Through the automated wind farm line setting method, the optimal line is selected using data information and optimization dimensions, which solves the accuracy problems caused by manual operation and improves the accuracy and stability of wind farm line setting.

CN119005460APending Publication Date: 2024-11-22WUHUAN GREEN ENERGY (BEIJING) ENGINEERING TECHNOLOGY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410958859.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-17
Publication Date
2024-11-22

AI Technical Summary

Technical Problem

The existing wind farm line setting process relies on manual operations, which are prone to calculation errors and optimal design omissions, resulting in poor accuracy of the results.

Method used

By obtaining the input documents of the wind farm, extracting target data information, calculating the number of fan settings and determining the line setting category, generating preliminary setting results of multiple lines, and selecting the final results based on the line score (including the average load as the optimization dimension), realizing automation and Mechanized line setting process.

Benefits of technology

It improves the accuracy of line settings, avoids manual operation errors, ensures the stability of wind farm operation, and provides more accurate data support for the feasibility study report of wind farms.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119005460A_ABST
    Figure CN119005460A_ABST
Patent Text Reader

Abstract

The invention discloses a line setting method and device based on a wind power plant, and relates to the technical field of data processing. The method comprises the steps that an input document of a wind power plant is acquired, and target data information is extracted based on the input document; the line association information at least comprises fan information and line information; calculating a fan setting number according to the fan information in the target data information and the wind power plant capacity demand, determining a line setting category based on the line information in the target data information, and generating a plurality of line preliminary setting results based on the line setting category and the fan setting number; and selecting the line preliminary setting result with the maximum line score as the final line setting result of the wind power plant based on the line score of each line preliminary setting result from the plurality of line preliminary setting results. The method is used for realizing a line setting function based on the wind power plant.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of data processing technology, and in particular to a method and device for setting up a line based on a wind farm. Background Art

[0002] In the process of preparing a feasibility study report for a wind farm, it is generally necessary to carry out line design for the wind farm. As an important part of the feasibility study report for a wind farm, correct line design of the wind farm is very important for the accuracy of the content of the feasibility study report for a wind farm.

[0003] At present, in the process of line design, various data information is usually collected manually for statistics and calculations. For example, after manually collecting parameters such as wind turbine coordinates, booster station coordinates, access station coordinates, and topographic maps, the line calculation and planning of the wind farm are carried out. However, in actual applications, although the manual calculation method can complete the line setting of the wind farm to a certain extent, it consumes manpower because the results need to be analyzed and planned during this calculation process, and it is easy to cause calculation errors. Especially when the project scale is large and the line route is complicated, the manual line setting may miss the optimal design due to human operation errors or deviations, resulting in poor accuracy of the line setting results. Summary of the invention

[0004] The embodiment of the present application provides a line setting method and device based on a wind farm, the main purpose of which is to implement a line setting method based on a wind farm to solve the problem that the existing line setting process based on a wind farm consumes manpower and the accuracy of the line setting results is poor due to human operation errors or deviations.

[0005] In order to solve the above technical problems, the embodiments of the present application provide the following technical solutions:

[0006] In a first aspect, the present application provides a method for setting up a line based on a wind farm, the method comprising:

[0007] Obtaining input documents of the wind farm, and extracting target data information based on the input documents; wherein the input documents include line-related documents; the target data information includes line-related information; the line-related information includes at least wind turbine information and line information;

[0008] Calculating the number of wind turbine settings according to the wind turbine information and the wind farm capacity requirement in the target data information, determining the line setting category based on the line information in the target data information, and generating a plurality of preliminary line setting results based on the line setting category and the number of wind turbine settings;

[0009] Among the multiple preliminary line setting results, the preliminary line setting result with the largest line score is selected as the final line setting result of the wind farm based on the line score of each preliminary line setting result; wherein the line score is determined based on at least one optimization dimension, and the optimization dimension includes at least the average load of each loop in the preliminary line setting result.

[0010] In a second aspect, the present application further provides a line setting device based on a wind farm, the device comprising:

[0011] An extraction unit is used to obtain input documents of the wind farm and extract target data information based on the input documents; wherein the input documents include line-related documents; the target data information includes line-related information; the line-related information includes at least wind turbine information and line information;

[0012] a generating unit, configured to calculate the number of wind turbine settings according to the wind turbine information and the wind farm capacity requirement in the target data information, determine a line setting category based on the line information in the target data information, and generate a plurality of preliminary line setting results based on the line setting category and the number of wind turbine settings;

[0013] A selection unit is used to select a line preliminary setting result with the largest line score from a plurality of the line preliminary setting results based on the line score of each line preliminary setting result as the final line setting result of the wind farm; wherein the line score is determined based on at least one optimization dimension, and the optimization dimension at least includes the average load of each loop in the line preliminary setting result.

[0014] In a third aspect, the present application further provides a storage medium, which includes a stored program, wherein when the program is running, the device where the storage medium is located is controlled to execute the line setting method based on the wind farm described in the first aspect.

[0015] In a fourth aspect, the present application also provides a wind farm-based line setting device, the device comprising a storage medium; and one or more processors, the storage medium is coupled to the processor, and the processor is configured to execute program instructions stored in the storage medium; when the program instructions are executed, the wind farm-based line setting method described in any one of the first aspects is executed.

[0016] By means of the above technical solution, the technical solution provided by this application has at least the following advantages:

[0017] The present application provides a line setting method and device based on a wind farm, which can obtain input documents of the wind farm and extract target data information based on the input documents; wherein the input documents include line-related documents; the target data information includes line-related information; the line-related information includes at least wind turbine information and line information; then, the number of wind turbine settings is calculated based on the wind turbine information in the target data information and the wind farm capacity demand, and the line setting category is determined based on the line information in the target data information, and multiple line preliminary setting results are generated based on the line setting category and the number of wind turbine settings; finally, among the multiple line preliminary setting results, the line preliminary setting result with the largest line score is selected based on the line score of each line preliminary setting result as the final line setting result of the wind farm; wherein the line score is determined based on at least one optimization dimension, and the optimization dimension at least includes the average load of each loop in the line preliminary setting result, thereby solving the problem of poor accuracy of the existing line setting results. Compared with the prior art, the above method of the present application can be automatically operated and processed based on a machine with one click, which solves the problem that the prior art relies on manual labor. Compared with manual line setting, the above method of the present application does not rely on manual operation and participation during the process, whether it is the process of extracting target data information from the input documents of the wind farm, or the process of calculating the number of wind turbine settings and determining the line setting category based on the target data, or even the process of determining the preliminary setting results of multiple lines, and selecting the final result of line setting according to the line score based on the preliminary setting results of the lines. This avoids manual operation errors in the process of extracting target data information from input documents, and also avoids manual calculation errors or operation errors in the process of calculating the number of wind turbine settings and determining the line setting category. It also avoids the situation that the selected line setting result is not the optimal line due to subjective factors or operation errors of personnel when selecting the final result of line setting after determining the preliminary setting results of multiple lines, and avoids the situation that the optimal line is missed due to manual errors, thereby improving the accuracy of the line setting of the wind farm and solving the problem of poor accuracy caused by the existing line setting method relying on manual labor. In addition, in the process of determining the final result of line setting in this application, it is determined based on the line score, and the line score is determined based on the optimization dimension including the average load of each loop. This ensures that in the process of selecting the optimal line, the capacity of each loop can be taken into account when deploying the wind turbine, and can avoid the problem of excessive load differences that may be caused by saving line length due to excessive emphasis on economic benefits during line setting, thereby ensuring the stable operation of the wind farm, and then laying the foundation for the overall accuracy of the wind farm feasibility study report based on the wind farm line setting results.

