Ocean sea wind power plant electricity-hydrogen hybrid energy storage planning method considering multi-time scale fluctuation stabilization

Through the improved adaptive modal digital variation mode decomposition method and modal allocation coefficient matrix model, combined with the full life cycle cost model of sea-land power-hydrogen hybrid energy storage system, the problem of suppression of multi-time scale fluctuations in offshore wind power is solved, and the problem of suppression of offshore wind power is realized. The efficiency, economy and environmental differences of the energy storage system are considered, and the rationality and efficiency of offshore wind energy storage planning are achieved.

CN119005752APending Publication Date: 2024-11-22SHANGHAI UNIVERSITY OF ELECTRIC POWER +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411090954.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-09
Publication Date
2024-11-22

AI Technical Summary

Technical Problem

The multi-time scale fluctuations of offshore wind power have an impact on the stable operation of the power grid. The existing energy storage planning methods are difficult to effectively suppress the fluctuations, and do not consider the economics of energy storage and the differences in land and sea environment.

Method used

Adopting improved adaptive modal digital variation mode decomposition method and modal allocation coefficient matrix model, combined with the full life cycle cost model of the sea-land-hydrogen hybrid energy storage system, decompose offshore wind power fluctuations and optimize energy storage allocation, through two stages The planning model determines the final electric and hydrogen energy storage allocation and sea and land energy storage configuration.

Benefits of technology

Effectively curb the output fluctuations of offshore wind power on multiple time scales, improve energy storage allocation efficiency, and reduce costs. Taking into account the long-term comprehensive economics of the energy storage system and the differences in sea and land environment, a more reasonable and efficient offshore wind power energy storage planning has been achieved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119005752A_ABST
    Figure CN119005752A_ABST
Patent Text Reader

Abstract

The invention relates to an offshore wind power plant electricity-hydrogen hybrid energy storage planning method considering multi-time scale fluctuation stabilization. The method comprises the steps of obtaining offshore wind power time sequence output data, and extracting an initial fluctuation component after preprocessing; splitting the initial fluctuation component into fluctuation components of different time scales by using an improved self-adaptive modal number variational mode decomposition method; performing initial electro-hydrogen energy storage distribution by using the modal distribution coefficient matrix model; quantifying the costs of the sea-land electricity and hydrogen energy storage in each stage of the life cycle by using a sea-land electricity-hydrogen hybrid energy storage system full life cycle cost model; and utilizing the sea-land electricity-hydrogen hybrid energy storage system capacity two-stage planning model to complete sea-land electricity-hydrogen energy storage planning, wherein the planning comprises a first stage for determining final electricity-hydrogen energy storage distribution and a second stage for determining sea-land energy storage distribution. Compared with the prior art, the method has the advantages that offshore wind power energy storage planning is more reasonably and efficiently carried out while offshore wind power multi-time-scale output fluctuation is stabilized, and the like.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of offshore storage technology, and in particular to a method for planning electric-hydrogen hybrid energy storage for offshore wind farms taking multi-time scale fluctuation smoothing into consideration. Background Art

[0002] Since the dual carbon goals were set, more and more renewable energy power generation has been connected to the grid. Offshore wind power has developed rapidly through load centers. However, the random fluctuations of large-scale offshore wind power access will have an impact on the stable operation of the grid. Reasonable planning of energy storage can effectively smooth out random fluctuations. However, the multi-time scale fluctuations of offshore wind power and the increasingly tight coastal land resources have brought new challenges to the storage allocation of offshore wind power sources. Therefore, it is urgent to study the source-side energy storage planning method to smooth the fluctuations of offshore wind power output.

[0003] There are multiple unbalanced fluctuations in the output of offshore wind power on a time scale: short-scale fluctuations within a day and long-scale fluctuations in seasons. The hybrid energy storage system (HESS) can effectively solve the power fluctuations on multiple time scales. Research on hybrid energy storage capacity matching can be divided into two categories: time domain simulation and frequency domain analysis. Time domain simulation obtains planning results by running simulation hour by hour for 8760 hours throughout the year. It has high requirements for modeling, and the difficulty of solving increases linearly with the increase of time series scale and accuracy. Some studies use clustering methods to achieve efficient solution of time series planning problems. However, the fluctuation of offshore wind power output has seasonal characteristics, and it is difficult to characterize the long-scale energy storage capacity planning problem after time domain scenario reduction. Converting time domain data to frequency domain and then allocating it will no longer be restricted by time scale. The existing frequency domain planning method has a relatively simple consideration of the allocation relationship between fluctuations and energy storage. It is believed that the fluctuation of a single frequency is borne by a certain energy storage alone. However, the working ranges of most energy storages have intersections. Sharing the work of smoothing a certain large amplitude fluctuation can effectively avoid the advanced planning of energy storage equipment. At the same time, no research has quantitatively analyzed the planning economics of offshore energy storage, and most scholars have only conducted simple feasibility analysis. my country's offshore wind power planning and layout has been carried out on a large scale. The energy storage layout corresponding to such a large-scale uncertain power source will no longer be solved by simply considering centralized construction near the onshore grid connection point. Therefore, how to more reasonably and efficiently plan offshore wind power energy storage while smoothing the multi-time scale output fluctuations of offshore wind power has become a problem that needs to be solved in this field. Summary of the invention

[0004] The purpose of the present invention is to overcome the defects of the above-mentioned prior art and to provide a method for planning electric-hydrogen hybrid energy storage for offshore wind farms that takes into account multi-time scale fluctuation smoothing, which can smooth the multi-time scale output fluctuations of offshore wind power and carry out offshore wind power energy storage planning more reasonably and efficiently.

[0005] The purpose of the present invention can be achieved by the following technical solutions:

[0006] The present invention provides a method for planning electric-hydrogen hybrid energy storage for offshore wind farms considering multi-time scale fluctuation smoothing, comprising the following steps: S1, obtaining and preprocessing offshore wind power time series output data; S2, extracting initial fluctuation components from the preprocessed offshore wind power time series output data; S3, splitting the initial fluctuation components into fluctuation components of different time scales using an improved adaptive modal number variational modal decomposition method; S4, based on the fluctuation components of different time scales, using a pre-constructed modal allocation coefficient matrix model to perform initial electric-hydrogen energy storage allocation; S5, using a pre-constructed full life cycle cost model for offshore and land electric-hydrogen hybrid energy storage systems to quantify the costs of offshore and land electric and hydrogen energy storage at various stages of the life cycle; S6, based on the fluctuation components of different time scales, the initial electric-hydrogen energy storage allocation and the quantified costs of offshore and land electric and hydrogen energy storage at various stages of the life cycle, using a pre-constructed two-stage planning model for the capacity of offshore and land electric-hydrogen hybrid energy storage systems to complete offshore and land electric-hydrogen energy storage planning, including a first stage for determining the final electric-hydrogen energy storage allocation and a second stage for determining the offshore and land energy storage allocation.

