Manufacturing process of explosion-proof gas storage tank of dust removal system
By presetting the explosion disc connector port in the gas storage tank and protecting carbon dioxide gas, combined with anti-corrosion coating, the explosion and corrosion problems of the gas storage tank in a high carbon monoxide environment are solved, and the safety and anti-corrosion effect are improved.
Patent Information
- Application Number
- CN202410668136.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-28
- Publication Date
- 2024-11-22
AI Technical Summary
Gas storage tanks are prone to explosions in high carbon monoxide environments, with high internal dust concentration and acid gas corrosion. The existing processes lack explosion-proof and anti-corrosion measures, resulting in high accident risk.
The gas storage tank is manufactured using laser cutting and spin forming process, with a preset blasting plate connector, and the weld strength and corrosion protection coating are ensured through carbon dioxide gas protection welding and anti-corrosion coating, and the blasting plate is fixed by flange to release excessive pressure .
It effectively reduces the explosion risk and corrosion damage of the gas storage tank, improves welding deformation and internal stress control, and ensures the uniformity and safety of anti-corrosion coating.
Smart Images

Figure CN118989864A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of gas storage tanks, and in particular relates to a manufacturing process of an explosion-proof gas storage tank for a dust removal system. Background Art
[0002] The gas tank is one of the important components of the dust removal system. In the pulse bag dust removal system, the air compressor transports the compressed gas to the dust removal equipment through the pipeline, and the gas tank is responsible for regulating the gas flow and balancing the gas pressure. Its main function is to store enough gas to ensure the gas consumption of each gas-consuming component in the dust removal system; at the same time, it also plays a role in stabilizing the compressed air pressure: that is, when each gas-consuming component is working, the gas source pressure remains relatively stable, and the dust removal equipment will not be unable to operate normally due to unstable gas source pressure. The gas tank works in an environment with a high carbon monoxide content, with an air cooler running around it and a high operating temperature. When the CO concentration of the gas in the gas tank reaches 12.5%, it may cause an explosion. In addition, the dust concentration inside the gas tank is high, which is prone to dust explosion accidents. When manufacturing such gas tanks with existing technology, no bursting disc connection port is provided for installing the bursting disc. As a result, when the pressure generated by the chemical reaction increases sharply, the gas tank body is easily ruptured by the huge pressure, causing a huge explosion accident. On the other hand, the existing manufacturing process generally cannot perform anti-corrosion coating on the inside of the gas tank, and the acidic gas (SO 2 , HCL, CL 2 ) is easy to corrode the tank body and reduce the compressive strength of the weld. Summary of the invention
[0003] In view of the shortcomings of the prior art, the object of the present invention is to provide a gas tank manufacturing process that is convenient for internal coating operations.
[0004] A manufacturing process for explosion-proof gas storage tanks for dust removal systems, the gas storage tanks comprising a support, a head, a cylinder, a pressure gauge, a flange, a pipeline, a bursting disc and a safety valve, the head comprising a lower head and an upper head, the pipeline comprising a pressure gauge pipeline, an exhaust pipe, a bursting disc pipeline, a safety valve pipeline, an air intake pipe and a sewage pipe; the flange comprising an exhaust pipe flange, a bursting disc flange and an air intake pipe flange. The manufacturing process of the present invention comprises the following steps: material preparation, forming, preparation of connection ports and grooves, spot welding, welding, testing, anti-corrosion coating of the tank surface and installation of other components. The forming step is to leave a bursting disc pipe connection port at the upper head; the anti-corrosion coating step of the tank surface includes anti-corrosion coating of the inner surface of the tank, especially the longitudinal weld and the circumferential weld, through the bursting disc pipeline.
[0005] The material preparation process refers to the use of laser cutting technology to cut the cylinder and the head. When the cylinder is typesetting and programmed on the computer, the interfaces of the pressure gauge pipe, exhaust pipe, safety valve pipe, air intake pipe and sewage pipe on the cylinder must be pre-opened at the corresponding positions.
[0006] The forming process refers to the head being formed by spinning, which makes the surface of the head smooth and has no sudden changes in appearance, and ensures that there is no corrosion, cracks or scars on the surface of the head. The cylinder is formed by rolling, that is, the steel plate is placed on a plate rolling machine and rolled into a cylinder section.
