Construction method of automatic sludge discharge type prefabricated section steel car washing system
By assembling and hoisting prefabricated sedimentation tanks and spray structures on the construction site, combining high-pressure water spraying and pumping pumps, the problem of large area and inability to be recycled by the car wash system is solved, and efficient car wash effect and reduced floor area are achieved.
Patent Information
- Application Number
- CN202411188342.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-28
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2044-08-28
AI Technical Summary
The existing car wash system covers a large area and cannot adapt to the tight land use of urban construction sites. Moreover, traditional equipment cannot be disassembled, assembled and reused many times, affecting the construction progress.
The construction method of automatic mud discharge prefabricated steel car wash system is adopted. By assembling the spray structure and the three-stage sedimentation tank in the factory or on site, the sedimentation tank and the spray tank are excavated to form the sedimentation tank and the spray tank, and the prefabricated sedimentation tank and the base are hoisted to the set position. , combined with high-pressure water jet head and high-power pump, achieve efficient cleaning and sediment precipitation.
The recycling of the car wash system is realized, the floor area is reduced, the traditional car wash tank is abolished, the overall length is shortened, and construction efficiency is improved.
Smart Images

Figure CN118991687A_ABST
Abstract
Description
Technical Field
[0001] The invention patent relates to the technical field of car washing systems, specifically, to a construction method of an automatic mud-discharging prefabricated steel car washing system. Background Art
[0002] The conventional car wash system consists of three parts: a car wash tank with a length of 30m, a width of 4.5m and a depth of 1m at the rear end, a spray system with a length of 5m at the front end, and a sedimentation tank structure on the side. The flushing system is generally set up inside the gate of the construction site, with drainage ditches set up around it. The drainage ditches are connected to the three-level sedimentation tanks, and mud and wastewater are discharged according to regulations. The sedimentation tanks need to be cleaned regularly and connected to the municipal drainage network.
[0003] In the prior art, after a muck truck enters the car washing system at the gate, it first enters the car washing trough. The mud blocks on the sides of the car, chassis and tires are washed by the flowing water in the car washing trough and fall into the car washing trough during the driving process of the vehicle. When the muck truck leaves the car washing trough, the mud blocks on the tires, bottom plate and lower positions on both sides of the car are washed clean. Then the muck truck enters the spray system. The spray system pipeline is connected to the high-power pump of the third-level sedimentation tank. When the pump is started, the spray pipeline automatically sprays high-pressure water jets from the nozzle to further clean the higher positions on both sides of the vehicle and the residual mud that has not been cleaned when passing through the car washing trough. Finally, the vehicle leaves the spray system and manually checks whether there is any residual mud. If there is still residual mud, it is manually cleaned in the open space in front of the spray system. However, there is a problem of large floor space. The traditional car washing system includes a car washing trough, a spray system, a three-level sedimentation tank, surrounding drainage ditches, etc., which requires a total of about 200 square meters. Among them, the car wash tank alone occupies an area of 30*4.5m=135㎡, accounting for more than half of the car wash system. Therefore, the traditional car wash system cannot adapt to the increasingly tight land use situation of urban construction sites. In addition, most of the existing ones are cast with reinforced concrete and cannot be disassembled and recycled many times. Even if some equipment is prefabricated with steel sections, it cannot be fully prefabricated and cannot be fully recycled. At the same time, every time the sediment accumulated in the car wash tank is cleaned, the car wash system cannot be used, affecting the construction progress of the site. Summary of the invention
[0004] The purpose of the present invention is to provide a construction method for an automatic mud-discharging prefabricated steel car washing system, aiming to solve the problem in the prior art that the car washing system occupies a large area.
