Operating method of cross-flow stripping tower

By real-time monitoring and controlling parameters such as water quality, temperature, and pressure difference, the operation method of the throughflow stripping tower is optimized, which solves the problems of poor production stability and steam consumption, improves processing efficiency and product quality, and extends the service life of the equipment.

CN119015731APending Publication Date: 2024-11-26内蒙古三联化工股份有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411399742.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-08
Publication Date
2024-11-26

AI Technical Summary

Technical Problem

During use, the throughflow stripping tower has problems such as poor production stability, poor tray flushing effect and high steam consumption.

Method used

By monitoring and controlling water quality, temperature, pressure difference and liquid level parameters in real time, an intelligent temperature control system, steam flow control algorithm and automatic return control system are adopted to optimize the stripping process, ensure the flushing effect and production stability, and reduce human intervention. Extend the service life of the equipment.

Benefits of technology

It improves processing efficiency and product quality, reduces the risk of operating errors, ensures stable operation of stripping towers, extends equipment service life and reduces maintenance costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119015731A_ABST
    Figure CN119015731A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of polyvinyl chloride production, and discloses a cross-flow stripping tower operation method, which comprises: S1, washing and cleaning: washing a slurry pipeline, recording the washing time, and detecting the water quality of the washing water; s2, establishing false material balance and temperature rise: opening a steam flow control valve entering a tower, starting an intelligent temperature control system, opening a tower top spray water valve, and starting a low-pressure recovery system; s3, feeding and adjusting: closing a flushing water vapor valve, opening a feeding valve, and starting a steam flow control algorithm at the same time; s4, stable operation control; s5, stopping and flushing; the production efficiency and the operation safety are improved by optimizing operation conditions, improving the quality of a PVC steam stripping product, reducing the impurity content, improving an automatic liquid level control system of the steam stripping tower and increasing automatic valve control, and the flushing effect is optimized by optimizing the flushing control of the tower tray of the steam stripping tower.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of polyvinyl chloride production, in particular to an operating method of a cross-flow stripping tower. Background Art

[0002] Polyvinyl chloride is a polymer formed by the polymerization of vinyl chloride monomer in peroxide and initiator according to the free radical polymerization mechanism. Vinyl chloride homopolymer and vinyl chloride copolymer are collectively referred to as vinyl chloride resin. The mechanism of polyvinyl chloride slurry stripping is to provide polyvinyl chloride slurry with energy to overcome the adsorption force of VCM through some means, so that VCM is continuously desorbed from polyvinyl chloride resin into the liquid phase, and VCM in the liquid phase is continuously precipitated into the gas phase under good diffusion conditions, and this process is repeated over and over again, thereby achieving the purpose of stripping and removing VCM.

[0003] At present, the residual VCM content in the loose PVC products produced domestically is ≤5mg / kg, and the sanitary grade is ≤2mg / kg. The domestic PVC production enterprises usually adopt two stripping methods: kettle stripping and tower stripping. The cross-flow stripping tower and baffle stripping tower in the tower stripping are used to remove VCM from PVC produced by suspension process. However, some cross-flow stripping towers have poor production stability, poor tray flushing effect and high steam consumption during use. Summary of the invention

[0004] The object of the present invention is to provide an operating method of a cross-flow stripping tower to solve the problems raised in the above background technology.

[0005] To achieve the above object, the present invention provides the following technical solution: a method for operating a cross-flow stripping tower, comprising the following steps:

[0006] S1. Flushing and cleaning: flush the slurry pipeline, record the flushing time, and test the flushing water quality;

[0007] S2. Establish pseudo material balance and temperature increase: open the steam flow control valve into the tower, start the intelligent temperature control system at the same time, open the tower top spray water valve, and start the low-pressure recovery system;

[0008] S3, feeding and adjustment: close the flushing water vapor valve, open the feeding valve, and start the steam flow control algorithm at the same time;

[0009] S4, stable operation control: real-time monitoring and control of the temperature at the bottom, middle and top of the tower, control of the pressure difference in the tower, control of the liquid level at the bottom of the tower, and control of the top pressure, steam flow and feed rate;

[0010] S5. Stop and flush: Open the flushing valve, gradually adjust the steam flow, and cut out the unqualified materials for separate treatment.