[0007] As a preferred technical solution, S2 specifically includes: using an anti-pulse average filtering method to extract a grid-connected component that meets the grid-connected requirements and an initial fluctuation component to be smoothed by hybrid energy storage from the preprocessed offshore wind power time-series output data, wherein the grid-connected requirements are obtained in advance.

[0008] As an optimal technical solution, S3 specifically includes: using the MUSIC algorithm to extract the characteristic power spectrum of wind power fluctuations, and then determining the decomposed mode number; based on the mode number, using the improved adaptive mode number variational mode decomposition method to split the fluctuation components in different frequency domains.

[0009] As a preferred technical solution, the process of solving the characteristic power spectrum is:

[0010]

[0011] Where P MUSIC is the spectral function, {V1,V2,···,V p}、{V m+1 ,V m+2 ,···,V p} represent the signal and noise subspaces respectively.

[0012] As a preferred technical solution, the costs of sea and land electricity and hydrogen energy storage at each stage of the life cycle include construction investment costs, operation and maintenance costs, and replacement recovery costs.

[0013] As a preferred technical solution, the modal distribution coefficient matrix model includes the proportional coefficients λ of K sub-modal components allocated to the electric energy storage bat and the proportional coefficient λ allocated to hydrogen energy storage hyd , respectively expressed as:

[0014]

[0015] and

[0016]

[0017] In the formula, They represent the proportional coefficient matrices of the kth submodal component allocated to electric energy storage and hydrogen energy storage respectively.

[0018] As a preferred technical solution, the first stage specifically includes: based on the fluctuation components of different time scales, the initial electric-hydrogen energy storage allocation and the quantified costs of sea and land electricity and hydrogen energy storage at each stage of the life cycle, with the goal of minimizing the total cost of the hybrid energy storage system over the entire life cycle, the electric-hydrogen energy storage allocation is optimized to obtain the time domain operating power curves and SOC sequences of the electric and hydrogen energy storage.

[0019] As a preferred technical solution, the second stage specifically includes: based on the time-domain operating power curves of the electricity and hydrogen energy storage and the SOC sequence, with the goal of optimizing the comprehensive economic cost including transmission benefits, optimizing the offshore and onshore energy storage configurations and completing the sea and land energy storage allocation.

[0020] As an optimal technical solution, the constraints of the two-stage planning model of the capacity of the sea-land electricity-hydrogen hybrid energy storage system include power balance constraints, modal allocation coefficient constraints, energy storage capacity matching constraints, energy storage state constraints, energy transmission balance constraints, geographical resource endowment constraints and black start constraints.

[0021] As a preferred technical solution, the first stage is expressed as:

[0022]

[0023]

[0024]

[0025]

[0026] In the formula, is the total cost of various energy storage types, C inv , C o&m , C rep&rec and C lossThey represent the costs of construction investment, operation and maintenance, reset recovery and energy loss of marine and land electric hydrogen hybrid energy storage respectively; and are the energy loss costs of electricity and hydrogen energy storage respectively; P bat,t , P hyd,t is the power value of electric energy storage and hydrogen energy storage at time t, η EL , η FC They represent the charging efficiency of the battery, the discharging efficiency of the battery, the energy utilization efficiency of the electrolyzer, and the energy utilization efficiency of the hydrogen fuel cell, respectively. e is the loss compensation electricity price, T represents the total time;

[0027] The second stage is expressed as:

[0028]

[0029]

[0030] L = αd

[0031]

[0032] In the formula, C on+off represents the comprehensive economic cost of offshore and onshore energy storage, (C tran,on -C tran,on+off ) represents the transmission benefit, are the total costs of the marine and land hybrid energy storage systems, C tran,on , C tran,on+off They represent the cost of offshore power transmission and transformation system without and with offshore energy storage, respectively. tran represents the total cost of offshore power transmission and transformation equipment, Respectively represent the unit costs of flexible direct current transmission equipment and converter equipment, is the design capacity of offshore power transmission and transformation equipment, L is the planned length of the transmission submarine cable, d is the offshore distance of the offshore wind farm, α represents the submarine cable design coefficient, represents the maximum value of the transmission power, and β represents the transmission coefficient.

[0033] Compared with the prior art, the present invention has the following beneficial effects:

[0034] 1. The offshore wind farm electric-hydrogen hybrid energy storage planning method proposed in the present invention combines the improved adaptive modal number variational modal decomposition method, the pre-constructed modal allocation coefficient matrix model and the pre-constructed offshore and onshore electric-hydrogen hybrid energy storage system life cycle cost model to obtain the fluctuation components of different scales, the initial electric-hydrogen energy storage allocation and the quantified costs of each stage. On this basis, the offshore and onshore electric-hydrogen hybrid energy storage system capacity two-stage planning model is used to complete the offshore and onshore electric-hydrogen energy storage planning. This method can not only effectively smooth the multi-time scale output fluctuations of offshore wind power, but also improve the energy storage allocation efficiency while fully considering the long-term comprehensive cost of the energy storage system, making the offshore wind power energy storage planning more reasonable, efficient and cost-saving;

[0035] 2. The present invention adopts an improved adaptive mode number variational mode decomposition method, which has a mathematical basis, and adopts MUSIC power spectrum to determine the wind power fluctuation characteristic spectrum by spectral peak search to set the decomposition mode number K. Compared with human subjective determination, it has a more realistic basis and is more convenient and faster than obtaining the parameter K value through algorithm optimization. At the same time, combined with the cost of the planning stage and the operation stage of the energy storage system, it fully explores the differences in the sea and land energy storage environment, and constructs a full life cycle cost model for the sea and land electric-hydrogen hybrid energy storage system, which is convenient for evaluating the overall economy of the energy storage system from a long-term perspective, and thus more reasonably and effectively planning offshore wind power energy storage;

[0036] 3. Compared with the conventional energy storage allocation method based on cutoff frequency, the modal allocation coefficient matrix model proposed in the present invention more reasonably describes the mapping relationship between fluctuation and energy storage, and can obtain a more reasonable and low-cost electric-hydrogen hybrid energy storage configuration scheme;

[0037] 4. The two-stage planning method for offshore wind power source side energy storage proposed in the present invention determines the distribution ratio of electricity and hydrogen in the first stage, and determines the allocation share of offshore and onshore energy storage in the second stage, and finally obtains the planning result of offshore and onshore electricity-hydrogen hybrid energy storage. In the second stage, the economic benefits of offshore energy storage on the design of power transmission and transformation system are taken into account, and the economic efficiency of energy storage is quantified more accurately;

