Capital construction project completion data case library management system

By designing the completion data case library management system for infrastructure projects, the problems of cumbersome information inspection and inefficient management in the existing technology were solved, and a systematic completion data library was built, which improved management efficiency and construction quality.

CN119003683APending Publication Date: 2024-11-22GUIZHOU ELECTRIC POWER DESIGN INST
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202410952136.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-16
Publication Date
2024-11-22

AI Technical Summary

Technical Problem

The existing infrastructure construction data management system lacks systematic case library management, resulting in cumbersome information inspection and low management efficiency, and the intrinsic value of massive project data is not effectively utilized.

Method used

A case library management system for completion data of infrastructure projects was designed, including construction data module, acceptance data module, quality database module, logical relationship module, case library module, project set module and recommendation module, through the association and automatic screening of modules, key Techniques such as word searching to build a systematic completion database and provide project promotion guidance and knowledge reuse.

Benefits of technology

It realizes systematic guidance and knowledge reuse of project management, improves management efficiency, and gradually improves the case library, saves management costs, and improves construction quality and efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119003683A_ABST
    Figure CN119003683A_ABST
Patent Text Reader

Abstract

An infrastructure project completion data case library management system comprises a construction data module, an acceptance data module, a quality library module, a logical relationship module, a case library module, a project set module and a recommendation module. A user fills and reports construction data through a built-in template to form a construction record file, when the user creates a new project, the template can be recommended according to keywords, and completion data, construction procedures, logic association and the like of the corresponding project are copied into the new project in a case reference mode. A systematic completion data case library capable of guiding construction, assisting management and reusing knowledge is provided for a project, and the management efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of digital construction of infrastructure projects, and in particular relates to a case library management system for completed data of infrastructure projects. Background Art

[0002] In the field of infrastructure engineering, as the management and control of projects and projects become more and more complex, enterprise-level infrastructure systems have gathered a huge amount of project data. However, the simple accumulation of data cannot be directly converted into a long-term competitive advantage for enterprises. In order to deeply explore the intrinsic value of these data, there is an urgent need for a management system to manage the project information of the enterprise, guide and serve the project advancement of the enterprise, save management costs, and improve management efficiency. The formation of a case library of completion data has become an indispensable key link. The construction of a case library of completion data is a gradual and continuous optimization process. It relies on the advancement of actual projects and constantly absorbs new completion project data to enrich and improve the content of the library. The completion data case library involves the comprehensive collection, detailed organization, accurate classification and long-term storage of various types of completion project data, aiming to build a valuable resource library for reference, learning and reference for future projects.

[0003] However, in the prior art, although there is a management system for construction data, it is only a simple storage and management of construction data and acceptance data, and no systematic case library has been formed. The system information verification is relatively cumbersome, and it is laborious to read information. A large amount of reading is required to obtain project data, and the management efficiency is low. Summary of the invention

[0004] The technical problem to be solved by the present invention is to provide a management system for a case library of completed data of infrastructure projects to solve the above-mentioned problem.

[0005] A case library management system for completed construction project data, including Construction data module: create construction data templates and input construction data; Acceptance document module: create acceptance document template and enter acceptance document; Quality library module: stores the construction basis, testing method quality standard documents and inspection method documents involved in the construction process; Logical relationship module: records the sequence of construction processes; Case library module: stores completed cases, including construction data, acceptance data, logical relationships and quality library files; Project set module: filter completed cases in the case library and store them as templates; Recommendation module: Recommend completion cases from the program module.

[0006] Furthermore, the construction data attributes include node name, node code, unit, unit project name, sub-unit project name, section project name, sub-section project name and sub-item project name.

[0007] Furthermore, the acceptance document attributes include node name, node code, unit, unit project name, sub-unit project name, section project name, sub-section project name and sub-project name.

[0008] Furthermore, the sequence of construction procedures in the logic relationship module includes underground first and then ground, structure first and then enclosure, main body first and then decoration, and civil engineering first and then professional.

[0009] Furthermore, the case library is associated with quality acceptance forms, associated construction record forms, quality standards and inspection method files, and the case library attributes include node name, node code, unit, unit project name, sub-unit project name, section project name, sub-section project name and sub-project name.

[0010] Furthermore, the method adopted by the project set module when screening template cases is automatic calculation according to a predefined calculation formula to achieve automatic screening of the project set.

[0011] Furthermore, the recommendation module recommends by keyword search.

[0012] Beneficial effects of the present invention: The present invention gradually improves the case library through the project, gradually improves and fills the completion data upward, and through the mutual connection of various modules, provides a systematic completion data case library for the project that can guide construction, assist management, and reuse knowledge, thereby improving management efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 It is a schematic diagram of the system composition of the present invention. DETAILED DESCRIPTION

[0015] A management system for a case library of completed construction project data, characterized in that: include Construction data module: create construction data templates and input construction data; Acceptance document module: create acceptance document template and enter acceptance document; Quality library module: stores the construction basis, testing method quality standard documents and inspection method documents involved in the construction process; Logical relationship module: records the sequence of construction processes; Case library module: stores completed cases, including construction data, acceptance data, logical relationships and quality library files; Project set module: filter completed cases in the case library and store them as templates; Recommended module: Recommended as-built cases from the project set module when creating a new as-built case.

[0016] Furthermore, the construction data attributes include node name, node code, unit, unit project name, sub-unit project name, section project name, sub-section project name and sub-item project name.

[0017] Furthermore, the acceptance document attributes include node name, node code, unit, unit project name, sub-unit project name, section project name, sub-section project name and sub-project name.