[0005] The present invention is implemented in this way: the construction method of the automatic mud discharge prefabricated steel car washing system includes the following construction steps:
[0006] 1) Assemble the base of the spray structure and the three-stage sedimentation tank in the factory or construction site;
[0007] 2) According to the external dimensions of the tertiary sedimentation tank, the ground is leveled at the entrance and exit of the construction site, and a sedimentation tank tank is excavated; the tertiary sedimentation tank is hoisted into the sedimentation tank tank, and a backfill area is formed between the outer periphery of the tertiary sedimentation tank and the side wall of the sedimentation tank tank;
[0008] 3) backfilling fine-grained soil into the backfill area to form a soil layer, and fixing the three-stage sedimentation tank in the sedimentation tank tank through the soil layer; the three-stage sedimentation tank includes a tank body, and the tank body includes a head end sedimentation tank, a middle sedimentation tank and a terminal sedimentation tank arranged in sequence, a first partition is provided between the head end sedimentation tank and the middle sedimentation tank, and a second partition is provided between the middle sedimentation tank and the terminal sedimentation tank;
[0009] 4) Excavating a spray trough and a drainage ditch at the construction site. The drainage ditch is arranged between the spray trough and the sedimentation tank. One side of the drainage ditch is connected to the spray trough, and the other side of the drainage ditch is connected to the head end sedimentation tank;
[0010] 5) Hoist the base into the spray tank, a water spray bottom plate is formed on the top of the base, a guide plate is provided in the middle of the base, the guide plate and the water spray bottom plate are arranged at intervals up and down to form an overhead layer, and the overhead layer is connected to the drainage ditch; the side walls are installed on both sides of the water spray bottom plate, and a car washing area is formed between the two side walls, and a plurality of side water spray heads are provided on the side walls, and the side water spray heads are connected to the side water pipes, and a plurality of bottom water spray heads are provided on the water spray bottom plate, and the bottom water spray heads are connected to the bottom water pipes;
[0011] 6) Use lime sand bricks to build drainage ditches, and use waterproof mortar to plaster the drainage ditches;
[0012] 7) Provide a water pump, fix the water pump in the terminal sedimentation tank, and inject a set amount of water into the tank; connect the water pump to a water pump pipe, and connect the water pump pipe to the bottom water pipe and the side water pipe;
[0013] When the vehicle enters the car wash area, the side water spray heads and the bottom water spray heads spray water toward the vehicle body. The water carries the mud on the vehicle body through the water spraying bottom plate into the overhead layer to form car wash waste water. The car wash waste water flows along the extension direction of the guide plate to the drain ditch, and then flows to the head end sedimentation tank. The car wash waste water flows and settles along the head end sedimentation tank, the middle sedimentation tank and the terminal sedimentation tank in sequence.
[0014] Optionally, in the construction step 2), before the tertiary sedimentation tank is hoisted into the sedimentation tank, the bottom of the sedimentation tank is hardened with concrete to form a first hardened layer. When the tank body is placed in the sedimentation tank, the bottom of the tank body is pressed against the first hardened layer.
[0015] Optionally, in the construction step 5), before the base is hoisted to the spray tank, the bottom of the spray tank is hardened with concrete to form a second hardened layer. When the base is placed in the spray tank, the base is pressed against the second hardened layer from top to bottom.
[0016] Optionally, the water spray bottom plate includes a plurality of pressure bearing rods, the plurality of pressure bearing rods are arranged at intervals along the length direction of the water spray bottom plate, and pressure bearing intervals are formed between adjacent water spray bottom plates;
[0017] In the construction step 5), the plurality of bottom water pipes are respectively arranged below the plurality of pressure-bearing intervals, and the bottom water spray heads are embedded in the pressure-bearing intervals.
[0018] Optionally, the upper surface of the bottom water pipe is provided with a plurality of the bottom water spray heads, the lower surface of the bottom water pipe is provided with a plurality of lower water spray heads, and the bottom of the lower water spray head has a lower water spray port arranged downward;
[0019] When the car wash wastewater is discharged into the drainage ditch through the overhead layer, the lower water spray port sprays water toward the guide plate, causing the mud in the car wash wastewater to flow into the drainage ditch.
[0020] Optionally, a water collecting pipe is provided above the drainage ditch, the water collecting pipe is extended and arranged along the length direction of the drainage ditch, one side of the water collecting pipe is connected to the water pumping pipe, and the other side of the water collecting pipe is connected to a plurality of bottom water pipes, and the plurality of bottom water pipes are arranged at intervals along the length direction of the water collecting pipe; a plurality of drainage ditch water spray heads are provided on the water collecting pipe, and the plurality of drainage ditch water spray heads are arranged at intervals along the length direction of the water collecting pipe, and the drainage ditch water spray heads are arranged above the drainage ditch;
[0021] When the car wash wastewater flows through the drainage ditch to the head end sedimentation tank, the drainage ditch spray head sprays water toward the drainage ditch, and under the impact of the water, the car wash wastewater in the drainage ditch is forced to flow to the head end sedimentation tank.
