Method and system for monitoring influence of adjacent tunnel blasting excavation on existing tunnel

Through the finite element analysis model and multi-physics coupled model, the impact of newly built tunnel blasting on existing tunnels is simulated, and the water seepage flow and lining cracking degree is predicted, which solves the problem of difficult monitoring of the impact of newly built tunnel blasting on existing tunnel diseases, and realizes the More scientific and reasonable blasting design and construction plan reduces risks and costs.

CN119004592APending Publication Date: 2024-11-22广东省路桥建设发展有限公司 +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410998687.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-24
Publication Date
2024-11-22

AI Technical Summary

Technical Problem

Blasting and excavation of newly built tunnels may aggravate the diseases near existing tunnels, resulting in deformation or settlement, and increase safety hazards. It is difficult for the existing technology to effectively monitor and evaluate its impact on existing tunnels.

Method used

Establish a finite element analysis model including new tunnels and existing tunnels, divide the lining area into seepage areas, lining cracked areas and overlapping areas, simulate the water pressure and lining stress under different blasting conditions, and predict the water seepage and lining cracking degree , determine the impact of overlapping areas through multi-physics coupling model, and select a reasonable amount of explosives for blasting excavation.

Benefits of technology

Accurately simulate the mechanical effects during the blasting process, provide accurate impact prediction, reduce construction risks, optimize explosives, improve engineering economic benefits, and reduce repair costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119004592A_ABST
    Figure CN119004592A_ABST
Patent Text Reader

Abstract

The invention discloses a method and system for monitoring the influence of blasting excavation of adjacent tunnels on an existing tunnel, and the method comprises the steps: building a finite element analysis model, dividing a lining region of the existing tunnel into a first region, a second region and an overlapping region according to the disease type of the existing tunnel, simulating the blasting excavation of a newly-built tunnel in the finite element model, and obtaining the influence of the blasting excavation of the newly-built tunnel. Obtaining a water pressure maximum value set of the first area and a lining stress maximum value set of the second area under different blasting working conditions, and predicting according to the water pressure maximum value set to obtain a water flow seepage flow data set corresponding to the first area; a lining cracking degree data set corresponding to the second area is obtained through prediction according to the lining stress maximum value set, and the water flow seepage flow and lining cracking degree data sets of overlapped areas under different blasting working conditions are determined according to the superposition principle; and integrating data results of all the areas, and selecting explosives with reasonable equivalents to perform blasting excavation of the newly-built tunnel.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of tunnel monitoring, and specifically to a method and system for monitoring the impact of blasting excavation of an adjacent tunnel on an existing tunnel. Background Art

[0002] The blasting excavation of a new tunnel may aggravate the defects of the existing tunnel nearby, thereby causing deformation or settlement of the existing tunnel, which poses many safety hazards. In-depth research on the impact of blasting excavation of a new tunnel on the defects of the existing tunnel is an important prerequisite for ensuring excavation safety. Based on this, the present invention provides a monitoring method and system for the impact of blasting excavation of a nearby tunnel on the existing tunnel to simulate excavation, and evaluate the impact of excavation on the surrounding existing tunnels based on the simulation results. The simulation results have guiding significance for engineering construction. Summary of the invention

[0003] The invention provides a method and system for monitoring the influence of blasting excavation of an adjacent tunnel on an existing tunnel.

[0004] In the first aspect, the present application example provides a method for monitoring the impact of blasting excavation of an adjacent tunnel on an existing tunnel, comprising:

[0005] Establish a finite element analysis model including new tunnels and existing tunnels;

[0006] According to the disease type of the existing tunnel, the lining area of ​​the existing tunnel in the finite element analysis model is divided into a first area, a second area and an overlapping area, the first area is a water seepage area, the second area is a lining cracking area, and the overlapping area is an overlapping area of ​​the first area and the second area;

[0007] Simulate the blasting excavation of the new tunnel in the finite element model, and obtain the maximum value set of water pressure in the first area and the maximum value set of lining stress in the second area under different blasting conditions;

[0008] According to the water pressure maximum value set, a water flow seepage data set corresponding to the first area is obtained;

[0009] A lining cracking degree data set corresponding to the second area is obtained according to the lining stress maximum value set prediction;

[0010] According to the superposition principle, the data set of water seepage and lining cracking degree in overlapping areas under different blasting conditions is determined;

[0011] The water seepage rate and lining cracking degree data of each area are integrated to select the reasonable equivalent of explosives for blasting excavation of the new tunnel.

