Manufacturing method of super weathering resistant steel thin-wall large-arc square tube
By adopting the bottom line from high to bottom down molding method, high-frequency welding of inert gas protection, finishing adjustment of four rollers and two rollers, involute arc angle release and box-type fixing, ultra-weathering steel thin wall large circle is solved The problems of arc square tube molding accuracy and welding quality have achieved high-precision and high-quality finished product production.
Patent Information
- Application Number
- CN202411349523.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-26
- Publication Date
- 2024-11-26
AI Technical Summary
The existing cold-bending square pipe production process is difficult to meet the molding accuracy and high-frequency welding quality requirements of ultra-weather resistant steel thin-wall large circular arc square pipes, resulting in low finished product accuracy and high welding difficulty, and cannot meet customer usage standards.
Using the "minimum deformation of edge down molding method" with the bottom line from high to bottom, high frequency welding of inert gas protection, finishing adjustment of four-roll structure and two-roll arc-packing structure, involute arc-shaped angle release and controllable stroke The type of fixture is used for flying sawing to ensure molding accuracy and welding quality.
It effectively reduces the edge wave shape, improves the quality of high-frequency welding, ensures arc value, dimensional accuracy and angle accuracy, reduces the deformation of the flying saw saw, and improves the accuracy and quality of the overall finished product.
Smart Images

Figure CN119017024A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of cold-bent steel pipe manufacturing, and in particular to a method for manufacturing a super-weathering steel thin-wall large-arc square pipe. Background Art
[0002] The conventional production process of cold-bent square tubes is: longitudinal shearing and slitting - trimming - rolling mill loading - shearing and welding between the head and tail of the steel strip - loop storage - cold bending initial forming - high-frequency welding - cold bending fine forming - flying saw cutting - packaging and warehousing; its conventional production materials have excellent welding performance and can be high-frequency welded in the conventional way; and the material strength is not high (tensile strength <600MPa), the width-to-thickness ratio is not large (<20), and cold bending is easier; the arc value of cold-bent steel pipes is generally 1.5 to 3.5 times the wall thickness. If it exceeds this range, the forming accuracy will be difficult to achieve.
[0003] Due to the special nature of its material, namely its weather resistance, the chemical composition of related elements accounts for a large proportion, making it difficult to perform cold bending and high-frequency welding of super-weathering steel thin-walled, large-section, and large-arc square tubes; in addition, due to its thin wall thickness (<4.0mm), high strength (tensile strength>750MPa), large width-to-thickness ratio (>30), and large arc value (>6 times the wall thickness), it is difficult to cold-bend and the precision of the finished product is difficult to control. The conventional production process has low precision and cannot meet customer requirements.
[0004] In view of this, the inventor conducted in-depth research on this demand, and thus the present case was produced. Summary of the invention
[0005] Aiming at the problem that the production process of cold-bent square tubes in the prior art for preparing super-weathering steel thin-walled large arc steel tubes has low forming accuracy and cannot meet the requirements of customers, the present invention provides a method for manufacturing super-weathering steel thin-walled large arc square tubes, which improves the forming quality and yield rate of steel tubes. The specific technical scheme is as follows:
[0006] A method for manufacturing a super-weathering steel thin-walled large arc square tube comprises longitudinal shearing and striping, cold bending initial forming, high-frequency welding, cold bending fine forming and flying saw cutting in sequence, and the cold bending initial forming adopts a downhill forming method, and the bottom line is gradually reduced during the forming process.
[0007] The traditional cold-bent square tube forming process adopts the method of keeping the bottom line level consistent; the thin-walled, large-section, large-arc square tube of super-weathering steel will have a wave shape on the edge due to the inconsistent elongation between the edge and the middle during the forming process due to its thin wall thickness and wide width, which will affect the final product's dimensional accuracy and high-frequency welding quality. Here, in order to avoid edge deformation during the initial cold-bending forming process as much as possible, the "edge minimum deformation downhill forming method" with the bottom line from high to low is adopted, which reduces the serious edge wave problem caused by the inconsistent extension between the middle and the edge of the semi-finished steel strip.
