to the current power supply combination, the scheduling control is not updated.

[0119] Specifically, if the next load combination does not change compared to the current load combination and the next power supply combination does not change compared to the current power supply combination, there is no need to adjust the power supply and load, that is, the scheduling control is not updated.

[0120] The above technical solution adds a step of adjusting the next load combination or the next power combination if the next load combination is changed compared to the current load combination or the next power combination is changed compared to the current power combination.

[0121] Embodiment 2

[0122] Figure 2 This is a schematic diagram of the structure of an optimization scheduling system for accessing all categories of power supplies provided in the second embodiment of the present invention. The system can be applied to the situation where optimization scheduling is performed for accessing all categories of power supplies. The optimization scheduling system for accessing all categories of power supplies can be configured in an electronic device, such as Figure 2 As shown, the system comprises: a mode acquisition module 21, a mode determination module 22 and an optimization scheduling module 23; wherein,

[0123] A mode acquisition module 21 is used to acquire the current load combination mode at the current moment;

[0124] A mode determination module 22 is used to query a pre-built power-load combination mode set, obtain an optimal power-load combination mode corresponding to a current load combination mode, and use a power combination mode in the power-load combination mode as a current power combination mode. The power-load combination mode set stores at least one power-load combination mode, and the power-load combination mode is determined based on the minimum difference between the sum of the predicted output values ​​of each power combination mode and the sum of the predicted load values ​​of each type of load;

[0125] The optimization scheduling module 23 is used to perform scheduling control by taking the current load combination mode and the current power supply combination mode as the current optimal power supply load combination mode.

[0126] The above technical solution achieves optimized scheduling of all types of power sources by subtracting the sum of predicted output values ​​from the sum of predicted load values ​​to solve the minimum value. There is no need to perform complex modeling operations. The predicted values ​​that can be performed by existing technologies can be directly used to find the optimal solution, making full use of existing technologies and avoiding iteratively falling into local optimal solutions. In actual scheduling, you only need to query the power combination that best matches the current load combination from the pre-built power-load combination set, thereby achieving more accurate and rapid scheduling control.

[0127] Optionally, the device includes a mode set construction module, and the mode set construction module may include:

[0128] A predicted value acquisition unit, used to acquire predicted output values ​​of various types of power supplies and predicted load values ​​of various types of loads;

[0129] The permutation and combination unit is used to permutate and combine various types of power supplies and various types of loads to obtain various power supply combination modes on the power supply side and various load combination modes on the load side;

[0130] A mode matching unit is used to determine, for each load combination mode, the power source combination mode that best matches the load combination mode and satisfies the scheduling constraint condition according to the sum of the predicted output values ​​corresponding to the load combination mode and the sum of the predicted load values ​​corresponding to each power source combination mode, and use the load combination mode and the best matching power source combination mode as the optimal power source load combination mode, and the scheduling constraint condition is that the difference between the sum of the predicted output values ​​and the sum of the predicted load values ​​is minimized;

[0131] The mode set construction unit is used to form a power supply load combination mode set by combining various optimal power supply load combination modes.

[0132] Optionally, the mode matching unit includes:

[0133] A load sum determination subunit, used for determining the sum of the predicted load values ​​of each load combination mode;

[0134] The output sum determination subunit is used to determine the sum of the predicted output values ​​of each power supply combination mode;

[0135] The minimum difference determination subunit is used to determine the sum of predicted output values ​​with the minimum difference from the sum of predicted load values ​​based on the sum of predicted load values ​​and the sum of each predicted output value in combination with a preset iteration method;

[0136] The power supply combination determination subunit is used to take the power supply combination corresponding to the sum of the predicted output values ​​with the smallest difference as the power supply combination that best matches the load combination.

[0137] Optionally, the minimum difference determination subunit is specifically used for:

[0138] Match the load combination mode with each power supply combination mode to obtain each power supply load combination mode;

[0139] Calculate the difference between the sum of the predicted output values ​​and the sum of the predicted load values ​​under each power load combination mode, record it as the output load difference, and filter out the power load combination modes with an output load difference less than zero;

[0140] Substitute the output load differences under the filtered power load combinations into the preset combination iteration formula to obtain the sum of predicted output values ​​with the smallest difference from the sum of predicted load values.

