Slag dredging hopper convenient to operate and capable of controlling elevation quality of pile head concrete
By designing funnel-type slag picking buckets, using vertical rod length adjustment parts and positioning piles, the problem of inaccurate measurement of existing tools during concrete pouring is solved, accurate measurement of filling height and cost savings are achieved, and pile head quality is ensured .
Patent Information
- Application Number
- CN202410974274.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-19
- Publication Date
- 2024-11-22
AI Technical Summary
Existing rope measuring tools are susceptible to concrete slump and aggregate size distribution during concrete pouring, resulting in inaccurate measurement, which in turn affects pile head quality and pouring height, resulting in waste or insufficient concrete.
A triangular cone-shaped funnel-type slag hopper is designed. Through the coordination of vertical rod length adjustment parts and positioning piles, the height of the concrete liquid level can be accurately measured, reducing the impact on the size distribution of aggregates, and ensuring the filling quality.
Accurate measurement of concrete pouring height is achieved, filling time and cost is saved, pile head construction and forming quality is ensured, and pile heads are reduced in the cost of later pile heads.
Smart Images

Figure CN118997150A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of pile foundation engineering, in particular to a slag bucket which is easy to operate and controls the high quality of pile head concrete mark. Background Art
[0002] During the concrete pouring process, in order to control the length of the virtual pile and the quality of the pile head, it is necessary to use corresponding testing tools and refer to testing standards to carry out concrete pouring inspection.
[0003] In the prior art, a common method is to use a measuring rope (wire rope measuring rope and steel hammer head) for measurement. However, since the steel hammer head is heavy, when the concrete slump is large and there are more fine aggregates on the pile top, the steel hammer head will sink, resulting in a larger virtual pile measurement value, which in turn leads to an increase in the amount of poured concrete, and the pouring height of the concrete virtual pile head exceeds the standard, wasting concrete; and when there are large lumps floating on the pile top during the pouring process, the steel hammer head cannot sink, resulting in a smaller virtual pile measurement value, resulting in a smaller virtual pile measurement value, insufficient concrete virtual pile head pouring height, and the pile head quality cannot be guaranteed, and there is a risk of pile connection in the later stage; the test results of this method are not accurate, so a slag bucket that is easy to operate and controls the high quality of the pile head concrete mark is proposed to solve the above problems. Summary of the invention
[0004] In order to solve the above technical problems, the present invention proposes a slag bucket that is easy to operate and can control the high quality of the pile head concrete mark. The present invention makes a triangular cone into a funnel shape, which is used to measure the height of the concrete liquid level during the concrete pouring process. This not only saves the concrete pouring time and reduces the concrete pouring cost, but also greatly reduces the cost of chiseling the pile head in the later stage.
[0005] The technical solution to achieve the purpose of the present invention is: a slag scoop that is easy to operate and controls the high quality of the pile head concrete mark, including a slag scoop funnel, the top of the slag scoop funnel is fixedly connected to a first-level vertical rod, the surface of the first-level vertical rod is slidably connected to a second-level vertical rod, the surface of the second-level vertical rod is slidably connected to a third-level vertical rod, the surface of the third-level vertical rod is fixedly connected to a handle, and the first-level vertical rod and the second-level vertical rod are both provided with vertical rod length adjustment parts.
[0006] In some embodiments, the slag scooping funnel is funnel-shaped, and a plurality of through slits are opened on the surface of the slag scooping funnel, and the plurality of through slits divide the funnel surface equally.
[0007] In some embodiments, the vertical rod length adjustment member includes a receiving hole opened on the first-level vertical rod, the inner wall of the receiving hole is fixedly connected to a spring, the inner wall of the receiving hole is slidably connected to a positioning pile, one side of the positioning pile is fixedly connected to one end of the spring, and a connecting hole is penetrated through one side of the second-level vertical rod, and the inner diameter of the connecting hole is adapted to the outer diameter of the positioning pile.
[0008] In some embodiments, the secondary vertical rod and the tertiary vertical rod are fixed via positioning piles provided on the secondary vertical rod and connecting holes provided on the tertiary vertical rod.