[0007] The connection port and groove preparation process refers to the use of laser cutting technology to open a through hole, i.e., the connection port, on the top of the upper head to connect the bursting disc pipeline. A through hole is opened at the bottom of the lower head to connect the sewage pipe. A welding groove is processed at the connection between the head and the cylinder to facilitate penetration during subsequent welding.
[0008] The spot welding process and welding process refer to spot welding and welding the rolled cylinder into a whole and forming a longitudinal weld; spot welding and welding the cylinder and the head into a whole and forming a circumferential weld; and consolidating the support to the bottom of the lower head by spot welding and welding. Install the spot-welded pressure gauge pipe, exhaust pipe, safety valve pipe and intake pipe on the cylinder, install the spot-welded bursting disc pipe on the upper head, install the spot-welded sewage pipe on the lower head, and fix each pipe on the head or cylinder by welding. Install and spot weld the corresponding flanges at the outlet of the intake pipe, exhaust pipe and bursting disc pipe, and weld each flange to the corresponding pipe.
[0009] The welding of the cylinder and the welding between the cylinder and the head adopts single-sided welding and double-sided forming process of continuous carbon dioxide gas shielded welding to complete the full penetration bottom weld.
[0010] The inspection process refers to the non-destructive inspection of the weld after welding is completed. The weld defect evaluation of ultrasonic inspection is carried out in accordance with JB 4730. After the weld inspection is completed, the gas tank is pressure tested, and the hydraulic test is used to check whether the strength and sealing performance of the container meet the requirements.
[0011] The anti-corrosion coating process on the tank surface refers to the process of spraying the gas tank surface with compressed air or high-pressure airless spraying to directly spray the outer surface after the rust removal treatment. The inner surface of the gas tank is anti-corrosion coated through the bursting disc pipe port at the upper head, and the thickness of all coatings reaches 60μm;
[0012] The process of installing other components refers to that the pressure gauge and the safety valve are directly installed on the pressure gauge connecting pipe and the safety valve connecting pipe respectively, and the bursting disc is fixed between the upper and lower flanges of the bursting disc connecting pipe by the bolt group between the upper and lower flanges.
[0013] Compared with the prior art, the above-mentioned manufacturing process of the explosion-proof gas storage tank for the dust removal system has the following beneficial effects.
[0014] ① Small welding deformation and internal stress. When welding the longitudinal weld and the circumferential weld of the tank body, continuous carbon dioxide gas shielded welding single-sided welding and double-sided forming process are adopted to complete the full penetration bottom weld. Compared with other welding methods, the arc heating of carbon dioxide gas shielded welding is concentrated, the heated area of the weldment is small, and the carbon dioxide gas flow has a strong cooling effect, so the welding deformation and internal stress are small.
[0015] ② Good anti-corrosion coating effect. When applying anti-corrosion coating to the tank body, if the material is coated with anti-corrosion coating before welding, the sparks generated during welding will damage the anti-corrosion coating on the material. However, if the anti-corrosion coating is applied to the inside of the tank body through the explosion-proof pipe mouth, the anti-corrosion layer obtained will be uniform and complete, and the anti-corrosion coating effect will be good.
[0016] ③Good explosion-proof effect. Compared with other air storage tank manufacturing processes, a bursting disc pipeline is opened at the upper head and the bursting disc is fixed with a flange. When the pressure in the gas tank rises sharply due to chemical reaction, the bursting disc can be used to release the pressure, thereby protecting the gas tank and reducing accident damage. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a schematic diagram of the overall structure of the explosion-proof gas storage tank of the dust removal system and a manufacturing process flow chart.
[0018] Figure 2 It is a schematic diagram of the structure of the various parts of the explosion-proof gas storage tank of the dust removal system.
[0019] Figure 3 It is a schematic diagram of the rolling forming of the explosion-proof gas storage tank cylinder of the dust removal system.
[0020] Figure 4 It is a schematic diagram of the structure of each part of the explosion-proof gas tank of the dust removal system before welding.
