Municipal ardealite asphalt concrete road and construction method thereof
By adding adhesive layer and bonded asphalt layer in phosphogypsum asphalt concrete roads, combined with curbs and drainage mechanisms, the problem of asphalt concrete layer falling off is solved, the stability and drainage effect of the road are improved, and the stronger and more beautiful pavement structure.
Patent Information
- Application Number
- CN202411296861.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-18
- Publication Date
- 2024-11-26
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Existing phosphogypsum asphalt concrete roads are prone to peeling off and peeling during long-term use, affecting the overall stability of the road.
Adopt a municipal phosphogypsum asphalt concrete road and its construction method. By adding an adhesive layer and an adhesive asphalt layer between the asphalt concrete layer and the reinforced concrete layer, combining the curb mechanism and the drainage mechanism, the adhesion of the pavement structure is enhanced. and drainage capacity to form a more stable multi-layer fusion.
It effectively solves the problem of insufficient connection strength between the asphalt concrete layer and the base layer, improves the stability of the road usage and drainage effect, and enhances the strength and aesthetics of the overall structure.
Smart Images

Figure CN119021049A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of asphalt concrete road construction, in particular to a municipal phosphogypsum asphalt concrete road and a construction method thereof. Background Art
[0002] The existing patent (publication number: CN220503589U) discloses "an industrial solid waste phosphogypsum composite pavement structure, which includes, from bottom to top, a drainage cushion layer, a phosphogypsum composite stabilized subbase layer, a phosphogypsum composite stabilized lower base layer, a phosphogypsum composite stabilized upper base layer, a waterproof seal layer and an asphalt concrete surface layer, and the drainage cushion layer is laid on the earth roadbed. The industrial solid waste phosphogypsum composite pavement structure provided by the utility model fully considers the strength requirements and performance of different structural layers in the road environment according to the structural key points of each layer of the pavement, and gradually increases the amount of phosphogypsum from top to bottom. It reasonably consumes phosphogypsum while ensuring road performance, alleviating the existing difficulties in the resource utilization of phosphogypsum."
[0003] In the process of realizing this application, the inventor discovered that the existing phosphogypsum asphalt concrete roads lay the asphalt concrete pavement on the base layer. During actual construction, the connection strength between the asphalt concrete and the pavement base layer is not high. The asphalt concrete of the pavement will fall off after long-term use, affecting the overall use of the road. Summary of the invention
[0004] In view of the deficiencies in the prior art, the present invention provides a municipal phosphogypsum asphalt concrete road and a construction method thereof, which solves the problem that the asphalt on the existing road surface is prone to falling off and peeling off after long-term use.
[0005] To achieve the above objectives, the present invention is implemented through the following technical solutions: A municipal phosphogypsum asphalt concrete road, comprising a road body, a plurality of drainage mechanisms are fixedly arranged on the upper ends of both sides of the road body, a plurality of curb mechanisms are fixedly arranged on the upper ends of the plurality of drainage mechanisms, and a plurality of road lines are fixedly arranged at equal intervals on the upper surface of the road body;
[0006] The main body of the road includes a plain soil layer, a phosphogypsum cushion layer is fixedly arranged on the upper surface of the plain soil layer, a reinforced concrete layer is fixedly arranged on the upper surface of the phosphogypsum cushion layer, an adhesive layer is fixedly arranged on the upper surface of the reinforced concrete layer, an adhesive asphalt layer is fixedly arranged on the upper surface of the adhesive layer, and an asphalt concrete layer is fixedly arranged on the upper surface of the adhesive asphalt layer.
[0007] Preferably, the curb structure includes a curb stone, a quartz sand layer is fixedly disposed inside the curb stone, a gravel layer is fixedly disposed on the upper surface of the quartz sand layer, a planting soil layer is fixedly disposed on the upper surface of the gravel layer, and a plant layer is fixedly disposed on the upper surface of the planting soil layer.
[0008] Preferably, a drainage outlet is provided in the middle of the front side of the curbstone, a filter is fixedly provided inside the drainage outlet, and a water outlet is provided in the middle of the interior of the curbstone.
