Differential expansion control system and method for cylindrical high-pressure cylinder of steam turbine
Through the differential expansion control system of the cylindrical high-pressure cylinder of the turbine, data acquisition and automation control technology are used to solve the problem of the reduction of the differential expansion of the high-pressure cylinder during start-up and stop-and-clock peak regulating of the turbine, the safety and performance are improved, and the peak regulating of the unit is extended Time has achieved energy saving and consumption reduction.
Patent Information
- Application Number
- CN202411185867.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-27
- Publication Date
- 2024-11-22
AI Technical Summary
The high-pressure cylinder difference expands rapidly during start-stop and peak regulating of the steam turbine with a cylinder-type cylinder structure, limiting the start-stop and peak regulating ability of the unit, affecting the safe operation of the equipment and causing losses in enterprise efficiency.
A differential expansion control system for the barrel-shaped high-pressure cylinder of the steam turbine is designed, including data acquisition, data processing and analysis, decision support and automatic control modules. Through real-time collection and analysis of operating parameters, classification algorithms and feature extraction technology are used to provide automated control. Instructions are used to adjust the operating parameters of the turbine to achieve precise control of differential expansion.
It improves the safety and performance of the turbine, extends the equipment life, reduces human operation risks, saves energy, enhances the start-stop and peak-shaving capabilities of the unit, and extends the maximum peak-adjustable time to more than 6 hours.
Smart Images

Figure CN118997868A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of steam turbines, and in particular relates to a differential expansion control system and method for a cylindrical high-pressure cylinder of a steam turbine. Background Art
[0002] Thermal power plants now participate in the electricity spot market. Based on the unit's quotation and clearance situation, the units need to be started and stopped frequently for peak regulation. When a steam turbine with a cylindrical cylinder structure is started and stopped for peak regulation, the high-pressure cylinder differential expansion will drop rapidly until it approaches the lower limit, limiting the unit's start-stop peak regulation capability, affecting the safe operation of the equipment and causing losses to the enterprise. Summary of the invention
[0003] (I) Purpose of the invention
[0004] In order to overcome the above shortcomings, the purpose of the present invention is to provide a differential expansion control system and method for a cylindrical high-pressure cylinder of a steam turbine to solve the above technical problems.
[0005] (II) Technical solution
[0006] To achieve the above objectives, the technical solutions provided by this application are as follows:
[0007] A differential expansion control system for a cylindrical high-pressure cylinder of a steam turbine, comprising:
[0008] The data acquisition module collects various operating parameters of the steam turbine in real time, including temperature, pressure, flow rate and speed, and transmits the data to the data processing and analysis module;
[0009] Data processing and analysis module processes and analyzes the collected data.
[0010] The decision support module provides operational decision support based on the structure of data analysis and transmits signals to the automatic control module;
[0011] The automatic control module converts the decision into specific control instructions to automatically adjust the operating parameters of the steam turbine according to the output of the decision module;
[0012] The user interface module provides operators with an intuitive operating interface and displays the collected data and decisions made in real time.
[0013] Preferably, the specific steps of the data processing and analysis module include:
[0014] S1 data preprocessing, removing outliers and duplicate values from the data and converting the data into a unified scale;
[0015] S2 feature extraction, extracting key features from the preprocessed data, the key features including temperature change rate and pressure fluctuation;
[0016] S3 data fusion integrates key features to obtain more comprehensive status information;
[0017] S4 state identification, using a classification algorithm to classify the operating state of the steam turbine;
[0018] S5 decision support converts the analysis results into decision support information to provide an operational basis for the automatic control system.
[0019] Preferably, the classification algorithm comprises:
[0020] A1 For linearly separable data, find a hyperplane that maximizes the interval between data points. The algorithm equation of the hyperplane is:
[0021] ω·x+b=0
[0022] Where ω is the weight vector, b is the bias term, and x is the data point;
[0023] Find the interval boundaries with the formula:
[0024] The interval boundary maximization problem is transformed into a minimization problem:
[0025] The constraints are: i (ω·x i +b)≥1
[0026] A2 When the data is not safe linearly separable, introduce a slack variable ξ i To allow some data points to violate the interval boundaries, the objective function becomes:
[0027] A3 When the data is nonlinearly separable, a kernel function is used to map the data to a high-dimensional space. The formula of the kernel function is:
[0028] Among them, γ is the parameter of the kernel function.