[0012] When the embodiment of the present application is implemented, in order to facilitate the establishment of a finite element model of an existing tunnel, it is necessary to conduct a comprehensive field survey and inspection of the existing tunnel before simulating blasting and excavation. The aspects of the survey and inspection include monitoring the changes in the water level and seepage volume in the tunnel by deploying equipment such as water level meters and seepage flow meters, and monitoring the changes in the width, length and shape of the cracks by equipment such as crack meters and measuring rulers; monitoring the water pressure in the seepage area of ​​the tunnel by a pressure gauge, and detecting the lining stress in the lining cracking area by a strain gauge. The monitored water pressure is used as the initial water pressure, the water seepage volume is used as the initial water seepage volume, the lining stress is used as the initial lining stress, and the length and width of the lining crack are used as the initial strain parameters of the crack, which are passed into the finite element model as input data for calculation.

[0013] In the implementation of this embodiment, a finite element model is used to simulate the impact of different blasting conditions on the existing tunnel diseases. By simulating the impact force and vibration force generated by explosives of different equivalents, the groundwater level around the existing tunnel changes and the cracks in the existing tunnel lining continue to crack, which leads to changes in the water pressure and lining stress of the existing tunnel. The maximum water pressure set of the seepage zone generated under different blasting conditions and the proportional relationship of the initial water pressure are multiplied by the initial water flow seepage rate to estimate the water flow seepage rate per unit time of the maximum water pressure set under different blasting conditions. The corresponding shear modulus set is obtained by the maximum lining stress set of the lining cracking zone generated under different blasting conditions, and the initial shear modulus is obtained by using the initial lining stress. Then, the objects in the shear modulus set are respectively multiplied by the proportional relationship of the initial shear modulus and the strain increase rate at the lining crack tip and the initial parameters of the crack strain to estimate the lining crack development degree corresponding to each lining stress maximum set. Finally, the water flow seepage rate and lining crack degree data of the overlapping area under different blasting conditions are determined by the superposition principle.

[0014] In one possible implementation, the seepage volume and lining cracking degree of the overlapping units are determined according to the superposition principle, including:

[0015] Identify and quantify the initial water pressure and initial lining stress in the overlapping area, and determine the distribution of the initial water pressure and initial lining stress in the overlapping area;

[0016] decoupling the overlapping region into a first region and a second region, determining a distribution of initial water pressure in the first region, and determining a distribution of initial lining stress in the second region;

[0017] Establish a multi-physics coupling model including overlapping areas, and determine the distribution of the maximum water pressure set and the maximum lining stress set in the coupling model under different blasting conditions;

[0018] According to the maximum water pressure set and the initial water pressure, a corresponding water flow seepage data set is obtained;

[0019] According to the maximum lining stress set and the initial lining stress, the corresponding lining cracking degree data set is obtained;

[0020] A correlation equation is established to couple the water seepage rate and the crack degree, and a data set of water seepage rate and lining crack degree under the combined action of water pressure and lining stress is obtained.

[0021] In this embodiment, since there is mutual influence between the overlap area and the seepage and lining cracking, as the lining cracking unfolds, the seepage of the lining increases, and as the water seepage increases, the cracking of the lining increases. Therefore, a multi-physics field coupling model of water pressure and lining stress is established to simulate and analyze the impact of the overlap area under the combined action of water seepage and lining deformation and cracking.

[0022] Furthermore, the correlation equation is obtained by fitting the water pressure, lining stress and crack degree. The expression of the correlation equation is:

[0023]

[0024] Among them, f- represents the relationship function between water seepage and crack opening degree; - indicates the change of crack opening degree over time; q- indicates water seepage; - represents the change of water pressure with time; σ- represents the lining stress.

