Sewage treatment intelligent control system based on feedforward algorithm and feedback control
Through an intelligent control system based on feedforward algorithm and feedback control, the problem of traditional sewage treatment methods relying on manual operations is solved, precise control and efficient treatment of sewage treatment are achieved, and treatment efficiency and quality are improved.
Patent Information
- Application Number
- CN202411462911.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-19
- Publication Date
- 2024-11-22
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Traditional sewage treatment methods rely on manual operation and empirical judgment, resulting in unstable treatment effects and low efficiency. The model generalization capabilities of intelligent equipment are limited, making it difficult to achieve precise control and efficient treatment.
Using a sewage treatment intelligent control system based on feedforward algorithm and feedback control, the sewage treatment response index is calculated through the sewage treatment time division module, data acquisition module, feedforward algorithm establishment module, feedback control execution module, intelligent analysis module and intelligent evaluation module. and capability index, realize scientific data analysis decision-making, improve model accuracy and generalization capabilities, and realize global optimization control throughout the process.
The efficiency and quality of sewage treatment have been improved. Through automated and intelligent management, problems have been discovered and measures have been taken in advance to avoid the expansion of problems, and precise control and efficient treatment have been achieved.
Smart Images

Figure CN119002285A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of intelligent control of sewage treatment, and more specifically, to an intelligent control system for sewage treatment based on feedforward algorithm and feedback control. Background Art
[0002] Wastewater treatment is a key component of urban environmental protection and sustainable development. With the acceleration of urbanization and the expansion of industrial development, comprehensive monitoring and intelligent optimization of the sewage treatment process can be achieved through data collection, transmission and analysis, which helps to improve the operating efficiency and treatment effect of sewage treatment plants.
[0003] As a predictive control technology, the feedforward algorithm can establish an accurate mathematical model based on historical data and real-time data to predict and optimize the sewage treatment process. Feedback control can ensure that the treatment process is always stable and meets the standards, avoiding the decline in treatment effect due to parameter fluctuations.
[0004] However, there are still some shortcomings in its actual use. For example, traditional sewage treatment methods often rely on manual operation and experience judgment. This method has problems such as unstable treatment effect and low efficiency, and it is difficult to achieve precise control and efficient treatment.
[0005] With the continuous advancement of science and technology, more and more intelligent equipment is being used in sewage treatment. In the scenario of centralized integrated operation and control of plant sites, the generalization ability of the model of performance and stability of intelligent equipment is limited, resulting in the inability to accurately predict and make decisions. Summary of the invention
[0006] In order to overcome the above-mentioned defects of the prior art, an embodiment of the present invention provides a sewage treatment intelligent control system based on a feedforward algorithm and feedback control, which is used to solve the problems raised in the above-mentioned background technology.
[0007] To achieve the above object, the present invention provides the following technical solution: an intelligent sewage treatment control system based on feedforward algorithm and feedback control, comprising: Sewage treatment time division module: used to divide the sewage treatment time of the target integrated operation and control sewage plant into various monitoring sub-areas according to the equal time division method, and number each monitoring sub-area of the target integrated operation and control sewage plant.
[0008] Sewage treatment data collection module: used to collect sewage treatment information of each monitoring sub-area of the target integrated operation and control sewage plant. The sewage treatment data collection module includes a sewage status index collection unit and a treatment effect index collection unit. The sewage treatment information includes sewage status data indicators and treatment effect data indicators.
[0009] Sewage treatment feedforward algorithm establishment module: used to receive the sewage treatment information transmitted by the sewage treatment data acquisition module, calculate the sewage treatment response index of each monitoring sub-area of the target integrated operation and control sewage plant according to the sewage condition index collection unit, and calculate the sewage treatment capacity index of each monitoring sub-area of the target integrated operation and control sewage plant according to the treatment effect index collection unit.
[0010] Sewage treatment feedback control execution module: used to receive the historical sewage treatment response index and sewage treatment capacity index of each monitoring sub-area of the target integrated operation and control sewage plant transmitted by the sewage treatment feedforward algorithm establishment module. The sewage treatment feedback control execution module includes a sewage response output control unit and a sewage treatment capacity feedback output unit.
