Source network load storage optimization scheduling method, device, equipment, medium and product
Through the optimization scheduling method of source grid load storage, the multi-dimensional output characteristics of photovoltaic and the resource characteristics of the power system are analyzed, and the deep interactive relationship model is built, which solves the problem of supply and demand balance in the power system under the access of high permeability new energy, and realizes the safety of the power grid Reliable operation and peak shaving cost reduction.
Patent Information
- Application Number
- CN202411473090.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-22
- Publication Date
- 2024-11-22
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing power system is difficult to maintain a balance between power supply and demand under the access of new energy with high permeability, resulting in increased system scheduling pressure and safety hazards, and the scheduling cost is high.
The source network load storage optimization scheduling method is adopted to analyze the photovoltaic multi-dimensional output characteristic model, combine the source network load storage elastic resource characteristics of the power system, build a deep interactive relationship model, determine the scheduling cost model, and minimize the scheduling cost according to the objective function, determine Optimal scheduling strategy to meet the system scheduling needs at different photovoltaic permeability rates.
The supply and demand balance of power system under different photovoltaic permeability is achieved, the system peak shaping pressure is reduced, the safe and reliable operation of the power grid is improved, and the peak shaping cost is optimized, which achieves the optimal matching between the photovoltaic permeability and the system peak shaping capability. .
Smart Images

Figure CN119010221A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of power system dispatching, and in particular to a source-grid-load-storage optimization dispatching method, device, equipment, medium and product. Background Art
[0002] The exhaustion of fossil energy and the deterioration of the environment have made it urgent for the traditional electricity production and consumption system, which is centered on primary energy, to transform. Clean energy such as wind power and photovoltaics is an important development direction in the energy field, but the current research on the output characteristics of new energy is too single-dimensional, and due to the limitations of elastic resources and elastic capacity, it is difficult for the system to maintain the balance of power supply and demand under the high penetration rate of new energy access, which makes the system dispatch pressure increase sharply and there are safety risks in the operation of the power grid. Summary of the invention
[0003] In view of the above-mentioned defects, the present invention provides a source-grid-load-storage optimization scheduling method, device, equipment, medium and product, which can meet the system scheduling requirements under different photovoltaic penetration rates, ensure the balance of supply and demand of the power system, and ensure the safe and reliable operation of the power grid.
[0004] An embodiment of the present invention provides a source-grid-load-storage optimization scheduling method, the method comprising: Analyze the acquired historical output data to obtain a photovoltaic multi-dimensional output characteristic model; According to the photovoltaic multi-dimensional output characteristic model, combined with the analysis and modeling of the source-grid-load-storage elastic resource characteristics of the power system, a dispatch cost model is determined; Construct a deep interactive relationship model of the source-grid-load-storage deep interactive hub, and construct an objective function with the goal of minimizing the cost of power system resource dispatch; The dispatch cost model is solved according to the deep interactive relationship model and the objective function, and the optimal dispatch strategy that meets the characteristics of source, grid, load and storage resources is determined by combining the photovoltaic penetration rate of the power system and the peak regulation margin of the power system.
[0005] Preferably, solving the dispatch cost model according to the deep interactive relationship model and the objective function, combining the photovoltaic penetration rate of the power system and the peak regulation margin of the power system, and determining the optimal dispatch strategy that meets the source-grid-load-storage resource characteristics, includes: Set the illumination sequence, permeability sequence, and peak-shaving scheduling margin set; When the power system meets the preset dispatching conditions, it is determined that dispatching is required, and the constraint formula is converted into a linear constraint condition using the power distribution factor; the peak-shaving characteristics of the resources on each side of the source, grid, load and storage are comprehensively considered, and a set of peak-shaving strategies is obtained according to the deep interactive relationship model; with the minimization of the objective function as the goal, the optimal dispatching strategy under the corresponding photovoltaic penetration rate is optimized.
[0006] As a preferred solution, the photovoltaic multi-dimensional output characteristic model is: ; in, is the Gamma function, is the independent variable, is the Beta distribution function, and is the shape factor of the photovoltaic array, is the maximum value of photovoltaic output, For photovoltaic power generation, , is the light intensity, is the maximum power tracking point, is the photovoltaic radiation area, is the conversion factor, is the photovoltaic irradiation angle, , and are the mean and standard deviation of solar radiation during the statistical period.
[0007] As a preferred solution, the dispatching cost model includes a deep peak-shaving dispatching cost model for thermal power units, a unit dispatching cost model, a battery energy storage system charging and discharging cost model, and a transferable load cost model; The deep peak load scheduling cost model of thermal power units is: ; The unit scheduling cost model is: ; The transferable load cost model is: ; The charging and discharging cost model of the battery energy storage system is: ; Among them, C T (P T ) is the deep peak load dispatching cost of thermal power units, To provide power for thermal power units, is the unit consumption characteristic function, and are the unit loss cost and the unit fuel consumption cost respectively. is the maximum output of the unit, It is the minimum technical output in the basic dispatching stage of the unit. It is the minimum stable combustion output in the deep dispatching stage without oil injection. C is the stable combustion limit output during the oil injection depth scheduling stage; Ti (P T ) is the dispatching cost of the i-th unit, C coal (P T ) is the coal cost, and are two Boolean variables, C Tr is the transferable load cost, is the total optimization time length, is the amount of transferable load, represents the amount of electricity of the transferable load k transferred from time period t to time t', is the transfer load price from time t to time t', C c The charging and discharging cost of the battery energy storage system, and Respectively represent the charging and discharging prices of the energy storage system at time t, , They represent the charge and discharge amount of the energy storage system at time t, is the current fuel cost.
[0008] As a preferred solution, the deep interactive relationship model is ; in, To meet peak demand; is the coupling matrix; Indicates different scheduling strategies; is the elastic resource participation matrix, ~ Respectively represent the resource participation in dispatching of source, network, load and storage; , , , Indicates the participation of each resource, P T S is the capacity of each resource, , Respectively represent the upper and lower limits of the capacity of the Sth resource in the source, network, load, and storage resources; , are the output of the i-th machine in the period t~t-1, , are the maximum and minimum output of the i-th unit during period t, and are the maximum up-ramp power and the maximum down-ramp power of the i-th unit respectively; is the state variable of the i-th unit in period t, is the ratio of the load side participation to its maximum capacity, and are the load side peak load power and the maximum load side peak load power in the dispatching interval, respectively. is the user satisfaction threshold.
[0009] As a preferred solution, the objective function is: ; Among them, minf(C) is the minimum cost, is the dispatching cost of thermal power units, C Tr is the transferable load cost, is the energy storage dispatch cost.