[0025] When implementing this embodiment, by collecting data such as water pressure, lining stress, water seepage, lining crack width and lining crack length of a large number of tunnels, preliminary statistical analysis and correlation analysis are performed on the data to analyze the relationship and influencing factors between various parameters; the correlation equation between seepage and lining crack degree is fitted and established by the least squares method, and the final correlation equation is obtained through iterative verification. This fitting process belongs to the prior art and is not further limited in this embodiment.

[0026] In a possible implementation, the water flow seepage data corresponding to the first area is obtained by determining the initial water pressure of the first area according to the monitoring report of the existing tunnel;

[0027] The initial water seepage rate per unit time is calculated using the initial water pressure according to Darcy's law. The water seepage rate per unit time for each maximum water pressure set is estimated by combining the initial water pressure proportional relationship with the initial water pressure.

[0028] When this embodiment is implemented, the water seepage rate per unit time of the maximum water pressure set under different blasting conditions is estimated by multiplying the initial water pressure ratio with the initial water seepage rate, rock and soil permeability coefficient and permeability growth rate.

[0029] In a possible implementation, the method of obtaining the lining cracking degree data corresponding to the second area is to determine the initial lining stress of the second area according to the monitoring report of the existing tunnel;

[0030] The initial shear modulus is obtained according to the initial lining stress, and the corresponding shear modulus set is obtained according to each lining stress maximum value set. The proportional relationship between each shear modulus set and the initial shear modulus is combined with the strain increase rate at the lining crack tip and the initial parameters of the crack strain to estimate the lining crack development degree corresponding to each lining stress maximum value set.

[0031] In one possible implementation, integrating the water seepage and lining cracking data for each area includes:

[0032] The maximum allowable value of water flow seepage in the first area is used as the first safety warning value, the maximum allowable value of the degree of lining cracks in the second area is used as the second safety warning value, the maximum allowable value of water flow seepage in the overlapping area is used as the third safety warning value, and the maximum allowable value of the degree of lining cracks in the overlapping area is used as the fourth safety warning value;

[0033] Establishing a first relationship curve between different blasting conditions and water seepage in the first area according to the water seepage data set corresponding to the first area;

[0034] According to the lining cracking degree data set corresponding to the second area, a second relationship curve between different blasting conditions and lining cracking degrees in the second area is established;

[0035] According to the data set of water seepage and lining cracking degree after coupling in the overlapping area, a third relationship curve between different blasting conditions and water seepage in the overlapping area and a fourth relationship curve between different blasting conditions and lining cracking degree are established.

[0036] In one possible implementation, appropriate amounts of explosives in the first area, the second area, and the overlapping area are evaluated based on the first relationship curve, the second relationship curve, the third relationship curve, and the fourth relationship curve, thereby evaluating a reasonable blasting construction plan.

[0037] In one possible implementation, evaluating a reasonable blasting construction plan includes:

[0038] Conduct early warning assessment of the hazards in the first area, the second area and the overlapping area under different blasting conditions;

[0039] Evaluate and select a first data set in which the water flow seepage rate in the first relationship curve does not exceed the first safety warning value;

[0040] Evaluate and select a second data set in which the degree of lining cracking within the second relationship curve does not exceed a second safety warning value;

[0041] Evaluate and select a third data set in which the water flow seepage rate in the third relationship curve does not exceed the third safety warning value;

[0042] Evaluate and select a fourth data set in which the degree of lining cracking within the fourth relationship curve does not exceed a fourth safety warning value;

[0043] The means of the first data set, the second data set, the third data set and the fourth data set are respectively obtained, and the equivalent explosives corresponding to the means in each area are obtained to blast and excavate a new tunnel.

[0044] When this embodiment is implemented, in order to avoid excessive vibration impact stress caused by blasting during blasting and excavation, which may cause the lining structure to withstand water seepage and the degree of lining cracking to reach their respective safety warning values, and also to avoid excessive vibration impact stress caused by blasting, which may affect the excavation efficiency; therefore, an equivalent amount of explosives corresponding to the average value of the test data set that does not exceed the safety warning value of each area is selected to carry out blasting excavation in each area.

