Method and device for determining substandard root cause of BOD5 concentration of inflow water of water quality purification plant

By calculating the theoretical external water flow rate and the BOD5 concentration value of the BOD5 inlet in the plant, the main reason why the BOD5 concentration in the water quality purification plant does not meet the standards is determined, and the problem of not considering the impact of domestic sewage and foreign water in the existing technology is solved, and the impact of domestic sewage and foreign water is improved. The analysis accuracy and response plan effect were carried out.

CN118993183AActive Publication Date: 2024-11-22POWERCHINA WATER ENVIRONMENT GOVERANCE +3
View PDF 10 Cites 0 Cited by

Patent Information

Application Number
CN202411012979.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-26
Publication Date
2024-11-22
Estimated Expiration
2044-07-26

AI Technical Summary

Technical Problem

When the existing technology analyzes that the BOD5 concentration in water inlet in water quality purification plants is low, it fails to fully consider influencing factors such as domestic sewage and foreign water, resulting in low accuracy of the analysis results and insignificant response results.

Method used

By obtaining different types of water flow and BOD5 concentration values ​​in the preset time period, using the equilibrium coupling equation to calculate the theoretical external water flow and background value, further calculate the BOD5 concentration values ​​of various theories to enter the factory, and determine the reference with the largest difference. and determine the resolution and order of implementation based on it.

Benefits of technology

The accuracy of the root cause of the incoming BOD5 concentration in water quality purification plant does not meet the standards, ensuring the reliability of the analysis results and the effectiveness of the response plan.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118993183A_ABST
    Figure CN118993183A_ABST
Patent Text Reader

Abstract

The invention discloses a root cause determination method and device for substandard BOD5 concentration of inflow water of a water quality purification plant, and the method comprises the steps: obtaining a plurality of inflow water flows entering the water quality purification plant in a preset time period, and determining the BOD5 concentration value of the inflow water flows; calculating a background value based on the theoretical external water flow calculated by the inflow water flow and the BOD5 concentration value thereof, the inflow water flow and the BOD5 concentration value thereof; calculating a plurality of theoretical BOD5 concentration values corresponding to different reference root causes based on the theoretical external water flow and the BOD5 concentration value thereof, the incoming water flow, the plurality of external water flows and the BOD5 concentration values thereof; and calculating the difference value between the background value and each theoretical BOD5 concentration value, and determining the reference root cause corresponding to the maximum difference value as the target root cause. According to the method, the background value and the concentration values corresponding to a plurality of different reference root causes are calculated, the target root cause of which the BOD5 concentration does not reach the standard is analyzed in multiple aspects, and the root cause of which the BOD5 concentration does not reach the standard is accurately determined.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to but is not limited to the field of sewage treatment technology, and in particular to a method and device for determining the root cause of substandard BOD5 concentration of influent in a water purification plant. Background Art

[0002] The BOD5 concentration of water in the water purification plant is of great significance in assessing the degree of organic pollution in the water body, evaluating the effect of sewage treatment, reflecting the sewage treatment capacity, affecting technical and economic indicators, measuring the biodegradability of sewage, and protecting the water environment. Therefore, in the sewage treatment process, the changes in the BOD5 concentration of the inlet water should be closely monitored, and necessary measures should be taken to ensure that it is within a reasonable range.

[0003] When it is detected that the BOD5 concentration of the water inlet to a water purification plant is low, it is necessary to analyze the reasons and the corresponding solutions. At present, in order to address the problem of low BOD5 concentration of the water inlet to the water purification plant, the existing method is to analyze the weights of the water quality and quantity of industrial wastewater and the impact of the stripping of industrial wastewater on the BOD5 concentration of the water purification plants in the area. However, this method only considers the impact of the stripping of industrial wastewater on the improvement of BOD5, and does not consider the influencing factors of domestic sewage, external water, etc., resulting in low accuracy of the analysis results, and thus the effect of the response plan based on the analysis results is not significant. Summary of the invention

[0004] The embodiments of the present application provide a method and device for determining the root cause of the BOD5 concentration of the influent of a water purification plant not meeting the standard, which can effectively improve the accuracy of determining the root cause of the BOD5 concentration of the influent of a water purification plant not meeting the standard.

[0005] In a first aspect, the present application provides a method for determining the root cause of the BOD5 concentration of water inlet of a water purification plant not meeting the standard, including:

[0006] Acquire multiple different types of inlet water flow rates entering a water purification plant within a preset time period, and determine a first BOD5 concentration value corresponding to each of the inlet water flow rates;

[0007] Calculate the theoretical external water flow rate entering the water purification plant within the preset time period based on the preset equilibrium coupling equation, all the inlet water flow rates, and all the first BOD5 concentration values;

[0008] Calculating a background value based on the theoretical external water flow, each of the first BOD5 concentration values ​​and the total inlet water flow, wherein the background value is used to indicate the BOD5 concentration value of the current water purification plant when no external water is added;

[0009] Calculate multiple theoretical inlet BOD5 concentration values ​​based on the theoretical external water flow rate, each of the first BOD5 concentration values, all of the inlet water flow rates, multiple external water flow rates, and the BOD5 concentration values ​​corresponding to each of the external water flow rates, wherein the reference root causes corresponding to different theoretical inlet BOD5 concentration values ​​are different from each other;

[0010] The differences between the background value and each of the theoretical inlet BOD5 concentration values ​​are calculated, and the reference root cause corresponding to the difference with the largest value is determined as the target root cause.

[0011] In some embodiments, the inlet water flow includes domestic sewage flow, industrial wastewater flow, guest water flow, and BOD tail water flow. The theoretical outflow water flow is calculated based on a preset equilibrium coupling equation, all the inlet water flows, and all the first BOD5 concentration values, including:

[0012] Calculate theoretical sewage flow based on the domestic sewage flow, the industrial wastewater flow, the industrial water pollution coefficient and the domestic water pollution coefficient;

[0013] Calculating the sum of the domestic sewage flow, the industrial wastewater flow and the BOD tail water flow to obtain an intermediate value;

[0014] The theoretical sewage flow rate and the guest water flow rate are subtracted from the intermediate value in sequence to obtain the theoretical external water flow rate.