[0010] The embodiment of the present invention further provides a source-grid-load-storage optimization scheduling device, the device comprising: An analysis module is used to analyze the acquired historical output data to obtain a photovoltaic multi-dimensional output characteristic model; A cost calculation module is used to determine a dispatch cost model based on the photovoltaic multi-dimensional output characteristic model and the source-grid-load-storage elastic resource characteristics of the power system by analyzing and modeling the characteristics; The model building module is used to build a deep interactive relationship model of the source-grid-load-storage deep interactive hub, and to build an objective function with the goal of minimizing the cost of power system resource dispatch; A solution module is used to solve the dispatch cost model according to the deep interactive relationship model and the objective function, and determine the optimal dispatch strategy that meets the characteristics of source, grid, load and storage resources in combination with the photovoltaic penetration rate of the power system and the peak regulation margin of the power system.
[0011] Preferably, the solution module is specifically used for: Set the illumination sequence, permeability sequence and peak-shaving scheduling margin set; When the power system meets the preset dispatching conditions, it is determined that dispatching is required, and the constraint formula is converted into a linear constraint condition using the power distribution factor; the peak-shaving characteristics of the resources on each side of the source, grid, load and storage are comprehensively considered, and a set of peak-shaving strategies is obtained according to the deep interactive relationship model; with the minimization of the objective function as the goal, the optimal dispatching strategy under the corresponding photovoltaic penetration rate is optimized.
[0012] Preferably, the photovoltaic multi-dimensional output characteristic model is ; in, is the Gamma function, is the independent variable, is the Beta distribution function, and is the shape factor of the photovoltaic array, is the maximum value of photovoltaic output, For photovoltaic power generation, , is the light intensity, is the maximum power tracking point, is the photovoltaic radiation area, is the conversion factor, is the photovoltaic irradiation angle, , and are the mean and standard deviation of solar radiation during the statistical period.
[0013] As a preferred solution, the dispatching cost model includes a deep peak-shaving dispatching cost model for thermal power units, a unit dispatching cost model, a battery energy storage system charging and discharging cost model, and a transferable load cost model; The deep peak load scheduling cost model of thermal power units is: ; The scheduling cost model of a single unit is: ; The transferable load cost model is: ; The charging and discharging cost model of the battery energy storage system is: ; Among them, C r (P T ) is the deep peak load dispatching cost of thermal power units, To provide power for thermal power units, is the unit consumption characteristic function, and are the unit loss cost and the unit fuel consumption cost respectively. is the maximum output of the unit, It is the minimum technical output in the basic dispatching stage of the unit. It is the minimum stable combustion output in the deep dispatching stage without oil injection. C is the stable combustion limit output during the oil injection depth scheduling stage; Ti (P T ) is the dispatching cost of the i-th unit, C coal (P T ) is the coal cost, and are two Boolean variables, C Tr is the transferable load cost, is the total optimization time length, is the amount of transferable load, represents the amount of electricity of the transferable load k transferred from time period t to time t', is the transfer load price from time t to time t', C c The charging and discharging cost of the battery energy storage system, and Respectively represent the charging and discharging prices of the energy storage system at time t, , They represent the charge and discharge amount of the energy storage system at time t, is the current fuel cost.
[0014] As a preferred solution, the deep interactive relationship model is ; in, To meet peak demand; is the coupling matrix; Indicates different scheduling strategies; is the elastic resource participation matrix, ~ Respectively represent the resource participation in dispatching of source, network, load and storage; , , , Indicates the participation of each resource, P T S is the capacity of each resource, , Respectively represent the upper and lower limits of the capacity of the Sth resource in the source, network, load, and storage resources; , are the output of the i-th machine in the period t~t-1, , are the maximum and minimum output of the i-th unit during period t, and are the maximum up-ramp power and the maximum down-ramp power of the i-th unit respectively; is the state variable of the i-th unit in period t, is the ratio of the load side participation to its maximum capacity, and are the load side peak load power and the maximum load side peak load power in the dispatching interval, respectively. is the user satisfaction threshold.
[0015] As a preferred solution, the objective function is: ; Among them, minf(C) is the minimum cost, is the dispatching cost of thermal power units, C Tr is the transferable load cost, is the energy storage dispatch cost.
[0016] An embodiment of the present invention also provides a terminal device, including a processor, a memory, and a computer program stored in the memory and configured to be executed by the processor, and when the processor executes the computer program, it implements the source-grid-load-storage optimization scheduling method as described in any one of the above embodiments.
[0017] An embodiment of the present invention also provides a computer-readable storage medium, which includes a stored computer program, wherein when the computer program is running, the device where the computer-readable storage medium is located is controlled to execute the source-grid-load-storage optimization scheduling method as described in any one of the above embodiments.
[0018] An embodiment of the present invention further provides a computer program product, including a computer program / instruction, which, when executed by a processor, implements the source-grid-load-storage optimization scheduling method as described in any one of the above embodiments.
[0019] The source-grid-load-storage optimization scheduling method, device, equipment, medium and product provided by the present invention obtain a photovoltaic multi-dimensional output characteristic model by analyzing the acquired historical output data; determine the scheduling cost model based on the photovoltaic multi-dimensional output characteristic model in combination with the analysis and modeling of the source-grid-load-storage elastic resource characteristics of the power system; construct a deep interactive relationship model of the source-grid-load-storage deep interactive hub, and construct an objective function with the goal of minimizing the resource scheduling cost of the power system; solve the scheduling cost model based on the deep interactive relationship model and the objective function, and determine the optimal scheduling strategy that meets the source-grid-load-storage resource characteristics in combination with the photovoltaic penetration rate of the power system and the peak-shaving margin of the power system. This solution can meet the system scheduling requirements under different photovoltaic penetration rates to ensure the balance of supply and demand of the power system and ensure the safe and reliable operation of the power grid. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 It is a flow chart of a source-grid-load-storage optimization scheduling method provided by an embodiment of the present invention; Figure 2 It is another flow chart of the source-grid-load-storage optimization scheduling method provided by an embodiment of the present invention; Figure 3 It is a schematic diagram of the principle of a source-grid-load-storage deep interaction hub provided by an embodiment of the present invention; Figure 4 is a schematic diagram of photovoltaic and load prediction curves provided by an embodiment of the present invention; Figure 5 It is a curve diagram showing a cost comparison between traditional scheduling and deep interactive scheduling of source, grid, load and storage provided by an embodiment of the present invention; Figure 6 is a curve diagram of the dispatching cost of various resources under different photovoltaic penetration rates and peak-shaving margin conditions provided by an embodiment of the present invention; Figure 7 It is a curve diagram of the unit loss of a traditional single thermal power unit in a peak-shaving mode provided by an embodiment of the present invention; Figure 8 It is a curve diagram of unit loss under the source-grid-load-storage deep interactive scheduling mode provided by an embodiment of the present invention; Fig. 9 It is a structural schematic diagram of a source-grid-load-storage optimization scheduling device provided by an embodiment of the present invention; Fig.10 It is a structural diagram of a terminal device provided by an embodiment of the present invention. DETAILED DESCRIPTION
[0021] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0022] See also Figure 1 , is a flow chart of a source-grid-load-storage optimization scheduling method provided by an embodiment of the present invention, the method comprising steps S1 to S4: S1, analyzing the acquired historical output data to obtain the photovoltaic multi-dimensional output characteristics; S2, according to the photovoltaic multi-dimensional processing characteristics, combined with the source-grid-load-storage elastic resource characteristics of the power system, analyze and model, and determine the dispatch cost model; S3, build a deep interactive relationship model of the source-grid-load-storage deep interactive hub, and build an objective function with the goal of minimizing the resource dispatching cost of the power system; S4, solving the dispatch cost model according to the deep interactive relationship model and the objective function, combining the photovoltaic penetration rate of the power system and the peak regulation margin of the power system, to determine the optimal dispatch strategy that meets the characteristics of source, grid, load and storage resources.