[0022] Optionally, the guide plate has an inclined section arranged obliquely, and along the direction toward the drain outlet, the inclined section is arranged to extend obliquely downward;
[0023] When the car wash waste water falls onto the inclined section from top to bottom, under the action of gravity, the car wash waste water flows downward along the extension direction of the inclined section and flows into the drainage ditch.
[0024] Optionally, the top of the water spray base plate is higher than the horizontal plane of the construction site. In the construction step 5), after the base is hoisted into the spray trough, end seats are hoisted at the front and rear ends of the base respectively, and the bottom of the end seat is pressed against the bottom of the spray trough. The top of the end seat has an inclined plate arranged obliquely, the inner end of the inclined plate is aligned with the water spray base plate, and the outer end of the inclined plate is aligned with the horizontal plane of the construction site.
[0025] Optionally, in the construction step 5), after the base is hoisted into the spray tank, a plurality of longitudinally arranged longitudinal bars are installed on both sides of the base, and the plurality of longitudinal bars are arranged at intervals along the length direction of the base, and installation intervals are formed between adjacent longitudinal bars;
[0026] A plurality of transverse bars are arranged in the installation interval, the transverse bars are extended and arranged along the length direction of the base, the two ends of the transverse bars are respectively connected to two longitudinal bars arranged at intervals, the plurality of transverse bars are respectively arranged in the middle and top of the installation interval, and the plurality of transverse bars and longitudinal bars are enclosed to form a plurality of rectangular installation areas; side panels are fixed in the installation areas, and the plurality of side panels respectively enclose the plurality of installation areas to form the side walls;
[0027] The transverse rod has a transverse surface facing the car wash area, and an inwardly recessed installation groove is formed on the transverse surface. The installation groove has a groove opening. The side water pipe is arranged longitudinally, and the side water pipe passes through the installation groove on the transverse rod from top to bottom. The outer side of the side water pipe is exposed on the outer side of the groove opening and is connected to a bracket, and the side water pipe is fixed by the bracket.
[0028] Optionally, the guide plate has a horizontal section arranged horizontally, and the horizontal section is connected to the top of the inclined section; the side water pipe has a lower section extending into the overhead layer, and an end water spray head is provided at the bottom of the lower section, and the end water spray head has an end water spray port, and the end water spray port is arranged toward the drain port; a fixed rotating cylinder is provided on the horizontal section;
[0029] The plurality of rotating cylinders are arranged at intervals along the length direction of the horizontal section, and the outer circumference of the rotating cylinder is provided with a plurality of rotating blades, and the bottoms of the plurality of rotating blades are pressed against the horizontal section;
[0030] When the car wash wastewater is discharged into the drainage ditch through the overhead layer, the end water spray port faces outward toward the water body, and the rotating blades rotate under the impact of the water body. The rotating blades sweep the car wash wastewater on the horizontal section and make the car wash wastewater flow toward the inclined section.
[0031] Compared with the prior art, the automatic mud-discharging prefabricated steel car washing system construction method provided by the present invention forms a sedimentation tank and a spray tank by excavation, and then hoists the prefabricated three-level sedimentation tank and the base to the set position respectively, which is convenient for disassembly and can be recycled, replacing the traditional reinforced concrete car washing tank, reinforced concrete spray system and reinforced concrete three-level sedimentation tank, and achieving the purpose of recycling. Then, it occupies a small area, and there is no need to construct a car washing tank with a large area like the traditional car washing system. By adopting an extra-long spray structure, and setting a bottom high-pressure water spray head and a side high-pressure water spray head, and cooperating with a high-power water pump, the high-pressure water jet sprayed out impacts and cleans the mud blocks on the tires and the chassis of the vehicle, achieving the same effect as the car washing tank, so the setting of the car washing tank can be cancelled. BRIEF DESCRIPTION OF THE DRAWINGS
[0032] Figure 1 It is a schematic diagram of the process of the construction method of the automatic mud-discharging prefabricated steel car washing system provided by the present invention;
[0033] Figure 2 It is a schematic diagram of the layout of the automatic mud-discharging prefabricated steel car washing system provided by the present invention;
[0034] Figure 3 It is a cross-sectional schematic diagram of the automatic mud-discharging prefabricated steel car washing system provided by the present invention;
[0035] Figure 4 It is a cross-sectional schematic diagram of the automatic mud-discharging prefabricated steel car washing system provided by the present invention;
[0036] Figure 5 It is a schematic diagram of the arrangement of the sedimentation structure and the drainage ditch provided by the present invention;
[0037] Figure 6 It is a schematic diagram of the arrangement of the side water pipes, bottom water pipes, water collecting pipes and water pumping pipes provided by the present invention;
[0038] Figure 7 It is a partial schematic diagram of the connection between the side wall and the base provided by the present invention;
[0039] Figure 8 It is a partial schematic diagram of the overhead layer provided by the present invention. DETAILED DESCRIPTION
[0040] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.
