Intelligent wharf horizontal transportation scheduling method and system
By using sensors and data analysis technology in the intelligent dock horizontal transportation system, the priority and path of transportation tasks are adjusted, and the problem of insufficient response speed and environmental adaptability in the existing technology is solved, and the efficiency and safety of dock transportation is improved. .
Patent Information
- Application Number
- CN202411481933.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-23
- Publication Date
- 2024-11-22
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing intelligent terminal horizontal transportation scheduling technology has limited response speed and environmental adaptability in complex dynamic environments, and has failed to make full use of real-time data, resulting in limited transportation efficiency and safety, insufficient resource utilization, and increased energy consumption and environmental burden.
Through sensors, GPS coordinates and speed information of terminal transport vehicles and containers are collected, combined with weather and traffic flow data, environmental and time sensitivity analysis is carried out, loading and unloading priority and path of transportation tasks, dynamically adjust vehicle allocation and operation schedule, and generate Continuously optimized dock transportation scheduling plan.
It realizes fine management of terminal transportation tasks, effectively adapt to weather and traffic changes, optimizes resource allocation, reduces invalid waits and interrupts during transportation, reduces operating costs, improves transportation efficiency and cargo throughput, and improves the continuity of operation plans. and adaptability.
Smart Images

Figure CN119005644A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of intelligent dispatching technology, and in particular to an intelligent terminal horizontal transportation dispatching method and system. Background Art
[0002] The field of intelligent scheduling technology involves automating and optimizing resource allocation, task allocation, and transportation management, combining artificial intelligence, machine learning, operations research, and real-time data processing technologies to improve the efficiency and responsiveness of scheduling systems, and to make fast and effective decisions in complex dynamic environments such as factories, transportation networks, or logistics centers. By analyzing large amounts of data, demand and resource availability can be predicted, thereby optimizing the order of task execution and resource utilization, reducing waiting time and operating costs.
[0003] Among them, the intelligent terminal horizontal transportation scheduling method refers to the application of intelligent scheduling technology in the terminal environment to optimize the horizontal transportation tasks of containers or other goods. The core is to use automation and intelligent tools, such as sensors, real-time tracking systems and prediction models, to manage and schedule port transportation vehicles, such as trailers or automatic guided vehicles (AGVs). The main purpose is to improve the efficiency and safety of terminal transportation, reduce cargo processing time, reduce transportation costs, and increase overall cargo throughput. Through intelligent scheduling, terminals can respond more flexibly to changes in transportation demand, optimize the utilization of vehicles and drivers, and reduce energy consumption and environmental impact.
[0004] Although existing intelligent scheduling technologies have been applied in resource allocation and task management, their response speed and environmental adaptability are still limited in dynamic and complex environments such as ports. Existing systems often fail to make full use of real-time data, such as weather and traffic conditions, resulting in scheduling plans that cannot flexibly adapt to environmental changes, affecting transportation efficiency and safety. In addition, existing technologies lack in-depth analysis of environmental factors and time sensitivity, which limits the dynamic optimization of transportation routes and times and reduces the efficiency of vehicle and personnel use. This limitation leads to inadequate resource utilization, increased energy consumption and environmental burden, and also affects the speed of cargo handling and the overall operational efficiency of the port. Summary of the invention
[0005] The purpose of the present invention is to solve the shortcomings of the prior art and to propose an intelligent terminal horizontal transportation scheduling method.
[0006] In order to achieve the above object, the present invention adopts the following technical solution: a method for scheduling horizontal transportation of an intelligent terminal, comprising the following steps: S1: Collect GPS coordinates and speed information of terminal transport vehicles and containers through sensors, simultaneously obtain temperature, humidity and cargo conditions in containers, screen key environmental factors and time nodes, and obtain environmental and time sensitivity analysis results; S2: Based on the environmental and time sensitivity analysis results, combined with the current weather conditions and traffic flow of the terminal, the loading and unloading priority of each transportation task is adjusted. According to the loading and unloading priority adjustment results, the transportation route is adjusted, the loading and unloading time is reallocated, and the terminal scheduling route and time optimization plan are formed to match the real-time operation environment of the terminal; S3: According to the terminal dispatch route and time optimization plan, adjust the vehicle allocation and operation schedule in the terminal, dynamically adjust the operation plan based on real-time feedback, analyze and confirm the actual demand of each operation task based on the dynamic adjustment result of the operation plan, optimize and adjust the operating conditions in a targeted manner, and generate a dispatch execution plan; S4: Execute the scheduling execution plan, continuously monitor the status changes of containers and transport vehicles through sensors, dynamically adjust and optimize the operation plan according to real-time collected data, and generate a continuously optimized terminal transportation scheduling plan.
[0007] As a further solution of the present invention, the step of obtaining the results of the environment and time sensitivity analysis is: Sensors installed on terminal transport vehicles and containers capture GPS coordinates and speed information, monitor the temperature, humidity and cargo conditions inside the container, record data and timestamps, and generate raw environmental data and time-tagged data sets; Analyze the original environmental data and time tag data set, screen key environmental factors, mark key time nodes, and obtain key environmental factors and time node data sets; Comprehensively analyze the key environmental factors and time node data sets, and use the formula: ; Calculate the environmental sensitivity score corresponding to each time node , and obtain the results of environmental and time sensitivity analysis, among which, Indicates the actual environmental parameter measurement value, Indicates the exposure time of the goods to the target environmental conditions, and are the environmental sensitivity adjustment coefficient, the exponential growth rate of environmental factors and the impact weight of time factors, is the total number of data points analyzed.