[0023] In the specific implementation of this embodiment, the volatility, seasonality and randomness of photovoltaic output are taken into account, the historical photovoltaic output data is collected, and the photovoltaic multi-dimensional output characteristics are obtained through fuzzy C-means clustering and Gaussian fitting method; Establish models of dispatch capacity, system fault handling capability, user satisfaction, etc. of various resources of source, grid, load and storage, and obtain different dispatch strategies corresponding to different power system regulation capabilities; Establishing a deep interactive scheduling model of source, grid, load and storage; the scheduling model is a cost minimization model, and defines an objective function; Aiming at the coupling mode of elastic resources with multiple factors, an energy system with multiple factors is abstracted into a two-port network.
[0024] With the goal of optimizing the economic efficiency of power system dispatch, the optimal match between different photovoltaic penetration rates and the power system regulation capacity is achieved; that is, the optimal matching model between penetration rate and system peak-shaving capacity is solved: taking the lowest total system dispatch cost as the objective function, the optimal dispatch strategy that satisfies the characteristics of source, grid, load and storage resources is obtained, thereby achieving the optimal match between photovoltaic penetration rate and system peak-shaving capacity.
[0025] In this case, the multi-dimensional output characteristics of photovoltaic power are obtained through fuzzy C-means clustering and Gaussian fitting method; the parameter models such as the dispatching capacity, system fault handling capability, and user satisfaction of various elastic resources are analyzed to obtain different dispatching strategies corresponding to different power system regulation capabilities; with the goal of minimizing the dispatching cost of the power system, the optimal matching of photovoltaic power with the dispatching capability of the power system at different penetration rates is achieved; the present invention can meet the system dispatching requirements under different photovoltaic penetration rates, ensure the balance of supply and demand of the power system, effectively reduce the power loss at the peak of the system load, and ensure the safe and reliable operation of the power grid.
[0026] In another embodiment provided by the present invention, the step S4 specifically includes the following steps: Set the illumination sequence, permeability sequence, and peak scheduling margin set.
[0027] When the power system meets the preset dispatching conditions, it is determined that dispatching is required, and the constraint formula is converted into a linear constraint condition using the power distribution factor; the peak-shaving characteristics of the resources on each side of the source, grid, load and storage are comprehensively considered, and a set of peak-shaving strategies is obtained according to the deep interactive relationship model; with the minimization of the objective function as the goal, the optimal dispatching strategy under the corresponding photovoltaic penetration rate is optimized.
[0028] When this embodiment is implemented, see Figure 2 , is another flow chart of the source-grid-load-storage optimization scheduling method provided by an embodiment of the present invention. Figure 2 The solution process specifically includes the following steps: Step 1: Input the original photovoltaic data, use FCM clustering and Gaussian fitting method to model the multidimensional features, and set the parameter sequence number m=0, n=0, s=0.
[0029] That is, by collecting historical photovoltaic output data, using fuzzy C-means clustering, and then using FCM clustering method and Gaussian simulation to model the multi-dimensional characteristics of photovoltaic output such as randomness and volatility.
[0030] Step 2: Set the illumination sequence and permeability. That is, set the illumination sequence and permeability sequence.
[0031] Step 3: Determine whether the system needs peak load regulation, if yes, proceed to the next step, that is, determine whether the power system needs peak load regulation by determining whether the power system meets the preset peak load regulation conditions.
[0032] If yes, go to step 4; if no, go to step 7.
[0033] Step 4: Set the peak-shaving margin set and use the power distribution factor method to transform the nonlinear constraint formula in the model. That is, the constraint formula is transformed into a linear constraint condition by using the power distribution factor through the peak-shaving scheduling margin set.
[0034] Step 5: Comprehensively consider the economic and technical characteristics of peak-shaving resources on all sides of the source, grid, load and storage, and use the deep interactive matching model of source, grid, load and storage to obtain a set of peak-shaving strategies.
[0035] That is, the peak-shaving characteristics of resources on the source, grid, load and storage sides are comprehensively considered, and a set of peak-shaving strategies is obtained according to the deep interactive relationship model.
[0036] Step 6: With the goal of optimizing the economic efficiency of system dispatch, optimize the optimal dispatch strategy under the corresponding photovoltaic penetration rate. That is, m=m+1, n=n+1, return to step 2.
[0037] Step 7: Output the output and dispatch cost of each resource under different peak-shaving margins and different photovoltaic penetration rates.
[0038] Compared with the existing scheduling strategies that do not consider the changes in photovoltaic penetration rate, this invention sets the system peak-shaving margin under different photovoltaic penetration rates, and can derive the optimal peak-shaving strategy under the corresponding photovoltaic penetration rate according to the resource response characteristics on each side of the source, grid, load and storage, thereby achieving the matching of photovoltaic penetration rate and the peak-shaving capacity of the power system.
[0039] In another embodiment provided by the present invention, the photovoltaic multi-dimensional output characteristic model ; in, is the Gamma function, is the independent variable, is the Beta distribution function, and is the shape factor of the photovoltaic array, is the maximum value of photovoltaic output, For photovoltaic power generation, , is the light intensity, is the maximum power tracking point, is the photovoltaic radiation area, is the conversion factor, is the photovoltaic irradiation angle, , and are the mean and standard deviation of solar radiation during the statistical period.