[0009] Preferably, the drainage mechanism comprises a water collecting trough, and connection ports are provided at the bottom ends of both sides of the water collecting trough.
[0010] Preferably, fixed ground nails are fixedly installed at the four corners of the bottom surface of the sump, and drainage pipes are fixedly installed inside the two connection ports.
[0011] Preferably, the asphalt concrete layer is composed of asphalt and stone, the ratio of asphalt to stone is 3.8%, the stone is composed of coarse aggregate, fine aggregate, stone chips, sand and mineral powder, and the ratio of coarse aggregate, fine aggregate, stone chips, sand and mineral powder is 31:28:18:16:7.
[0012] Preferably, the bonding asphalt layer is composed of asphalt, coal tar, waste polyvinyl chloride plastics and recycled rubber, and the ratio of asphalt, coal tar, waste polyvinyl chloride plastics and recycled rubber is 24:5:4:4.
[0013] Preferably, the adhesive layer is composed of a polyurethane adhesive and a curing agent, and the ratio between the polyurethane adhesive and the curing agent is 4:1.
[0014] Preferably, the phosphogypsum cushion layer is composed of phosphogypsum, recycled concrete aggregate and recycled brick aggregate, and the ratio of phosphogypsum, recycled concrete aggregate and recycled brick aggregate is 5:3:2.
[0015] A municipal phosphogypsum asphalt concrete road construction method specifically comprises the following steps:
[0016] S1. On-site staking
[0017] Open the on-site drawings through drawing software, extract key nodes at the edge of the municipal road to be constructed, mark the coordinates of the key nodes, print the drawings and bring them to the site after marking, introduce the standard coordinate points to the site through the total station, and mark them, and use the total station combined with the introduced standard coordinate points to stake out the coordinates of each key node of the road. After the stakeout is completed, mark each point and connect the points with lime lines to complete the determination of the edge position of the road;
[0018] S2. Compacting the soil
[0019] Clear the debris within the designated road range, measure the site elevation, excavate the earthwork at locations above the design elevation, and backfill the earthwork at locations below the design elevation. After the adjustment is completed, compact the ground soil in the site;
[0020] S3. Template fixation
[0021] Lay the templates along both sides of the road and fix them with steel bars. After fixing, measure the height of the templates to determine the elevation of the finished surface of the road foundation and mark the corresponding height of the templates.
[0022] S4. Pad laying
[0023] Mix phosphogypsum, recycled concrete aggregate and recycled brick aggregate in a ratio of 5:3:2 to make a phosphogypsum cushion layer. Evenly lay the mixed phosphogypsum cushion layer between the formworks on both sides of the road by mechanical and manual methods. The thickness of the laid phosphogypsum cushion layer shall not be less than 15 cm.
[0024] S5. Base pouring
[0025] After the phosphogypsum cushion layer is laid, the steel bars are tied on the basis of the phosphogypsum cushion layer according to the spacing required by the drawings. After the steel bars are tied, concrete with a label of C35 is poured between the templates on both sides and poured to the marked positions of the templates on both sides. After the pouring is completed, the surface is manually finished, and after the finishing is completed, the film is covered to keep it moist and wait for it to solidify to form a reinforced concrete layer;
[0026] S6. Curb laying
[0027] After the reinforced concrete layer is completely solidified, the steel bars fixing the formwork are pulled out, and the formwork is removed using tools. The drainage mechanism is fixed to the ground on both sides of the road through the fixed ground nails at the bottom, and the various connection ports are connected through drainage pipes. After the connection is completed, backfill between multiple water collection tanks to make the ground level with the upper surface of the water collection tank, align the water outlet of the curb stone above the water collection tank, and fix the curb stone with mortar;
[0028] S7. Asphalt paving
[0029] After the curb structure is laid, remove the film on the surface of the reinforced concrete layer, mix the polyurethane adhesive and curing agent in a ratio of 4:1, and spray them evenly on the surface of the reinforced concrete layer to form an adhesive layer. After spraying, mix asphalt, coal tar, waste polyvinyl chloride plastic, and recycled rubber in a ratio of 24:5:4:4, heat and melt, and spread them on the surface of the adhesive layer to form an adhesive asphalt layer. When the adhesive asphalt layer is not completely cooled, mix asphalt and stone in proportion to make an asphalt concrete layer for paving, and flatten it with a roller. After the road surface has cooled as a whole, use road marking equipment to draw road lines with hot melt adhesive to complete the road construction.