[0015] In some embodiments, the theoretical sewage flow is calculated based on the domestic sewage flow, the industrial wastewater flow, the industrial water pollution coefficient and the domestic water pollution coefficient, and is calculated according to the following formula:

[0016] Q 理论污水 =α 工业 Q 工业废水 +α 生活 Q 生活污水 ;

[0017] Among them, Q 理论污水 is the theoretical sewage flow, α 工业 is the industrial water pollution coefficient, Q 工业废水 is the industrial wastewater flow rate, α 生活 is the pollution coefficient of domestic water, Q 生活污水 is the domestic sewage flow rate.

[0018] In some embodiments, the background value is calculated based on the theoretical external water flow, each of the first BOD5 concentration values ​​and the total inlet water flow, and is obtained according to the following formula:

[0019] C0=(Q 进厂 C 进厂 +∑QBOD C BOD -∑Q 客水 C 客水 -Q 理论外水 C 理论外水 ) / Q 理论污水 ;

[0020] Wherein, C0 is the background value, Q 进厂 is the water flow of domestic sewage and industrial wastewater entering the water purification plant, C 进厂 is the BOD5 concentration value of the domestic sewage flow and the industrial wastewater flow entering the water purification plant, ∑Q BOD is the BOD tailwater flow rate, C BOD is the BOD5 concentration value of the BOD tail water flow entering the water purification plant, ∑Q 客水 is the passenger water flow, C 客水 is the BOD5 concentration value of the guest water flow, Q 理论污水 is the theoretical sewage flow, Q 理论外水 is the theoretical external water flow rate, C 理论外水 It is the BOD5 concentration value of the theoretical external water flow entering the water purification plant.

[0021] In some embodiments, the theoretical inlet BOD5 concentration value includes a first theoretical inlet BOD5 concentration value, a second theoretical inlet BOD5 concentration value and a third theoretical inlet BOD5 concentration value, and multiple theoretical inlet BOD5 concentration values ​​are calculated based on the theoretical external water flow rate, each of the first BOD5 concentration values, all of the inlet water flow rates, multiple external water flow rates and the BOD5 concentration values ​​corresponding to each of the external water flow rates, including:

[0022] Calculate a first theoretical inlet BOD5 concentration value based on the theoretical outflow flow, each of the first BOD5 concentration values, all of the inlet water flow, the first outflow flow, and the second BOD5 concentration value, wherein the second BOD5 concentration value is the BOD5 concentration value of the first outflow flow;

[0023] Calculate a second theoretical inlet BOD5 concentration value based on the theoretical external water flow rate, each of the first BOD5 concentration values, the total inlet water flow rate, the first external water flow rate, the second BOD5 concentration value, the second external water flow rate and the third BOD5 concentration value, wherein the third BOD5 concentration value is the BOD5 concentration value of the second external water flow rate;

[0024] The third theoretical inlet BOD5 concentration value is calculated based on the theoretical external water flow, each of the first BOD5 concentration values, all the inlet water flow, the first external water flow, the second BOD5 concentration value, the second external water flow, the third BOD5 concentration value, the third external water flow and the fourth BOD5 concentration value, wherein the fourth BOD5 concentration value is the BOD5 concentration value of the third external water flow, and the external water types between the first external water flow, the second external water flow and the third external water flow are different.

[0025] In some embodiments, the first theoretical inlet BOD5 concentration value is calculated based on the theoretical external water flow rate, each of the first BOD5 concentration values, the total inlet water flow rate, the first external water flow rate and the second BOD5 concentration value, and is obtained according to the following formula:

[0026] C1=[(Q 进厂 C 进厂 +∑Q BOD C BOD +Q 不可剥离地下水 C 不可剥离地下水 )-(∑Q 客水 C 客水 -Q 理论外水 C 理论外水 )] / (Q 理论污水 +Q 不可剥离地下水 );

[0027] Wherein, C1 is the first theoretical BOD5 concentration value entering the plant, Q 进厂 is the water flow of domestic sewage and industrial wastewater entering the water purification plant, C 进厂 is the BOD5 concentration value of the domestic sewage flow and the industrial wastewater flow entering the water purification plant, ∑Q BOD is the BOD tailwater flow rate, C BOD is the BOD5 concentration value of the BOD tail water flow entering the water purification plant, ∑Q 客水 is the passenger water flow, C 客水 is the BOD5 concentration value of the guest water flow, Q 理论污水 is the theoretical sewage flow, Q 理论外水 is the theoretical external water flow rate, C 理论外水 is the BOD5 concentration value of the theoretical external water flow entering the water purification plant, Q 不可剥离地下水 is the first external water flow rate, C 不可剥离地下水 is the second BOD5 concentration value.

[0028] In some embodiments, the second theoretical inlet BOD5 concentration value is calculated based on the theoretical external water flow rate, each of the first BOD5 concentration values, the total inlet water flow rate, the first external water flow rate, the second BOD5 concentration value, the second external water flow rate and the third BOD5 concentration value, and is obtained according to the following formula:

[0029] C2=[(Q 进厂 C 进厂 +∑Q BOD C BOD +Q 不可剥离地下水 C 不可剥离地下水 +Q 1 / 2级缺陷地下水 C 1 / 2级缺陷离地下水 )-(∑Q 客水 C 客水 +Q 理论外水 C 理论外水 )] / (Q 理论污水 +Q 不可剥离地下水 +Q 1 / 2级缺陷地下水 );

[0030] Wherein, C2 is the second theoretical BOD5 concentration value entering the plant, Q 1 / 2级缺陷地下水 is the second external water flow, C 1 / 2级缺陷离地下水 is the third BOD5 concentration value.