[0141] Optionally, the device further includes a next mode adjustment module, and the next mode adjustment module may include:

[0142] A mode naming unit, used to record the load combination mode and power supply combination mode at the next moment as the next load combination mode and the next power supply combination mode respectively;

[0143] A mode adjustment unit, used for adjusting the next load combination mode or the next power combination mode if the next load combination mode is changed compared with the current load combination mode or the next power combination mode is changed compared with the current power combination mode, determining the next optimal power-load combination mode, and performing scheduling control based on the next optimal power-load combination mode;

[0144] The mode unchanged unit is used for not updating the scheduling control if the next load combination mode does not change compared with the current load combination mode and the next power supply combination mode does not change compared with the current power supply combination mode.

[0145] Optionally, the mode adjustment unit includes:

[0146] A first adjustment subunit is used to determine the optimal power-load combination at the next moment as the next optimal power-load combination according to the sum of the predicted output values ​​and the sum of the predicted load values, in combination with a preset formula for the sum of predicted output values ​​or a formula for the sum of predicted load values, if the difference between the sum of the predicted output values ​​of the next power combination mode and the sum of the predicted load values ​​of the next load combination mode is less than zero;

[0147] The second adjustment subunit is used to determine the next optimal power-load combination based on the sum of the predicted output values ​​and the sum of the predicted load values, combined with a preset energy storage device calling formula, if the difference between the sum of the predicted output values ​​of the next power combination and the sum of the predicted load values ​​of the next load combination is greater than a set threshold.

[0148] Optionally, the first adjusting subunit is configured to:

[0149] Obtain the conventional power available for output at the next moment;

[0150] According to the formula for the sum of predicted output values, determine the difference between the sum of the predicted output values ​​of the next power combination mode and each conventional power source that can output power and the sum of the predicted load values ​​of the next load combination mode;

[0151] The outputtable conventional power source corresponding to the time when the difference is greater than or equal to zero and is the minimum value is used as the conventional power source to be added;

[0152] Add the conventional power source to be added to the next power source combination mode to obtain an updated next power source combination mode;

[0153] The updated next power supply combination mode and the next load combination mode are used as the next optimal power supply load combination.

[0154] Optionally, the mode adjustment unit further includes a third adjustment subunit, configured to:

[0155] If the sum of the predicted output values ​​of the next power source combination and the conventional power source that can be output at the next moment is still less than the sum of the predicted load values ​​of the next load combination, the non-essential load to be disconnected is determined according to the formula for the sum of the predicted load values;

[0156] The next load combination mode is removed from the non-essential loads to be disconnected to obtain an updated next load combination mode;

[0157] The next power supply combination and the updated next load combination are used as the next optimal power supply load combination.

[0158] Optionally, the second adjustment unit is specifically configured to:

[0159] According to the sum of the predicted output values ​​and the sum of the predicted load values, combined with the preset energy storage device calling formula, the sum of the energy storage values ​​of the energy storage devices that need to be called is determined;

[0160] According to the sum of the energy storage values, determine the energy storage device to be called;

[0161] The next power source combination, the next load combination and the energy storage device to be called are used as the next optimal power source load combination.

[0162] The optimized scheduling control system for accessing all categories of power supplies provided in the embodiment of the present invention can execute the optimized scheduling control method for accessing all categories of power supplies provided in any embodiment of the present invention, and has the corresponding functional modules and beneficial effects of the execution method.

[0163] Embodiment 3

[0164] Figure 3 A schematic diagram of the structure of an electronic device provided for Embodiment 3 of the present invention. The electronic device is intended to represent various forms of digital computers, such as laptop computers, desktop computers, workstations, personal digital assistants, servers, blade servers, mainframe computers, and other suitable computers. The electronic device may also represent various forms of mobile devices, such as personal digital processing, cellular phones, smart phones, wearable devices (such as helmets, glasses, watches, etc.), and other similar computing devices. The components shown herein, their connections and relationships, and their functions are merely examples and are not intended to limit the implementation of the present invention described and / or required herein.

[0165] like Figure 3As shown, the electronic device 30 includes at least one processor 31, and a memory connected to the at least one processor 31, such as a read-only memory (ROM) 32, a random access memory (RAM) 33, etc., wherein the memory stores a computer program that can be executed by at least one processor, and the processor 31 can perform various appropriate actions and processes according to the computer program stored in the read-only memory (ROM) 32 or the computer program loaded from the storage unit 38 to the random access memory (RAM) 33. In the RAM 33, various programs and data required for the operation of the electronic device 30 can also be stored. The processor 31, the ROM 32, and the RAM 33 are connected to each other through a bus 34. An input / output (I / O) interface 35 is also connected to the bus 34.