[0045] In the second aspect, the present application example provides a monitoring system for the impact of blasting excavation of adjacent tunnels on existing tunnels, comprising:

[0046] A segmentation unit: configured to divide the existing tunnel lining area into a first area, a second area and an overlapping area;

[0047] A decoupling unit: configured to decouple the overlapping area into a first area and a second area;

[0048] A coupling unit: configured to couple the first area and the second area into an overlapping area;

[0049] Calculation unit: a data set configured to calculate the water seepage amount in the first area, a data set to calculate the degree of lining cracks in the second area, and a data set to calculate the water seepage amount and the degree of lining cracks in the overlapping area;

[0050] Evaluation unit: configured to evaluate a reasonable blasting construction plan based on a data set of water seepage and lining cracking degree.

[0051] In summary, the present invention has the following beneficial effects compared with the prior art:

[0052] (1) Accurate simulation: By establishing a finite element model that includes both new and existing tunnels, the mechanical effects of the blasting process can be simulated in detail, providing accurate impact predictions.

[0053] (2) Zoning management: Based on the different damage conditions of the tunnel, the areas are divided for targeted assessment, which improves the targeted nature of the analysis.

[0054] (3) Risk estimation: By calculating the maximum values ​​of water pressure and lining stress, the degree of possible leakage and structural damage can be estimated in advance, thus reducing the risk of actual construction.

[0055] (4) Optimize decision-making: Based on the prediction results, the seepage volume and cracking degree data of each area can be used to provide a basis for decision-making on key parameters such as the amount of explosives, thereby achieving a more scientific and reasonable blasting design.

[0056] (5) Cost-effectiveness: Knowing the scope and extent of the impact in advance can help reduce repair costs and improve the economic benefits of the overall project. BRIEF DESCRIPTION OF THE DRAWINGS

[0057] The drawings described herein are used to provide a further understanding of the embodiments of the present invention, constitute a part of this application, and do not constitute a limitation of the embodiments of the present invention. In the drawings:

[0058] Figure 1 A flow chart of the monitoring method of the present application example;

[0059] Figure 2 This is a unit diagram of the monitoring system of the present application example. DETAILED DESCRIPTION

[0060] In order to make the objectives, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with embodiments and drawings. The exemplary embodiments of the present invention and their description are only used to explain the present invention and are not intended to limit the present invention.

[0061] Please refer to Figure 1 , which is a flow chart of a monitoring method for the impact of blasting excavation of an adjacent tunnel on an existing tunnel provided in an embodiment of the present invention. Further, the monitoring method includes the following steps S1 to S7.

[0062] S1: Establish a finite element analysis model including new tunnels and existing tunnels;

[0063] S2: According to the damage type of the existing tunnel, the lining area of ​​the existing tunnel in the finite element analysis model is divided into a first area, a second area and an overlapping area, wherein the first area is a water seepage area, the second area is a lining cracking area, and the overlapping area is an overlapping area of ​​the first area and the second area;

[0064] S3: simulating blasting excavation of a new tunnel in the finite element model, and obtaining a set of maximum water pressure values ​​in the first area and a set of maximum lining stress values ​​in the second area under different blasting conditions;

[0065] S4: obtaining a water flow seepage data set corresponding to the first area according to the water pressure maximum value set prediction;

[0066] S5: obtaining a lining cracking degree data set corresponding to the second region according to the lining stress maximum value set prediction;

[0067] S6: Determine the water flow seepage and lining cracking degree data set of the overlapping area under different blasting conditions according to the superposition principle;

[0068] S7: Integrate the water seepage and lining cracking degree data of each area to select the appropriate amount of explosives for blasting and excavation of the new tunnel.