[0038] 5. The source-side sea-land electricity-hydrogen hybrid energy storage planning method proposed in the present invention takes into account the energy storage configuration of two points on the source side (onshore grid connection point and offshore power collection platform), which is more in line with the development direction of energy storage. BRIEF DESCRIPTION OF THE DRAWINGS

[0039] Figure 1 A schematic diagram of a flow chart of a method provided in an embodiment of the present invention;

[0040] Figure 2 This is a framework diagram of an offshore wind power supply side electricity-hydrogen HESS system provided in an embodiment of the present invention;

[0041] Figure 3A basic framework of a sea-land hybrid energy storage system LCC provided in an embodiment of the present invention;

[0042] Figure 4 A normalized MUSIC power spectrum provided in an embodiment of the present invention;

[0043] Figure 5 A comparative analysis of VMD and EMD decomposition results provided in an embodiment of the present invention;

[0044] Figure 6 A diagram showing calculation results of each sub-modal distribution coefficient provided in an embodiment of the present invention;

[0045] Figure 7 A year-round operating power curve of sea and land electricity and hydrogen energy storage provided in an embodiment of the present invention;

[0046] Figure 8 A bar chart showing the composition of the full life cycle cost of a land-sea electricity-hydrogen HESS provided in an embodiment of the present invention;

[0047] Fig. 9 This is a schematic diagram of the impact of key technical parameters of a sea-land electricity-hydrogen HESS on planning costs provided in an embodiment of the present invention. DETAILED DESCRIPTION

[0048] The present invention is described in detail below in conjunction with the accompanying drawings and specific embodiments. This embodiment is implemented based on the technical solution of the present invention, and provides a detailed implementation method and specific operation process, but the protection scope of the present invention is not limited to the following embodiments.

[0049] Example

[0050] like Figure 1As shown, in order to smooth out the multi-time scale output fluctuations of offshore wind power, this embodiment provides a method for planning electric-hydrogen hybrid energy storage for offshore wind farms that takes into account the multi-time scale fluctuation smoothing. First, in view of the problem that the output fluctuations of wind power are difficult to accurately split and reasonably map to the hybrid energy storage configuration, an improved variational mode decomposition (VMD) method of adaptive modal number is proposed to accurately obtain the frequency domain grouping of the fluctuations, and a sub-modal allocation coefficient is introduced to allocate the fluctuations to the electric and hydrogen energy storage at the sea and land points; secondly, considering the differences in the energy storage environment at sea and on land, which makes it difficult to quantify the cost, a full life cycle cost model for the construction, operation and maintenance, and decommissioning of the sea and land electric-hydrogen hybrid energy storage system is constructed, that is, the full life cycle cost model of the sea and land electric-hydrogen HESS, to provide a measurement basis for accurate planning; finally, the calculation The "peak shaving" effect of offshore energy storage can reduce the design planning of power transmission and transformation equipment. With the goal of minimizing the comprehensive cost including energy storage cost (the cost of energy storage at each stage of the life cycle, that is, the total cost of energy storage over the entire life cycle) and transmission benefits, a two-stage planning model for the capacity of the sea-land electricity-hydrogen hybrid energy storage system (that is, the two-stage planning model for the capacity of the sea-land electricity-hydrogen hybrid energy storage system, which takes the capacity of the sea-land electricity-hydrogen hybrid energy storage system as the planning object, hereinafter referred to as the two-stage planning model) is established, and the planning results are analyzed around key parameters such as the offshore distance of the wind farm and the electrolysis efficiency. The results of the specific implementation example show that the proposed energy storage planning scheme improves the system economy while effectively smoothing fluctuations, and with the construction of wind farms offshore and the continuous improvement of energy storage technology, the economy of offshore energy storage will become more significant.

[0051] The specific steps of the above method are as follows:

[0052] Step S1, obtaining and preprocessing offshore wind power time-series output data.

[0053] Step S2, extracting the initial fluctuation component from the preprocessed offshore wind power time series output data. Specifically, using the anti-pulse average filtering method, the grid-connected component that meets the grid-connected requirements and the initial fluctuation component that needs to be smoothed by hybrid energy storage are extracted from the preprocessed offshore wind power time series output data.

[0054] Step S3, using the improved adaptive modal number VMD method to split the initial fluctuation component into fluctuation components of different time scales. Specifically, the characteristic power spectrum of wind power fluctuation is extracted using the MUSIC algorithm, and then the number of decomposed modes is determined, and then the different frequency domain fluctuation components are split using the improved adaptive modal number VMD method.

[0055] Step S4, based on the fluctuation components of different time scales, the pre-constructed modal allocation coefficient matrix model is used to perform initial electric-hydrogen energy storage allocation. Specifically, based on the fact that the sea-land hybrid energy storage can cooperate with each other to synergistically smooth fluctuations, a modal allocation coefficient matrix model is constructed, and the fluctuation components are allocated to each module in the electric-hydrogen HESS through the modal allocation coefficient matrix model, and relevant constraints are formulated to quantify the relationship between the fluctuation components and the sea-land energy storage capacity.

[0056] Step S5, using the pre-constructed sea and land electricity-hydrogen HESS full life cycle cost model to quantify the cost of sea and land electricity and hydrogen energy storage at each stage of the life cycle. Specifically, considering the differences in the operating environment of sea and land energy storage, a sea and land electricity-hydrogen HESS investment, construction, operation and maintenance, and retirement full life cycle cost model is constructed, including construction investment cost, operation and maintenance cost, and reset recovery cost. The cost is annualized to the initial year for comparison, which can more accurately quantify the cost, provide a calculation basis for subsequent accurate energy storage planning, evaluate the overall economy of the system from a long-term perspective, and effectively reflect a series of costs of energy storage equipment from investment, operation, maintenance to recovery.

[0057] Step S6, based on the fluctuation components of different time scales, the initial electric hydrogen energy storage allocation and the quantified costs of sea and land electricity and hydrogen energy storage at each stage of the life cycle, the sea and land electricity-hydrogen energy storage planning is completed using a pre-constructed two-stage planning model, including the first stage for determining the final electric hydrogen energy storage allocation and the second stage for determining the sea and land energy storage allocation. Among them, the two-stage planning model is constructed based on the full life cycle cost model, and the economic benefits of offshore energy storage on the design budget of offshore power transmission and transformation equipment are quantified and the objective function is constructed.

[0058] After determining the final electric-hydrogen energy storage allocation and sea-land energy storage allocation in stages, a sensitivity analysis can be conducted on the planning results based on parameters such as the offshore distance of the wind farm, the efficiency of key equipment, and the cost of major technologies, in order to derive an economically feasible solution for offshore wind power generation and storage while exploring future development directions.

