Post-construction anchor cable prestress detection coupling lengthening system and reinforcing method
Through the post-working anchor cable prestress detection coupling joint system, the anchor clamping part and tensioning device are used to drive the anchor displacement, and the prefabricated holding member is placed at the designated position, which solves the problem of insufficient reserved length of the anchor cable, and realizes the Effective prestressing and locking of anchor cables are provided.
Patent Information
- Application Number
- CN202411257342.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-09
- Publication Date
- 2024-11-26
AI Technical Summary
The length of the anchor cable reserved anchor cable is insufficient to perform tensioning and reinforcement, and the existing technology cannot effectively overcome this problem.
A coupling joint system for prestress detection of post-work anchor cables is designed, including anchor clamping part, steel pull rod, tensioning device, support frame and prefabricated holding member. By clamping the anchor, it drives its displacement. And place prefabricated holding members at designated locations to compensate for prestress loss.
It has effectively strengthened the anchor cable with large prestress loss, solved the problem of insufficient reserve length caused by anchor cable retraction, simplified the operation process, improved work efficiency, and achieved accurate results through prefabricated holding components. Prestressed fast locking reinforcement.
Smart Images

Figure CN119021247A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of slope engineering, and in particular to a post-construction anchor cable prestressing reinforcement system and a one-stop rapid tensioning reinforcement method. Background Art
[0002] Prestressed anchor cables have been widely used in the field of civil engineering reinforcement and protection such as slopes and foundation pits. The anchor cable consists of an anchor section, a free section and an anchor. The anchor section is buried in rock or concrete, the free section is used for tensioning, and the anchor is located at the end of the anchor cable for fixing and anchoring. The anchor of the single-hole multi-beam anchor cable has multiple bundles of steel strands, and each bundle of steel strands will be tensioned and locked separately to ensure that they can play an independent anchoring role. In slope engineering scenarios, prestress can be applied to the anchor cables of the protective structure to provide active loads to the slope, constrain slope deformation, and effectively improve the overall stability of the engineering slope.
[0003] However, during the long-term operation of the project, affected by many complex factors such as the displacement and deformation of the structural concrete, the creep relaxation of the steel strands, and the creep of the anchoring rock and soil, the post-construction anchor cable prestressing loss phenomenon is inevitable, resulting in a reduction in the safety reserve of the slope of the anchoring project, and the need to reinforce the anchor cable prestressing.
[0004] In the related technology, a tool anchor with threaded threads can be passed through the existing anchor cable steel strands and aligned and stacked on the outside of the existing working anchor. Then, a matching clip is used to clamp and tighten each steel strand. The tool anchor is then screwed on with a pull rod or a steel strand roller to lengthen the reserved section of the anchor cable after slope construction. Then, the anchor cable with a large prestress loss can be tensioned and reinforced.
[0005] However, the length of the reserved anchor cable steel strands at the end anchor of the post-construction anchor cable is relatively short (about 3 cm). During the operation period, due to various factors, some anchor cable steel strands further shrink and the exposed length becomes shorter (less than 2 cm), or even completely shrink into the anchor device, making it impossible to stack and install the tool anchor in the related technology with the existing working anchor (the tool anchor generally requires a thickness of not less than 1.5-2 cm due to stiffness), and therefore it is impossible to tension and reinforce the anchor cable with a large prestress loss. Summary of the invention
[0006] In order to solve or partially solve the problems existing in the related technology, the present application provides a post-construction anchor cable prestressed detection coupling extension system and reinforcement method, which can effectively overcome the technical problem that the exposed section of the post-construction anchor cable is not long enough to be implemented.
[0007] The first aspect of the present application provides a post-construction anchor cable prestress detection coupling extension system, comprising:
[0008] An anchor clamping part, used for clamping and fastening the anchor of the target anchor cable;
[0009] A steel pull rod, the top end of which is rigidly connected to the anchor clamping portion;
[0010] A tensioning device, used for clamping a portion of the rod body close to the bottom end of the steel pull rod and outputting a compensating tensioning force;
[0011] A support frame, one end of which is arranged on the surface of the engineering structure where the anchor is located, and the other end is used to place the tensioning device;
[0012] A prefabricated bearing member is used to be placed between the anchor and the engineering structure after the tensioning device moves the anchor away from the engineering structure to a compensation distance based on the compensating tensioning force, so as to compensate for the prestress lost by the target anchor cable.