[0018] The above description is only an overview of the technical solution of the present application. In order to more clearly understand the technical means of the present application, it can be implemented in accordance with the contents of the specification. In order to make the above and other purposes, features and advantages of the present application more obvious and easy to understand, the specific implementation methods of the present application are listed below. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] By reading the detailed description below with reference to the accompanying drawings, the above and other purposes, features and advantages of the exemplary embodiments of the present application will become easy to understand. In the accompanying drawings, several embodiments of the present application are shown in an exemplary and non-limiting manner, and the same or corresponding reference numerals represent the same or corresponding parts, wherein:

[0020] Figure 1 A flow chart of a line setting method based on a wind farm provided in an embodiment of the present application is shown;

[0021] Figure 2 A flow chart of another method for setting up a line based on a wind farm provided in an embodiment of the present application is shown;

[0022] Figure 3 A block diagram showing a wind farm-based line setting device provided in an embodiment of the present application is shown;

[0023] Figure 4 A block diagram showing the composition of another wind farm-based line setting device provided in an embodiment of the present application. DETAILED DESCRIPTION

[0024] The exemplary embodiments of the present application will be described in more detail below with reference to the accompanying drawings. Although the exemplary embodiments of the present application are shown in the accompanying drawings, it should be understood that the present application can be implemented in various forms and should not be limited by the embodiments described herein. On the contrary, these embodiments are provided in order to enable a more thorough understanding of the present application and to fully convey the scope of the present application to those skilled in the art.

[0025] It should be noted that, unless otherwise specified, the technical terms or scientific terms used in this application should have the common meanings understood by technicians in the field to which this application belongs.

[0026] The present application embodiment provides a flow chart of a method for setting a line based on a wind farm, such as Figure 1 As shown, the method includes:

[0027] 101. Obtain input documents of a wind farm, and extract target data information based on the input documents.

[0028] The input document includes a line-related document; the target data information includes line-related information; and the line-related information includes at least wind turbine information and line information.

[0029] In this embodiment, the line setting method of the wind farm can be deployed in the system for generating the feasibility study report of the wind farm, and specifically can be deployed in the subsystem involving the line in the system, that is to say, the final result of the line setting obtained in this embodiment can actually be obtained by the subsystem, and is a link in the process of generating the subsequent feasibility study report, and provides data about the line for the generation of the subsequent feasibility study report. Of course, the line setting method of the wind farm can also be deployed separately in a separate independent system, and the lines of the wind farm are specially designed based on user needs. Here, there is no specific restriction on the specific use scenario of the line setting method. The above two deployment methods are only exemplary. The specific situation can be deployed in any of the above or other ways based on the actual needs of the user.

[0030] When it is necessary to generate a line setting plan, first, it is necessary to extract the relevant data for generating the line setting plan from the relevant files, that is, the target data information described in this embodiment. The input document can be special data provided specifically for line setting, or it can be a composite document containing the above data but also other data. There is no specific limitation on the type of the input document, and it can be selected based on the actual system currently deployed by the line setting method. For example, if the currently deployed system is a system that can specifically extract target data information suitable for line setting from the composite document, then the input document can be a compliant document. On the contrary, if the currently deployed system can only recognize line-related documents, then the input document can only be a document containing only the current line.

[0031] Specifically, the target data information includes data required for line setting, namely, line-related information, which may include information related to the wind turbine and information related to the line, namely, wind turbine information and line information. The wind turbine information may include at least information such as wind turbine capacity, and the line information may include at least line specifications, line-adapted capacity, etc.

[0032] 102. Calculate the number of wind turbine settings according to the wind turbine information and wind farm capacity requirements in the target data information, determine a line setting category based on the line information in the target data information, and generate a plurality of preliminary line setting results based on the line setting category and the number of wind turbine settings.

[0033] After the target data information is determined, the next step is to determine the number of wind turbines required for the current line setting, that is, the number of wind turbine settings described in this example. The number of wind turbine settings is determined based on the capacity specifications of each wind turbine determined in the wind turbine information and the capacity requirements of the current wind farm. For example, when the capacity requirement of the wind farm is 100,000 kW and the capacity specification of each wind turbine is 5,000 kW, the division calculation shows that the number of wind turbines deployed is 20.

[0034] Next, you need to determine the line setting category. Since the specifications of different line types are different, when determining the line setting, you need to know which one to use in the current line setting process, that is, the line setting category. For example, the line setting category can be divided into laying underground cables and erecting aerial cables. The specifications of these two types of cables are different, so they will affect the maximum capacity of the loop, thereby affecting the setting of the fans in each loop during the line setting process, and then affecting the results of the line setting.

[0035] After determining the line setting category and the number of fan settings, the line design can be carried out. Generally, there are multiple design schemes that meet user needs, which means that in theory each scheme is feasible. Therefore, these schemes can be used as preliminary line setting results so that the more suitable one can be selected as the final scheme later.

[0036] 103. Among the multiple preliminary line setting results, based on the line score of each preliminary line setting result, select the preliminary line setting result with the largest line score as the final line setting result of the wind farm.

[0037] The line score is determined based on at least one optimization dimension, and the optimization dimension at least includes an average load of each loop in the preliminary setting result of the line.

[0038] In this embodiment, after the preliminary line setting result is determined, all feasible solutions are actually determined, and then the most suitable one needs to be selected as the final solution, that is, the final line setting result.

