Well point dewatering device and method for building engineering construction
By using a multi-layer filter structure and dredging components in the well point precipitation device, the problem of silt blockage in the well hole and the difficult-to-control backfill height of coarse sand clay is solved, and the precipitation efficiency of the well pipe is improved and construction convenience is achieved.
Patent Information
- Application Number
- CN202411158819.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-22
- Publication Date
- 2024-11-22
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
In the prior art, the sludge in the well hole enters the well pipe through the filling sand and filter pipe, causing the filter pipe mesh to be blocked, reducing the precipitation efficiency of the well pipe, and the backfilling height of coarse sand and clay is difficult to control.
A well point precipitation device including pumping pipes, well point precipitation mechanisms, external filter components, support pipe frames and dredging components is designed. Through the cooperation of multi-layer filter structure and dredging components, it prevents silt blockage and facilitates coarse sand and Accurate backfill of clay.
Effectively prevent filter pipe blockage, improve the precipitation efficiency of well pipes, and through the design of dredging components and supporting pipe frames, the effective filtration of silt in the wellbore and the accurate backfilling of coarse sand clay is ensured, and the construction efficiency is improved.
Smart Images

Figure CN118997196A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of building construction, and in particular to a well point dewatering device and method for building engineering construction. Background Art
[0002] During the excavation of foundation pits for construction projects, well point dewatering is required. The traditional dewatering method is: punch holes around the foundation pit to form wells, connect the filter tube at the bottom of the well pipe and insert it into the well hole, then fill the well hole with coarse sand. After the coarse sand is filled to a certain height, fill the well hole above the coarse sand with clay; use pumping equipment to pump water through the well pipe to lower the groundwater level in the foundation pit area and improve the foundation strength.
[0003] At present, the well point dewatering method of the prior art for construction engineering has the following problems: the silt in the wellbore enters the well pipe after passing through the filling sand and the filter tube, and the silt easily remains on the filter tube, causing the mesh of the filter tube to be blocked, affecting the water permeability of the filter tube, thereby reducing the efficiency of the well pipe dewatering. In addition, when the coarse sand and clay are backfilled into the wellbore, the backfill height is difficult to control. Therefore, it is necessary to provide a well point dewatering device and method for construction engineering construction, which can solve the problem in the prior art that the filter tube mesh is blocked and the well pipe dewatering efficiency is reduced, and the backfill height of coarse sand and clay is difficult to control. Summary of the invention
[0004] The purpose of the present invention is to provide a well point dewatering device and method for construction engineering construction, which can solve the problems in the prior art that filter pipe mesh is blocked, thereby reducing the well pipe dewatering efficiency and the coarse sand and clay backfill height is difficult to control.
[0005] The present invention is achieved in that:
[0006] A wellpoint dewatering device for construction engineering, comprising a pumping pipeline and several groups of wellpoint dewatering mechanisms, a plurality of well holes are formed around a foundation pit, the several groups of wellpoint dewatering mechanisms are respectively placed in the several well holes, and the pumping pipeline of the annular structure is arranged circumferentially along the edge of the foundation pit and is externally connected to the pumping equipment; each group of wellpoint dewatering mechanisms comprises a downpipe body, an external filtering component, a supporting pipe rack and a dredging component; water-permeable holes are evenly distributed on the downpipe body, and the external filtering component is wrapped around the outside of the downpipe body and covers the water-permeable holes; the supporting pipe rack is sleeved on the outside of the downpipe body and the external filtering component, the bottom of the supporting pipe rack abuts against the lower end of the downpipe body, the upper end of the downpipe body extends to the top of the supporting pipe rack and is connected to the pumping pipeline; the dredging component is arranged in the supporting pipe rack, the upper end of the dredging component extends to the top of the supporting pipe rack and is externally connected to the air supply equipment, and the lower end of the dredging component can slide in contact with the surface of the external filtering component.