[0011] Preferably, in S1, the turbidity and pH value of the flushing water need to be monitored in real time by a water quality monitor, and the water outlet at the bottom of the stripping tower needs to be observed and compared with the water quality monitoring data.

[0012] Preferably, in S1, when the water quality of the flushing water reaches the preset standard and the inlet slurry flow shows that the flushing water flow is stable, the flushing is judged to be completed and the flushing water valve can be closed. In S2, after closing the flushing water valve, the water inlet valve at the top of the stripping tower needs to be opened.

[0013] Preferably, in S2, the initial setting flow rate of the steam inlet to the tower is 1500kg / h, and is gradually increased to 1500-3000kg / h, and the steam flow rate is monitored by the steam inlet flow display point. In S2, the intelligent temperature control system is started, and the target temperature is set to 90°C, which is monitored by the temperature display points at the bottom and top of the tower.

[0014] Preferably, in S2, when the tower top spray water valve is opened, the spray water flow rate is set to 5000-7000 kg / h. In S3, the feed valve needs to be opened slowly, and the opening of the feed valve is accurately controlled by the automatic control system. The initial feed amount is set to 45-60 m 3 / h, monitor the feed rate through the inlet slurry flow display point.

[0015] Preferably, in S3, when the steam flow control is started, the steam flow is adjusted to 3000-4000 kg / h in real time according to the feed amount, and the steam flow is monitored by the inlet steam flow display point. At the same time, according to the feed target value, the feed is adjusted at intervals of 5-10 minutes / time through the automatic control system preset parameters.

[0016] Preferably, in S3, the slurry in the tower stays for 8-10 minutes, and the material is automatically sent to the centrifugal drying system for processing by the tower outlet pump. In S4, the feed rate is stabilized at 100-110m 3 / h, the steam flow rate is further increased to 13000-15000kg / h using intelligent steam flow control algorithm.

[0017] Preferably, in S4, it is necessary to install temperature sensors at different heights in the tower to monitor and control the temperatures at the bottom, middle and top of the tower in real time, and monitor the temperature through the temperature display points at the bottom and top of the tower. In S4, it is necessary to monitor the pressure difference in the tower in real time through a pressure difference sensor.

[0018] Preferably, when performing the pressure difference detection in the tower, it is necessary to maintain the pressure difference in the tower at 14-17 kPa, and monitor the pressure difference through the tower pressure difference display point. In S4, a pressure sensor is installed at the top of the tower, and the top pressure of the tower is controlled to be stable at 3550 kPa. In S4, it is necessary to monitor the change of gas phase composition in real time through an online gas phase analyzer, and adjust the reflux ratio through an automatic reflux control system to maintain the liquid level at the bottom of the tower at 50%-60%, and monitor the liquid level through the liquid level display point at the bottom of the tower.

[0019] Preferably, in S5, after stopping the feeding, the stripping tower feed pipeline is flushed by opening the flushing valve, and the steam flow rate is adjusted to 3000-4000 kg / h. In S5, during the flushing process, the turbidity and pH value of the flushing water need to be monitored, and the inlet slurry flow display point is observed to confirm the flushing water flow.

[0020] Compared with the prior art, the present invention has the following beneficial effects:

[0021] The present invention accurately identifies and solves the problems and bottlenecks that may exist in the operation process of the stripping tower through real-time monitoring methods such as water quality monitoring, temperature control and pressure difference detection, ensures the flushing effect by real-time monitoring of the flushing water quality and flushing time, thereby avoiding the influence of impurity residue on subsequent production, further optimizes the stripping process by adjusting key parameters such as steam flow, temperature and liquid level, improves the processing efficiency and product quality, and realizes precise control of the operating state of the stripping tower through intelligent temperature control system, steam flow control algorithm, automatic reflux control system and other control means, which can reduce human intervention and reduce the risk of operating errors, and also enables the stripping tower to operate continuously and stably under optimal conditions, thereby improving production efficiency and product quality, and ensures the thoroughness and effectiveness of flushing by setting the flushing water quality to reach the preset standard, displaying the inlet slurry flow and stabilizing the flushing water flow, and by setting advanced equipment such as online gas phase analyzer, monitors the change of gas phase composition in real time, and automatically adjusts parameters such as reflux ratio to maintain the stability of the bottom liquid level, thereby improving the flushing effect, extending the service life of the stripping tower and reducing maintenance costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 A method flow chart of a preferred embodiment of the method for operating a cross-flow stripping tower provided by the present invention. DETAILED DESCRIPTION