[0008] As a further solution of the present invention, the steps for adjusting the loading and unloading priority of the transport task are: Collect the environmental and time sensitivity analysis results, combine them with the current weather data of the dock, analyze the weather adaptability of each task, and generate preliminary impact assessment results of the task; Based on the preliminary impact assessment results of the tasks, the current real-time traffic flow data of the terminal is integrated to evaluate the direct impact of vehicle congestion and cargo loading and unloading efficiency on the transportation tasks, analyze the traffic adaptability of each task, and obtain the comprehensive environmental and traffic impact results; According to the comprehensive environmental and traffic impact results, the formula is adopted: ; Calculate the overall priority score of the target task , generate the adjusted loading and unloading priority results, where Represents the weather adaptability score of the mission, represents the traffic adaptability score of the task, and is to adjust the weight, is the normalization coefficient.
[0009] As a further solution of the present invention, the steps for obtaining the terminal scheduling route and time optimization solution are: Analyze the adjusted loading and unloading priority results, identify bottlenecks and efficiency issues in the transportation path, evaluate the matching degree between the expected loading and unloading time and the actual demand in combination with the congestion and availability of the current transportation path, adjust the transportation path, and obtain a transportation path adjustment record; Re-allocate loading and unloading time according to the adjusted loading and unloading priority result, optimize task time allocation, balance resource utilization and avoid conflicts between tasks, and obtain loading and unloading time adjustment records; According to the loading and unloading time adjustment records and the transportation route adjustment records, matching with the real-time operating environment of the terminal, and combining weather conditions, staff shifts and equipment availability factors, the terminal scheduling route and time optimization plan are output.
[0010] As a further solution of the present invention, the step of dynamically adjusting the operation plan is: Based on the terminal scheduling route and time optimization plan, obtain current vehicle usage data and operation progress, analyze all data, analyze vehicle usage and build a real-time view of the operation schedule, and generate real-time operation status records; Using the real-time job status record, the formula is adopted: ; Calculate the target vehicle's current optimal allocation index , re-optimize vehicle allocation and operation schedule, and generate an adjusted vehicle allocation plan, where It is a vehicle The availability weight of It is a vehicle The overall priority score of the current task, It is a vehicle operating efficiency, It is a vehicle Scheduled working hours, It is a vehicle Predetermined running distance; According to the adjusted vehicle allocation plan, combined with real-time feedback from the terminal operation site, the operation execution is monitored, necessary dynamic adjustments are made to the operation plan, emergencies or delays are responded to, and a dynamic operation adjustment plan is generated.
[0011] As a further solution of the present invention, the step of obtaining the scheduling execution plan is: According to the dynamic operation adjustment plan, the completion status of each task and the feedback information of the terminal site are integrated to evaluate the actual demand and resource matching of the task, determine the effectiveness of resource use and adjustment needs, and generate an operation demand analysis record; Using the operation demand analysis records, identify key operating conditions, including equipment performance limitations, working environment difficulties and staffing issues, optimize resource allocation, and generate an operating condition optimization plan; Implement the operating condition optimization plan, monitor the adjustment effect in real time, confirm that each operation accurately reflects the current job requirements and environmental changes, and generate a scheduling execution plan.
[0012] As a further solution of the present invention, the step of obtaining the continuously optimized terminal transportation scheduling plan is: Execute the dispatch execution plan, deploy sensors to collect key transportation data in real time, transmit the data to the central data processing center in real time, and generate real-time data streams; Based on the real-time data stream, perform data cleaning and preprocessing, analyze the data to identify abnormal patterns and predict potential transportation risks, and generate optimized transportation scheduling decision suggestions; According to the optimized transportation scheduling decision suggestions, the terminal's transportation scheduling plan is updated and adjusted, and the transportation path and loading and unloading time are automatically adjusted based on the current operating conditions and forecast results to generate a continuously optimized terminal transportation scheduling plan.