[0007] The main body of the precipitation pipe includes a precipitation well pipe and a precipitation filter pipe; the lower end of the precipitation well pipe is connected to the upper end of the precipitation filter pipe, the lower end of the precipitation filter pipe is abutted against the bottom of the supporting pipe rack, the upper end of the precipitation well pipe is a curved pipe structure and is connected to the pumping pipeline; the external filter component is wrapped around the precipitation well pipe and the precipitation filter pipe.
[0008] The outer filter assembly includes a well pipe filter and a filter tube filter. The well pipe filter is wrapped on the outer wall of the precipitation well pipe. Several layers of filter tube filter screens are wrapped on the outer wall of the precipitation filter tube in sequence. The several layers of filter tube filter screens form a conical structure that is narrow at the top and wide at the bottom. The meshes of two adjacent layers of filter tube filter screens are staggered.
[0009] The supporting pipe rack includes a vertical cylinder, an inner shell, vertical partitions and a bottom column; the inner shell is coaxially arranged in the vertical cylinder, a clearance cavity is formed between the inner shell and the vertical cylinder, and the dredging component is arranged in the clearance cavity; the inner shell is sleeved on the outside of the well pipe filter and the precipitation well pipe, and the lower ends of the vertical cylinder, the inner shell, the well pipe filter and the precipitation well pipe are flush; a number of vertical partitions are respectively arranged on the outer wall of the vertical cylinder at intervals, the lower ends of a number of vertical partitions extend to the bottom of the vertical cylinder and are circumferentially arranged around the filter tube filter, the lower ends of a number of vertical partitions are fixedly connected to the bottom of the bottom column, and the upper end of the bottom column abuts against the bottom end of the well pipe filter.
[0010] A marking gap is formed on the upper part of the vertical partition, coarse sand is filled to the bottom of the marking gap, and clay is filled to the top of the marking gap; the upper end of the vertical partition and the upper end of the marking gap are flush with the upper end of the vertical tube.
[0011] The top of the give-way cavity is semi-enclosed by a drainage hole plate, on which a plurality of drainage holes communicating with the give-way cavity and a plurality of mounting holes for the dredging components to pass through are formed at intervals, and the drainage holes and the mounting holes are arranged alternately.
[0012] The dredging assembly includes a support block, a dredging rubber block, a vertical rod and a telescopic air pipe; a plurality of vertical rods are respectively arranged at intervals at the lower part of the give way cavity, a plurality of telescopic air pipes are respectively coaxially connected to the top of the plurality of vertical rods, and the upper ends of the plurality of telescopic air pipes extend to the top of the supporting pipe rack and are externally connected to the air supply equipment; the support block is annular in structure and is slidably embedded in the give way cavity, a plurality of water leakage holes connecting the give way cavity and the wellbore are formed at intervals on the support block, the support block is connected to the lower ends of the plurality of vertical rods, and the vertical rods and the water leakage holes are staggered; the dredging rubber block is a hollow cylindrical structure and is arranged at the bottom of the support block, and the inner wall of the dredging rubber block is a conical structure and can slide in contact with the surface of the filter tube and filter screen.
[0013] A liquid level switch is arranged in the wellbore, the liquid level switch is located beside the upper part of the supporting pipe rack, and the liquid level switch is connected with the pumping equipment.
[0014] A well point dewatering method using a well point dewatering device for construction engineering construction comprises the following steps:
[0015] Steps: Wrap the outer filter assembly on the outside of the downcomer main body, insert the downcomer main body into the support pipe rack, install the dredging assembly in the support pipe rack, and form a well point downcomer mechanism;
[0016] Steps: Install the liquid level switch in the wellbore and connect the liquid level switch to the pumping equipment;
[0017] Steps: several groups of well point dewatering mechanisms are respectively placed in several well holes around the foundation pit, pumping pipelines are laid around the edge of the foundation pit, and several groups of well point dewatering mechanisms are connected to the pumping equipment through the pumping pipelines;
[0018] Steps: Fill the wellbore with coarse sand to the lower elevation of the marking gap, and fill clay above the coarse sand in the wellbore to the upper elevation of the marking gap;
[0019] Steps: When the external filter component needs to be unblocked, connect the unblocking component to an external air supply device, so that the unblocking component and the surface of the external filter component are in sliding contact to unblock the mesh.