[0041] The implementation of the present invention is described in detail below in conjunction with specific embodiments.
[0042] The same or similar numbers in the drawings of this embodiment correspond to the same or similar parts; in the description of the present invention, it should be understood that if the terms "upper", "lower", "left", "right" and the like indicate directions or positional relationships based on the directions or positional relationships shown in the drawings, it is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction. Therefore, the terms describing the positional relationship in the drawings are only used for illustrative purposes and cannot be understood as limitations on this patent. For ordinary technicians in this field, the specific meanings of the above terms can be understood according to specific circumstances.
[0043] Reference Figure 1-8 The figure shows a preferred embodiment of the present invention.
[0044] The construction method of the automatic mud-discharging prefabricated steel car washing system provided by the present invention comprises the following construction steps:
[0045] 1) Assemble the base of the spray structure and the tertiary sedimentation tank 200 in the factory or construction site;
[0046] 2) According to the external dimensions of the tertiary sedimentation tank 200, the ground is leveled at the entrance and exit of the construction site, and a sedimentation tank tank is excavated; the tertiary sedimentation tank 200 is hoisted into the sedimentation tank tank, and a backfill area is formed between the outer periphery of the tertiary sedimentation tank 200 and the side wall of the sedimentation tank tank;
[0047] 3) Backfill fine-grained soil into the backfill area to form a soil layer, and fix the tertiary sedimentation tank 200 in the sedimentation tank tank through the soil layer; the tertiary sedimentation tank 200 includes a tank body, which includes a head sedimentation tank 210, a middle sedimentation tank 220 and a terminal sedimentation tank 230 arranged in sequence, a first partition 211 is provided between the head sedimentation tank 210 and the middle sedimentation tank 220, and a second partition 221 is provided between the middle sedimentation tank 220 and the terminal sedimentation tank 230;
[0048] 4) Excavating a spray trough and a drainage ditch at the construction site, wherein the drainage ditch is arranged between the spray trough and the sedimentation tank, one side of the drainage ditch is connected to the spray trough, and the other side of the drainage ditch is connected to the head end sedimentation tank 210;
[0049] 5) Hoist the base into the spray tank, a water spray base plate 100 is formed on the top of the base, a guide plate 600 is provided in the middle of the base, and the guide plate 600 and the water spray base plate 100 are arranged in intervals up and down to form an overhead layer, which is connected to the drainage ditch; side walls 400 are installed on both sides of the water spray base plate 100, and a car washing area is formed between the two side walls 400, and a plurality of side water spray heads 410 are provided on the side walls 400, and the side water spray heads 410 are connected to the side water pipes 420, and a plurality of bottom water spray heads 110 are provided on the water spray base plate 100, and the bottom water spray heads 110 are connected to the bottom water pipes 130;
[0050] 6) Use lime sand bricks to build the drainage ditch to form the drainage ditch 300, and use waterproof mortar to plaster the drainage ditch 300;
[0051] 7) Provide a water pump 240, fix the water pump 240 in the terminal sedimentation tank 230, and inject a set amount of water into the tank; connect the water pump 240 to a water pump pipe 241, and connect the water pump pipe 241 to the bottom water pipe 130 and the side water pipe 420;
[0052] When the vehicle enters the car wash area, the side water spray heads 410 and the bottom water spray heads 110 spray water toward the vehicle. The water carries the mud on the vehicle through the water spraying bottom plate 100 into the overhead layer to form car wash waste water. The car wash waste water flows along the extension direction of the guide plate 600 to the drain ditch 300, and then flows to the head end sedimentation tank 210. The car wash waste water flows and settles along the head end sedimentation tank 210, the middle sedimentation tank 220 and the terminal sedimentation tank 230 in sequence.