[0023] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0024] See also Figure 1 As shown, a method for operating a cross-flow stripping tower comprises the following steps:

[0025] S1. Flushing and cleaning: flush the slurry pipeline, record the flushing time, and test the flushing water quality;

[0026] S2. Establish pseudo material balance and temperature increase: open the steam flow control valve into the tower, start the intelligent temperature control system at the same time, open the tower top spray water valve, and start the low-pressure recovery system;

[0027] S3, feeding and adjustment: close the flushing water vapor valve, open the feeding valve, and start the steam flow control algorithm at the same time;

[0028] S4, stable operation control: real-time monitoring and control of the temperature at the bottom, middle and top of the tower, control of the pressure difference in the tower, control of the liquid level at the bottom of the tower, and control of the top pressure, steam flow and feed rate;

[0029] S5. Stop and flush: Open the flushing valve, gradually adjust the steam flow, and cut the unqualified materials into bins and handle them separately.

[0030] refer to Figure 1 As shown, in S1, the turbidity and pH value of the flushing water need to be monitored in real time through a water quality monitor, and the water outflow from the bottom drain of the stripping tower needs to be observed and compared with the water quality monitoring data. At the same time, the installation position and opening angle of the spray valve need to be accurately calculated to ensure that each sieve hole and corner of the sieve plate are flushed clean, and there are no dead corners that cannot be sprayed. In addition, spray holes are also provided on the tower wall, feed pipe, sight glass and other parts to prevent material from hanging on these parts. The spray device provides an effective guarantee for the long-term stable operation of the stripping tower and the quality of the resin. The turbidity and pH value of the flushing water are monitored in real time through a water quality monitor to ensure that the quality of the flushing water meets the standards, thereby effectively removing residues and impurities in the tower. At the same time, the water outflow from the bottom drain is observed and compared with the water quality monitoring data to further verify the flushing effect.

[0031] In S1, when the flushing water quality reaches the preset standard and the inlet slurry flow shows that the flushing water flow is stable, the flushing is judged to be completed and the flushing water valve can be closed. In S2, after closing the flushing water valve, the top water inlet valve of the stripping tower needs to be opened. Gradually increasing the inlet steam flow helps to gently establish the temperature gradient in the tower and reduce the impact of thermal stress on the tower body. At the same time, the start-up of the intelligent temperature control system and the setting of the target temperature enable the temperature in the tower to be accurately controlled within the optimal range, improving the stability and efficiency of the process. The use of top spray water helps to adjust the humidity and temperature distribution in the tower, further optimizing the stripping effect.

[0032] In the S2, the initial setting flow rate of the steam entering the tower is 1500kg / h, and is gradually increased to 1500-3000kg / h. The steam flow rate is monitored by the steam entering the tower flow display point. In the S2, the intelligent temperature control system is started, and the target temperature is set to 90°C, which is monitored by the temperature display points at the bottom and top of the tower.

[0033] In S2, when the tower top spray water valve is opened, the spray water flow rate is set to 5000-7000 kg / h. In S3, the feed valve needs to be opened slowly, and the opening of the feed valve is accurately controlled by the automatic control system. The initial feed amount is set to 45-60 m 3 / h, monitor the feed rate through the slurry flow display point. Slowly open the feed valve and accurately control the feed rate through the automatic control system, effectively avoiding the impact and fluctuation that may occur during the feeding process, ensuring the stability of the process, and adjusting the steam flow in real time according to the feed rate to ensure the balance of heat transfer and material stripping in the tower, further improving the processing efficiency.

[0034] In S3, when the steam flow control is started, the steam flow is adjusted to 3000-4000 kg / h in real time according to the feed amount, and the steam flow is monitored through the inlet steam flow display point. At the same time, according to the feed target value, the feed is adjusted at intervals of 5-10 minutes / time through the automatic control system preset parameters.

[0035] In S3, the slurry in the tower stays for 8-10 minutes, and the material is automatically sent to the centrifugal drying system for processing by the tower discharge pump. In S4, the feed rate is stabilized at 100-110m 3 / h, the steam flow rate is further increased to 13000-15000kg / h using intelligent steam flow control algorithm.