[0013] Intelligent terminal horizontal transportation dispatching system, including: The sensor information acquisition module uses sensors to capture the GPS coordinates and speed information of transport vehicles and containers, monitor the internal conditions of containers, screen key environmental factors, mark key time nodes, calculate the environmental sensitivity score corresponding to each time node, and obtain the environmental and time sensitivity analysis results; The adaptability analysis module collects the environmental and time sensitivity analysis results, combines the weather data of the current terminal, analyzes the weather adaptability of each task, integrates the real-time traffic flow data of the current terminal, analyzes the traffic adaptability of each task, calculates the comprehensive priority score of the target task, and generates the adjusted loading and unloading priority result; The route and time optimization module analyzes the adjusted loading and unloading priority results, identifies bottlenecks and efficiency issues in the transportation route, adjusts the transportation route, optimizes task time allocation, matches the real-time operating environment of the terminal, and outputs the terminal scheduling route and time optimization plan; The vehicle dispatch optimization module analyzes the vehicle usage based on the terminal dispatch route and time optimization plan, calculates the current optimization allocation index of the target vehicle, re-optimizes the vehicle allocation and operation schedule, and generates a dynamic operation adjustment plan in combination with the real-time feedback from the terminal operation site; The resource allocation optimization module adjusts the plan according to the dynamic operation, evaluates the actual demand of the task and the resource matching situation, identifies the key operating conditions, optimizes the resource allocation, confirms that each operation accurately reflects the current operation demand and environmental changes, and generates a scheduling execution plan; The transportation risk management module executes the scheduling execution plan, collects key transportation data in real time, analyzes the data to identify abnormal patterns and predict potential transportation risks, updates and adjusts the terminal's transportation scheduling plan, and generates a continuously optimized terminal transportation scheduling plan.
[0014] Compared with the prior art, the advantages and positive effects of the present invention are: In the present invention, through comprehensive real-time monitoring data and environmental sensitivity analysis, fine management of terminal transportation tasks is achieved. By dynamically adjusting the transportation route and loading and unloading time, it effectively adapts to the changing weather conditions and traffic flow, optimizes resource allocation, reduces ineffective waiting and interruptions in the transportation process, directly reduces operating costs, and improves transportation efficiency. Continuous status monitoring and data analysis ensure the continuity and adaptability of the operation plan. By accurately adjusting and responding to real-time changes, the speed and safety of cargo handling are improved, and the cargo throughput of the terminal is significantly increased. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 It is a main step flow chart of the present invention; Figure 2 A flowchart for obtaining the results of the environmental and time sensitivity analysis of the present invention; Figure 3 A flow chart for adjusting the loading and unloading priority of a transport task of the present invention; Figure 4 A flowchart for obtaining the terminal scheduling route and time optimization solution of the present invention; Figure 5A flow chart for dynamically adjusting the operation plan of the present invention; Figure 6 A flowchart for obtaining a scheduling execution plan of the present invention; Figure 7 The present invention is a flowchart for obtaining the continuously optimized terminal transportation scheduling solution. DETAILED DESCRIPTION
[0016] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.
[0017] In the description of the present invention, it should be understood that the terms "length", "width", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, in the description of the present invention, "multiple" means two or more, unless otherwise clearly and specifically defined.
[0018] See also Figure 1 , the intelligent terminal horizontal transportation scheduling method includes the following steps: S1: Collect GPS coordinates and speed information of terminal transport vehicles and containers through sensors, simultaneously obtain temperature, humidity and cargo conditions in containers, screen key environmental factors and time nodes, and obtain environmental and time sensitivity analysis results; S2: Based on the results of the environmental and time sensitivity analysis, combined with the current weather conditions and traffic flow at the terminal, the loading and unloading priority of each transportation task is adjusted. According to the loading and unloading priority adjustment results, the transportation route is adjusted, the loading and unloading time is reallocated, and the terminal scheduling route and time optimization plan are formed to match the real-time operation environment of the terminal; S3: According to the terminal dispatch route and time optimization plan, adjust the vehicle allocation and operation schedule within the terminal, dynamically adjust the operation plan based on real-time feedback, analyze and confirm the actual needs of each operation task based on the dynamic adjustment results of the operation plan, make targeted optimization adjustments to the operating conditions, and generate a dispatch execution plan; S4: Execute the scheduling execution plan, continuously monitor the status changes of containers and transport vehicles through sensors, dynamically adjust and optimize the operation plan based on real-time collected data, and generate a continuously optimized terminal transportation scheduling plan.
[0019] The results of the environmental and time sensitivity analysis include the environmental factor screening results, time node determination records and sensitivity measurement results; the terminal scheduling route and time optimization plan includes the weather condition adaptation analysis results, traffic flow adjustment records, and task loading and unloading priority adjustment records; the scheduling execution plan includes the vehicle allocation results, operation schedule, and operating condition optimization records; the continuously optimized terminal transportation scheduling plan includes the dynamic adjustment results of the operation plan, operating environment matching records, and scheduling continuity and accuracy confirmation records.
[0020] See also Figure 2 ,The steps to obtain the results of environmental and time sensitivity analysis are, S111: Capture GPS coordinates and speed information through sensors installed on terminal transport vehicles and containers, monitor the temperature, humidity and cargo conditions inside the container, record data and timestamps, and generate raw environmental data and time tag data sets; The sensors installed on the terminal transport vehicles and containers capture GPS coordinates and speed information, monitor the temperature, humidity and cargo condition inside the container, and record data and timestamps. During the process, the sensors are precisely calibrated to ensure the real-time and accuracy of the data. The selection of sensors takes into account their environmental adaptability and failure rate to ensure stable operation under various climatic conditions. GPS data is used to track the real-time location of vehicles and containers, and speed information helps monitor the dynamics of the transportation process. Temperature and humidity monitoring is to ensure that the goods are transported in a suitable environment to avoid damage to the goods caused by environmental changes. The recording of data and timestamps provides basic time clues for analysis, so that they can be associated with specific events or status changes in subsequent processing to obtain the original environmental data and time tag data sets.