[0040] In the specific implementation of this embodiment, the fuzzy C-means clustering (FCM) algorithm is improved from the K-means algorithm and is a fuzzy clustering algorithm that constructs an objective function based on distance and membership degree. The clusters generated by clustering are regarded as fuzzy sets, and the membership degrees of sample point data to different clusters are calculated to determine the clusters to which the sample points belong. Compared with the hard standard clustering of K-means, it can better handle the situation of noise in the dataset, the clustering result is more flexible, and it can provide more comprehensive information. This method combines fuzzy theory to achieve flexible fuzzy partitioning, can handle the situation where data points belong to multiple classes, and is suitable for handling situations with a high degree of fuzziness of data points.
[0041] FCM reduces the problem to a constrained non-linear programming problem, and obtains the fuzzy partitioning of the photovoltaic sequence through optimization, and obtains the membership degree and clustering center as follows: ; ; In the formula: dataset , is the fuzzy cluster center; is the number of cluster centers; n is the number of sample data; is the membership degree of the i-th sample belonging to the j-th class, =[0,1]; is the Euclidean distance from sample i to cluster center j, ; m is a weight parameter that刻画模糊化程度 (characterizes the degree of fuzzification) 1<m<∞, and the larger m is, the higher the degree of fuzziness.
[0042] By repeatedly adjusting the cluster center matrix to update the membership degree matrix, the optimal membership degree and cluster center are obtained, and the sample points are divided into clusters according to the membership degree.
[0043] Furthermore, the photovoltaic characteristic is modeled to obtain the output formula: ; is the photovoltaic output; is the light intensity; is the maximum power tracking point; is the photovoltaic radiation area; is the conversion coefficient; is the photovoltaic irradiation angle. The photovoltaic output satisfies the Beta distribution with respect to light and is fitted by a Gaussian function as the following formula: ; Among them, is the Gamma function; is the independent variable; is the Beta distribution function; , is the shape factor of the photovoltaic array, which is determined by the structure of the photovoltaic array itself; is the maximum value of photovoltaic output.
[0044] in, , It can be obtained by the following formula: , are the mean and standard deviation of solar radiation in a certain period of time; Furthermore, in order to better analyze the fluctuation characteristics of the load, the normal distribution is used to describe the load, and the model is: ; in, , , are the load value, mean and standard deviation of the load during the reference period respectively.
[0045] In another embodiment provided by the present invention, the dispatching cost model includes a deep peak-shaving dispatching cost model for thermal power units, a unit dispatching cost model, a battery energy storage system charging and discharging cost model, and a transferable load cost model; The deep peak load scheduling cost model of thermal power units is: ; The unit scheduling cost model is: ; The transferable load cost model is: ; The charging and discharging cost model of the battery energy storage system is: ; Among them, C r (P T ) is the deep peak load dispatching cost of thermal power units, To provide power for thermal power units, is the unit consumption characteristic function, and are the unit loss cost and the unit fuel consumption cost respectively. is the maximum output of the unit, It is the minimum technical output in the basic dispatching stage of the unit. It is the minimum stable combustion output in the deep dispatching stage without oil injection. C is the stable combustion limit output during the oil injection depth scheduling stage; Ti (P T ) is the dispatching cost of the i-th unit, C coal (P T) is the coal cost, and are two Boolean variables, C Tr is the transferable load cost, is the total optimization time length, is the amount of transferable load, represents the amount of electricity of the transferable load k transferred from time period t to time t', is the transfer load price from time t to time t', C c The charging and discharging cost of the battery energy storage system, and Respectively represent the charging and discharging prices of the energy storage system at time t, , They represent the charge and discharge amount of the energy storage system at time t, is the current fuel cost.
[0046] In the specific implementation of this embodiment, the source-grid-load-storage elastic resource characteristics are analyzed and modeled: On the source side, the failure probability of the unit is fully considered and the failure capacity of the unit is modeled: ; ; ; ; in, The reliability of normal operation of the unit. and are the failure rate and repair rate of the unit respectively; and They are the mean repair time and mean trouble-free time of the unit respectively. Dispatch capacity for unit j; is the corresponding reliability.
[0047] The dispatching cost model includes a deep peak-shaving dispatching cost model for thermal power units, a unit dispatching cost model, a battery energy storage system charging and discharging cost model, and a transferable load cost model; The deep peak load scheduling cost model of thermal power units is: ; Among them, C r (P T ) is the deep peak load dispatching cost of thermal power units, To provide power for thermal power units, is the unit consumption characteristic function, and are the unit loss cost and the unit fuel consumption cost respectively. is the maximum output of the unit, It is the minimum technical output in the basic dispatching stage of the unit. It is the minimum stable combustion output in the deep dispatching stage without oil injection. It is the limit output for stable combustion during the oil injection depth scheduling stage.
[0048] ; ; ; in, , They are the total number of time periods and the number of units respectively; and Indicates whether unit i switches to the start-up and shutdown states during period t; , , is the coal consumption function coefficient of thermal power units; is the current coal price, unit: yuan / t; , They are the startup and shutdown costs of the unit respectively; is the operation impact coefficient of the thermal power unit, indicating the impact of different operating conditions on the unit; The purchase cost of the unit; The number of cycles that cause rotor cracking can be determined from the rotor low-cycle fatigue curve; It is the fuel consumption of the unit during operation; is the current fuel price.
[0049] To facilitate the solution, Boolean variables m and n are introduced, and the dispatch cost of unit i is rewritten. The unit dispatch cost model is: ; Among them, CTi(PT) is the dispatching cost of the i-th unit, Ccoal(PT) is the coal cost, and are two Boolean variables, , .
[0050] Furthermore, grid-side resources are modeled. Grid-side dispatching is to improve the regulation capacity of the power system by enhancing the network elasticity of the power system. The cost is low and can be ignored. Appropriately changing the power flow distribution of the transmission line can alleviate grid congestion such as line overload and node voltage exceeding the limit, so as to enhance the system's fault response capability and increase the active power flow and voltage difference of the line: in, , Represent the voltages of node i and node j respectively; is the equivalent voltage amplitude; is the reactance between node i and node j; for and The phase difference; The elastic constraint condition on the grid side is: .
[0051] in, , Respectively represent the upper and lower limits of the voltage at node i; , They represent the minimum and maximum active power of branch ij respectively.
[0052] Furthermore, demand-side resources are modeled, and when user cooperation is required for scheduling, users need to be compensated for participating in scheduling. Different user satisfaction thresholds are set so that when matching the optimal scheduling strategy according to different penetration rates, user satisfaction and the cost of transferring load can also be taken into account.