[0036] In the S4, it is necessary to install temperature sensors at different heights in the tower to monitor and control the temperature of the bottom, middle and top of the tower in real time, and monitor the temperature through the temperature display points at the bottom and top of the tower. In the S4, it is necessary to monitor the pressure difference in the tower in real time through a differential pressure sensor. Installing temperature sensors at different heights in the tower to monitor and control the temperature in the tower in real time ensures accurate control of process conditions. At the same time, the use of differential pressure sensors allows the pressure difference in the tower to be maintained within the optimal range, preventing damage to the tower or leakage caused by excessive pressure difference.

[0037] When the pressure difference in the tower is detected, the pressure difference in the tower needs to be maintained at 14-17kPa, and the pressure difference is monitored by the tower pressure difference display point. In S4, by installing a pressure sensor at the top of the tower and controlling the top pressure to be stable at 3550kPa, in S4, it is necessary to monitor the change of gas phase composition in real time through an online gas phase analyzer, and adjust the reflux ratio through an automatic reflux control system to maintain the bottom liquid level at 50%-60%, and monitor the liquid level through the bottom liquid level display point. The application of the online gas phase analyzer and the automatic reflux control system can monitor the gas phase composition in real time and automatically adjust the reflux ratio, ensure the stability of the bottom liquid level, and further improve the product quality and process stability.

[0038] In the S5, after stopping the feeding, the stripping tower feed pipeline is flushed by opening the flushing valve, and the steam flow rate is adjusted to 3000-4000 kg / h. In the S5, during the flushing process, the turbidity and pH value of the flushing water need to be monitored, and the flow display point of the slurry flow entering the tower is observed to confirm the flushing water flow rate. Flushing after stopping the feeding helps to completely remove the residual materials in the tower and prevent scaling and corrosion. Adjusting the steam flow rate to an appropriate range helps to accelerate the flushing process and improve the flushing effect. Monitoring the turbidity and pH value of the flushing water and confirming the flushing water flow rate ensure the thoroughness and effectiveness of the flushing process, and make full preparations for the next startup.

