Energy optimization management method for interactive multi-source routing adaptive power supply system
Through the interactive multi-source routing adaptive power supply system, combined with new energy and hybrid energy storage systems, the load impact and power supply instability of the marine platform power supply system is solved, the energy utilization rate and stability are improved, and the cost is reduced. Marine engineering and other areas of high energy demand.
Patent Information
- Application Number
- CN202411159286.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-22
- Publication Date
- 2024-11-22
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The marine platform power supply system faces problems such as large load impact, insufficient energy utilization, unstable power supply and poor economics, especially the unstable DC bus voltage caused by high-power loads.
Adopt interactive multi-source routing adaptive power supply system, including energy grid terminals, hybrid energy storage systems, energy routers and diesel engine auxiliary power supply systems, through a variety of new energy sources (such as photovoltaic power generation, wind power generation and land power grid) and hybrid energy storage systems The combination of the rectifying inverter system and bidirectional DC-DC converter realizes optimized management and stable distribution of electricity, ensuring the stability and economicality of the power supply system.
Improve the energy utilization rate and power supply stability of the marine platform power supply system, reduce the cost of diesel generators, reduce maintenance costs, achieve economic benefits, and solve the problem of DC bus voltage instability caused by high-power loads. .
Smart Images

Figure CN119010003A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of marine platform power supply, and in particular to an energy optimization management method for an interactive multi-source routing adaptive power supply system. Background Art
[0002] As the commanding heights of the industry that is being competed for in the field of shipbuilding and marine engineering technology, offshore platforms have become an important symbol of the transformation and upgrading of the marine development field. In recent years, the power consumption of offshore platforms has continued to increase. Relying on traditional diesel generators can no longer meet the large and stable power needs of offshore platforms. In addition, due to the single structure of the power supply system, long-term reliance on diesel generators will also cause environmental pollution and prone to fragmented power outages. Therefore, how to provide clean, stable and economical electricity has become an important research direction for today's offshore platforms.
[0003] At present, there are many new energy forms serving the offshore platform, such as wind power generation and photovoltaic power generation applied to the offshore platform power supply system, which give full play to the unique advantages of the marine environment to provide reliable power support for the special operation equipment, control and life electricity of the offshore platform, so as to achieve the goal of clean, green and economic. In addition, as the equipment load conditions of the offshore platform become increasingly complex and the power level continues to increase, the power system of the offshore platform not only needs to ensure the stability of power supply, but also needs to have sufficient adaptability and reliability, which has become one of the key technical problems that the offshore platform power system needs to solve urgently.
[0004] In summary, how to solve the problems faced by the offshore platform power supply system, such as large load shock, insufficient energy utilization, unstable power supply, and poor economy, has become a difficult problem that needs to be solved urgently today. Summary of the invention
[0005] In order to improve the load impact resistance, energy utilization, power supply stability, economic and environmental protection performance of the marine platform power supply system, the present invention provides an energy optimization management method for an interactive multi-source routing adaptive power supply system, which is used to solve various problems faced by the marine platform power supply system, such as large load impact, insufficient energy utilization, unstable power supply, etc. It can solve the problem of unstable DC bus voltage caused by high-power loads on the marine platform, and improve the energy utilization rate and power supply stability of the marine platform power supply system; To achieve the above purpose, the present invention is implemented through the following technical solutions:
[0006] An interactive multi-source routing adaptive power supply system, comprising an energy grid terminal, a hybrid energy storage system, an energy router and a diesel engine auxiliary power supply system, characterized in that the output end of the energy grid terminal and the input end of the energy router are both connected to the AC bus, and the AC bus is connected to the diesel engine auxiliary power supply system through a step-up transformer; the output end of the energy router is connected to the load AC bus in the AC load terminal of the offshore platform; and the hybrid energy storage system is connected to the intermediate-level public DC bus in the energy router.
