Indoor temperature control method and device, electronic equipment and readable storage medium

By acquiring and preprocessing the environment and operating status data of the cold station system, inputting the target cold volume prediction model, generating the target operating status data of the cold station equipment, realizing refined control of the cold station equipment, solving the temperature control in the existing technology The problems of inaccuracy and high energy consumption improve the accuracy and efficiency of temperature control.

CN118998950AActive Publication Date: 2024-11-22BEIJING LONGZHI DIGITAL TECH CO LTD

Patent Information

Application Number
CN202411085856.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-08
Publication Date
2024-11-22
Estimated Expiration
2044-08-08

AI Technical Summary

Technical Problem

The existing cold station system cannot accurately predict the cooling load demand in the mall, resulting in inaccurate temperature control and excessive energy consumption.

Method used

By obtaining the current indoor and outdoor environment characteristic data and the operating status characteristic data of the cold station equipment, performing preprocessing and inputting the target cold volume prediction model completed by training, and generating the target operating status data of the cold station equipment to achieve the fineness of the cold station equipment .

Benefits of technology

Improves the accuracy and efficiency of temperature control, reduces energy consumption and operating costs, and ensures that the indoor temperature is always within the set comfortable range.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118998950A_ABST
    Figure CN118998950A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of temperature control, and provides an indoor temperature control method and device, electronic equipment and a readable storage medium. The method comprises the following steps: inputting current indoor and outdoor environment characteristic data into a target cooling capacity prediction model, and processing the processed characteristic data of the current indoor and outdoor environment based on the target cooling capacity prediction model to obtain indoor candidate cooling capacity in the next time period; on the basis of the candidate cooling capacity, the current indoor and outdoor environment characteristic data and the current operation state characteristic data of the cold station equipment, operation parameters of the cold station equipment are predicted, and target operation state data of the cold station equipment are generated; and according to the target operation state data, the cold station equipment is controlled, so that the temperature of the indoor environment is controlled. The problem that in the prior art, indoor temperature control is not accurate is solved, the indoor temperature is kept within the set comfortable range all the time, cold station equipment is finely controlled, and the accuracy and efficiency of temperature control are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present disclosure relates to the technical field of temperature control, and in particular to an indoor temperature control method, device, electronic device and readable storage medium. Background Art

[0002] With the increase of urbanization and commercial activities, the energy consumption of public places such as shopping malls has received increasing attention. As a key facility for regulating indoor temperature, the energy consumption of the cooling station system accounts for a large part of the total energy consumption of shopping malls. The existing cooling station system adopts a computer-based control system, which collects indoor and outdoor environmental data through sensors and automatically adjusts the operating status of the cooling station equipment according to the preset control logic. However, it lacks real-time data analysis and prediction, and cannot accurately predict the cooling load demand in the shopping mall, resulting in inaccurate temperature control and excessive energy consumption. Summary of the invention

[0003] In view of this, the embodiments of the present disclosure provide an indoor temperature control method, device, electronic device and readable storage medium to solve the problem of inaccurate indoor temperature control in the prior art.

[0004] According to a first aspect of an embodiment of the present disclosure, a method for controlling indoor temperature is provided, including: obtaining characteristic data of current indoor and outdoor environments and characteristic data of current operating status of a cooling station device; preprocessing the characteristic data of current indoor and outdoor environments to obtain characteristic data of current indoor and outdoor environments after processing, and preprocessing the characteristic data of current operating status to obtain characteristic data of current operating status after processing; inputting the characteristic data of current indoor and outdoor environments after processing into a trained target cooling capacity prediction model, processing the characteristic data of current indoor and outdoor environments after processing based on the target cooling capacity prediction model, and obtaining candidate cooling capacity in the room for the next time period; predicting operating parameters of the cooling station device based on the candidate cooling capacity, the characteristic data of current indoor and outdoor environments after processing, and the characteristic data of current operating status after processing, and generating target operating status data of the cooling station device; controlling the cooling station device according to the target operating status data so as to control the temperature of the indoor environment.

[0005] According to a second aspect of an embodiment of the present disclosure, there is provided an indoor temperature control device, comprising: a data acquisition module, for acquiring current indoor and outdoor environment characteristic data and current operating status characteristic data of a cooling station device; a preprocessing module, for preprocessing the current indoor and outdoor environment characteristic data to obtain the processed characteristic data of the current indoor and outdoor environment, and for preprocessing the current operating status characteristic data to obtain the processed characteristic data of the current operating status; a cooling capacity prediction module, for inputting the processed characteristic data of the current indoor and outdoor environment into a trained target cooling capacity prediction model, and processing the processed characteristic data of the current indoor and outdoor environment based on the target cooling capacity prediction model to obtain candidate cooling capacity in the room for the next time period; a target operating status data generation module, for predicting the operating parameters of the cooling station device based on the candidate cooling capacity, the processed characteristic data of the current indoor and outdoor environment, and the processed characteristic data of the current operating status, and generating target operating status data of the cooling station device; and an execution module, for controlling the cooling station device according to the target operating status data, so as to control the temperature of the indoor environment.

[0006] According to a third aspect of an embodiment of the present disclosure, an electronic device is provided, including a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the steps of the above method when executing the computer program.

[0007] According to a fourth aspect of an embodiment of the present disclosure, a readable storage medium is provided, which stores a computer program, and when the computer program is executed by a processor, the steps of the above method are implemented.

[0008] Compared with the prior art, the disclosed embodiment has the following beneficial effects: by obtaining the current indoor and outdoor environment characteristic data and the current operating state characteristic data of the cooling station equipment, a basis is provided for subsequent data analysis and model prediction; by continuously monitoring and recording the current indoor and outdoor environment characteristic data and the current operating state characteristic data of the cooling station equipment, the indoor environment changes and the operating state of the cooling station equipment can be more accurately understood, and reliable data support is provided for the intelligent control of the cooling station system. The current indoor and outdoor environment characteristic data are preprocessed to obtain the processed characteristic data of the current indoor and outdoor environment, and the current operating state characteristic data are preprocessed to obtain the processed characteristic data of the current operating state; the collected raw data are preprocessed to remove abnormal values ​​and convert the data format to make the data suitable for the target cooling prediction model to understand; the preprocessed indoor and outdoor environment processed characteristic data and the operating state processed characteristic data can more accurately reflect the actual situation, and provide reliable input data for the subsequent target cooling prediction model, thereby improving the accuracy and generalization ability of the target cooling prediction model. Based on the trained target cooling prediction model, the current indoor and outdoor environment processed characteristic data are input to predict the cooling required indoors in the next time period, and basic data is provided for the generation of target operating state data. The operating parameters of the cooling station equipment are predicted by combining the candidate cooling capacity, the characteristic data after the current indoor and outdoor environment processing, and the characteristic data after the current operating status processing to meet the expected cooling capacity demand, which helps the cooling station equipment to operate in the optimal state, both to meet the temperature control requirements and to reduce energy consumption as much as possible, and to generate the target operating status data of the cooling station equipment. The generated target operating status data is applied to the actual cooling station equipment control, and through the refined control of the cooling station equipment, the effective management of the indoor temperature is achieved, and the problem of inaccurate indoor temperature control in the prior art is solved, which helps to maintain the indoor temperature within the set comfortable range at all times, and the cooling station equipment is refined to improve the accuracy and efficiency of temperature control, and reduce energy consumption and operating costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0009] In order to more clearly illustrate the technical solutions in the embodiments of the present disclosure, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present disclosure. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.