[0059] Steps S1 and S2 preprocess the time domain series of offshore wind power output fluctuations; steps S3 and S4 group the fluctuation components in the frequency domain and realize the allocation relationship between wind power fluctuations and hybrid energy storage; steps S5 and S6 establish a full life cycle cost model for sea and land electricity-hydrogen HESS, and on this basis propose a two-stage planning model; subsequently, based on the two-stage planning model, the planning results can be analyzed and the impact of key technologies on the development of offshore energy storage can be explored.

[0060] The frequency domain splitting method proposed in steps S1 to S4 is mainly based on variational mode decomposition (VMD), combined with MUSIC power spectrum function and anti-pulse average filtering method. That is, the frequency domain splitting of offshore wind power fluctuation provided in this embodiment first pre-processes the offshore wind power time series output data according to the grid connection requirements to obtain the wind power fluctuation power curve, and then considers the improved adaptive modal coefficient VMD decomposition method to split the wind power fluctuation in the frequency domain into fluctuation components of different time scales.

[0061] Variational mode decomposition (VMD) is an adaptive, fully non-recursive modal variation and signal processing method. After inputting the preset number of modal decompositions, the optimal center frequency and finite bandwidth that match each mode can be searched during the solution process, and then the effective frequency domain decomposition result of the given signal can be obtained, and finally the optimal solution to the variational problem is obtained. This method has been widely used in the fields of short-term output forecasting of renewable energy and fault monitoring due to its high time-frequency resolution when processing large amounts of data. After the original wind power fluctuation power is input through this method, K finite bandwidth intrinsic modal function (IMFs) components can be decomposed. The requirement that the sum of the estimated bandwidths of all modes is minimized can fully cluster and effectively separate the power fluctuation components with similar frequencies, overcoming the drawbacks of aliasing of modes after decomposition by the EMD method. The specific constrained variational model expression is:

[0062]

[0063] Where * represents the convolution operation; {u k}={u1,u2,...,u k} are the K sub-modal components obtained by decomposition; {ω k}={ω1,ω2,...,ω k} is the center frequency of each modal component; δ(t) is the impulse function; represents the derivative with respect to time t; P HESS It is the fluctuation component of wind power output.

[0064] The quadratic penalty factor and Lagrange multiplier are used to convert the above constrained problem into an unconstrained problem to solve the optimal solution of the above model. The quadratic penalty factor can ensure the reconstruction accuracy of the signal, and the Lagrange multiplier can ensure the strictness of the constraint conditions. The augmented Lagrangian expression is shown as follows:

[0065]

[0066] Where λ is the Lagrange multiplier and β is the quadratic penalty factor.

[0067] For unconstrained problems, the alternating direction multiplier method is used to iteratively update u k (t),ω k and λ(t) finally obtain all the modes of offshore wind power fluctuation signal decomposition. The minimum value of and can be obtained by the solution shown in the following formula:

[0068]

[0069] In the formula, Wiener filter for the current residual; is the center frequency of the former sub-mode function.

[0070] The Lagrange multiplier update formula is:

[0071]

[0072] The iteration stop condition is as follows:

[0073]

[0074] Where, e is the given judgment accuracy, e>0.

[0075] In addition, the artificial selection of the decomposition number K is subjective. The K value is determined after multiple iterations of the algorithm. The amount of calculation is large and it is difficult to find the optimal solution. In fact, the center frequency of each IMF component is often related to the fluctuation of wind resources in the sea area, and the value of K can be determined by the characteristic spectrum of wind power fluctuations. Therefore, in order to determine the decomposition mode number K more quickly and accurately, this embodiment can accurately and quickly reflect the characteristic spectrum of the signal through the MUSIC power spectrum. The basic idea is to perform characteristic decomposition on the estimated random process correlation matrix to obtain the signal subspace and the noise subspace, and then use the orthogonality of the two to construct the spectral function, and obtain the frequency estimate of the characteristic fluctuation through the spectral peak search:

[0076]

[0077] Where P MUSIC is the spectral function, {V1,V2,···,V p}、{V m+1 ,V m+2 ,···,V p} represent the signal and noise subspaces respectively.

[0078] The wind power fluctuation data is input as the original signal, and the spectrum function is calculated. When it shows an obvious peak on the frequency axis, it means that the frequency corresponding to the peak is higher than the adjacent frequency components, and it is identified as the characteristic frequency of the wind power fluctuation in the region. Therefore, according to the peak value of the power spectrum, the characteristic spectrum of the wind resource fluctuation in the region can be obtained more accurately, and then the VMD decomposition mode number K can be quickly determined.

[0079] At the same time, in order to overcome the problem that the traditional power allocation method based on cutoff frequency is difficult to apply to the power configuration of hybrid energy storage, this embodiment provides a method to introduce the sub-modal allocation coefficient λ bat and λ hyd , respectively represent the proportion of K sub-modal components allocated to battery energy storage and hydrogen energy storage:

[0080]

[0081]

[0082] Where: They represent the proportional coefficient matrices of the kth submodal component allocated to electric energy storage and hydrogen energy storage respectively.

[0083]

[0084]

[0085] Where: U b , P b , U h , P h They are the frequency spectrum complex sequence and time domain power curve corresponding to battery energy storage and hydrogen energy storage respectively; u k (ω),u k (t) are the sub-spectrum sequence and time domain data of modal component k respectively.

[0086] The fluctuation components are distributed to each energy storage module of the electric-hydrogen HESS through the modal distribution coefficient matrix model. The fluctuation frequency domain components and time domain components that each energy storage is responsible for are calculated as follows: Each element in the fluctuation frequency domain sequence is associated with the corresponding λ bat and λ hyd The sub-spectrum of the modal component corresponding to the electric energy storage and hydrogen energy storage can be obtained by multiplying the complex sequence of the spectrum of the sub-modal component; bat and λ hyd Multiplying each element in with the time domain data of the corresponding sub-modal component can obtain the time domain curve of the battery energy storage and hydrogen energy storage corresponding to the sub-modal component.