[0031] In some embodiments, the third theoretical inlet BOD5 concentration value is calculated based on the theoretical external water flow rate, each of the first BOD5 concentration values, the total inlet water flow rate, the first external water flow rate, the second BOD5 concentration value, the second external water flow rate, the third BOD5 concentration value, the third external water flow rate and the fourth BOD5 concentration value, and is obtained according to the following formula:

[0032] C3=[(Q 进厂 C 进厂 +∑Q BOD C BOD +Q 不可剥离地下水 C 不可剥离地下水 +Q 1 / 2级缺陷地下水 C 1 / 2级缺陷离地下水 +Q 3 / 4级缺陷地下水 C 3 / 4级缺陷离地下水 )-(∑Q 客水 C 客水 +Q 理论外水 C 理论外水 )] / (Q 理论污水 +Q 不可剥离地下水 +Q 1 / 2级缺陷地下水 +Q 3 / 4级缺陷地下水 );

[0033] Wherein, C3 is the third theoretical BOD5 concentration value entering the plant, Q 3 / 4级缺陷地下水 is the third external water flow rate, C3 / 4级缺陷离地下水 is the fourth BOD5 concentration value.

[0034] In some embodiments, after determining the reference root cause corresponding to the difference with the largest value as the target root cause, the method further includes:

[0035] Determine solution information corresponding to each of the reference root causes;

[0036] Determine the target measure execution order by ordering all the differences from small to large;

[0037] Prompt information is generated based on all of the solution measure information and the target measure execution order, and the prompt information is sent.

[0038] In the second aspect, an embodiment of the present application provides a device for determining the root cause of non-standard BOD5 concentration of influent water of a water purification plant, comprising at least one control processor and a memory for communicating with the at least one control processor; the memory stores instructions executable by the at least one control processor, and the instructions are executed by the at least one control processor so that the at least one control processor can execute the method for determining the root cause of non-standard BOD5 concentration of influent water of a water purification plant as described in the first aspect.

[0039] The embodiment of the present application provides a method and device for determining the root cause of the substandard BOD5 concentration of influent water of a water purification plant. The method includes: obtaining multiple different types of influent water flow rates entering the water purification plant within a preset time period, and determining a first BOD5 concentration value corresponding to each of the influent water flow rates; calculating a theoretical external water flow rate entering the water purification plant within the preset time period based on a preset equilibrium coupling equation, all of the influent water flow rates, and all of the first BOD5 concentration values; calculating a background value based on the theoretical external water flow rate, each of the first BOD5 concentration values, and all of the influent water flow rates. , wherein the background value is used to indicate the BOD5 concentration value when no external water is added to the current water purification plant; multiple theoretical inlet BOD5 concentration values ​​are calculated based on the theoretical external water flow rate, each of the first BOD5 concentration values, all of the inlet water flow rates, multiple external water flow rates, and the BOD5 concentration values ​​corresponding to each of the external water flow rates, and the reference root causes corresponding to different theoretical inlet BOD5 concentration values ​​are different; the difference between the background value and each of the theoretical inlet BOD5 concentration values ​​is calculated, and the reference root cause corresponding to the difference with the largest value is determined as the target root cause. According to the scheme provided in the embodiment of the present application, by calculating a background value and the concentration values ​​corresponding to multiple different reference root causes, a multi-faceted analysis is performed to determine the target root cause that causes the inlet BOD5 concentration of the water purification plant to fail to meet the standard, which can effectively improve the accuracy of determining the root cause of the failure of the inlet BOD5 concentration of the water purification plant to meet the standard. BRIEF DESCRIPTION OF THE DRAWINGS

[0040] Figure 1 It is a flowchart of the steps of a method for determining the root cause of substandard BOD5 concentration of water inlet of a water purification plant provided by an embodiment of the present application;

[0041] Figure 2 It is a structural diagram of a device for determining the root cause of substandard BOD5 concentration of influent to a water purification plant provided by another embodiment of the present application. DETAILED DESCRIPTION

[0042] In order to make the purpose, technical solution and advantages of the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.

[0043] It is understood that although the functional modules are divided in the device schematic diagram and the logical order is shown in the flow chart, in some cases, the steps shown or described may be performed in a different order than the module division in the device or the order in the flow chart. The terms "first", "second", etc. in the specification, claims or the above drawings are used to distinguish similar objects and are not necessarily used to describe a specific order or sequence.

[0044] The BOD5 concentration of water in the water purification plant is of great significance in assessing the degree of organic pollution in the water body, evaluating the effect of sewage treatment, reflecting the sewage treatment capacity, affecting technical and economic indicators, measuring the biodegradability of sewage, and protecting the water environment. Therefore, in the sewage treatment process, the changes in the BOD5 concentration of the inlet water should be closely monitored, and necessary measures should be taken to ensure that it is within a reasonable range.

[0045] When it is detected that the BOD5 concentration of the water inlet to a water purification plant is low, it is necessary to analyze the reasons and the corresponding solutions. At present, in order to address the problem of low BOD5 concentration of the water inlet to the water purification plant, the existing method is to analyze the weights of the water quality and quantity of industrial wastewater and the impact of the stripping of industrial wastewater on the BOD5 concentration of the water purification plants in the area. However, this method only considers the impact of the stripping of industrial wastewater on the improvement of BOD5, and does not consider the influencing factors of domestic sewage, external water, etc., resulting in low accuracy of the analysis results, and thus the effect of the response plan based on the analysis results is not significant.