[0010] Figure 1 is a flow chart of an indoor temperature control method provided by an embodiment of the present disclosure;

[0011] Figure 2 is a flow chart of another indoor temperature control method provided by an embodiment of the present disclosure;

[0012] Figure 3 is a flow chart of another indoor temperature control method provided by an embodiment of the present disclosure;

[0013] Figure 4 is a flow chart of another indoor temperature control method provided by an embodiment of the present disclosure;

[0014] Figure 5 is a flow chart of another indoor temperature control method provided by an embodiment of the present disclosure;

[0015] Figure 6 is a structural schematic diagram of an indoor temperature control device provided by an embodiment of the present disclosure;

[0016] Figure 7 It is a structural schematic diagram of an electronic device provided by an embodiment of the present disclosure. DETAILED DESCRIPTION

[0017] In the following description, specific details such as specific system structures and technologies are provided for the purpose of illustration rather than limitation, so as to provide a thorough understanding of the embodiments of the present disclosure. However, it should be clear to those skilled in the art that the present disclosure may be implemented in other embodiments without these specific details. In other cases, detailed descriptions of well-known systems, devices, circuits, and methods are omitted to avoid obstructing the description of the present disclosure with unnecessary details.

[0018] A method and device for controlling indoor temperature according to an embodiment of the present disclosure will be described in detail below with reference to the accompanying drawings.

[0019] Figure 1 FIG. 1 is a flow chart of an indoor temperature control method provided by an embodiment of the present disclosure. Figure 1 As shown, the indoor temperature control method includes:

[0020] Step 101, obtaining characteristic data of the current indoor and outdoor environment and characteristic data of the current operating status of the refrigeration station equipment.

[0021] In some embodiments, the current indoor and outdoor environmental characteristic data may include the current time, the current indoor temperature, the current indoor humidity, the current outdoor temperature, the current outdoor humidity, the flow of people, the wind force, the wind speed, the weather, the CO2 concentration, etc. The current indoor and outdoor environmental characteristic data may directly affect the indoor comfort and the indoor cooling demand within a time period. By collecting the current indoor and outdoor environmental characteristic data in real time, the current environmental status can be understood in real time, providing a basis for subsequent decision-making.

[0022] In some embodiments, the current operating status characteristic data includes the current time, chiller power, water pump frequency, chilled water supply temperature, chilled water return temperature, chilled water supply pressure, chilled water return pressure, chilled water supply flow, chilled water return flow, operating status of the cooling tower, etc. The current operating status characteristic data can reflect the operating status of the cold station system and is an important indicator of the performance of the cold station system. Through the real-time current indoor and outdoor environmental characteristic data and the current operating status characteristic data of the cold station equipment, it can provide a basis for subsequent data processing and analysis. Through the continuous monitoring and recording of the current indoor and outdoor environmental characteristic data and the current operating status characteristic data of the cold station equipment, the indoor environmental changes and the operating status of the cold station equipment can be more accurately understood, providing reliable data support for the intelligent control of the cold station system.

[0023] Step 102, preprocessing the current indoor and outdoor environment characteristic data to obtain the processed characteristic data of the current indoor and outdoor environment, and preprocessing the current operating state characteristic data to obtain the processed characteristic data of the current operating state.

[0024] In some embodiments, preprocessing the current indoor and outdoor environment characteristic data may include eliminating noise and outliers, converting the current indoor and outdoor environment characteristic data into a unified format or range, constructing environmental factor characteristics, etc., to obtain the processed characteristic data of the current indoor and outdoor environment, which is helpful for subsequent analysis and modeling to improve the accuracy and reliability of the data. Preprocessing the current operating state characteristic data may include eliminating noise and outliers, converting the data into a format suitable for subsequent model input, and obtaining the processed characteristic data of the current operating state, which can more accurately reflect the current operating state of the cold station equipment, provide a basis for subsequent prediction and control, and eliminate noise and outliers caused by equipment characteristics or measurement errors, thereby improving the accuracy of prediction.

[0025] Step 103, input the processed characteristic data of the current indoor and outdoor environment into the trained target cooling capacity prediction model, process the processed characteristic data of the current indoor and outdoor environment based on the target cooling capacity prediction model, and obtain the candidate cooling capacity of the room in the next time period.

[0026] In some embodiments, the target cooling capacity prediction model can be an algorithm model that has been learned and optimized based on historical data, and can capture the complex relationship between indoor and outdoor environmental characteristics and cooling demand. The characteristic data after the current indoor and outdoor environment processing is input into the trained target cooling capacity prediction model, and the relationship and potential rules between the characteristic data after the current indoor and outdoor environment processing can be analyzed by mathematical operations and learned patterns. The target output, that is, the candidate cooling capacity of the next time period, is inferred based on the input characteristic data after the current indoor and outdoor environment processing. The candidate cooling capacity of the next time period is the estimated cooling capacity that the cold station system may need to provide in the future period according to the current environmental conditions. The next time period can be the next hour. By inputting the characteristic data after the current indoor and outdoor environment processing, the target cooling capacity prediction model can predict the cooling demand in the future period in real time, and the accuracy of the prediction can affect the subsequent cold station equipment operating parameter setting and indoor temperature control effect. After obtaining the candidate cooling capacity, the operating parameters of the cold station equipment can be finely adjusted according to the candidate cooling capacity, so as to achieve accurate control of the indoor temperature, which helps to avoid energy waste and improve energy efficiency.

[0027] Step 104 , predicting the operating parameters of the cooling station equipment based on the candidate cooling capacity, the processed characteristic data of the current indoor and outdoor environment, and the processed characteristic data of the current operating state, and generating target operating state data of the cooling station equipment.

[0028] In some embodiments, the candidate cooling capacity of the next time period predicted by the comprehensive target cooling capacity prediction model, the characteristic data after processing of the current indoor and outdoor environment, and the characteristic data after processing of the current operating state together constitute a comprehensive input data set, which provides a basis for subsequent optimization calculations. Based on this data set, a data analysis algorithm or a machine learning model can be used, while considering the stability and efficiency of the cooling station equipment, avoiding frequent switching and over-adjustment leading to increased energy consumption or equipment damage, and predicting the target operating state data to which the cooling station equipment should be adjusted. The target operating state data is the optimized recommended value, which is a control strategy that meets the demand and is the best energy-saving, and helps the cooling station equipment to respond quickly and maintain the best working efficiency when facing future load changes, while ensuring the stability of the indoor temperature. The target operating state data may include: cold source system name: the name or identifier of the cooling station system; project name: the name of the current project or shopping mall; expected temperature: the set target indoor temperature; number of cooling towers: the number of cooling towers to be operated; number of freezing pumps: the number of freezing pumps to be operated; freezing pump frequency: the operating frequency of the freezing pump; number of chillers: the number of chillers to be operated; set temperature: the set temperature of the chiller, etc. By predicting and optimizing the operating status data of the cooling station equipment, the cooling station equipment can meet the cooling demand while minimizing energy consumption and operating costs, which helps to improve energy efficiency and reduce waste. The predicted target operating status data helps maintain the comfort of the indoor environment, so that parameters such as temperature and humidity fluctuate within the set range.