[0007] Preferably, the energy grid terminal includes at least an offshore platform photovoltaic power generation system, an offshore platform wind power generation system and a land power grid system, the offshore platform photovoltaic power generation system includes at least a photovoltaic power generation panel, and the photovoltaic power generation panel is connected to the AC bus through a photovoltaic DC-AC conversion module; the offshore platform wind power generation system includes at least a wind turbine, and the wind turbine is connected to the AC bus through a wind AC-AC conversion module; the land power grid system is connected to the AC bus through a step-down transformer; the AC bus voltage level is 600V, the step-up transformer adopts a 0.4KV / 0.6KV step-up transformer, and the step-down transformer adopts a 10KV / 0.6KV step-down transformer.
[0008] Preferably, the power generation specification of the offshore platform photovoltaic power generation system is 1000 m2 / 100KW; the power generation specification of the offshore platform wind power generation system is a maximum of 30KW, and the land power grid has a voltage level of 10kV.
[0009] Preferably, the diesel engine auxiliary power supply system comprises at least a diesel auxiliary generator, which is connected to the AC bus via a step-up transformer, and is also connected to a lighting and control system and an automatic drill feeding system.
[0010] Preferably, the power generation specification of the diesel-assisted generator is 400V / 320kW.
[0011] Preferably, the energy router includes at least a plurality of rectifier and inverter systems, the rectifier and inverter systems include an AC input-level AC-DC rectifier unit and an AC output-level DC-AC inverter unit, one end of the AC input-level AC-DC rectifier unit is connected to the AC bus, and the other end is connected to the intermediate-level common DC bus; one end of the AC output-level DC-AC inverter unit is connected to the intermediate-level common DC bus, and the other end is connected to the offshore platform AC load terminal; a plurality of rectifier and inverter systems are connected through the intermediate-level common DC bus, and at least one DC bus link switch is provided on the intermediate-level common DC bus between the rectifier and inverter systems.
[0012] Preferably, the hybrid energy storage system includes a battery group and a supercapacitor group, both of which are connected to the intermediate-level common DC bus through a bidirectional DC-DC converter, the battery group includes multiple batteries, and the supercapacitor group includes multiple supercapacitors.
[0013] Preferably, the offshore platform AC load terminal includes a plurality of offshore platform load equipment, and the offshore platform load equipment are all connected to the load AC bus; the offshore platform load equipment includes at least one or more of a turntable frequency conversion system, a mud pump, and a platform crane / winch.
[0014] An energy optimization management method for an interactive multi-source routing adaptive power supply system is applied to the interactive multi-source routing adaptive power supply system, and the management method includes:
[0015] Basic working condition 1: When there is sufficient wind energy and solar energy, the offshore platform photovoltaic power generation system and the offshore platform wind power generation system continuously supply power to the offshore platform AC load terminal through the energy router, and close the link switch of the intermediate public DC bus to charge the hybrid energy storage system with the remaining power through the energy router;
[0016] Basic working condition 2: when wind energy is insufficient, the offshore platform photovoltaic power generation system and the land power grid system continuously supply power to the offshore platform AC load terminal through the energy router;
[0017] Basic working condition 3: At night or when the sunshine is poor, the offshore platform wind power generation system and the land power grid system continuously supply power to the offshore platform AC load terminal through the energy router;
[0018] Basic working condition 4: when both wind energy and solar energy are insufficient, only the land power grid system continuously supplies power to the AC load terminal of the offshore platform through the energy router;
[0019] Basic working condition 5: when both wind energy and solar energy are insufficient and the land power grid system fails, the energy grid terminal cannot form a complementary power supply situation. At this time, the hybrid energy storage system is preferentially connected and the AC load terminal of the offshore platform is powered through the energy router; before the hybrid energy storage system discharges to the restricted area, the diesel engine auxiliary power supply system is immediately started, and on the basis of maintaining the normal operation of the lighting and control system and the automatic drilling system, the AC power generated by the diesel auxiliary generator is boosted to the same voltage level as the AC bus through the step-up transformer, and the energy router is connected to continuously supply power to the AC load terminal of the offshore platform; if the AC load terminal of the offshore platform is in the energy feedback operation state at this time, the fed-back electric energy is transferred to the hybrid energy storage system for charging; if it is detected that the hybrid energy storage system is in the energy-limited state during the process of continuing to charge the hybrid energy storage system, and the charge state SOCsc of the supercapacitor group is ≥95% and the voltage Ubat of the battery group is ≥450V, the hybrid energy storage system is stopped from charging, and only the AC load terminal of the offshore platform is powered at this time.