[0053] The transferable load cost model is ; Among them, C Tr is the transferable load cost, is the total optimization time length, is the amount of transferable load, represents the amount of electricity of the transferable load k transferred from time period t to time t', is the transfer load price from time t to time t'.
[0054] Furthermore, the energy storage resources are modeled. Energy storage equipment can alleviate power shortages and surpluses by charging during low load periods and discharging during peak periods, thereby reducing the peak-to-valley difference in system load. As a high-quality elastic resource in the power system, energy storage equipment can effectively smooth out the power fluctuations caused by the grid connection of new energy sources. Reasonable scheduling of energy storage facilities and encouraging and giving priority to the use of energy storage-assisted scheduling are effective ways to solve the peak load problem.
[0055] The charging and discharging cost model of the battery energy storage system is: ; Among them, C c The charging and discharging cost of the battery energy storage system, and Respectively represent the charging and discharging prices of the energy storage system at time t, , They represent the charge and discharge amount of the energy storage system at time t, is the current fuel cost.
[0056] In another embodiment provided by the present invention, the deep interactive relationship model is ; Among them, among them, To meet peak demand; is the coupling matrix; Indicates different scheduling strategies; is the elastic resource participation matrix, ~ Respectively represent the resource participation in dispatching of source, network, load and storage; , , , Indicates the participation of each resource, P T S is the capacity of each resource, , Respectively represent the upper and lower limits of the capacity of the Sth resource in the source, network, load, and storage resources; , are the output of the i-th machine in the period t~t-1, , are the maximum and minimum output of the i-th unit during period t, and are the maximum up-ramp power and the maximum down-ramp power of the i-th unit respectively; is the state variable of the i-th unit in period t, is the ratio of the load side participation to its maximum capacity, and are the load side peak load power and the maximum load side peak load power in the dispatching interval, respectively. is the user satisfaction threshold.
[0057] In the specific implementation of this embodiment, different photovoltaic penetration rates are matched with the system peak load regulation capacity: Solve the matching between different photovoltaic penetration rates and system peak load regulation capacity. Different from the traditional single resource dispatching method, the deep interactive dispatching method of source, grid, load and storage takes into account the deep synergy ability of complementary resources on all sides, and then matches the optimal strategy with different photovoltaic penetration rates to balance the peak and valley difference of the system.
[0058] See also Figure 3 , is a schematic diagram of the principle of the source-grid-load-storage deep interaction hub provided by the embodiment of the present invention. Modeling the elastic resource coupling mode affected by multiple factors, an energy system affected by multiple factors is abstracted into Figure 3 The two-port network shown.
[0059] Figure 3 middle ~ is the input of the hub, including peak-shaving demand, technical characteristics of elastic resources on each side, user satisfaction, etc.; S1~S4 are elastic resource types, and their different combinations represent different scheduling strategies. The deep interactive relationship model of the input-output relationship of the source-grid-load-storage deep interactive hub is: ; in, To meet peak demand; is the coupling matrix; The value of is 0 or 1. If the value is 1, it means that the resource participates in the scheduling, otherwise it does not participate. Different value combinations can represent different scheduling strategies. is the elastic resource participation matrix, ~ Respectively represent the resource participation in dispatching of source, network, load and storage; , , , Indicates the participation degree of each resource; the second, third and fourth items of the constraint conditions are resource capacity constraint and thermal power unit ramp constraint respectively; , are the upper and lower limits of each resource capacity respectively; , are the outputs of the i-th machine at time periods t and t-1 respectively; , are the maximum and minimum output of the i-th unit during period t respectively; , They are the load side peak load power and the load side maximum peak load power within the dispatching interval respectively; , They are the maximum up and down climbing power of the unit respectively; is the state variable; the fifth constraint is the network constraint of the system; It indicates user satisfaction, which is the ratio of the load side participation to its maximum capacity; is the user satisfaction threshold, which can be set by the user.
[0060] In another embodiment provided by the present invention, the objective function is: ; Among them, minf(C) is the minimum cost, is the dispatching cost of thermal power units, C Tr is the transferable load cost, is the energy storage dispatch cost.
[0061] In the specific implementation of this embodiment, the lowest cost is taken as the objective function: in, is the dispatching cost of thermal power units, C Tr is the transferable load cost, is the energy storage dispatch cost.
[0062] Solve the optimal matching model between permeability and system peak load regulation capacity: Taking the minimum total system dispatching cost as the objective function, the optimal dispatching strategy that satisfies the characteristics of source, grid, load and storage resources is obtained, and its dispatching cost function is as follows: ; ; ; in, is the dispatching cost of thermal power unit i in period t; It is the scheduling margin, which can be formulated according to the system; The total amount of peak load required by the system; , , They are thermal power peak-shaving output, transferable load peak-shaving output, and energy storage system peak-shaving output; is the penetration rate of photovoltaic power. Considering the full consumption of photovoltaic power output, no penalty for abandoned photovoltaic power is considered. is the total dispatching cost of the system. The first item on the right side of the equal sign is the dispatching cost of thermal power units, the second item is the transferable load cost, and the third item is the dispatching cost of the energy storage system. The grid control cost is relatively low and can be ignored for the time being.
[0063] The system power balance constraint is .
[0064] in, is the total load during the reference period; Provide power for non-peak-shaving units.
[0065] Elasticity constraints of peak-shaving units and system network elasticity constraints.
[0066] Output range of peak load units: .
[0067] in, , are the minimum and maximum output of peak-shaving unit i respectively.
[0068] The constraints on the start and stop time and the number of start and stop times of the unit include: .
[0069] .
[0070] .
[0071] .
[0072] .
[0073] Grid power flow elasticity constraints: , .
[0074] in, , They are the minimum continuous start-up time and shutdown time of the unit respectively; , Respectively represent the maximum start and stop times of the unit; is the imaginary part of the system line admittance matrix; , They are the node injected active power column vector and the node voltage phase angle column vector respectively; Indicates branch Active power flow in period t; Indicates branch Active power flow limit.
[0075] The elastic constraints for transferable loads include: , and .
[0076] in, represents the upper limit of a single transfer load k; represents the upper limit of the total transferred electricity of the transferred load k in the T period; Indicates the maximum transfer time.
[0077] The elastic constraints of the energy storage system include: .
[0078] .
[0079] .
[0080] .
[0081] in, is the state of charge of the energy storage device in period t; is the self-discharge rate of the energy storage device; , are the charging and discharging efficiency of the energy storage device, respectively; , 0-1 variables representing the charging and discharging status of the energy storage device; is the capacity of the energy storage device; , Respectively represent the upper and lower limits of the state of charge of the energy storage device; , Respectively represent the maximum and minimum values of the charging power of the energy storage device; , They respectively represent the maximum and minimum values of the discharge power of the energy storage device.