[0008] Preferably, during the cold bending initial forming process, 10 rough formings are used, and the bottom line gradually decreases during the forming process. Here, the downhill value of each set is determined according to calculation, and then the bottom line elevation of each set is adjusted according to the downhill value. The height difference between the bottom line height and the final height of the bottom line during the nth forming is the increase in the bottom line elevation of the nth set, that is:
[0009] The increase in the first bottom line elevation H10 = 1.0-1.5 times the outer length of the square tube;
[0010] The increase in the second bottom line elevation H9 = 0.8-1.2 times the outer length of the square tube;
[0011] The increase in the bottom line elevation of the third flight is H8 = 0.7-1.1 times the outer length of the square tube;
[0012] The increase in the fourth bottom line elevation H7 = 0.6-1.0 times the outer length of the square tube;
[0013] The increase in the bottom line elevation of the 5th flight H6 = 0.5-0.9 times the outer length of the square tube;
[0014] The increase in the sixth bottom line elevation H5 = 0.4-0.8 times the outer length of the square tube;
[0015] The increase in the bottom line elevation of the 7th flight H4 = 0.3-0.7 times the outer length of the square tube;
[0016] The increase in the bottom line elevation of the 8th flight H3 = 0.2-0.6 times the outer length of the square tube;
[0017] The increase in the bottom line elevation of the 9th flight H2 = 0.2-0.5 times the outer length of the square tube;
[0018] The increase in the bottom line elevation of the 10th flight H1 = 0.1-0.4 times the outer length of the square tube;
[0019] The wall thickness of the square tube is 1.5-3.5 mm, and the value of the increase in the bottom line elevation of each flight is proportional to the wall thickness of the square tube.
[0020] The traditional cold-bent square tube welding process adopts high-frequency welding technology. Through the two effects of high-frequency welding (skin effect and proximity effect), the steel pipe can achieve the purpose of qualified welding without any external auxiliary materials. Due to the special physical and chemical properties of the material, the thin-walled, large-section, large-arc square tube of super-weathering steel is difficult to meet the welding requirements for high-frequency welding. It is necessary to use external auxiliary materials to participate in welding and formulate a suitable high-frequency welding control process to achieve the purpose of qualified welding quality. Here, the environment of high-frequency welding is controlled. In the process of high-frequency welding, inert gas is used as the protective gas, and the flow rate of inert gas is controlled to ensure that the weld of the steel pipe is isolated from the air during high-frequency welding, which effectively avoids the problem of oxygen entering to form oxides that affect the welding quality.
[0021] Preferably, during the high-frequency welding process, the inert gas in the inert gas storage tank is transported along the inert gas pipe to the weld of the steel pipe, and a flow regulating valve is provided on the inert gas pipe to control the flow rate to 20-30 L / min, and the inert gas is argon.
[0022] The traditional cold-bent square tube fine forming process adopts a four-roller structure with upper and lower flat rollers and left and right vertical rollers for finishing; this four-roller structure cannot enlarge the arc value. In addition, it is poor in adjusting the dimensional accuracy and cannot ensure that the square tube angle deviation, side length size deviation, diagonal deviation, arc deviation, etc. meet the standard requirements. However, this application adopts a four-roller structure combined with a two-roller arc wrapping structure for finishing adjustment. First, the four-roller structure is used for rough adjustment of the side length size and angle value, and then the arc wrapping roller of the two-roller structure is used for fine adjustment, which can ensure that the arc value, dimensional accuracy, angle accuracy, etc. meet the standard requirements.
[0023] Specifically, in the cold bending finishing process, six cold bending finishing processes are adopted, and the forming center lines are kept at the same level during the six cold bending finishing processes; wherein the sixth cold bending finishing process sequentially adopts a four-convex roller structure, a left and right two-convex roller structure, a four-straight roller structure, an upper and lower two-roller arc wrapping structure, and a four-straight roller structure to perform cold bending finishing processing on the square tube formed after five cold bending finishing processes.