[0029] Step 105: Control the cooling station equipment according to the target operation status data so as to control the temperature of the indoor environment.

[0030] In some embodiments, the indoor temperature control method disclosed in the present invention can be applied to a cold station temperature control system, which receives and parses target operating status data. The target operating status data includes specific operating parameters of each device that should be set to achieve the target indoor temperature, such as the number of cooling towers, the number of refrigeration pumps, and the frequency of the refrigeration pumps. The cold station temperature control system sends instructions to each device in the cold station based on the operating status data to accurately control the cold station equipment to ensure that the cold station equipment operates in the optimal state to meet the expected cooling demand. Controlling the cold station equipment according to the target operating status data to achieve temperature control of the indoor environment and intelligent adjustment of the indoor temperature helps to improve energy efficiency and user satisfaction. By controlling the cold station equipment based on the target operating status data, the operating status of the cold station equipment can be automatically adjusted to achieve automated control, reduce dependence on manual operations, and improve the response speed and operating efficiency of the cold station temperature control system.

[0031] Based on the indoor temperature control method proposed in the present disclosure, by obtaining the current indoor and outdoor environmental characteristic data and the current operating state characteristic data of the cooling station equipment, a basis is provided for subsequent data analysis and model prediction. By continuously monitoring and recording the current indoor and outdoor environmental characteristic data and the current operating state characteristic data of the cooling station equipment, the indoor environmental changes and the operating state of the cooling station equipment can be more accurately understood, and reliable data support is provided for the intelligent control of the cooling station system. The current indoor and outdoor environmental characteristic data are preprocessed to obtain the processed characteristic data of the current indoor and outdoor environment, and the current operating state characteristic data are preprocessed to obtain the processed characteristic data of the current operating state. The collected raw data are preprocessed to remove abnormal values ​​and convert the data format to make the data suitable for the target cooling prediction model to understand. The preprocessed indoor and outdoor environmental processed characteristic data and the processed operating state characteristic data can more accurately reflect the actual situation, and provide reliable input data for the subsequent target cooling prediction model, thereby improving the accuracy and generalization ability of the target cooling prediction model. Based on the trained target cooling prediction model, the processed characteristic data of the current indoor and outdoor environment are input to predict the cooling required indoors in the next time period, and basic data is provided for the generation of target operating state data. The operating parameters of the cooling station equipment are predicted by combining the candidate cooling capacity, the characteristic data after the current indoor and outdoor environment processing, and the characteristic data after the current operating status processing to meet the expected cooling capacity demand, which helps the cooling station equipment to operate in the optimal state, both to meet the temperature control requirements and to reduce energy consumption as much as possible, and to generate the target operating status data of the cooling station equipment. The generated target operating status data is applied to the actual cooling station equipment control, and through the refined control of the cooling station equipment, the effective management of the indoor temperature is achieved, and the problem of inaccurate indoor temperature control in the prior art is solved, which helps to maintain the indoor temperature within the set comfortable range at all times, and the cooling station equipment is refined to improve the accuracy and efficiency of temperature control, and reduce energy consumption and operating costs.

[0032] Figure 2 1 is a flow chart of another indoor temperature control method provided by an embodiment of the present disclosure. In some embodiments, the current indoor and outdoor environment characteristic data include the current time, the current indoor temperature, the current indoor humidity, the current outdoor temperature, the current outdoor humidity, the current indoor and outdoor category characteristic data, and the current indoor and outdoor tilt characteristic data.

[0033] like Figure 2 As shown, step 102 may specifically include steps 201 to 207 .

[0034] Step 201, constructing a time feature based on the current time;

[0035] Step 202, performing exploratory data analysis on the current indoor temperature, the current indoor humidity, the current outdoor temperature, and the current outdoor humidity, respectively, to obtain the analyzed current indoor temperature, the analyzed current indoor humidity, the analyzed current outdoor temperature, and the analyzed current outdoor humidity;

[0036] Step 203, determining the corresponding indoor wet-bulb temperature based on the analyzed current indoor temperature and the analyzed current indoor humidity;

[0037] Step 204, determining a corresponding indoor and outdoor temperature difference based on the analyzed current indoor temperature and the analyzed current outdoor temperature;

[0038] Step 205, normalizing the current indoor and outdoor tilt feature data to obtain current indoor and outdoor normalized feature data;

[0039] Step 206, encoding the current indoor and outdoor category feature data to obtain the current indoor and outdoor category feature vector;

[0040] Step 207, the time feature, the current indoor temperature after analysis, the current indoor humidity after analysis, the current outdoor temperature after analysis, the current outdoor humidity after analysis, the indoor wet-bulb temperature, the indoor and outdoor temperature difference, the current indoor and outdoor normalized feature data and the current indoor and outdoor category feature vector are determined as the processed feature data of the current indoor and outdoor environment.

[0041] In some embodiments, based on the current time, the constructed time features may include whether it is a holiday, whether it is a holiday adjustment, the number of days from the holiday, the number of days from the summer solstice, the business hours, the opening and closing times of the store, etc. The time features help the target cooling prediction model to better capture the impact of time-related features on cooling demand and capture time dependence. Exploratory data analysis is an important step to understand data distribution, identify outliers, understand the relationship between variables, etc. Exploratory data analysis can be processed by cleaning (e.g., removing outliers), conversion (e.g., logarithmic conversion) or standardization. By performing exploratory data analysis on the current indoor temperature, the current indoor humidity, the current outdoor temperature and the current outdoor humidity, the current indoor temperature after analysis, the current indoor humidity after analysis, the current outdoor temperature after analysis and the current outdoor humidity after analysis can be obtained, so as to better understand their characteristics and potential laws, improve the accuracy and reliability of the data, and provide a basis for subsequent cooling prediction. The wet-bulb temperature is a parameter representing the relative humidity of the air, which integrates the information of temperature and humidity. Based on the current indoor temperature after analysis and the current indoor humidity after analysis, the corresponding indoor wet-bulb temperature can be determined, which helps to more comprehensively describe the thermal and humid state of the indoor environment. Based on the current indoor temperature after analysis and the current outdoor temperature after analysis, the corresponding indoor and outdoor temperature difference is determined. The indoor and outdoor temperature difference can indicate the difference between the indoor environment and the external environment. The size of the indoor and outdoor temperature difference can directly affect the comfort and energy efficiency of the indoor environment. Based on the chilled water supply temperature and the chilled water return temperature, the corresponding cold source system temperature difference is determined. The size of the cold source system temperature difference can indicate the efficiency of the cold station equipment. A larger temperature difference may indicate that the cold station equipment is operating well and has high refrigeration efficiency. The current indoor and outdoor tilted feature data is unevenly distributed or has abnormal values. The current indoor and outdoor tilted feature data can be processed. The processing means to obtain the current indoor and outdoor category feature vector can include logarithmic transformation, normalization or truncation of the current indoor and outdoor tilted feature data, etc., to obtain the current indoor and outdoor normalized feature data to ensure the stability and availability of the feature data. The indoor and outdoor category feature data can be converted into a feature vector by One-Hot Encoding to obtain the current indoor and outdoor category feature vector, so that non-numerical data can be understood and processed by the target cooling capacity prediction model, thereby increasing the accuracy of the target cooling capacity prediction. All the processed features mentioned above are integrated with the unprocessed feature data (such as pedestrian flow) to obtain a structured set of "processed feature data of the current indoor and outdoor environment", which contains multi-dimensional information reflecting the status of the indoor and outdoor environment, which is helpful for further analysis, prediction or control decision-making.