[0046] In order to solve the above-mentioned problems, the embodiment of the present application provides a method and device for determining the root cause of the BOD5 concentration of influent water not meeting the standard in a water purification plant. The method comprises: obtaining a plurality of different types of influent water flow rates entering the water purification plant within a preset time period, and determining a first BOD5 concentration value corresponding to each of the influent water flow rates; calculating a theoretical external water flow rate entering the water purification plant within the preset time period based on a preset equilibrium coupling equation, all of the influent water flow rates, and all of the first BOD5 concentration values; calculating a theoretical external water flow rate entering the water purification plant within the preset time period based on the theoretical external water flow rate, each of the first BOD5 concentration values, and all of the influent water flow rates; Calculate the background value, wherein the background value is used to indicate the BOD5 concentration value when no external water is added to the water purification plant; calculate multiple theoretical inlet BOD5 concentration values ​​based on the theoretical external water flow rate, each of the first BOD5 concentration values, all of the inlet water flow rates, multiple external water flow rates, and the BOD5 concentration values ​​corresponding to each of the external water flow rates, and the reference root causes corresponding to different theoretical inlet BOD5 concentration values ​​are different; calculate the difference between the background value and each of the theoretical inlet BOD5 concentration values, and determine the reference root cause corresponding to the difference with the largest value as the target root cause. According to the scheme provided in the embodiment of the present application, by calculating a background value and the concentration values ​​corresponding to multiple different reference root causes, a multi-faceted analysis is performed to determine the target root cause that causes the inlet BOD5 concentration of the water purification plant to fail to meet the standard, which can effectively improve the accuracy of determining the root cause of the inlet BOD5 concentration of the water purification plant to fail to meet the standard.

[0047] The embodiments of the present application are further described below in conjunction with the accompanying drawings.

[0048] refer to Figure 1 , Figure 1 The present invention provides a method for determining the root cause of the BOD5 concentration of influent water not meeting the standard in a water purification plant, which includes but is not limited to the following steps:

[0049] Step S10, obtaining a plurality of different types of inlet water flows entering the water purification plant within a preset time period, and determining a first BOD5 concentration value corresponding to each inlet water flow;

[0050] Step S20, calculating the theoretical external water flow rate entering the water purification plant within a preset time period based on a preset equilibrium coupling equation, the total inlet water flow rate, and the total first BOD5 concentration values;

[0051] Step S30, calculating a background value based on the theoretical external water flow, each first BOD5 concentration value and the total inlet water flow, wherein the background value is used to indicate the BOD5 concentration value of the current water purification plant when no external water is added;

[0052] Step S40, calculating multiple theoretical inlet BOD5 concentration values ​​based on the theoretical external water flow rate, each first BOD5 concentration value, the total inlet water flow rate, multiple external water flow rates and the BOD5 concentration value corresponding to each external water flow rate, wherein the reference root causes corresponding to different theoretical inlet BOD5 concentration values ​​are different from each other;

[0053] Step S50, calculating the difference between the background value and each theoretical inlet BOD5 concentration value, and determining the reference root cause corresponding to the largest difference as the target root cause.

[0054] It should be noted that the embodiments of the present application do not limit the specific preset time period, and those skilled in the art can determine it according to actual conditions.

[0055] It should be noted that the inlet water flow rate in the embodiment of the present application is used to characterize the amount of water entering the water purification plant within a preset time period, and may include, for example, domestic sewage flow rate, industrial wastewater flow rate, passenger water flow rate, etc.

[0056] It should be noted that the theoretical external water flow rate of the embodiment of the present application is used to characterize the amount of water entering the water purification plant within a preset time period, in addition to domestic sewage and industrial wastewater, and the amount of water that needs to be additionally introduced in order to achieve the treatment target or improve the treatment effect.

[0057] It should be noted that the background value is calculated based on the theoretical external water flow, each first BOD5 concentration value and the total inlet water flow, and is obtained according to the following formula:

[0058] C0=(Q 进厂 C 进厂 +∑Q BOD C BOD -∑Q 客水 C 客水 -Q 理论外水 C 理论外水 ) / Q 理论污水 ;

[0059] Among them, C0 is the background value, Q 进厂 is the water flow of domestic sewage and industrial wastewater entering the water purification plant, C 进厂 is the BOD5 concentration of domestic sewage and industrial wastewater entering the water purification plant, ∑Q BOD is the BOD tailwater flow rate, C BOD is the BOD5 concentration of the BOD tailwater entering the water purification plant, ∑Q 客水 is the passenger water flow, C 客水 is the BOD5 concentration value of the guest water flow, Q 理论污水 is the theoretical sewage flow, Q 理论外水 is the theoretical external water flow rate, C 理论外水It is the BOD5 concentration value of the theoretical external water flow entering the water purification plant.

[0060] It can be understood that the embodiment of the present application obtains multiple different types of inlet water flow rates entering the water purification plant within a preset time period, and determines the first BOD5 concentration value corresponding to each inlet water flow rate, so as to provide an effective data basis for calculating the theoretical external water flow rate and theoretical sewage flow rate entering the water purification plant and then calculating the background value. The theoretical external water flow rate entering the water purification plant within the preset time period is calculated based on the preset equilibrium coupling equation, all inlet water flow rates, and all first BOD5 concentration values; the background value is calculated based on the theoretical external water flow rate, each first BOD5 concentration value, and all inlet water flow rates, wherein the background value is used to indicate the BOD5 concentration value when no external water (i.e., the amount of water that needs to be introduced in addition to domestic sewage and industrial wastewater mentioned in the above embodiment to achieve the treatment target or improve the treatment effect) is added to the current water purification plant; multiple theoretical inlet BOD5 concentration values ​​are calculated based on the theoretical external water flow rate, each first BOD5 concentration value, all inlet water flow rates, multiple external water flow rates, and the BOD5 concentration value corresponding to each external water flow rate, and the parameters corresponding to different theoretical inlet BOD5 concentration values ​​are used. The reference root causes are different from each other, that is to say, in this embodiment, each different theoretical inlet BOD5 concentration value is based on the background value, and the theoretical inlet BOD5 concentration value is determined after adding different types of external water to the inlet water of the water purification plant. Since the reference root causes corresponding to different theoretical inlet BOD5 concentration values ​​are different, the difference between each different theoretical inlet BOD5 concentration value and the background value can be combined to determine the degree of influence of different reference root causes on the inlet BOD5 concentration of the water purification plant. The greater the difference between the theoretical inlet BOD5 concentration value and the background value, the higher the degree of influence. Then the reference root cause corresponding to the largest numerical difference is determined as the target root cause that causes the inlet BOD5 concentration of the water purification plant to fail to meet the standard, that is, the main cause, which can provide effective support for the arrangement of subsequent solutions.

