Combined type auxiliary maintenance tool for outdoor type GIL (Gas Insulated Line) equipment
By designing a combined auxiliary maintenance tool for outdoor GIL equipment, the difficulty of disassembly and hoisting during GIL equipment maintenance is solved, an efficient and safe maintenance process is achieved, and the quality and efficiency of maintenance are improved.
Patent Information
- Application Number
- CN202411460942.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-18
- Publication Date
- 2024-11-22
AI Technical Summary
During the maintenance of GIL equipment, there are problems such as disassembly and hoisting, and the existing technology cannot meet the needs of efficient and safe maintenance.
A combined auxiliary maintenance tool for outdoor GIL equipment is designed, including supporting trolleys, spreaders and brackets, used to support conductor movement, lift pot-type insulators and flanges, and provides fixed and auxiliary lifting functions, suitable for different Size flanges and insulators.
It realizes a standardized maintenance process, improves work efficiency, shortens the equipment power outage time, improves the quality of maintenance operations, and avoids unnecessary errors, ensuring the correct positioning of the conductor and the safe disassembly and assembly of the equipment.
Smart Images

Figure CN119009764A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of GIL equipment operation and maintenance, and in particular relates to a combined auxiliary maintenance tool for outdoor GIL equipment. Background Art
[0002] GIL equipment (Gas Insulated Transmission Lines) is a high-voltage, high-current power transmission equipment that uses gas insulation and coaxial arrangement of the cylinder and conductor. GIL equipment has significant advantages such as large transmission capacity, small footprint, flexible layout, high reliability, low maintenance, long life, and low environmental impact. It is particularly suitable for large-capacity outgoing lines and connecting lines of power plants or substations, and is the development trend of the current transmission system.
[0003] GIL is a large-sized gas-insulated equipment with a complex application environment. Disassembly and hoisting during on-site maintenance are difficult, so higher requirements are placed on maintenance technology and special demands are placed on disassembly, hoisting and other maintenance equipment. Summary of the invention
[0004] In view of the deficiencies in the prior art, the present invention provides a combined auxiliary maintenance tool for outdoor GIL equipment.
[0005] In order to solve one, part or all of the above technical problems, the technical solution adopted by the present invention is: A combined auxiliary maintenance tool for outdoor GIL equipment, comprising a support trolley for supporting the movement of a conductor in a GIL equipment cylinder, a hoist for hoisting a pot-type insulator and a flange of the GIL equipment, and a bracket for supporting the pot-type insulator and the flange; The support trolley comprises a first support part and a second support part, the first support part is provided with two first support blocks forming a V-shaped support structure, and the second support part is provided with two second support blocks forming a V-shaped support structure; the first support blocks are slidably connected to the first support part, and rollers are provided on the support surfaces of the first support blocks; the second support blocks are slidably connected to the second support part, and first buffer pads are provided on the support surfaces of the second support blocks; first casters are provided at the four corners of the first support part and the second support part; The lifting device comprises a first connecting plate, a hanging plate with one end vertically fixedly connected to the first connecting plate, and a hanging ring fixedly arranged on the top of the hanging plate; a plurality of first connecting holes are arranged at the lower part of the first connecting plate, wherein at least two of the first connecting holes can be aligned with the bolt holes of the pot insulator or the flange at the same time; The bracket includes a first support plate, columns whose bottoms are slidably connected to the first support plate, and a second connecting plate hinged to the top of the columns; the second connecting plates are each provided with a second long connecting hole, which is used for bolt connection with the bolt hole of the pot insulator or the flange.
[0006] Furthermore, a first screw that is rotatably connected is provided on the first support part, and the left and right sections of the first screw have threads with opposite rotation directions, and the two sections of the threads are respectively threadedly connected to one of the first support blocks; a second screw that is rotatably connected is provided on the second support part, and the left and right sections of the second screw have threads with opposite rotation directions, and the two sections of the threads are respectively threadedly connected to one of the second support blocks; hand wheels are provided at both ends of the first screw and the second screw.
[0007] Furthermore, the supporting trolley is fixedly provided with traction rings at both ends in the traveling direction, and the traction rings are connected to the handles by means of a pull rope.
[0008] Furthermore, the first connecting hole is an arc-shaped long hole.
[0009] Furthermore, a vertical first guide rail is disposed on the upper side of the first support plate, the first guide rail passes through the columns, and the columns are all slidably connected to the first guide rail.
