Multi-stage energy absorption port anti-collision device
By designing a multi-stage energy absorption mechanism and sliding connection structure in the port anti-collision device, the problem of poor load absorption of existing port anti-collision device is solved, multi-stage energy absorption and reverse thrust are achieved, and the safety of the dock structure is improved. Sex and service life.
Patent Information
- Application Number
- CN202411339144.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-25
- Publication Date
- 2024-11-26
AI Technical Summary
The existing port anti-collision device has poor load absorption effect when the ship collides, which is prone to aging, resulting in damage to the port structure and difficulty in repair.
Design a multi-stage energy-absorbing port collision prevention device, including setting up a multi-stage energy-absorbing mechanism and a sliding connection structure on the basis of the dock, and realize multiple Level energy absorption, reducing the impact force of the ship.
Effectively absorb ship impact energy, avoid damage to the dock foundation, improve safety and service life, and provide reverse thrust through specific water flow channel structures to reduce impact force.
Smart Images

Figure CN119021155A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of anti-collision, and in particular relates to a multi-stage energy-absorbing port anti-collision device. Background Art
[0002] When a ship is moored at a port, due to the complex hydrological environment, the ship undergoes multi-directional cyclic displacement under the action of waves and currents, and may collide repeatedly with the port front and dock foundation. With the continuous increase in the tonnage of ships in my country, in extreme cases such as typhoons and driver errors, the impact load may cause partial damage to the port structure, which may seriously affect the overall stability of the port and make subsequent maintenance work more difficult. At present, most ports in my country use rubber anti-collision, but there are problems such as easy aging and low energy absorption effect. Summary of the invention
[0003] In view of this, the present invention aims to propose a multi-stage energy-absorbing port anti-collision device to improve the energy absorption capacity and reliability when a ship collides with a dock foundation, thereby avoiding damage to the port.
[0004] To achieve the above object, the technical solution of the present invention is achieved as follows:
[0005] A multi-stage energy-absorbing port anti-collision device comprises a first connecting piece, a second connecting piece and an elastic pad which are arranged in sequence from near to far on the water-facing side of a dock foundation;
[0006] The first connecting member is slidably connected to the wharf foundation in a direction perpendicular to the water-facing side of the wharf foundation, and a first energy absorbing mechanism is provided between the first connecting member and the wharf foundation;
[0007] The center position of the second connecting member is connected to the first connecting member through a ball joint mechanism, and the upper and lower ends of the second connecting member are connected to the first connecting member through a second energy absorbing mechanism respectively;
[0008] The elastic pad is fixed to the water-facing side of the second connecting member.
[0009] Furthermore, the first energy absorbing mechanism includes a plurality of first energy absorbing units, the first energy absorbing units include a first spring and a first damper, and the first spring and the first damper are respectively connected between the first connecting member and the dock foundation.
[0010] Furthermore, an overhanging plate is horizontally arranged at the center position of the side of the first connecting member facing the dock foundation, a groove is provided on the water-facing side of the dock foundation, vertical beams are respectively arranged on the upper and lower groove walls of the groove, the bottom end of the vertical beam of the upper groove wall and the top end of the vertical beam of the lower groove wall face each other to form a slot corresponding to the overhanging plate, and the overhanging plate is inserted into the slot to form a sliding connection structure.
[0011] Furthermore, a avoidance groove is provided at the bottom of the groove directly opposite to the overhanging plate, and the distal end of the overhanging plate extends into the avoidance groove;
[0012] The upper and lower surfaces of the extended plate are respectively provided with limit plates corresponding to the vertical beams at the outer sides of the vertical beams.
[0013] Furthermore, the vertical beam is an I-beam structure, the wing plate of which is parallel to the water-facing side of the dock foundation, and the web plate of which is provided with vertical strip holes.
[0014] Furthermore, the second energy absorbing mechanism includes a plurality of second energy absorbing units, and the second energy absorbing units include a second spring and a second damper, wherein the second spring is connected between the second connecting member and the first connecting member, and the second damper is hinged between the second connecting member and the first connecting member.
[0015] Furthermore, the upper and lower ends of the first connecting member and the second connecting member are respectively provided with limiting bosses, and a gap is left between the two limiting bosses to form a first limiting structure;
[0016] The ball joint mechanism includes a ball head, which is installed on the first connecting member through a connecting rod. A ball socket corresponding to the ball head is arranged in the second connecting member. A conical opening connected to the ball socket is opened on the back water side of the second connecting member. The ball head and the ball socket are matched and assembled, and the connecting rod passes through the conical opening to form a second limiting structure with the side wall of the conical opening.
[0017] Furthermore, two openings are provided on the water-facing side of the elastic pad, one above and one below, and a channel is provided in the elastic pad to connect the two openings.