[0039] Specifically, in this embodiment, the line score can be determined based on the average load as an optimization dimension. The line score can be understood as the "score" of the preliminary setting results of each line under the dimension of average load. The relationship between the line score and the average load is negatively correlated, that is, the higher the average load, the worse the reliability of the wind farm during operation, and it is easy to have operation problems when special circumstances arise, so its "score" is relatively low, that is, the smaller the line score. On the contrary, when the average load is smaller, the higher the operation stability, the larger the index, then the selection according to the line score can ensure the operation stability of the wind farm for setting, thus ensuring that the wind farm can ensure high operation stability during the line setting process, thereby ensuring that the set line is more reasonable, and avoiding the situation where the high average load affects the normal operation of the wind farm.

[0040] Furthermore, as a further description and refinement of the above-mentioned embodiment, the present application also provides a line setting method based on a wind farm, specifically as follows: Figure 2 As shown:

[0041] 201. Obtain input documents of a wind farm, and extract target data information based on the input documents.

[0042] Wherein, the input document includes line-related documents; the target data information includes line-related information; and the line-related information includes at least wind turbine information and line information.

[0043] In this embodiment, the input document can be a specific document including line aspects, or a composite document including multiple different aspects including line aspects. The type of the input document is not specifically limited here, and it can be determined by the type of document that can be recognized by the system deployed by the method described in this embodiment. Of course, in this embodiment, the application scenario and the adapted system of the method are consistent with the description in the above embodiment. At the same time, the target data information, line-related documents, line-related information, fan information and line information extracted from the input document are consistent with the description in the above embodiment, and will not be repeated here.

[0044] In addition, in the present embodiment, the data content involved in the line relationship information specifically included in the target data information may also specifically include the following types of wind turbine coordinates, booster station coordinates, access station coordinates, topographic maps, road information, site turning point coordinates, avoidance areas, and wind turbine capacity. Of course, these data may belong to the wind turbine information and line information in the present embodiment. For example, wind turbine capacity, wind turbine coordinates, etc. belong to the content in the wind turbine information, while site turning point coordinates, avoidance areas, etc. may belong to the content included in the line information, and topographic areas, road information, etc. may be other information other than the line-related information in the target data information. That is to say, the target data information extracted in the present embodiment may also include other data that the user wants to know later, or data required for the execution of other subsequent schemes. Here, the specific content and data types included in the target data information are not limited. The above is only exemplary. It is sufficient to ensure that the target data information contains line-related information for implementing the method described in the present embodiment.

[0045] 202. Calculate the number of wind turbine settings according to the wind turbine information and the wind farm capacity requirement in the target data information, determine the line setting category based on the line information in the target data information, and generate a plurality of preliminary line setting results based on the line setting category and the number of wind turbine settings.

[0046] In this step, two main operations are performed. One is to calculate the wind turbine setting data based on the wind turbine information and the wind farm capacity requirements, and to determine the line setting category from the line information. The other is to generate preliminary line setting results based on the line setting category and the wind turbine setting data.

[0047] For the former, specifically, in this step, the number of wind turbines to be set is calculated according to the wind turbine information in the target data information and the wind farm capacity demand, and the line setting category is determined based on the line information in the target data information. When executing, it can be specifically performed in the following manner:

[0048] First, the wind farm capacity demand is obtained based on the user input information, and the wind turbine capacity information of each wind turbine in the wind farm is determined based on the wind turbine information; wherein the user input information is input based on the preset interactive interface of the platform, and the user input information contains overall capacity information useful for determining the scale of the wind farm. Here, the wind farm capacity demand can be understood as the scale of the wind farm that the actual user wants to build, and the user input information can directly contain information related to the size of the wind farm capacity as the wind farm capacity demand, or it can be based on some parameters input by the user. The system deployed by the method described in this embodiment calculates the capacity of the wind farm based on these parameters, and uses this as the wind farm capacity demand. Here, the specific type and determination method of the wind farm capacity demand are not limited, and the user can proceed in any of the above methods based on actual needs. In addition, the wind turbine information in this embodiment may include the wind turbine capacity information of the wind turbine. The wind turbine capacity information may be specifically determined by the wind turbine specification parameters, and the wind turbine specification parameters may be pre-entered. At the same time, the wind turbine specification parameters may actually be divided into multiple types. Specifically, in the process of determining the wind turbine capacity information in this step, it may be selected from a variety of wind turbine rule parameters based on the characteristics of the user. Of course, the user characteristics here may be any one or several information in multiple dimensions such as user preferences, user regions, and wind farm scale. Of course, here, with the help of a model algorithm, a model trained on the "characteristics" of a large number of different users can be used to process the "characteristics" of new and old users, and then predict the wind capacity information actually required by the user from a variety of wind turbine specification parameters.

[0049] Then, the number of wind turbines to be set is determined based on the overall capacity information and the wind turbine capacity information, wherein the number of wind turbines to be set is obtained by rounding up after dividing the overall capacity information and the wind turbine capacity information. Based on the overall capacity information and the wind turbine capacity information, the number of wind turbines required by Dangdang can be calculated by division. Since the calculated number is not an integer in some cases, in order to ensure that the capacity of the wind farm meets the needs of users, it is necessary to round up based on the number. For example, if the calculated result is 4.5 units, the actual number of wind turbines to be set should be 5 units.

[0050] Finally, terrain information is obtained, and based on the terrain information and / or user input information, the line category required by the user is selected from the line information as the line setting category, wherein the line information includes at least two line categories, each line category has a different degree of adaptation to the terrain, and each line category includes its set maximum loop deployment length. Since different terrains have an impact on the deployment of wind turbines, and different types of cable laying methods also have certain requirements for terrain, then in the process of determining the line setting category, it is actually necessary to analyze the terrain information. Of course, in actual applications, since the user may need several different cables to set the line, the line setting category can also be determined based on the user input information. Of course, in some cases, the user may select multiple different types of cables or line laying methods, and the terrain conditions only allow some types of cables or line laying methods. Then, the terrain information and user input information can be combined to select the line category suitable for the user from the line information as the line setting category. For example, the user selects three types of cables, cable A, cable B, and cable C, and also selects two methods of direct buried cable laying and overhead line laying. Next, a judgment can be made based on the terrain information. When it is determined that the terrain can only be applied to the overhead line method, and cable A and cable C are not suitable for the current terrain due to material or other parameters, then the method of laying cable C and overhead line can be determined. The specific line setting type that meets these two requirements can be selected in the line information. Specifically, in this embodiment, the line setting type can be understood as a scheme that includes a variety of different cable types and different installation methods, which can include specific cable models, cable loop capacity, line deployment methods, etc.

[0051] On the other hand, in this step, a plurality of preliminary line setting results are generated based on the line setting category and the number of wind turbine settings, which may specifically include:

[0052] First, based on the line setting category and the number of wind turbines, wind turbine points are set according to the preset wind turbine spacing, wherein each wind turbine point is set one by one starting from the booster station;

[0053] Then, the fan points are connected according to the maximum setting quantity of each loop to obtain a plurality of fan layout connections, and each of the fan layout connections is determined as a preliminary line setting result.