[0010] Furthermore, a movable bracket for movement and lifting is also provided at the bottom of the bracket.
[0011] Furthermore, the movable bracket includes a second support plate and a jack; the jack is fixedly arranged on the second support plate and is used to lift up the first support plate; vertical second guide rails are fixedly arranged at both ends of the second support plate, the second guide rails pass through the first support plate, and the first support plate is slidably connected to the second guide rails; a plurality of second casters are arranged at the bottom of the movable bracket.
[0012] Furthermore, it also includes a support plate for supporting the conductor at the end of the GIL equipment cylinder; both ends of the support plate are provided with a third long connection hole, and the third connection hole is used to be bolted to the threaded hole at the end of the cylinder; the middle of the support plate is provided with a V-shaped support groove.
[0013] Furthermore, a second buffer pad is arranged on the inner side of the V-shaped support groove.
[0014] Furthermore, the first casters are all rubber wheels with self-locking function.
[0015] Compared with the prior art, the present invention has the following beneficial effects: By analyzing the difficulties in on-site disassembly and assembly of GIL equipment, summarizing the on-site installation, maintenance processes and methods of outdoor GIL three-phase vertical and horizontal arrangements, studying the on-site maintenance methods and processes of typical GIL faults, the combined auxiliary maintenance tooling of the present invention is proposed, which provides support for the operation and maintenance of GIL equipment faults. The present invention can be used to achieve standardized maintenance processes, improve work efficiency, effectively shorten equipment power outage time, improve the quality of maintenance operations, and effectively avoid unnecessary errors during the maintenance process.
[0016] The supporting trolley used for conductor assembly of the present invention can support and fix the conductor inside the air chamber during the construction process, and can ensure that the position of the conductor inside the air chamber is fixed during the reinstallation construction of the air chamber without position deviation, and ensure that the error of the conductor center positioning is met when the male and female contacts are connected; the contact part between the supporting trolley and the equipment is made of soft materials such as rubber to avoid unnecessary damage to the equipment during the construction process. The supporting trolley can not only be used to support the conductor during the replacement construction of the air chamber, but also can play an effective supporting and fixing role during the transportation of the GIL equipment, and can also be used in the internal inspection of the GIL equipment. The bracket of the present invention can provide fixation and auxiliary lifting when disassembling and assembling flanges and pot-type insulators, and can also be applied to flanges and insulators of different sizes. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] The present invention is further described in detail below in conjunction with the accompanying drawings.
[0018] Figure 1 : A schematic top view of the supporting trolley of the present invention; Figure 2 : A side view schematic diagram of the support trolley of the present invention, wherein the left side of the dotted line is the first support portion, the right side of the dotted line is the second support portion, A is a cross-sectional schematic diagram of the first support block, B is a cross-sectional schematic diagram of the second support block, and C is a cross-sectional schematic diagram of the caster; Figure 3 : One of the structural schematic diagrams of the sling of the present invention; Figure 4 : The second structural diagram of the sling of the present invention; Figure 5 : One of the structural schematic diagrams of the bracket of the present invention; Figure 6 : The second structural diagram of the bracket of the present invention; Figure 7 : A schematic diagram of the structure of the support plate of the present invention; Wherein: 1-support trolley, 11-first support part, 111-first support block, 112-roller, 113-first screw, 12-second support part, 121-second support block, 122-first buffer pad, 123-second screw, 13-handle, 15-handwheel, 16-traction ring, 17-first caster, 2-sling, 21-first connecting plate, 22-lifting plate, 23-lifting ring, 24-first connecting hole, 25-strengthening rib, 3-bracket, 31-first support plate, 32-first guide rail, 33-column, 34-second connecting plate, 35-second connecting hole, 36-second support plate, 37-jack, 38-second guide rail, 39-second caster, 4-support plate, 41-V-shaped support groove, 42-third connecting hole, 43-second buffer pad. DETAILED DESCRIPTION
[0019] In order to better understand the present invention, the content of the present invention is further clearly described below in conjunction with the embodiments and the accompanying drawings, but the protection content of the present invention is not limited to the following embodiments. In the following description, a large number of specific details are provided to provide a more thorough understanding of the present invention. However, it is obvious to those skilled in the art that the present invention can be implemented without one or more of these details.