[0166] A number of components in the electronic device 30 are connected to the I / O interface 35, including: an input unit 36, such as a keyboard, a mouse, etc.; an output unit 37, such as various types of displays, speakers, etc.; a storage unit 38, such as a disk, an optical disk, etc.; and a communication unit 39, such as a network card, a modem, a wireless communication transceiver, etc. The communication unit 39 allows the electronic device 30 to exchange information / data with other devices through a computer network such as the Internet and / or various telecommunication networks.

[0167] The processor 31 may be a variety of general and / or special processing components with processing and computing capabilities. Some examples of the processor 31 include, but are not limited to, a central processing unit (CPU), a graphics processing unit (GPU), various dedicated artificial intelligence (AI) computing chips, various processors running machine learning model algorithms, a digital signal processor (DSP), and any appropriate processor, controller, microcontroller, etc. The processor 31 executes the various methods and processes described above, such as an optimized scheduling control method for accessing all categories of power supplies.

[0168] In some embodiments, the optimized scheduling control method for accessing all categories of power supplies can be implemented as a computer program, which is tangibly contained in a computer-readable storage medium, such as a storage unit 38. In some embodiments, part or all of the computer program can be loaded and / or installed on the electronic device 30 via the ROM 32 and / or the communication unit 39. When the computer program is loaded into the RAM 33 and executed by the processor 31, one or more steps of the optimized scheduling control method for accessing all categories of power supplies described above can be performed. Alternatively, in other embodiments, the processor 31 can be configured to execute the optimized scheduling control method for accessing all categories of power supplies in any other appropriate manner (for example, by means of firmware).

[0169] Various implementations of the systems and techniques described above herein can be implemented in digital electronic circuit systems, integrated circuit systems, field programmable gate arrays (FPGAs), application specific integrated circuits (ASICs), application specific standard products (ASSPs), systems on chips (SOCs), load programmable logic devices (CPLDs), computer hardware, firmware, software, and / or combinations thereof. These various implementations can include: being implemented in one or more computer programs that can be executed and / or interpreted on a programmable system including at least one programmable processor, which can be a special purpose or general purpose programmable processor that can receive data and instructions from a storage system, at least one input device, and at least one output device, and transmit data and instructions to the storage system, the at least one input device, and the at least one output device.

[0170] Computer programs for implementing the methods of the present invention may be written in any combination of one or more programming languages. These computer programs may be provided to a processor of a general-purpose computer, a special-purpose computer, or other programmable data processing device, so that when the computer program is executed by the processor, the functions / operations specified in the flow chart and / or block diagram are implemented. The computer program may be executed entirely on the machine, partially on the machine, partially on the machine and partially on a remote machine as a stand-alone software package, or entirely on a remote machine or server.

[0171] In the context of the present invention, a computer-readable storage medium may be a tangible medium that may contain or store a computer program for use by or in combination with an instruction execution system, device or equipment. A computer-readable storage medium may include, but is not limited to, electronic, magnetic, optical, electromagnetic, infrared, or semiconductor systems, devices or equipment, or any suitable combination of the foregoing. Alternatively, a computer-readable storage medium may be a machine-readable signal medium. A more specific example of a machine-readable storage medium may include an electrical connection based on one or more lines, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the foregoing.

[0172] To provide interaction with a user, the systems and techniques described herein may be implemented on an electronic device having: a display device (e.g., a CRT (cathode ray tube) or LCD (liquid crystal display) monitor) for displaying information to the user; and a keyboard and a pointing device (e.g., a mouse or trackball) through which the user can provide input to the electronic device. Other types of devices may also be used to provide interaction with the user; for example, the feedback provided to the user may be any form of sensory feedback (e.g., visual feedback, auditory feedback, or tactile feedback); and input from the user may be received in any form (including acoustic input, voice input, or tactile input).

[0173] The systems and techniques described herein may be implemented in a computing system that includes backend components (e.g., as a data server), or a computing system that includes middleware components (e.g., an application server), or a computing system that includes frontend components (e.g., a user computer with a graphical user interface or a web browser through which a user can interact with implementations of the systems and techniques described herein), or a computing system that includes any combination of such backend components, middleware components, or frontend components. The components of the system may be interconnected by any form or medium of digital data communication (e.g., a communication network). Examples of communication networks include: a local area network (LAN), a wide area network (WAN), a blockchain network, and the Internet.