[0024] In order to reduce scratches when the previous pass enters the next pass, the traditional cold-bent square tube has a release angle in the design of the forming mold. The release angle is a release angle, that is, the forming angle of the mold edge is appropriately increased by a few degrees during cold bending, so that the steel pipe billet of the previous pass will not be scratched when entering this pass; the traditional release angle is a linear angle tangent to the hole type; the super-weathering steel thin-walled large-section large-arc square tube is affected by the large rebound amount of thin-walled high-strength performance. If this release angle is still used, scratches will be generated when the previous pass enters the next pass due to inappropriate angles, and the use of a linear release angle will also cause the precision of the forming hole size to deteriorate; the production process of super-weathering steel thin-walled large-section large-arc square tube has changed the way the release angle is an angle, and an involute arc release angle connected to the hole type is used, which can make the semi-finished product enter the next pass smoothly through this arc from the previous pass, which not only effectively solves the scratch problem, but also ensures the accuracy of the hole size.
[0025] Specifically, in the cold bending primary forming and the cold bending fine forming, the forming molds in the upper and lower roller arc forming process all use involute arc release angles.
[0026] In the slitting process, the traditional cold-bent steel strip slitting adopts the driven bite type, which does not require tension. The hardness range of the disc shear blade is HRC50-55, and the end is straight without curvature. Due to the high strength and thin wall thickness of the super-weathering steel thin-walled steel strip, if the traditional process is used, there will be shearing defects such as continuous sawing, large edge burrs, and gaps.
[0027] Here, the longitudinal slitting adopts a pulling shear longitudinal slitting shearing process to form tension between the uncoiler and the disc shear; the blade material hardness is HRC60-65, and the thickness is 35-45mm; the blade end is arc-shaped, and its arc radius R is 75-100mm, which solves the quality problems of excessive shear burrs, unevenness and roughness on the edges of thin-walled super-weathering steel during longitudinal shearing due to its hard material, high strength and thin wall thickness.
[0028] In the flying sawing process, in order to ensure the sawing stability and sawing quality, the traditional cold-bent square tube flying sawing adopts the upper and lower left and right flat plate clamps. This clamp can ensure the stability during sawing, but due to the "sawing big and small heads" effect during sawing, the end will be deformed, affecting the dimensional accuracy. Here, a box-type clamp with controllable stroke and clamping force is used to clamp the end of the sawed steel pipe up and down according to a certain clamping force, forcibly limiting the deformation of the steel pipe during sawing, which can ensure that the end of the steel pipe will not be deformed after sawing, and meet the standard requirements.
[0029] Preferably, when the flying saw is sawing, a box-type clamp with controllable stroke and controllable clamping force is used to clamp the square tube up and down and left and right.
[0030] Preferably, the box-type clamp includes an upper and lower clamping assembly and a left and right clamping assembly.
[0031] The upper and lower clamping components include an upper clamp and a lower clamp, the upper clamp and the lower clamp are U-shaped and arranged opposite to each other, and a receiving space for accommodating the square tube is formed in the middle; when the square tube is clamped between the upper clamp and the lower clamp, the upper clamp is in close contact with the upper surface of the square tube and the side walls on both sides of the upper part, and the lower clamp is in close contact with the lower surface of the square tube and the side walls on both sides of the lower part;
[0032] The left and right clamping assemblies include a left clamp and a right clamp, the left clamp and the right clamp are U-shaped and arranged opposite to each other, and a storage space for accommodating a square tube is formed in the middle; when the square tube is clamped between the left clamp and the right clamp, the left clamp is tightly attached to the left side wall of the square tube and the upper and lower surfaces on the left side, and the right clamp is tightly attached to the right side wall of the square tube and the upper and lower surfaces on the right side.
[0033] Preferably, a cylinder for controlling the upper clamp, the lower clamp, the left clamp and the right clamp to approach or move away from the square tube is respectively provided on the side away from the square tube.
[0034] Beneficial effects:
[0035] The beneficial effects produced by the technical solution of the present invention are as follows:
[0036] (1) The "edge minimum deformation downhill forming method" with the bottom line from high to bottom is adopted to reduce the serious edge wave problem caused by the inconsistent extension between the middle and the edge of the semi-finished steel strip.
[0037] (2) During the high-frequency welding process, inert gas is used as the protective gas, and the flow rate of the inert gas is controlled to ensure that the weld of the steel pipe is isolated from the air during high-frequency welding, effectively avoiding the problem of oxygen entering to form oxides that affect the welding quality.