[0020] Example 1: See Figure 1-Figure 7 The purpose of this embodiment is to provide a combined auxiliary maintenance tool for outdoor GIL equipment.
[0021] GIL equipment (Gas Insulated Transmission Lines) includes a cylinder and a conductor coaxially arranged with the cylinder. The cylinder is filled with insulating gas, and a pot-type insulator is used as a gas separation structure. The opening is sealed with a flange.
[0022] The maintenance tool provided in this embodiment includes a support trolley 1 for supporting the movement of the conductor in the GIL equipment cylinder, a hoist 2 for hoisting the pot insulator and flange of the GIL equipment, a bracket 3 for supporting the pot insulator and flange of the GIL equipment, and a support plate 4 for supporting the conductor at the end of the GIL equipment cylinder.
[0023] like Figure 1-Figure 2As shown, the support trolley 1 includes a first support portion 11 and a second support portion 12. Two first support blocks 111 are arranged in the middle of the first support portion 11, and the first support blocks 111 are slidably connected to the top plate of the first support portion 11. The two first support blocks 111 are arranged opposite to each other, and the opposite sides of the first support blocks 111 are provided with oblique support surfaces, so that the two first support blocks 111 form a V-shaped support structure. A first lead screw 113 is also arranged on the first support portion 11, and both ends of the first lead screw 113 are rotatably connected to the frame of the first support portion 11, and hand wheels 15 are fixedly arranged at both ends of the first lead screw 113. The left and right sections of the first lead screw 113 have opposite thread rotation directions, and the two sections of the thread are respectively threadedly connected to a first support block 111, so that the two first support blocks 111 can be driven to slide synchronously toward or away from each other by rotating the hand wheel 15.
[0024] The structure of the second support part 12 is similar to that of the first support part 11. Two second support blocks 121 are arranged in the middle of the second support part 12. The second support blocks 121 are slidably connected to the top plate of the second support part 12. The two second support blocks 121 are arranged opposite to each other, and the two opposite sides of the second support blocks 121 are provided with oblique support surfaces, so that the two second support blocks 121 form a V-shaped support structure. A second lead screw 123 is also arranged on the second support part 12. Both ends of the second lead screw 123 are rotatably connected to the frame of the second support part 12, and hand wheels 15 are fixedly arranged at both ends of the second lead screw 123. The thread directions on both sides of the second lead screw 123 are opposite, and the threads on both sides are respectively threadedly connected to a second support block 121, so that the two second support blocks 121 can be driven to slide synchronously toward or away from each other by rotating the hand wheel 15.
[0025] A roller 112 is arranged on the supporting surface of the first supporting block 111, and the projection of the central axis of the roller 112 on the horizontal plane is parallel to the first lead screw 113; the rollers 112 are all rubber wheels; a first buffer pad 122 is arranged on the supporting surface of the second supporting block 121, and the first buffer pad 122 can provide soft support for the conductor of the GIL device.
[0026] First casters 17 are provided at the four corners of the first support part 11 and the four corners of the second support part 12. The bottom of the first caster 17 is tilted outward, and the projection of the central axis of the first caster 17 on the horizontal plane is parallel to the first lead screw 113; the first casters 17 are all rubber wheels with self-locking function. After the support trolley 1 is set in the cylinder of the GIL equipment, the first caster 17 contacts the pipe wall, and the first support part 11 and the second support part 12 can carry the wire and move along the cylinder after supporting the conductor. The support trolley 1 is fixedly provided with a traction ring 16 at both ends of the moving direction, and the handle 13 is connected to the traction ring 16 by a pull rope, and the support trolley 1 can be pulled to move by the handle 13. The first support part 11 and the second support part 12 can be connected by a rope, a chain or a telescopic rod.
[0027] When moving the conductor from the GIL device, first put the support trolley 1 into the cylinder, with the first support part 11 and the second support part 12 located at the two ends of the cylinder respectively; adjust the hand wheel 15 so that the first support part 11 and the second support part 12 support the two ends of the conductor respectively, wherein the first caster 17 on the first support part 11 is locked; then pull the conductor toward the first support part 11 to move the conductor along the cylinder, during which the first support part 11 maintains its position unchanged and continues to provide support, and the second support part 12 continues to provide support as the conductor moves.