[0020] Compared with the prior art, the present invention has the following beneficial effects:
[0021] 1. The present invention is provided with a dredging component. The telescopic air pipe is inflated by the air supply device to push the vertical rod, the support block and the dredging rubber block downward, so that the dredging rubber block squeezes and rubs the filter tube and filter screen, and squeezes out the silt accumulated in the mesh of the filter tube and filter screen, thereby ensuring the water permeability of the filter tube and filter screen, and further ensuring the precipitation efficiency of the well point precipitation mechanism.
[0022] 2. The present invention is provided with an external filtering component, which wraps the precipitation well pipe with the well pipe filter screen and wraps the precipitation filter pipe with the filter pipe filter screen, thereby effectively preventing the precipitation well pipe and the water-permeable holes on the precipitation filter pipe from being blocked by silt and affecting the precipitation effect of the well pipe. At the same time, the filter pipe filter screen with a multi-layer conical structure effectively filters the silt at the bottom of the wellbore, and increases the flow path of groundwater mixed with silt through multi-layer staggered mesh holes, thereby further improving the silt filtering effect and ensuring sufficient and efficient pumping of groundwater.
[0023] 3. The present invention is provided with a supporting pipe rack, and the clearance cavity formed between the vertical pipe and the inner pipe facilitates the installation of the dredging component, and the dewatering well pipe is installed through the inner pipe. The installation is convenient and the structure is simple. At the same time, the vertical partition and its marking notch facilitate the control of the filling height of coarse sand and clay in the wellbore, making the construction of the well point dewatering device more convenient. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 It is a schematic diagram of the installation of a well point dewatering device used in construction engineering of the present invention;
[0025] Figure 2 It is a stereoscopic diagram of a set of well point dewatering mechanisms and a liquid level switch in a well point dewatering device used in construction engineering of the present invention;
[0026] Figure 3 It is a cross-sectional view of a group of well point dewatering mechanisms in a well point dewatering device used for construction engineering construction of the present invention;
[0027] Figure 4 It is a three-dimensional diagram of a supporting pipe rack in a well point dewatering device used in construction engineering of the present invention;
[0028] Figure 5 It is a stereoscopic diagram of the inner and outer filtering components and the dredging components of the well point dewatering device used for construction engineering construction of the present invention.
[0029] In the figure, 1. pumping pipeline; 11. precipitation well pipe; 12. precipitation filter pipe; 2. external filter assembly; 21. well pipe filter; 22. filter pipe filter; 3. support pipe rack; 31. vertical cylinder; 32. inner shell; 321. leakage hole; 33. vertical partition; 331. identification notch; 34. bottom column; 35. drainage hole plate; 301. give way cavity; 4. dredging assembly; 41. support block; 42. dredging rubber block; 43. vertical rod; 44. telescopic air pipe; 5. liquid level switch. DETAILED DESCRIPTION
[0030] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.
[0031] Please see attached Figure 1 and attached Figure 2 A well point dewatering device for construction engineering, comprising a pumping pipeline 1 and a plurality of well point dewatering mechanisms, a plurality of well holes are formed around the foundation pit, a plurality of well point dewatering mechanisms are respectively placed in the plurality of well holes, a pumping pipeline 1 of an annular structure is arranged along the circumference of the foundation pit edge and connected to an external pumping device; each well point dewatering mechanism comprises a dewatering pipe body, an external filtering component 2, a supporting pipe rack 3 and a dredging component 4; water permeable holes are evenly distributed on the dewatering pipe body, and the external filtering component 2 includes a plurality of well points. It is wrapped around the outside of the downcomer main body and covers the water permeable holes; the support pipe rack 3 is sleeved on the outside of the downcomer main body and the external filter component 2, the bottom of the support pipe rack 3 abuts against the lower end of the downcomer main body, and the upper end of the downcomer main body extends to the top of the support pipe rack 3 and is connected to the pumping pipeline 1; the dredging component 4 is arranged in the support pipe rack 3, the upper end of the dredging component 4 extends to the top of the support pipe rack 3 and is externally connected to the air supply equipment, and the lower end of the dredging component 4 can slide in contact with the surface of the external filter component 2.