[0029] Preferably, the method comprises the following steps:
[0030] Step 1 starts with sliding cylinder temperature. When the load drops to 50% BMCR, the high pressure cylinder is cooled and shrunk by reducing the inlet steam temperature from 600°C to 560°C and maintaining it for 2 hours;
[0031] Step 2: Continue with the sliding cylinder temperature: When the load further drops below 40% BMCR, control the main steam pressure at 7-8 MPa, and ensure that the inlet steam temperature is between 530℃ and 510℃ to speed up the cooling speed, but avoid overcooling;
[0032] Step 3: Increase the steam volume in the flow section: When the load drops to 30% BMCR, increase the steam volume in the flow section by reducing the condenser vacuum to maintain a faster sliding cylinder temperature speed.
[0033] Step 4: Increase the rotor temperature: When the load drops to 25% BMCR, due to the low main steam temperature, the shaft seal inlet steam temperature is increased to 400°C by injecting main steam into the shaft seal pipeline, thereby increasing the temperature of the high-pressure rotor;
[0034] Step 5: Reduce cylinder temperature: When the load drops to 20% BMCR, the temperature of the high-pressure cylinder interlayer is reduced by adjusting the temperature of the cooling steam source of the high-pressure steam inlet pipe, thereby enhancing the cooling of the high-pressure cylinder inner cylinder;
[0035] Step 6: Increase steam temperature: After the unit is disconnected, increase the inlet steam temperature to 550°C to slow down the cooling rate of the high-pressure rotor;
[0036] Step 7: Timed drainage: After the turbine is braked and put into operation, the cooling of the high-pressure rotor is slowed down by draining the turbine regularly and using the cylinder blocking method;
[0037] Step 8: Increase the steam temperature: Before the turbine is started up, increase the main steam temperature to 570°C so that the high-pressure rotor can enter a direct heating state during the start-up.
[0038] Beneficial effects:
[0039] 1. Improve safety: By accurately controlling the differential expansion of the steam turbine under different loads, it can effectively prevent equipment damage or failure caused by excessive temperature stress and mechanical stress, thereby improving the safety of the entire system.
[0040] 2. Optimize performance: The system ensures that the steam turbine can maintain optimal performance under various load conditions and extend the life of the equipment through real-time monitoring and automatic adjustment.
[0041] 3. Automated control: Automated control processes reduce the need for manual operation, reduce the risks caused by operational errors, and improve the response speed and accuracy of control.
[0042] 4. Energy saving and consumption reduction: By precisely controlling the steam temperature and pressure, energy waste is avoided and energy saving and consumption reduction is achieved.
[0043] 5. By using this system and method, the present invention enhances the start-stop peak-shaving capability of the unit, and the maximum peak-shaving time of the unit is increased from less than 3 hours to more than 6 hours, creating economic benefits for the enterprise. BRIEF DESCRIPTION OF THE DRAWINGS
[0044] Figure 1 It is a trend diagram of the differential expansion of the high-pressure cylinder of the steam turbine during start-stop peak regulation after the control method of the present invention is adopted;
[0045] Figure 2 This is a trend chart of the differential expansion of the high-pressure cylinder of the turbine when starting and stopping for peak regulation before the control method is adopted. DETAILED DESCRIPTION
[0046] In order to make the purpose, technical solutions and advantages of the present invention more clear, the following is a detailed description of the present invention in conjunction with the specific implementation methods and with reference to the attached drawings. Figure 1-2 , the present invention is further described in detail. It should be understood that these descriptions are exemplary only and are not intended to limit the scope of the present invention. In addition, in the following description, descriptions of well-known structures and technologies are omitted to avoid unnecessary confusion of the concept of the present invention.