[0020] An energy power management method for a hybrid energy storage system is used to manage the energy stability of the hybrid energy storage system, specifically, a supercapacitor is used as a regulating body, a battery is used as an auxiliary energy support unit, and an operating condition analysis is performed based on the charge state of the supercapacitor and the battery voltage limit;
[0021] Execution condition 1: when the energy router is in no-load or long-term stable operation state of 0-100% rated current, if it is detected that the energy of the hybrid energy storage system is in the safe working area, the battery or supercapacitor is charged at this time; if it is detected that the energy of the hybrid energy storage system reaches the charging warning area, the charging rate is reduced; if it is detected at any time that the energy of the hybrid energy storage system reaches the charging power limit area, the charging is stopped;
[0022] Execution condition 2: When the energy router is in a short-term operation state of 100%-150% rated current and the operation time is less than 3 minutes, if the supercapacitor charge state is detected to be less than or equal to 20%, it enters the discharge warning zone, and in order to prevent the supercapacitor from over-discharging, the supercapacitor is charged at this time, and the battery provides the power required for load changes; when the supercapacitor charge state is detected to be greater than or equal to 20% and less than or equal to 80%, the power manager controls the battery and the supercapacitor to output power together, and each bears the high and low frequency power components; and when the supercapacitor charge state is ≥80%, in order to ensure that the supercapacitor is not overcharged, the supercapacitor is used first;
[0023] Execution condition 3: When the energy router is in the instantaneous operation state of 150%-180% rated current and the operation time is less than 10s, it is in the pure discharge condition. The battery cannot react quickly. The power manager needs to be used to control the supercapacitor to be in the discharge state and meet the load demand. If the supercapacitor charge state is detected to be greater than or equal to 15% and less than or equal to 20% during the supercapacitor discharge process, the supercapacitor enters the discharge warning zone and controls the bidirectional DC-DC converter to slow down the discharge rate of the supercapacitor.
[0024] When the energy router is in the load operation state of more than 180% rated current during execution of working condition 4, it will cause extremely serious impact on the intermediate level public DC bus in the energy router. The AC load should be cut off immediately to ensure system safety.
[0025] Beneficial effects of the present invention:
[0026] (1) The present invention solves the problem of unstable DC bus voltage caused by high-power loads on offshore platforms, improves energy utilization of offshore platform power supply systems, and improves power supply stability; and can be applied in the fields of rail transportation, aerospace, industrial automation, etc.;
[0027] (2) The energy grid terminal of the present invention manages energy flow by adopting an energy optimization management method. On the basis of ensuring the reliable operation of the energy router, it reduces the electricity usage cost of the land power grid and the diesel auxiliary power supply system through the access of wind power and photovoltaic power, thereby further reducing the maintenance cost of the diesel generator, and achieving the goals of improving operating efficiency, reducing costs and improving economic benefits. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] Figure 1 It is a structural principle diagram of the interactive multi-source routing adaptive power supply system of the present invention;
[0029] Figure 2 This is a management principle diagram of the energy optimization management method of the present invention;
[0030] Figure 3 This is a management principle diagram of the energy power management method of the hybrid energy storage system of the present invention.
[0031] In the figure: 1. Energy grid terminal; 2. Energy router; 3. Hybrid energy storage system; 4. Diesel engine auxiliary power supply system; 5. Offshore platform AC load terminal; 6. AC bus; 7. Step-up transformer; 8. Load AC bus; 9. Intermediate level public DC bus; 10. Offshore platform photovoltaic power generation system; 11. Offshore platform wind power generation system; 12. Land power grid system; 13. Diesel auxiliary generator; 14. AC input stage AC-DC rectifier unit; 15. AC output stage DC-AC inverter unit; 16. Bidirectional DC-DC converter; 17. Battery pack; 18. Supercapacitor pack; 19. Step-down transformer; 20. Lighting and control system; 21. Automatic drilling system; 22. Turntable frequency conversion system; 23. Mud pump; 24. Platform crane / winch. DETAILED DESCRIPTION
[0032] Below, the present invention is further described in conjunction with the accompanying drawings and specific embodiments:
[0033] In order to make the purpose, technical solutions and advantages of the present invention more clear and explicit, the present invention is further described below with reference to the accompanying drawings and embodiments.