[0032] The number and spacing of the well holes can be adaptively arranged according to the size of the foundation pit and the conditions of groundwater. The number of well point dewatering mechanisms is consistent with the number of well holes. The pumping pipeline 1 is arranged along the circumference of the foundation pit and used in conjunction with the pumping equipment to pump water and drain water for all well point dewatering mechanisms. The support pipe rack 3 is used to set the dewatering pipe body in the well hole, which is convenient for filling coarse sand and clay between the well hole and the dewatering pipe body, and is also convenient for the installation of the dredging component 4.
[0033] In each wellbore, groundwater enters the pumping pipeline 1 after being filtered by the outer filter assembly 2, and is discharged through the pumping pipeline 1 via the pumping equipment. When the mesh of the outer filter assembly 2 is clogged, the mesh of the outer filter assembly 2 can be dredged by the dredging assembly 4 to ensure the water permeability and drainage efficiency of the well point dewatering mechanism.
[0034] Please see attached Figure 3 The main body of the precipitation pipe includes a precipitation well pipe 11 and a precipitation filter pipe 12; the lower end of the precipitation well pipe 11 is connected to the upper end of the precipitation filter pipe 12, the lower end of the precipitation filter pipe 12 is abutted against the bottom of the supporting pipe rack 3, the upper end of the precipitation well pipe 11 is a curved pipe structure and is connected to the pumping pipeline 1; the external filter component 2 is wrapped around the precipitation well pipe 11 and the precipitation filter pipe 12.
[0035] The size of the precipitation well pipe 11 and the precipitation filter pipe 12, the number of water holes evenly distributed on the pipe body, etc. can be adaptively selected according to actual drainage needs. The precipitation well pipe 11 is used to connect the pumping pipeline 1, and groundwater mainly enters the precipitation pipe body through the precipitation filter pipe 12.
[0036] Please see attached Figure 3 and attached Figure 5 The outer filtering component 2 includes a well pipe filter 21 and a filter tube filter 22. The well pipe filter 21 is wrapped on the outer wall of the precipitation well pipe 11. Several layers of filter tube filter 22 are wrapped on the outer wall of the precipitation filter tube 12 in sequence, and several layers of filter tube filter 22 form a conical structure that is narrow at the top and wide at the bottom. The meshes of two adjacent layers of filter tube filter 22 are staggered.
[0037] The precipitation well pipe 11 is wrapped by the well pipe filter 21 and fixed by wire binding. The well pipe filter 21 ensures water permeability and plays a role of preventing the water permeable holes on the precipitation well pipe 11 from being blocked. The precipitation filter pipe 12 is wrapped by the filter pipe filter 22 and fixed by wire binding. The filter pipe filter 22 ensures water permeability and plays a role of preventing the water permeable holes on the precipitation filter pipe 12 from being blocked.
[0038] Since the bottom of the groundwater where the silt is mainly deposited has more silt at lower places, the number and thickness of the filter tube filter screen 22 gradually increase from top to bottom, thereby being able to effectively block the silt. At the same time, through the staggered meshes arranged on the multi-layer filter tube filter screen 22, the groundwater mixed with silt can flow into the precipitation filter tube 12 through the meshes at different levels, increasing the number of flow paths and extending the flow path, which is conducive to reducing the blockage of the precipitation filter tube 12 by silt, thereby improving the well point precipitation effect.
[0039] Please see attached Figure 3 and attached Figure 4 The supporting pipe rack 3 includes a vertical cylinder 31, an inner shell 32, a vertical partition 33 and a bottom column 34; the inner shell 32 is coaxially arranged in the vertical cylinder 31, and a clearance cavity 301 is formed between the inner shell 32 and the vertical cylinder 31, and the dredging component 4 is arranged in the clearance cavity 301; the inner shell 32 is sleeved on the outside of the well pipe filter 21 and the precipitation well pipe 11, and the lower ends of the vertical cylinder 31, the inner shell 32, the well pipe filter 21 and the precipitation well pipe 11 are flush; a plurality of vertical partitions 33 are respectively arranged on the outer wall of the vertical cylinder 31 at intervals, and the lower ends of a plurality of vertical partitions 33 extend to the bottom of the vertical cylinder 31 and are circumferentially arranged around the filter tube filter 22, and the lower ends of the plurality of vertical partitions 33 are fixedly connected to the bottom of the bottom column 34, and the upper end of the bottom column 34 abuts against the bottom end of the well pipe filter 21.