[0011] Sewage treatment intelligent analysis module: used to receive the target integrated operation and control sewage plant The sewage treatment response output index and sewage treatment feedback output index of +1 monitoring sub-area are used to calculate the sewage control stability assessment coefficient of the target integrated operation and control sewage plant.
[0012] Sewage treatment intelligent assessment module: used to obtain the sewage control stability assessment coefficient of the target integrated operation and control sewage plant, compare it with the preset sewage control stability assessment coefficient, and process it.
[0013] Preferably, the specific division method of the sewage treatment time division module is: The sewage treatment time of the target integrated operation and control sewage plant is divided into various monitoring sub-areas according to the equal time division method, and the monitoring sub-areas of the target integrated operation and control sewage plant are numbered 1, 2...n in sequence.
[0014] Preferably, the specific collection method of the sewage treatment data collection module is: Sewage status index collection unit: collects the sewage inflow, sludge concentration, and pollutant removal rate of each monitoring sub-area of the target integrated operation and control sewage plant, and marks them as , , ,in =1, 2, ... n, Expressed as The number of the monitoring sub-area; Treatment effect index collection unit: collects the reaction efficiency index, sludge treatment effect index, and dosage index of each monitoring sub-area of the target integrated operation and control sewage plant, and marks them as , , ,in =1, 2, ... n, Expressed as The number of the monitoring sub-area.
[0015] Preferably, the calculation formula of the sewage treatment response index is: ,in Expressed as The sewage treatment response index of each monitoring sub-area, Expressed as Pollutant removal rate in each monitoring sub-area, Expressed as the preset pollutant removal rate, Expressed as The sludge concentration in each monitoring sub-area is Expressed as The sewage inflow volume of each monitoring sub-area.
[0016] Preferably, the specific steps for establishing the sewage treatment capacity index are: Step S01: The calculation formula of the reaction efficiency index is: ,in Expressed as The response efficiency index of each monitoring sub-area, Expressed as The sewage reaction stirring speed in each monitoring sub-area, Expressed as The sewage treatment time of each monitoring sub-area, Expressed as The sewage reaction temperature in each monitoring sub-area, It is expressed as the mean temperature of sewage reaction; Step S02: The calculation formula of the sludge treatment effect index is: ,in Expressed as The sludge treatment effect index of each monitoring sub-area is: Expressed as The sludge settling ratio of each monitoring sub-area, Expressed as The sludge production in each monitoring sub-area, Expressed as pH value of each monitoring sub-area, Expressed as a preset pH value, Expressed as a natural constant; Step S03: The calculation formula of the drug dosage index is: ,in Expressed as The drug dosage index of each monitoring sub-area, Expressed as The conductivity of each monitoring sub-area, Expressed as The amount of sewage chemicals added in each monitoring sub-area, Expressed as Solid content of sewage in each monitoring sub-area; Step S04: The calculation formula of the sewage treatment capacity index is: ,in Expressed as The sewage treatment capacity index of each monitoring sub-area, Expressed as The response efficiency index of each monitoring sub-area, Expressed as The sludge treatment effect index of each monitoring sub-area is: Expressed as The drug dosage index of each monitoring sub-area, , , They are respectively expressed as the weight factors of reaction efficiency index, sludge treatment effect index and drug dosage index.
[0017] Preferably, the sewage response output control unit is specifically: Step S01: Obtain the historical sewage treatment response index of each monitoring sub-area of the target integrated operation and control sewage plant, and obtain the target integrated operation and control sewage plant's first +1 sewage treatment response output index of the monitoring sub-area; Step S02: The calculation formula for analyzing the sewage treatment response output index is: ,in Expressed as +1 sewage treatment response output index of the monitoring sub-area, Expressed as The sewage treatment response index of each monitoring sub-area, Expressed as -1 sewage treatment response index of the monitoring sub-area, It is expressed as the mean of sewage treatment response index; Step S03: Obtain the sewage treatment response output index of the target integrated operation and control sewage plant, and compare it with the preset sewage treatment response output index. If the sewage treatment response output index of the target integrated operation and control sewage plant is greater than the preset sewage treatment response output index, it indicates that the sewage water quality control trend of the integrated operation and control sewage plant has not met expectations, and the management personnel should be notified immediately for effective supervision. Otherwise, it indicates that the sewage treatment water quality control trend of the integrated operation and control sewage plant is stable.