[0039] Working principle: Before starting the feeding of the through-flow stripping tower, it is first flushed with a large amount of water on the slurry pipeline for 20-30 minutes. The turbidity and pH value of the flushing water are monitored in real time using a water quality monitor to ensure that the flushing water quality meets the preset standards. At the same time, the flushing time is recorded and the display point of the slurry flow into the tower is monitored to confirm that the flushing water flow is stable and can remove residues and impurities in the tower. At the same time, the water outlet at the bottom of the stripping tower is observed and compared with the water quality monitoring data. If any abnormality is found, the flushing strategy needs to be adjusted in time. After the flushing operation is completed, the flushing water on the slurry pipeline replaces the flushing water of the PVC slurry entering the stripping tower from the top of the stripping tower. The initial steam flow rate into the tower is set to 1500kg / h, and gradually increased to 1500-3000k g / h, monitor the steam flow rate through the inlet steam flow display point to ensure that the steam supply is stable and meets the process requirements, start the intelligent temperature control system, set the target temperature to 90℃, monitor the temperature in real time through the temperature display points at the bottom and top of the tower, and adjust it as needed. The intelligent temperature control system can quickly respond to temperature fluctuations to ensure that the temperature in the tower is uniform and stable. Open the tower top spray water valve and set the spray water flow rate to 5000-7000kg / h. Spray water helps to adjust the humidity and temperature distribution in the tower and further optimize the stripping effect. When feeding the stripping tower, close the tower flushing water vapor. After closing the flushing water vapor valve, slowly open the feed valve. The opening of the feed valve and the feed amount are accurately controlled by the automatic control system. The initial feed amount is set to 45-60m 3 / h. During the feeding process, the flow display point of the slurry entering the tower needs to be continuously monitored to ensure that the feed amount is stable and meets the process requirements. According to the feed target value, the feed adjustment amount of the stripping tower is controlled to be 10-15m / time, the interval control is 5-10min / time, and the steam control is 1000-2000kg / time. After the slurry stays in the tower for 8-10 minutes, it is pumped to the centrifugal drying system for treatment by the outlet pump. About 5 minutes after feeding, the vent line is closed, the low-pressure recovery system is started, and the steam flow control algorithm is started. According to the feed amount, the steam flow rate is adjusted to 3000-4000kg / h in real time. The steam flow rate adjustment needs to match the feed amount to maintain the balance of heat transfer and material stripping in the tower. The parameters are preset through the automatic control system at intervals of 5-10 minutes / time for feeding adjustment. This helps to adapt to changes in feed volume and maintain process stability. Temperature sensors are installed at different heights in the tower to monitor and control the temperatures at the bottom, middle and top of the tower in real time. The temperature is monitored through the temperature display points at the bottom and top of the tower and adjusted as needed to ensure stable process temperature. The bottom temperature of the stripping tower is controlled at 110-116°C, the middle temperature is controlled at 112-114°C, and the top temperature is controlled at 108-110°C. The pressure difference in the tower is monitored in real time by a pressure difference sensor and maintained within the range of 14-17kPa. The stability of the pressure difference in the tower helps to maintain the normal flow and mass transfer and heat transfer process of the gas-liquid two phases in the tower. A pressure sensor is installed on the top of the tower and the top pressure is controlled to be stable at 3550kPa. At the same time, the steam flow rate is adjusted to 13000-15000kg / h according to process requirements to maintain the stripping efficiency in the tower. The gas phase composition changes are monitored in real time by an online gas phase analyzer and the reflux ratio is adjusted through the automatic reflux control system to maintain the bottom liquid level in the range of 50%-60%. The stripping tower shutdown control mainly stops feeding and opens the steam The flushing water on the stripper feed line is used to flush the stripper feed line. At the same time, the steam flow rate is adjusted to 3000-4000kg / h to accelerate the flushing process. During the flushing process, the turbidity and pH value of the flushing water and the flushing water flow rate must be continuously monitored to ensure that the flushing effect meets the standard. At the same time, the installation position and opening angle of the spray valve must be accurately calculated to ensure that each sieve hole on the tower plate and the corner of the sieve plate are flushed cleanly without any dead corners that cannot be sprayed. In addition, spray holes are also provided on the tower wall, the feed pipe, the sight glass and other parts to prevent Prevent material from hanging in these parts. During the normal operation of the cross-flow stripping tower, the flow of slurry in and out of the tower is unstable. If it is a flow control valve failure, it can be quickly repaired. If there is no problem, it can be manually adjusted until the flow in and out of the tower is stable and then put into automatic operation. The original design of the inlet and outlet pump is a single device. Once a failure occurs, it will affect the continuity of the entire production line and even cause shutdown. After research, a spare pump was added and the daily maintenance of the equipment was strengthened. If the inlet and outlet pump fails, the spare pump can be switched to effectively ensure the continuity of production;Unstable inlet steam pressure or flow will cause the stripping efficiency to decrease. If it is not a fault of the inlet steam pressure regulating valve, the drainage of the steam chamber can be strengthened to ensure the smooth flow of inlet steam. Then, according to the change of steam pressure, the steam volume can be manually adjusted to control the tower temperature. After the inlet steam pressure and flow are stable, it can be put into automatic operation. If the vacuum degree at the top of the tower fluctuates greatly, the vacuum system should be checked. When the stripping tower is "supported", the amount of material discharged is reduced, and the liquid level at the bottom of the tower drops rapidly, which may easily cause no material at the bottom of the tower and steam to enter the outlet pipeline, resulting in air binding of the outlet pump and malfunction of the normal operation. When the stripping tower has "material dropping", the liquid level at the bottom of the tower will rise rapidly or even flood the tower, and slurry is likely to occur at this time. Sedimentation blocks the outlet pipeline, making the outlet pump unable to work normally. Whether the outlet pump fails or gas binding occurs, the liquid level at the bottom of the tower will rise rapidly, and the slurry in the tower will precipitate, resulting in blockage of the outlet pipeline or the outlet plate heat exchanger. In addition to quickly solving the related "supporting material" and "dropping material" problems and replacing the spare pump, it is necessary to flush the outlet pipeline and plate heat exchanger with high-pressure water, and add water to the tower to dilute the sediment slurry. It must be handled quickly and in time, otherwise the sediment slurry will easily produce black and yellow spots at high temperature, affecting product quality; if it cannot be handled in time, the outlet pipeline valve can be switched to the sewage side, and the slurry in the tower can be discharged into the polymerization wastewater pool until normal feeding can be achieved. ;

[0040] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.