[0013] As an implementation of the first aspect, the anchor clamping portion specifically includes:
[0014] A clip set, comprising a plurality of conical clips, wherein the plurality of conical clips are used to clamp and fasten an anchor of a target anchor cable;
[0015] A steel ferrule, the steel ferrule comprising a large diameter portion and a small diameter portion, the inner diameter thread of the large diameter portion being connected to the anti-slip threads on the outer sides of the plurality of tapered clips;
[0016] A steel support ring, wherein the inner thread of the steel support ring is connected to the thread of the small diameter portion of the steel hoop, and the outer ring portion of the steel support ring is inlet to the top end of the clip group;
[0017] A cylindrical support cylinder, wherein the thread inside the open end of the cylindrical support cylinder is connected to the thread outside the steel sleeve, and the thread of the central through hole on the end face is screwed to the top end of the steel pull rod.
[0018] As an implementation of the first aspect, the tensioning device is specifically a hollow jack.
[0019] As an implementation of the first aspect, the support frame specifically includes two annular support plates and at least four steel columns.
[0020] As an implementation of the first aspect, the displacement meter assembly includes a displacement meter, a displacement reference plate and a displacement meter mounting plate;
[0021] The displacement reference plate is installed on the thread of one end of the steel pull rod close to the cylindrical support cylinder, the displacement meter mounting plate is fixed in the reserved hole of the annular support plate close to the engineering structure, and the displacement meter is installed on the displacement meter mounting plate for real-time measurement of the displacement of the anchor.
[0022] As an implementation of the first aspect, the prefabricated force-holding member is composed of a plurality of arc-shaped prefabricated rigid pad monomers, and a through hole is provided in the center of the prefabricated force-holding member.
[0023] After the above-mentioned parts are assembled, the anchor cable can be tensioned and compensated.
[0024] The second aspect of the present application provides a post-construction anchor cable prestress reinforcement method applied to the above-mentioned post-construction anchor cable prestress detection coupling extension system, comprising:
[0025] Obtaining design requirements for the target anchor cable;
[0026] Using the graded loading method in the design requirements, controlling the graded loading load of the tensioning device, and obtaining the anchor displacement under each graded load;
[0027] Obtaining a prestress test result based on each graded load and the anchor displacement corresponding to the load;
[0028] Obtaining reinforcement parameters that need to be compensated according to the design requirements and the prestress test results;
[0029] The tensioning device is controlled to provide tensioning force according to the reinforcement parameters to compensate for the prestress lost by the target anchor cable and to achieve locking when the target anchor cable retracts to the surface of the placed prefabricated bearing member; wherein the compensation load value after re-measuring the locking is the actual locking compensation load value.
[0030] As an implementation of the second aspect, obtaining a prestress detection result based on each graded load and the anchor displacement corresponding to the load includes:
[0031] Draw a load-displacement curve based on each graded load and the anchor displacement corresponding to the load;
[0032] Obtaining the current prestress level and current anchoring performance of the target anchor cable according to the load-displacement curve;
[0033] The current prestress level and the current anchoring performance are used as prestress detection results.
[0034] As an implementation of the second aspect, obtaining the reinforcement parameters that need to be compensated according to the design requirements and the prestress test results includes:
[0035] Determine the standard prestressing level and standard anchoring performance in the design requirements;
[0036] Calculating the standard prestressing level and the current prestressing level, and data to be compensated between the standard anchoring performance and the current anchoring performance;
[0037] A pre-calibrated compensation parameter table is searched based on the data to be compensated to obtain the reinforcement parameters that need to be compensated.