[0034] Embodiment 1:
[0035] like Figure 1 As shown, an interactive multi-source routing adaptive power supply system includes an energy grid terminal 1, a hybrid energy storage system 3, an energy router 2 and a diesel engine auxiliary power supply system 4, wherein the output end of the energy grid terminal 1 and the input end of the energy router 2 are both connected to the AC bus 6, and the AC bus 6 is also connected to the diesel engine auxiliary power supply system 4 through a step-up transformer 7; the output end of the energy router 2 is then connected to the load AC bus 8 in the offshore platform AC load terminal 5; finally, the hybrid energy storage system 3 is connected to the intermediate-level public DC bus 9 in the energy router 2.
[0036] Specifically, the energy grid terminal 1 includes an offshore photovoltaic power generation system 10, an offshore wind power generation system 11 and a land power grid system 12. The offshore photovoltaic power generation system 10 includes photovoltaic power generation panels, which are connected to the AC bus 6 through a photovoltaic DC-AC conversion module; the offshore wind power generation system 11 includes a wind turbine generator, which is connected to the AC bus 6 through a wind AC-AC conversion module; and the land power grid system 12 is connected to the AC bus 6 through a step-down transformer 19. The power generation specification of the offshore photovoltaic power generation system 10 is 1000㎡ / 100KW; the power generation specification of the offshore wind power generation system 11 is a maximum of 300KW, and the land power grid system is a 10kV voltage level.
[0037] Specifically, the diesel engine auxiliary power supply system 4 includes a diesel auxiliary generator 13. The power generation specification of the diesel auxiliary generator 13 is preferably 400V / 320kW. It is connected to the AC bus 6 through a step-up transformer 7. In addition, the diesel auxiliary generator 7 is also connected to a lighting and control system 20 and an automatic drilling system 21.
[0038] Specifically, the energy router 2 includes multiple groups of rectifier and inverter systems, and the rectifier and inverter systems include an AC input stage AC-DC rectifier unit 14 and an AC output stage DC-AC inverter unit 15. Through the conversion function, the AC power of the power grid is first converted into a DC power grid, and then the DC power is converted into the three-phase AC power required by the AC load terminal 5 of the offshore platform. One end of the AC input stage AC-DC rectifier unit 14 is connected to the AC bus 6, and the other end is connected to the intermediate stage common DC bus 9; one end of the AC output stage DC-AC inverter unit 15 is connected to the intermediate stage common DC bus 9, and the other end is connected to the offshore platform AC load terminal 5; the rectifier and inverter systems are connected through the intermediate stage common DC bus 9, and a group of DC bus link switches are set on the intermediate stage common DC bus 9 between the rectifier and inverter systems.
[0039] Specifically, the hybrid energy storage system 3 includes a battery group 17 and a supercapacitor group 18, both of which are connected to the intermediate-level common DC bus 9 through a bidirectional DC-DC converter 16, so that under load changes of different power levels, the power management system coordinates and distributes energy transmission, provides voltage support and power response, and achieves the effect of stabilizing the DC bus voltage; the battery group 17 includes multiple batteries, and the supercapacitor group 18 includes multiple supercapacitors.
[0040] Specifically, the marine platform AC load 5 terminal includes multiple marine platform load equipment, and the multiple marine platform load equipment are all connected to the load AC bus 8; the marine platform load equipment is one or more of the turntable frequency conversion system 22, the mud pump 23, and the platform crane / winch 24.