[0040] The inner shell 32 is used to install the precipitation well pipe 11 wrapped with the well pipe filter 21, and the giving cavity 301 is used to install the dredging component 4. The precipitation filter pipe 12 and the filter pipe filter 22 are located below the vertical cylinder 31, so that the groundwater in the wellbore can be filtered through the filter pipe filter 22 and then enter the precipitation filter pipe 12.
[0041] The vertical partition 33 is welded and protruded on the outer wall of the vertical tube 31. After filling the space between the vertical tube 31 and the wellbore with coarse sand and clay, the stability of the vertical tube 31 in the wellbore can be improved. The number of vertical partitions 33 can be set according to actual needs, preferably four at equal intervals. The bottom column 34 is used to abut the bottom of the precipitation filter pipe 12, which can close the lower end of the precipitation filter pipe 12, so that groundwater can enter the precipitation filter pipe 12 after being filtered through the filter pipe filter screen 22, and at the same time, it can improve the stability of the precipitation filter pipe 12 and the precipitation well pipe 11.
[0042] Please see attached Figure 4 A marking notch 331 is formed on the upper portion of the vertical partition 33 , coarse sand is filled to the bottom of the marking notch 331 , and clay is filled to the top of the marking notch 331 ; the upper end of the vertical partition 33 and the upper end of the marking notch 331 are flush with the upper end of the vertical cylinder 31 .
[0043] The marking gap 331 is set according to the height of the coarse sand and clay to be filled, and the lower end and the upper end of the marking gap 331 are used to provide guidance for the filling of the coarse sand and clay, so as to facilitate accurate and efficient filling construction.
[0044] Please see attached Figure 2 and attached Figure 4 The top of the make way cavity 301 is semi-enclosed by a drainage hole plate 35, and a plurality of drainage holes connected to the make way cavity 301 and a plurality of mounting holes for the dredging component 4 to pass through are formed on the drainage hole plate 35 at intervals, and the drainage holes and the mounting holes are arranged alternately.
[0045] When water accumulates on the top of the supporting pipe rack 3, the accumulated water can enter the give way cavity 301 through the drainage holes of the drainage hole plate 35, flow through the dredging component 4 to the outside of the filter tube filter screen 22, and then enter the precipitation filter tube 12 through the filter tube filter screen 22, and be pumped out together with the groundwater.
[0046] Please see attached Figure 3 and attached Figure 5 The dredging assembly 4 includes a support block 41, a dredging rubber block 42, a vertical rod 43 and a telescopic air pipe 44; a plurality of vertical rods 43 are respectively arranged at intervals at the lower part of the clearance cavity 301, a plurality of telescopic air pipes 44 are respectively coaxially connected to the top of the plurality of vertical rods 43, and the upper ends of the plurality of telescopic air pipes 44 extend to the upper part of the support pipe rack 3 and are externally connected to the air supply equipment; the support block 41 is annular in structure and is slidably embedded in the clearance cavity 301, and a plurality of water leakage holes 321 connecting the clearance cavity 301 and the wellbore are formed at intervals on the support block 41, the support block 41 is connected to the lower ends of the plurality of vertical rods 43, and the vertical rods 43 and the water leakage holes 321 are staggered; the dredging rubber block 42 is a hollow cylindrical structure and is arranged at the bottom of the support block 41, and the inner wall of the dredging rubber block 42 is a conical structure and can slide in contact with the surface of the filter tube filter 22.