[0021] S112: Analyze the original environmental data and the time label data set, screen key environmental factors, mark key time nodes, and obtain the key environmental factor and time node data set; The original environmental data and time-tagged data sets were analyzed. By screening key environmental factors such as temperature extremes, humidity fluctuations, and speed changes, data cleaning was used to remove erroneous readings. Data normalization was used to ensure data comparability between different sensors. The markings of key time nodes, such as loading and unloading and transit time, were matched with log files and timestamps to ensure that each time node accurately reflected its corresponding environmental status. In this process, special attention was paid to the integrity of the data and the precise matching of time to avoid time misalignment in subsequent analysis, and to obtain key environmental factors and time node data sets.
[0022] S113: Comprehensively analyze key environmental factors and time node data sets, using the formula, ; Calculate the environmental sensitivity score corresponding to each time node , and obtain the results of environmental and time sensitivity analysis, among which, Indicates the actual environmental parameter measurement value, Indicates the exposure time of the goods to the target environmental conditions, and are the environmental sensitivity adjustment coefficient, the exponential growth rate of environmental factors and the impact weight of time factors, is the total number of data points analyzed.
[0023] Get three data points (taking temperature as an example, unit: Celsius), where , , , (Celsius), (minutes), the calculation process is as follows: ; The results show that the sensitivity score of the current environment (temperature) and time sensitivity analysis is , which indicates the average sensitivity level faced by the cargo under given time and temperature conditions, helps to determine whether special protective measures or adjustments to transportation plans are needed.
[0024] See also Figure 3 ,The steps for adjusting the loading and unloading priorities of the transport task are, S211: Collect the results of environmental and time sensitivity analysis, combine them with the weather data of the current dock, analyze the weather adaptability of each task, and generate preliminary impact assessment results of the task; First, the results of the environmental and time sensitivity analysis provide key environmental factor data, such as temperature, humidity, and changes over time. Combined with the current weather conditions at the terminal, such as temperature fluctuations and rainfall, the environmental risks that each mission may face are analyzed based on the environmental sensitivity data and real-time weather data. The real-time measured temperature and humidity are compared with historical data for the same period to evaluate the magnitude of changes under current conditions. A score is assigned based on the weather adaptability of the changes to the mission (weather adaptability score), and a preliminary impact assessment result for the mission is generated, which will directly affect subsequent priority adjustment decisions.
[0025] S212: Based on the preliminary impact assessment results of the mission, integrate the current real-time traffic flow data of the terminal, evaluate the direct impact of vehicle congestion and cargo loading and unloading efficiency on the transportation mission, analyze the traffic adaptability of each mission, and obtain the comprehensive environmental and traffic impact results; The real-time traffic flow data of the current terminal is taken into consideration to evaluate how factors such as vehicle congestion and loading and unloading efficiency affect the transportation task. Combined with traffic data and task scheduling, the delays and conflicts that may be encountered for each task are analyzed, and the negative impact of traffic conditions on task execution is evaluated, such as the delay time during peak vehicle flow periods. A score is assigned to the traffic adaptability of the task (traffic adaptability score), which is then combined with the preliminary impact assessment results of the task to facilitate subsequent judgment of the execution priority of the task under current conditions, ensuring the optimal allocation of resources and maximization of transportation efficiency.
[0026] S213: Based on the comprehensive environmental and traffic impact results, the formula is used.
[0027] Calculate the overall priority score of the target task , generate the adjusted loading and unloading priority results, where Represents the weather adaptability score of the task, indicating the adaptability of the task under the current weather conditions. Represents the traffic adaptability score of the task, indicating the adaptability of the task under the current traffic flow conditions. and is to adjust the weights to enhance the sensitivity to the adaptability of different task environments. is the normalization coefficient; A task under target conditions , the calculation process is as follows: ; ; The results show that the comprehensive priority score of the given task is 11.34486. The score will be used to determine the loading and unloading priority of the task. A higher score means a higher priority and will be processed first.
[0028] See also Figure 4 ,The steps to obtain the terminal scheduling route and time optimization plan are, S221: Analyze the adjusted loading and unloading priority results, identify bottlenecks and efficiency issues in the transportation path, evaluate the matching degree between the expected loading and unloading time and the actual demand based on the congestion and availability of the current transportation path, adjust the transportation path, and obtain the transportation path adjustment record; In-depth analysis of the adjusted loading and unloading priority results, through real-time traffic management and transportation scheduling data, detailed assessment of congestion points and inefficient areas in existing transportation routes, special attention to those key nodes affected by priority adjustments, identification of bottlenecks that may cause delays, such as excessive congestion at loading and unloading sites or insufficient loading and unloading equipment, collection and analysis of actual operating data at each loading and unloading point, comparison with historical data for the same period to identify and optimize potential problems at these points, and formulation of specific route adjustment recommendations, with the goal of improving the overall efficiency and response speed of the transportation chain by optimizing routes.