[0069] When the embodiment of the present application is implemented, in order to facilitate the establishment of the finite element model of the existing tunnel, it is necessary to conduct a comprehensive field survey and inspection of the existing tunnel before simulating blasting and excavation. The aspects of the survey and inspection include monitoring the changes in the water level and seepage volume in the tunnel by deploying equipment such as water level meters and seepage flow meters, and monitoring the changes in the width, length and shape of the cracks by equipment such as crack meters and measuring rulers; monitoring the water pressure in the seepage area of ​​the tunnel by a pressure gauge, and detecting the lining stress in the lining cracking area by strain gauges. The monitored water pressure is used as the initial water pressure, the water seepage volume is used as the initial water seepage volume, the lining stress is used as the initial lining stress, and the length and width of the lining cracks are used as the initial strain parameters of the cracks, which are passed into the finite element model as input data for calculation.

[0070] In the implementation of this embodiment, the finite element model is used to simulate the impact of different blasting conditions on the existing tunnel defects. By simulating the impact force and vibration force generated by explosives of different equivalents, the groundwater level around the existing tunnel changes and the continuous cracking of the existing tunnel lining cracks are caused, thereby changing the water pressure and the lining stress of the existing tunnel; by multiplying the maximum water pressure set of the seepage zone generated under different blasting conditions and the proportional relationship of the initial water pressure with the initial water flow seepage rate and the rock and soil permeability coefficient, it is estimated that the maximum water pressure set per unit time under different blasting conditions The water seepage rate is obtained by the set of maximum lining stress values ​​of the lining cracking zone generated under different blasting conditions, and the corresponding shear modulus set is obtained by using the initial lining stress to obtain the initial shear modulus. The shear model in the shear modulus set is then multiplied by the proportional relationship of the initial shear modulus with the strain increase rate at the lining crack tip and the initial parameters of the crack strain to estimate the degree of lining crack development corresponding to each set of maximum lining stress values. Finally, the water seepage rate and lining cracking degree data of the overlapping area under different blasting conditions are determined by the superposition principle.

[0071] In a possible implementation, determining the seepage volume and lining cracking degree of the overlapping unit according to the superposition principle includes:

[0072] Identifying and quantifying the initial water pressure and the initial lining stress in the overlapping area, and determining the distribution of the initial water pressure and the initial lining stress in the overlapping area;

[0073] decoupling the overlapping region into the first region and the second region, determining the initial water pressure in the first region, and determining the initial lining stress in the second region;

[0074] Establishing a multi-physics field coupling model including the overlapping area, and determining the maximum water pressure set and the maximum lining stress set in the coupling model under different blasting conditions;

[0075] Obtaining a corresponding water flow seepage data set according to the maximum water pressure set and the initial water pressure;

[0076] Obtaining a corresponding lining cracking degree data set according to the lining stress maximum value set and the initial lining stress;

[0077] A correlation equation is established to couple the water flow seepage rate and the cracking degree of the cracks, and a data set of the water flow seepage rate and the lining cracking degree under the combined action of water pressure and lining stress is obtained.

[0078] In this embodiment, since there is mutual influence between the overlap area and the seepage and lining cracking, as the lining cracking unfolds, the seepage of the lining increases, and as the water seepage increases, the cracking of the lining increases; therefore, a multi-physical field coupling model of water pressure and lining stress is established to simulate and analyze the impact of the overlap area under the combined action of water seepage and lining deformation and cracking.

[0079] Furthermore, the correlation equation is obtained by fitting the water pressure, lining stress and crack degree, and the correlation equation formula is:

[0080]

[0081] Among them, f- represents the relationship function between water seepage and crack opening degree; - indicates the change of crack opening degree over time; q- indicates water seepage; - represents the change of water pressure with time; σ- represents the lining stress.

[0082] When implementing this embodiment, by collecting data such as water pressure, lining stress, water seepage, lining crack width and lining crack length of a large number of tunnels, preliminary statistical analysis and correlation analysis are performed on the data to analyze the relationship and influencing factors between various parameters; the correlation equation between seepage and lining crack degree is fitted and established by the least squares method, and the final correlation equation is obtained through iterative verification. This fitting process belongs to the prior art and is not further limited in this embodiment.