[0053] The above-mentioned automatic mud-discharging prefabricated steel car washing system construction method forms a sedimentation tank and a spray tank by excavation, and then hoists the prefabricated three-stage sedimentation tank 200 and the base to the set position respectively, which is convenient for disassembly and can be recycled, replacing the traditional reinforced concrete car washing tank, reinforced concrete spray system and reinforced concrete three-stage sedimentation tank 200, and achieving the purpose of recycling. Then, it occupies a small area, and there is no need to construct a car washing tank with a large area like the traditional car washing system. By adopting an extra-long spray structure, and setting a bottom high-pressure water spray head and a side high-pressure water spray head, and cooperating with a high-power water pump 240, the high-pressure water jet sprayed out impacts and washes the mud blocks on the tires and the chassis of the vehicle, achieving the same effect as the car washing tank, so the setting of the car washing tank can be cancelled.
[0054] This application eliminates the traditional car wash tank with a large floor space, and only retains the spray system and the three-stage sedimentation system. Therefore, the floor space is greatly reduced, and the overall length is reduced from the traditional 30m to 12m. At the same time, the prefabricated steel spray structure and sedimentation structure 200 that are easy to disassemble and assemble are used to replace the traditional reinforced concrete spray system and the three-stage sedimentation tank 200.
[0055] In construction step 2), before the tertiary sedimentation tank 200 is hoisted to the sedimentation tank, the bottom of the sedimentation tank is hardened with concrete to form a first hardened layer. When the tank body is placed in the sedimentation tank, the bottom of the tank body presses against the first hardened layer. In this way, the bottom of the sedimentation tank is hardened to ensure its bearing capacity.
[0056] In construction step 5), before the base is hoisted to the spray tank, the bottom of the spray tank is hardened with concrete to form a second hardened layer. When the base is placed in the spray tank, the base presses against the second hardened layer from top to bottom. In this way, the bottom of the spray tank is hardened to ensure its bearing capacity.
[0057] The water spray bottom plate 100 includes a plurality of pressure bearing rods, which are arranged at intervals along the length direction of the water spray bottom plate 100, and pressure bearing intervals are formed between adjacent water spray bottom plates 100;
[0058] In construction step 5), multiple bottom water pipes 130 are respectively arranged under multiple pressure-bearing intervals, and the bottom water spray heads 110 are embedded in the pressure-bearing intervals. In this way, through the design of the pressure-bearing intervals, space is provided for the arrangement of the bottom plate water spray heads to prevent the vehicle body from rolling over the bottom water spray heads 110.
[0059] A plurality of bottom water spray heads 110 are disposed on the upper surface of the bottom water pipe 130, and a plurality of lower water spray heads 120 are disposed on the lower surface of the bottom water pipe 130. The bottom of the lower water spray head 120 has a lower water spray port arranged downward.
[0060] When the car wash wastewater is discharged into the drainage ditch 300 through the overhead layer, the lower water spray port sprays water toward the guide plate 600, causing the mud in the car wash wastewater to flow into the drainage ditch 300. In this way, through the design of the lower water spray head 120, the mud will not accumulate in the overhead layer, and once the mud blocks of the vehicle fall into the overhead layer, they will be washed by the high-pressure water of the lower water spray head 120 and merged into the drainage ditch.
[0061] A water collecting pipe 242 is provided above the drainage ditch 300. The water collecting pipe 242 is extended and arranged along the length direction of the drainage ditch 300. One side of the water collecting pipe 242 is connected to the water pumping pipe 241. The other side of the water collecting pipe 242 is connected to a plurality of bottom water pipes 130. The plurality of bottom water pipes 130 are arranged at intervals along the length direction of the water collecting pipe 242. A plurality of drainage ditch water spray heads 310 are provided on the water collecting pipe 242. The plurality of drainage ditch water spray heads 310 are arranged at intervals along the length direction of the water collecting pipe 242. The drainage ditch water spray heads 310 are arranged above the drainage ditch 300.
[0062] When the car wash wastewater flows through the drain ditch 300 to the head end sedimentation tank 210, the drain ditch water spray head 310 sprays water toward the drain ditch 300. Under the impact of the water, the car wash wastewater in the drain ditch 300 is forced to flow to the head end sedimentation tank 210. In this way, the design of the drain ditch water spray head 310 can prevent sediment from settling in the drain ditch 300 and force it to flow to the head end sedimentation tank 210.