[0054] In this embodiment, after the number of wind turbines and the line setting category are determined, the wind turbine layout can be set. Of course, in the process of setting the wind turbines and lines, it is first necessary to determine how many circuits are currently needed and how many wind turbines need to be set in each circuit. In the process of setting the number of circuits, the cable parameters determined in the line setting category can be used. In this embodiment, it is assumed that the cables can be divided into two major categories: direct buried cable laying and overhead line laying. Each major category corresponds to specific cables of various specifications that can carry different capacities. Based on the different line specifications, the number of wind turbines it is allowed to carry can be determined. Based on the number of wind turbines that each circuit can carry and the wind turbine capacity of each wind turbine, the capacity of a circuit can be determined. Based on the total capacity of the wind farm, the number of circuits can be determined. After determining the number of loops, it is equivalent to knowing each line and its nodes (wind turbines) starting from the substation. Then, based on these lines, the positions of each wind turbine can be set in the area where the wind farm currently needs to be deployed, that is, the wind turbine points. In the process of setting the wind turbine points, they can be set according to the preset wind turbine spacing, and then these points can be connected. After the connection is completed, the line setting plan is obtained, that is, the preliminary line setting result.

[0055] 203. Optimize each of the preliminary line setting results to obtain an optimized line setting result.

[0056] The optimization operation is used to classify the first fan into the second fan group when the first fan is close to the second fan and far from the third fan; the first fan and the third fan are fans of the first fan group, the third fan is the fan closest to the first fan in the first fan group; the second fan is a fan of the second fan group;

[0057] In actual applications, some line design schemes may not be particularly reasonable. For example, due to wind turbine layout, terrain or some other reasons, the locations of some wind turbines are set too far away from other wind turbines in the group and are close to wind turbines in other wind turbine groups. In this process, it is necessary to optimize the preliminary line setting results according to the method of this step. Specifically, it can be the same-tower double-circuit path optimization. This process can be understood as designing some wind turbines that are far away from other wind turbines in the circuit to which they belong as double-circuit wind turbines in other circuits that are closer to them.

[0058] Specifically, when performing the optimization process in this step, the specific execution process may be:

[0059] When it is determined that the distance between the first fan and the third fan exceeds the upper limit of the distance, and it is determined that the distance between the first fan and the third fan is greater than the distance from the second fan to the booster station, it is determined whether the distance between the first fan and the second fan is less than a preset target value, and the preset target value is calculated by the distance between the first fan and the third fan and a preset coefficient, and the preset coefficient is between 0 and 1;

[0060] If it is determined that the distance between the first fan and the second fan is less than a preset target value, the connection between the first fan and the third fan is deleted and the first fan is connected to the second fan, so as to classify the first fan from the first fan group into the second fan group;

[0061] When it is determined that the straight-line distance between the third fan and the fourth fan is less than the line distance from the third fan to the booster station, the original connection line of the third fan is deleted and connected with the fourth fan; wherein the fourth fan is the fan that is closest to the line distance of the second fan in the second fan group.

[0062] That is, when it is determined that the distance between the first fan in a certain circuit and the third fan in the circuit exceeds the upper limit of the distance, and it is determined that the distance between the first fan and the third fan is greater than the distance from the second fan in the adjacent circuit to the booster station, it is determined whether the distance between the first fan and the second fan in the adjacent circuit is less than a preset target value, and the preset target value is calculated by the distance between the first fan and the third fan and a preset coefficient, and the preset coefficient is between 0 and 1;

[0063] If it is determined that the distance between the first fan and the second fan of the adjacent loop is less than a preset target value, the connection between the first fan and the third fan is deleted and the first fan is connected to the second fan of the adjacent loop, so as to classify the first fan from the first fan group into the second fan line of the adjacent loop, that is, the first fan is connected to the booster station by a new line along the path of the second fan line of the adjacent loop, that is, a double-circuit line is formed with the second fan line of the adjacent loop;

[0064] When it is determined that the straight-line distance between the third fan and the fourth fan of the adjacent circuit is less than the line distance from the third fan to the booster station, the original connection line of the third fan is deleted and connected with the fourth fan of the adjacent circuit;

[0065] Further, it can continue to determine whether the sum of the grouped capacities of the third fan and the adjacent fourth fan exceeds the maximum grouped capacity of the line. If it does not exceed the maximum grouped capacity, the third fan is directly incorporated into the group of the adjacent fourth fan, and no double-circuit line is formed. If it does not exceed the maximum grouped capacity, a double-circuit line is formed by the third fan and the adjacent fourth fan group.

[0066] For example, in this embodiment, the fans are grouped according to circuits. When the distance between a certain fan (the first fan) in a certain circuit and the closest fan (the second fan) in the same group exceeds 1.5 km (the upper limit of the distance), the fan exceeding 1.5 km is selected as fan A (the first fan), and the distance AY between fan A and fan Y (the third fan) is calculated. At this time, if the closest fan to fan A is fan C (the second fan) in another circuit (the second fan group), and fan C must be a non-double-circuit point, then the distance CS from fan C to the booster station S is calculated (here this distance is the line distance, that is, assuming that the line from fan C to the booster station S includes fans D (the fourth fan) and F, then the line distance CS from fan C to the booster station S = CD + DF + FS). Next, the magnitudes of AY and CS are judged: if AY is greater than CS, then it is further judged whether the ratio AC <= / AY * 0.8 (the preset coefficient) between the distances from point A to point C, and if so, a double-circuit connection is made between fan A and fan C, so as to divide fan A from the original first fan group into the second fan group. Then, after the connection, the straight-line distance YD between fan Y and fan D in the same circuit as fan A is judged. If it is determined that YD < YS (that is, the straight-line distance between fan Y and the booster station S), then fan Y needs to be assigned to the circuit to which fan D belongs, that is, the original connection of fan Y is removed and connected to fan D. On the other hand, if AY is less than or equal to CS, then fan A is not connected to fan Y. If none of the fans closest to fan A meet the conditions, the optimization process for fan A stops, and the next fan meeting the above conditions is processed until all fans have been judged.

[0067] It should be noted that in practical applications, after the preliminary line setting result has been determined in the foregoing steps, it can be seen whether it is necessary to perform an optimization operation on the preliminary line setting result as needed. If so, it is carried out in the manner described in this embodiment, that is, from step 202 to this step, and step 204 is executed after this step. On the contrary, if in some cases the user does not need to perform an optimization operation, then after step 202 is completed, this step is skipped and step 204 is executed. Specifically, it depends on the actual needs of the user.