[0028] like Figure 3 As shown, the hanger 2 includes a first connecting plate 21, a hanging plate 22 having one end vertically fixedly connected to the first connecting plate 21, and a hanging ring 23 fixedly arranged on the top of the hanging plate 22. A reinforcing rib 25 is arranged between the first connecting plate 21 and the hanging plate 22. A plurality of first connecting holes 24 are arranged at the lower part of the first connecting plate 21, and the first connecting holes 24 are arranged along the arc direction, and the central axes of the first connecting holes 24 are parallel to the hanging plate 22, wherein at least two first connecting holes 24 can be aligned with the bolt holes of the pot insulator at the same time.
[0029] like Figure 4 Another structure of a sling 2 is shown, in which the first connecting hole 24 is an arc-shaped long hole.
[0030] When the sling 2 is in use, align at least two first connection holes 24 with the bolt holes on the pot-type insulator to be hoisted, remove the bolts in the aligned bolt holes on the pot-type insulator, and partially unscrew the other bolts to separate the pot-type insulator from the barrel; then insert the bolts into the aligned first connection holes 24, and fix the sling 2 to the pot-type insulator with nuts; finally, remove the other bolts on the pot-type insulator, and then lift the pot-type insulator through the lifting ring 23. When the original bolts of the pot-type insulator are too short, the distance between the pot-type insulator and the barrel may affect the fixation of the bolts in the first connection holes 24. At this time, the original bolts of the pot-type insulator can be temporarily replaced with long bolts, or a longer guide rod can be inserted into the screw hole to ensure that the pot-type insulator can have a sufficient distance from the barrel without falling off. The lifting ring 23 and the first connecting plate 21 in the sling 2 are staggered, so that the center of gravity of the lifted pot-type insulator can be close to the lifting ring 23. The sling 2 can lift the flange of the GIL device in the same way.
[0031] like Figure 5 As shown, the bracket 3 includes a horizontal first support plate 31, columns 33 whose bottoms are slidably connected to the first support plate 31, and a second connecting plate 34 hinged to the top of the columns 33. Specifically, the columns 33 are placed on the upper side of the first support plate 31, and the bottom surface of the columns 33 is in contact with the top surface of the first support plate 31. At the same time, a horizontal first guide rail 32 is also provided on the upper side of the first support plate 31. The first guide rail 32 also penetrates the two columns 33, so that the columns 33 can slide horizontally along the first guide rail 32 while maintaining a vertical state. The second connecting plate 34 is provided with a long second connecting hole 35.
[0032] Figure 5 The provided bracket 3 is installed on the lifting trolley. When in use, the bracket 3 is moved to the side of the pot-type insulator to be disassembled, and two bolts on both sides of the lower part of the pot-type insulator are removed, and the other bolts are partially screwed out to separate the pot-type insulator from the barrel part; then the height of the bracket 3 is adjusted, and each second connecting plate 34 is fixed to the two bolt holes of the pot-type insulator by bolts; finally, the other bolts on the pot-type insulator are removed, and the disassembled pot-type insulator can be carried by the bracket 3. The bracket 3 can be used for the removal of flanges in the same way.
[0033] like Figure 6As shown, further, a movable bracket that can be moved and raised and lowered can be provided at the bottom of the bracket 3. Specifically, the movable bracket includes a second support plate 36, a jack 37, a second guide rail 38 and a second caster 39. The second support plate 36 is horizontally arranged, and the jack 37 is fixedly arranged on the top surface of the second support plate 36, and the top end of the output shaft of the jack 37 abuts against the first support plate 31; vertical second guide rails 38 are fixedly arranged at both ends of the second support plate 36, and the second guide rails 38 also pass through both ends of the first support plate 31, so that the first support plate 31 can slide vertically along the second guide rails 38. At the same time, a plurality of second casters 39 are also provided at the bottom of the bracket 3. Therefore, Figure 6 The provided bracket 3 can move freely and has a lifting function.
[0034] Furthermore, the jack 37 can also be replaced with an electric push rod, which can provide faster lifting and lowering operations.
[0035] like Figure 7 As shown, both ends of the support plate 4 are provided with a third long connection hole 42, a V-shaped support groove 41 is provided in the middle, and a second buffer pad 43 is provided inside the V-shaped support groove 41. The second buffer pad 43 can provide soft support for the conductor of the GIL device. When the support plate 4 is in use, it is horizontally arranged, the third connection hole 42 is aligned with the bolt hole at the end of the cylinder of the GIL device, and the support plate 4 is fixed to the cylinder with bolts. At this time, the conductor can be placed in the V-shaped support groove 41 for temporary support. Using the same method, the support plate 4 can also be inverted, so that the V-shaped support groove 41 opens downward to provide support for the upper side of the conductor.