[0061] In addition, in some embodiments, the inflow water flow includes domestic sewage flow, industrial wastewater flow, guest water flow, and BOD tail water flow. Figure 1 Step S20 includes but is not limited to the following steps:

[0062] Calculate theoretical sewage flow based on domestic sewage flow, industrial wastewater flow, industrial water pollution coefficient and domestic water pollution coefficient;

[0063] Calculate the sum of domestic sewage flow, industrial wastewater flow and BOD tailwater flow to obtain the intermediate value;

[0064] Subtract the theoretical sewage flow and guest water flow from the intermediate value in turn to obtain the theoretical external water flow.

[0065] It should be noted that the BOD tail water flow rate in this embodiment is used to characterize wastewater that has been biochemically treated but still needs further treatment to meet safe discharge standards.

[0066] It should be noted that the theoretical sewage flow is calculated based on the domestic sewage flow, industrial wastewater flow, industrial water pollution coefficient and domestic water pollution coefficient, and is calculated according to the following formula:

[0067] Q 理论污水 =α 工业 Q 工业废水 +α 生活 Q 生活污水 ;

[0068] Among them, Q 理论污水 is the theoretical sewage flow, α 工业 is the industrial water pollution coefficient, α 工业 The value is 0.8, Q 工业废水 is the industrial wastewater flow, α 生活 is the pollution coefficient of domestic water, α 生活 The value is 0.9, Q 生活污水 The flow rate of domestic sewage.

[0069] It can be understood that the embodiment of the present application calculates the theoretical sewage flow based on the domestic sewage flow, industrial wastewater flow, industrial water pollution coefficient and domestic water pollution coefficient; calculates the sum of the domestic sewage flow, industrial wastewater flow and BOD tail water flow to obtain the intermediate value; subtracts the theoretical sewage flow and the guest water flow from the intermediate value in turn to obtain the theoretical external water flow, which can provide an effective data basis for calculating the background value.

[0070] In addition, in some embodiments, the theoretical inlet BOD5 concentration value includes a first theoretical inlet BOD5 concentration value, a second theoretical inlet BOD5 concentration value, and a third theoretical inlet BOD5 concentration value. Figure 1 Step S40 includes but is not limited to the following steps:

[0071] Calculate the first theoretical inlet BOD5 concentration value based on the theoretical external water flow rate, each first BOD5 concentration value, the total inlet water flow rate, the first external water flow rate and the second BOD5 concentration value, wherein the second BOD5 concentration value is the BOD5 concentration value of the first external water flow rate;

[0072] Calculate the second theoretical inlet BOD5 concentration value based on the theoretical external water flow, each first BOD5 concentration value, the total inlet water flow, the first external water flow, the second BOD5 concentration value, the second external water flow and the third BOD5 concentration value, wherein the third BOD5 concentration value is the BOD5 concentration value of the second external water flow;

[0073] The third theoretical inlet BOD5 concentration value is calculated based on the theoretical external water flow rate, each first BOD5 concentration value, the total inlet water flow rate, the first external water flow rate, the second BOD5 concentration value, the second external water flow rate, the third BOD5 concentration value, the third external water flow rate and the fourth BOD5 concentration value, wherein the fourth BOD5 concentration value is the BOD5 concentration value of the third external water flow rate, and the external water types between the first external water flow rate, the second external water flow rate and the third external water flow rate are different.

[0074] It should be noted that the external water type of the external water flow (the first external water flow, the second external water flow or the third external water flow) of the embodiment of the present application can be level 1 or 2 defective infiltration groundwater, level 3 or 4 defective infiltration groundwater or non-separable groundwater, wherein level 1, 2, 3, and 4 defective infiltration groundwater are divided according to the severity of water pollution problems, and level 1 defects refer to minor quality problems or pollution problems, while level 2 defects refer to more serious pollution or quality problems. For example, level 1 defects involve some minor organic pollutants, while level 2 defects involve heavy metals or other pollutants that are more difficult to handle. Level 3 and level 4 defects generally refer to more serious pollution or quality problems. Level 3 defects involve a wider range of pollution or more complex pollutants, while level 4 defects involve pollutants that have a significant impact on human health or the ecosystem. Non-separable groundwater generally refers to certain groundwater resources that cannot be separated from their current environment due to their location, depth or relationship with other water bodies.

[0075] It should be noted that the first theoretical inlet BOD5 concentration value is calculated based on the theoretical external water flow, each first BOD5 concentration value, the total inlet water flow, the first external water flow and the second BOD5 concentration value, and is obtained according to the following formula:

[0076] C1=[(Q 进厂 C 进厂 +∑Q BOD C BOD +Q 不可剥离地下水 C 不可剥离地下水 )-(∑Q 客水 C 客水 -Q 理论外水 C 理论外水 )] / (Q

[0077] 理论污水 +Q 不可剥离地下水 );

[0078] Among them, C1 is the first theoretical BOD5 concentration value entering the plant, Q 进厂 is the water flow of domestic sewage and industrial wastewater entering the water purification plant, C 进厂 is the BOD5 concentration of domestic sewage and industrial wastewater entering the water purification plant, ∑Q BODis the BOD tailwater flow rate, C BOD is the BOD5 concentration of the BOD tailwater entering the water purification plant, ∑Q 客水 is the passenger water flow, C 客水 is the BOD5 concentration value of the guest water flow, Q 理论污水 is the theoretical sewage flow, Q 理论外水 is the theoretical external water flow rate, C 理论外水 is the BOD5 concentration of the theoretical external water flow entering the water purification plant, Q 不可剥离地下水 is the first external water flow, C 不可剥离地下水 is the second BOD5 concentration value.