[0030] The present invention provides a municipal phosphogypsum asphalt concrete road and a construction method thereof. It has the following beneficial effects:
[0031] 1. The present invention provides a municipal phosphogypsum asphalt concrete road and a construction method thereof. Compared with the existing phosphogypsum asphalt concrete road and a construction method thereof, the phosphogypsum asphalt concrete road and a construction method thereof add an adhesive layer between the asphalt concrete layer and the reinforced concrete layer to bond the asphalt layer. When actually used, the adhesive layer can increase the viscosity between the asphalt surface and the reinforced concrete cushion layer. At the same time, combined with the adhesive asphalt layer, the cushion layer and the surface asphalt concrete layer are transitioned by materials of the same material, so that the multiple layers of the road surface can be better integrated into a whole. In addition, curb mechanisms and drainage mechanisms are provided on both sides of the road, which can speed up the drainage of the road surface and improve the stability of the road as a whole when in use. BRIEF DESCRIPTION OF THE DRAWINGS
[0032] Figure 1 It is an axonometric schematic diagram of the present invention;
[0033] Figure 2 It is a cross-sectional schematic diagram of the present invention;
[0034] Figure 3 It is an axonometric schematic diagram of the curb mechanism of the present invention;
[0035] Figure 4 is a bottom view schematic diagram of the curb mechanism of the present invention;
[0036] Figure 5 It is an axonometric schematic diagram of the drainage mechanism of the present invention;
[0037] Figure 6 is a cross-sectional schematic diagram of the curb mechanism of the present invention;
[0038] Figure 7 It is a schematic diagram of the construction process of the present invention.
[0039] Among them, 1. Road body; 2. Road line; 3. Curb mechanism; 4. Drainage mechanism; 101. Asphalt concrete layer; 102. Bonding asphalt layer; 103. Adhesive layer; 104. Reinforced concrete layer; 105. Phosphogypsum cushion layer; 106. Soil layer; 301. Plant layer; 302. Curb stone; 303. Filter; 304. Drainage outlet; 305. Water outlet; 306. Planting soil layer; 307. Gravel layer; 308. Quartz sand layer; 401. Sump; 402. Drain pipe; 403. Fixed ground nails; 404. Connection port. DETAILED DESCRIPTION
[0040] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0041] like Figure 1-7 As shown, an embodiment of the present invention provides a municipal phosphogypsum asphalt concrete road, including a road body 1, multiple drainage mechanisms 4 are fixedly arranged on the upper ends of both sides of the road body 1, which is conducive to improving the drainage effect of the road surface and preventing water accumulation on the road surface. Curb mechanisms 3 are fixedly arranged on the upper ends of the multiple drainage mechanisms 4, which is conducive to dividing and limiting the range on both sides of the road. Multiple road lines 2 are fixedly arranged on the upper surface of the road body 1 at equal intervals, which is conducive to maintaining the traffic order when the road is in normal use;
[0042] The main body 1 of the road includes a plain soil layer 106, and a phosphogypsum cushion layer 105 is fixedly arranged on the upper surface of the plain soil layer 106. The phosphogypsum cushion layer 105 is composed of phosphogypsum, recycled concrete aggregate and recycled brick aggregate. The ratio between phosphogypsum, recycled concrete aggregate and recycled brick aggregate is 5:3:2. By adopting recycled materials, the consumption cost of road construction can be reduced. A reinforced concrete layer 104 is fixedly arranged on the upper surface of the phosphogypsum cushion layer 105, which is conducive to providing a guarantee for the overall strength of the road surface. An adhesive layer 103 is fixedly arranged on the upper surface of the reinforced concrete layer 104. The adhesive layer 103 is composed of a polyurethane adhesive and a curing agent. The ratio between the polyurethane adhesive and the curing agent is 4:1, which is conducive to improving the bonding effect between the various structures of the road surface. The adhesive layer An adhesive asphalt layer 102 is fixedly arranged on the upper surface of 103. The adhesive asphalt layer 102 is composed of asphalt, coal tar, waste polyvinyl chloride plastics and recycled rubber. The ratio of asphalt, coal tar, waste polyvinyl chloride plastics and recycled rubber is 24:5:4:4, which is conducive to providing a transition between the layers of the road surface and allowing the layers to be better integrated. An asphalt concrete layer 101 is fixedly arranged on the upper surface of the adhesive asphalt layer 102. The asphalt concrete layer 101 is composed of asphalt and stone. The ratio of asphalt to stone is 3.8%. The stone is composed of coarse aggregate, fine aggregate, stone chips, sand and mineral powder. The ratio of coarse aggregate, fine aggregate, stone chips, sand and mineral powder is 31:28:18:16:7, which is conducive to realizing the basic use function of the road surface.