[0047] The upper end of the telescopic air pipe 44 passes through the mounting hole of the drainage hole plate 35, and the air supply equipment inflates the plurality of telescopic air pipes 44 to make them expand downward, pushing the plurality of vertical rods 43 downward, so that the support block 41 drives the dredging rubber block 42 to move downward synchronously, so that the inner wall of the dredging rubber block 42 slides in contact with the surface of the filter tube filter screen 22, so as to scrape off the silt accumulated in the mesh of the filter tube filter screen 22, thereby ensuring the filtering effect of the filter tube filter screen 22.
[0048] Preferably, fluff can be formed on the inner wall of the dredging rubber block 42, and the dredging rubber block 42 is made of flexible material and has a certain deformation ability, so that the deformation and the fluff can be used to fully contact the filter tube filter screen 22 to effectively remove the sludge accumulated in the mesh.
[0049] Preferably, three vertical rods 43 may be provided, three water leakage holes 321 may be provided, and the number of the telescopic air pipes 44 is consistent with the number of the vertical rods 43 .
[0050] The accumulated water entering the give way cavity 301 through the drainage hole flows downward through the leakage hole 321, flows through the surface of the dredging rubber block 42 and enters the bottom of the wellbore, and then passes through the filter pipe filter screen 22 together with the groundwater and enters the precipitation filter pipe 12.
[0051] Please see attached Figure 2 A liquid level switch 5 is provided in the wellbore. The liquid level switch 5 is located beside the upper part of the supporting pipe rack 3. The liquid level switch 5 is connected to the pumping equipment.
[0052] Preferably, the liquid level switch 5 can adopt a liquid level meter to detect the liquid level in the wellbore. After setting the liquid level threshold, when the liquid level in the wellbore reaches the liquid level threshold, the pumping equipment is started for active drainage. When the liquid level drops below the liquid level threshold, the pumping equipment is turned off.
[0053] Please see attached Figure 1 To Attachment Figure 5 , a well point dewatering method for construction engineering, comprising the following steps:
[0054] Step 1: Wrap the external filter assembly 2 on the outside of the downcomer main body, and insert the downcomer main body into the support pipe rack 3, and install the dredging assembly 4 in the support pipe rack 3 to form a well point downcomer mechanism.
[0055] Specifically, the well pipe filter screen 21 is wrapped around the outside of the precipitation well pipe 11 and fixed by wire tying, and the filter pipe filter screen 22 is wrapped around the outside of the precipitation filter pipe 12 and fixed by wire tying. The precipitation well pipe 11 wrapped with the well pipe filter screen 21 is inserted into the inner shell 32 of the support pipe rack 3, and the dredging component 4 is arranged in the clearance cavity 301 between the vertical cylinder 31 and the inner shell 32 of the support pipe rack 3.
[0056] Step 2: Install the liquid level switch 5 in the wellbore and connect the liquid level switch 5 to the pumping equipment.
[0057] The specifications of the liquid level switch 5 can be selected according to the adaptability of the actual working conditions, and the corresponding liquid level threshold can be set to trigger and close the pumping equipment to achieve the effect of automatic precipitation.
[0058] Step 3: Place several groups of well point dewatering mechanisms into several well holes around the foundation pit, lay out pumping pipelines 1 around the edge of the foundation pit, and connect several groups of well point dewatering mechanisms to the pumping equipment through the pumping pipelines 1.
[0059] Preferably, the pumping equipment may be a water pump, and the number, specification and power of the water pump may be adaptively set according to actual working conditions to ensure that groundwater in several wellbores can be efficiently pumped out through the pumping pipeline 1 via several groups of well point dewatering mechanisms.
[0060] Step 4: Fill the wellbore with coarse sand to the lower elevation of the marking gap 331, and fill clay above the coarse sand in the wellbore to the upper elevation of the marking gap 331.
[0061] The coarse sand and clay are backfilled into the wellbore in a conventional manner, which will not be described here.
[0062] Step 5: When the external filter component 2 needs to be unblocked, the unblocking component 4 is connected to an external air supply device so that the unblocking rubber block 42 of the unblocking component 4 moves downward under the action of air pressure and slides in contact with the surface of the filter tube filter screen 22 of the external filter component 2 to unblock the mesh of the filter tube filter screen 22.