[0021] Figure 5 It is a schematic diagram of the locations of the longitudinal and transverse welds of the explosion-proof gas storage tank of the dust removal system.
[0022] above Figures 1 to 5 The markings are: 1. Support, 2. Head, 2-1. Lower head, 2-2. Upper head, 3. Cylinder, 3-1. Longitudinal weld, 3-2. Circumferential weld, 4. Pressure gauge, 5. Flange, 5-1. Exhaust pipe flange, 5-2. Bursting disc flange, 5-3. Inlet pipe flange, 6. Pipeline, 6-1. Pressure gauge pipeline, 6-2. Exhaust pipe, 6-3. Bursting disc pipeline, 6-4. Safety valve pipeline, 6-5. Inlet pipe, 6-6. Drain pipe, 7. Bursting disc, 8. Safety valve. DETAILED DESCRIPTION
[0023] In order to enable those skilled in the art to better understand the technical solutions in the present invention, the technical solutions in the embodiments of the present invention are clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.
[0024] This embodiment provides a gas storage tank manufacturing process, including the following steps: material preparation, forming, connection port and groove preparation, spot welding, welding, testing, anti-corrosion coating of the tank surface and installation of other components.
[0025] When preparing the materials, the head specification is selected as EHA650×192mm Q345R GB / T713-2014, and the cutting diameter is The specifications of the cylinder are DN650mm×5mm×1500mm Q345R GB / T713-2014. After cleaning the surface of the selected material from oil and dust, the head and the cylinder are cut by laser. When the cylinder is typed and programmed by computer, the interfaces of the pressure gauge pipe, exhaust pipe, safety valve pipe, air inlet pipe and sewage pipe on the cylinder should be pre-opened at the corresponding positions. When cutting, oxides, slag nodules and splashes should be removed, and the material should be ground to ensure that there are no cracks or slag inclusions on the end face.
[0026] During forming, the head is formed by spinning to make the surface of the head smooth and without sudden changes in shape, and to ensure that the surface of the head is free of corrosion, cracks and scars; the cylinder is formed by rolling, placing the steel plate on a rolling machine and rolling it into a cylinder section. This method of forming is continuous, easy to operate, fast and uniform.
[0027] Preparation of connection ports and grooves: A connection port with a diameter of 250mm is opened on the top of the upper head using laser cutting technology to connect the bursting disc pipeline, and a through hole is opened in the lower head to connect the sewage pipe; a welding groove is processed at the connection between the head and the cylinder to facilitate penetration during subsequent welding.
[0028] The rolled cylinder is spot welded and welded into a whole and a longitudinal weld is formed; the cylinder and the head are spot welded and welded into a whole and a circumferential weld is formed; the support is fixed to the bottom of the lower head by spot welding and welding. The pressure gauge pipe, exhaust pipe, safety valve pipe and intake pipe are installed on the cylinder, the spot welded bursting disc pipe is installed on the upper head, and the spot welded sewage pipe is installed on the lower head. Each pipe is fixed to the head or cylinder by welding; the corresponding flanges are installed and spot welded at the outlet of the intake pipe, exhaust pipe and bursting disc pipe, and each flange is welded to the corresponding pipe.
[0029] The longitudinal weld of the cylinder adopts Class A joint, and the circumferential weld connecting the cylinder and the head adopts Class B joint. For Class A and B joints, the welding groove adopts I-type groove. Due to the limitation of the joint structure shape, only single-sided welding process can be used, but it must also ensure the formation of a full penetration butt joint equivalent to double-sided welding. Therefore, the single-sided welding and double-sided forming process of continuous carbon dioxide gas shielded welding is adopted to complete the full penetration bottom weld. Compared with other welding methods, carbon dioxide gas shielded welding has concentrated arc heating, small heated area of weldment, and strong cooling effect of carbon dioxide gas flow, so welding deformation and internal stress are small.
[0030] The weld joint between the support and the cylinder is a Class E joint, using a double-sided beveled full-penetration fillet weld with a weld thickness of not less than 6mm.