[0029] S222: reallocate loading and unloading time according to the adjusted loading and unloading priority result, optimize task time allocation, balance resource utilization and avoid conflicts between tasks, and obtain a loading and unloading time adjustment record; According to the adjusted loading and unloading priority results, the loading and unloading time is reallocated, and the loading and unloading schedule of each task is carefully arranged. According to the real-time monitoring of terminal operations and traffic flow data, the time allocation is dynamically adjusted to reduce waiting time and avoid resource conflicts, ensuring that high-priority tasks can be executed first. At the same time, the reasonable arrangement of low-priority tasks is considered. By simulating different scheduling schemes, the optimal solution is selected to maximize resource utilization and minimize operation time, ensuring that each task is processed at the best time, thereby significantly improving the overall efficiency of terminal operations.
[0030] S223: Output terminal dispatch route and time optimization plan based on loading and unloading time adjustment records and transportation route adjustment records, matching with the real-time operation environment of the terminal, and combining weather conditions, staff shifts and equipment availability factors; The adjusted transportation routes and reallocated loading and unloading times are matched with the real-time operating environment of the terminal, taking into account factors such as weather changes, human resource allocation and equipment status, and integrating data obtained from weather forecast services and human resource management, as well as input from the terminal equipment monitoring system, to form a comprehensive scheduling and time optimization plan. The plan is fine-tuned to the actual operating environment to ensure efficient and flexible response under various conditions. The optimization plan is based on data-driven decision support and aims to improve the adaptability and efficiency of terminal operations while reducing any possible operational interruptions or delays.
[0031] See also Figure 5 ,The steps for dynamic adjustment of the job plan are, S311: Based on the terminal scheduling route and time optimization plan, obtain the current vehicle usage data and operation progress, analyze all data, analyze vehicle usage and build a real-time view of the operation schedule, and generate real-time operation status records; Based on the existing terminal dispatch route and time optimization solutions, logistics management is used to capture data, centrally monitor the current status of vehicles and operation progress, analyze the specific utilization rate and task completion status of each vehicle, and update the operation schedule in real time to reflect the actual operation situation. By comparing real-time data with the scheduled plan, deviations in execution and possible adjustment points are identified, and detailed real-time operation status records are generated, which fully display the real-time dynamics of terminal transportation and provide decision support for adjusting vehicle allocation and operation time.
[0032] S312: Using real-time job status records, using formulas, ; Calculate the target vehicle's current optimal allocation index , re-optimize vehicle allocation and operation schedule, and generate an adjusted vehicle allocation plan, where It is a vehicle The availability weight of the vehicle represents the capability of the vehicle to be used for the current task. It is a vehicle The overall priority score of the current task, It is a vehicle operating efficiency, It is a vehicle Scheduled working hours, It is a vehicle Predetermined running distance; For the target vehicle, the following parameters are collected: Indicates high vehicle availability. Indicates that the task priority is medium. It means the vehicle is running efficiently. Hours scheduled working time, Kilometers is the scheduled running distance. Substituting into the formula, the calculation process is as follows: ; The results show that the optimal allocation index for a given vehicle under current parameters is 0.321. This index is used to evaluate the applicability and priority of vehicles under specific tasks and conditions, and to assist in making more accurate vehicle allocation decisions.
[0033] S313: Based on the adjusted vehicle allocation plan and combined with real-time feedback from the terminal operation site, monitor the operation execution status, make necessary dynamic adjustments to the operation plan, respond to emergencies or delays, and generate a dynamic operation adjustment plan; After obtaining the adjusted vehicle allocation and operation schedule, we continuously monitor the actual execution of terminal operations, combine the real-time feedback from on-site staff and equipment, dynamically adjust the operation plan to adapt to sudden changes such as weather impacts, equipment failures, or the addition of emergency tasks, and re-optimize vehicle allocation and time arrangements to ensure that each adjustment is based on the latest operational information, forming a fully updated dynamic operation adjustment plan aimed at continuously optimizing terminal operation efficiency, reducing any delays or cost increases caused by unforeseen events, and ensuring the smoothness and efficiency of terminal transportation.
[0034] See also Figure 6 , the steps to obtain the scheduling execution plan are: S321: According to the dynamic operation adjustment plan, the completion status of each task and the feedback information of the terminal site are integrated to evaluate the actual demand and resource matching of the task, determine the effectiveness of resource use and adjustment needs, and generate an operation demand analysis record; First, real-time data on vehicle usage status and task progress is automatically extracted from the terminal's integrated management system. The data includes the vehicle's location, cargo capacity and operating efficiency. The frequency of use of each vehicle and the time standard for task completion are recorded in detail, and the efficiency of different vehicles and real-time changes in task requirements are evaluated. This helps identify deficiencies and overloaded links in resource allocation, ensuring that the update of the operation schedule and the adjustment of the vehicle allocation plan are based on the most accurate operational data, so as to formulate targeted improvement measures and generate a comprehensive operation demand analysis record, which lists optimization suggestions and expected resource saving points in detail.