[0063] By sliding and squeezing the surface of the filter tube filter screen 22 by the dredging rubber block 42, the silt accumulated in the mesh of the filter tube filter screen 22 is squeezed out, so that the filter tube filter screen 22 maintains a good water permeability and ensures the precipitation effect.
[0064] The above are only preferred embodiments of the present invention and are not intended to limit the scope of protection of the invention. Therefore, any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.
Claims
1. A well point dewatering device for construction engineering, Its characteristics are: The invention comprises a water pumping pipeline (1) and a plurality of well point dewatering mechanisms. A plurality of well holes are formed around the foundation pit. The plurality of well point dewatering mechanisms are respectively placed in the plurality of well holes. The water pumping pipeline (1) with an annular structure is arranged along the circumference of the foundation pit edge and is externally connected to a water pumping device. Each well point dewatering mechanism comprises a dewatering pipe body, an external filtering component (2), a supporting pipe rack (3) and a dredging component (4). The dewatering pipe body is evenly distributed with water permeable holes. The external filtering component (2) is wrapped around the outside of the dewatering pipe body and covers the permeable holes. The support pipe rack (3) is sleeved on the outside of the downcomer main body and the external filter assembly (2), the bottom of the support pipe rack (3) is in contact with the lower end of the downcomer main body, the upper end of the downcomer main body extends to the top of the support pipe rack (3) and is connected to the water pumping pipeline (1); the dredging assembly (4) is arranged in the support pipe rack (3), the upper end of the dredging assembly (4) extends to the top of the support pipe rack (3) and is externally connected to the air supply equipment, and the lower end of the dredging assembly (4) can be in sliding contact with the surface of the external filter assembly (2).
2. The well point dewatering device for construction engineering according to claim 1, Its characteristics are: The main body of the precipitation pipe comprises a precipitation well pipe (11) and a precipitation filter pipe (12); the lower end of the precipitation well pipe (11) is connected to the upper end of the precipitation filter pipe (12), the lower end of the precipitation filter pipe (12) is in contact with the bottom of the supporting pipe rack (3), the upper end of the precipitation well pipe (11) is in a curved pipe structure and is connected to the pumping pipeline (1); the external filter assembly (2) is wrapped around the precipitation well pipe (11) and the precipitation filter pipe (12).
3. The well point dewatering device for construction engineering according to claim 2, Its characteristics are: The outer filter assembly (2) comprises a well pipe filter (21) and a filter tube filter (22); the well pipe filter (21) is wrapped on the outer wall of the precipitation well pipe (11); a plurality of layers of filter tube filter (22) are sequentially wrapped on the outer wall of the precipitation filter pipe (12); the plurality of layers of filter tube filter (22) form a conical structure that is narrow at the top and wide at the bottom; the meshes of two adjacent layers of filter tube filter (22) are staggered.
4. The well point dewatering device for construction engineering according to claim 2, Its characteristics are: The supporting pipe rack (3) comprises a vertical cylinder (31), an inner shell (32), a vertical partition (33) and a bottom column (34); the inner shell (32) is coaxially arranged in the vertical cylinder (31), a clearance cavity (301) is formed between the inner shell (32) and the vertical cylinder (31), and the dredging component (4) is arranged in the clearance cavity (301); the inner shell (32) is sleeved on the outside of the well pipe filter (21) and the precipitation well pipe (11), and the vertical cylinder (31) and the inner shell (32) are coaxially arranged in the vertical cylinder (31), a clearance cavity (301) is formed between the inner shell (32) and the vertical cylinder (31), and the dredging component (4) is arranged in the clearance cavity (301); , the well pipe filter (21) and the lower end of the precipitation well pipe (11) are flush; a plurality of vertical partitions (33) are arranged at intervals on the outer wall of the vertical cylinder (31), the lower ends of the plurality of vertical partitions (33) extend to the bottom of the vertical cylinder (31) and are circumferentially arranged around the filter pipe filter (22), the lower ends of the plurality of vertical partitions (33) are fixedly connected to the bottom of the bottom column (34), and the upper end of the bottom column (34) abuts against the bottom end of the well pipe filter (21).