[0009] Compared with the prior art, the present invention has the following significant advantages:
[0010] The present invention makes a triangular pyramid into a funnel shape, which is used to measure the height of the concrete liquid level during the concrete pouring process. During use, the slag bucket is inserted into the top elevation position of the pile head to be poured. If concrete coarse aggregate exists in the slag bucket after it is lifted, it means that the concrete has been poured to this elevation position with good quality; otherwise, it means that the concrete has not been poured to the specified elevation. The present concrete pouring status can be accurately fed back, thereby saving concrete pouring time, reducing concrete pouring costs, greatly reducing the cost of pile head chiseling in the later stage, and ensuring the quality of pile head construction.
[0011] The invention solves the problem that the existing measuring tool for measuring the height of the concrete liquid level is easily affected by the slump of concrete and the size distribution of concrete aggregates, resulting in inaccurate measurement. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] The present invention will be further explained below in conjunction with the accompanying drawings and embodiments:
[0013] Figure 1 is a schematic diagram of the main structure provided in one embodiment of the present invention;
[0014] Figure 2 It is a schematic diagram of the structure of the primary vertical rod and the secondary vertical rod provided in one embodiment of the present invention;
[0015] Figure 3 1 is a schematic diagram of a primary vertical rod (cross-section) structure provided in one embodiment of the present invention;
[0016] Figure 4 The present invention provides in one embodiment Figure 3 A is an enlarged schematic diagram of the structure;
[0017] Figure 5 is a schematic diagram of a secondary vertical rod structure provided in one embodiment of the present invention;
[0018] Figure 6 It is a schematic diagram of the structure of a secondary vertical rod (cross-section) provided in one embodiment of the present invention;
[0019] Figure 7 The present invention provides in one embodiment Figure 6 A schematic diagram of the enlarged structure at B;
[0020] Figure 8It is a schematic diagram of a three-level vertical rod structure provided in one embodiment of the present invention.
[0021] Description of reference numerals:
[0022] 1. Slag scoop funnel; 2. First-level vertical rod; 3. Second-level vertical rod; 4. Third-level vertical rod; 5. Handle; 6. Vertical rod length adjustment piece; 601. Accommodating hole; 602. Spring; 603. Positioning pile; 604. Connecting hole. DETAILED DESCRIPTION
[0023] The present invention is described in detail below, and the technical solutions in the embodiments of the present invention are clearly and completely described. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0024] The present invention provides a slag bucket that is easy to operate and controls the high quality of pile head concrete mark through improvement. The technical solution of the present invention is:
[0025] like Figure 1 As shown, a slag scoop bucket which is easy to operate and can control the high quality of pile head concrete marking comprises a slag scoop funnel 1, the top of the slag scoop funnel 1 is fixedly connected with a first-level vertical rod 2, the surface of the first-level vertical rod 2 is slidably connected with a second-level vertical rod 3, the surface of the second-level vertical rod 3 is slidably connected with a third-level vertical rod 4, the first-level vertical rod 2, the second-level vertical rod 3 and the third-level vertical rod 4 have the same overall length, a handle 5 is fixedly connected with the surface of the third-level vertical rod 4, a vertical rod length adjusting piece 6 is arranged on the first-level vertical rod 2 and the second-level vertical rod 3, and a protrusion is provided on the second-level vertical rod 3 to avoid obstruction with the vertical rod length adjusting piece 6 on the first-level vertical rod 2 for setting the vertical rod length adjusting piece 6.
[0026] In one embodiment, the slag scoop funnel 1 is funnel-shaped, and a plurality of through slits are opened on the surface of the slag scoop funnel 1. The plurality of through slits divide the funnel surface equally. The setting of the through slits reduces the influence of the size distribution of concrete aggregates on the slag scoop funnel 1 to a certain extent, thereby improving the measurement accuracy.