[0035] S322: Using the job demand analysis records, identify key operating conditions, including equipment performance limitations, working environment difficulties, and staffing issues, optimize resource allocation, and generate an operating condition optimization plan; Based on the operational demand analysis records, a detailed review of operating conditions is conducted, including performance evaluation of the terminal's existing equipment, analysis of challenges in the work environment, and actual deployment of human resources. Systematic adjustments are made to key operations, such as adjusting the working rhythm of loading machinery, optimizing cargo flow paths, and reconfiguring personnel shifts. The adjustment process is simulated to confirm its specific contribution to improving operational efficiency, and a detailed operational condition optimization plan is generated. The plan clearly points out which specific measures can be implemented to eliminate efficiency bottlenecks and improve overall operational adaptability and response speed. It also includes detailed instructions for expected efficiency improvement indicators and resource allocation optimization.
[0036] S323: Implement the operation condition optimization plan, monitor the adjustment effect in real time, confirm that each operation accurately reflects the current operation requirements and environmental changes, and generate a scheduling execution plan; The formulated operating condition optimization plan is implemented on-site. Through continuous real-time monitoring and data feedback mechanism, the actual effect of each adjustment is accurately tracked, and the operation plan is dynamically adjusted to match the needs and challenges in actual operations. In this process, all adjustments are confirmed to be effective through real-time data analysis to ensure that each change in resource allocation and scheduling strategy can maximize operational efficiency, reduce downtime, and reduce cost increases caused by emergency adjustments. The final scheduling execution plan generated records the adjustment process and effect evaluation in detail to ensure that the terminal's transportation reaches the optimal state and continues to adapt to the complex and changing operating environment.
[0037] See also Figure 7 ,The steps to obtain the continuously optimized terminal transportation scheduling plan are, S411: Execute the scheduling execution plan, deploy sensors to collect key transportation data in real time, transmit it to the central data processing center in real time, and generate real-time data streams; First, high-precision sensors are deployed to monitor various key indicators in real time, such as temperature, humidity, location, speed, and the weight and internal pressure of containers. The collected data is transmitted to the central monitoring center in real time through a secure wireless network. At the same time, data from GPS and other navigation devices are integrated to track the precise location of the transport vehicle in real time. The continuous influx of data enables the operation center to obtain a comprehensive view of the transportation status at any given point in time, providing an information basis for subsequent data processing and real-time decision-making. It not only enhances the reliability and timeliness of the data, but also improves the response speed and accuracy of the entire logistics monitoring system, ensuring that any abnormalities in the transportation process can be detected and processed immediately, thereby generating real-time data streams and storing them in the database for further analysis.
[0038] S412: Perform data cleaning and preprocessing based on real-time data streams, analyze data to identify abnormal patterns and predict potential transportation risks, and generate optimized transportation scheduling decision suggestions; At the central data processing center, the received real-time data stream first undergoes a series of preprocessing steps, including data cleaning to filter out noise and non-critical information, data standardization to unify the data format of different sensors and sources, and then uses time series analysis and pattern recognition to deeply mine the data, automatically identify abnormal patterns in the data, predict potential transportation risks and possible delays, evaluate the current transportation status, determine whether the plan needs to be adjusted to deal with any problems detected, and list in detail all recommended scheduling adjustments and preventive measures, laying a solid foundation for dynamically adjusting the transportation plan and generating a series of specific scheduling recommendations.
[0039] S413: Update and adjust the terminal's transportation scheduling plan based on the optimized transportation scheduling decision suggestions, automatically adjust the transportation route and loading and unloading time based on the current operation status and forecast results, and generate a continuously optimized terminal transportation scheduling plan; Based on the scheduling suggestions provided by the central data processing center, the terminal scheduling system will automatically update the transportation scheduling plan, taking into account the current transportation operation status, forecast data and optimization suggestions, and comprehensively evaluating the possible best transportation routes and loading and unloading time points to maximize transportation efficiency and safety, optimize transportation routes, and reduce waiting time. In addition, it can dynamically respond to emergencies such as traffic congestion or bad weather, and adjust plans in real time to avoid delays. The entire decision-making process not only includes the optimization of routes and time, but also involves resource allocation, such as the optimal configuration of vehicles, loading and unloading equipment and human resources. These automated decision-making processes ensure the continuity and accuracy of the transportation scheduling plan, and ultimately generate a comprehensive and continuously optimized terminal transportation scheduling plan. At the same time, the plan is updated in real time and is ready to respond to possible transportation challenges in the future.
[0040] Intelligent terminal horizontal transportation dispatching system, including: The sensor information acquisition module uses sensors to capture the GPS coordinates and speed information of transport vehicles and containers, monitor the internal conditions of containers, screen key environmental factors, mark key time nodes, calculate the environmental sensitivity score corresponding to each time node, and obtain the environmental and time sensitivity analysis results; The adaptability analysis module collects the results of environmental and time sensitivity analysis, combines the current weather data of the terminal, analyzes the weather adaptability of each task, integrates the current real-time traffic flow data of the terminal, analyzes the traffic adaptability of each task, calculates the comprehensive priority score of the target task, and generates the adjusted loading and unloading priority results; The route and time optimization module analyzes the adjusted loading and unloading priority results, identifies bottlenecks and efficiency issues in the transportation route, adjusts the transportation route, optimizes task time allocation, matches the real-time operating environment of the terminal, and outputs the terminal scheduling route and time optimization plan; The vehicle dispatch optimization module analyzes vehicle usage based on the terminal dispatch route and time optimization plan, calculates the current optimization allocation index of the target vehicle, re-optimizes vehicle allocation and operation schedule, and generates a dynamic operation adjustment plan based on real-time feedback from the terminal operation site; The resource allocation optimization module adjusts the plan according to dynamic operations, evaluates the actual demand of tasks and resource matching, identifies key operating conditions, optimizes resource allocation, confirms that each operation accurately reflects the current operation demand and environmental changes, and generates a scheduling execution plan; The transportation risk management module executes the scheduling execution plan, collects key transportation data in real time, analyzes the data to identify abnormal patterns and predict potential transportation risks, updates and adjusts the terminal's transportation scheduling plan, and generates a continuously optimized terminal transportation scheduling plan.