[0041] The voltage level of the AC bus of the present invention is preferably 600V in this embodiment. At this time, the AC bus is a 600V AC bus, and the step-down transformer 19 in the land power grid system adopts a 10KV / 0.6KV step-down transformer, and the step-up transformer 7 adopts a 0.4KV / 0.6KV step-up transformer; when the voltage level of the AC bus is adjusted according to actual needs, such as being set to 500V, 700V, 800V, etc.; the voltage specifications of the step-down transformer 19 and the step-up transformer 7 also need to be changed in time to keep their voltages consistent with the AC bus voltage.
[0042] Embodiment 2:
[0043] An energy optimization management method for an interactive multi-source routing adaptive power supply system includes the following management methods:
[0044] Basic working condition 1: when wind energy and light energy are sufficient, the offshore platform photovoltaic power generation system 10 and the offshore platform wind power generation system 11 continuously supply power to the offshore platform AC load terminal 5 through the energy router 2, and close the link switch of the intermediate-level public DC bus 9 to charge the hybrid energy storage system 3 with the remaining power through the energy router 2;
[0045] Basic working condition 2, when wind energy is insufficient, the offshore platform photovoltaic power generation system 10 and the land power grid system 12 continuously supply power to the offshore platform AC load 5 terminal through the energy router 2;
[0046] Basic working condition 3: at night or when the sunshine is poor, the offshore platform wind power generation system 11 and the land power grid system 12 continuously supply power to the offshore platform AC load terminal 5 through the energy router 2;
[0047] Basic working condition 4, when both wind energy and solar energy are insufficient, only the land power grid system 12 continuously supplies power to the AC load 5 terminal of the offshore platform through the energy router 2;
[0048] Basic working condition 5: when both wind energy and solar energy are insufficient and the land power grid system 12 fails, the energy grid terminal 1 cannot form a complementary power supply situation. At this time, the hybrid energy storage system 3 is preferentially connected and the power is supplied to the offshore platform AC load terminal 5 through the energy router 2. Before the hybrid energy storage system 3 discharges to the restricted area, the diesel auxiliary power supply system 4 is immediately started. On the basis of maintaining the normal operation of the lighting and control system 20 and the automatic drilling system 21, the 400V AC power generated by the diesel auxiliary generator 13 is boosted to 60V through the 0.4KV / 0.6KV step-up transformer 7. 0V AC power is connected to the energy router 2 to continuously supply power to the marine platform AC load terminal 5; if the marine platform AC load terminal 5 is in the energy feedback operation state at this time, the fed-back electric energy will be transferred to the hybrid energy storage system 3 for charging; if in the process of continuing to charge the hybrid energy storage system 3, it is detected that the hybrid energy storage system 3 is in an energy-limited state, and the charge state SOCsc of the supercapacitor group 18 is ≥95% and the voltage Ubat of the battery group 17 is ≥450V, then the charging of the hybrid energy storage system 3 is stopped, and only the marine platform AC load terminal 5 is supplied with power.
[0049] The energy grid terminal 1 manages the energy flow through the above-mentioned management method. On the basis of ensuring the reliable operation of the energy router 2, it reduces the cost of using the land power grid through the access of wind power and photovoltaic power, and further reduces the maintenance cost of the diesel auxiliary generator 13, thereby achieving the goals of improving operating efficiency, reducing costs and improving economic benefits.
[0050] When the diesel auxiliary generator 13 is not working, the loads in the diesel engine auxiliary power supply system 4, such as the lighting and control system 20, are powered by the complementary power supply energy grid terminal 1 through the transformer; when the energy grid terminal 1 is not in the complementary power supply condition, the diesel engine auxiliary power supply system 4 is started to generate electricity and continue to supply power to the corresponding loads, and the voltage is transformed through the 0.4KV / 0.6KV step-up transformer 7 to ensure the stability of the 600V AC bus 6 voltage.