[0038] As an implementation of the second aspect, controlling the tensioning device to provide the tensioning force according to the reinforcement parameter includes:
[0039] When controlling the tensioning and reinforcing device to output the load tension, the current load F and displacement S of the target anchor cable are obtained in real time, and a FS model is constructed;
[0040] When the F or the S meets the reinforcement parameter, the tensioning and reinforcing device is controlled to stop output;
[0041] Among them, when the F is greater than the preset load upper limit, the S is greater than the preset displacement upper limit, or the slope of the FS curve at the current moment determined based on the FS model is greater than the warning value, the tensioning and reinforcement device is controlled to stop output.
[0042] The technical solution provided by this application may have the following beneficial effects:
[0043] The present application provides a post-construction anchor cable prestress detection coupling extension system, in which the anchor clamping part can tighten and clamp the anchor as a whole, and the anchor clamping part is connected to the tensioning device on the support frame through a steel pull rod. The tensioning device applies tension to the steel pull rod to drive the anchor fixed by the anchor clamping part to move. After tensioning the anchor to the specified position, a suitable prefabricated bearing member is selected to be placed between the anchor and the engineering structure, thereby completing the reinforcement of the prestress lost by the target anchor cable. The post-construction anchor cable prestress detection coupling extension system in the present application is fixed by the anchor, and at the same time, all the anchor cable steel strands on the anchor are tensioned and compensated as a whole, which solves the technical problem that the reserved anchor cable cannot be reinforced because the length of the reserved anchor cable steel strand outside the anchor is too short to cooperate with the tool anchor. BRIEF DESCRIPTION OF THE DRAWINGS
[0044] The above and other objects, features and advantages of the present application will become more apparent by describing in more detail exemplary embodiments of the present application in conjunction with the accompanying drawings, wherein the same reference numerals generally represent the same components in the exemplary embodiments of the present application.
[0045] Figure 1 It is a structural schematic diagram of a post-construction anchor cable prestress detection coupling extension system shown in an embodiment of the present application;
[0046] Figure 2 It is a structural schematic diagram of a clip group in a post-construction anchor cable prestress detection coupling extension system shown in an embodiment of the present application;
[0047] Figure 3 It is a schematic diagram of the steel hoop structure in the post-construction anchor cable prestress detection coupling extension system shown in an embodiment of the present application;
[0048] Figure 4It is a schematic diagram of the combined structure of the clip group and the steel hoop in the post-construction anchor cable prestress detection coupling extension system shown in the embodiment of the present application;
[0049] Figure 5 It is a schematic diagram of the cylindrical support cylinder structure in the post-construction anchor cable prestress detection coupling extension system shown in an embodiment of the present application;
[0050] Figure 6 It is a schematic diagram of the steel support ring structure in the post-construction anchor cable prestress detection coupling extension system shown in an embodiment of the present application;
[0051] Figure 7 It is a schematic diagram of the steel pull rod structure in the post-construction anchor cable prestress detection coupling extension system shown in an embodiment of the present application;
[0052] Figure 8 It is a schematic diagram of the mechanical connection structure of the cylindrical support cylinder and the steel pulling rod through threads in the post-construction anchor cable prestress detection coupling extension system shown in the embodiment of the present application;
[0053] Fig. 9 It is a schematic diagram of the support frame structure in the post-construction anchor cable prestress detection coupling extension system shown in an embodiment of the present application;
[0054] Fig.10 It is a schematic diagram of the installation position of the displacement meter installation plate in the post-construction anchor cable prestress detection coupling extension system shown in the embodiment of the present application;
[0055] Fig.11 It is a schematic diagram of the installation position of the displacement reference plate in the post-construction anchor cable prestress detection coupling extension system shown in the embodiment of the present application;
[0056] Fig.12 It is a schematic diagram of the structure of the prefabricated bearing member in the post-construction anchor cable prestress detection coupling extension system shown in the embodiment of the present application;
[0057] Fig.13 It is a schematic diagram of the structure of a prefabricated rigid pad monomer in the post-construction anchor cable prestress detection coupling extension system shown in an embodiment of the present application;
[0058] Fig.14 It is a flow chart of a method for installing a post-construction anchor cable prestress detection coupling extension system shown in an embodiment of the present application;
[0059] Fig.15 It is a flow chart of a post-construction anchor cable prestressing reinforcement method of a post-construction anchor cable prestressing detection coupling extension system shown in an embodiment of the present application.