[0047] The present invention provides a differential expansion control system for a steam turbine cylindrical high-pressure cylinder, comprising:
[0048] The data acquisition module collects various operating parameters of the steam turbine in real time, including temperature, pressure, flow rate and speed, and transmits the data to the data processing and analysis module;
[0049] Data processing and analysis module, which processes and analyzes the collected data;
[0050] The decision support module provides operational decision support based on the structure of data analysis and transmits signals to the automatic control module;
[0051] The automatic control module converts the decision into specific control instructions to automatically adjust the operating parameters of the steam turbine according to the output of the decision module;
[0052] The user interface module provides operators with an intuitive operating interface and displays the collected data and decisions made in real time.
[0053] The specific steps of the data processing and analysis module include:
[0054] S1 data preprocessing, removing outliers and duplicate values from the data and converting the data into a unified scale;
[0055] S2 feature extraction, extracting key features from the preprocessed data, the key features including temperature change rate and pressure fluctuation;
[0056] S3 data fusion integrates key features to obtain more comprehensive status information;
[0057] S4 state identification, using a classification algorithm to classify the operating state of the steam turbine;
[0058] The classification algorithm includes:
[0059] A1 For linearly separable data, find a hyperplane that maximizes the interval between data points. The algorithm equation of the hyperplane is:
[0060] ω·x+b=0
[0061] Where ω is the weight vector, b is the bias term, and x is the data point;
[0062] Find the interval boundaries with the formula:
[0063] The interval boundary maximization problem is transformed into a minimization problem:
[0064] The constraints are: i (ω·x i +b)≥1
[0065] A2 When the data is not safe linearly separable, introduce a slack variable ξ i To allow some data points to violate the interval boundaries, the objective function becomes:
[0066] A3 When the data is nonlinearly separable, a kernel function is used to map the data to a high-dimensional space. The formula of the kernel function is:
[0067] Among them, γ is the parameter of the kernel function.
[0068] S5 decision support converts the analysis results into decision support information to provide an operational basis for the automatic control system.
[0069] A method for controlling differential expansion of a cylindrical high-pressure cylinder of a steam turbine comprises the following steps:
[0070] Step 1 starts with sliding cylinder temperature. When the load drops to 50% BMCR, the high pressure cylinder is cooled and shrunk by reducing the inlet steam temperature from 600°C to 560°C and maintaining it for 2 hours;
[0071] Step 2: Continue with the sliding cylinder temperature: When the load further drops below 40% BMCR, control the main steam pressure at 7-8 MPa, and ensure that the inlet steam temperature is between 530℃ and 510℃ to speed up the cooling speed, but avoid overcooling;
[0072] Step 3: Increase the steam volume in the flow section: When the load drops to 30% BMCR, increase the steam volume in the flow section by reducing the condenser vacuum to maintain a faster sliding cylinder temperature speed.
[0073] Step 4: Increase the rotor temperature: When the load drops to 25% BMCR, due to the low main steam temperature, the shaft seal inlet steam temperature is increased to 400°C by injecting main steam into the shaft seal pipeline, thereby increasing the temperature of the high-pressure rotor;
[0074] Step 5: Reduce cylinder temperature: When the load drops to 20% BMCR, the temperature of the high-pressure cylinder interlayer is reduced by adjusting the temperature of the cooling steam source of the high-pressure steam inlet pipe, thereby enhancing the cooling of the high-pressure cylinder inner cylinder;
[0075] Step 6: Increase steam temperature: After the unit is disconnected, increase the inlet steam temperature to 550°C to slow down the cooling rate of the high-pressure rotor;
[0076] Step 7: Timed drainage: After the turbine is braked and put into operation, the cooling of the high-pressure rotor is slowed down by draining the turbine regularly and using the cylinder blocking method;
[0077] Step 8: Increase the steam temperature: Before the turbine is started up, increase the main steam temperature to 570°C so that the high-pressure rotor can enter a direct heating state during the start-up.