[0051] Embodiment 3:
[0052] An energy power management method for a hybrid energy storage system is used to manage the energy stability of the hybrid energy storage system 3, specifically, using a supercapacitor as a regulating body and a battery as an auxiliary energy support unit, and performing operating condition analysis based on the charge state of the supercapacitor and the battery voltage limit;
[0053] Execute working condition 1. When the energy router 2 is in a no-load or long-term stable operation state of 0-100% rated current, if it is detected that the energy of the hybrid energy storage system 3 is in the safe working area, the battery or supercapacitor is charged at this time; if it is detected that the energy of the hybrid energy storage system 3 reaches the charging warning area, the charging rate is reduced; if it is detected at any time that the energy of the hybrid energy storage system 3 reaches the charging power limit area, the charging is stopped;
[0054] Execution condition 2: When the energy router 2 is in a short-term operation state of 100%-150% rated current and the operation time is less than 3 minutes, if the supercapacitor charge state SOC is detected SC When it is less than or equal to 20%, it enters the discharge warning zone, and in order to prevent the supercapacitor from over-discharging, the supercapacitor is charged at this time, and the battery provides the power required for the load change; when the supercapacitor charge state SOC is detected SC When the SOC is greater than or equal to 20% and less than or equal to 80%, the power manager controls the battery and the supercapacitor to output power together, and each bears the high and low frequency power components; and when the supercapacitor charge state SOC SC When the charge is ≥80%, the supercapacitor is used first to ensure that the supercapacitor is not overcharged.
[0055] Execution condition 3: When the energy router 2 is in the instantaneous operation state of 150%-180% rated current and the operation time is less than 10s, it is in the pure discharge condition. The battery cannot react quickly, and the power manager needs to be used to control the supercapacitor to be in the discharge state and meet the load demand. If the supercapacitor charge state is detected to be greater than or equal to 15% and less than or equal to 20% during the supercapacitor discharge process, the supercapacitor enters the discharge warning zone and controls the bidirectional DC-DC converter to slow down the discharge rate of the supercapacitor.
[0056] Execution condition 4: when the energy router 2 is in a load operation state greater than 180% of the rated current, it will cause extremely serious impact on the intermediate-level public DC bus 9 in the energy router 2. The AC load should be cut off immediately to ensure system safety.
[0057] The hybrid energy storage system 3 controls the stable flow of energy in the hybrid energy storage system 3 through the above method, and absorbs the excess energy inside the energy grid terminal 1 while ensuring the normal operation of the load, prevents the problem of wind and solar power abandonment, and provides sufficient power support when the relevant load operates in an impact overload condition, while ensuring the voltage stability of the intermediate-level common DC bus 9.
[0058] When the system is in grid-connected mode, the energy transmission direction is from the land power grid and the new energy power generation side to the AC bus. The electric energy in the AC bus is reasonably distributed through the energy router 2, and the hybrid energy storage system 3 absorbs the excess energy of the energy grid terminal 1 during the low-power period, and provides sufficient power support when the load operates in an impact overload condition, while ensuring the voltage stability of the intermediate public DC bus 9, and replenishing energy to the load power grid during peak power consumption to ensure stable operation of the load; when the system is in off-grid mode, energy is transmitted from the new energy power generation side and the hybrid energy storage side to the load, and the energy is transmitted to the DC bus voltage through the energy router 2. Then, according to the type of load, the corresponding load is powered by the DC / DC module or the DC / AC module. This system solves the problem of unstable DC bus voltage caused by high-power loads on the offshore platform, and improves the energy utilization rate and power supply stability of the offshore platform power supply system.
[0059] An interactive multi-source routing adaptive power supply system of the present invention includes an energy grid terminal 1, a hybrid energy storage system 3, an energy router 2 and a diesel engine auxiliary power supply system 4 and other equipment. The energy grid terminal 1 provided can provide initial power for the energy router 2, and is coupled with the diesel engine auxiliary power supply system 4 through a transformer. When the energy grid terminal 1 is not in a complementary power supply condition, the diesel engine auxiliary power supply system 4 is started to generate electricity and continue to supply power to the corresponding load; the hybrid energy storage system 3 can control the electric energy of the hybrid energy storage system 3 through an energy power management method, and absorb the excess energy inside the energy grid terminal 1 while ensuring the normal operation of the load; the energy router 2 can reasonably distribute the electric energy introduced into the energy router 2 to improve the system stability and economy; the marine platform AC load terminal 5 is mainly a high-power load of the marine platform. Through the cooperation between the above-mentioned devices, the problem of stable power supply in marine engineering islands, shore bases, shipyards and other occasions is solved, and it can be applied in rail transportation, aerospace, industrial automation and other fields.