[0082] Furthermore, the equivalent constraints are as follows: .
[0083] in, Represents the unit state variable; , are constants greater than 0, ensuring The inequalities in rows 4 and 6 hold.
[0084] Based on the above constraints, the output and dispatching cost of each resource under different peak-shaving margins and different photovoltaic penetration rates are output.
[0085] Compared with the prior art, the technical solution provided by the present invention has the following beneficial effects: Compared with the existing single rapid peak-shaving power supply optimization scheduling mode, the present invention can fully utilize peak-shaving resources to reduce system peak-shaving pressure and improve system power supply reliability through deep interaction between source, grid, load and storage.
[0086] Compared with the existing scheduling strategy that does not consider the changes in photovoltaic penetration rate, the present invention sets the system peak-shaving margin under different photovoltaic penetration rates, and can derive the optimal peak-shaving strategy under the corresponding photovoltaic penetration rate according to the resource response characteristics on each side of the source, grid, load and storage, thereby achieving the matching of photovoltaic penetration rate and the peak-shaving capacity of the power system.
[0087] Compared with only dispatching thermal power units under different photovoltaic penetration rates, the deep interactive dispatch of source, grid, load and storage under different penetration rates and peak regulation margins of the present invention has lower cost and is more economical.
[0088] The present invention can make full use of the elastic operation characteristics of the source, grid, load and storage, and provide a flexible and accurate matching method for solving the peak load regulation of the power system under different photovoltaic penetration rates.
[0089] In the grid structure system provided in this embodiment, the system includes two 50MW photovoltaic arrays, a cascade hydropower station with a total installed capacity of 120MW, and two 10MW energy storage devices. The relevant parameters of the energy storage devices are shown in Table 1: Table 1 Energy storage equipment parameters There are two peak-shaving power plants in total. Ignoring the actual peak-shaving capacity of the units, refer to the existing regulations and set Rated capacity of the unit 30% for 45% for 60% of the total.
[0090] The parameters of the thermal power unit are shown in the table. The load forecast adopts the forecast value of a certain day in the local area in the same year. The photovoltaic forecast curve is the historical output data of the photovoltaic array on a typical day, which is fitted by FCM. Figure 4 , is a schematic diagram of the photovoltaic and load prediction curve provided in an embodiment of the present invention.
[0091] See also Figure 4 As shown in the figure, changing the installed capacity can correspond to different permeabilities. The coal price is selected as 577.55 yuan / t, and the oil price is selected as 6450.1 yuan / t.
[0092] Table 2 Thermal power unit parameters When analyzing the deep interaction between source, grid, load and storage, two peak-shaving margins of 85% and 95% are selected. Taking 85, the optimal match between different penetration rates and the peak-shaving capacity of the power system is explored under the deep interaction of resources on the source, grid, load and storage sides. The participation of each peak-shaving resource under five penetration rates of 20.25%, 36.12%, 41.71%, 68.46% and 85.64% and two peak-shaving margins is obtained, as shown in Table 3.
[0093] Table 3 Participation of various resources under different penetration rates The optimal strategy analysis for different penetration rates and system peak-shaving capabilities comprehensively considers the economic characteristics of the peak-shaving resources on the four sides of source, grid, load and storage, takes the minimum system peak-shaving cost as the objective function, and obtains the optimal matching strategy for different photovoltaic penetration rates and system peak-shaving capabilities from the peak-shaving strategy set obtained through deep interactive matching of resources on the four sides of source, grid, load and storage. The output of each resource under different penetration rates is obtained, as shown in Table 4.
[0094] Table 4 Output of each resource and total peak-shaving cost of the system under different penetration rates See also Figure 5 , is a curve diagram showing a cost comparison between traditional scheduling and deep interactive scheduling of source, grid, load and storage provided by an embodiment of the present invention; Figure 5 The system peak-shaving cost comparison of the traditional single-resource thermal power unit peak-shaving and the proposed source-grid-load-storage deep interactive peak-shaving strategy under different photovoltaic penetration rates and peak-shaving margins of 85% and 95%. Figure 5It can be seen that when the penetration rate is 20.25% and 36.12%, the peak-shaving costs of the two methods are basically the same. This is because at low penetration rates, the fluctuations of the system are mostly balanced by thermal power units, and the peak-shaving costs at this time are the coal consumption cost of the units and the start-up and shutdown costs of the units. When the penetration rate is greater than 41.71%, the types of resources involved in the system peak-shaving gradually increase, and are not limited to the traditional deep peak-shaving of thermal power units, which reduces oil consumption and loss costs. Therefore, the cost of the deep interactive peak-shaving method of source, grid, load and storage gradually becomes lower than that of the traditional peak-shaving method.
[0095] See also Figure 6 , is a curve diagram of the dispatching cost of each resource under different photovoltaic penetration rates and peak-shaving margin conditions provided by an embodiment of the present invention, Figure 6 After the deep interaction of resources on the source, grid, load and storage sides, the peak-shaving costs of various resources under different photovoltaic penetration rates and peak-shaving margin conditions. Figure 6 It can be seen that at different penetration rates, the peak-shaving cost of thermal power units at the source end is much greater than the cost of the other two peak-shaving resources. This is because the peak-shaving capacity of thermal power units is much greater than the peak-shaving capacity of energy storage and load-side resources. With the increase in photovoltaic penetration, the volatility of photovoltaic output becomes larger, and some thermal power units gradually enter the deep peak-shaving stage. Fuel consumption and losses also increase greatly, and the peak-shaving cost of thermal power units also increases accordingly. Therefore, it is necessary to take measures such as increasing peak-shaving compensation to stimulate the peak-shaving enthusiasm of thermal power units. At the same time, when When the peak load is less than or equal to 20.25%, the peak load cost is only equal to the conventional peak load cost of thermal power units. At this time, the photovoltaic penetration rate is low, and only the thermal power units need to be called for basic peak load regulation. When 20.25%< ≤41.71%, the net load fluctuation becomes larger. Since energy storage is more economical and will not affect load satisfaction, the peak load regulation task can be completed by calling on resources on both sides of the source and storage. When the permeability is less than 68.46%, the peak-to-valley difference fluctuates more under high permeability. To ensure economy, the resources on the three sides of source, load and storage all participate in the system peak regulation task; When it is ≥85.64%, it is easy to cause network congestion. Some methods can be used to change the line flow, and the resources on the four sides can work together to complete the peak-shaving task. It can be seen that the priority of each resource participating in the peak-shaving is determined by the goal of optimizing the system peak-shaving economy, which is consistent with the logic of the established optimization model.