[0068] 204. From the plurality of preliminary line setting results, based on the line score of each preliminary line setting result, select the preliminary line setting result with the largest line score as the final line setting result of the wind farm.

[0069] The line score is determined based on at least one optimization dimension, and the optimization dimension at least includes an average load of each loop in the preliminary setting result of the line.

[0070] Specifically, optimization processing is performed based on the aforementioned steps. Therefore, when this step is executed, the final result of line setting is actually determined in the optimized line setting result. Based on this, when this step is executed, it is specifically as follows: among the multiple optimized line setting results, based on the line score of each optimized line setting result, the one with the largest line score is selected as the final result of line setting of the wind farm.

[0071] Specifically, this step may specifically include:

[0072] Determine the number of loop fans in each loop based on the preliminary setting results of each circuit, and determine the average load based on the number of loop fans and the number of loops;

[0073] A line score is determined for the preliminary setting result of the line based on the average load, wherein there is a negative correlation between the average load and the line score.

[0074] In this way, when selecting a suitable one as the final result of line setting from multiple preliminary line setting results (based on the description of the above steps, if the above steps perform the optimization operation of step 203, then at this time, the final result of line setting is selected from the optimized line setting results. On the contrary, if the above steps do not perform the step optimization operation, but perform this step after step 202, then at this time, the final result of line setting is determined from the preliminary line setting results), it is mainly based on the optimization dimension of average load. In this process, the entire load of the loop is determined mainly based on the number of fans in each loop (the number of fans in the loop), and then the average load is determined based on the number of loops. Then, the preliminary line setting results are "scored" based on the average load, that is, the line score is determined. The score is negatively correlated with the average load. That is, the lower the average load, the greater the redundancy of the fan load of each loop, which is more conducive to the stable operation of the entire wind farm and the subsequent expansion of the wind farm. Then, its line score should be higher. On the contrary, it means that the load of each loop is large, and there is a greater hidden danger in the stability of operation, so the line score is lower. Next, based on the size of the scores, the preliminary setting result of the line with the largest score (the line setting result after optimization) can be used as the final line design plan, that is, the final line setting result.

[0075] Furthermore, when the method described in this embodiment is executed, the optimization dimension may also include the line length of each loop in the preliminary line setting result and the total line length in the preliminary line setting result;

[0076] Based on this, before determining the line score for the preliminary setting result of the line based on the average load, the method further includes:

[0077] Calculating the line length of each loop in the preliminary setting result, and performing summation calculation based on the line length of each loop to obtain the total line length of the preliminary setting result of the line;

[0078] Based on this, in this step, the line score is determined based on the average load as the preliminary setting result of the line, and when executed, it is specifically as follows:

[0079] The line score of each of the preliminary setting results of the lines is determined based on the line length of each loop, the total line length and the average load, wherein the line score is calculated based on the line length of each loop, the total line length and the average load according to the weight.

[0080] In this way, in the process of determining the line score, the two optimization dimensions of the loop line length and the total line length are taken into account on the basis of considering the average load as an optimization dimension, and the indicators of these optimization dimensions are scored and calculated according to certain weights. In this way, it is ensured that when the final line setting result is selected from a large number of preliminary line setting results (optimized line setting results), it is possible to analyze not only from the perspective of stable operation of the wind farm, but also from the perspective of the cable length required for the actual laying of the line when the wind farm is actually erected. This ensures the comprehensiveness of the final line design plan, that is, the final line setting result.

[0081] Furthermore, as a response to the above Figure 1 and Figure 2 In order to realize the method shown in the figure, another embodiment of the present application also provides a line setting device based on a wind farm. This device embodiment corresponds to the aforementioned method embodiment. For ease of reading, this device embodiment will not repeat the details of the aforementioned method embodiment one by one, but it should be clear that the device in this embodiment can correspond to all the contents of the aforementioned method embodiment. In order to realize a line setting method based on a wind farm, the device is specifically as follows Figure 3 As shown, the device comprises:

[0082] The extraction unit 31 may be used to obtain input documents of the wind farm and extract target data information based on the input documents; wherein the input documents include line-related documents; the target data information includes line-related information; the line-related information includes at least wind turbine information and line information;

[0083] The generating unit 32 may be used to calculate the number of wind turbine settings according to the wind turbine information and the wind farm capacity requirement in the target data information, determine the line setting category based on the line information in the target data information, and generate a plurality of preliminary line setting results based on the line setting category and the number of wind turbine settings;

[0084] The selection unit 33 can be used to select the line preliminary setting result with the largest line score from the multiple line preliminary setting results based on the line score of each line preliminary setting result as the final line setting result of the wind farm; wherein the line score is determined based on at least one optimization dimension, and the optimization dimension at least includes the average load of each loop in the line preliminary setting result.

[0085] Further, such as Figure 4 As shown, the generating unit 32 can be used to obtain the capacity demand of the wind farm based on the user input information, and determine the wind turbine capacity information of each wind turbine in the wind farm based on the wind turbine information; wherein the user input information is input based on the preset interactive interface of the platform, and the user input information includes the overall capacity information used to determine the scale of the wind farm; the number of wind turbine settings is determined based on the overall capacity information and the wind turbine capacity information, wherein the number of wind turbine settings is obtained by rounding up after division of the overall capacity information and the wind turbine capacity information; and, obtaining terrain information, and selecting the line category required by the user in the line information as the line setting category based on the terrain information and / or the user input information, wherein the line information includes at least two line categories, each line category has a different degree of adaptation to the terrain, and each line category respectively includes its set maximum loop deployment length.

[0086] Further, such as Figure 4 As shown, the generating unit 32 can also be specifically used to set the fan points according to the preset fan spacing based on the line setting category and the fan setting quantity, wherein each fan point is set one by one starting from the booster station; and, the fan points are connected according to the maximum setting quantity of each loop to obtain a variety of fan layout connections, and each of the fan layout connections is determined as the preliminary line setting result.

[0087] Further, such as Figure 4As shown, the selection unit 33 can also be used to determine the number of loop fans in each loop based on the preliminary setting results of each line, and determine the average load based on the number of loop fans and the number of loops; and determine the line score for the preliminary setting results of the line based on the average load, wherein the average load is negatively correlated with the line score.

[0088] Further, such as Figure 4 As shown, the optimization dimension also includes the line length of each loop in the preliminary line setting result and the total line length in the preliminary line setting result;

[0089] The selection unit 33 may also be used to: calculate the line length of each loop in the preliminary setting result, and perform summation calculation based on the line length of each loop to obtain the total line length of the preliminary line setting result;

[0090] The selection unit 33 can be specifically used to determine the line score of each preliminary setting result of the line based on the line length of each loop, the total length of the line and the average load, wherein the line score is calculated based on the line length of each loop, the total length of the line and the average load according to the weight.