[0063] The guide plate 600 has an inclined section 610 which is arranged obliquely. Along the direction toward the drain outlet, the inclined section 610 is arranged to extend obliquely downward.
[0064] When the car wash wastewater falls onto the inclined section 610 from top to bottom, under the action of gravity, the car wash wastewater flows downward along the extension direction of the inclined section 610 and flows into the drainage ditch 300. In this way, the guide plate 600 at the bottom of the overhead layer is provided with the inclined section 610, and the silt cannot settle on the bottom plate of the overhead layer.
[0065] The top of the water spray base plate 100 is higher than the horizontal plane of the construction site. In construction step 5), after the base is hoisted into the spray tank, the end seats 500 are hoisted at the front and rear ends of the base respectively. The bottom of the end seat 500 is pressed against the bottom of the spray tank. The top of the end seat 500 has an inclined plate arranged obliquely. The inner end of the inclined plate is aligned with the water spray base plate 100, and the outer end of the inclined plate is aligned with the horizontal plane of the construction site. In this way, the top of the water spray base plate 100 is higher than the horizontal plane of the construction site, which is convenient for installing the side wall 400 and avoiding large-scale excavation.
[0066] In construction step 5), after the base is hoisted into the spray tank, a plurality of longitudinally arranged longitudinal rods 401 are installed on both sides of the base, and the plurality of longitudinal rods 401 are arranged at intervals along the length direction of the base, and installation intervals are formed between adjacent longitudinal rods 401;
[0067] A plurality of transverse rods 402 are arranged in the installation interval, the transverse rods 402 are extended and arranged along the length direction of the base, the two ends of the transverse rods 402 are respectively connected to two longitudinal rods 401 arranged at intervals, and the plurality of transverse rods 402 are respectively arranged in the middle and the top of the installation interval, and the plurality of transverse rods 402 and the longitudinal rods 401 enclose a plurality of rectangular installation areas; side panels are fixed in the installation areas, and the plurality of side panels respectively enclose the plurality of installation areas to form side walls 400;
[0068] The transverse bar 402 has a transverse surface facing the car wash area, and an inwardly recessed mounting groove is formed on the transverse surface. The mounting groove has a groove opening, and the side water pipe 420 is arranged longitudinally. The side water pipe 420 passes through the mounting groove on the transverse bar 402 from top to bottom, and the outer side of the side water pipe 420 is exposed outside the groove opening, and is connected with a bracket 4020, and the side water pipe 420 is fixed by the bracket 4020. In this way, the side wall 400 has a simple structure, can be quickly installed on site, and is also easy to disassemble. At the same time, the side water pipe 420 is connected to the transverse bar 402 by the bracket 4020 to ensure the long-term stable longitudinal arrangement of the side water pipe 420.
[0069] The guide plate 600 has a horizontal section arranged horizontally, and the horizontal section is connected to the top of the inclined section 610; the side water pipe 420 has a lower section extending into the overhead layer, and an end water spray head 430 is provided at the bottom of the lower section, and the end water spray head 430 has an end water spray port, and the end water spray port is arranged toward the drain port; a fixed rotating cylinder 620 is provided on the horizontal section;
[0070] A plurality of rotating cylinders 620 are arranged at intervals along the length direction of the horizontal section, and a plurality of rotating blades 621 are arranged on the outer circumference of the rotating cylinder 620, and the bottoms of the plurality of rotating blades 621 are pressed against the horizontal section;
[0071] When the car wash wastewater is discharged into the drainage ditch 300 through the overhead layer, the end water spray port faces outward toward the water body, and the rotating blade 621 rotates under the impact of the water body, and the rotating blade 621 sweeps the car wash wastewater on the horizontal section, so that the car wash wastewater flows toward the inclined section 610. In this way, the water body can be sprayed out through the end high-pressure water spray head, and this part of the water body moves from the end of the guide plate 600 toward the drainage ditch 300, so as to promote the flow of car wash wastewater along the way, and the design of the rotating blade 621 prevents sediment from settling in the horizontal section.
