Distributed phase modifier locating and sizing method considering new energy randomness
Through the analysis of the power fluctuation dominance of the new energy access node and the calculation of grid-connected power peaks, combined with the access of distributed cameras, the problem of the inability to suppress transient overvoltage in the fixed output scenario of new energy in the existing technology is solved. It has achieved effective estimation of new energy output and improved grid voltage support capabilities, ensuring the safe and stable operation of the power system.
Patent Information
- Application Number
- CN202411093409.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-09
- Publication Date
- 2024-11-22
AI Technical Summary
The existing distributed camera site selection and capacity setting strategy is analyzed in the fixed output scenario of new energy energy, ignoring the uncertainty of wind power and photovoltaic power generation output, resulting in the inability to effectively suppress the transient overvoltage of new energy stations under severe failure disturbances. The problem may cause large-scale outage of new energy sources.
By conducting a dominant analysis of the wind power and photovoltaics of each new energy access node in the sending terminal system, calculate the power fluctuation dominant indicators, determine the grid-connected power peak, and calculate the short-circuit ratio of new energy multi-site stations based on these indicators, access distributed Adjust the camera, update the impedance matrix until the preset conditions are met, and a configuration scheme for distributed camera adjustment is obtained.
A reasonable estimate of the output of new energy, accurately determine the power grid voltage capacity support capacity nodes, significantly improve the power grid voltage support intensity after new energy access, reduce the transient overvoltage level of the transmitting end after disturbance, and ensure the power system safe and stable operation.
Smart Images

Figure CN119010201A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of distributed renewable energy power generation in power systems, and in particular relates to a method for site selection and capacity determination of distributed phase shifters taking into account the randomness of renewable energy. Background Art
[0002] The high proportion of renewable energy in the sending-end system is the main feature of China's power system. However, the output of renewable energy is volatile and uncertain, which brings challenges to the power balance of the power grid. At the same time, the increase in the penetration rate of renewable energy has also weakened the overall strength of the system, making the transient overvoltage problem of the system increasingly prominent, which seriously threatens the safe and stable operation of the power grid.
[0003] As a type of synchronous motor, phase regulators can effectively increase the short-circuit capacity of the system, enhance the voltage support strength of the power grid, and improve the voltage support capacity of the power grid when disturbances occur. Existing projects often configure centralized phase regulators in converter stations and their vicinity, but given the long electrical distance between the new energy station and the DC converter station bus, the centralized phase regulator has limited effect in suppressing transient overvoltages in the new energy station. Therefore, configuring distributed phase regulators at different voltage level grid connection points or collection station buses in new energy stations has become a more effective strategy.
[0004] Existing research has produced a wealth of research results on the site selection and capacity determination of distributed phase-converters. The paper "Study on the Optimal Configuration of Phase-Converters to Improve the Transient Voltage Stability Level of Weak Sending-End Power Grids" considers the phase-converter location, capacity determination and emergency control strategy after disturbance, and proposes a phase-converter optimization configuration method for weak power grid voltage support, which effectively improves the system stability. The paper "Research on the Configuration of Distributed Phase-Converters in UHV AC / DC Hybrid Power Grids" proposes an optimal solution for configuring distributed phase-converters in Hunan Power Grid based on the actual voltage stability requirements of the power grid, which improves the high-voltage DC power transmission capacity and the overall power supply capacity of Hunan Province. The paper "Optimal Site Selection Algorithm for Phase-Converters in New Energy Bases under Synchronous Constraints" considers synchronous stability constraints and proposes an algorithm for the optimal site selection of synchronous phase-converters in new energy bases. By evaluating the phase changes of each node after the disturbance and combining the power angle characteristics of the system after the phase-converter is connected, the node location suitable for the phase-converter access is selected.
[0005] However, most existing studies are limited to the situation of fixed output of renewable energy, and fail to fully consider the uncertainty of wind power and photovoltaic power generation output, which limits the effectiveness of the formulated strategies and their adaptability in practical applications. Especially under severe fault disturbances, it may not be possible to effectively suppress the transient overvoltage problem at the grid connection point of renewable energy stations, which may lead to serious consequences such as large-scale disconnection of renewable energy power generation. Therefore, in order to solve the transient overvoltage problem and ensure large-scale access to renewable energy such as wind and light, relevant research is urgently needed. Summary of the invention
[0006] In view of the above-mentioned deficiencies in the prior art, the method for site selection and sizing of distributed phase regulators taking into account the randomness of new energy provided by the present invention solves the problem that the existing distributed phase regulator site selection and sizing strategies are often analyzed under the scenario of fixed new energy output, ignoring the randomness of wind and solar output at each node, making it difficult to ensure the effectiveness and adaptability of the strategy. In severe cases, the transient overvoltage of the sending-end system under DC disturbance cannot be suppressed, which may lead to serious consequences such as large-scale disconnection of new energy from the grid.