[0079] It can be understood that the first theoretical BOD5 concentration value entering the plant corresponds to the BOD5 concentration value after stripping off the level 1 and 2 defective groundwater infiltration from the influent of the water purification plant. Therefore, the reference root cause corresponding to the first theoretical BOD5 concentration value entering the plant is the level 1 and 2 defective groundwater infiltration.

[0080] In addition, the second theoretical inlet BOD5 concentration value is calculated based on the theoretical external water flow, each first BOD5 concentration value, the total inlet water flow, the first external water flow, the second BOD5 concentration value, the second external water flow and the third BOD5 concentration value, and is obtained according to the following formula:

[0081] C2=[(Q 进厂 C 进厂 +∑Q BOD C BOD +Q 不可剥离地下水 C 不可剥离地下水 +Q 1 / 2级缺陷地下水 C 1 / 2级缺陷离地下水 )-(∑Q 客水 C

[0082] 客水 +Q 理论外水 C 理论外水 )] / (Q 理论污水 +Q 不可剥离地下水 +Q 1 / 2级缺陷地下水 );

[0083] Among them, C2 is the second theoretical BOD5 concentration value entering the plant, Q 1 / 2级缺陷地下水 is the second external water flow, C 1 / 2级缺陷离地下水 This is the third BOD5 concentration value.

[0084] It can be understood that the second theoretical BOD5 concentration value entering the plant corresponds to the BOD5 concentration value after stripping off the level 3 and 4 defective groundwater infiltration from the water purification plant's influent. Therefore, the reference root cause corresponding to the first theoretical BOD5 concentration value entering the plant is the level 3 and 4 defective groundwater infiltration.

[0085] In addition, the third theoretical inlet BOD5 concentration value is calculated based on the theoretical external water flow, each first BOD5 concentration value, the total inlet water flow, the first external water flow, the second BOD5 concentration value, the second external water flow, the third BOD5 concentration value, the third external water flow and the fourth BOD5 concentration value, and is obtained according to the following formula:

[0086] C3=[(Q 进厂 C 进厂 +∑Q BOD C BOD +Q 不可剥离地下水 C 不可剥离地下水 +Q 1 / 2级缺陷地下水 C 1 / 2级缺陷离地下水 +Q 3 / 4级缺陷地下水

[0087] C 3 / 4级缺陷离地下水 )-(∑Q 客水 C 客水 +Q 理论外水 C 理论外水 )] / (Q 理论污水 +Q 不可剥离地下水 +Q 1 / 2级缺陷地下水 +Q 3 / 4级缺陷地下水 );

[0088] Among them, C3 is the third theoretical BOD5 concentration value entering the plant, Q 3 / 4级缺陷地下水 is the third external water flow, C 3 / 4级缺陷离地下水 This is the fourth BOD5 concentration value.

[0089] It can be understood that the reference root cause corresponding to the third theoretical BOD5 concentration value entering the plant is inseparable groundwater. At this point, the reference root causes corresponding to the first theoretical BOD5 concentration value entering the plant, the second theoretical BOD5 concentration value entering the plant and the third theoretical BOD5 concentration value entering the plant can be determined, providing an effective data basis for the subsequent determination of the target root causes that cause the BOD5 concentration of the water purification plant to fail to meet the standards.

[0090] In addition, after executing step S50, the method for determining the root cause of the substandard BOD5 concentration of the water purification plant inlet provided by the embodiment of the present application includes but is not limited to the following steps:

[0091] Determine the solution information corresponding to each reference root cause;

[0092] Determine the order of all differences from small to large as the target measure execution order;

[0093] Prompt information is generated based on all solution measure information and target measure execution order, and the prompt information is sent.

[0094] It can be understood that after calculating the difference between the background value and each theoretical inlet BOD5 concentration value, and determining the reference root cause corresponding to the difference with the largest numerical value as the target root cause, the solution information corresponding to each reference root cause is determined, and all the differences are determined in order from small to large as the target measure execution order, that is, the processing priority order of the solution information is determined from large to small according to the degree of impact, that is, the target measure execution order, and prompt information is generated and sent based on all the solution information and the target measure execution order. This can realize sending the prompt information to the maintenance personnel of the water purification plant, and promptly executing the solutions corresponding to each solution information in accordance with the target measure execution order, so as to achieve targeted quality improvement and efficiency enhancement for the water purification plant.

[0095] like Figure 2 As shown, Figure 2 1 is a structural diagram of a device for determining the root cause of a water purification plant inlet BOD5 concentration not meeting the standard provided by an embodiment of the present application. The present invention also provides a device 200 for determining the root cause of a water purification plant inlet BOD5 concentration not meeting the standard, comprising:

[0096] The processor 210 may be implemented by a general-purpose central processing unit (CPU), a microprocessor, an application-specific integrated circuit (ASIC), or one or more integrated circuits, and is used to execute relevant programs to implement the technical solutions provided in the embodiments of the present application;

[0097] The memory 220 can be implemented in the form of a read-only memory (ROM), a static storage device, a dynamic storage device, or a random access memory (RAM). The memory 220 can store an operating system and other application programs. When the technical solution provided in the embodiment of this specification is implemented by software or firmware, the relevant program code is stored in the memory 220, and the processor 210 calls and executes the method for determining the root cause of the substandard BOD5 concentration of the water purification plant inlet water in the embodiment of this application;

[0098] Input / output interface 230, used to implement information input and output;

[0099] Communication interface 240, used to realize communication interaction between the apparatus and other devices, which can be realized by wired means (such as USB, network cable, etc.) or wireless means (such as mobile network, WIFI, Bluetooth, etc.);

[0100] bus 250 , which transmits information between the various components of the device (e.g., processor 210 , memory 220 , input / output interface 230 , and communication interface 240 );

[0101] The processor 210 , the memory 220 , the input / output interface 230 , and the communication interface 240 are connected to each other in communication within the device via the bus 250 .