[0072] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. The construction method of the automatic mud-discharging prefabricated steel car washing system is characterized in that: The construction steps include: 1) Assemble the base of the spray structure and the three-stage sedimentation tank in the factory or construction site; 2) According to the external dimensions of the tertiary sedimentation tank, the ground is leveled at the entrance and exit of the construction site, and a sedimentation tank tank is excavated; the tertiary sedimentation tank is hoisted into the sedimentation tank tank, and a backfill area is formed between the outer periphery of the tertiary sedimentation tank and the side wall of the sedimentation tank tank; 3) backfilling fine-grained soil into the backfill area to form a soil layer, and fixing the three-stage sedimentation tank in the sedimentation tank tank through the soil layer; the three-stage sedimentation tank includes a tank body, and the tank body includes a head end sedimentation tank, a middle sedimentation tank and a terminal sedimentation tank arranged in sequence, a first partition is provided between the head end sedimentation tank and the middle sedimentation tank, and a second partition is provided between the middle sedimentation tank and the terminal sedimentation tank; 4) Excavating a spray trough and a drainage ditch at the construction site. The drainage ditch is arranged between the spray trough and the sedimentation tank. One side of the drainage ditch is connected to the spray trough, and the other side of the drainage ditch is connected to the head end sedimentation tank; 5) Hoist the base into the spray tank, a water spray bottom plate is formed on the top of the base, a guide plate is provided in the middle of the base, the guide plate and the water spray bottom plate are arranged in an upper and lower interval to form an overhead layer, and the overhead layer is connected to the drainage ditch; side walls are installed on both sides of the water spray bottom plate, and a car washing area is formed between the two side walls, and a plurality of side water spray heads are provided on the side walls, and the side water spray heads are connected to the side water pipes, and a plurality of bottom water spray heads are provided on the water spray bottom plate, and the bottom water spray heads are connected to the bottom water pipes; 6) Use lime sand bricks to build drainage ditches, and use waterproof mortar to plaster the drainage ditches; 7) Provide a water pump, fix the water pump in the terminal sedimentation tank, and inject a set amount of water into the tank; connect the water pump to a water pump pipe, and connect the water pump pipe, the bottom water pipe and the side water pipe to each other; When the vehicle enters the car wash area, the side water spray heads and the bottom water spray heads spray water toward the vehicle body. The water carries the mud on the vehicle body through the water spraying bottom plate into the overhead layer to form car wash waste water. The car wash waste water flows along the extension direction of the guide plate to the drain ditch, and then flows to the head end sedimentation tank. The car wash waste water flows and settles along the head end sedimentation tank, the middle sedimentation tank and the terminal sedimentation tank in sequence.
2. The construction method of the automatic mud-discharging prefabricated steel car washing system according to claim 1, characterized in that: In the construction step 2), before the tertiary sedimentation tank is hoisted to the sedimentation tank, the bottom of the sedimentation tank is hardened with concrete to form a first hardened layer. When the tank body is placed in the sedimentation tank, the bottom of the tank body is pressed against the first hardened layer.
3. The construction method of the automatic mud-discharging prefabricated steel car washing system according to claim 1, characterized in that: In the construction step 5), before the base is hoisted to the spray tank, the bottom of the spray tank is hardened with concrete to form a second hardened layer. When the base is placed in the spray tank, the base is pressed from top to bottom on the second hardened layer.
4. The construction method of the automatic mud-discharging prefabricated steel car washing system according to claim 1, characterized in that: The water spray bottom plate includes a plurality of pressure bearing rods, which are arranged at intervals along the length direction of the water spray bottom plate, and pressure bearing intervals are formed between adjacent water spray bottom plates; In the construction step 5), the plurality of bottom water pipes are respectively arranged below the plurality of pressure-bearing intervals, and the bottom water spray heads are embedded in the pressure-bearing intervals.
5. The construction method of the automatic mud-discharging prefabricated steel car washing system according to claim 4 is characterized in that: The upper surface of the bottom water pipe is provided with a plurality of bottom water spray heads, the lower surface of the bottom water pipe is provided with a plurality of lower water spray heads, and the bottom of the lower water spray head has a lower water spray port arranged downward; When the car wash wastewater is discharged into the drainage ditch through the overhead layer, the lower water spray port sprays water toward the guide plate, causing the mud in the car wash wastewater to flow into the drainage ditch.