[0041] The above are only preferred embodiments of the present invention and are not intended to limit the present invention in other forms. Any technician familiar with the profession may use the technical contents disclosed above to change or modify them into equivalent embodiments with equivalent changes and apply them to other fields. However, any simple modification, equivalent change and modification made to the above embodiments based on the technical essence of the present invention without departing from the technical solution of the present invention still falls within the protection scope of the technical solution of the present invention.
Claims
1. A method for dispatching horizontal transportation of an intelligent terminal, characterized in that: The following steps are involved: The sensors collect GPS coordinates and speed information of terminal transport vehicles and containers, simultaneously obtain the temperature, humidity and cargo conditions in the containers, screen key environmental factors and time nodes, and obtain environmental and time sensitivity analysis results; Based on the environmental and time sensitivity analysis results, combined with the current weather conditions and traffic flow at the terminal, the loading and unloading priority of each transportation task is adjusted. According to the loading and unloading priority adjustment results, the transportation route is adjusted, the loading and unloading time is reallocated, and the terminal scheduling route and time optimization plan are formed to match the real-time operation environment of the terminal; According to the terminal dispatch route and time optimization plan, adjust the vehicle allocation and operation schedule within the terminal, dynamically adjust the operation plan based on real-time feedback, analyze and confirm the actual needs of each operation task based on the dynamic adjustment results of the operation plan, optimize and adjust the operating conditions in a targeted manner, and generate a dispatch execution plan; Execute the scheduling execution plan, continuously monitor the status changes of containers and transport vehicles through sensors, dynamically adjust and optimize the operation plan according to real-time collected data, and generate a continuously optimized terminal transportation scheduling plan.
2. The intelligent terminal horizontal transportation scheduling method according to claim 1 is characterized in that: The steps for obtaining the environmental and time sensitivity analysis results are: Sensors installed on terminal transport vehicles and containers capture GPS coordinates and speed information, monitor the temperature, humidity and cargo conditions inside the container, record data and timestamps, and generate raw environmental data and time-tagged data sets; Analyze the original environmental data and time tag data set, screen key environmental factors, mark key time nodes, and obtain key environmental factors and time node data sets; Comprehensively analyze the key environmental factors and time node data sets, and use the formula: ; Calculate the environmental sensitivity score corresponding to each time node , and obtain the results of environmental and time sensitivity analysis, among which, Indicates the actual environmental parameter measurement value, Indicates the exposure time of the goods to the target environmental conditions, and are the environmental sensitivity adjustment coefficient, the exponential growth rate of environmental factors and the impact weight of time factors, is the total number of data points analyzed.
3. The intelligent terminal horizontal transportation scheduling method according to claim 2 is characterized in that: The steps for adjusting the loading and unloading priority of the transport task are as follows: Collect the environmental and time sensitivity analysis results, combine them with the current weather data of the dock, analyze the weather adaptability of each task, and generate preliminary impact assessment results of the task; Based on the preliminary impact assessment results of the tasks, the current real-time traffic flow data of the terminal is integrated to evaluate the direct impact of vehicle congestion and cargo loading and unloading efficiency on the transportation tasks, analyze the traffic adaptability of each task, and obtain the comprehensive environmental and traffic impact results; According to the comprehensive environmental and traffic impact results, the formula is adopted: ; Calculate the overall priority score of the target task , generate the adjusted loading and unloading priority results, where Represents the weather adaptability score of the mission, represents the traffic adaptability score of the task, and is to adjust the weight, is the normalization coefficient.
4. The intelligent terminal horizontal transportation scheduling method according to claim 3 is characterized in that: The steps for obtaining the terminal scheduling route and time optimization plan are as follows: Analyze the adjusted loading and unloading priority results, identify bottlenecks and efficiency issues in the transportation path, evaluate the matching degree between the estimated loading and unloading time and the actual demand in combination with the congestion and availability of the current transportation path, adjust the transportation path, and obtain a transportation path adjustment record; Re-allocate loading and unloading time according to the adjusted loading and unloading priority result, optimize task time allocation, balance resource utilization and avoid conflicts between tasks, and obtain loading and unloading time adjustment records; According to the loading and unloading time adjustment records and the transportation route adjustment records, matching with the real-time operating environment of the terminal, and combining weather conditions, staff shifts and equipment availability factors, the terminal scheduling route and time optimization plan are output.