[0042] In some embodiments, the current operating status characteristic data includes the chilled water supply temperature and the chilled water return temperature. The current operating status characteristic data is preprocessed to obtain the processed characteristic data of the current operating status, including: determining the corresponding chilled water temperature difference based on the chilled water supply temperature and the chilled water return temperature; and determining the chilled water temperature difference as the processed characteristic data of the current operating status.

[0043] In some embodiments, the chilled water supply temperature is the temperature of the chilled water flowing out of the refrigeration unit and before entering the terminal equipment (such as fan coil units, air conditioning boxes, etc.), which can indicate the refrigeration capacity of the refrigeration unit and the heat loss of the water supply pipe. The chilled water return temperature is the temperature of the chilled water flowing back from the terminal equipment to the refrigeration unit, which can indicate the heat exchange efficiency and load of the terminal equipment. The chilled water supply temperature and the chilled water return temperature collected by the sensor are obtained and cleaned. Based on the chilled water supply temperature and the chilled water return temperature, the chilled water temperature difference is calculated. Chilled water temperature difference = chilled water supply temperature - chilled water return temperature. The chilled water temperature difference can indicate the actual load borne by the cold station equipment and the operating efficiency of the refrigeration unit. The chilled water temperature difference is an important indicator for evaluating the performance of the cold station equipment. Preprocessing the characteristic data of the current operating status and extracting the feature of the chilled water temperature difference can help the cold station equipment to perform performance analysis, fault prediction, optimization control and load prediction.

[0044] Figure 3 1 is a flow chart of another indoor temperature control method provided by an embodiment of the present disclosure. In some embodiments, step 104, i.e., predicting the operating parameters of the cooling station equipment based on the candidate cooling capacity, the processed characteristic data of the current indoor and outdoor environment, and the processed characteristic data of the current operating state, and generating the target operating state data of the cooling station equipment, may specifically include steps 301 to 305.

[0045] Step 301, inputting the indoor and outdoor temperature difference and the chilled water temperature difference into a temperature prediction model, processing the indoor and outdoor temperature difference and the chilled water temperature difference based on the temperature prediction model, and obtaining a predicted set temperature of the cold station equipment;

[0046] Step 302, inputting the predicted cooling capacity, indoor wet-bulb temperature and the current outdoor temperature after analysis into a cooling tower quantity prediction model, processing the predicted cooling capacity, indoor wet-bulb temperature and the current outdoor temperature after analysis based on the cooling tower quantity prediction model, and obtaining a predicted number of cooling towers for the cold station equipment;

[0047] Step 303, inputting the predicted number of cooling towers and the processed characteristic data of the current operating status into the supply cooling capacity prediction model, processing the predicted number of cooling towers and the processed characteristic data of the current operating status to obtain the second candidate cooling capacity of the cooling station equipment;

[0048] Step 304, correcting the candidate cooling capacity based on the second candidate cooling capacity to obtain a target cooling capacity of the indoor environment, and obtaining a target set temperature of the cooling station equipment and a target number of cooling towers of the cooling station equipment;

[0049] Step 305: Generate target operating status data of the cooling station equipment based on the target cooling capacity, the target set temperature and the target number of cooling towers.

[0050] In some embodiments, the temperature prediction model is a linear regression model trained based on historical data (including historical indoor and outdoor temperature differences and historical chilled water temperature differences). It can be processed based on the indoor and outdoor temperature differences and the chilled water temperature differences to predict the predicted set temperature of the cold station equipment. The predicted set temperature of the cold station equipment obtained can not only meet the comfort requirements of the indoor environment, but also optimize energy consumption and the operating efficiency of the equipment. The predicted cold capacity, indoor wet bulb temperature and the current outdoor temperature after analysis output by the target cold capacity prediction model are input into the cooling tower quantity prediction model to predict the required number of cooling towers and obtain the predicted number of cooling towers for the cold station equipment, which helps to determine whether there is enough cooling capacity to support the predicted cold capacity demand while avoiding excessive or insufficient use of cooling towers. The cooling tower is an important heat dissipation component in the cold station system. The number of cooling towers directly affects the heat dissipation efficiency. Through a comprehensive analysis of the predicted cold capacity, indoor wet bulb temperature and the current outdoor temperature after analysis, the most economical and effective cooling tower configuration is determined to obtain the predicted number of cooling towers for the cold station equipment to meet the current and expected cold load requirements. The cooling tower quantity prediction model comprehensively considers the impact of environmental conditions on the cooling effect to ensure that the system can effectively dissipate heat under different environments. The predicted number of cooling towers and the processed feature data of the current operating status are input into the supply cooling capacity prediction model. Based on the predicted number of cooling towers and the current operating status of the cooling station equipment, the cooling capacity that the cooling station equipment can actually supply is predicted, that is, the second candidate cooling capacity of the cooling station equipment. This can provide basic data for subsequent cooling capacity correction and target setting temperature and the target number of cooling towers of the cooling station equipment, ensuring that the predicted cooling capacity matches the actual cooling capacity supplied. If the difference between the second candidate cooling capacity of the cooling station equipment and the candidate cooling capacity is within the preset range, the target operating status data of the cooling station equipment is generated based on the candidate cooling capacity, the predicted setting temperature and the predicted number of cooling towers; if the difference between the second candidate cooling capacity of the cooling station equipment and the candidate cooling capacity exceeds the preset range, the candidate cooling capacity is corrected based on the second candidate cooling capacity until the difference between the corrected second candidate cooling capacity and the predicted cooling capacity is within the preset range, and the target cooling capacity of the indoor environment, the target setting temperature of the cooling station equipment, and the target number of cooling towers of the cooling station equipment are obtained. Based on the target cooling capacity, target set temperature and target number of cooling towers, a relationship table of the number of units started, frequency and cooling capacity is constructed, and the optimal startup strategy, i.e. the target operating status data of the cooling station equipment, is generated using optimization algorithms or rule engines to achieve maximum energy saving while meeting the demand. The target operating status data obtained can directly guide the regulation of the cooling station equipment to achieve efficient and stable cooling effects. Predicting and optimizing the operating parameters of the cooling station equipment through the prediction model can help the cooling station equipment to operate in the optimal state, meet the needs of the indoor environment, and reduce energy consumption and improve the operating efficiency of the equipment.