[0060] Explanation of symbols:
[0061] 1-anchor clamping part; 2-steel pull rod; 3-tensioning device; 4-support frame; 5-prefabricated bearing member; 6-the anchor; 11-clip set; 111-conical clip; 12-steel hoop; 121-large diameter part of steel hoop; 122-small diameter part of steel hoop; 13-cylindrical support cylinder; 131-center through hole; 14-steel support ring; 41-displacement meter mounting plate; 42-displacement reference plate; 51-prefabricated rigid pad unit. DETAILED DESCRIPTION
[0062] The embodiments of the present application will be described in more detail below with reference to the accompanying drawings. Although the embodiments of the present application are shown in the accompanying drawings, it should be understood that the present application can be implemented in various forms and should not be limited by the embodiments described herein. On the contrary, these embodiments are provided to make the present application more thorough and complete, and to fully convey the scope of the present application to those skilled in the art.
[0063] The terms used in this application are for the purpose of describing specific embodiments only and are not intended to limit this application. The singular forms of "a", "said" and "the" used in this application and the appended claims are also intended to include plural forms unless the context clearly indicates other meanings. It should also be understood that the term "and / or" used herein refers to and includes any or all possible combinations of one or more associated listed items.
[0064] It should be understood that although the terms "first", "second", "third", etc. may be used in this application to describe various information, this information should not be limited to these terms. These terms are only used to distinguish the same type of information from each other. For example, without departing from the scope of this application, the first information may also be referred to as the second information, and similarly, the second information may also be referred to as the first information. Thus, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of this application, the meaning of "multiple" is two or more, unless otherwise clearly and specifically defined.
[0065] Prestressed anchor cables have been widely used in the field of civil engineering reinforcement and protection such as slopes and foundation pits. However, during the long-term operation of the project, affected by many complex factors such as structural concrete displacement and deformation, creep relaxation of steel strands, and creep of anchored rock and soil, the prestress loss phenomenon of the anchor cables after construction occurs, resulting in a reduction in the safety reserve of the slope of the anchoring project. Such anchor cables need to be prestressed and reinforced.
[0066] In the related technology, although there are related means to tension and reinforce anchor cables with large prestress loss, some anchor cable strands will further shrink due to various factors, resulting in a shorter exposed length or even completely shrinking into the anchor, making it impossible to tension and reinforce such anchor cables with related technology.
[0067] In view of the above problems, the embodiment of the present application provides a post-construction anchor cable prestress detection coupling extension system, which uses the anchor clamping part to form an overall stable clamp for the existing working anchor, and the tensioning device pulls the steel pull rod, and drives the anchor clamping part to move together through the steel pull rod, thereby realizing the overall graded tensioning operation of the single anchor hole. After tensioning to the specified position, the prestress compensation is completed by placing a prefabricated bearing member between the anchor pad and the existing working anchor. The problem of being unable to connect with the tool anchor due to the retraction of the reserved anchor cable is solved.
[0068] The technical solution of the embodiments of the present application is described in detail below with reference to the accompanying drawings.
[0069] Figure 1 The structure diagram of the post-construction anchor cable prestress detection coupling extension system shown in the embodiment of the present application. The post-construction anchor cable prestress detection coupling extension system (hereinafter referred to as the system) includes an anchor clamping part 1, a steel pull rod 2, a tensioning device 3, a support frame 4, a prefabricated bearing member 5 (not shown in the figure), and an anchor 6. The system may include the following components:
[0070] The anchor clamping part 1 is used for clamping and fastening the anchor of the target anchor cable.