[0083] In a possible implementation, the water flow seepage data corresponding to the first area is obtained by determining the initial water pressure of the first area according to the monitoring report of the existing tunnel;

[0084] The initial water seepage rate per unit time is calculated using the initial water pressure according to Darcy's law, and the water seepage rate per unit time of each water pressure maximum value set is estimated by combining the initial water pressure maximum value set with the proportional relationship between the initial water pressure and the initial water pressure.

[0085] When this embodiment is implemented, the water seepage rate per unit time of the water pressure maximum value set under different blasting conditions is estimated by multiplying the water pressure maximum value set and the initial water pressure proportional relationship of the seepage zone generated under different blasting conditions with the initial water seepage rate, rock and soil permeability coefficient and permeability growth rate.

[0086] In a possible implementation, the method of obtaining the lining cracking degree data corresponding to the second area is to determine the initial lining stress of the second area according to the monitoring report of the existing tunnel;

[0087] The initial shear modulus is obtained according to the initial lining stress, and the corresponding shear modulus set is obtained according to each of the lining stress maximum value sets. The proportional relationship between each of the shear modulus sets and the initial shear modulus is combined with the strain increase rate at the lining crack tip and the initial parameters of the crack strain to estimate the degree of lining crack development corresponding to each of the lining stress maximum value sets.

[0088] When this embodiment is implemented, the corresponding shear modulus set is obtained through the lining stress maximum value set of the lining cracking zone generated under different blasting conditions, the initial shear modulus is obtained using the initial lining stress, and then the shear model in the shear modulus set is respectively multiplied with the proportional relationship of the initial shear modulus and the strain increase rate of the lining crack tip and the length parameter and width parameter of the initial crack to estimate the degree of lining crack development corresponding to each lining stress maximum value set.

[0089] In one possible implementation, integrating the water seepage and lining cracking data for each area includes:

[0090] The maximum allowable value of water seepage in the first area is used as the first safety warning value, the maximum allowable value of the degree of lining cracks in the second area is used as the second safety warning value, the maximum allowable value of water seepage in the overlapping area is used as the third safety warning value, and the maximum allowable value of the degree of lining cracks in the overlapping area is used as the fourth safety warning value;

[0091] Establishing a first relationship curve between different blasting conditions and water seepage in the first area according to the water seepage data set corresponding to the first area;

[0092] Establishing a second relationship curve between different blasting conditions and lining cracking degrees in the second area according to the lining cracking degree data set corresponding to the second area;

[0093] According to the coupled water seepage and lining cracking degree data set in the overlapping area, a third relationship curve between different blasting conditions and water seepage in the overlapping area and a fourth relationship curve between different blasting conditions and lining cracking degree are established.

[0094] When this embodiment is implemented, the first safety warning value is the maximum water seepage that the lining structure in the first area can withstand, the second safety warning value is the maximum cracking degree that the lining structure in the second area can withstand, the third safety warning value is the maximum water seepage that the lining structure in the overlapping area can withstand, and the fourth safety warning value is the cracking degree that the lining structure in the overlapping area can withstand.

[0095] In one possible implementation, based on the first relationship curve, the second relationship curve, the third relationship curve and the fourth relationship curve, the appropriate amount of explosives in the first area, the second area and the overlapping area are evaluated, and then a reasonable blasting construction plan is evaluated.

[0096] Furthermore, the reasonable blasting construction plan is evaluated to include:

[0097] Conducting early warning assessment on the hazards in the first area, the second area and the overlapping area under different blasting conditions;

[0098] Evaluate and select a first data set in which the water seepage rate in the first relationship curve does not exceed the first safety warning value;

[0099] evaluating and selecting a second data set in which the degree of lining cracking in the second relationship curve does not exceed the second safety warning value;

[0100] Evaluate and select a third data set whose water flow seepage rate in the third relationship curve does not exceed the third safety warning value;

[0101] evaluating and selecting a fourth data set in which the degree of lining cracking within the fourth relationship curve does not exceed the fourth safety warning value;

[0102] The means of the first data set, the second data set, the third data set and the fourth data set are respectively obtained, and the equivalent explosives corresponding to the means in each area are obtained to blast and excavate a new tunnel.