[0051] Figure 4 is a flow chart of another indoor temperature control method provided by the embodiment of the present disclosure. In some embodiments, reference Figure 4 Step 305, i.e., generating target operating status data of the cold station equipment based on the target cooling capacity, the target set temperature and the target number of cooling towers, may specifically include: steps 401 to 404.

[0052] Step 401, generating a plurality of first candidate operating state data of cooling station equipment that meets the target cooling capacity based on the target cooling capacity, the target set temperature and the target number of cooling towers;

[0053] Step 402, screening the plurality of first candidate running status data based on a preset rule to obtain a plurality of second candidate running status data;

[0054] Step 403, based on each second candidate operating state data, obtaining energy consumption corresponding to each second candidate operating state data;

[0055] Step 404: determine target operating state data from each second candidate operating state data based on each energy consumption.

[0056] In some embodiments, according to the three core indicators of target cooling capacity, target set temperature and target number of cooling towers, multiple possible operation configuration schemes are generated, i.e., multiple first candidate operation state data, each of which takes into account different equipment combinations and operation parameters (such as the number of cooling towers, the number of cooling pumps, etc.) to meet the established cooling capacity demand and environmental adjustment target. Multiple first candidate operation state data can provide a broad option basis for subsequent screening to ensure that all configurations that may reach the target cooling capacity and set temperature are covered. Based on the preset rules, multiple first candidate operation state data can be screened, and the first candidate operation state data that are not feasible or have low economic benefits can be eliminated to obtain multiple second candidate operation state data. The preset rules can be cold station equipment operation restriction conditions, safety thresholds, economic principles, etc. For each second candidate operation state that passes the screening, the energy consumption corresponding to each second candidate operation state data is calculated, and based on the calculated energy consumption, the second candidate operation state with the lowest energy consumption or the highest energy efficiency ratio is selected as the final target operation state. In addition, the state that meets other optimization conditions (such as the lowest cost, the shortest operating time, etc.) can also be selected as the target operation state data. Through screening and optimization, the cold station equipment can operate in an energy-saving manner while meeting the cooling demand and environmental regulation. At the same time, the stability and efficiency of the cold station equipment can be considered to avoid frequent switching and excessive adjustment that may lead to increased energy consumption or equipment damage.

[0057] Figure 5 A flow chart of another indoor temperature control method provided in the embodiment of the present disclosure. In some embodiments, reference is made to Figure 5Step 103, that is, before inputting the processed characteristic data of the current indoor and outdoor environment into the trained target cooling capacity prediction model, it can also include steps 501 to 506.

[0058] Step 501, obtaining historical indoor environment characteristic data and historical operation status characteristic data of the refrigeration station equipment, the historical operation status characteristic data including historical chilled water supply temperature, historical chilled water return temperature, historical chilled water supply flow, and historical chilled water return flow;

[0059] Step 502, pre-processing the historical indoor and outdoor environment characteristic data to obtain the processed historical indoor and outdoor environment characteristic data;

[0060] Step 503, determining the corresponding historical cooling capacity based on the historical chilled water supply temperature, the historical chilled water return temperature, the historical chilled water supply flow rate and the historical chilled water return flow rate;

[0061] Step 504, using the processed feature data of the historical indoor and outdoor environment as training samples and the historical cooling capacity as labels of the training samples to construct a cooling capacity prediction training set;

[0062] Step 505, inputting the cooling capacity prediction training set into a plurality of candidate cooling capacity prediction models to be trained respectively, and training each candidate cooling capacity prediction model to be trained based on the cooling capacity prediction training set to obtain a plurality of candidate cooling capacity prediction models;

[0063] Step 506: Select a target cooling capacity prediction model from a plurality of candidate cooling capacity prediction models.

[0064] In some embodiments, the historical indoor environment characteristic data may include historical time, historical indoor temperature, historical indoor humidity, historical outdoor temperature, historical outdoor humidity, historical flow of people, historical wind speed, historical weather, etc., and the historical operating state characteristic data may include historical chilled water supply temperature, historical chilled water return temperature, historical chilled water supply flow, and historical chilled water return flow. The historical indoor and outdoor environment characteristic data are preprocessed, and the preprocessing may include cleaning, screening, conversion, and standardization to eliminate noise, missing values, and inconsistency, improve data quality, obtain historical indoor and outdoor environment processed characteristic data, and make the historical indoor and outdoor environment processed characteristic data suitable for subsequent data analysis and model training. By analyzing the historical chilled water supply temperature, historical chilled water return temperature, historical chilled water supply flow, and historical chilled water return flow, combined with thermodynamic principles and calculation formulas, the corresponding historical cooling capacity is calculated. If the calculated historical cooling capacity contains negative values, the negative values ​​are truncated to zero to ensure the rationality and accuracy of the cooling capacity data. The preprocessed historical indoor and outdoor environmental characteristic data are used as training samples, and the corresponding historical cooling capacity is used as the label of the training sample to construct a cooling capacity prediction training set, which will be used for subsequent model training. Use different algorithms (such as linear regression, decision tree, random forest, support vector machine, etc.) to construct multiple candidate cooling capacity prediction models to be trained, and train them with the cooling capacity prediction training set to obtain multiple candidate cooling capacity prediction models, verify the performance of different algorithms on the cooling capacity prediction training set, and screen out the target cooling capacity prediction model that is most suitable for predicting cooling capacity. The cross-validation, mean square error, and determination coefficient R can be used to determine the cooling capacity prediction model. 2 The prediction performance of each candidate cooling prediction model is compared by using evaluation indicators such as , and the target cooling prediction model with the best prediction performance is selected. The obtained target cooling prediction model has the best cooling prediction ability, can accurately predict future cooling demand, and provide a reliable basis for intelligent scheduling and energy-saving control of cooling station equipment. In addition, the training of the cooling prediction model can be deployed to the cloud server to realize centralized model training and optimization across projects, and use the massive data and computing power resources in the cloud to further improve the accuracy and generalization ability of the cooling prediction model.

[0065] In some embodiments, after controlling the cold station equipment, it also includes: collecting real-time indoor and outdoor environmental characteristic data and real-time operating status characteristic data of the cold station equipment; updating the parameters of the target cooling capacity prediction model according to the real-time indoor and outdoor environmental characteristic data and the real-time operating status characteristic data.