[0102] It will be appreciated by those skilled in the art that all or some of the steps and systems in the disclosed method above may be implemented as software, firmware, hardware and appropriate combinations thereof. Some physical components or all physical components may be implemented as software executed by a processor, such as a central processing unit, a digital signal processor or a microprocessor, or may be implemented as hardware, or may be implemented as an integrated circuit, such as an application specific integrated circuit. Such software may be distributed on a computer-readable medium, which may include a computer storage medium (or a non-transitory medium) and a communication medium (or a temporary medium). As known to those skilled in the art, the term computer storage medium includes volatile and non-volatile, removable and non-removable media implemented in any method or technology for storing information (such as computer-readable instructions, data structures, program modules or other data). Computer storage media include, but are not limited to, RAM, ROM, EEPROM, flash memory or other memory technologies, CD-ROM, digital versatile disks (DVD) or other optical disk storage, magnetic cassettes, magnetic tapes, disk storage or other magnetic storage devices, or any other medium that may be used to store desired information and may be accessed by a computer. Furthermore, it is well known to those skilled in the art that communication media generally include computer readable instructions, data structures, program modules, or other data in a modulated data signal such as a carrier wave or other transport mechanism, and may include any information delivery media.

[0103] The above is a specific description of the preferred implementation of the present invention, but the present invention is not limited to the above-mentioned implementation mode. Technical personnel familiar with the field can also make various equivalent deformations or substitutions under the shared conditions without violating the spirit of the present invention. These equivalent deformations or substitutions are all included in the scope defined by the claims of the present invention.

Claims

1. A method for determining the root cause of substandard BOD5 concentration in water purification plant inlet, characterized in that: include: Acquire multiple different types of inlet water flow rates entering a water purification plant within a preset time period, and determine a first BOD5 concentration value corresponding to each of the inlet water flow rates; Calculate the theoretical external water flow rate entering the water purification plant within the preset time period based on the preset equilibrium coupling equation, all the inlet water flow rates, and all the first BOD5 concentration values; Calculating a background value based on the theoretical external water flow, each of the first BOD5 concentration values ​​and the total inlet water flow, wherein the background value is used to indicate the BOD5 concentration value of the current water purification plant when no external water is added; Calculate multiple theoretical inlet BOD5 concentration values ​​based on the theoretical external water flow rate, each of the first BOD5 concentration values, all of the inlet water flow rates, multiple external water flow rates, and the BOD5 concentration values ​​corresponding to each of the external water flow rates, wherein the reference root causes corresponding to different theoretical inlet BOD5 concentration values ​​are different from each other; The differences between the background value and each of the theoretical inlet BOD5 concentration values ​​are calculated, and the reference root cause corresponding to the difference with the largest value is determined as the target root cause.

2. The method for determining the root cause of the substandard BOD5 concentration of water inlet of a water purification plant according to claim 1, characterized in that: The inlet water flow includes domestic sewage flow, industrial wastewater flow, guest water flow, and BOD tail water flow. The theoretical outflow water flow is calculated based on a preset equilibrium coupling equation, all the inlet water flows, and all the first BOD5 concentration values, including: Calculate theoretical sewage flow based on the domestic sewage flow, the industrial wastewater flow, the industrial water pollution coefficient and the domestic water pollution coefficient; Calculating the sum of the domestic sewage flow, the industrial wastewater flow and the BOD tail water flow to obtain an intermediate value; The theoretical sewage flow rate and the guest water flow rate are subtracted from the intermediate value in sequence to obtain the theoretical external water flow rate.

3. The method for determining the root cause of the BOD5 concentration of water inlet of a water purification plant not reaching the standard according to claim 2, characterized in that: The theoretical sewage flow is calculated based on the domestic sewage flow, the industrial wastewater flow, the industrial water pollution coefficient and the domestic water pollution coefficient, and is calculated according to the following formula: Q 理论污水 =α 工业 Q 工业废水 +α 生活 Q 生活污水 ; Among them, Q 理论污水 is the theoretical sewage flow, α 工业 is the industrial water pollution coefficient, Q 工业废水 is the industrial wastewater flow rate, α 生活 is the pollution coefficient of domestic water, Q 生活污水 is the domestic sewage flow rate.

4. The method for determining the root cause of the substandard BOD5 concentration of water inlet of a water purification plant according to claim 2, characterized in that: The background value is calculated based on the theoretical external water flow, each of the first BOD5 concentration values ​​and the total inlet water flow, and is obtained according to the following formula: C0=(Q 进厂 C 进厂 +∑Q BOD C BOD -∑Q 客水 C 客水 -Q 理论外水 C 理论外水 ) / Q 理论污水 ; Wherein, C0 is the background value, Q 进厂 is the water flow of domestic sewage and industrial wastewater entering the water purification plant, C 进厂 is the BOD5 concentration value of the domestic sewage flow and the industrial wastewater flow entering the water purification plant, ∑Q BOD is the BOD tailwater flow rate, C BOD is the BOD5 concentration value of the BOD tail water flow entering the water purification plant, ∑Q 客水 is the passenger water flow, C 客水 is the BOD5 concentration value of the guest water flow, Q 理论污水 is the theoretical sewage flow rate, Q 理论外水 is the theoretical external water flow rate, C 理论外水 It is the BOD5 concentration value of the theoretical external water flow entering the water purification plant.