[0041] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A method for operating a cross-flow stripping tower, It is characterized in that The following steps are involved: S1. Flushing and cleaning: flush the slurry pipeline, record the flushing time, and test the flushing water quality; S2. Establish pseudo material balance and temperature increase: open the steam flow control valve into the tower, start the intelligent temperature control system at the same time, open the tower top spray water valve, and start the low-pressure recovery system; S3, feeding and adjustment: close the flushing water vapor valve, open the feeding valve, and start the steam flow control algorithm at the same time; S4, stable operation control: real-time monitoring and control of the temperature at the bottom, middle and top of the tower, control of the pressure difference in the tower, control of the liquid level at the bottom of the tower, and control of the top pressure, steam flow and feed rate; S5. Stop and flush: Open the flushing valve, gradually adjust the steam flow, and cut out the unqualified materials for separate treatment.

2. The method for operating a cross-flow stripping tower according to claim 1, Features: In S1, the turbidity and pH value of the flushing water need to be monitored in real time by a water quality monitor. At the same time, the water outflow from the bottom drain of the stripping tower needs to be observed and compared with the water quality monitoring data.

3. The method for operating a cross-flow stripping tower according to claim 1, Features: In S1, when the quality of the flushing water reaches the preset standard and the inlet slurry flow shows that the flushing water flow is stable, the flushing is judged to be completed and the flushing water valve can be closed. In S2, after closing the flushing water valve, the water inlet valve at the top of the stripping tower needs to be opened.

4. The method for operating a cross-flow stripping tower according to claim 1, Features: In the S2, the initial setting flow rate of the steam entering the tower is 1500kg / h, and is gradually increased to 1500-3000kg / h. The steam flow rate is monitored by the steam entering the tower flow display point. In the S2, the intelligent temperature control system is started, and the target temperature is set to 90°C, which is monitored by the temperature display points at the bottom and top of the tower.

5. The method for operating a cross-flow stripping tower according to claim 1, Features: In S2, when the tower top spray water valve is opened, the spray water flow rate is set to 5000-7000 kg / h. In S3, the feed valve needs to be opened slowly, and the opening of the feed valve is accurately controlled by the automatic control system. The initial feed amount is set to 45-60 m 3 / h, monitor the feed rate through the inlet slurry flow display point.

6. The method for operating a cross-flow stripping tower according to claim 1, Features: In S3, when the steam flow control is started, the steam flow is adjusted to 3000-4000 kg / h in real time according to the feed amount, and the steam flow is monitored through the inlet steam flow display point. At the same time, according to the feed target value, the feed is adjusted at intervals of 5-10 minutes / time through the automatic control system preset parameters.

7. The method for operating a cross-flow stripping tower according to claim 1, Features: In S3, the slurry in the tower stays for 8-10 minutes, and the material is automatically sent to the centrifugal drying system for processing by the tower discharge pump. In S4, the feed rate is stabilized at 100-110m 3 / h, the steam flow rate is further increased to 13000-15000kg / h using intelligent steam flow control algorithm.

8. The method for operating a cross-flow stripping tower according to claim 1, Features: In S4, it is necessary to install temperature sensors at different heights in the tower to monitor and control the temperatures at the bottom, middle and top of the tower in real time, and monitor the temperature through the temperature display points at the bottom and top of the tower. In S4, it is necessary to monitor the pressure difference in the tower in real time through a pressure difference sensor.

9. The method for operating a cross-flow stripping tower according to claim 8, Features: When performing the pressure difference detection in the tower, it is necessary to maintain the pressure difference in the tower at 14-17kPa, and monitor the pressure difference through the tower pressure difference display point. In S4, a pressure sensor is installed at the top of the tower, and the top pressure of the tower is controlled to be stable at 3550kPa. In S4, it is necessary to monitor the change of gas phase composition in real time through an online gas phase analyzer, and adjust the reflux ratio through an automatic reflux control system to maintain the liquid level at the bottom of the tower at 50%-60%, and monitor the liquid level through the liquid level display point at the bottom of the tower.

10. The method for operating a cross-flow stripping tower according to claim 1, Features: In the S5, after the feeding is stopped, the stripping tower feed pipeline is flushed by opening the flushing valve, and the steam flow rate is adjusted to 3000-4000 kg / h. In the S5, during the flushing process, the turbidity and pH value of the flushing water need to be monitored, and the inlet slurry flow display point is observed to confirm the flushing water flow.