[0007] In order to achieve the above-mentioned invention object, the technical solution adopted by the present invention is: a method for site selection and capacity determination of distributed phase shifters taking into account the randomness of new energy, comprising the following steps:
[0008] S1. Conduct dominant analysis on wind power and photovoltaic power at each renewable energy access node in the sending end system, and calculate the corresponding power fluctuation dominant index;
[0009] S2. Determine the peak power of each new energy access node based on the confidence interval determined by the calculated power fluctuation dominant indicator;
[0010] S3. According to the calculated grid-connected power peak, calculate the short-circuit ratio of each new energy access node after it is connected to the distributed phase regulator, taking into account the randomness of the new energy;
[0011] S4. Connect the distributed phase regulator to the new energy access node corresponding to the calculated minimum new energy multi-station short-circuit ratio;
[0012] S5. Based on the connected distributed phase regulator, the impedance matrix of the sending-end system is updated, and then the short-circuit ratio of the new energy multi-station after the impedance matrix is updated is calculated;
[0013] S6. Repeat steps S4 to S5 until the short-circuit ratios of all renewable energy multi-stations in the sending-end system meet preset conditions, and obtain the configuration scheme of each distributed phase regulator.
[0014] Furthermore, in step S1, the power fluctuation dominant indicator of the new energy access node is:
[0015]
[0016] Where D wp represents the power fluctuation leading indicator of wind power connected to the renewable energy access node p, the subscript wp represents the wind power connected to the renewable energy access node p, D pvp represents the power fluctuation leading indicator of photovoltaic power generation connected to the new energy access node p, the subscript pvp represents the installed capacity of the new energy access node p, t represents the time of day, P w (t) represents the time domain value of wind power at the new energy access node p, P pv (t) represents the time domain value of photovoltaic power generation at the new energy access node p.
[0017] Furthermore, in step S2, the method for determining the grid-connected power peak value of the new energy access node is:
[0018] According to the value of the power fluctuation leading index, the 95% confidence interval of the first new energy type corresponding to the larger index value of each new energy access node is determined, and on this basis, the 95% confidence interval of the second new energy type within the 95% confidence interval of the new energy type is determined;
[0019] The maximum values of the 95% confidence interval of the first new energy type and the 95% confidence interval of the second new energy type are summed up to obtain the grid-connected power peak value of the new energy access node.
[0020] Furthermore, in step S3, after the new energy access node p is connected to the distributed phase regulator, the new energy multi-station short circuit ratio MRSCR′ taking into account the randomness of the new energy p The calculation formula is:
[0021]
[0022] In the formula, p and q represent two different new energy access nodes, U Np represents the rated voltage of node p, Z eqpq P represents the equivalent mutual impedance between node p and node q before the distributed phase shifter is connected. max represents the peak power of the grid, and n represents the total number of nodes.
[0023] Furthermore, in step S5, the impedance matrix Z′ of the sending-end system is expressed as:
[0024]
[0025] In the formula, Z i =[Z eq1i ...Z eqii ...Z eqni ] represents the impedance matrix related to node i in the original impedance matrix Z, Represents Z i Matrix transpose, Z eqii Represents the equivalent self-impedance value of node i, subscript i=1,2,3,…,n, i represents the node number, n represents the total number of nodes;
[0026] in, Each item in is expressed as:
[0027]
[0028] In the formula, Z e ' qpqIt represents the equivalent mutual impedance value between node p and node q after the distributed phase condenser is connected, Z eqpq represents the equivalent mutual impedance between node p and node q before the distributed condenser is connected, Z eqip represents the equivalent mutual impedance between node p and node i, Z eqiq represents the equivalent mutual impedance between node q and node i, z io Represents the distributed phase condenser impedance.
[0029] The beneficial effects of the present invention are:
[0030] (1) The method of the present invention proposes a method for site selection and sizing of distributed phase-shifting devices taking into account the randomness of renewable energy. The method achieves a reasonable estimation of the renewable energy output of each node in the power grid through confidence intervals, thus solving the problem of inaccuracy in the calculation of traditional MRSCR indicators caused by fluctuations in renewable energy output.