5. The well point dewatering device for construction engineering according to claim 4, Its characteristics are: A marking notch (331) is formed at the upper portion of the vertical partition (33), coarse sand is filled to the bottom of the marking notch (331), and clay is filled to the top of the marking notch (331); the upper end of the vertical partition (33) and the upper end of the marking notch (331) are flush with the upper end of the vertical cylinder (31).
6. The well point dewatering device for construction engineering according to claim 4, Its characteristics are: The top of the clearance cavity (301) is semi-enclosed by a drainage hole plate (35), and a plurality of drainage holes communicating with the clearance cavity (301) and a plurality of mounting holes for the dredging component (4) to pass through are formed on the drainage hole plate (35) at intervals, and the drainage holes and the mounting holes are arranged in an alternating manner.
7. The well point dewatering device for construction engineering according to claim 6, Its characteristics are: The dredging assembly (4) comprises a support block (41), a dredging rubber block (42), a vertical rod (43) and a telescopic air pipe (44); a plurality of vertical rods (43) are respectively arranged at intervals at the lower part of the clearance cavity (301); a plurality of telescopic air pipes (44) are respectively coaxially connected to the tops of the plurality of vertical rods (43); the upper ends of the plurality of telescopic air pipes (44) extend to the upper part of the supporting pipe rack (3) and are externally connected to the air supply device; the support block (41) is annular in structure and is slidably embedded. In the clearance cavity (301), a plurality of water leakage holes (321) are formed at intervals on the support block (41) to communicate with the clearance cavity (301) and the wellbore. The support block (41) is connected to the lower ends of a plurality of vertical rods (43), and the vertical rods (43) and the water leakage holes (321) are arranged alternately. The dredging rubber block (42) has a hollow cylindrical structure and is arranged at the bottom of the support block (41). The inner wall of the dredging rubber block (42) has a conical structure and can be in sliding contact with the surface of the filter tube filter (22).
8. The well point dewatering device for construction engineering according to claim 1 or 7, Its characteristics are: A liquid level switch (5) is arranged in the wellbore. The liquid level switch (5) is located beside the upper part of the supporting pipe rack (3). The liquid level switch (5) is connected to the pumping equipment.
9. A well point dewatering method using the well point dewatering device for construction engineering construction according to claim 1, Its characteristics are: The following steps are involved: Step 1: Wrap the outer filter assembly (2) on the outside of the downcomer main body, and insert the downcomer main body into the support pipe rack (3), and install the dredging assembly (4) in the support pipe rack (3) to form a well point downcomer mechanism; Step 2: Install a liquid level switch (5) in the wellbore and connect the liquid level switch (5) to the pumping equipment; Step 3: Place several groups of well point dewatering mechanisms into several well holes around the foundation pit, lay out pumping pipelines (1) around the edge of the foundation pit, and connect the several groups of well point dewatering mechanisms to the pumping equipment through the pumping pipelines (1); Step 4: Fill the wellbore with coarse sand to the lower elevation of the marking gap (331), and fill clay above the coarse sand in the wellbore to the upper elevation of the marking gap (331); Step 5: When the external filter component (2) needs to be unblocked, the unblocking component (4) is connected to an external air supply device so that the unblocking component (4) and the surface of the external filter component (2) are in sliding contact to unblock the mesh.
Citation Information
Patent Citations
Expanded-end decompression well, deep foundation pit structure and construction method for expanded-end decompression well
CN104975610A
Foundation pit dewatering method in coastal sandy soil region
CN105625445A
Well-point dewatering device applied to building engineering construction
CN106836253A
Well point dewatering device and method for building engineering construction
CN116856443A
Dewatering combined system for foundation pit pressure relief dewatering and drainage dewatering
CN210066791U
Cited By
Construction device and construction method for dewatering and drainage of deep foundation pit
CN119736927A
Anti-blocking foundation pit dewatering system and method
CN121272941A