[0018] Furthermore, the two openings have different calibers, wherein the caliber of the upper opening is larger than the caliber of the lower opening, and the channel is arc-shaped, so that the two openings are smoothly connected;
[0019] A bent steel rod is arranged in the channel to support the side wall of the channel.
[0020] Furthermore, of the two openings, a cover is correspondingly provided for the lower opening, and the cover is hinged to the elastic pad above the lower opening.
[0021] Compared with the prior art, the multi-stage energy-absorbing port anti-collision device described in the present invention has the following advantages:
[0022] (1) In the present invention, the elastic pad realizes the first-level energy absorption, the second energy absorption mechanism realizes the second-level energy absorption, the first energy absorption mechanism realizes the third-level energy absorption, and the vertical beam and the limit plate in the sliding connection structure realize the fourth-level energy absorption. After the impact force of the ship on the dock foundation is absorbed by the above-mentioned four-level energy absorption mechanism, the energy of the ship hitting the dock foundation is reduced, the damage to the dock foundation structure is avoided, the structural integrity is ensured, and the safety and service life of the device are improved.
[0023] (2) In the present invention, the elastic anti-skid pad has a channel structure with a large upper opening and a small lower opening, and a cover is provided on the lower opening. When a ship approaches, water is forced to flow into the upper circular hole. When it flows out from the lower circular hole, the flow rate is constant and the cross-sectional area is reduced, which can increase the water flow speed and provide a certain reverse thrust for the ship, thereby reducing its impact force on the dock foundation. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] The accompanying drawings constituting a part of the present invention are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the accompanying drawings:
[0025] Figure 1 This is a front view of a multi-stage energy-absorbing port anti-collision device according to an embodiment of the present invention;
[0026] Figure 2 A top view of a multi-stage energy-absorbing port anti-collision device according to an embodiment of the present invention;
[0027] Figure 3 for Figure 1 AA section view;
[0028] Figure 4 for Figure 3 BB cross-sectional view.
[0029] Description of reference numerals:
[0030] 1-pier foundation; 2-vertical beam; 3-extending plate; 4-limiting plate; 5-first spring; 6-first damper; 7-first connecting piece; 8-ball head; 9-second damper; 10-second spring; 12-second connecting piece; 13-elastic pad; 14-bent steel rod; 15-cover; 16-limiting boss; 17-conical opening; 18-connecting rod; 19-channel; 101-groove; 102-avoidance groove. DETAILED DESCRIPTION
[0031] The present invention will be described in detail below with reference to the accompanying drawings and in conjunction with embodiments.
[0032] like Figure 1 , Figure 2 , Figure 3 and Figure 4As shown, a multi-stage energy-absorbing port anti-collision device is arranged on the waterfront side of the dock foundation 1, including a first connecting member 7, a second connecting member 12 and an elastic pad 13 arranged in sequence from near to far on the waterfront side, the first connecting member 7 is opposite to the waterfront side of the dock foundation 1, the second connecting member 12 is opposite to the side of the first connecting member 7 away from the dock foundation 1, the first connecting member 7 and the second connecting member 12 are both metal plate structures, and the side of the second connecting member 12 facing the first connecting member 7 is a convex arc surface, the elastic pad 13 is a rubber pad, and the elastic pad 13 is installed on the second connecting member 12.
[0033] A square groove 101 is provided on the water-facing side of the dock foundation 1. Several vertical beams 2 are arranged side by side on the upper and lower groove walls of the groove 101 in a horizontal direction and parallel to the water-facing side of the dock foundation 1. The upper vertical beam 2 corresponds to the lower vertical beam 2 one by one, and a distance is left between the bottom end of the upper vertical beam 2 and the top end of the lower vertical beam to form a slot. The first connecting member 7 is horizontally provided with an extended plate 3 toward the center of the side of the dock foundation 1. The extended plate 3 is slidably installed in the slot and forms a sliding connection structure with the slot. The structure only allows the extended plate 3 to move horizontally and constrains its vertical position. In order to prevent the far end of the extended plate 3, that is, the end close to the dock foundation 1, from colliding with the dock benchmark, an avoidance groove 102 is provided at the bottom of the groove 101. The far end of the extended plate 3 extends into the avoidance groove 102 and leaves a distance from the bottom of the avoidance groove 102. A first energy absorbing mechanism is respectively arranged between the upper and lower ends of the first connecting member 7 and the dock foundation 1. The first energy absorbing mechanism includes a plurality of first energy absorbing units which are arranged side by side in a horizontal direction and parallel to the water-facing side of the dock foundation 1. The first energy absorbing unit includes a first spring 5 and a first damper 6. The first spring 5 and the first damper 6 respectively connect the first connecting member 7 and the dock foundation 1.