[0036] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Other modifications or equivalent substitutions made to the technical solution of the present invention by ordinary technicians in the field should be included in the scope of the claims of the present invention as long as they do not depart from the spirit and scope of the technical solution of the present invention.
Claims
1. A combined auxiliary maintenance tool for outdoor GIL equipment, characterized in that: It includes a supporting trolley for supporting the movement of the conductor in the cylinder of the GIL equipment, a lifting device for lifting the pot-type insulator and flange of the GIL equipment, and a bracket for supporting the pot-type insulator and the flange; The support trolley comprises a first support part and a second support part, the first support part is provided with two first support blocks forming a V-shaped support structure, and the second support part is provided with two second support blocks forming a V-shaped support structure; the first support blocks are slidably connected to the first support part, and rollers are provided on the support surfaces of the first support blocks; the second support blocks are slidably connected to the second support part, and first buffer pads are provided on the support surfaces of the second support blocks; first casters are provided at the four corners of the first support part and the second support part; The lifting device comprises a first connecting plate, a hanging plate with one end vertically fixedly connected to the first connecting plate, and a hanging ring fixedly arranged on the top of the hanging plate; a plurality of first connecting holes are arranged at the lower part of the first connecting plate, wherein at least two of the first connecting holes can be aligned with the bolt holes of the pot insulator or the flange at the same time; The bracket includes a first support plate, columns whose bottoms are slidably connected to the first support plate, and a second connecting plate hinged to the top of the columns; the second connecting plates are each provided with a second long connecting hole, which is used for bolt connection with the bolt hole of the pot insulator or the flange.
2. The combined auxiliary maintenance tool for outdoor GIL equipment according to claim 1 is characterized in that: The first support part is provided with a first screw connected in a rotational manner, and the left and right sections of the first screw have threads with opposite rotation directions, and the two sections of the threads are respectively threadedly connected to one of the first support blocks; the second support part is provided with a second screw connected in a rotational manner, and the left and right sections of the second screw have threads with opposite rotation directions, and the two sections of the threads are respectively threadedly connected to one of the second support blocks; hand wheels are provided at both ends of the first screw and the second screw.
3. The combined auxiliary maintenance tool for outdoor GIL equipment according to claim 1 is characterized in that: The supporting trolley is fixedly provided with traction rings at both ends of the traveling direction, and the traction rings are connected to the handles by using a pull rope.
4. The combined auxiliary maintenance tool for outdoor GIL equipment according to claim 1 is characterized in that: The first connecting hole is an arc-shaped long hole.
5. The combined auxiliary maintenance tool for outdoor GIL equipment according to claim 1, characterized in that: A vertical first guide rail is disposed on the upper side of the first support plate. The first guide rail passes through the columns, and the columns are all slidably connected to the first guide rail.
6. The combined auxiliary maintenance tool for outdoor GIL equipment according to claim 1, characterized in that: The bottom of the bracket is also provided with a movable bracket for movement and lifting.
7. The combined auxiliary maintenance tool for outdoor GIL equipment according to claim 6, characterized in that: The movable bracket includes a second support plate and a jack; the jack is fixedly arranged on the second support plate and is used to lift up the first support plate; vertical second guide rails are fixedly arranged at both ends of the second support plate, the second guide rails pass through the first support plate, and the first support plate is slidably connected to the second guide rails; a plurality of second casters are arranged at the bottom of the movable bracket.
8. The combined auxiliary maintenance tool for outdoor GIL equipment according to claim 1, characterized in that: It also includes a support plate for supporting the conductor at the end of the GIL device cylinder; both ends of the support plate are provided with a third long connection hole, and the third connection hole is used to be bolted to the threaded hole at the end of the cylinder; the middle of the support plate is provided with a V-shaped support groove.
9. The combined auxiliary maintenance tool for outdoor GIL equipment according to claim 8, characterized in that: A second buffer pad is arranged inside the V-shaped supporting groove.
10. The combined auxiliary maintenance tool for outdoor GIL equipment according to claim 1, characterized in that: The first casters are all rubber wheels with self-locking function.