[0038] (3) The four-roller structure is combined with the two-roller arc-wrapping structure for fine adjustment. The four-roller structure is first used to roughly adjust the side length and angle value, and then the two-roller arc-wrapping roller is used for fine adjustment. This can ensure that the arc value, dimensional accuracy, angle accuracy, etc. meet the standard requirements. BRIEF DESCRIPTION OF THE DRAWINGS
[0039] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without paying creative work.
[0040] Figure 1This is a manufacturing process flow chart of the super-weathering steel thin-walled large arc square tube in the present invention;
[0041] Figure 2 This is a schematic diagram of the longitudinal shearing and strip shearing structure in the present invention;
[0042] Figure 3 It is a schematic diagram of the longitudinal section of the slitting disc scissors blade in the present invention;
[0043] Figure 4 It is a schematic diagram of the cold bending initial forming downhill forming method in the present invention;
[0044] Figure 5 It is a schematic diagram of the high frequency welding structure of the present invention;
[0045] Figure 6 This is a schematic diagram of the bottom line of the precision cold bending and precision forming in the present invention;
[0046] Figure 7 This is a schematic diagram of the H6 forming process of precision cold bending and precision forming in the present invention;
[0047] Figure 8 It is a schematic diagram of the angle release form of the cold-bending forming hole type in the present invention;
[0048] Fig. 9 It is a schematic diagram of the flying saw cutting structure in the present invention. DETAILED DESCRIPTION
[0049] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Therefore, the following detailed description of the embodiments of the present invention provided in the drawings is not intended to limit the scope of the claimed invention, but merely represents the selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0050] like Figure 1-9 As shown, the manufacturing process of super weathering steel thin-walled large arc square tube includes longitudinal shearing and striping 100, edge trimming 200, rolling mill loading 300, shearing and welding between the head and tail of the steel strip 400, loop storage 500, cold bending initial forming 600, high-frequency welding 700, cold bending fine forming 800, flying saw cutting 900 and packaging and warehousing 110.
[0051] like Figure 2 and 3As shown, the longitudinal shearing slit 100 adopts the pulling and shearing longitudinal shearing process, so that tension is formed between the uncoiler 101 and the disc shear 102; the blade 103 of the disc shear has a material hardness of HRC60-65 and a thickness of 35-45mm; the blade end 104 is arc-shaped, and its arc radius R is 75-100mm, which solves the quality problems of excessive shear burrs, unevenness and roughness generated on the edges of thin-walled super-weathering steel during longitudinal shearing due to its hard material, high strength and thin wall thickness.
[0052] When cold-bent square tubes are formed, the traditional square tube direct square forming process is changed to a production process of rounding first and then squaring. The rough forming is rounded first, and the fine forming is then squaring. (1) The rough forming part adopts the "edge minimum deformation downhill forming method" with the bottom line from high to low; the fine forming part adopts the "forming center line level consistent" process forming method. (2) The roll angle release adopts the involute arc angle release with the center of the circle outside the hole and connected to the hole.
[0053] like Figure 4 As shown, in order to avoid edge deformation during the initial cold bending 600 forming process as much as possible, the "edge minimum deformation downhill forming method" with a bottom line from high to bottom is adopted, which reduces the serious edge wave problem caused by inconsistent extension between the middle and edge of the semi-finished steel strip.