[0103] When this embodiment is implemented, in order to avoid excessive vibration impact stress caused by blasting during blasting and excavation, which may cause the lining structure to withstand water seepage and the degree of lining cracking to reach their respective safety warning values, and also to avoid excessive vibration impact stress caused by blasting, which may affect the excavation efficiency; therefore, an equivalent amount of explosives corresponding to the average value of the test data set that does not exceed the safety warning value of each area is selected to carry out blasting excavation in each area.

[0104] See also Figure 2 Based on the above monitoring method, the present application example provides a monitoring system for the impact of blasting excavation of adjacent tunnels on existing tunnels, the monitoring system comprising:

[0105] A segmentation unit: configured to divide the existing tunnel lining area into the first area, the second area and the overlapping area;

[0106] A decoupling unit: configured to decouple the overlapping area into the first area and the second area;

[0107] A coupling unit: configured to couple the first region and the second region into an overlapping region;

[0108] A calculation unit: a data set configured to calculate the water seepage amount of the first area, a data set to calculate the degree of lining cracks in the second area, and a data set to calculate the water seepage amount and the degree of lining cracks in the overlapping area;

[0109] Evaluation unit: configured to evaluate a reasonable blasting construction plan based on a data set of water seepage and lining cracking degree.

[0110] The specific implementation methods described above further illustrate the objectives, technical solutions and beneficial effects of the present invention in detail. It should be understood that the above description is only a specific implementation method of the present invention and is not intended to limit the scope of protection of the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.

Claims

1. A method for monitoring the impact of blasting excavation of adjacent tunnels on existing tunnels, characterized in that include: Establish a finite element analysis model including new tunnels and existing tunnels; According to the disease type of the existing tunnel, the lining area of ​​the existing tunnel in the finite element analysis model is divided into a first area, a second area and an overlapping area, wherein the first area is a water seepage area, the second area is a lining cracking area, and the overlapping area is an overlapping area of ​​the first area and the second area; Simulating blasting excavation of a new tunnel in the finite element model, and obtaining a set of maximum water pressure values ​​in the first area and a set of maximum lining stress values ​​in the second area under different blasting conditions; Predicting a water flow seepage data set corresponding to the first area based on the water pressure maximum value set; Predicting a lining cracking degree data set corresponding to the second region based on the lining stress maximum value set; Determine the water flow seepage and lining cracking degree data set of the overlapping area under different blasting conditions according to the superposition principle; The water seepage rate and lining cracking degree data of each area are integrated to select the reasonable equivalent of explosives for blasting excavation of the new tunnel.

2. The method for monitoring the impact of blasting excavation of adjacent tunnels on existing tunnels according to claim 1, characterized in that: Determining the seepage volume and lining cracking degree of the overlapping unit according to the superposition principle includes: Identifying and quantifying the initial water pressure and the initial lining stress in the overlapping area, and determining the distribution of the initial water pressure and the initial lining stress in the overlapping area; decoupling the overlapping region into the first region and the second region, determining the initial water pressure in the first region, and determining the initial lining stress in the second region; Establishing a multi-physics field coupling model including the overlapping area, and determining the maximum water pressure set and the maximum lining stress set in the coupling model under different blasting conditions; Obtaining a corresponding water flow seepage data set according to the maximum water pressure set and the initial water pressure; Obtaining a corresponding lining cracking degree data set according to the lining stress maximum value set and the initial lining stress; A correlation equation is established to couple the water flow seepage rate and the cracking degree of the cracks, and a data set of the water flow seepage rate and the lining cracking degree under the combined action of water pressure and lining stress is obtained.

3. The method for monitoring the impact of blasting excavation of adjacent tunnels on existing tunnels according to claim 2, characterized in that: The correlation equation is obtained by fitting the water pressure, lining stress and crack degree. The correlation equation formula is: Among them, f- represents the relationship function between water seepage and crack opening degree; - indicates the change of crack opening degree over time; q- indicates water seepage; - represents the change of water pressure with time; σ- represents the lining stress.