[0031] The weld joints between the air inlet pipe, exhaust pipe and bursting disc pipe and the cylinder and the head are of Class D joints, using embedded pipe butt joints. The embedded pipe is connected to the container shell with a butt joint, which can be opened with a single U-shaped interface or a double U-shaped interface. The weld of this joint is evenly stressed, the stress is relatively concentrated, and it is convenient for non-destructive testing.
[0032] The joint between the flange and the connecting pipe is a Class C joint. Due to the small diameter of the flange, an I-shaped groove fillet weld is used. However, the flange must be sealed on both the inside and outside of the flange. This can prevent the flange from welding deformation and ensure the required rigidity of the flange.
[0033] After welding, non-destructive testing is used, such as weld ultrasonic testing (UT), and the weld defect evaluation of ultrasonic testing is carried out according to JB4730 standard. The gas tank is pressure tested, and the hydraulic test is used to check whether the container strength and sealing performance meet the requirements.
[0034] Anti-corrosion coating on the tank surface. After the rust removal treatment on the surface of the gas tank, the paint is sprayed directly on the outer surface by compressed air spraying or high-pressure airless spraying. The inner surface of the gas tank is anti-corrosion coated through the bursting piece pipe port at the upper head. The thickness of all coatings reaches 60μm. The welding is first inspected and then the coating process is carried out to ensure that a layer of anti-corrosion coating is firmly attached to the weld and its surroundings.
[0035] The anti-corrosion coating operation of the tank body must be carried out after welding is completed. If the material is anti-corrosion coated before welding, the sparks generated during welding will destroy the anti-corrosion coating on the material. If the anti-corrosion coating is carried out after welding is completed, the anti-corrosion layer obtained will be uniform and complete, and the anti-corrosion coating effect will be good.
[0036] Install other components, install the pressure gauge and safety valve directly on the pressure gauge pipe and safety valve pipe respectively, and fix the bursting disc between the upper and lower flanges through the bolt group between the upper and lower flanges. When the pressure in the gas tank rises sharply due to chemical reaction, the bursting disc will burst and release the pressure, thereby protecting the gas tank and reducing accident damage.
[0037] During the airtightness test, if any abnormal phenomenon is found, such as abnormal noise, pressure drop, obvious deformation of pressure-bearing components, failure of safety accessories, damage of fasteners or malfunction of the test system, inconsistent pressure gauge indications, etc., the test should be stopped immediately and the cause should be analyzed.
[0038] The above embodiments are only preferred embodiments of the present invention, and are not intended to limit the scope of protection of the present invention. Therefore, any equivalent changes made according to the structure, shape, and principle of the present invention should be included in the scope of protection of the present invention. Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those commonly understood by those skilled in the art of the present invention. The terms used in the description of the present invention are only for the purpose of describing specific implementation methods and are not intended to limit the present invention.
Claims
1. A manufacturing process for an explosion-proof gas storage tank for a dust removal system, the gas storage tank comprising a support (1), a head (2), a cylinder (3), a pressure gauge (4), a flange (5), a pipeline (6), a bursting disc (7) and a safety valve (8), the head (2) comprising a lower head (2-1) and an upper head (2-2), the pipeline (6) comprising a pressure gauge pipeline (6-1), an exhaust pipe (6-2), a bursting disc pipeline (6-3), a safety valve pipeline (6-4), an air intake pipe (6-5) and a sewage pipe (6-6); the flange (5) comprising an exhaust pipe flange (5-1), a bursting disc flange (5-2) and an air intake pipe flange (5-3), characterized in that: The manufacturing process comprises the following steps: material preparation, forming, preparation of connection ports and grooves, spot welding, welding, testing, anti-corrosion coating of the tank surface and installation of other components; the forming step is to leave a bursting disc pipe connection port at the upper head; the tank surface anti-corrosion coating step comprises performing anti-corrosion coating operations on the inner surface of the tank, especially the longitudinal weld (3-1) and the girth weld (3-2), through a bursting disc pipe (6-3).
2. The manufacturing process of a dust removal system explosion-proof gas storage tank according to claim 1 is characterized in that: The material preparation process refers to cleaning the surface of the selected material to remove oil and dust, performing computer typesetting and programming according to the unfolded dimensions of the head (2) and the cylinder (3), and then using laser cutting to cut the material; When the cylinder (3) is typed and programmed by a computer, interfaces of a pressure gauge pipeline (6-1), an exhaust pipe (6-2), a safety valve pipeline (6-4), an air inlet pipe (6-5) and a sewage discharge pipe (6-6) on the cylinder (3) are pre-opened at corresponding positions.