[0031] (2) The method of the present invention can quickly estimate the node injection power parameters in the MRSCR index and accurately identify the nodes with weak voltage support capability.
[0032] (3) The distributed phase regulator configuration results obtained by the method of the present invention can provide a reference for the site selection and capacity determination of distributed phase regulators in actual projects, thereby ensuring the safe and stable operation of the power system.
[0033] (4) Based on the method of the present invention, by connecting distributed phase regulators with smaller capacity, the voltage support strength of the power grid after the access of new energy sources such as wind and solar power can be significantly improved, and the transient overvoltage level at the sending end after the disturbance can be reduced. BRIEF DESCRIPTION OF THE DRAWINGS
[0034] Figure 1 A flow chart of a method for site selection and capacity determination of a distributed phase regulator taking into account the randomness of new energy provided in an embodiment of the present invention.
[0035] Figure 2 The present invention provides a DC near-zone topological structure.
[0036] Figure 3 This is a comparison chart of the typical wind and solar grid-connected power of each branch in one day provided by the present invention.
[0037] Figure 4 This is a comparison chart of the 35kV overvoltage conditions of each node provided by the present invention. DETAILED DESCRIPTION
[0038] The specific implementation modes of the present invention are described below so that those skilled in the art can understand the present invention. However, it should be clear that the present invention is not limited to the scope of the specific implementation modes. For those of ordinary skill in the art, as long as various changes are within the spirit and scope of the present invention as defined and determined by the attached claims, these changes are obvious, and all inventions and creations utilizing the concept of the present invention are protected.
[0039] The embodiment of the present invention provides a method for selecting the site and determining the capacity of a distributed phase condenser taking into account the randomness of new energy sources, such as Figure 1 As shown, the following steps are included:
[0040] S1. Conduct dominant analysis on wind power and photovoltaic power at each renewable energy access node in the sending end system, and calculate the corresponding power fluctuation dominant index;
[0041] S2. Determine the peak power of each new energy access node based on the confidence interval determined by the calculated power fluctuation dominant indicator;
[0042] S3. According to the calculated grid-connected power peak, calculate the short-circuit ratio of each new energy access node after it is connected to the distributed phase regulator, taking into account the randomness of the new energy;
[0043] S4. Connect the distributed phase regulator to the new energy access node corresponding to the calculated minimum new energy multi-station short-circuit ratio;
[0044] S5. Based on the connected distributed phase regulator, the impedance matrix of the sending-end system is updated, and then the short-circuit ratio of the new energy multi-station after the impedance matrix is updated is calculated;
[0045] S6. Repeat steps S4 to S5 until the short-circuit ratios of all renewable energy multi-stations in the sending-end system meet preset conditions, and obtain the configuration scheme of each distributed phase regulator.
[0046] In the embodiment of the present invention, a typical DC sending end system with a high proportion of renewable energy access is as follows: Figure 2 As shown in the figure, the entire system consists of three parts, namely, direct current transmission, the branch where the thermal power units are located, and multiple new energy branches composed of wind farms and photovoltaic stations. When the thermal power support at the sending end is weak and the AC system strength is low, the system faces the problem of transient overvoltage exceeding the limit after a DC fault, causing the wind turbine unit to fail to go offline due to fault ride-through, which seriously threatens the safety and stability of the sending end system.
[0047] In the traditional method, Figure 2 For the system shown in the figure, the short-circuit ratio (MRSCR) of the new energy multi-station of any new energy access node p (p≤n) is p ) can be expressed as:
[0048]
[0049] Where U Np Represents the rated voltage of node p; P ref Represents the per-unit value of active power injected into the node; Z eq represents the system node admittance matrix; Z eqpp represents the self-impedance value of node p; Z eqpq Represents the mutual impedance value between node p and node q.
[0050] As can be seen from the formula, the traditional MRSCR index usually obtains results under the condition of a certain power injection at each node. In fact, the grid-connected power of new energy is highly random due to factors such as wind speed and light intensity changes. When the grid-connected power of new energy entered into the above formula is too small, the MRSCR index will increase accordingly. At this time, the result will be too ideal and it will be difficult to effectively suppress the transient overvoltage of the sending end system; at the same time, if the maximum grid-connected power (installed capacity) of wind power and photovoltaic power at all nodes is selected, the result will be too conservative, and the cost will be high under this scheme. Therefore, how to select the appropriate injection power for each node to achieve the optimal configuration of distributed phase-shifting is a problem that needs further research.