[0066] In some embodiments, actual indoor and outdoor real-time environmental characteristic data and real-time operating status characteristic data of cold station equipment are continuously collected, and the collected indoor and outdoor real-time environmental characteristic data and real-time operating status characteristic data of cold station equipment are fed back to the target cooling capacity prediction model for parameter updating and optimization of the target cooling capacity prediction model. Based on the feedback data, the target cooling capacity prediction model is updated and adjusted to improve the accuracy and prediction ability of the target cooling capacity prediction model. Based on the updated target cooling capacity prediction model, the generated control strategy is adjusted to adapt to the current environmental changes and energy consumption requirements. By continuously collecting indoor and outdoor real-time environmental characteristic data and real-time operating status characteristic data of cold station equipment and feeding them back to the target cooling capacity prediction model, the target cooling capacity prediction model can be adjusted and optimized in a timely manner, thereby improving the accuracy and stability of prediction and control, helping the cold station equipment system to continuously adapt to changes in the indoor environment, and realizing intelligent management and optimization of cold station equipment.

[0067] In some embodiments, in addition to automatically adjusting the operating parameters of the cooling station equipment, it can also be extended to the intelligent coordinated control of other indoor equipment, such as lighting equipment, ventilation equipment, etc. The linkage control of various indoor subsystems can further improve the overall energy efficiency.

[0068] All the above optional technical solutions can be arbitrarily combined to form optional embodiments of the present disclosure, and will not be described in detail here.

[0069] The following are embodiments of the device disclosed herein, which can be used to execute the method embodiments disclosed herein. For details not disclosed in the device embodiments disclosed herein, please refer to the method embodiments disclosed herein.

[0070] Figure 6 Schematic diagram of an indoor temperature control device provided by an embodiment of the present disclosure. Figure 4 As shown, the indoor temperature control device comprises:

[0071] The data acquisition module 601 is used to acquire the current indoor and outdoor environment characteristic data and the current operation status characteristic data of the cold station equipment;

[0072] The preprocessing module 602 is used to preprocess the current indoor and outdoor environment characteristic data to obtain the processed characteristic data of the current indoor and outdoor environment, and to preprocess the current operating state characteristic data to obtain the processed characteristic data of the current operating state;

[0073] The cooling capacity prediction module 603 is used to input the processed characteristic data of the current indoor and outdoor environment into the trained target cooling capacity prediction model, and process the processed characteristic data of the current indoor and outdoor environment based on the target cooling capacity prediction model to obtain the candidate cooling capacity of the room in the next time period;

[0074] The target operation state data generating module 604 is used to predict the operation parameters of the cooling station equipment based on the candidate cooling capacity, the processed characteristic data of the current indoor and outdoor environment, and the processed characteristic data of the current operation state, and generate the target operation state data of the cooling station equipment;

[0075] The execution module 605 is used to control the cooling station equipment according to the target operation status data so as to control the temperature of the indoor environment.

[0076] According to the technical solution provided by the embodiment of the present disclosure, by obtaining the current indoor and outdoor environmental characteristic data and the current operating state characteristic data of the cooling station equipment, a basis is provided for subsequent data analysis and model prediction. By continuously monitoring and recording the current indoor and outdoor environmental characteristic data and the current operating state characteristic data of the cooling station equipment, the indoor environmental changes and the operating state of the cooling station equipment can be more accurately understood, and reliable data support is provided for the intelligent control of the cooling station system. The current indoor and outdoor environmental characteristic data are preprocessed to obtain the processed characteristic data of the current indoor and outdoor environment, and the current operating state characteristic data are preprocessed to obtain the processed characteristic data of the current operating state. The collected raw data are preprocessed to remove abnormal values ​​and convert the data format to make the data suitable for the target cooling prediction model to understand. The preprocessed indoor and outdoor environmental processed characteristic data and the processed operating state characteristic data can more accurately reflect the actual situation, and provide reliable input data for the subsequent target cooling prediction model, thereby improving the accuracy and generalization ability of the target cooling prediction model. Based on the trained target cooling prediction model, the processed characteristic data of the current indoor and outdoor environment are input to predict the cooling required indoors in the next time period, and basic data is provided for the generation of the target operating state data. The operating parameters of the cooling station equipment are predicted by combining the candidate cooling capacity, the characteristic data after the current indoor and outdoor environment processing, and the characteristic data after the current operating status processing to meet the expected cooling capacity demand, which helps the cooling station equipment to operate in the optimal state, both to meet the temperature control requirements and to reduce energy consumption as much as possible, and to generate the target operating status data of the cooling station equipment. The generated target operating status data is applied to the actual cooling station equipment control, and through the refined control of the cooling station equipment, the effective management of the indoor temperature is achieved, and the problem of inaccurate indoor temperature control in the prior art is solved, which helps to maintain the indoor temperature within the set comfortable range at all times, and the cooling station equipment is refined to improve the accuracy and efficiency of temperature control, and reduce energy consumption and operating costs.

[0077] In some embodiments, the current indoor and outdoor environment characteristic data include the current time, the current indoor temperature, the current indoor humidity, the current outdoor temperature, the current outdoor humidity, the current indoor and outdoor category characteristic data, and the current indoor and outdoor tilt characteristic data. The preprocessing module 602 is configured to construct a time feature based on the current time; perform exploratory data analysis on the current indoor temperature, the current indoor humidity, the current outdoor temperature, and the current outdoor humidity, respectively, to obtain the current indoor temperature after analysis, the current indoor humidity after analysis, the current outdoor temperature after analysis, and the current outdoor humidity after analysis; determine the current indoor temperature after analysis and the current indoor humidity after analysis based on the current indoor temperature after analysis and the current indoor humidity after analysis. Determine the corresponding indoor wet-bulb temperature; determine the corresponding indoor and outdoor temperature difference based on the current indoor temperature after analysis and the current outdoor temperature after analysis; normalize the current indoor and outdoor tilt feature data to obtain the current indoor and outdoor normalized feature data; encode the current indoor and outdoor category feature data to obtain the current indoor and outdoor category feature vector; determine the time feature, the current indoor temperature after analysis, the current indoor humidity after analysis, the current outdoor temperature after analysis, the current outdoor humidity after analysis, the indoor wet-bulb temperature, the indoor and outdoor temperature difference, the current indoor and outdoor normalized feature data and the current indoor and outdoor category feature vector as the processed feature data of the current indoor and outdoor environment.

[0078] In some embodiments, the current operating status characteristic data includes the chilled water supply temperature and the chilled water return temperature. The preprocessing module 602 is configured to determine the corresponding chilled water temperature difference based on the chilled water supply temperature and the chilled water return temperature; and determine the chilled water temperature difference as the processed characteristic data of the current operating status.