[0174] A computing system may include a client and a server. The client and the server are generally remote from each other and usually interact through a communication network. The client and server relationship is generated by computer programs running on the corresponding computers and having a client-server relationship with each other. The server may be a cloud server, also known as a cloud computing server or cloud host, which is a host product in the cloud computing service system to solve the defects of difficult management and weak business scalability in traditional physical hosts and VPS services.

[0175] In the process of implementation, the computer program product can be written in one or more programming languages ​​or a combination thereof to perform the computer program code for the operation of the present disclosure, including but not limited to object-oriented programming languages ​​such as Java, Smalltalk, C++, and conventional procedural programming languages ​​such as "C" language or similar programming languages. The program code can be executed entirely on the user's computer, partially on the user's computer, as a separate software package, partially on the user's computer and partially on a remote computer, or entirely on a remote computer or server. In the case of a remote computer, the remote computer can be connected to the user's computer through any type of network, including a local area network (LAN) or a wide area network (WAN), or can be connected to an external computer (for example, using an Internet service provider to connect through the Internet).

[0176] It should be understood that the various forms of processes shown above can be used to reorder, add or delete steps. For example, the steps described in the present invention can be executed in parallel, sequentially or in different orders, as long as the desired results of the technical solution of the present invention can be achieved, and this document does not limit this.

[0177] The above specific implementations do not constitute a limitation on the protection scope of the present invention. It should be understood by those skilled in the art that various modifications, combinations, sub-combinations and substitutions can be made according to design requirements and other factors. Any modification, equivalent substitution and improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims

1. An optimization scheduling control method for accessing all types of power sources, characterized in that: include: Get the current load combination mode at the current moment; Query a pre-built power-load combination mode set, obtain an optimal power-load combination mode corresponding to the current load combination mode, and use a power combination mode in the power-load combination mode as the current power combination mode, wherein the power-load combination mode set stores at least one power-load combination mode, and the power-load combination mode is determined based on the minimum difference between the sum of the predicted output values ​​of each power combination mode and the sum of the predicted load values ​​of each type of load; The current load combination mode and the current power supply combination mode are used as the current optimal power supply load combination mode for scheduling control.

2. The method according to claim 1, characterized in that The steps of constructing the power-load combination set include: Obtain the predicted output value of each type of power supply and the predicted load value of each type of load; Arrange and combine the various types of power supplies and the various types of loads respectively to obtain various power supply combination modes on the power supply side and various load combination modes on the load side; For each load combination, according to the sum of the predicted output values ​​corresponding to the load combination and the sum of the predicted load values ​​corresponding to each of the power source combinations, determine the power source combination that best matches the load combination and satisfies the scheduling constraint, and use the load combination and the best matching power source combination as the optimal power source load combination, and the scheduling constraint is that the difference between the sum of the predicted output values ​​and the sum of the predicted load values ​​is minimized; The optimal power-load combination modes constitute the power-load combination mode set.

3. The method according to claim 2, characterized in that For each of the load combinations, according to the sum of the predicted output values ​​corresponding to the load combination and the sum of the predicted load values ​​corresponding to each of the power source combinations, determining a power source combination that best matches the load combination and satisfies the scheduling constraint condition, including: For each of the load combinations, determine the sum of the predicted load values ​​of the load combinations; Determining the sum of the predicted output values ​​of each power supply combination; According to the sum of the predicted load values ​​and the sum of the predicted output values, in combination with a preset iteration method, determine the sum of the predicted output values ​​having the smallest difference with the sum of the predicted load values; The power supply combination corresponding to the sum of the predicted output values ​​with the smallest difference is used as the power supply combination that best matches the load combination.

4. The method according to claim 3, characterized in that The step of determining the sum of the predicted output values ​​having the smallest difference from the sum of the predicted load values ​​based on the sum of the predicted load values ​​and the sum of the predicted output values ​​in combination with a preset iteration method includes: Matching the load combination mode with each power supply combination mode respectively to obtain each power supply load combination mode; Calculate the difference between the sum of the predicted output values ​​and the sum of the predicted load values ​​under each power-load combination mode, record it as the output-load difference, and filter out the power-load combination modes with an output-load difference less than zero; Substitute the filtered output load differences under each power load combination mode into a preset combination mode iteration formula to obtain the sum of predicted output values ​​with the smallest difference from the sum of the predicted load values.