[0051] Based on this, in the embodiment of the present invention, when formulating the site selection and sizing strategy of the distributed phase-shifting machine taking into account the randomness of new energy, the maximum grid-connected power of new energy is estimated based on the confidence interval. Specifically, the confidence interval of a probability sample is an interval estimate of a certain population parameter of this sample. The confidence interval shows the degree to which the true value of this parameter has a certain probability of falling around the measurement result, which gives the degree of credibility of the measured value of the measured parameter. The confidence interval is calculated under a predetermined significance level, which is usually called α, and the α value is generally taken as 0.05. The confidence interval calculated under this condition is called a 95% confidence interval.
[0052] Based on the above analysis, in order to prevent the MRSCR calculation results from being too radical or conservative, it is necessary to find the grid-connected power peak P of each node where the actual probability of new energy is relatively high. max To estimate the P of node p max_p First, a dominant analysis is performed on the wind power and photovoltaic power connected to the node, and the index D is defined as the dominant index of the power fluctuation of the node. Since wind and light are related to the weather in a day, that is, related to different times in a day, the absolute values of the power change rates at different times in 24 hours in a day are summed up on the typical wind and solar output curves of each node at intervals of 1 hour. Based on this, the dominant index of the power fluctuation of the new energy access node in step S1 of the embodiment of the present invention is obtained as follows:
[0053]
[0054] Where D wprepresents the power fluctuation leading indicator of wind power connected to the renewable energy access node p, the subscript wp represents the wind power connected to the renewable energy access node p, D pvp represents the power fluctuation leading indicator of photovoltaic power generation connected to the new energy access node p, the subscript pvp represents the installed capacity of the new energy access node p, t represents the time of day, P w (t) represents the time domain value of wind power at the new energy access node p, P pv (t) represents the time domain value of photovoltaic power generation at the new energy access node p.
[0055] Based on the determined power fluctuation dominant indicator, in step S2 of the embodiment of the present invention, the method for determining the grid-connected power peak value of the new energy access node is:
[0056] According to the value of the power fluctuation leading index, the 95% confidence interval of the first new energy type corresponding to the larger index value of each new energy access node is determined. On this basis, the 95% confidence interval of the second new energy type within the 95% confidence interval of the new energy type (corresponding to the discrete or continuous time interval within a day) is determined;
[0057] The maximum values of the 95% confidence interval of the first new energy type and the 95% confidence interval of the second new energy type are summed up to obtain the grid-connected power peak value of the new energy access node.
[0058] Specifically, the larger the index D is, the more it dominates the power fluctuation event of the node. Therefore, the 95% confidence interval of the new energy source is analyzed first, and the corresponding discrete or continuous time interval within a day is obtained on this basis. The 95% confidence interval of another new energy source is analyzed within this interval. Since the change of the other new energy source is relatively small, the actual 95% confidence interval of the two new energy sources can be obtained well. The maximum value points in the two confidence intervals are taken and summed, and the P of node p can be estimated. max_p The advantage of doing this is that the maximum output of photovoltaic and wind power at node p generally does not occur at the same time, so directly adding them is equivalent to reserving a certain margin, which is convenient for the subsequent site selection and capacity determination analysis of distributed phase-shifting machines.
[0059] In step S3 of the embodiment of the present invention, in view of the problem that the existing MRSCR index does not take into account the randomness of the output of new energy, which may lead to the problem of result deviation, this embodiment proposes a new energy multi-station short-circuit ratio MRSCR′ that takes into account the randomness of new energy after the new energy access node p is connected to the distributed phase regulator. p After obtaining the peak power of the grid-connected power, the short-circuit ratio of the new energy multi-station MRSCR′ is obtained. p The calculation formula is:
[0060]
[0061] In the formula, p and q represent two different new energy access nodes, U Np represents the rated voltage of node p, Z eqpq P represents the equivalent mutual impedance between node p and node q before the distributed phase shifter is connected. max represents the peak power of the grid, and n represents the total number of nodes.
[0062] Based on this indicator, the point where the global voltage support capacity is weakest under the condition of energy power fluctuations within a day can be analyzed, and then the distributed phase regulator can be connected.