[0027] like Figure 2-Figure 7As shown, in one embodiment, the vertical rod length adjustment member 6 includes a receiving hole 601 opened on the primary vertical rod 2, the inner wall of the receiving hole 601 is fixedly connected with a spring 602, the inner wall of the receiving hole 601 is slidably connected with a positioning pile 603, one side of the positioning pile 603 is fixedly connected to one end of the spring 602, and a connecting hole 604 is penetrated through one side of the secondary vertical rod 3, the inner diameter of the connecting hole 604 is adapted to the outer diameter of the positioning pile 603, according to usage requirements, the user can press the positioning pile 603 into the receiving hole 601 and squeeze the spring 602, and then release the positioning pile 603 at an appropriate position, so that the spring 602 is reset and the positioning pile 603 is squeezed into the connecting hole 604, and then the two vertical rods are connected to achieve the effect of adjusting the length.
[0028] like Figure 8 As shown, in one embodiment, the secondary vertical rod 3 and the tertiary vertical rod 4 are fixed by means of positioning piles 603 provided on the secondary vertical rod 3 and connecting holes 604 provided on the tertiary vertical rod 4 , and the secondary vertical rod 3 and the tertiary vertical rod 4 are adapted in shape.
[0029] The specific working method is: when the easy-to-operate slag scoop bucket for controlling the high quality of the pile head concrete mark is used, the slag scoop funnel 1 is inserted into the pile head to be poured at the top elevation position of the pile, and if there is concrete coarse aggregate in the slag scoop funnel 1 after lifting it, it means that the concrete has been poured to this elevation position and the quality is good; otherwise, it means that the concrete has not been poured to the specified elevation. At the same time, according to the use requirements, the user can press the positioning pile 603 into the accommodating hole 601 and squeeze the spring 602 by pressing the positioning pile 603, and then release the positioning pile 603 at the appropriate position to reset the spring 602 and squeeze the positioning pile 603 into the connecting hole 604, thereby connecting the first-level vertical rod 2 with the second-level vertical rod 3, and completing the adjustment of the length of the entire vertical rod part, so that the device is easier to operate.
[0030] The technical means disclosed in the solution of the present invention are not limited to the technical means disclosed in the above technical means, but also include technical solutions composed of equivalent replacement of the above technical features. Matters not covered in the present invention belong to the common knowledge of those skilled in the art.
Claims
1. A slag hopper for controlling the high quality of pile head concrete mark, which is easy to operate, comprises a slag hopper (1), characterized in that: The top of the slag scoop funnel (1) is fixedly connected to a primary vertical rod (2), the surface of the primary vertical rod (2) is slidably connected to a secondary vertical rod (3), the surface of the secondary vertical rod (3) is slidably connected to a tertiary vertical rod (4), the surface of the tertiary vertical rod (4) is fixedly connected to a handle (5), and both the primary vertical rod (2) and the secondary vertical rod (3) are provided with a vertical rod length adjusting member (6).
2. The easy-to-operate slag bucket for controlling the high quality of pile head concrete mark according to claim 1, characterized in that: The slag scooping funnel (1) is in the shape of a funnel, and a plurality of through slits are provided on the surface of the slag scooping funnel (1), wherein the plurality of through slits divide the funnel surface equally.
3. The easy-to-operate slag bucket for controlling the high quality of pile head concrete mark according to claim 1, characterized in that: The vertical rod length adjustment member (6) comprises a receiving hole (601) provided on the primary vertical rod (2), the inner wall of the receiving hole (601) being fixedly connected to a spring (602), the inner wall of the receiving hole (601) being slidably connected to a positioning pile (603), one side of the positioning pile (603) being fixedly connected to one end of the spring (602), and a connecting hole (604) being provided through one side of the secondary vertical rod (3), the inner diameter of the connecting hole (604) being adapted to the outer diameter of the positioning pile (603).
4. The easy-to-operate slag bucket for controlling the high quality of pile head concrete mark according to claim 1, characterized in that: The secondary vertical rod (3) and the tertiary vertical rod (4) are fixed to each other via positioning piles (603) arranged on the secondary vertical rod (3) and connecting holes (604) arranged on the tertiary vertical rod (4).