[0034] A connecting rod 18 is arranged at the side of the first connecting member 7 away from the dock foundation 1, i.e., the center position of the side of the first connecting member 7 facing the second connecting member 12. A ball head 8 is arranged at the far end of the connecting rod 18. A ball socket is arranged at the center of the second connecting member 12. A conical opening 17 connected to the ball socket is arranged on the back-to-water side of the second connecting member 12, i.e., the side facing the first connecting member 7. The large end of the conical opening 17 faces outward, the ball head 8 is matched in the ball socket, and the connecting rod 18 passes through the conical opening 17 to realize the ball-joint connection between the second connecting member 12 and the first connecting member 7. The upper and lower ends of the second connecting member 12 are respectively connected to the first connecting member 7 through a second energy absorbing mechanism. The second energy absorbing mechanism includes a plurality of second energy absorbing units arranged side by side in a horizontal direction parallel to the water-facing side of the dock foundation 1. The second energy absorbing unit includes a second spring 10 and a second damper 9, wherein the second spring 10 is hung and connected between the second connecting member 12 and the first connecting member 7, and the second damper 9 is hinged between the second connecting member 12 and the first connecting member 7.
[0035] Preferably, the upper and lower surfaces of the extension plate 3 are provided with stopper plates 4 corresponding to the vertical beam 2 at the outer side of the vertical beam 2 (the side facing the first connecting member 7). The vertical beam 2 is preferably an I-beam structure, whose wing plate is parallel to the water-facing side of the dock foundation 1, and whose web plate is vertically provided with strip holes. The provision of the strip holes can cause the web area of the vertical beam 2 to undergo a large plastic deformation after the first connecting member 7 hits the vertical beam 2, thereby improving the energy absorption effect of the vertical beam.
[0036] The working principle of the present invention is that when a ship approaches the dock and hits the rubber pad 13, the rubber pad 13 deforms and performs the first stage of energy absorption. After being hit, the rubber pad 13 swings together with the second connecting member 12, stimulating the second energy absorption mechanism to perform the second stage of energy absorption; and the deformation of the second spring 10 can provide a reverse bending moment to the rubber pad 13 together with the second connecting member 12, limiting the further tilting of the ship, and restoring the rubber pad 13 and the second connecting member 12 to their original positions after the collision. As the displacement of the ship's collision increases, the rubber pad 13, the second connecting member 12 and the first connecting member 7 move horizontally toward the dock foundation 1, stimulating the first energy absorption mechanism to perform the third stage of energy absorption. The function of the first spring 5 in the first energy absorption mechanism is to provide a horizontal reverse thrust, so that the rubber pad 13, the second connecting member 12 and the first connecting member 7 move back and return to their original positions. During the collision, when the first connecting member 7 moves horizontally toward the dock foundation 1, after the limit plate 4 contacts the vertical beam 2, the vertical beam 2 can limit the further movement of the first connecting member 7, providing a reaction force for the ship; and when the ship collision load is too large, the vertical beam 2 will be subjected to excessive force and will undergo plastic deformation, achieving the fourth level of energy absorption, while the vertical beam 2 also continues to provide a reverse thrust. It can be seen that the present invention sequentially performs the first level of energy absorption, the second level of energy absorption, the third level of energy absorption and the fourth level of energy absorption, a total of four levels of energy absorption operations, on the collision of the ship. After the above device absorbs energy, the energy of the ship hitting the dock foundation is relatively small, which can avoid damage to the dock foundation structure, ensure structural integrity, and help improve safety and service life.
[0037] In the present invention, the upper and lower ends of the first connecting member 7 and the second connecting member 12 are respectively opposite to the limiting bosses 16, and a gap is left between the two limiting bosses 16 to form a first limiting structure. The connecting rod 18 and the side wall of the tapered opening 17 form a second limiting structure. The first limiting structure and the second limiting structure prevent the second connecting member 12 from swinging too much to protect the second spring 10 and the second damper 9.
[0038] In the present invention, two circular openings are provided on the water-facing side of the elastic pad 13, one above and one below. The two openings have different calibers, wherein the caliber of the upper opening is larger than that of the lower opening. A channel 19 is provided inside the elastic pad 13, and the channel 19 is arc-shaped, so as to smoothly transition and connect the two openings. It can be seen that the channel 19 is a conical channel with a cross-sectional diameter gradually decreasing from top to bottom. Preferably, in order to prevent the channel 19 from being deformed by impact, a bent steel bar 14 is provided inside the hole, for example, the bent steel bar 14 is a spiral steel wire structure corresponding to the channel 19, and the bent steel bar 14 is used to support the side wall of the channel to prevent the channel 19 from deforming and closing. Of the two openings, a cover 15 is provided corresponding to the lower opening, and the cover 15 is hinged to the elastic pad 13 by a hinge, and its hinge axis is above the lower opening, and the cover 15 covers the lower opening. When the ship approaches the dock, water flows in from the upper opening on the rubber pad 13 and flows out from the lower opening on the rubber pad 13, providing a certain reverse thrust at the lower position of the ship to reduce the impact load of the ship.