Claims
1. An interactive multi-source routing adaptive power supply system, comprising an energy grid terminal, a hybrid energy storage system, an energy router and a diesel engine auxiliary power supply system, characterized in that: The output end of the energy grid terminal and the input end of the energy router are both connected to the AC bus, and the AC bus is connected to the diesel engine auxiliary power supply system through a step-up transformer; the output end of the energy router is connected to the load AC bus in the offshore platform AC load terminal; the hybrid energy storage system is connected to the intermediate-level public DC bus in the energy router.
2. An interactive multi-source routing adaptive power supply system as claimed in claim 1, characterized in that: The energy grid terminal includes at least an offshore platform photovoltaic power generation system, an offshore platform wind power generation system and a land power grid system. The offshore platform photovoltaic power generation system includes at least a photovoltaic power generation panel, which is connected to the AC bus through a photovoltaic DC-AC conversion module; the offshore platform wind power generation system includes at least a wind turbine, which is connected to the AC bus through a wind AC-AC conversion module; the land power grid system is connected to the AC bus through a step-down transformer; the AC bus voltage level is 600V, the step-up transformer adopts a 0.4KV / 0.6KV step-up transformer, and the step-down transformer adopts a 10KV / 0.6KV step-down transformer.
3. An interactive multi-source routing adaptive power supply system as claimed in claim 2, characterized in that: The power generation specification of the offshore platform photovoltaic power generation system is 1000 m2 / 100KW; the power generation specification of the offshore platform wind power generation system is a maximum of 30KW, and the land power grid has a voltage level of 10kV.
4. The interactive multi-source routing adaptive power supply system according to claim 1, characterized in that: The diesel engine auxiliary power supply system at least includes a diesel auxiliary generator, which is connected to the AC bus through a step-up transformer. The diesel auxiliary generator is also connected to a lighting and control system and an automatic drill feeding system.
5. An interactive multi-source routing adaptive power supply system as claimed in claim 4, characterized in that: The power generation specification of the diesel auxiliary generator is 400V / 320kW.
6. The interactive multi-source routing adaptive power supply system according to claim 1, characterized in that: The energy router at least includes multiple groups of rectifier and inverter systems, and the rectifier and inverter systems include an AC input-level AC-DC rectifier unit and an AC output-level DC-AC inverter unit. One end of the AC input-level AC-DC rectifier unit is connected to the AC bus, and the other end is connected to the intermediate-level common DC bus; one end of the AC output-level DC-AC inverter unit is connected to the intermediate-level common DC bus, and the other end is connected to the offshore platform AC load terminal; multiple groups of the rectifier and inverter systems are connected through the intermediate-level common DC bus, and at least one group of DC bus link switches is provided on the intermediate-level common DC bus between the rectifier and inverter systems.
7. The interactive multi-source routing adaptive power supply system according to claim 1, characterized in that: The hybrid energy storage system includes a battery group and a supercapacitor group, both of which are connected to the intermediate-level common DC bus through a bidirectional DC-DC converter. The battery group includes multiple batteries, and the supercapacitor group includes multiple supercapacitors.
8. The interactive multi-source routing adaptive power supply system according to claim 1, characterized in that: The marine platform AC load terminal includes a plurality of marine platform load equipments, and the marine platform load equipments are all connected to the load AC busbar; the marine platform load equipments include at least one or more of a turntable frequency conversion system, a mud pump, and a platform crane / winch.