[0087] In step S5, a corresponding relationship with hybrid energy storage is established based on the obtained fluctuation component and a cost model is established. The sea-land electric hydrogen HESS framework proposed in this embodiment is as follows: Figure 2 Its life cycle cost model is shown in Figure 3 The specific process is as follows:

[0088] Unlike land-based energy storage, the marine environment is complex and changeable. Offshore energy storage faces a more difficult environment during the installation and construction, operation and maintenance, and recycling and decommissioning stages, which will incur additional costs. In addition to a large amount of transportation costs during the installation and construction stage, it is also necessary to build an offshore platform for energy storage installation; during the operation and maintenance stage, offshore energy storage is eroded by seawater and its life is lost faster; in the recycling and decommissioning stage, additional transportation and harmless treatment costs also need to be considered. Therefore, the full life cycle cost model for constructing an electric-hydrogen HESS that takes into account the differences between land and sea is as follows, where the investment and construction costs are:

[0089]

[0090]

[0091]

[0092] Ω hyd ={EL,FC,TANK} (14)

[0093] In the formula, and They represent the investment costs of onshore HESS, battery energy storage and hydrogen energy storage systems respectively; P bat and E bat They are the unit power investment cost, unit capacity investment cost, planned power capacity and energy capacity of electric energy storage respectively; Ω hyd It is a collection of main equipment for hydrogen energy storage system, including electrolyzer EL, hydrogen fuel cell FC and hydrogen storage tank TANK; and M hyd,j are the unit investment cost and planned scale of equipment j in the hydrogen energy storage system; y bat ,y hyd are the service life of electric energy storage and hydrogen energy storage systems respectively, and r is the investment discount factor.

[0094] The investment and construction costs of offshore electric-hydrogen HESS are as follows:

[0095]

[0096]

[0097]

[0098] In the formula, and Represents offshore HESS, offshore platform and construction costs respectively; In order to meet the higher design requirements of offshore energy storage for corrosion and moisture resistance, the offshore energy storage investment cost coefficient is introduced v is the platform volume coefficient; n plat and nday The number of platforms and construction days; and Unit costs for platform and construction.

[0099] The operation and maintenance cost calculation expression is:

[0100]

[0101]

[0102]

[0103]

[0104] In the formula, and They are the operation and maintenance costs of onshore HESS, battery energy storage, hydrogen energy storage and offshore HESS; and They are the unit power operation and maintenance cost of electric energy storage, the unit capacity operation and maintenance cost, and the unit operation and maintenance cost of device j in the hydrogen energy storage system; is the conversion factor for offshore energy storage operation and maintenance costs.

[0105] The calculation expression for reset recovery cost is:

[0106]

[0107]

[0108]

[0109]

[0110] In the formula, and represent the replacement cost and recovery cost of offshore and onshore energy storage, respectively; and They represent the replacement cost coefficient and recovery cost coefficient of marine and land HESS respectively; N represents the number of times the electric energy storage is reset within the life cycle of the unit hydrogen energy storage, Indicates rounding up to an integer.

[0111] In step S6, the two-stage planning of sea-land electricity-hydrogen hybrid energy storage is completed and sensitivity analysis is performed. The specific process is as follows:

[0112] In the first stage, the fluctuation frequency domain components are decomposed according to the improved adaptive modal number VMD method. Combined with the acquired initial electric hydrogen energy storage allocation and the quantified costs of sea and land electric and hydrogen energy storage at each stage of the life cycle, the electric hydrogen energy storage allocation is optimized with the goal of minimizing the total cost of the HESS life cycle. The time domain operating power curves and SOC sequences of the electric and hydrogen energy storage are obtained and input into the second stage. The time domain operating power curves of the electric and hydrogen energy storage can be obtained by decomposing the wind power fluctuation power curve.

[0113] In the second stage, based on the received time-domain operating power curves and SOC sequences of electricity and hydrogen energy storage, and with the goal of optimizing the comprehensive economic cost including transmission benefits, the offshore and onshore energy storage configurations are optimized to complete the allocation of sea and land energy storage.

[0114] Phase 1:

[0115]

[0116]

[0117]

[0118]

[0119] In the formula, is the total cost of various energy storage types, C inv , C o&m , C rep&rec and C loss They represent the costs of construction investment, operation and maintenance, reset recovery and energy loss of marine and land electric hydrogen hybrid energy storage respectively; and are the energy loss costs of electricity and hydrogen energy storage respectively; P bat,t , P hyd,t is the power value of electric energy storage and hydrogen energy storage at time t, η EL , η FC They represent the charging and discharging efficiency of the battery, the energy utilization efficiency of the electrolyzer and the hydrogen fuel cell, respectively. e Compensate for the loss in electricity prices.

[0120] The first stage constraints include:

[0121] 1) Power balance constraints

[0122] P wind =P grid +P HESS (30)

[0123] Where P wind is the wind farm output data, P gridis the grid-connected power component.

[0124] 2) Modal distribution coefficient constraints

[0125] Hydrogen energy storage is suitable for regulating low-frequency and high-amplitude fluctuations, while batteries are suitable for regulating high-frequency and small-amplitude fluctuations. In order to reasonably allocate the smoothing intervals of the two types of energy storage, the following constraints are constructed:

[0126]

[0127] In the formula, Represent sub-mode u k The minimum and maximum frequencies, f bat is the lower limit of the frequency that battery energy storage can bear, f hyd Indicates the upper limit of the frequency that hydrogen energy storage can sustain.

[0128] 3) Energy storage capacity matching constraints

[0129] The following calculations are performed on the time domain charging and discharging power sequence and energy sequence of the electric-hydrogen HESS to match and determine the power capacity and energy capacity of the energy storage:

[0130]

[0131] Where P bat,t , P hyd,t and P bat , P hyd Respectively represent the real-time charging and discharging power and configured power capacity of electric energy storage and hydrogen energy storage; E bat,t 、E hyd,t and E bat 、E hyd represents the real-time storage energy and planned energy capacity of electric energy storage and hydrogen energy storage respectively; They represent the upper and lower limits of the state of charge of electric energy storage and hydrogen energy storage respectively.

[0132] 4) Energy storage state constraints

[0133]

[0134] In the formula, SOC bat,t , SOC hyd,t They represent the charge state of the electricity and hydrogen energy storage at time t respectively.

[0135] Phase 2:

[0136]

[0137]

[0138] L=αd (36)

[0139]

[0140] In the formula, C on+off represents the comprehensive economic cost of offshore and onshore energy storage; are the total cost of marine and land HESS respectively; C tran,on , C tran,on+off They represent the cost of offshore power transmission and transformation system without and with offshore energy storage, respectively. (C tran,on -C tran,on+off ) represents the transmission benefit; C tran represents the total cost of offshore power transmission and transformation equipment, They represent the unit costs of flexible direct current transmission equipment and converter equipment respectively; L is the planned length of the transmission submarine cable, d is the offshore distance of the offshore wind farm, and α represents the submarine cable design coefficient, which is usually greater than 1; represents the maximum value of the transmission power, and β represents the transmission coefficient.

[0141] The constraints of the second stage include:

[0142] In addition to considering the relevant constraints at the upper level, the second-stage planning of the electric-hydrogen HESS on the offshore wind power source side also adds the following constraints.