[0043] The curb structure 3 includes a curb stone 302, a quartz sand layer 308 is fixedly set inside the curb stone 302, a gravel layer 307 is fixedly set on the upper surface of the quartz sand layer 308, a planting soil layer 306 is fixedly set on the upper surface of the gravel layer 307, and a plant layer 301 is fixedly set on the upper surface of the planting soil layer 306, which is beneficial to improving the greening and beautification function of the road surface when it is used, and filtering rainwater to remove pollution and impurities. A drainage outlet 304 is opened in the middle of the front side of the curb stone 302, and a filter screen 303 is fixedly set inside the drainage outlet 304, which is beneficial to prevent impurities from entering the curb stone 302. A water outlet 305 is opened in the middle of the curb stone 302, which is beneficial to realize the drainage function of the application.
[0044] The drainage mechanism 4 includes a water collecting trough 401, and connection ports 404 are opened at the bottom ends of both sides of the water collecting trough 401. Fixed ground nails 403 are fixedly set at the four corners of the bottom surface of the water collecting trough 401, which is convenient for the user to fix the device to the position where it needs to be used. Drain pipes 402 are fixedly set inside the two connection ports 404, which is conducive to realizing the drainage function when the application is used.
[0045] A municipal phosphogypsum asphalt concrete road construction method specifically comprises the following steps:
[0046] S1. On-site staking
[0047] Open the on-site drawings through drawing software, extract key nodes at the edge of the municipal road to be constructed, mark the coordinates of the key nodes, print the drawings and bring them to the site after marking, introduce the standard coordinate points to the site through the total station, and mark them, and use the total station combined with the introduced standard coordinate points to stake out the coordinates of each key node of the road. After the stakeout is completed, mark each point and connect the points with lime lines to complete the determination of the edge position of the road;
[0048] S2. Compacting the soil
[0049] Clear the debris within the designated road range, measure the site elevation, excavate the earthwork at locations above the design elevation, and backfill the earthwork at locations below the design elevation. After the adjustment is completed, compact the ground soil in the site;
[0050] S3. Template fixation
[0051] Lay the templates along both sides of the road and fix them with steel bars. After fixing, measure the height of the templates to determine the elevation of the finished surface of the road foundation and mark the corresponding height of the templates.