[0054] Here, in the process of cold bending initial forming 600, 10 rough formings are used. The bottom line gradually decreases during the forming process. Here, the downhill value of each set is determined according to the calculation, and then the bottom line elevation of each set is adjusted according to the downhill value. The height difference between the bottom line height and the final height of the bottom line during the nth forming is the increase in the bottom line elevation of the nth set, that is:
[0055] The increase in the first bottom line elevation H10 = 1.0-1.5 times the outer length of the square tube;
[0056] The increase in the second bottom line elevation H9 = 0.8-1.2 times the outer length of the square tube;
[0057] The increase in the bottom line elevation of the third flight is H8 = 0.7-1.1 times the outer length of the square tube;
[0058] The increase in the fourth bottom line elevation H7 = 0.6-1.0 times the outer length of the square tube;
[0059] The increase in the bottom line elevation of the 5th flight H6 = 0.5-0.9 times the outer length of the square tube;
[0060] The increase in the sixth bottom line elevation H5 = 0.4-0.8 times the outer length of the square tube;
[0061] The increase in the bottom line elevation of the 7th flight H4 = 0.3-0.7 times the outer length of the square tube;
[0062] The increase in the bottom line elevation of the 8th flight H3 = 0.2-0.6 times the outer length of the square tube;
[0063] The increase in the bottom line elevation of the 9th flight H2 = 0.2-0.5 times the outer length of the square tube;
[0064] The increase in the bottom line elevation of the 10th flight H1 = 0.1-0.4 times the outer length of the square tube;
[0065] The wall thickness of the square tube is 1.5-3.5mm, and the value of the increase in the bottom line elevation of each flight is proportional to the wall thickness of the square tube. For example, for F100*100, when the wall thickness is 2mm, the values of H1-H10 are 11.2mm, 24.1mm, 32.5mm, 40.8mm, 50.1mm, 60.8mm, 68.8mm, 85.5mm, 92.0mm, and 102.4mm respectively. When the wall thickness is 3mm, the values of H1-H10 are 12.5mm, 26.2mm, 35.5mm, 43.1mm, 52.3mm, 62.8mm, 69.2mm, 89.4mm, 93.5mm, and 104.2mm respectively.
[0066] In the high-frequency welding 700 process, due to the particularity of the physical and chemical properties of the super-weathering steel thin-walled large-section large-arc square tube, such as high strength and high chemical composition of elements not suitable for welding, it is difficult to meet the welding quality requirements for high-frequency welding; it is necessary to use external auxiliary materials to participate in welding, and formulate a suitable high-frequency welding control process to achieve the purpose of qualified welding quality. Here, the environment of high-frequency welding is controlled. In the high-frequency welding process, inert gas is used as the protective gas, and the flow of inert gas is controlled to ensure that the steel pipe weld is isolated from the air during high-frequency welding, effectively avoiding the problem of oxygen entering to form oxides that affect welding quality.
[0067] like Figure 5 As shown, the inert gas in the inert gas storage tank 701 is transported to the steel pipe weld 703 along the inert gas pipe 702, and a flow regulating valve 704 is provided on the inert gas pipe 702 to control the flow rate to 20-30 L / min, and the inert gas is argon.
[0068] The traditional cold-bent square tube finishing process adopts a four-roller structure with upper and lower flat rollers and left and right vertical rollers for finishing; this four-roller structure cannot enlarge the arc value. In addition, it is poor in adjusting the dimensional accuracy and cannot ensure that the square tube angle deviation, side length size deviation, diagonal deviation, arc deviation, etc. meet the standard requirements. However, this embodiment adopts a four-roller structure combined with a two-roller arc wrapping structure for finishing adjustment. The four-roller structure is first used for rough adjustment of the side length size and angle value, and then the arc wrapping roller of the two-roller structure is used for fine adjustment, which can ensure that the arc value, dimensional accuracy, angle accuracy, etc. meet the standard requirements.
[0069] like Figure 6 and 7 As shown, in the cold bending finishing process 800, six cold bending finishing processes are used, and the forming center lines are kept at the same level during the six cold bending finishing processes; wherein the sixth cold bending finishing process sequentially uses a four-convex roller structure 801, a left and right two-convex roller structure 802, a four-straight roller structure 803, an upper and lower two-roller arc wrapping structure 804, and a four-straight roller structure 805 to perform cold bending finishing processing on the square tube formed after five cold bending finishing processes.
[0070] In order to reduce the scratches when the previous pass enters the next pass, the traditional cold-bent square tube has a release angle in the design of the forming mold. The release angle is a kind of release angle, that is, the forming angle of the mold edge is appropriately increased by a few degrees during cold bending, so that the steel tube billet of the previous pass will not be scratched when entering the current pass; the traditional release angle is a linear angle tangent to the hole type; the thin-walled, large-section, large-arc square tube of super-weathering steel has a large rebound due to the high strength of the thin wall. If this release angle is still used, it will cause scratches when the previous pass enters the next pass due to inappropriate angles, and the use of a linear release angle will also cause the accuracy of the forming hole size to deteriorate; if Figure 8 As shown, the production process of super-weathering steel thin-walled large-section large-arc square tubes has changed the way of using the release angle as an angle, and adopted an involute arc release angle connected to the hole type, that is, the release angle 810 is an involute arc segment 811, which allows the semi-finished product to smoothly pass through this arc when entering the next pass from the previous pass, which effectively solves the scratch problem and also ensures the accuracy of the hole size.