3. The manufacturing process of a dust removal system explosion-proof gas storage tank according to claim 1 is characterized in that: The forming process refers to the head (2) being formed by spinning, so that the surface of the head (2) is smooth and the shape has no sudden changes, and the surface of the head (2) is free of corrosion, cracks and scars; the cylinder (3) is formed by rolling, that is, the steel plate is placed on a plate rolling machine and rolled into a cylinder section.
4. The manufacturing process of a dust removal system explosion-proof gas storage tank according to claim 1 is characterized in that: The connection port and groove preparation process refers to using a laser cutting process to open a through hole, i.e., a connection port, at the top of the upper head (2-2) for connecting the bursting disc pipeline (6-3); opening a through hole at the bottom of the lower head (2-1) for connecting the sewage pipe (6-6); and processing a welding groove at the connection between the head (2) and the cylinder (3) to facilitate penetration during subsequent welding.
5. The manufacturing process of a dust removal system explosion-proof gas storage tank according to claim 1 is characterized in that: The spot welding process and welding process refer to spot welding and welding the rolled cylinder (3) into a whole and forming a longitudinal weld (3-1); spot welding and welding the cylinder (3) and the head (2) into a whole and forming a circumferential weld (3-2); and fixing the support (1) to the bottom of the lower head (2-1) by spot welding and welding. A pressure gauge pipe (6-1), an exhaust pipe (6-2), a safety valve pipe (6-4) and an air inlet pipe (6-5) are installed and spot-welded on the cylinder (3); a spot-welded bursting disc pipe (6-3) is installed on the upper end cap (2-2); a spot-welded sewage pipe (6-6) is installed on the lower end cap (2-1); and each pipe (6) is fixed to the end cap (2) or the cylinder (3) by welding; corresponding flanges (5) are installed and spot-welded at the outlet positions of the air inlet pipe (6-5), the exhaust pipe (6-2) and the bursting disc pipe (6-3), and each flange (5) is welded to the corresponding pipe (6).
6. The welding process according to claim 5, characterized in that: The welding of the cylinder (3) and the welding between the cylinder (3) and the sealing head (2) can only be performed by a single-sided welding process due to the structural shape of the joint. However, it is also necessary to ensure that a full penetration butt joint equivalent to a double-sided weld is formed. Therefore, a single-sided welding and double-sided forming process of continuous carbon dioxide gas shielded welding is used to complete a full penetration bottom sealing weld.
7. The manufacturing process of a dust removal system explosion-proof gas storage tank according to claim 1 is characterized in that: The inspection process refers to the use of non-destructive testing after welding, such as ultrasonic testing (UT) of welds. The weld defect evaluation of ultrasonic testing is carried out in accordance with the JB4730 standard; the gas tank is pressure tested and a hydraulic test is used to check whether the strength and sealing performance of the container meet the requirements.
8. The manufacturing process of a dust removal system explosion-proof gas storage tank according to claim 1 is characterized in that: The tank body surface anti-corrosion coating process refers to the process of spraying the paint directly on the outer surface of the gas tank after the surface of the gas tank is shot blasted and rusted, using compressed air spraying or high-pressure airless spraying to spray the paint on the bottom and one side; the inner surface of the gas tank is anti-corrosion coated through the bursting piece pipe port at the upper head (2-2), and the thickness of all coatings reaches 60μm; the welding is first inspected and then the coating process is carried out, ensuring that a layer of anti-corrosion coating is firmly attached to the weld and its surroundings.
9. The manufacturing process of the explosion-proof gas storage tank for dust removal system according to claim 1 is characterized in that: The process of installing other components refers to the pressure gauge (4) and the safety valve (8) being directly installed on the pressure gauge pipeline (6-1) and the safety valve pipeline (6-4) respectively, and the bursting disc (7) being connected and fixed between the upper and lower flanges by the bolt group between the upper and lower flanges.