[0091] Further, such as Figure 4 As shown, the device also includes:

[0092] The optimization unit 34 can be used to optimize each of the preliminary setting results of the line to obtain an optimized line setting result; wherein the optimization operation can be used to classify the first fan into the second fan group when the first fan is close to the second fan and far from the third fan; the first fan and the third fan are fans of the first fan group, the third fan is the fan closest to the first fan in the first fan group; the second fan is a fan of the second fan group;

[0093] The selection unit 33 may be specifically configured to select, from among the plurality of optimized line setting results, the one with the largest line score based on the line score of each optimized line setting result as the final line setting result of the wind farm.

[0094] Further, such as Figure 4 As shown, the first fan includes a terminal fan of the first fan group;

[0095] The optimization unit 34 comprises:

[0096] The first determination module 341 may be used to determine whether the distance between the first fan and the second fan is less than a preset target value when it is determined that the distance between the first fan and the third fan exceeds the upper limit of the distance and when it is determined that the distance between the first fan and the third fan is greater than the distance from the second fan to the booster station. The preset target value is calculated by the distance between the first fan and the third fan and a preset coefficient, and the preset coefficient is between 0 and 1.

[0097] The first operating module 342 may be configured to delete the connection between the first fan and the third fan and connect the first fan to the second fan if it is determined that the distance between the first fan and the second fan is less than a preset target value, so as to classify the first fan from the first fan group into the second fan group;

[0098] The second operation module 343 can be used to delete the original connection of the third fan and connect it with the fourth fan when it is determined that the straight-line distance between the third fan and the fourth fan is less than the line distance from the third fan to the booster station; wherein the fourth fan is the fan that is closest to the line distance of the second fan in the second fan group.

[0099] In order to achieve the above-mentioned purpose, according to another aspect of the present application, an embodiment of the present application further provides a storage medium, wherein the storage medium includes a stored program, wherein when the program is running, the device where the storage medium is located is controlled to execute the above-mentioned wind farm-based line setting method.

[0100] In order to achieve the above-mentioned purpose, according to another aspect of the present application, an embodiment of the present application also provides a line setting device based on a wind farm, the device comprising a storage medium; and one or more processors, the storage medium is coupled to the processor, and the processor is configured to execute program instructions stored in the storage medium; when the program instructions are executed, the above-mentioned wind farm-based line setting method is executed.

[0101] The embodiment of the present application provides a line setting method and device based on a wind farm. The present application can obtain input documents of the wind farm and extract target data information based on the input documents; wherein the input documents include line-related documents; the target data information includes line-related information; the line-related information includes at least wind turbine information and line information; then, the number of wind turbine settings is calculated based on the wind turbine information in the target data information and the wind farm capacity demand, and the line setting category is determined based on the line information in the target data information, and a plurality of line preliminary setting results are generated based on the line setting category and the number of wind turbine settings; finally, among the plurality of line preliminary setting results, the line preliminary setting result with the largest line score is selected based on the line score of each line preliminary setting result as the final line setting result of the wind farm; wherein the line score is determined based on at least one optimization dimension, and the optimization dimension at least includes the average load of each loop in the line preliminary setting result, thereby solving the problem of poor accuracy of the existing line setting results. Compared with the prior art, the above method of the present application can be automatically operated and processed based on a machine with one click, which solves the problem that the prior art relies on manual labor. Compared with manual line setting, the above method of the present application does not rely on manual operation and participation during the process, whether it is the process of extracting target data information from the input documents of the wind farm, or the process of calculating the number of wind turbine settings and determining the line setting category based on the target data, or even the process of determining the preliminary setting results of multiple lines, and selecting the final result of line setting according to the line score based on the preliminary setting results of the lines. This avoids manual operation errors in the process of extracting target data information from input documents, and also avoids manual calculation errors or operation errors in the process of calculating the number of wind turbine settings and determining the line setting category. It also avoids the situation that the selected line setting result is not the optimal line due to subjective factors or operation errors of personnel when selecting the final result of line setting after determining the preliminary setting results of multiple lines, and avoids the situation that the optimal line is missed due to manual errors, thereby improving the accuracy of the line setting of the wind farm and solving the problem of poor accuracy caused by the existing line setting method relying on manual labor. In addition, in the process of determining the final result of line setting in this application, it is determined based on the line score, and the line score is determined based on the optimization dimension including the average load of each loop. This ensures that in the process of selecting the optimal line, the capacity of each loop can be taken into account when deploying the wind turbine, and can avoid the problem of excessive load differences that may be caused by saving line length due to excessive emphasis on economic benefits during line setting, thereby ensuring the stable operation of the wind farm, and then laying the foundation for the overall accuracy of the wind farm feasibility study report based on the wind farm line setting results.

[0102] The wind farm-based line setting device includes a processor and a memory. The extraction unit, generation unit, selection unit, etc. are all stored in the memory as program units, and the processor executes the program units stored in the memory to implement corresponding functions.

[0103] The processor includes a kernel, and the kernel retrieves the corresponding program unit from the memory. One or more kernels can be set, and a line setting method based on a wind farm is implemented by adjusting kernel parameters to solve the problem that the accuracy of the line setting result is poor due to human operation errors or deviations in the existing line setting process based on a wind farm.

[0104] An embodiment of the present application provides a line setting device based on a wind farm, the device comprising a storage medium; and one or more processors, the storage medium is coupled to the processor, the processor is configured to execute program instructions stored in the storage medium; when the program instructions are executed, any of the aforementioned wind farm-based line setting methods are executed.

[0105] An embodiment of the present application provides a storage medium, which includes a stored program, wherein when the program is executed, a device where the storage medium is located is controlled to execute the above-mentioned wind farm-based line setting method.

[0106] The storage medium may include non-permanent memory in a computer-readable medium, random access memory (RAM) and / or non-volatile memory in the form of read-only memory (ROM) or flash RAM, and the memory includes at least one storage chip.

[0107] An embodiment of the present application provides a device, which includes a processor, a memory, and a program stored in the memory and executable on the processor. When the processor executes the program, the following steps are implemented: obtaining input documents of a wind farm, and extracting target data information based on the input documents; wherein the input documents include line-related documents; the target data information includes line-related information; the line-related information includes at least wind turbine information and line information; calculating the number of wind turbine settings according to the wind turbine information in the target data information and the wind farm capacity demand, determining the line setting category based on the line information in the target data information, and generating a plurality of line preliminary setting results based on the line setting category and the number of wind turbine settings; among the plurality of line preliminary setting results, selecting the line preliminary setting result with the largest line score based on the line score of each line preliminary setting result as the final line setting result of the wind farm; wherein the line score is determined based on at least one optimization dimension, and the optimization dimension includes at least the average load of each loop in the line preliminary setting result.