5. The method according to claim 1, characterized in that After scheduling the current load combination mode and the current power supply combination mode as the current optimal power supply load combination mode, the method further includes: The load combination mode and the power supply combination mode at the next moment are recorded as the next load combination mode and the next power supply combination mode respectively; If the next load combination mode changes compared to the current load combination mode or the next power supply combination mode changes compared to the current power supply combination mode, the next load combination mode or the next power supply combination mode is adjusted to determine the next optimal power supply-load combination mode, and scheduling control is performed based on the next optimal power supply-load combination mode; If the next load combination mode does not change compared to the current load combination mode and the next power source combination mode does not change compared to the current power source combination mode, the scheduling control is not updated.

6. The method according to claim 5, characterized in that If the next load combination mode changes compared to the current load combination mode or the next power supply combination mode changes compared to the current power supply combination mode, the next load combination mode or the next power supply combination mode is adjusted to determine the next optimal power supply-load combination mode, and scheduling is performed based on the next optimal power supply-load combination mode, including: If the difference between the sum of the predicted output values ​​of the next power combination mode and the sum of the predicted load values ​​of the next load combination mode is less than zero, then according to the sum of the predicted output values ​​and the sum of the predicted load values, combined with a preset predicted output value sum formula or a predicted load value sum formula, the optimal power-load combination at the next moment is determined and recorded as the next optimal power-load combination; If the difference between the sum of the predicted output values ​​of the next power combination and the sum of the predicted load values ​​of the next load combination is greater than a set threshold, the next optimal power-load combination is determined based on the sum of the predicted output values ​​and the sum of the predicted load values, combined with a preset energy storage device calling formula.

7. The method according to claim 6, characterized in that The determining of the optimal power-load combination at the next moment based on the sum of the predicted output values ​​and the sum of the predicted load values ​​in combination with a preset predicted output value sum formula or a predicted load value sum formula as the next optimal power-load combination includes: Obtain the conventional power available for output at the next moment; According to the formula for the sum of predicted output values, determine the difference between the sum of the predicted output values ​​of the next power combination and each of the conventional power sources that can output power and the sum of the predicted load values ​​of the next load combination; The outputtable conventional power source corresponding to the time when the difference is greater than or equal to zero and is the minimum value is used as the conventional power source to be added; Adding the conventional power source to be added to the next power source combination mode to obtain an updated next power source combination mode; The updated next power supply combination mode and next load combination mode are used as the next optimal power supply load combination.

8. The method according to claim 7, characterized in that Also includes: If the sum of the predicted output values ​​of the next power source combination and the conventional power source that can be output at the next moment is still less than the sum of the predicted load values ​​of the next load combination, then determine the non-essential load to be disconnected according to the formula for the sum of the predicted load values; The next load combination mode is removed from the non-essential load to be disconnected to obtain an updated next load combination mode; The next power supply combination and the updated next load combination are used as the next optimal power supply-load combination.

9. The method according to claim 6, characterized in that The determining the next optimal power-load combination mode according to the sum of the predicted output values ​​and the sum of the predicted load values ​​in combination with a preset energy storage device calling formula includes: According to the sum of the predicted output values ​​and the sum of the predicted load values, combined with a preset energy storage device calling formula, the sum of the energy storage values ​​of the energy storage devices to be called is determined; Determining the energy storage device to be called according to the sum of the energy storage values; The next power supply combination, the next load combination and the energy storage device to be called are used as the next optimal power supply load combination.

10. An optimized dispatching control system connected to all types of power sources, characterized in that: include: A mode acquisition module is used to obtain the current load combination mode at the current moment; A mode determination module is used to query a pre-built power-load combination mode set, obtain an optimal power-load combination mode corresponding to the current load combination mode, and use a power combination mode in the power-load combination mode as the current power combination mode, wherein the power-load combination mode set stores at least one power-load combination mode, and the power-load combination mode is determined based on the minimum difference between the sum of the predicted output values ​​of each power combination mode and the sum of the predicted load values ​​of each type of load; The optimization scheduling module is used to schedule and control the current load combination mode and the current power supply combination mode as the current optimal power supply load combination mode.