5. The intelligent terminal horizontal transportation scheduling method according to claim 4 is characterized in that: The steps of dynamic adjustment of the operation plan are: Based on the terminal scheduling route and time optimization plan, obtain current vehicle usage data and operation progress, analyze all data, analyze vehicle usage and build a real-time view of the operation schedule, and generate real-time operation status records; Using the real-time job status record, the formula is adopted: ; Calculate the target vehicle's current optimal allocation index , re-optimize vehicle allocation and operation schedule, and generate an adjusted vehicle allocation plan, where It is a vehicle The availability weight of It is a vehicle The overall priority score of the current task, It is a vehicle operating efficiency, It is a vehicle Scheduled working hours, It is a vehicle Predetermined running distance; According to the adjusted vehicle allocation plan, combined with real-time feedback from the terminal operation site, the operation execution is monitored, necessary dynamic adjustments are made to the operation plan, emergencies or delays are responded to, and a dynamic operation adjustment plan is generated.
6. The intelligent terminal horizontal transportation scheduling method according to claim 5 is characterized in that: The steps for obtaining the scheduling execution plan are: According to the dynamic operation adjustment plan, the completion status of each task and the feedback information of the terminal site are integrated to evaluate the actual demand and resource matching of the task, determine the effectiveness of resource use and adjustment needs, and generate an operation demand analysis record; Using the operation demand analysis records, identify key operating conditions, including equipment performance limitations, working environment difficulties and staffing issues, optimize resource allocation, and generate an operating condition optimization plan; Implement the operating condition optimization plan, monitor the adjustment effect in real time, confirm that each operation accurately reflects the current job requirements and environmental changes, and generate a scheduling execution plan.
7. The intelligent terminal horizontal transportation scheduling method according to claim 6 is characterized in that: The steps for obtaining the continuously optimized terminal transportation scheduling plan are: Execute the dispatch execution plan, deploy sensors to collect key transportation data in real time, transmit the data to the central data processing center in real time, and generate real-time data streams; Based on the real-time data stream, perform data cleaning and preprocessing, analyze the data to identify abnormal patterns and predict potential transportation risks, and generate optimized transportation scheduling decision suggestions; According to the optimized transportation scheduling decision suggestions, the terminal's transportation scheduling plan is updated and adjusted, and the transportation path and loading and unloading time are automatically adjusted based on the current operating conditions and forecast results to generate a continuously optimized terminal transportation scheduling plan.
8. Intelligent terminal horizontal transportation dispatching system, characterized by: The intelligent terminal horizontal transportation scheduling system is used to execute the intelligent terminal horizontal transportation scheduling method according to any one of claims 1 to 7, including: The sensor information acquisition module uses sensors to capture the GPS coordinates and speed information of transport vehicles and containers, monitor the internal conditions of containers, screen key environmental factors, mark key time nodes, calculate the environmental sensitivity score corresponding to each time node, and obtain the environmental and time sensitivity analysis results; The adaptability analysis module collects the environmental and time sensitivity analysis results, combines the weather data of the current terminal, analyzes the weather adaptability of each task, integrates the real-time traffic flow data of the current terminal, analyzes the traffic adaptability of each task, calculates the comprehensive priority score of the target task, and generates the adjusted loading and unloading priority result; The route and time optimization module analyzes the adjusted loading and unloading priority results, identifies bottlenecks and efficiency issues in the transportation route, adjusts the transportation route, optimizes task time allocation, matches the real-time operating environment of the terminal, and outputs the terminal scheduling route and time optimization plan; The vehicle dispatch optimization module analyzes the vehicle usage based on the terminal dispatch route and time optimization plan, calculates the current optimization allocation index of the target vehicle, re-optimizes the vehicle allocation and operation schedule, and generates a dynamic operation adjustment plan in combination with the real-time feedback from the terminal operation site; The resource allocation optimization module adjusts the plan according to the dynamic operation, evaluates the actual demand of the task and the resource matching situation, identifies the key operating conditions, optimizes the resource allocation, confirms that each operation accurately reflects the current operation demand and environmental changes, and generates a scheduling execution plan; The transportation risk management module executes the scheduling execution plan, collects key transportation data in real time, analyzes the data to identify abnormal patterns and predict potential transportation risks, updates and adjusts the terminal's transportation scheduling plan, and generates a continuously optimized terminal transportation scheduling plan.
Citation Information
Patent Citations
Intelligent horizontal transportation system and method for full-automatic container loading and unloading wharf.
CN113486293A
Goods transportation management method and system based on Internet of Things
CN117094631A
Intelligent wharf trailer scheduling method and system
CN117314058A
Intelligent carrying system and method for stored materials
CN118387519A
Ship and ground transport vehicle collaborative port material scheduling simulation method
CN118608028A
Cited By
Crude oil storage and transportation global commanding and dispatching optimization system
CN119273109A
Intelligent scheduling method and system based on artificial intelligence large model
CN120258275A
Blade transportation state monitoring and analyzing method and device
CN120317785A
Intelligent transportation method and system based on multi-dimensional scheduling
CN120338644A
Intelligent transportation method and system based on multi-dimensional scheduling
CN120338644B