[0039] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims
1. A multi-stage energy absorption port anti-collision device, characterized in that: It comprises a first connecting piece (7), a second connecting piece (12) and an elastic pad (13) which are arranged in sequence from near to far on the waterfront side of a dock foundation (1); The first connecting member (7) is slidably connected to the dock foundation (1) in a direction perpendicular to the water-facing side of the dock foundation (1), and a first energy absorbing mechanism is provided between the first connecting member (7) and the dock foundation (1); The center position of the second connecting member (12) is connected to the first connecting member (7) via a ball joint mechanism, and the upper and lower ends of the second connecting member (12) are connected to the first connecting member (7) via a second energy absorbing mechanism, respectively; The elastic pad (13) is fixed to the water-facing side of the second connecting member (12).
2. A multi-stage energy absorption port anti-collision device according to claim 1, characterized in that: The first energy absorbing mechanism comprises a plurality of first energy absorbing units, wherein the first energy absorbing units comprise a first spring (5) and a first damper (6), wherein the first spring (5) and the first damper (6) are respectively connected between a first connecting member (7) and a pier foundation (1).
3. The multi-stage energy absorption port anti-collision device according to claim 1, characterized in that: The first connecting member (7) is horizontally provided with an extended plate (3) at the center position of the side of the dock foundation (1), and a groove (101) is provided on the water-facing side of the dock foundation (1). Vertical beams (2) are respectively provided on the upper and lower groove walls of the groove (101), and the bottom end of the upper groove wall vertical beam (2) and the top end of the lower groove wall vertical beam (2) are opposite to form a slot corresponding to the extended plate (3), and the extended plate (3) is inserted into the slot to form a sliding connection structure.
4. A multi-stage energy absorption port anti-collision device according to claim 3, characterized in that: The groove bottom of the groove (101) is provided with an avoidance groove (102) directly opposite to the overhanging plate (3), and the distal end of the overhanging plate (3) extends into the avoidance groove (102); Limiting plates (4) corresponding to the vertical beams are respectively arranged on the upper and lower surfaces of the extended plate (3) at positions outside the vertical beams (2).
5. The multi-stage energy absorption port anti-collision device according to claim 3 is characterized in that: The vertical beam (2) is an I-beam structure, the wing plate of which is parallel to the water-facing side of the dock foundation (1), and the web plate of which is provided with vertical strip holes.
6. The multi-stage energy absorption port anti-collision device according to claim 1, characterized in that: The second energy absorbing mechanism comprises a plurality of second energy absorbing units, wherein the second energy absorbing units comprise a second spring (10) and a second damper (9), wherein the second spring (10) is connected between the second connecting member (12) and the first connecting member (7), and the second damper (9) is hinged between the second connecting member (12) and the first connecting member (7).
7. The multi-stage energy absorption port anti-collision device according to claim 1, characterized in that: The upper and lower ends of the first connecting member (7) and the second connecting member (12) are respectively oppositely provided with limiting bosses (16), and a gap is left between the two limiting bosses (16) to form a first limiting structure; The ball joint mechanism comprises a ball head (8), wherein the ball head (8) is mounted on a first connecting member (7) via a connecting rod (18), a ball socket corresponding to the ball head (8) is arranged in the second connecting member (12), a conical opening (17) connected to the ball socket is arranged on the back side of the second connecting member (12), the ball head (8) and the ball socket are matched and assembled, and the connecting rod (18) passes through the conical opening (17) and forms a second limiting structure with the side wall of the conical opening (17).
8. The multi-stage energy absorption port anti-collision device according to claim 1, characterized in that: The elastic pad (13) has two openings, one above and one below, on the water-facing side thereof, and a channel (19) is arranged inside the elastic pad (13) to connect the two openings.
9. The multi-stage energy absorption port anti-collision device according to claim 1, characterized in that: The two openings have different calibers, wherein the caliber of the upper opening is larger than the caliber of the lower opening, and the channel (19) is arc-shaped, connecting the two openings through a smooth transition; A bent steel rod (14) is arranged in the channel to support the side wall of the channel.
10. The multi-stage energy absorption port anti-collision device according to claim 8, characterized in that: Of the two openings, a cover (15) is correspondingly provided for the lower opening, and the cover (15) is hinged to the elastic pad (13) above the lower opening.