[0018] Preferably, the sewage treatment capacity feedback output unit is specifically: Step S01: Obtain the historical sewage treatment capacity index of each monitoring sub-area of the target integrated operation and control sewage plant, and obtain the target integrated operation and control sewage plant's first +1 sewage treatment feedback output index of the monitoring sub-area; Step S02: Analyze the calculation formula of the sewage treatment feedback output index: ,in Expressed as +1 sewage treatment feedback output index of the monitoring sub-area, Expressed as The sewage treatment capacity index of each monitoring sub-area, Expressed as -1 monitoring sub-area sewage treatment capacity index, It is expressed as the mean value of sewage treatment capacity index; Step S03: Obtain the sewage treatment feedback output index of the target integrated operation and control sewage plant, and compare it with the preset sewage treatment feedback output index. If the sewage treatment feedback output index of the target integrated operation and control sewage plant is less than the preset sewage treatment feedback output index, it indicates that the sewage treatment effect of the integrated operation and control sewage plant has not met expectations, and the management personnel should be notified immediately to adjust and optimize the sewage treatment process. Otherwise, it indicates that the sewage treatment effect of the integrated operation and control sewage plant meets the standards.
[0019] Preferably, the calculation formula of the sewage control stability evaluation coefficient is: ,in Expressed as the sewage control stability assessment coefficient, Expressed as +1 sewage treatment response output index of the monitoring sub-area, Expressed as +1 sewage treatment feedback output index of the monitoring sub-area.
[0020] Preferably, the specific evaluation method of the sewage treatment intelligent evaluation module is: Obtain the sewage control stability assessment coefficient of the target integrated operation and control sewage treatment plant, and compare it with the preset sewage control stability assessment coefficient. If the sewage control stability assessment coefficient of the integrated operation and control sewage treatment plant is less than the preset sewage control stability assessment coefficient, it indicates that there is an abnormality in the intelligent management and control mode of sewage by the integrated operation and control sewage treatment plant, and the abnormal information should be fed back to the sewage treatment intelligent management terminal. Otherwise, it indicates that there is no abnormality in the intelligent management and control mode of sewage by the integrated operation and control sewage treatment plant.
[0021] Technical effects and advantages of the present invention: 1. The present invention provides an intelligent sewage treatment control system based on a feedforward algorithm and feedback control. By collecting sewage treatment information of each monitoring sub-area of a target integrated operation and control sewage plant, the sewage treatment response index of each monitoring sub-area of the target integrated operation and control sewage plant is calculated according to a sewage condition index collection unit, and the sewage treatment capacity index of each monitoring sub-area of the target integrated operation and control sewage plant is calculated according to a treatment effect index collection unit. This realizes scientific data analysis and decision-making to improve the accuracy and generalization ability of the model, and evolves from the traditional single process section and independent equipment unit control to the whole process and the overall optimization control of the whole plant, improves the data processing and decision support system, and improves the data quality, processing speed and decision accuracy. 2. The present invention provides a sewage treatment intelligent control system based on a feedforward algorithm and feedback control. The sewage treatment response output control unit calculates the sewage treatment response output index of the i+1th monitoring sub-area of the target integrated operation and control sewage plant. If the sewage treatment response output index of the target integrated operation and control sewage plant is greater than the preset sewage treatment response output index, it indicates that the sewage water quality control trend of the integrated operation and control sewage plant has not met expectations, and the management personnel should be notified immediately for effective supervision. The sewage treatment feedback output index of the i+1th monitoring sub-area of the target integrated operation and control sewage plant is calculated based on the sewage treatment capacity feedback output unit. If the target integrated operation and control sewage plant If the sewage treatment feedback output index is less than the preset sewage treatment feedback output index, it means that the sewage treatment effect of the integrated operation and control sewage plant has not met expectations. The management personnel should be notified immediately to adjust and optimize the sewage treatment process. Further analysis is conducted to obtain the sewage control stability assessment coefficient of the target integrated operation and control sewage plant, which is used to assess whether there are any abnormalities in the intelligent management and control mode of sewage. By analyzing historical sewage treatment data, the trend of sewage treatment is predicted and analyzed, problems can be discovered in advance and preventive measures can be taken to avoid the expansion of problems. With the help of intelligent algorithms, automated and intelligent dynamic management of sewage treatment processes can be achieved to improve treatment efficiency and quality. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 It is a schematic diagram of the system module connection process of the present invention.