[0079] In some embodiments, the target operating status data generation module 604 is configured to input the indoor and outdoor temperature difference and the chilled water temperature difference into a temperature prediction model, process the indoor and outdoor temperature difference and the chilled water temperature difference based on the temperature prediction model, and obtain the predicted set temperature of the cold station equipment; input the predicted cooling capacity, indoor wet-bulb temperature and the current outdoor temperature after analysis into a cooling tower quantity prediction model, process the predicted cooling capacity, indoor wet-bulb temperature and the current outdoor temperature after analysis based on the cooling tower quantity prediction model, and obtain the predicted number of cooling towers for the cold station equipment; input the predicted number of cooling towers and the processed feature data of the current operating status into the supply cooling capacity prediction model, process the predicted number of cooling towers and the processed feature data of the current operating status, and obtain the second candidate cooling capacity of the cold station equipment; correct the candidate cooling capacity based on the second candidate cooling capacity to obtain the target cooling capacity of the indoor environment, and obtain the target set temperature of the cold station equipment and the target number of cooling towers for the cold station equipment; generate the target operating status data of the cold station equipment based on the target cooling capacity, the target set temperature and the target number of cooling towers.

[0080] In some embodiments, the target operating status data generation module 604 is configured to generate multiple first candidate operating status data for cold station equipment that meets the target cooling capacity based on the target cooling capacity, the target set temperature and the target number of cooling towers; filter the multiple first candidate operating status data based on preset rules to obtain multiple second candidate operating status data; obtain the energy consumption corresponding to each second candidate operating status data based on each second candidate operating status data; and determine the target operating status data from each second candidate operating status data based on each energy consumption.

[0081] In some embodiments, before inputting the processed characteristic data of the current indoor and outdoor environment into the trained target cooling capacity prediction model, the indoor temperature control device is configured to obtain historical indoor environmental characteristic data and historical operating status characteristic data of the cold station equipment, the historical operating status characteristic data including historical chilled water supply temperature, historical chilled water return temperature, historical chilled water supply flow, and historical chilled water return flow; preprocessing the historical indoor and outdoor environmental characteristic data to obtain the processed characteristic data of the historical indoor and outdoor environment; determining the corresponding historical cooling capacity based on the historical chilled water supply temperature, historical chilled water return temperature, historical chilled water supply flow, and historical chilled water return flow; constructing a cooling capacity prediction training set using the processed characteristic data of the historical indoor and outdoor environment as training samples and the historical cooling capacity as labels of the training samples; inputting the cooling capacity prediction training set into multiple candidate cooling capacity prediction models to be trained respectively, training each candidate cooling capacity prediction model to be trained based on the cooling capacity prediction training set to obtain multiple candidate cooling capacity prediction models; and selecting a target cooling capacity prediction model from the multiple candidate cooling capacity prediction models.

[0082] In some embodiments, after controlling the cooling station equipment, the indoor temperature control device is configured to collect real-time indoor and outdoor environmental characteristic data and real-time operating status characteristic data of the cooling station equipment; and update the parameters of the target cooling capacity prediction model according to the real-time indoor and outdoor environmental characteristic data and the real-time operating status characteristic data.

[0083] It should be understood that the size of the serial numbers of the steps in the above embodiments does not mean the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of the present disclosure.

[0084] Figure 7 Schematic diagram of an electronic device 7 provided by an embodiment of the present disclosure. Figure 7As shown, the electronic device 7 of this embodiment includes: a processor 701, a memory 702, and a computer program 703 stored in the memory 702 and executable on the processor 701. When the processor 701 executes the computer program 703, the steps in the above-mentioned method embodiments are implemented. Alternatively, when the processor 701 executes the computer program 703, the functions of the modules / units in the above-mentioned device embodiments are implemented.

[0085] The electronic device 7 may be a desktop computer, a notebook, a PDA, a cloud server, or other electronic device. The electronic device 7 may include, but is not limited to, a processor 701 and a memory 702. Those skilled in the art will appreciate that Figure 7 The electronic device 7 is merely an example and does not limit the electronic device 7 , and may include more or less components than those shown in the figure, or different components.

[0086] The processor 701 may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA), or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc.

[0087] The memory 702 may be an internal storage unit of the electronic device 7, for example, a hard disk or memory of the electronic device 7. The memory 702 may also be an external storage device of the electronic device 7, for example, a plug-in hard disk, a smart media card (SMC), a secure digital (SD) card, a flash card, etc. equipped on the electronic device 7. The memory 702 may also include both an internal storage unit of the electronic device 7 and an external storage device. The memory 702 is used to store computer programs and other programs and data required by the electronic device.

[0088] Those skilled in the art can clearly understand that for the convenience and simplicity of description, only the division of the above-mentioned functional units and modules is used as an example. In actual applications, the above-mentioned functions can be assigned to different functional units and modules as needed, that is, the internal structure of the device can be divided into different functional units or modules to complete all or part of the functions described above. The functional units and modules in the embodiments can be integrated into one processing unit, or each unit can exist physically separately, or two or more units can be integrated into one unit. The above-mentioned integrated unit can be implemented in the form of hardware or in the form of software functional units.

[0089] If the integrated module / unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a readable storage medium (e.g., a computer-readable storage medium). Based on this understanding, the present disclosure implements all or part of the processes in the above-mentioned embodiment method, and can also be completed by instructing the relevant hardware through a computer program. The computer program can be stored in a computer-readable storage medium, and the computer program can implement the steps of the above-mentioned various method embodiments when executed by the processor. The computer program may include computer program code, and the computer program code may be in source code form, object code form, executable file or some intermediate form, etc. The computer-readable storage medium may include: any entity or device capable of carrying computer program code, recording medium, U disk, mobile hard disk, magnetic disk, optical disk, computer memory, read-only memory (ROM), random access memory (RAM), electric carrier signal, telecommunication signal and software distribution medium, etc.

[0090] The above embodiments are only used to illustrate the technical solutions of the present disclosure, rather than to limit them. Although the present disclosure has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. These modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present disclosure, and should all be included in the protection scope of the present disclosure.

Claims

1. A method for controlling indoor temperature, characterized in that: include: Obtain current indoor and outdoor environmental characteristic data and current operating status characteristic data of the cold station equipment; Preprocessing the current indoor and outdoor environment characteristic data to obtain processed characteristic data of the current indoor and outdoor environment, and preprocessing the current operating state characteristic data to obtain processed characteristic data of the current operating state; Inputting the processed characteristic data of the current indoor and outdoor environment into the trained target cooling capacity prediction model, processing the processed characteristic data of the current indoor and outdoor environment based on the target cooling capacity prediction model to obtain candidate cooling capacity for the next time period; Predicting the operating parameters of the refrigeration station equipment based on the candidate cooling capacity, the processed characteristic data of the current indoor and outdoor environment, and the processed characteristic data of the current operating state, and generating target operating state data of the refrigeration station equipment; The cold station equipment is controlled according to the target operating status data so as to control the temperature of the indoor environment.