[0096] See also Figure 7 , is a curve diagram of the unit loss of a conventional single thermal power unit in a peak load regulation mode provided by an embodiment of the present invention, Figure 7 For the traditional single thermal power unit peak load regulation method, see Figure 8 , is a curve diagram of unit loss under the source-grid-load-storage deep interactive scheduling method provided by an embodiment of the present invention, Figure 8It is a peak-shaving method with deep interaction between source, grid, load and storage. Figure 7 and Figure 8 By comparison, it can be found that the start-up and shutdown costs of the units under the two peak-shaving strategies have not changed much, while the fuel consumption and unit losses have changed significantly. This is because the start-up and shutdown costs of thermal power units are relatively high. When the penetration rate is high, thermal power units can enter the deep peak-shaving stage without oil injection and the deep peak-shaving stage with oil injection, reducing the number of start-ups and shutdowns of the units. At the same time, due to the increase in the capacity of peak-shaving resources, the economic efficiency of the deep interaction mode of source, grid, load and storage is better under different penetration rates.
[0097] The embodiment of the present invention also provides a source-grid-load-storage optimization scheduling device, see Fig. 9 , is a schematic diagram of the structure of a source-grid-load-storage optimization scheduling device provided by an embodiment of the present invention, the device comprising: An analysis module is used to analyze the acquired historical output data to obtain a photovoltaic multi-dimensional output characteristic model; A cost calculation module is used to determine a dispatch cost model based on the photovoltaic multi-dimensional output characteristic model and the source-grid-load-storage elastic resource characteristics of the power system by analyzing and modeling the characteristics; The model building module is used to build a deep interactive relationship model of the source-grid-load-storage deep interactive hub, and to build an objective function with the goal of minimizing the dispatching cost of power system dispatching resource utilization; A solution module is used to solve the dispatch cost model according to the deep interactive relationship model and the objective function, determine the optimal dispatch strategy that meets the characteristics of source, grid, load and storage resources, and adjust the photovoltaic penetration rate of the power system and the peak regulation margin of the power system.
[0098] It should be noted that the source-grid-load-storage optimization scheduling device provided in the embodiment of the present invention can execute the source-grid-load-storage optimization scheduling method described in any of the above embodiments, and the specific functions of the source-grid-load-storage optimization scheduling device are not described here.
[0099] See also Fig.10 , is a schematic diagram of the structure of a terminal device provided in an embodiment of the present invention. The terminal device of this embodiment includes: a processor, a memory, and a computer program stored in the memory and executable on the processor, such as a source-grid-load-storage optimization scheduling program. When the processor executes the computer program, the steps in the above-mentioned source-grid-load-storage optimization scheduling method embodiments are implemented, such as Figure 1 Steps S1 to S4 are shown. Or the processor implements the functions of each module in the above-mentioned device embodiments when executing the computer program.
[0100] Exemplarily, the computer program may be divided into one or more modules / units, and the one or more modules / units are stored in the memory and executed by the processor to complete the present invention. The one or more modules / units may be a series of computer program instruction segments that can complete functions, and the instruction segments are used to describe the execution process of the computer program in the terminal device. For example, the computer program may be divided into various modules, and the specific functions of each module are not described again.
[0101] The terminal device may be a computing device such as a desktop computer, a notebook, a PDA, and a cloud server. The terminal device may include, but is not limited to, a processor and a memory. Those skilled in the art will appreciate that the schematic diagram is merely an example of a terminal device and does not constitute a limitation on the terminal device. The terminal device may include more or fewer components than shown in the diagram, or may combine certain components, or different components. For example, the terminal device may also include an input / output device, a network access device, a bus, etc.
[0102] The processor may be a central processing unit (CPU), other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. The general-purpose processor may be a microprocessor or any conventional processor, etc. The processor is the control center of the terminal device, and uses various interfaces and lines to connect various parts of the entire terminal device.
[0103] The memory can be used to store the computer program and / or module, and the processor realizes various functions of the terminal device by running or executing the computer program and / or module stored in the memory, and calling the data stored in the memory. The memory can mainly include a program storage area and a data storage area, wherein the program storage area can store an operating system, an application required for at least one function (such as a sound playback function, an image playback function, etc.), etc.; the data storage area can store data created according to the use of the mobile phone (such as audio data, a phone book, etc.), etc. In addition, the memory can include a high-speed random access memory, and can also include a non-volatile memory, such as a hard disk, a memory, a plug-in hard disk, a smart memory card (Smart Media Card, SMC), a secure digital (Secure Digital, SD) card, a flash card (Flash Card), at least one disk storage device, a flash memory device, or other volatile solid-state storage devices.
[0104] Wherein, if the module / unit integrated in the terminal device is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on such an understanding, the present invention implements all or part of the processes in the above-mentioned embodiment method, and can also be completed by instructing the relevant hardware through a computer program. The computer program can be stored in a computer-readable storage medium, and the computer program can implement the steps of the above-mentioned various method embodiments when executed by the processor. Wherein, the computer program includes computer program code, and the computer program code can be in code form, object code form, executable file or some intermediate form. The computer-readable medium may include: any entity or device capable of carrying the computer program code, recording medium, U disk, mobile hard disk, disk, optical disk, computer memory, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), electric carrier signal, telecommunication signal and software distribution medium, etc.
[0105] An embodiment of the present invention further provides a computer program product, including a computer program / instruction, which, when executed by a processor, implements the source-grid-load-storage optimization scheduling method as described in any one of the above embodiments.
[0106] The above is a preferred embodiment of the present invention. It should be pointed out that a person skilled in the art can make several improvements and modifications without departing from the principle of the present invention. These improvements and modifications are also considered to be within the scope of protection of the present invention.
Claims
1. A source-grid-load-storage optimization scheduling method, characterized in that: The method comprises: Analyze the acquired historical output data to obtain a photovoltaic multi-dimensional output characteristic model; According to the photovoltaic multi-dimensional output characteristic model, combined with the analysis and modeling of the source-grid-load-storage elastic resource characteristics of the power system, a dispatch cost model is determined; Construct a deep interactive relationship model of the source-grid-load-storage deep interactive hub, and construct an objective function with the goal of minimizing the cost of power system resource dispatch; The dispatch cost model is solved according to the deep interactive relationship model and the objective function, and the optimal dispatch strategy that meets the characteristics of source, grid, load and storage resources is determined by combining the photovoltaic penetration rate of the power system and the peak regulation margin of the power system.