[0143] 1) Energy transfer balance constraints

[0144]

[0145] Where P tran Represents the transmission power, P HESS,off represents the charging power of offshore HESS, P HESS,on Indicates the charging power of the onshore HESS.

[0146] 2) Geographical resource endowment constraints

[0147] Energy storage planning and construction is limited by the geographical resource conditions of the sea and land areas, and the following constraints are set on the capacity of the electric-hydrogen HESS:

[0148]

[0149] In the formula, E bat,on is the energy capacity of onshore electric energy storage, E bat,off is the energy capacity of offshore energy storage, V hyd,on is the hydrogen storage tank capacity for onshore hydrogen energy storage, V hyd,off is the hydrogen storage tank capacity of offshore hydrogen energy storage. The superscript min represents the lower limit, and the superscript max represents the upper limit.

[0150] 3) Black start constraints

[0151] Affected by natural disasters such as typhoons, offshore wind farms need to be equipped with a certain amount of energy storage to achieve reconnection after large-scale grid disconnection:

[0152]

[0153] Where P HESS,off 、E HESS,off For the power capacity and energy capacity of offshore HESS, The power and energy values ​​required to start a single fan.

[0154] The specific example analysis is carried out below:

[0155] This example analyzes a specific example with reference to relevant data of an offshore wind farm. According to the annual wind power output, the electric-hydrogen HESS capacity of the offshore platform and the onshore grid connection point is planned; and a scenario is constructed for the future offshore layout trend of wind power. With the development of energy storage technology, a corresponding electric-hydrogen HESS capacity matching solution is given, which verifies the effectiveness of the method proposed in this example.

[0156] The selected wind farm center is 100km offshore, with a planned installed capacity of 620MW, consisting of 62 wind turbines. The annual historical output data of the wind farm is used. The discount factor r is 6%.

[0157] 1. Analysis on the effectiveness of frequency domain splitting

[0158] The wind farm output fluctuation data is input to obtain the MUSIC power spectrum, and the curve is normalized for easy observation. Then, the characteristic spectrum of the wind resources in the sea area can be obtained by spectrum peak search, such as Figure 4 The power spectrum shown shows 16 obvious characteristic peaks, and the horizontal axis corresponding to the characteristic peak points is the characteristic frequency of the wind resources in the sea area.

[0159] In order to verify the advantages of the adaptive modal number VMD method proposed in this embodiment in dealing with the problem of splitting offshore wind power output fluctuations with a large frequency domain span, this method and the EMD method are used to decompose wind power output fluctuations. The VMD decomposition modal number K determined according to the characteristic frequency number of wind resources in the sea area is 16.

[0160] (1.1) Comparison between VMD and EMD methods

[0161] In order to compare the decomposition effects of the two decomposition methods, the two sets of time domain sequences are transformed by IDFT to obtain their respective frequency domain sequences, such as Figure 5As shown in sub-figures (a) and (b) in . It can also be seen from sub-figure (a) that the IMF amplitude obtained by decomposing using the adaptive modal number VMD method shows a downward trend as the frequency increases. In addition, the frequency distribution of each IMF can be clearly seen, and the frequency domain splitting effect of different IMFs is obvious, showing a pattern in which the peak values ​​are arranged from high to low and the bandwidth is arranged from narrow to wide. It can be seen from sub-figure (b) that the frequency band distribution of each IMF obtained by EMD decomposition is relatively wide, and IMF2 almost covers the entire frequency band, resulting in serious aliasing of frequency components between different IMFs, and it is impossible to determine a clear frequency band boundary. In addition, compared with the amplitude-frequency curve of the original wind power fluctuation, the EMD decomposition result has a lot of new data at the end points of the frequency band, which is caused by its inherent end point effect. The decomposition result of the adaptive modal number VMD method proposed in this embodiment has a high degree of overlap with the original spectrum curve, and can efficiently separate the high and low frequency components in the fluctuation data, laying a good foundation for subsequent HESS capacity planning.

[0162] (1.2) Verification of the accuracy of the modal number K

[0163] In order to specifically measure the decomposition effect and restoration degree, the following two parameters are used as evaluation indicators to compare and analyze the traditional EMD method and the adaptive mode number VMD method:

[0164]

[0165] In the formula, S1 is the correlation coefficient, S2 is the energy loss coefficient; and Represents sub-mode u k and the mean of the original wind power fluctuation signal f.

[0166] The correlation coefficients of the decomposed modes are used to evaluate the degree of aliasing, and the energy loss coefficient is used to evaluate the coincidence of the reconstructed signal. The effects of the EMD method, the adaptive mode number of 16, and the VMD method when the mode number is 15 and 17 are compared as shown in Table 1:

[0167] Table 1 Comparison of decomposition effect evaluation indicators

[0168]

[0169] From the results of the four groups of decomposition evaluation indicators in Table 1, it can be seen that the EMD decomposition method has obvious modal aliasing when processing complex wind power fluctuation data, and the energy loss accounts for more than 5%. By comparing the three groups of indicators of the VMD method, it can be seen that when the modal number K=16, the evaluation indicators S1 and S2 are both optimal, which shows that at this time not only the degree of energy loss is the lowest, but also the degree of modal aliasing is reduced to the lowest, achieving accurate division of the fluctuation frequency domain. When K=15, the modal aliasing rate is high due to incomplete decomposition, and when K=17, excessive decomposition leads to an increase in the energy loss rate. It can be seen that the method of adaptively determining the modal number according to the characteristic spectrum of wind power fluctuations in this embodiment is more feasible than the traditional subjective determination method, which takes into account the intrinsic characteristics of wind power fluctuations.

[0170] 2. Verification of hybrid energy storage allocation scheme

[0171] The modal splitting results are input into the two-stage planning model to solve, and the modal distribution coefficients of the four energy storage modules corresponding to each fluctuation component are calculated as follows: Figure 6 As shown:

[0172] From the calculation results, it can be seen that the hydrogen energy storage system is mainly responsible for smoothing the high-frequency fluctuations (IMF1~IMF3), while the battery energy storage is mainly responsible for smoothing the high-frequency fluctuation components (IMF13~IMF16). The two forms of energy storage jointly bear the fluctuation components in the middle of the frequency domain (IMF4~IMF12). The cooperation between the two effectively avoids the situation where a single energy storage form is redundantly configured to smooth large-amplitude fluctuations. At the same time, from an overall perspective, almost all fluctuation components are mainly borne by the two energy storage modules on shore, and the distribution coefficient of offshore energy storage accounts for only a small part. This is caused by the high investment, construction, and operation and maintenance costs of offshore energy storage modules. A negative value of the distribution coefficient indicates that a certain energy storage module is responsible for fluctuations with a phase opposite to that of the modal component.