5. The method for determining the root cause of the substandard BOD5 concentration of water inlet of a water purification plant according to claim 2, characterized in that: The theoretical inlet BOD5 concentration value includes a first theoretical inlet BOD5 concentration value, a second theoretical inlet BOD5 concentration value and a third theoretical inlet BOD5 concentration value. Multiple theoretical inlet BOD5 concentration values ​​are calculated based on the theoretical external water flow rate, each of the first BOD5 concentration values, all of the inlet water flow rates, multiple external water flow rates and the BOD5 concentration values ​​corresponding to each of the external water flow rates, including: Calculate a first theoretical inlet BOD5 concentration value based on the theoretical outflow flow, each of the first BOD5 concentration values, all of the inlet water flow, the first outflow flow, and the second BOD5 concentration value, wherein the second BOD5 concentration value is the BOD5 concentration value of the first outflow flow; Calculate a second theoretical inlet BOD5 concentration value based on the theoretical external water flow rate, each of the first BOD5 concentration values, the total inlet water flow rate, the first external water flow rate, the second BOD5 concentration value, the second external water flow rate and the third BOD5 concentration value, wherein the third BOD5 concentration value is the BOD5 concentration value of the second external water flow rate; The third theoretical inlet BOD5 concentration value is calculated based on the theoretical external water flow, each of the first BOD5 concentration values, all the inlet water flow, the first external water flow, the second BOD5 concentration value, the second external water flow, the third BOD5 concentration value, the third external water flow and the fourth BOD5 concentration value, wherein the fourth BOD5 concentration value is the BOD5 concentration value of the third external water flow, and the external water types between the first external water flow, the second external water flow and the third external water flow are different.

6. The method for determining the root cause of the substandard BOD5 concentration of water inlet of a water purification plant according to claim 5, characterized in that: The first theoretical inlet BOD5 concentration value is calculated based on the theoretical external water flow rate, each of the first BOD5 concentration values, the total inlet water flow rate, the first external water flow rate and the second BOD5 concentration value, and is obtained according to the following formula: C1=[(Q 进厂 C 进厂 +∑Q BOD C BOD +Q 不可剥离地下水 C 不可剥离地下水 )-(∑Q 客水 C 客水 -Q 理论外水 C 理论外水 )] / (Q 理论污水 +Q 不可剥离地下水 ); Wherein, C1 is the first theoretical BOD5 concentration value entering the plant, Q 进厂 is the water flow of domestic sewage and industrial wastewater entering the water purification plant, C 进厂 is the BOD5 concentration value of the domestic sewage flow and the industrial wastewater flow entering the water purification plant, ∑Q BOD is the BOD tailwater flow rate, C BOD is the BOD5 concentration value of the BOD tail water flow entering the water purification plant, ∑Q 客水 is the passenger water flow, C 客水 is the BOD5 concentration value of the guest water flow, Q 理论污水 is the theoretical sewage flow rate, Q 理论外水 is the theoretical external water flow rate, C 理论外水 is the BOD5 concentration value of the theoretical external water flow entering the water purification plant, Q 不可剥离地下水 is the first external water flow rate, C 不可剥离地下水 is the second BOD5 concentration value.

7. The method for determining the root cause of the substandard BOD5 concentration of the water inlet of a water purification plant according to claim 6, characterized in that: The second theoretical inlet BOD5 concentration value is calculated based on the theoretical external water flow rate, each of the first BOD5 concentration values, the total inlet water flow rate, the first external water flow rate, the second BOD5 concentration value, the second external water flow rate and the third BOD5 concentration value, and is obtained according to the following formula: C2=[(Q 进厂 C 进厂 +∑Q BOD C BOD +Q 不可剥离地下水 C 不可剥离地下水 +Q 1 / 2级缺陷地下水 C 1 / 2级缺陷离地下水 )-(∑Q 客水 C 客水 +Q 理论外水 C 理论外水 )] / (Q 理论污水 +Q 不可剥离地下水 +Q 1 / 2级缺陷地下水 ); Wherein, C2 is the second theoretical BOD5 concentration value entering the plant, Q 1 / 2级缺陷地下水 is the second external water flow, C 1 / 2级缺陷离地下水 is the third BOD5 concentration value.

8. The method for determining the root cause of the substandard BOD5 concentration of water inlet of a water purification plant according to claim 7, characterized in that: The third theoretical inlet BOD5 concentration value is calculated based on the theoretical external water flow rate, each of the first BOD5 concentration values, the total inlet water flow rate, the first external water flow rate, the second BOD5 concentration value, the second external water flow rate, the third BOD5 concentration value, the third external water flow rate and the fourth BOD5 concentration value, and is obtained according to the following formula: C3=[(Q 进厂 C 进厂 +∑Q BOD C BOD +Q 不可剥离地下水 C 不可剥离地下水 +Q 1 / 2级缺陷地下水 C 1 / 2级缺陷离地下水 +Q 3 / 4级缺陷地下水 C 3 / 4级缺陷离地下水 )-(∑Q 客水 C 客水 +Q 理论外水 C 理论外水 )] / (Q 理论污水 +Q 不可剥离地下水 +Q 1 / 2级缺陷地下水 +Q 3 / 4级缺陷地下水 ); Wherein, C3 is the third theoretical BOD5 concentration value entering the plant, Q 3 / 4级缺陷地下水 is the third external water flow rate, C 3 / 4级缺陷离地下水 is the fourth BOD5 concentration value.

9. The method for determining the root cause of the substandard BOD5 concentration of water inlet of a water purification plant according to claim 1, characterized in that: After determining the reference root cause corresponding to the difference with the largest value as the target root cause, the method further includes: Determine solution information corresponding to each of the reference root causes; Determine the target measure execution order by ordering all the differences from small to large; Prompt information is generated based on all of the solution measure information and the target measure execution order, and the prompt information is sent.

10. A device for determining the root cause of BOD5 concentration not meeting the standard in a water purification plant, characterized in that: It includes at least one control processor and a memory for communicating with the at least one control processor; the memory stores instructions that can be executed by the at least one control processor, and the instructions are executed by the at least one control processor so that the at least one control processor can execute the method for determining the root cause of non-standard BOD5 concentration of influent water of a water purification plant as described in any one of claims 1 to 9.

Citation Information

Patent Citations

  • Optimum design method for secondary sedimentation tank of sewage treatment work

    CN103605859A

  • Mining and mineral separating wastewater processing method

    CN110407359A

  • Double-dosing coupled high-load operation method and system for sewage treatment plant

    CN113480093A

  • BOD5 rapid detection chip sensor and monitoring system and detection method thereof

    CN115165824A

  • Accounting method and device for effective collection and treatment capacity of urban area sewage

    CN115186960A