[0052] S4. Pad laying
[0053] The phosphogypsum, recycled concrete aggregate and recycled brick aggregate are mixed evenly in a ratio of 5:3:2 to form a phosphogypsum cushion layer 105, and the mixed phosphogypsum cushion layer 105 is evenly laid between the templates on both sides of the road by mechanical and manual methods, and the thickness of the laid phosphogypsum cushion layer 105 is not less than 15 cm;
[0054] S5. Base pouring
[0055] After the phosphogypsum cushion layer 105 is laid, steel bars are tied on the basis of the phosphogypsum cushion layer 105 according to the spacing required by the drawing. After the steel bars are tied, concrete with a label of C35 is poured between the templates on both sides and poured to the marked positions of the templates on both sides. After the pouring is completed, the surface is manually finished, and after the finishing is completed, the surface is covered with a film to keep it moist and wait for it to solidify to form a reinforced concrete layer 104;
[0056] S6. Curb laying
[0057] After the reinforced concrete layer 104 is completely solidified, the steel bars fixing the formwork are pulled out, and the formwork is removed using tools. The drainage mechanism 4 is fixed to the ground on both sides of the road through the fixed ground nails 403 at the bottom thereof, and the various connection ports 404 are connected through the drainage pipes 402. After the connection is completed, backfill between the multiple water collection tanks 401 to make the ground level with the upper surface of the water collection tank 401, and the water outlet 305 of the curb stone 302 is aligned with the top of the water collection tank 401, and the curb stone 302 is fixed with mortar;
[0058] S7. Asphalt paving
[0059] After the laying of the curb structure 3 is completed, the film on the surface of the reinforced concrete layer 104 is removed, and the polyurethane adhesive and the curing agent are mixed in a ratio of 4:1, and evenly sprayed on the surface of the reinforced concrete layer 104 to form an adhesive layer 103. After the spraying is completed, asphalt, coal tar, waste polyvinyl chloride plastic, and recycled rubber are mixed in a ratio of 24:5:4:4, heated and melted, and spread on the surface of the adhesive layer 103 to form an adhesive asphalt layer 102. When the adhesive asphalt layer 102 is not completely cooled, asphalt and stone are mixed in proportion to form an asphalt concrete layer 101 for paving, and flattened by a roller. After the road surface is cooled as a whole, a road line 2 is drawn with hot melt adhesive through a road line drawing device to complete the road construction.
[0060] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A municipal phosphogypsum asphalt concrete road, comprising a road body (1), characterized in that: A plurality of drainage mechanisms (4) are fixedly arranged at the upper ends of both sides of the road body (1), a curb mechanism (3) is fixedly arranged at the upper ends of the plurality of drainage mechanisms (4), and a plurality of road lines (2) are fixedly arranged at equal intervals on the upper surface of the road body (1); The road body (1) comprises a plain soil layer (106), a phosphogypsum cushion layer (105) is fixedly arranged on the upper surface of the plain soil layer (106), a reinforced concrete layer (104) is fixedly arranged on the upper surface of the phosphogypsum cushion layer (105), an adhesive layer (103) is fixedly arranged on the upper surface of the reinforced concrete layer (104), an adhesive layer (103) is fixedly arranged on the upper surface of the adhesive layer (103), and an asphalt layer (102) is fixedly arranged on the upper surface of the asphalt layer (102), and an asphalt concrete layer (101) is fixedly arranged on the upper surface of the asphalt layer (102).
2. A municipal phosphogypsum asphalt concrete road according to claim 1, characterized in that: The curb structure (3) comprises a curb stone (302), a quartz sand layer (308) is fixedly arranged inside the curb stone (302), a gravel layer (307) is fixedly arranged on the upper surface of the quartz sand layer (308), a planting soil layer (306) is fixedly arranged on the upper surface of the gravel layer (307), and a plant layer (301) is fixedly arranged on the upper surface of the planting soil layer (306).
3. A municipal phosphogypsum asphalt concrete road according to claim 2, characterized in that: A drainage port (304) is provided in the middle of the front of the curbstone (302), a filter screen (303) is fixedly arranged inside the drainage port (304), and a water outlet (305) is provided in the middle of the curbstone (302).
4. A municipal phosphogypsum asphalt concrete road according to claim 1, characterized in that: The drainage mechanism (4) comprises a water collecting trough (401), and connection ports (404) are provided at the bottom ends of both sides of the water collecting trough (401).
5. A municipal phosphogypsum asphalt concrete road according to claim 4, characterized in that: Fixed ground nails (403) are fixedly arranged at the four corners of the bottom surface of the water collecting tank (401), and drainage pipes (402) are fixedly arranged inside the two connecting ports (404).
6. A municipal phosphogypsum asphalt concrete road according to claim 1, characterized in that: The asphalt concrete layer (101) is composed of asphalt and stone, the ratio of the asphalt to stone is 3.8%, the stone is composed of coarse aggregate, fine aggregate, stone chips, sand, and mineral powder, and the ratio of the coarse aggregate, fine aggregate, stone chips, sand, and mineral powder is 31:28:18:16:
7.