[0173] The time domain sub-spectrum corresponding to the energy storage of the four energy storage modules can be obtained by allocating coefficients of each module. After IDFT transformation, the following can be obtained: Figure 7 The time domain power curves of sea and land electricity and hydrogen energy storage throughout the year are shown.

[0174] from Figure 7 It can be seen that the hydrogen energy storage system has a longer smoothing period and is mainly responsible for smoothing the extended multi-week and seasonal fluctuations in offshore wind power output. In contrast, the net energy flow of the electric energy storage system does not show obvious seasonal changes and is mainly responsible for smoothing the high-frequency output fluctuations of wind power during the day. This clearly shows that the hydrogen energy storage system is more suitable for solving the needs of seasonal energy storage, while the electric energy storage system is more effective in smoothing short-term fluctuations. In addition, the power amplitude of the onshore hybrid energy storage system is larger, which is because it is more economical to plan energy storage on land.

[0175] 3. Comparative analysis of planning results

[0176] (3.1) Analysis of energy storage planning results under different schemes

[0177] In order to verify the effectiveness of the planning scheme proposed in this embodiment, the following three planning schemes are set up for analysis.

[0178] Option 1: Consider only the traditional LCC model and plan the electric-hydrogen HESS capacity.

[0179] Option 2: Planning based on the LCC model that takes into account differences in offshore and onshore energy storage environments.

[0180] Solution 3: This embodiment comprehensively considers the LCC model of the differences in sea and land energy storage environments and the cost-effectiveness of the offshore power transmission and transformation system to plan the sea and land electricity-hydrogen HESS capacity.

[0181] The technical and economic parameters of each energy storage are shown in Table 2.

[0182] Table 2 Economic and technical parameters of electric-hydrogen HESS

[0183]

[0184]

[0185] The planning results of the three schemes are shown in Table 3.

[0186] Table 3 Planning results of electric-hydrogen HESS under different schemes

[0187]

[0188] It can be seen that Scheme 1 adopts the traditional hybrid energy storage cost model, and the energy storage is concentrated near the onshore grid connection point. The total cost of HESS is relatively economical, but this method ignores the limitation of onshore land resources. With the development of offshore wind power in the future, offshore land resources will become scarce, and the actual planning cost will be higher than it is now. In order to meet the self-starting constraints of offshore wind farms, Scheme 2 is equipped with a certain capacity of battery energy storage. Although the volume coefficient of electric energy storage is smaller than that of hydrogen energy storage systems, the high cost of offshore platform construction still causes the total cost of HESS in Scheme 2 to be nearly 10.5% higher than that of Scheme 1. From the planning results, the overall planned capacity of electric energy storage and hydrogen energy storage in Plan 3 is comparable to that in Plan 1, but part of the energy storage is planned at sea. This is because this part of energy storage brings economic benefits to the planning and design of transmission submarine cables and substations. Plan 3 quantifies this economic benefit and puts it into the objective function, so the total cost of Plan 3 is close to that of Plan 1. Unlike Plan 2, Plan 3 also plans some hydrogen energy storage at sea, forming an electric-hydrogen HESS with the offshore electric energy storage, which can not only realize the self-starting function of the wind farm, but also initially stabilize the wind power output at sea, and assist in the realization of peak regulation, frequency regulation and other functions on the farm side.

[0189] (3.2) Planning cost composition analysis

[0190] The specific cost structure of Option 3 is as follows: Figure 8 As shown, onshore hydrogen storage and onshore electric storage account for the largest proportion, 38.78% and 28.45% respectively. This is because most of the energy storage planning and construction is onshore. Although the planned capacity of offshore energy storage accounts for only a small part, the cost is almost half of that of onshore energy storage. This is because the offshore environment is harsh and the construction, operation and maintenance costs are very expensive compared to onshore. Electric energy storage is frequently charged and discharged, and its life is shorter than that of hydrogen energy storage. Therefore, the replacement cost accounts for a large part of the electric energy storage LCC. The replacement cost of onshore electric storage accounts for 45.31% of the corresponding total cost, and the replacement cost of offshore electric energy storage accounts for 34.25% of the corresponding total cost. The benefits of the objective function are mainly the recovery income of energy storage equipment of 394,200 yuan and the economic benefits of the transmission and transformation system of 5,062,700 yuan, accounting for 0.74% and 9.52% of the comprehensive economic cost respectively.

[0191] (3.3) Sensitivity analysis

[0192] In order to show the advanced and conservative situations of different technologies, the unit cost in the initial plan is used as the benchmark with a fluctuation of ±20%, and the total planning cost is recalculated as follows: Fig. 9 As shown, the upper and lower marginal lines of the bar graph in the figure represent the corresponding HESS comprehensive planning costs under the floating parameter case. Fig. 9 It shows that the cost of electricity storage has little impact on the total planning cost, and the reduction of planning cost mainly depends on the improvement of offshore platforms and construction technology. Compared with the cost of electricity storage, the reduction of hydrogen storage cost will bring greater benefits to HESS planning; and for electricity storage technology, research on the improvement of its life will be more promising. Offshore construction costs and platform costs have a huge impact on the overall economic benefits of the plan. If the unit cost of both increases by 20%, the planning cost will increase to 57.38 million yuan and 57.25 million yuan respectively. If the unit cost of both decreases by 20%, the comprehensive planning cost will drop to 47.89 million yuan and 48.56 million yuan, a decrease of 9.94% and 8.69% respectively.

[0193] In summary, the planning method proposed in this embodiment is based on the VMD decomposition method, and proposes a time-frequency domain planning method for electric-hydrogen HESS to smooth the fluctuation of offshore wind power output under the background of large-scale development of offshore wind power and significant grid connection problems. The following conclusions can be drawn from this embodiment:

[0194] 1) Compared with the traditional frequency domain planning method, the VMD decomposition method of the adaptive modal number proposed in this embodiment analyzes the characteristic frequency of wind resources and then determines the decomposition modal number K, which can accurately separate the wind power output fluctuation components of different time scales and has a more realistic basis.

[0195] 2) In response to the problem of insufficient consideration of environmental factors in offshore wind power generation and energy storage, a full life cycle cost model of electric-hydrogen HESS was constructed, which takes into account the cost differences of building, operating, and recovering energy storage equipment at different locations on land and sea, and quantifies the cost of HESS more accurately, providing a reference for offshore energy storage construction.

[0196] 3) The proposed planning method takes into account the economic benefits of HESS configuration for offshore power transmission and transformation, and analyzes the energy storage configuration under multiple scenarios of deep-sea wind power. The results show that hydrogen energy storage has an obvious effect on smoothing seasonal fluctuations, and as the wind farm is farther from the shore and land resources become scarcer, it will be more valuable to build energy storage at sea.