[0108] Further, the calculating the number of wind turbines to be set according to the wind turbine information and the wind farm capacity requirement in the target data information, and determining the line setting category based on the line information in the target data information, includes:

[0109] Obtaining the capacity demand of the wind farm based on the user input information, and determining the wind turbine capacity information of each wind turbine in the wind farm based on the wind turbine information; wherein the user input information is input based on a preset interactive interface of the platform, and the user input information includes overall capacity information useful for determining the scale of the wind farm;

[0110] Determining the number of fans to be set based on the overall capacity information and the fan capacity information, wherein the number of fans to be set is obtained by rounding up after dividing the overall capacity information and the fan capacity information;

[0111] Obtain terrain information, and select a route category required by the user from the route information as a route setting category based on the terrain information and / or user input information, wherein the route information includes at least two route categories, each route category has a different degree of adaptation to the terrain, and each route category includes its set maximum loop deployment length.

[0112] Furthermore, the generating of a plurality of preliminary line setting results based on the line setting category and the number of wind turbine settings includes:

[0113] Based on the line setting category and the number of wind turbines, the wind turbine points are set according to the preset wind turbine spacing, wherein each wind turbine point is set one by one starting from the booster station;

[0114] The fan points are connected according to the maximum setting quantity of each loop to obtain a plurality of fan layout connections, and each of the fan layout connections is determined as a preliminary line setting result.

[0115] Furthermore, the selecting, from among the plurality of preliminary line setting results, a preliminary line setting result with the largest line score based on the line score of each preliminary line setting result as the final line setting result of the wind farm includes:

[0116] Determine the number of loop fans in each loop based on the preliminary setting results of each circuit, and determine the average load based on the number of loop fans and the number of loops;

[0117] A line score is determined for the preliminary setting result of the line based on the average load, wherein there is a negative correlation between the average load and the line score.

[0118] Furthermore, the optimization dimension also includes the line length of each loop in the preliminary line setting result and the total line length in the preliminary line setting result;

[0119] Before determining the line score for the preliminary setting result of the line based on the average load, the method further includes:

[0120] Calculating the line length of each loop in the preliminary setting result, and performing summation calculation based on the line length of each loop to obtain the total line length of the preliminary setting result of the line;

[0121] The determining of the line score for the preliminary setting result of the line based on the average load comprises:

[0122] The line score of each of the preliminary setting results of the lines is determined based on the line length of each loop, the total line length and the average load, wherein the line score is calculated based on the line length of each loop, the total line length and the average load according to the weight.

[0123] Furthermore, before selecting the preliminary line setting result with the largest line score among the plurality of preliminary line setting results based on the line score of each preliminary line setting result as the final line setting result of the wind farm, the method further includes:

[0124] Optimizing each of the preliminary setting results of the line to obtain an optimized line setting result; wherein the optimization operation is used to classify the first fan into the second fan group when the first fan is close to the second fan and far from the third fan; the first fan and the third fan are fans of the first fan group, the third fan is the fan closest to the first fan in the first fan group; the second fan is a fan of the second fan group;

[0125] The selecting, from among the plurality of preliminary line setting results, a preliminary line setting result with the largest line score based on the line score of each preliminary line setting result as the final line setting result of the wind farm comprises:

[0126] Among the multiple optimized line setting results, based on the line scores of each optimized line setting result, one with the largest line score is selected as the final line setting result of the wind farm.

[0127] Further, the first fan includes a terminal fan of the first fan group;

[0128] The optimizing process for each of the preliminary line setting results to obtain the optimized line setting results includes:

[0129] When it is determined that the distance between the first fan and the third fan exceeds the upper limit of the distance, and it is determined that the distance between the first fan and the third fan is greater than the distance from the second fan to the booster station, it is determined whether the distance between the first fan and the second fan is less than a preset target value, and the preset target value is calculated by the distance between the first fan and the third fan and a preset coefficient, and the preset coefficient is between 0 and 1;

[0130] If it is determined that the distance between the first fan and the second fan is less than a preset target value, the connection between the first fan and the third fan is deleted and the first fan is connected to the second fan, so as to classify the first fan from the first fan group into the second fan group;

[0131] When it is determined that the straight-line distance between the third fan and the fourth fan is less than the line distance from the third fan to the booster station, the original connection line of the third fan is deleted and connected with the fourth fan; wherein the fourth fan is the fan that is closest to the line distance of the second fan in the second fan group.

[0132] The present application also provides a computer program product, which can execute corresponding functions, including: obtaining input documents of a wind farm, and extracting target data information based on the input documents; wherein the input documents include line-related documents; the target data information includes line-related information; the line-related information includes at least wind turbine information and line information; calculating the number of wind turbine settings through the wind turbine information in the target data information and the wind farm capacity demand, and determining the line setting category based on the line information in the target data information, and generating a plurality of preliminary line setting results based on the line setting category and the number of wind turbine settings; among the plurality of preliminary line setting results, selecting the preliminary line setting result with the largest line score based on the line score of each preliminary line setting result as the final line setting result of the wind farm; wherein the line score is determined based on at least one optimization dimension, and the optimization dimension includes at least the average load of each loop in the preliminary line setting result.

[0133] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented in one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that include computer-usable program code.

[0134] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0135] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0136] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0137] In a typical configuration, a computing device includes one or more processors (CPU), input / output interfaces, network interfaces, and memory.

[0138] The memory may include non-permanent memory in a computer-readable medium, random access memory (RAM) and / or non-volatile memory in the form of read-only memory (ROM) or flash RAM. The memory is an example of a computer-readable medium.

[0139] Computer readable media include permanent and non-permanent, removable and non-removable media that can be implemented by any method or technology to store information. Information can be computer readable instructions, data structures, program modules or other data. Examples of computer storage media include, but are not limited to, phase change memory (PRAM), static random access memory (SRAM), dynamic random access memory (DRAM), other types of random access memory (RAM), read-only memory (ROM), electrically erasable programmable read-only memory (EEPROM), flash memory or other memory technology, compact disk read-only memory (CD-ROM), digital versatile disk (DVD) or other optical storage, magnetic cassettes, magnetic tape magnetic disk storage or other magnetic storage devices or any other non-transmission media that can be used to store information that can be accessed by a computing device. As defined herein, computer readable media does not include temporary computer readable media (transitory media), such as modulated data signals and carrier waves.