2. The method according to claim 1, characterized in that The current indoor and outdoor environment characteristic data includes the current time, the current indoor temperature, the current indoor humidity, the current outdoor temperature, the current outdoor humidity, the current indoor and outdoor category characteristic data, and the current indoor and outdoor tilt characteristic data. The preprocessing of the current indoor and outdoor environment characteristic data to obtain the processed characteristic data of the current indoor and outdoor environment includes: Based on the current time, construct a time feature; Performing exploratory data analysis on the current indoor temperature, the current indoor humidity, the current outdoor temperature, and the current outdoor humidity, respectively, to obtain the analyzed current indoor temperature, the analyzed current indoor humidity, the analyzed current outdoor temperature, and the analyzed current outdoor humidity; Determining a corresponding indoor wet-bulb temperature based on the current indoor temperature after the analysis and the current indoor humidity after the analysis; Determining a corresponding indoor and outdoor temperature difference based on the analyzed current indoor temperature and the analyzed current outdoor temperature; Normalizing the current indoor and outdoor tilt feature data to obtain current indoor and outdoor normalized feature data; Encoding the current indoor and outdoor category feature data to obtain a current indoor and outdoor category feature vector; The time feature, the current indoor temperature after analysis, the current indoor humidity after analysis, the current outdoor temperature after analysis, the current outdoor humidity after analysis, the indoor wet-bulb temperature, the indoor and outdoor temperature difference, the current indoor and outdoor normalized feature data and the current indoor and outdoor category feature vector are determined as the processed feature data of the current indoor and outdoor environment.

3. The method according to claim 2, characterized in that The current operating state characteristic data includes a chilled water supply temperature and a chilled water return temperature. The preprocessing of the current operating state characteristic data to obtain the processed characteristic data of the current operating state includes: Determining a corresponding chilled water temperature difference based on the chilled water supply temperature and the chilled water return temperature; The chilled water temperature difference is determined as the processed characteristic data of the current operating state.

4. The method according to claim 3, characterized in that The predicting the operating parameters of the refrigeration station equipment based on the candidate cooling capacity, the processed characteristic data of the current indoor and outdoor environment, and the processed characteristic data of the current operating state, and generating the target operating state data of the refrigeration station equipment includes: Inputting the indoor and outdoor temperature difference and the chilled water temperature difference into the temperature prediction model, processing the indoor and outdoor temperature difference and the chilled water temperature difference based on the temperature prediction model, and obtaining the predicted set temperature of the cold station equipment; Inputting the predicted cooling capacity, the indoor wet-bulb temperature and the current outdoor temperature after analysis into a cooling tower quantity prediction model, processing the predicted cooling capacity, the indoor wet-bulb temperature and the current outdoor temperature after analysis based on the cooling tower quantity prediction model, and obtaining a predicted number of cooling towers for the cold station equipment; Inputting the predicted number of cooling towers and the processed characteristic data of the current operating state into a supply cooling capacity prediction model, processing the predicted number of cooling towers and the processed characteristic data of the current operating state to obtain a second candidate cooling capacity of the cooling station equipment; The candidate cooling capacity is corrected based on the second candidate cooling capacity to obtain the target cooling capacity of the indoor environment, and the target setting temperature of the cooling station equipment and the target number of cooling towers of the cooling station equipment are obtained; The target operating state data of the cooling station equipment is generated based on the target cooling capacity, the target set temperature and the target number of cooling towers.

5. The method according to claim 4, characterized in that The generating the target operating status data of the cold station equipment based on the target cooling capacity, the target set temperature and the target number of cooling towers includes: Generate a plurality of first candidate operating state data of the cooling station equipment that meets the target cooling capacity based on the target cooling capacity, the target set temperature and the target number of cooling towers; Filtering the plurality of first candidate running status data based on a preset rule to obtain a plurality of second candidate running status data; Based on each of the second candidate operating state data, obtaining energy consumption corresponding to each of the second candidate operating state data; Based on the respective energy consumptions, the target operating state data is determined from the respective second candidate operating state data.

6. The method according to claim 1, characterized in that Before inputting the processed characteristic data of the current indoor and outdoor environment into the trained target cooling capacity prediction model, the method further includes: Acquire historical indoor environment characteristic data and historical operation status characteristic data of the refrigeration station equipment, wherein the historical operation status characteristic data includes historical chilled water supply temperature, historical chilled water return temperature, historical chilled water supply flow rate, and historical chilled water return flow rate; Preprocessing the historical indoor and outdoor environment characteristic data to obtain processed historical indoor and outdoor environment characteristic data; Determine the corresponding historical cooling capacity based on the historical chilled water supply temperature, the historical chilled water return temperature, the historical chilled water supply flow rate and the historical chilled water return flow rate; Using the processed feature data of the historical indoor and outdoor environment as training samples and the historical cooling capacity as labels of the training samples, a cooling capacity prediction training set is constructed; Inputting the cooling capacity prediction training set into a plurality of candidate cooling capacity prediction models to be trained respectively, and training each candidate cooling capacity prediction model to be trained based on the cooling capacity prediction training set to obtain a plurality of candidate cooling capacity prediction models; A target cooling capacity prediction model is selected from the plurality of candidate cooling capacity prediction models.

7. The method according to claim 1, characterized in that After controlling the cold station equipment, the method further includes: Collecting real-time indoor and outdoor environmental characteristic data and real-time operating status characteristic data of the cold station equipment; The parameters of the target cooling capacity prediction model are updated according to the real-time indoor and outdoor environmental characteristic data and the real-time operating status characteristic data.

8. An indoor temperature control device, characterized in that: include: A data acquisition module is used to acquire the current indoor and outdoor environmental characteristic data and the current operating status characteristic data of the refrigeration station equipment; A preprocessing module, used to preprocess the current indoor and outdoor environment characteristic data to obtain the processed characteristic data of the current indoor and outdoor environment, and to preprocess the current operating state characteristic data to obtain the processed characteristic data of the current operating state; A cooling capacity prediction module is used to input the processed characteristic data of the current indoor and outdoor environment into a trained target cooling capacity prediction model, and process the processed characteristic data of the current indoor and outdoor environment based on the target cooling capacity prediction model to obtain candidate cooling capacity in the room for the next time period; a target operation status data generating module, configured to predict the operation parameters of the refrigeration station equipment based on the candidate cooling capacity, the processed characteristic data of the current indoor and outdoor environment, and the processed characteristic data of the current operation status, and generate the target operation status data of the refrigeration station equipment; An execution module is used to control the cold station equipment according to the target operating status data so as to control the temperature of the indoor environment.

9. An electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the computer program, the steps of the method according to any one of claims 1 to 7 are implemented.

10. A readable storage medium storing a computer program, characterized in that: When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 7 are implemented.

Citation Information

Patent Citations

  • Cold station startup control method and device

    CN114279075A

  • Central air-conditioning refrigeration station operation optimization method and system based on operation big data

    CN114543303A

  • Cold machine operation strategy determination method and device, electronic equipment and storage medium

    CN115127197A

  • Cold station temperature control method and device, electronic equipment and readable storage medium

    CN118442676A

  • A system for controlling chilled water plant

    WO2023193045A1

Cited By

  • Cold station operation control method, device, equipment and medium

    CN120332887A

  • Control method, system, device and equipment of cold water air conditioner and medium

    CN120760298A

  • Control method, system, device and equipment of water chiller and medium

    CN120760298B