2. The source-grid-load-storage optimization scheduling method according to claim 1, characterized in that: Solving the dispatch cost model according to the deep interactive relationship model and the objective function, combining the photovoltaic penetration rate of the power system and the peak regulation margin of the power system, and determining the optimal dispatch strategy that meets the characteristics of source, grid, load and storage resources, includes: Set the illumination sequence, permeability sequence, and peak-shaving scheduling margin set; When the power system meets the preset dispatching conditions, it is determined that dispatching is required, and the constraint formula is converted into a linear constraint condition using the power distribution factor; the peak-shaving characteristics of the resources on each side of the source, grid, load and storage are comprehensively considered, and a set of peak-shaving strategies is obtained according to the deep interactive relationship model; with the minimization of the objective function as the goal, the optimal dispatching strategy under the corresponding photovoltaic penetration rate is optimized.
3. The source-grid-load-storage optimization scheduling method according to claim 1, characterized in that: The photovoltaic multi-dimensional output characteristic model is: ; in, is the Gamma function, is the independent variable, is the Beta distribution function, and is the shape factor of the photovoltaic array, is the maximum value of photovoltaic output, For photovoltaic power output, , is the light intensity, is the maximum power tracking point, is the photovoltaic radiation area, is the conversion factor, is the photovoltaic irradiation angle, , and are the mean and standard deviation of solar radiation during the statistical period.
4. The source-grid-load-storage optimization scheduling method according to claim 1, characterized in that: The dispatching cost model includes a deep peak-shaving dispatching cost model for thermal power units, a unit dispatching cost model, a battery energy storage system charging and discharging cost model, and a transferable load cost model; The deep peak load scheduling cost model of thermal power units is: ; The scheduling cost model of a single unit is: ; The transferable load cost model is: ; The charging and discharging cost model of the battery energy storage system is: ; Among them, C T (P T ) is the deep peak load dispatching cost of thermal power units, To provide power for thermal power units, is the unit consumption characteristic function, and are the unit loss cost and the unit fuel consumption cost respectively. is the maximum output of the unit, It is the minimum technical output in the basic dispatching stage of the unit. It is the minimum stable combustion output in the deep dispatching stage without oil injection. C is the stable combustion limit output during the oil injection depth scheduling stage; Ti (P T ) is the dispatching cost of the i-th unit, C coal (P T ) is the coal cost, and are two Boolean variables, C Tr is the transferable load cost, is the total optimization time length, is the amount of transferable load, represents the amount of electricity of the transferable load k transferred from time period t to time t', is the transfer load price from time t to time t', C c The charging and discharging cost of the battery energy storage system, and Respectively represent the charging and discharging prices of the energy storage system at time t, , They represent the charge and discharge amount of the energy storage system at time t, is the current fuel cost.
5. The source-grid-load-storage optimization scheduling method according to claim 1, characterized in that: The deep interactive relationship model is ; in, To meet peak demand; is the coupling matrix; Indicates different scheduling strategies; is the elastic resource participation matrix, ~ Respectively represent the resource participation in dispatching of source, network, load and storage; , , , Indicates the participation of each resource, P T S is the capacity of each resource, , Respectively represent the upper and lower limits of the capacity of the Sth resource in the source, network, load, and storage resources; , are the output of the i-th machine in the period t~t-1, , are the maximum and minimum output of the i-th unit during period t, and are the maximum up-ramp power and the maximum down-ramp power of the i-th unit respectively; is the state variable of the i-th unit in period t, is the ratio of the load side participation to its maximum capacity, and are the load side peak load power and the maximum load side peak load power in the dispatching interval, respectively. is the user satisfaction threshold.
6. The source-grid-load-storage optimization scheduling method according to claim 1, characterized in that: The objective function is: ; Among them, minf(C) is the minimum cost, is the dispatching cost of thermal power units, C Tr is the transferable load cost, is the energy storage dispatch cost.
7. A source-grid-load-storage optimization scheduling device, characterized in that: The device comprises: An analysis module is used to analyze the acquired historical output data to obtain a photovoltaic multi-dimensional output characteristic model; A cost calculation module is used to determine a dispatch cost model based on the photovoltaic multi-dimensional output characteristic model and the source-grid-load-storage elastic resource characteristics of the power system by analyzing and modeling the characteristics; The model building module is used to build a deep interactive relationship model of the source-grid-load-storage deep interactive hub, and to build an objective function with the goal of minimizing the cost of power system resource dispatch; A solution module is used to solve the dispatch cost model according to the deep interactive relationship model and the objective function, and determine the optimal dispatch strategy that meets the characteristics of source, grid, load and storage resources in combination with the photovoltaic penetration rate of the power system and the peak regulation margin of the power system.
8. The source-grid-load-storage optimization scheduling device according to claim 7, characterized in that: The solution module is specifically used for: Set the illumination sequence, permeability sequence and peak-shaving scheduling margin set; When the power system meets the preset dispatching conditions, it is determined that dispatching is required, and the constraint formula is converted into a linear constraint condition using the power distribution factor; the peak-shaving characteristics of the resources on each side of the source, grid, load and storage are comprehensively considered, and a set of peak-shaving strategies is obtained according to the deep interactive relationship model; with the minimization of the objective function as the goal, the optimal dispatching strategy under the corresponding photovoltaic penetration rate is optimized.
9. The source-grid-load-storage optimization scheduling device according to claim 7, characterized in that: The photovoltaic multi-dimensional output characteristic model is: ; in, is the Gamma function, is the independent variable, is the Beta distribution function, and is the shape factor of the photovoltaic array, is the maximum value of photovoltaic output, For photovoltaic power output, , is the light intensity, is the maximum power tracking point, is the photovoltaic radiation area, is the conversion factor, is the photovoltaic irradiation angle, , and are the mean and standard deviation of solar radiation during the statistical period.
10. A terminal device, characterized in that: The method comprises a processor, a memory, and a computer program stored in the memory and configured to be executed by the processor, wherein when the processor executes the computer program, the source-grid-load-storage optimization scheduling method as described in any one of claims 1 to 6 is implemented.
11. A computer-readable storage medium, characterized in that: The computer-readable storage medium includes a stored computer program, wherein when the computer program is executed, the device where the computer-readable storage medium is located is controlled to execute the source-grid-load-storage optimization scheduling method according to any one of claims 1 to 6.
12. A computer program product comprising a computer program / instructions, characterized in that When the computer program / instructions are executed by a processor, the steps of any method described in claims 1 to 6 are implemented.
Citation Information
Patent Citations
Power system source network load storage planning method considering multi-element flexible resource collaboration
CN117526335A