[0018] Furthermore, the sequence of construction procedures in the logic relationship module includes underground first and then ground, structure first and then enclosure, main body first and then decoration, and civil engineering first and then professional.

[0019] Furthermore, the case library is associated with quality acceptance forms, associated construction record forms, quality standards and inspection method files, and the case library attributes include node name, node code, unit, unit project name, sub-unit project name, section project name, sub-section project name and sub-project name.

[0020] Furthermore, the method adopted by the project set module when screening template cases is automatic calculation according to a predefined calculation formula to achieve automatic screening of the project set.

[0021] Furthermore, the recommendation module recommends by keyword search.

[0022] In one embodiment, the user fills in the construction data template and the acceptance data template to form a construction record file, which helps engineering personnel review and analyze problems, thereby avoiding the recurrence of the same problems in future construction; The acceptance record form is an important document used to verify that the quality of the project meets the predetermined standards after the project is completed, in order to ensure that the project meets the relevant quality standards and requirements and to conduct quality inspections on various processes.

[0023] The construction materials include drawing review record files, project commencement report related materials (construction commencement application form, construction commencement report), technical and safety briefing record files, construction organization design (project management plan) files, construction log record files, design change files, project negotiation record files, project measurement record files, construction record files and project quality accident record files.

[0024] Completion data include construction site quality management inspection records, unit (sub-unit) project quality completion acceptance records, division (sub-division) project quality acceptance record documents, sub-project quality acceptance record documents, inspection batch quality acceptance record documents and completion drawings, etc. Quality standards and inspection methods are mainly composed of unstructured data. Users can refer to this function during construction to correct errors and avoid quality problems in a timely manner according to the procedures and requirements of each process. At the same time, managers can also query inspection methods through this module.

[0025] The quality standards and inspection method documents include quality certificates, qualification certificates, on-site material test reports, construction test records, hidden project inspection records, etc. for raw materials, components, appliances and equipment. They mainly include factory certificates and on-site inspection (test) reports, construction test records and witness inspection reports, hidden project acceptance record documents and handover inspection records, etc. for raw materials, components, finished products, semi-finished products and equipment for engineering projects.

[0026] The logical relationship refers to the sequence of construction procedures, including: underground first, ground later; structure first, enclosure later; main body first, decoration later; civil engineering first, professional later. The rationality of the procedures is ensured through logical relationships.

[0027] The specific fields of the case library include: node name, node code, unit, unit project name, sub-unit project name, section project name, sub-section project name, sub-item project name, associated quality acceptance form, associated construction record form and quality standard and inspection method file.

[0028] In the project set module, the time taken to complete a node (completion time = completion time - start time) and the amount of overdue tasks (overdue completion = planned completion time - actual completion time) are compared and analyzed with existing projects through keyword proportions. The system calculates the node with shorter completion time and larger amount of overdue tasks as template cases to optimize progress and quality, and automatically pushes them to the project set module, and fills them into the project set module after approval.

[0029] The recommended templates are mainly keyword searches. When users create a new project, they enter the scale, unit, investment amount and project construction scope. The system will search by project scale information first, and then search by construction scope, such as the words "to be built main plant" and "booster station". The more times the keywords are repeated, the higher the recommendation priority. The corresponding projects, whether in the form of completion data, construction procedures, logical associations, etc., can be copied into new projects through case references, and can be improved at any time to improve the quality of the project.

[0030] The above contents are further detailed descriptions of the present invention in combination with specific preferred embodiments, and it cannot be determined that the specific implementation of the present invention is limited to these descriptions. For ordinary technicians in the technical field to which the present invention belongs, several simple deductions or substitutions can be made without departing from the concept of the present invention, which should be regarded as falling within the protection scope of the present invention.

Claims

1. A case library management system for completed infrastructure projects, characterized by: include Construction data module: create construction data templates and input construction data; Acceptance document module: create acceptance document template and enter acceptance document; Quality library module: stores the construction basis, testing method quality standard documents and inspection method documents involved in the construction process; Logical relationship module: records the sequence of construction processes; Case library module: stores completed cases, including construction data, acceptance data, logical relationships and quality library files; Project set module: filter completed cases in the case library and store them as templates; Recommendation module: Recommend completion cases from the program module.

2. The infrastructure project completion data case library management system according to claim 1 is characterized by: The construction data attributes include node name, node code, unit, unit project name, sub-unit project name, section project name, sub-section project name and sub-item project name.

3. The infrastructure project completion data case library management system according to claim 1 is characterized by: The acceptance data attributes include node name, node code, unit, unit project name, sub-unit project name, section project name, sub-section project name and sub-project name.

4. The infrastructure project completion data case library management system according to claim 1 is characterized by: The sequence of construction procedures in the logic relationship module includes underground first and then ground, structure first and then enclosure, main body first and then decoration, and civil engineering first and then professional engineering.

5. The infrastructure project completion data case library management system according to claim 1 is characterized by: The case library is associated with a quality acceptance form, an associated construction record form, a quality standard and an inspection method file, and the case library attributes include a node name, a node code, a unit, a unit project name, a sub-unit project name, a division project name, a sub-division project name and a sub-project name.

6. The infrastructure project completion data case library management system according to claim 1 is characterized by: The method adopted by the project set module when screening template cases is to automatically calculate according to a predefined calculation formula to achieve automatic screening of project sets.

7. The infrastructure project completion data case library management system according to claim 1 is characterized by: The recommendation module recommends by keyword retrieval.

Citation Information

Patent Citations

  • Construction process and engineering data combined database and manufacturing method

    CN107480171A

  • Information management system based on completion data

    CN108776888A