9. An energy optimization management method for an interactive multi-source routing adaptive power supply system, the management method being applied to an interactive multi-source routing adaptive power supply system as claimed in any one of claims 1 to 8, characterized in that: The management method comprises: Basic working condition 1: When there is sufficient wind energy and solar energy, the offshore platform photovoltaic power generation system and the offshore platform wind power generation system continuously supply power to the offshore platform AC load terminal through the energy router, and close the link switch of the intermediate public DC bus to charge the hybrid energy storage system with the remaining power through the energy router; Basic working condition 2: when wind energy is insufficient, the offshore platform photovoltaic power generation system and the land power grid system continuously supply power to the offshore platform AC load terminal through the energy router; Basic working condition 3: At night or when the sunshine is poor, the offshore platform wind power generation system and the land power grid system continuously supply power to the offshore platform AC load terminal through the energy router; Basic working condition 4: when both wind energy and solar energy are insufficient, only the land power grid system continuously supplies power to the AC load terminal of the offshore platform through the energy router; Basic working condition 5: when both wind energy and solar energy are insufficient and the land power grid system fails, the energy grid terminal cannot form a complementary power supply situation. At this time, the hybrid energy storage system is preferentially connected and the AC load terminal of the offshore platform is powered through the energy router; before the hybrid energy storage system discharges to the restricted area, the diesel engine auxiliary power supply system is immediately started, and on the basis of maintaining the normal operation of the lighting and control system and the automatic drilling system, the AC power generated by the diesel auxiliary generator is boosted to the same voltage level as the AC bus through the step-up transformer, and the energy router is connected to continuously supply power to the AC load terminal of the offshore platform; if the AC load terminal of the offshore platform is in the energy feedback operation state at this time, the fed-back electric energy is transferred to the hybrid energy storage system for charging; if it is detected that the hybrid energy storage system is in the energy-limited state during the process of continuing to charge the hybrid energy storage system, and the charge state SOCsc of the supercapacitor group is ≥95% and the voltage Ubat of the battery group is ≥450V, the hybrid energy storage system is stopped from charging, and only the AC load terminal of the offshore platform is powered at this time.
10. An energy power management method for a hybrid energy storage system, characterized in that: Used to manage the energy stability of the hybrid energy storage system described in claim 7, specifically, using the supercapacitor as the regulating body and the battery as the auxiliary energy support unit, and performing operating condition analysis based on the charge state of the supercapacitor and the battery voltage limit; Execution condition 1: when the energy router is in no-load or long-term stable operation state of 0-100% rated current, if it is detected that the energy of the hybrid energy storage system is in the safe working area, the battery or supercapacitor is charged at this time; if it is detected that the energy of the hybrid energy storage system reaches the charging warning area, the charging rate is reduced; if it is detected at any time that the energy of the hybrid energy storage system reaches the charging power limit area, the charging is stopped; Execution condition 2: When the energy router is in a short-term operation state of 100%-150% rated current and the operation time is less than 3 minutes, if the supercapacitor charge state SOC is detected SC When it is less than or equal to 20%, it enters the discharge warning zone. In order to prevent the supercapacitor from over-discharging, the supercapacitor is charged and the battery provides the power required for load changes. When the supercapacitor state of charge SOC is detected SC When the SOC is greater than or equal to 20% and less than or equal to 80%, the power manager controls the battery and the supercapacitor to output power together, and each bears the high and low frequency power components; and when the supercapacitor state of charge SOC SC When the charge is ≥80%, the supercapacitor is used first to ensure that the supercapacitor is not overcharged. Execution condition 3: When the energy router is in the instantaneous operation state of 150%-180% rated current and the operation time is less than 10s, it is in the pure discharge condition. The battery cannot react quickly. The power manager needs to be used to control the supercapacitor to be in the discharge state and meet the load demand. If the supercapacitor charge state SOC is detected during the supercapacitor discharge process SC When it is greater than or equal to 15% and less than or equal to 20%, the supercapacitor enters the discharge warning zone and controls the bidirectional DC-DC converter to slow down the discharge rate of the supercapacitor; When the energy router is in the load operation state of more than 180% rated current during execution of working condition 4, it will cause extremely serious impact on the intermediate level public DC bus in the energy router. The AC load should be cut off immediately to ensure system safety.
Citation Information
Patent Citations
Household energy router
CN107749642A
Hybrid energy storage-containing photovoltaic DC micro-grid coordinated control method
CN113690873A
Shore power energy router system
CN117895551A
Method of energy and power management in dynamic power systems with ultra-capacitors (super capacitors)
US20140084817A1