[0023] Figure 2 It is a schematic diagram of the structure of the sewage treatment data acquisition module of the present invention. DETAILED DESCRIPTION
[0024] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0025] See also Figure 1 As shown, the present invention provides a sewage treatment intelligent control system based on feedforward algorithm and feedback control, including a sewage treatment time division module, a sewage treatment data acquisition module, a sewage treatment feedforward algorithm establishment module, a sewage treatment feedback control execution module, a sewage treatment intelligent analysis module, and a sewage treatment intelligent evaluation module.
[0026] The sewage treatment time division module is connected to the sewage treatment data acquisition module, the sewage treatment data acquisition module is connected to the sewage treatment feedforward algorithm establishment module, the sewage treatment feedforward algorithm establishment module is connected to the sewage treatment feedback control execution module, the sewage treatment feedback control execution module is connected to the sewage treatment intelligent analysis module, and the sewage treatment intelligent analysis module is connected to the sewage treatment intelligent evaluation module.
[0027] The sewage treatment time division module is used to divide the sewage treatment time of the target integrated operation and control sewage plant into various monitoring sub-areas according to an equal time division method, and number each monitoring sub-area of the target integrated operation and control sewage plant.
[0028] In a possible design, the specific division method of the sewage treatment time division module is: The sewage treatment time of the target integrated operation and control sewage plant is divided into various monitoring sub-areas according to the equal time division method, and the monitoring sub-areas of the target integrated operation and control sewage plant are numbered 1, 2...n in sequence.
[0029] See also Figure 2 As shown, the sewage treatment data acquisition module is used to collect sewage treatment information of each monitoring sub-area of the target integrated operation and control sewage plant. The sewage treatment data acquisition module includes a sewage status index acquisition unit and a treatment effect index acquisition unit. The sewage treatment information includes sewage status data indicators and treatment effect data indicators.
[0030] In a possible design, the specific collection method of the sewage treatment data collection module is: Sewage status index collection unit: collects the sewage inflow, sludge concentration, and pollutant removal rate of each monitoring sub-area of the target integrated operation and control sewage plant, and marks them as , , ,in =1, 2, ... n, Expressed as The number of the monitoring sub-area; Treatment effect index collection unit: collects the reaction efficiency index, sludge treatment effect index, and dosage index of each monitoring sub-area of the target integrated operation and control sewage plant, and marks them as , , ,in =1, 2, ... n, Expressed as The number of the monitoring sub-area.
[0031] The sewage treatment feedforward algorithm establishment module is used to receive the sewage treatment information transmitted by the sewage treatment data acquisition module, calculate the sewage treatment response index of each monitoring sub-area of the target integrated operation and control sewage plant according to the sewage condition index acquisition unit, and calculate the sewage treatment capacity index of each monitoring sub-area of the target integrated operation and control sewage plant according to the treatment effect index acquisition unit.
[0032] In a possible design, the calculation formula of the sewage treatment response index is: ,in Expressed as The sewage treatment response index of each monitoring sub-area, Expressed as Pollutant removal rate in each monitoring sub-area, Expressed as the preset pollutant removal rate, Expressed as The sludge concentration in each monitoring sub-area is Expressed as The sewage inflow volume of each monitoring sub-area.