7. A municipal phosphogypsum asphalt concrete road according to claim 1, characterized in that: The bonding asphalt layer (102) is composed of asphalt, coal tar, waste polyvinyl chloride plastics, and recycled rubber, and the ratio of asphalt, coal tar, waste polyvinyl chloride plastics, and recycled rubber is 24:5:4:
4.
8. The municipal phosphogypsum asphalt concrete road according to claim 1, characterized in that: The adhesive layer (103) is composed of a polyurethane adhesive and a curing agent, and the ratio between the polyurethane adhesive and the curing agent is 4:
1.
9. A municipal phosphogypsum asphalt concrete road according to claim 1, characterized in that: The phosphogypsum cushion layer (105) is composed of phosphogypsum, recycled concrete aggregate and recycled brick aggregate, and the ratio of the phosphogypsum, recycled concrete aggregate and recycled brick aggregate is 5:3:
2.
10. A municipal phosphogypsum asphalt concrete road construction method, characterized in that: The specific steps include: S1. On-site staking Open the on-site drawings through drawing software, extract key nodes at the edge of the municipal road to be constructed, mark the coordinates of the key nodes, print the drawings and bring them to the site after marking, introduce the standard coordinate points to the site through the total station, and mark them, and use the total station combined with the introduced standard coordinate points to stake out the coordinates of each key node of the road. After the stakeout is completed, mark each point and connect the points with lime lines to complete the determination of the edge position of the road; S2. Compacting the soil Clear the debris within the designated road range, measure the site elevation, excavate the earthwork at locations above the design elevation, and backfill the earthwork at locations below the design elevation. After the adjustment is completed, compact the ground soil in the site; S3. Template fixation Lay the templates along both sides of the road and fix them with steel bars. After fixing, measure the height of the templates to determine the elevation of the finished surface of the road foundation and mark the corresponding height of the templates. S4. Pad laying The phosphogypsum, recycled concrete aggregate and recycled brick aggregate are mixed evenly in a ratio of 5:3:2 to form a phosphogypsum cushion layer (105), and the mixed phosphogypsum cushion layer (105) is evenly laid between the formworks on both sides of the road by a mechanical and manual method, and the thickness of the laid phosphogypsum cushion layer (105) is not less than 15 centimeters; S5. Base pouring After the phosphogypsum cushion layer (105) is laid, steel bars are tied on the basis of the phosphogypsum cushion layer (105) according to the spacing required by the drawing. After the steel bars are tied, concrete with a label of C35 is poured between the templates on both sides and poured to the marked positions of the templates on both sides. After the pouring is completed, the surface is manually finished, and after the finishing is completed, a film is applied to keep it moist and wait for it to solidify to form a reinforced concrete layer (104); S6. Curb laying After the reinforced concrete layer (104) is completely solidified, the steel bars fixing the template are pulled out, the template is removed using tools, the drainage mechanism (4) is fixed to the ground on both sides of the road through the fixed ground nails (403) at the bottom, and the various connection ports (404) are connected through drainage pipes (402). After the connection is completed, backfill between the multiple water collection tanks (401) to make the ground level with the upper surface of the water collection tank (401), align the water outlet (305) of the curb stone (302) above the water collection tank (401), and fix the curb stone (302) with mortar; S7. Asphalt paving After the paving of the curb structure (3) is completed, the coating on the surface of the reinforced concrete layer (104) is removed, and the polyurethane adhesive and the curing agent are mixed in a ratio of 4:1 and evenly sprayed on the surface of the reinforced concrete layer (104) to form an adhesive layer (103). After the spraying is completed, asphalt, coal tar, waste polyvinyl chloride plastics, and recycled rubber are mixed in a ratio of 24:5:4:4, heated and melted, and spread on the surface of the adhesive layer (103) to form an adhesive asphalt layer (102). When the adhesive asphalt layer (102) is not completely cooled, asphalt and stone are mixed in proportion to form an asphalt concrete layer (101) for paving and flattened by a roller. After the road surface is cooled as a whole, a road line (2) is drawn with hot melt adhesive by a road line drawing device to complete the road construction.