[0078] By using this system and method, the present invention enhances the start-stop peak-shaving capability of the unit, and the maximum peak-shaving time of the unit is increased from less than 3 hours to more than 6 hours, creating economic benefits for the enterprise.
[0079] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.
[0080] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features thereof may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. A differential expansion control system for a steam turbine cylindrical high-pressure cylinder, characterized in that: Include: The data acquisition module collects various operating parameters of the steam turbine in real time, including temperature, pressure, flow rate and speed, and transmits the data to the data processing and analysis module; Data processing and analysis module processes and analyzes the collected data. The decision support module provides operational decision support based on the structure of data analysis and transmits signals to the automatic control module; The automatic control module converts the decision into specific control instructions to automatically adjust the operating parameters of the steam turbine according to the output of the decision module; The user interface module provides operators with an intuitive operating interface and displays the collected data and decisions made in real time.
2. A differential expansion control system for a steam turbine cylindrical high-pressure cylinder according to claim 1, characterized in that: The specific steps of the data processing and analysis module include: S1 data preprocessing, removing outliers and duplicate values from the data and converting the data into a unified scale; S2 feature extraction, extracting key features from the preprocessed data, the key features including temperature change rate and pressure fluctuation; S3 data fusion integrates key features to obtain more comprehensive status information; S4 status identification uses classification algorithms to classify the operating status of the steam turbine; S5 decision support converts the analysis results into decision support information to provide an operational basis for the automatic control system.
3. A differential expansion control system for a steam turbine cylindrical high-pressure cylinder according to claim 2, characterized in that: The classification algorithm includes: A1 For linearly separable data, find a hyperplane that maximizes the interval between data points. The algorithm equation of the hyperplane is: ω·x+b=0 Where ω is the weight vector, b is the bias term, and x is the data point; Find the interval boundaries with the formula: The interval boundary maximization problem is transformed into a minimization problem: The constraints are: i (ω·x i +b)≥1 A2 When the data is not safe linearly separable, introduce a slack variable ζ i To allow some data points to violate the interval boundaries, the objective function becomes: A3 When the data is nonlinearly separable, a kernel function is used to map the data to a high-dimensional space. The formula of the kernel function is: Among them, γ is the parameter of the kernel function.
4. A method for controlling differential expansion of a cylindrical high-pressure cylinder of a steam turbine, characterized in that: The steps include: Step 1 starts with sliding cylinder temperature. When the load drops to 50% BMCR, the high pressure cylinder is cooled and shrunk by reducing the inlet steam temperature from 600°C to 560°C and maintaining it for 2 hours; Step 2: Continue with the sliding cylinder temperature: When the load further drops below 40% BMCR, control the main steam pressure at 7-8 MPa, and ensure that the inlet steam temperature is between 530℃ and 510℃ to speed up the cooling speed, but avoid overcooling; Step 3: Increase the steam volume in the flow section: When the load drops to 30% BMCR, increase the steam volume in the flow section by reducing the condenser vacuum to maintain a faster sliding cylinder temperature speed. Step 4: Increase the rotor temperature: When the load drops to 25% BMCR, due to the low main steam temperature, the shaft seal inlet steam temperature is increased to 400°C by injecting main steam into the shaft seal pipeline, thereby increasing the temperature of the high-pressure rotor; Step 5: Reduce cylinder temperature: When the load drops to 20% BMCR, the temperature of the high-pressure cylinder interlayer is reduced by adjusting the temperature of the cooling steam source of the high-pressure steam inlet pipe, thereby enhancing the cooling of the high-pressure cylinder inner cylinder; Step 6: Increase steam temperature: After the unit is disconnected, increase the inlet steam temperature to 550°C to slow down the cooling rate of the high-pressure rotor; Step 7: Timed drainage: After the turbine is braked and put into operation, the cooling of the high-pressure rotor is slowed down by draining the turbine regularly and using the cylinder blocking method; Step 8: Increase the steam temperature: Before the turbine is started up, increase the main steam temperature to 570°C so that the high-pressure rotor can enter a direct heating state during the start-up.