[0033] In a possible design, the specific steps for establishing the sewage treatment capacity index are: Step S01: The calculation formula of the reaction efficiency index is: ,in Expressed as The response efficiency index of each monitoring sub-area, Expressed as The sewage reaction stirring speed in each monitoring sub-area, Expressed as The sewage treatment time of each monitoring sub-area, Expressed as The sewage reaction temperature in each monitoring sub-area, It is expressed as the mean temperature of sewage reaction; Step S02: The calculation formula of the sludge treatment effect index is: ,in Expressed as The sludge treatment effect index of each monitoring sub-area is: Expressed as The sludge settling ratio of each monitoring sub-area, Expressed as The sludge production in each monitoring sub-area, Expressed as pH value of each monitoring sub-area, Expressed as a preset pH value, Expressed as a natural constant; Step S03: The calculation formula of the drug dosage index is: ,in Expressed as The drug dosage index of each monitoring sub-area, Expressed as The conductivity of each monitoring sub-area, Expressed as The amount of sewage chemicals added in each monitoring sub-area, Expressed as Solid content of sewage in each monitoring sub-area; Step S04: The calculation formula of the sewage treatment capacity index is: ,in Expressed as The sewage treatment capacity index of each monitoring sub-area, Expressed as The response efficiency index of each monitoring sub-area, Expressed as The sludge treatment effect index of each monitoring sub-area is: Expressed as The drug dosage index of each monitoring sub-area, , , They are respectively expressed as the weight factors of reaction efficiency index, sludge treatment effect index and drug dosage index.
[0034] The sewage treatment feedback control execution module is used to receive the historical sewage treatment response index and sewage treatment capacity index of each monitoring sub-area of the target integrated operation and control sewage plant transmitted by the sewage treatment feedforward algorithm establishment module. The sewage treatment feedback control execution module includes a sewage response output control unit and a sewage treatment capacity feedback output unit.
[0035] In a possible design, the sewage response output control unit is specifically: Step S01: Obtain the historical sewage treatment response index of each monitoring sub-area of the target integrated operation and control sewage plant, and obtain the target integrated operation and control sewage plant's first +1 sewage treatment response output index of the monitoring sub-area; Step S02: The calculation formula for analyzing the sewage treatment response output index is: ,in Expressed as +1 sewage treatment response output index of the monitoring sub-area, Expressed as The sewage treatment response index of each monitoring sub-area, Expressed as -1 sewage treatment response index of the monitoring sub-area, It is expressed as the mean of sewage treatment response index; Step S03: Obtain the sewage treatment response output index of the target integrated operation and control sewage plant, and compare it with the preset sewage treatment response output index. If the sewage treatment response output index of the target integrated operation and control sewage plant is greater than the preset sewage treatment response output index, it indicates that the sewage water quality control trend of the integrated operation and control sewage plant has not met expectations, and the management personnel should be notified immediately for effective supervision. Otherwise, it indicates that the sewage treatment water quality control trend of the integrated operation and control sewage plant is stable.
[0036] In a possible design, the sewage treatment capacity feedback output unit is specifically: Step S01: Obtain the historical sewage treatment capacity index of each monitoring sub-area of the target integrated operation and control sewage plant, and obtain the target integrated operation and control sewage plant's first +1 sewage treatment feedback output index of the monitoring sub-area; Step S02: Analyze the calculation formula of the sewage treatment feedback output index: ,in Expressed as +1 sewage treatment feedback output index of the monitoring sub-area, Expressed as The sewage treatment capacity index of each monitoring sub-area, Expressed as -1 monitoring sub-area sewage treatment capacity index, It is expressed as the mean value of sewage treatment capacity index; Step S03: Obtain the sewage treatment feedback output index of the target integrated operation and control sewage plant, and compare it with the preset sewage treatment feedback output index. If the sewage treatment feedback output index of the target integrated operation and control sewage plant is less than the preset sewage treatment feedback output index, it indicates that the sewage treatment effect of the integrated operation and control sewage plant has not met expectations, and the management personnel should be notified immediately to adjust and optimize the sewage treatment process. Otherwise, it indicates that the sewage treatment effect of the integrated operation and control sewage plant meets the standards.
[0037] The sewage treatment intelligent analysis module is used to receive the target integrated operation and control sewage plant The sewage treatment response output index and sewage treatment feedback output index of +1 monitoring sub-area are used to calculate the sewage control stability assessment coefficient of the target integrated operation and control sewage plant.