[0071] Specifically, in the cold bending primary forming and the cold bending fine forming, the forming molds in the upper and lower roller arc forming process all use involute arc release angles.
[0072] like Fig. 9 As shown, in the flying saw cutting 900 stage, a box-type clamp with controllable stroke and clamping force is used to clamp the end of the sawn steel pipe up and down according to a certain clamping force, forcibly limiting the deformation of the steel pipe during sawing, which can ensure that the rear end of the steel pipe will not be deformed after sawing, meeting the standard requirements.
[0073] Specifically, a box-type clamp 910 with controllable stroke and clamping force is used to clamp the square tube up and down and left and right, and a saw blade 950 is used to saw the steel tube.
[0074] like Fig. 9As shown, the box-type clamp 910 includes an upper and lower clamping assembly 920 and a left and right clamping assembly 930, and the upper and lower clamping assembly 920 includes an upper clamp 921 and a lower clamp 922, and the upper clamp 921 and the lower clamp 922 are relatively arranged in a U-shape, and a receiving space for accommodating a square tube is formed in the middle; when the square tube is clamped between the upper clamp 921 and the lower clamp 922, the upper clamp 921 is closely attached to the upper surface of the square tube and the side walls on both sides of the upper part, and the lower clamp 922 is closely attached to the lower surface of the square tube and the side walls on both sides of the lower part;
[0075] The left and right clamping assemblies 930 include a left clamp 931 and a right clamp 932, and the left clamp 931 and the right clamp 932 are U-shaped and arranged opposite to each other, and a storage space for accommodating a square tube is formed in the middle; when the square tube is clamped between the left clamp 931 and the right clamp 932, the left clamp 931 is tightly attached to the left side wall of the square tube and the upper and lower surfaces on the left side, and the right clamp 932 is tightly attached to the right side wall of the square tube and the upper and lower surfaces on the right side.
[0076] The upper clamp 921, the lower clamp 922, the left clamp 931 and the right clamp 932 are respectively provided with a cylinder 940 on the side away from the square tube for controlling them to approach or move away from the square tube.
[0077] The control method in this embodiment is used to manufacture thin-walled large arc square tubes made of super-weathering steel, which has the following advantages: (1) It reduces shearing defects such as continuous sawing, large edge burrs, and notches during longitudinal shearing. (2) It reduces the serious problem of edge wave shape during initial forming, reduces the scratch problem of steel pipe products, and improves the accuracy during fine forming. (3) It ensures the welding pass rate during high-frequency welding and ensures good welding quality. (4) Fine forming adopts a combination of a four-roller structure and a two-roller arc wrapping structure to ensure that the arc value, side length, angle accuracy, flatness, diagonal difference, etc. meet the standard requirements. (5) The deformation of the end head during flying saw cutting is controlled so that the end head size meets the standard requirements.
[0078] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A method for manufacturing a super-weathering steel thin-walled large arc square tube, characterized in that: The process includes longitudinal shearing, cold bending initial forming, high frequency welding, cold bending fine forming and flying saw cutting in sequence, and the cold bending initial forming adopts a downhill forming method, and the bottom line is gradually reduced during the forming process.
2. The method for manufacturing a super-weathering steel thin-walled large arc square tube according to claim 1, characterized in that: During the cold bending initial forming process, the height difference between the bottom line height during the nth forming and the bottom line final height is the increase in the bottom line elevation of the nth formation, that is: The increase in the first bottom line elevation H10 = 1.0-1.5 times the outer length of the square tube; The increase in the second bottom line elevation H9 = 0.8-1.2 times the outer length of the square tube; The increase in the bottom line elevation of the third flight is H8 = 0.7-1.1 times the outer length of the square tube; The increase in the fourth bottom line elevation H7 = 0.6-1.0 times the outer length of the square tube; The increase in the bottom line elevation of the 5th flight H6 = 0.5-0.9 times the outer length of the square tube; The increase in the sixth bottom line elevation H5 = 0.4-0.8 times the outer length of the square tube; The increase in the bottom line elevation of the 7th flight H4 = 0.3-0.7 times the outer length of the square tube; The increase in the bottom line elevation of the 8th flight H3 = 0.2-0.6 times the outer length of the square tube; The increase in the bottom line elevation of the 9th flight H2 = 0.2-0.5 times the outer length of the square tube; The increase in the bottom line elevation of the 10th flight H1 = 0.1-0.4 times the outer length of the square tube; The wall thickness of the square tube is 1.5-3.5 mm, and the value of the increase in the bottom line elevation of each flight is proportional to the wall thickness of the square tube.