4. The method for monitoring the impact of blasting excavation of adjacent tunnels on existing tunnels according to claim 1, characterized in that: The method of obtaining the water flow seepage data corresponding to the first area is to determine the initial water pressure of the first area according to the monitoring report of the existing tunnel; The initial water seepage rate per unit time is calculated using the initial water pressure according to Darcy's law, and the water seepage rate per unit time of each water pressure maximum value set is estimated by combining the initial water pressure maximum value set with the proportional relationship between the initial water pressure and the initial water pressure.

5. The method for monitoring the impact of blasting excavation of adjacent tunnels on existing tunnels according to claim 1, characterized in that: The method of obtaining the lining cracking degree data corresponding to the second area is to determine the initial lining stress of the second area according to the monitoring report of the existing tunnel; The initial shear modulus is obtained according to the initial lining stress, and the corresponding shear modulus set is obtained according to each of the lining stress maximum value sets. The proportional relationship between each of the shear modulus sets and the initial shear modulus is combined with the strain increase rate at the lining crack tip and the initial parameters of the crack strain to estimate the degree of lining crack development corresponding to each of the lining stress maximum value sets.

6. The method for monitoring the impact of blasting excavation of adjacent tunnels on existing tunnels according to claim 1, characterized in that: Integration of water seepage and lining cracking data in various areas includes: The maximum allowable value of water seepage in the first area is used as the first safety warning value, the maximum allowable value of the degree of lining cracks in the second area is used as the second safety warning value, the maximum allowable value of water seepage in the overlapping area is used as the third safety warning value, and the maximum allowable value of the degree of lining cracks in the overlapping area is used as the fourth safety warning value; Establishing a first relationship curve between different blasting conditions and water seepage in the first area according to the water seepage data set corresponding to the first area; Establishing a second relationship curve between different blasting conditions and lining cracking degrees in the second area according to the lining cracking degree data set corresponding to the second area; According to the coupled water seepage and lining cracking degree data set in the overlapping area, a third relationship curve between different blasting conditions and water seepage in the overlapping area and a fourth relationship curve between different blasting conditions and lining cracking degree are established.

7. A method for monitoring the impact of blasting excavation of adjacent tunnels on existing tunnels according to claim 6, It is characterized in that According to the first relationship curve, the second relationship curve, the third relationship curve and the fourth relationship curve, evaluate and obtain the appropriate amount of explosives in the first area, the second area and the overlapping area, and then evaluate a reasonable blasting construction plan.

8. A method for monitoring the impact of blasting excavation of adjacent tunnels on existing tunnels according to claim 7, characterized in that: The reasonable blasting construction plan is evaluated to include: Conducting early warning assessment on the hazards in the first area, the second area and the overlapping area under different blasting conditions; Evaluate and select a first data set in which the water seepage rate in the first relationship curve does not exceed the first safety warning value; evaluating and selecting a second data set in which the degree of lining cracking in the second relationship curve does not exceed the second safety warning value; Evaluate and select a third data set whose water flow seepage rate in the third relationship curve does not exceed the third safety warning value; evaluating and selecting a fourth data set in which the degree of lining cracking within the fourth relationship curve does not exceed the fourth safety warning value; The means of the first data set, the second data set, the third data set and the fourth data set are respectively obtained, and the equivalent explosives corresponding to the means in each area are obtained to blast and excavate a new tunnel.

9. A monitoring system for the impact of blasting excavation of adjacent tunnels on existing tunnels, characterized in that: Using the method according to any one of claims 1 to 8, the monitoring system comprises: A segmentation unit: configured to divide the existing tunnel lining area into the first area, the second area and the overlapping area; A decoupling unit: configured to decouple the overlapping area into the first area and the second area; A coupling unit: configured to couple the first region and the second region into an overlapping region; A calculation unit: a data set configured to calculate the water seepage amount of the first area, a data set to calculate the degree of lining cracks in the second area, and a data set to calculate the water seepage amount and the degree of lining cracks in the overlapping area; Evaluation unit: configured to evaluate a reasonable blasting construction plan based on a data set of water seepage and lining cracking degree.