[0038] In a possible design, the calculation formula of the sewage control stability assessment coefficient is: ,in Expressed as the sewage control stability assessment coefficient, Expressed as +1 sewage treatment response output index of the monitoring sub-area, Expressed as +1 sewage treatment feedback output index of the monitoring sub-area.
[0039] The sewage treatment intelligent assessment module is used to obtain the sewage control stability assessment coefficient of the target integrated operation and control sewage plant, compare it with the preset sewage control stability assessment coefficient, and process it.
[0040] In a possible design, the specific evaluation method of the sewage treatment intelligent evaluation module is: Obtain the sewage control stability assessment coefficient of the target integrated operation and control sewage treatment plant, and compare it with the preset sewage control stability assessment coefficient. If the sewage control stability assessment coefficient of the integrated operation and control sewage treatment plant is less than the preset sewage control stability assessment coefficient, it indicates that there is an abnormality in the intelligent management and control mode of sewage by the integrated operation and control sewage treatment plant, and the abnormal information should be fed back to the sewage treatment intelligent management terminal. Otherwise, it indicates that there is no abnormality in the intelligent management and control mode of sewage by the integrated operation and control sewage treatment plant.
[0041] In the present embodiment, it should be specifically explained that the present invention collects sewage treatment information of each monitoring sub-area of the target integrated operation and control sewage plant, calculates the sewage treatment response index of each monitoring sub-area of the target integrated operation and control sewage plant according to the sewage status index collection unit, and calculates the sewage treatment capacity index of each monitoring sub-area of the target integrated operation and control sewage plant according to the treatment effect index collection unit, thereby realizing scientific data analysis decision-making to improve the accuracy and generalization ability of the model, evolving from the traditional single process section and independent equipment unit control to the whole process and the global optimization control of the whole plant, improving the data processing and decision support system, and improving data quality, processing speed and decision accuracy.
[0042] The present invention calculates the sewage treatment response output index of the i+1th monitoring sub-area of the target integrated operation and control sewage plant based on the sewage response output control unit. If the sewage treatment response output index of the target integrated operation and control sewage plant is greater than the preset sewage treatment response output index, it indicates that the sewage water quality control trend of the integrated operation and control sewage plant has not met expectations, and the management personnel should be notified immediately for effective supervision. The sewage treatment feedback output index of the i+1th monitoring sub-area of the target integrated operation and control sewage plant is calculated based on the sewage treatment capacity feedback output unit. If the sewage treatment feedback output index of the target integrated operation and control sewage plant is less than the preset sewage treatment feedback output index, it indicates that the sewage treatment effect of the integrated operation and control sewage plant has not met expectations, and the management personnel should be notified immediately to adjust and optimize the sewage treatment process. Further analysis is performed to obtain the sewage control stability evaluation coefficient of the target integrated operation and control sewage plant, which is used to evaluate whether there is an abnormality in the intelligent management and control mode of sewage. The prediction and analysis of the sewage treatment trend are realized by analyzing historical sewage treatment data, and problems can be discovered in advance and measures can be taken to prevent them, so as to avoid the expansion of problems. With the help of intelligent algorithms, automatic and intelligent dynamic management of sewage treatment processes can be achieved, and treatment efficiency and quality can be improved.