[0063] In step S5 of the embodiment of the present invention, it is assumed that the impedance of the distributed phase regulator is z io After it is connected, according to the analysis of the power system, it is equivalent to adding a new link branch z in parallel with the ground in the power grid. io , which will affect the impedance matrix. The impedance matrix Z′ of the sending end system is expressed as:
[0064]
[0065] In the formula, Z i =[Z eq1i ...Z eqii ...Z eqni ] represents the impedance matrix related to node i in the original impedance matrix Z, Represents Z i Matrix transpose, Z eqii Represents the equivalent self-impedance value of node i, subscript i=1,2,3,…,n, i represents the node number, n represents the total number of nodes;
[0066] in, Each item in is expressed as:
[0067]
[0068] In the formula, Z e ' qpq It represents the equivalent mutual impedance value between node p and node q after the distributed phase condenser is connected, Z eqpq represents the equivalent mutual impedance between node p and node q before the distributed condenser is connected, Z eqip represents the equivalent mutual impedance between node p and node i, Z eqiq represents the equivalent mutual impedance between node q and node i, z io Represents the distributed phase condenser impedance.
[0069] The above formula shows that after the distributed phase regulator is connected, the original system impedance matrix element value will be reduced. At this time, the short-circuit ratio of each node in the system will increase, and the system voltage support capacity will be improved. Substituting it into MRSCR pIn the calculation formula, the impact of the phase regulator connection on the short-circuit ratio of multiple renewable energy stations is obtained as follows:
[0070]
[0071] In the above process of this embodiment, considering that the phase regulator is usually connected with an integer number of fixed-capacity units, it is equivalent to further reserving a certain margin, and the obtained configuration result can better deal with the problem of poor effect of traditional solutions caused by fluctuations in new energy output.
[0072] The embodiment of the present invention provides a specific calculation example of the above-mentioned distributed phase shifter site selection and capacity determination method.
[0073] In this embodiment, the following is constructed in PSCAD / EMTDC: Figure 2 The DC sending-end system shown has a thermal power installed capacity of 2500MW, a total installed capacity of wind farms and photovoltaic farms of 2500MW, a DC rated power of 5000MW, and a rated voltage of ±800kV.
[0074] exist Figure 1 Take n = 3, that is, when there are three new energy branches at the sending end, the typical wind and solar power connected to the grid in each branch in one day is as follows: Figure 3 As shown in the figure, each 0.2s represents one hour in reality. The wind power and photovoltaic installed capacities of the three branches are as follows: Station 1: 500MW wind power installed capacity, 300MW photovoltaic installed capacity; Station 2: 600MW wind power installed capacity, 400MW photovoltaic installed capacity; Station 3: 700MW wind power installed capacity, 500MW photovoltaic installed capacity.
[0075] Figure 3 The blue, black and red curves are the typical changing trends of wind power, photovoltaic output and total branch power at each node within a day. By analyzing the dominant indicators of power fluctuation at each node, the confidence intervals of new energy output at the three nodes can be calculated as shown in Table 1.
[0076] Table 1 95% confidence interval of renewable energy output at each node
[0077]
[0078] The obtained P max Substitute the value into the MRSCR' calculation formula to calculate, and the MRSCR' index of each node can be obtained. Nodes 1 to 3 are 1.3601, 1.3648 and 1.3610 respectively, and the minimum short-circuit ratio requirement is set to 2.5. The commonly used distributed phase regulator in current projects is 50Mvar. Taking this capacity as an example, according to Figure 1The process shown in the figure is iteratively configured for phase regulators. After a 50Mvar distributed phase regulator is connected to node 1 for the first time, the indicators of nodes 1 to 3 become: 1.798, 1.806, and 1.799. At this time, node 1 is still the lowest indicator point, so another distributed phase regulator is configured at node 1. Continue iterative calculations, and the final result is that six 50Mvar distributed phase regulators are equipped at node 1.
[0079] When the randomness of renewable energy is not considered, the data of each node at 6 am is substituted for calculation. The configuration result obtained at this time is: only one distributed phase regulator is configured at node 4. The overvoltage analysis after DC blocking is carried out in the established sending-end system. In order to illustrate the rationality of this strategy, a period of large renewable energy output is selected for simulation. The DC blocking fault is set to occur at 3s and last for 0.2s. The voltage simulation results of each node are as follows Figure 4 As shown; it can be seen that the method of the present invention takes into account the randomness of new energy output and can better suppress transient overvoltage peaks.