3. The method for manufacturing a super-weathering steel thin-walled large arc square tube according to claim 1, characterized in that: During the high-frequency welding process, inert gas is used as the protective gas, and the flow rate of the inert gas is controlled to ensure that the weld of the steel pipe is isolated from the air during high-frequency welding.
4. The method for manufacturing a super-weathering steel thin-walled large arc square tube according to claim 3, characterized in that: During the high-frequency welding process, the inert gas in the inert gas storage tank is transported to the weld of the steel pipe along the inert gas pipe, and a flow regulating valve is provided on the inert gas pipe to control the flow rate to 20-30L / min. The inert gas is argon.
5. The method for manufacturing a super-weathering steel thin-walled large arc square tube according to claim 1, characterized in that: During the cold bending finishing process, six cold bending finishing processes are used, and the forming center lines are kept at the same level during the six cold bending finishing processes; the sixth cold bending finishing process sequentially uses a four-convex roller structure, a left and right two-convex roller structure, a four-straight roller structure, an upper and lower two-roller arc wrapping structure, and a four-straight roller structure to perform cold bending finishing on the square tube formed by five cold bending finishing processes.
6. The method for manufacturing a super-weathering steel thin-walled large arc square tube according to claim 5, characterized in that: In the cold bending initial forming and cold bending fine forming process of the upper and lower rollers wrapping arc forming, the forming die adopts an involute arc release angle.
7. The method for manufacturing a super-weathering steel thin-walled large arc square tube according to claim 1, characterized in that: The longitudinal slitting adopts the pulling and shearing longitudinal slitting shearing process, so that tension is formed between the uncoiler and the disc shear; The hardness of the blade material is HRC60-65 and the thickness is 35-45mm; the end of the blade is arc-shaped and its arc radius R is 75-100mm.
8. The method for manufacturing a super-weathering steel thin-walled large arc square tube according to claim 1, characterized in that: When the flying saw is sawing, the box-type clamp with controllable stroke and controllable clamping force is used to clamp the square tube up and down and left and right.
9. The method for manufacturing a super-weathering steel thin-walled large arc square tube according to claim 8, characterized in that: The box-type clamp includes upper and lower clamping assemblies and left and right clamping assemblies. The upper and lower clamping components include an upper clamp and a lower clamp, the upper clamp and the lower clamp are U-shaped and arranged opposite to each other, and a receiving space for accommodating the square tube is formed in the middle; when the square tube is clamped between the upper clamp and the lower clamp, the upper clamp is in close contact with the upper surface of the square tube and the side walls on both sides of the upper part, and the lower clamp is in close contact with the lower surface of the square tube and the side walls on both sides of the lower part; The left and right clamping assemblies include a left clamp and a right clamp, the left clamp and the right clamp are U-shaped and arranged opposite to each other, and a storage space for accommodating a square tube is formed in the middle; when the square tube is clamped between the left clamp and the right clamp, the left clamp is tightly attached to the left side wall of the square tube and the upper and lower surfaces on the left side, and the right clamp is tightly attached to the right side wall of the square tube and the upper and lower surfaces on the right side.
10. The method for manufacturing a super-weathering steel thin-walled large arc square tube according to claim 9, characterized in that: Oil cylinders for controlling the upper clamp, the lower clamp, the left clamp and the right clamp to approach or move away from the square tube are respectively arranged on the side away from the square tube.
Citation Information
Patent Citations
Cold bending forming process of high-strength steel square rectangular pipe
CN110871219A
Forming method for asymmetric pentagonal thin-wall cold-bent steel pipe with sharp corner
CN112588896A
Manufacturing method of pickling-free high-strength cold-formed thin-walled trapezoidal steel pipe
CN115921575A