[0043] Finally: The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A sewage treatment intelligent control system based on feedforward algorithm and feedback control, characterized in that: include: Sewage treatment time division module: used to divide the sewage treatment time of the target integrated operation and control sewage plant into various monitoring sub-areas according to the equal time division method, and number each monitoring sub-area of the target integrated operation and control sewage plant; Sewage treatment data collection module: used to collect sewage treatment information of each monitoring sub-area of the target integrated operation and control sewage plant, the sewage treatment data collection module includes a sewage status index collection unit and a treatment effect index collection unit, and the sewage treatment information includes sewage status data indicators and treatment effect data indicators; Sewage treatment feedforward algorithm establishment module: used to receive the sewage treatment information transmitted by the sewage treatment data acquisition module, calculate the sewage treatment response index of each monitoring sub-area of the target integrated operation and control sewage plant according to the sewage condition index acquisition unit, and calculate the sewage treatment capacity index of each monitoring sub-area of the target integrated operation and control sewage plant according to the treatment effect index acquisition unit; Sewage treatment feedback control execution module: used for receiving the historical sewage treatment response index and sewage treatment capacity index of each monitoring sub-area of the target integrated operation and control sewage plant transmitted by the sewage treatment feedforward algorithm establishment module, and the sewage treatment feedback control execution module includes a sewage response output control unit and a sewage treatment capacity feedback output unit; Sewage treatment intelligent analysis module: used to receive the target integrated operation and control sewage plant +1 sewage treatment response output index and sewage treatment feedback output index of the monitoring sub-area, and calculate the sewage control stability assessment coefficient of the target integrated operation and control sewage plant; Sewage treatment intelligent assessment module: used to obtain the sewage control stability assessment coefficient of the target integrated operation and control sewage plant, compare it with the preset sewage control stability assessment coefficient, and process it.
2. According to claim 1, a sewage treatment intelligent control system based on feedforward algorithm and feedback control is characterized in that: The specific division method of the sewage treatment time division module is as follows: The sewage treatment time of the target integrated operation and control sewage plant is divided into various monitoring sub-areas according to the equal time division method, and the monitoring sub-areas of the target integrated operation and control sewage plant are numbered 1, 2...n in sequence.
3. According to claim 2, a sewage treatment intelligent control system based on feedforward algorithm and feedback control is characterized in that: The specific collection method of the sewage treatment data collection module is: Sewage status index collection unit: collects the sewage inflow, sludge concentration, and pollutant removal rate of each monitoring sub-area of the target integrated operation and control sewage plant, and marks them as , , ,in =1, 2, ... n, Expressed as The number of the monitoring sub-area; Treatment effect index collection unit: collects the reaction efficiency index, sludge treatment effect index, and dosage index of each monitoring sub-area of the target integrated operation and control sewage plant, and marks them as , , ,in =1, 2, ... n, Expressed as The number of the monitoring sub-area.
4. According to claim 3, a sewage treatment intelligent control system based on feedforward algorithm and feedback control is characterized in that: The calculation formula of the sewage treatment response index is: ,in Expressed as The sewage treatment response index of each monitoring sub-area, Expressed as Pollutant removal rate in each monitoring sub-area, Expressed as the preset pollutant removal rate, Expressed as The sludge concentration in each monitoring sub-area is Expressed as The sewage inflow volume of each monitoring sub-area.
5. According to claim 4, a sewage treatment intelligent control system based on feedforward algorithm and feedback control is characterized in that: The specific steps for establishing the sewage treatment capacity index are: Step S01: The calculation formula of the reaction efficiency index is: ,in Expressed as The response efficiency index of each monitoring sub-area, Expressed as The sewage reaction stirring speed in each monitoring sub-area, Expressed as The sewage treatment time of each monitoring sub-area, Expressed as The sewage reaction temperature in each monitoring sub-area, It is expressed as the mean temperature of sewage reaction; Step S02: The calculation formula of the sludge treatment effect index is: ,in Expressed as The sludge treatment effect index of each monitoring sub-area is: Expressed as The sludge settling ratio of each monitoring sub-area, Expressed as The sludge production in each monitoring sub-area, Expressed as pH value of each monitoring sub-area, Expressed as a preset pH value, Expressed as a natural constant; Step S03: The calculation formula of the drug dosage index is: ,in Expressed as The drug dosage index of each monitoring sub-area, Expressed as The conductivity of each monitoring sub-area, Expressed as The amount of sewage chemicals added in each monitoring sub-area, Expressed as Solid content of sewage in each monitoring sub-area; Step S04: The calculation formula of the sewage treatment capacity index is: ,in Expressed as The sewage treatment capacity index of each monitoring sub-area, Expressed as The response efficiency index of each monitoring sub-area, Expressed as The sludge treatment effect index of each monitoring sub-area is: Expressed as The drug dosage index of each monitoring sub-area, , , They are respectively expressed as the weight factors of reaction efficiency index, sludge treatment effect index and drug dosage index.