[0197] The preferred specific embodiments of the present invention are described in detail above. It should be understood that a person skilled in the art can make many modifications and changes based on the concept of the present invention without creative work. Therefore, any technical solution that can be obtained by a person skilled in the art through logical analysis, reasoning or limited experiments based on the concept of the present invention on the basis of the prior art should be within the scope of protection determined by the claims.

Claims

1. A method for planning electric-hydrogen hybrid energy storage for offshore wind farms considering multi-time scale fluctuation smoothing, characterized in that: The following steps are involved: S1, obtaining and preprocessing the offshore wind power time series output data; S2, extracting the initial fluctuation component from the pre-processed offshore wind power time series output data; S3, splitting the initial fluctuation component into fluctuation components of different time scales using an improved adaptive mode number variational mode decomposition method; S4, performing initial electric hydrogen energy storage allocation based on the fluctuation components of different time scales using a pre-constructed modal allocation coefficient matrix model; S5, using the pre-built sea-land electricity-hydrogen hybrid energy storage system life cycle cost model to quantify the cost of sea-land electricity and hydrogen energy storage at each stage of the life cycle; S6, based on the fluctuation components of different time scales, the initial electric-hydrogen energy storage allocation and the quantified costs of sea and land electricity and hydrogen energy storage at each stage of the life cycle, a pre-constructed two-stage planning model of the capacity of the sea and land electricity-hydrogen hybrid energy storage system is used to complete the sea and land electricity-hydrogen energy storage planning, including a first stage for determining the final electric-hydrogen energy storage allocation and a second stage for determining the sea and land energy storage allocation.

2. The method for planning electric-hydrogen hybrid energy storage for offshore wind farms considering multi-time scale fluctuation smoothing according to claim 1 is characterized in that: The S2 specifically includes: The anti-pulse average filtering method is used to extract the grid-connected component that meets the grid-connected requirements and the initial fluctuation component to be smoothed by the hybrid energy storage from the pre-processed offshore wind power time-series output data, wherein the grid-connected requirements are obtained in advance.

3. The method for planning electric-hydrogen hybrid energy storage for offshore wind farms considering multi-time scale fluctuation smoothing according to claim 1 is characterized in that: The S3 specifically includes: The characteristic power spectrum of wind power fluctuation is extracted using the MUSIC algorithm, and then the number of decomposed modes is determined; Based on the modal number, the wave components in different frequency domains are decomposed using an improved adaptive modal number variational modal decomposition method.

4. The method for planning electric-hydrogen hybrid energy storage for offshore wind farms considering multi-time scale fluctuation smoothing according to claim 3 is characterized in that: The process of solving the characteristic power spectrum is: Where P MUSIC is the spectral function, a(ω)=[1 e -jω ···e -j(p-1)ω ],{V1,V2,···,V p }、{V m+1 ,V m+2 ,···,V p } represent the signal and noise subspaces respectively.

5. The offshore wind farm electricity-hydrogen hybrid energy storage planning method considering multi-time scale fluctuation smoothing according to claim 1 is characterized in that: The costs of sea and land electricity and hydrogen energy storage at each stage of the life cycle include construction investment costs, operation and maintenance costs, and replacement recovery costs.

6. The method for planning electric-hydrogen hybrid energy storage for offshore wind farms considering multi-time scale fluctuation smoothing according to claim 1 is characterized in that: The modal distribution coefficient matrix model includes the proportional coefficients λ of K sub-modal components distributed to the electrical energy storage bat and the proportional coefficient λ allocated to hydrogen energy storage hyd , respectively expressed as: and In the formula, They represent the proportional coefficient matrices of the kth submodal component allocated to electric energy storage and hydrogen energy storage respectively.

7. The method for planning electric-hydrogen hybrid energy storage for offshore wind farms considering multi-time scale fluctuation smoothing according to claim 1 is characterized in that: The first stage specifically includes: based on the fluctuation components of different time scales, the initial electric-hydrogen energy storage allocation and the quantified costs of sea and land electricity and hydrogen energy storage at each stage of the life cycle, with the goal of minimizing the total cost of the hybrid energy storage system over the entire life cycle, optimizing the electric-hydrogen energy storage allocation to obtain the time-domain operating power curves and SOC sequences of the electric-hydrogen energy storage.

8. The method for planning electric-hydrogen hybrid energy storage for offshore wind farms considering multi-time scale fluctuation smoothing according to claim 7 is characterized in that: The second stage specifically includes: based on the time-domain operating power curves of the electricity and hydrogen energy storage and the SOC sequence, with the goal of optimizing the comprehensive economic cost including transmission benefits, optimizing the offshore and onshore energy storage configurations and completing the allocation of sea and land energy storage.

9. The method for planning electric-hydrogen hybrid energy storage for offshore wind farms considering multi-time scale fluctuation smoothing according to claim 8 is characterized in that: The constraints of the two-stage planning model of the capacity of the sea-land electricity-hydrogen hybrid energy storage system include power balance constraints, modal allocation coefficient constraints, energy storage capacity matching constraints, energy storage state constraints, energy transmission balance constraints, geographical resource endowment constraints and black start constraints.

10. The method for planning electric-hydrogen hybrid energy storage for offshore wind farms considering multi-time scale fluctuation smoothing according to claim 8, characterized in that: The first stage is expressed as: In the formula, is the total cost of various energy storage types, C inv , C o&m , C rep&rec and C loss They represent the costs of construction investment, operation and maintenance, reset recovery and energy loss of marine and land electric hydrogen hybrid energy storage respectively; and are the energy loss costs of electricity and hydrogen energy storage respectively; P bat,t , P hyd,t is the power value of electric energy storage and hydrogen energy storage at time t, η EL , η FC They represent the charging efficiency of the battery, the discharging efficiency of the battery, the energy utilization efficiency of the electrolyzer, and the energy utilization efficiency of the hydrogen fuel cell, respectively. e is the loss compensation electricity price, T represents the total time; The second stage is expressed as: L = αd In the formula, C on+off represents the comprehensive economic cost of offshore and onshore energy storage, (C tran,on -C tran,on+off ) represents the transmission benefit, are the total costs of the marine and land hybrid energy storage systems, C tran,on , C tran,on+off They represent the cost of offshore power transmission and transformation system without and with offshore energy storage, respectively. tran represents the total cost of offshore power transmission and transformation equipment, Respectively represent the unit costs of flexible direct current transmission equipment and converter equipment, is the design capacity of offshore power transmission and transformation equipment, L is the planned length of the transmission submarine cable, d is the offshore distance of the offshore wind farm, α represents the submarine cable design coefficient, represents the maximum value of the transmission power, and β represents the transmission coefficient.