[0080] The present invention uses specific embodiments to illustrate the principles and implementation methods of the present invention. The description of the above embodiments is only used to help understand the method of the present invention and its core idea. At the same time, for those skilled in the art, according to the idea of the present invention, there will be changes in the specific implementation methods and application scope. In summary, the content of this specification should not be understood as a limitation on the present invention.
[0081] Those skilled in the art will appreciate that the embodiments described herein are intended to help readers understand the principles of the present invention, and should be understood that the protection scope of the present invention is not limited to such specific statements and embodiments. Those skilled in the art can make various other specific variations and combinations that do not deviate from the essence of the present invention based on the technical revelations disclosed by the present invention, and these variations and combinations are still within the protection scope of the present invention.
Claims
1. A method for site selection and capacity determination of distributed phase shifters taking into account the randomness of new energy, characterized in that: The following steps are involved: S1. Conduct dominant analysis on wind power and photovoltaic power at each renewable energy access node in the sending end system, and calculate the corresponding power fluctuation dominant index; S2. Determine the peak power of each new energy access node based on the confidence interval determined by the calculated power fluctuation dominant indicator; S3. According to the calculated grid-connected power peak, calculate the short-circuit ratio of each new energy access node after it is connected to the distributed phase regulator, taking into account the randomness of the new energy; S4. Connect the distributed phase regulator to the new energy access node corresponding to the calculated minimum new energy multi-station short-circuit ratio; S5. Based on the connected distributed phase regulator, the impedance matrix of the sending-end system is updated, and then the short-circuit ratio of the new energy multi-station after the impedance matrix is updated is calculated; S6. Repeat steps S4 to S5 until the short-circuit ratios of all renewable energy multi-stations in the sending-end system meet preset conditions, and obtain the configuration scheme of each distributed phase regulator.
2. The method for site selection and capacity determination of distributed phase shifters taking into account the randomness of new energy sources according to claim 1 is characterized in that: In step S1, the power fluctuation leading indicator of the new energy access node is: Where D wp represents the power fluctuation leading indicator of wind power connected to the renewable energy access node p, the subscript wp represents the wind power connected to the renewable energy access node p, D pvp represents the power fluctuation leading indicator of photovoltaic power generation connected to the new energy access node p, the subscript pvp represents the installed capacity of the new energy access node p, t represents the time of day, P w (t) represents the time domain value of wind power at the new energy access node p, P pv (t) represents the time domain value of photovoltaic power generation at the new energy access node p.
3. The method for site selection and capacity determination of distributed phase shifters taking into account the randomness of new energy sources according to claim 1 is characterized in that: In step S2, the method for determining the grid-connected power peak value of the new energy access node is: According to the value of the power fluctuation leading index, the 95% confidence interval of the first new energy type corresponding to the larger index value of each new energy access node is determined, and on this basis, the 95% confidence interval of the second new energy type within the 95% confidence interval of the new energy type is determined; The maximum values of the 95% confidence interval of the first new energy type and the 95% confidence interval of the second new energy type are summed up to obtain the grid-connected power peak value of the new energy access node.
4. The method for site selection and capacity determination of distributed phase shifters taking into account the randomness of new energy sources according to claim 1 is characterized in that: In step S3, after the new energy access node p is connected to the distributed phase regulator, the new energy multi-station short circuit ratio MRSCR′ taking into account the randomness of the new energy p The calculation formula is: In the formula, p and q represent two different new energy access nodes, U Np represents the rated voltage of node p, Z eqpq P represents the equivalent mutual impedance between node p and node q before the distributed phase shifter is connected. max represents the peak power of the grid, and n represents the total number of nodes.
5. The method for site selection and capacity determination of distributed phase shifters taking into account the randomness of new energy sources according to claim 1 is characterized in that: In step S5, the impedance matrix Z′ of the sending-end system is expressed as: In the formula, Z i =[Z eq1i ...Z eqii ...Z eqni ] represents the impedance matrix related to node i in the original impedance matrix Z, Represents Z i Matrix transpose, Z eqii Represents the equivalent self-impedance value of node i, subscript i=1,2,3,…,n, i represents the node number, n represents the total number of nodes; in, Each item in is expressed as: In the formula, Z e ' qpq It represents the equivalent mutual impedance value between node p and node q after the distributed phase condenser is connected, Z eqpq represents the equivalent mutual impedance between node p and node q before the distributed condenser is connected, Z eqip represents the equivalent mutual impedance between node p and node i, Z eqiq represents the equivalent mutual impedance between node q and node i, z io Represents the distributed phase condenser impedance.