6. The intelligent sewage treatment control system based on feedforward algorithm and feedback control according to claim 5 is characterized by: The sewage response output control unit is specifically: Step S01: Obtain the historical sewage treatment response index of each monitoring sub-area of the target integrated operation and control sewage plant, and obtain the target integrated operation and control sewage plant's first +1 sewage treatment response output index of the monitoring sub-area; Step S02: The calculation formula for analyzing the sewage treatment response output index is: ,in Expressed as +1 sewage treatment response output index of the monitoring sub-area, Expressed as The sewage treatment response index of each monitoring sub-area, Expressed as -1 sewage treatment response index of the monitoring sub-area, It is expressed as the mean of the sewage treatment response index; Step S03: Obtain the sewage treatment response output index of the target integrated operation and control sewage plant, and compare it with the preset sewage treatment response output index. If the sewage treatment response output index of the target integrated operation and control sewage plant is greater than the preset sewage treatment response output index, it indicates that the sewage water quality control trend of the integrated operation and control sewage plant has not met expectations, and the management personnel should be notified immediately for effective supervision. Otherwise, it indicates that the sewage treatment water quality control trend of the integrated operation and control sewage plant is stable.
7. The intelligent sewage treatment control system based on feedforward algorithm and feedback control according to claim 6 is characterized by: The sewage treatment capacity feedback output unit is specifically: Step S01: Obtain the historical sewage treatment capacity index of each monitoring sub-area of the target integrated operation and control sewage plant, and obtain the target integrated operation and control sewage plant's first +1 sewage treatment feedback output index of the monitoring sub-area; Step S02: Analyze the calculation formula of the sewage treatment feedback output index: ,in Expressed as +1 sewage treatment feedback output index of the monitoring sub-area, Expressed as The sewage treatment capacity index of each monitoring sub-area, Expressed as -1 monitoring sub-area sewage treatment capacity index, It is expressed as the mean value of sewage treatment capacity index; Step S03: Obtain the sewage treatment feedback output index of the target integrated operation and control sewage plant, and compare it with the preset sewage treatment feedback output index. If the sewage treatment feedback output index of the target integrated operation and control sewage plant is less than the preset sewage treatment feedback output index, it indicates that the sewage treatment effect of the integrated operation and control sewage plant has not met expectations, and the management personnel should be notified immediately to adjust and optimize the sewage treatment process. Otherwise, it indicates that the sewage treatment effect of the integrated operation and control sewage plant meets the standards.
8. The intelligent sewage treatment control system based on feedforward algorithm and feedback control according to claim 7 is characterized by: The calculation formula of the sewage control stability evaluation coefficient is: ,in Expressed as the sewage control stability assessment coefficient, Expressed as +1 sewage treatment response output index of the monitoring sub-area, Expressed as +1 sewage treatment feedback output index of the monitoring sub-area.
9. The intelligent sewage treatment control system based on feedforward algorithm and feedback control according to claim 8 is characterized by: The specific evaluation method of the sewage treatment intelligent evaluation module is: Obtain the sewage control stability assessment coefficient of the target integrated operation and control sewage treatment plant, and compare it with the preset sewage control stability assessment coefficient. If the sewage control stability assessment coefficient of the integrated operation and control sewage treatment plant is less than the preset sewage control stability assessment coefficient, it indicates that there is an abnormality in the intelligent management and control mode of sewage by the integrated operation and control sewage treatment plant, and the abnormal information should be fed back to the sewage treatment intelligent management terminal. Otherwise, it indicates that there is no abnormality in the intelligent management and control mode of sewage by the integrated operation and control sewage treatment plant.
Citation Information
Patent Citations
Adjustable control method and system based on sewage treatment monitoring
CN115793471A
Cited By
Veneer rotary cutting and drying performance monitoring, regulation and control management system and method
CN120181665A
Integrated management method for sewage treatment
CN120717540A
A sewage treatment integrated management method
CN120717540B
Rural domestic sewage intelligent diversion and recycling decision support system
CN120851809A
Intelligent diversion and resource utilization decision support system for rural domestic sewage
CN120851809B