[0140] It should also be noted that the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, commodity or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, commodity or device. In the absence of more restrictions, the elements defined by the sentence "comprises a ..." do not exclude the existence of other identical elements in the process, method, commodity or device including the elements.

[0141] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that contain computer-usable program code.

[0142] The above are only embodiments of the present application and are not intended to limit the present application. For those skilled in the art, the present application may have various changes and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application should be included within the scope of the claims of the present application.

Claims

1. A line setting method based on a wind farm, characterized in that: The method comprises: Obtaining input documents of the wind farm, and extracting target data information based on the input documents; wherein the input documents include line-related documents; the target data information includes line-related information; the line-related information includes at least wind turbine information and line information; Calculating the number of wind turbine settings according to the wind turbine information and the wind farm capacity requirement in the target data information, determining the line setting category based on the line information in the target data information, and generating a plurality of preliminary line setting results based on the line setting category and the number of wind turbine settings; Among the multiple preliminary line setting results, the preliminary line setting result with the largest line score is selected as the final line setting result of the wind farm based on the line score of each preliminary line setting result; wherein the line score is determined based on at least one optimization dimension, and the optimization dimension includes at least the average load of each loop in the preliminary line setting result.

2. The method according to claim 1, characterized in that The calculating the number of wind turbines to be set according to the wind turbine information and the wind farm capacity requirement in the target data information, and determining the line setting category based on the line information in the target data information, includes: Acquire the wind farm capacity demand based on the user input information, and determine the wind turbine capacity information of each wind turbine in the wind farm based on the wind turbine information; wherein the user input information is input based on the platform preset interactive interface, and the user input information includes overall capacity information used to determine the scale of the wind farm; Determining the number of fans to be set based on the overall capacity information and the fan capacity information, wherein the number of fans to be set is obtained by rounding up after dividing the overall capacity information and the fan capacity information; Obtain terrain information, and select a route category required by the user from the route information as a route setting category based on the terrain information and / or user input information, wherein the route information includes at least two route categories, each route category has a different degree of adaptation to the terrain, and each route category includes its set maximum loop deployment length.

3. The method according to claim 2, characterized in that The generating of a plurality of preliminary line setting results based on the line setting category and the number of wind turbine settings includes: Based on the line setting category and the number of wind turbines, wind turbine points are set according to the preset wind turbine spacing, wherein each wind turbine point is set one by one starting from the booster station; The fan points are connected according to the maximum setting quantity of each loop to obtain a plurality of fan layout connections, and each of the fan layout connections is determined as a preliminary line setting result.

4. The method according to claim 1, characterized in that The selecting, from among the plurality of preliminary line setting results, a preliminary line setting result with the largest line score based on the line score of each preliminary line setting result as the final line setting result of the wind farm comprises: Determine the number of loop fans in each loop based on the preliminary setting results of each circuit, and determine the average load based on the number of loop fans and the number of loops; A line score is determined for the preliminary setting result of the line based on the average load, wherein there is a negative correlation between the average load and the line score.

5. The method according to claim 4, characterized in that The optimization dimension also includes the line length of each loop in the preliminary line setting result and the total line length in the preliminary line setting result; Before determining the line score for the preliminary setting result of the line based on the average load, the method further includes: Calculating the line length of each loop in the preliminary setting result, and performing summation calculation based on the line length of each loop to obtain the total line length of the preliminary setting result of the line; The determining of the line score for the preliminary setting result of the line based on the average load comprises: The line score of each of the preliminary setting results of the lines is determined based on the line length of each loop, the total line length and the average load, wherein the line score is calculated based on the line length of each loop, the total line length and the average load according to the weight.

6. The method according to claim 1, characterized in that Before selecting, from among the plurality of preliminary line setting results, a preliminary line setting result having a maximum line score based on the line score of each preliminary line setting result as the final line setting result of the wind farm, the method further comprises: Optimizing each of the preliminary setting results of the line to obtain an optimized line setting result; wherein the optimization operation is used to classify the first fan into the second fan group when the first fan is close to the second fan and far from the third fan; the first fan and the third fan are fans of the first fan group, the third fan is the fan closest to the first fan in the first fan group; the second fan is a fan of the second fan group; The selecting, from among the plurality of preliminary line setting results, a preliminary line setting result with the largest line score based on the line score of each preliminary line setting result as the final line setting result of the wind farm comprises: Among the multiple optimized line setting results, based on the line scores of each optimized line setting result, one with the largest line score is selected as the final line setting result of the wind farm.

7. The method according to claim 6, characterized in that The first fan includes a terminal fan of the first fan group; The optimizing process for each of the preliminary line setting results to obtain the optimized line setting results includes: When it is determined that the distance between the first fan and the third fan exceeds the upper limit of the distance, and it is determined that the distance between the first fan and the third fan is greater than the distance from the second fan to the booster station, it is determined whether the distance between the first fan and the second fan is less than a preset target value, and the preset target value is calculated by the distance between the first fan and the third fan and a preset coefficient, and the preset coefficient is between 0 and 1; If it is determined that the distance between the first fan and the second fan is less than a preset target value, the connection between the first fan and the third fan is deleted and the first fan is connected to the second fan, so as to classify the first fan from the first fan group into the second fan group; When it is determined that the straight-line distance between the third fan and the fourth fan is less than the line distance from the third fan to the booster station, the original connection line of the third fan is deleted and connected with the fourth fan; wherein the fourth fan is the fan that is closest to the line distance of the second fan in the second fan group.

8. A line setting device based on a wind farm, characterized in that: The device comprises: An extraction unit is used to obtain input documents of the wind farm and extract target data information based on the input documents; wherein the input documents include line-related documents; the target data information includes line-related information; the line-related information includes at least wind turbine information and line information; a generating unit, configured to calculate the number of wind turbine settings according to the wind turbine information and the wind farm capacity requirement in the target data information, determine a line setting category based on the line information in the target data information, and generate a plurality of preliminary line setting results based on the line setting category and the number of wind turbine settings; A selection unit is used to select a line preliminary setting result with the largest line score from a plurality of the line preliminary setting results based on the line score of each line preliminary setting result as the final line setting result of the wind farm; wherein the line score is determined based on at least one optimization dimension, and the optimization dimension at least includes the average load of each loop in the line preliminary setting result.

9. A storage medium, characterized in that: The storage medium includes a stored program, wherein when the program is executed, the device where the storage medium is located is controlled to execute the line setting method based on a wind farm according to any one of claims 1 to 7.

10. A line setting device based on a wind farm, characterized in that: The device includes a storage medium; and one or more processors, the storage medium is coupled to the processor, and the processor is configured to execute program instructions stored in the storage medium; when the program instructions are executed, the line setting method based on the wind farm described in any one of claims 1-7 is executed.