6. The construction method of the automatic mud-discharging prefabricated steel car washing system according to claim 1, characterized in that: A water collecting pipe is arranged above the drainage ditch, and the water collecting pipe extends along the length direction of the drainage ditch. One side of the water collecting pipe is connected to the water pumping pipe, and the other side of the water collecting pipe is connected to a plurality of bottom water pipes, and the plurality of bottom water pipes are arranged at intervals along the length direction of the water collecting pipe; a plurality of drainage ditch water spray heads are arranged on the water collecting pipe, and the plurality of drainage ditch water spray heads are arranged at intervals along the length direction of the water collecting pipe, and the drainage ditch water spray heads are arranged above the drainage ditch; When the car wash wastewater flows through the drainage ditch to the head end sedimentation tank, the drainage ditch spray head sprays water toward the drainage ditch, and under the impact of the water, the car wash wastewater in the drainage ditch is forced to flow to the head end sedimentation tank.
7. The construction method of the automatic mud-discharging prefabricated steel car washing system according to any one of claims 1 to 6, characterized in that: The guide plate has an inclined section arranged obliquely, and along the direction toward the drain outlet, the inclined section extends and extends obliquely downward; When the car wash waste water falls onto the inclined section from top to bottom, under the action of gravity, the car wash waste water flows downward along the extension direction of the inclined section and flows into the drainage ditch.
8. The construction method of the automatic mud-discharging prefabricated steel car washing system according to claim 5 is characterized in that: The top of the water spray base plate is higher than the horizontal plane of the construction site. In the construction step 5), after the base is hoisted into the spray tank, end seats are hoisted at the front and rear ends of the base respectively, and the bottom of the end seat is pressed against the bottom of the spray tank. The top of the end seat has an inclined plate arranged obliquely, the inner end of the inclined plate is aligned with the water spray base plate, and the outer end of the inclined plate is aligned with the horizontal plane of the construction site.
9. The construction method of the automatic mud-discharging prefabricated steel car washing system according to any one of claims 1 to 6, characterized in that: In the construction step 5), after the base is hoisted into the spray tank, a plurality of longitudinal rods are installed on both sides of the base, the plurality of longitudinal rods are arranged at intervals along the length direction of the base, and installation intervals are formed between adjacent longitudinal rods; A plurality of transverse bars are arranged in the installation interval, the transverse bars are extended and arranged along the length direction of the base, the two ends of the transverse bars are respectively connected to two longitudinal bars arranged at intervals, the plurality of transverse bars are respectively arranged in the middle and top of the installation interval, and the plurality of transverse bars and longitudinal bars are enclosed to form a plurality of rectangular installation areas; side panels are fixed in the installation areas, and the plurality of side panels respectively enclose the plurality of installation areas to form the side walls; The transverse rod has a transverse surface facing the car wash area, and an inwardly recessed installation groove is formed on the transverse surface. The installation groove has a groove opening. The side water pipe is arranged longitudinally, and the side water pipe passes through the installation groove on the transverse rod from top to bottom. The outer side of the side water pipe is exposed on the outer side of the groove opening and is connected to a bracket, and the side water pipe is fixed by the bracket.
10. The construction method of the automatic mud-discharging prefabricated steel car washing system according to claim 7, characterized in that: The guide plate has a horizontal section arranged horizontally, and the horizontal section is connected to the top of the inclined section; the side water pipe has a lower section extending into the overhead layer, and the bottom of the lower section is provided with an end water spray head, and the end water spray head has an end water spray port, and the end water spray port is arranged toward the drain port; the horizontal section is provided with a fixed rotating cylinder; The plurality of rotating cylinders are arranged at intervals along the length direction of the horizontal section, and the outer circumference of the rotating cylinder is provided with a plurality of rotating blades, and the bottoms of the plurality of rotating blades are pressed against the horizontal section; When the car wash wastewater is discharged into the drainage ditch through the overhead layer, the end water spray port faces outward toward the water body, and the rotating blades rotate under the impact of the water body. The rotating blades sweep the car wash wastewater on the horizontal section and make the car wash wastewater flow toward the inclined section.
Citation Information
Patent Citations
Method for installing automatic car washing machine
CN110450759A
Construction method of vehicle washing tank system
CN112982989A
Finished product car washing pool system with three-stage sedimentation function
CN215962540U
Auto-induction modularized car washing system
CN218400483U