[0071] In the embodiment of the present application, the anchor clamping portion 1 can adopt an overall embracing clamping method to apply a squeezing force to the anchor 6, which is aimed at the anchor as a whole rather than a specific steel strand.
[0072] The top end of the steel pull rod 2 is rigidly connected to the clamping part of the anchor 6.
[0073] For the specific structure of the steel pull rod 2, please refer to Figure 7 , Figure 7 Schematic diagram of the structure of the steel pull rod 2. The steel pull rod 2 can be in the shape of a long rod, with threads at both ends, the end with fewer threads can be threadedly connected to the anchor clamping part 1, and the other end can be threadedly connected to the tensioning device 3, so that the tensioning device 3 and the anchor clamping part 1 form a tight structure.
[0074] The tensioning device 3 is used to clamp the portion of the rod body close to the bottom end of the steel pulling rod 2 and output a compensating tensioning force.
[0075] Among them, the compensating tension force is the tension applied to the anchor cable during the tension compensation process of the prestressed anchor cable. Tension compensation refers to the method of tensioning and reinforcing the existing prestressed anchor cable after it has a large prestress loss. This tensioning method can overcome the elastic compression loss, reduce the stress relaxation loss of steel and the shrinkage and creep loss of concrete, so as to achieve the expected stress reinforcement active reinforcement effect.
[0076] The tensioning device 3 can be fixed by a thread at one end of the steel pull rod 2, so as to ensure that the tension provided by the tensioning device 3 in the working state can be transmitted to the anchor clamping part 1. The compensating tensioning force corresponds to the design requirements.
[0077] The tensioning device 3 can be any device that can provide longitudinal tension to the steel pull rod 2, such as a hollow jack, an anchor tensioning device, a stretching machine, etc.
[0078] A support frame 4, one end of which is arranged on the surface of the engineering structure where the anchor 6 is located, and the other end is used to place the tensioning device 3. The support frame 4 supports and fixes the tensioning device 3 to offset the reaction force generated by the tensioning device 3 when the tension is applied.
[0079] The engineering structure refers to a building or structure that needs to be provided with additional anchor load protection by an anchor cable structure, such as a slope, a tunnel, a bridge, a dam, etc. When in use, the support frame 4 should be placed through the anchor 6, and the anchor is located at the inner center of the support frame 4.
[0080] The prefabricated bearing member 5 is used to be placed between the anchor 6 and the engineering structure after the tensioning device 3 moves the anchor 6 away from the engineering structure to a compensation distance based on the compensating tensioning force, so as to compensate for the prestress lost by the target anchor cable.
[0081] Among them, the above-mentioned placing of the prefabricated bearing member 5 between the anchor and the engineering structure refers to between the anchor 6 and the anchor pad. The anchor pad is a composite component specially used in the field of construction engineering. Its function is to disperse the pressure generated by the anchor cable driving the anchor 6 to a larger area of the building, relieve stress concentration, and reduce local damage to the building. In this embodiment, there is an anchor pad on the surface of the engineering structure where the anchor 6 is located. The prefabricated bearing member 5 is placed between the anchor 6 and the anchor pad. While preliminarily compensating for the prestress lost by the target anchor cable, it can also ensure that no local damage to the engineering structure is caused after the prestress compensation is completed.
[0082] In application, after the tensioning device 3 provides the required prestress for compensation, the prefabricated bearing member 5 can be placed between the anchor and the surface of the engineering structure, so that after the tensioning device 3 stops providing tension, the anchor cable anchor retracts to the surface of the placed prefabricated bearing member to achieve locking, and the actual locking compensation load value after locking still meets the design requirements.
[0083] In this system, the anchor clamping part 1 locks the anchor 6, and then the steel pull rod 2 is connected to the anchor clamping part 1, the support frame 4 passes through the anchor clamping part 1 and the steel pull rod 2, and is placed on the anchor pad on the surface of the engineering structure, and the tensioning device 3 is placed on the support frame 4 and the steel pull rod 2 is clamped, so that the assembly of the entire system is completed. After the system stretches all the anchor cables on the anchor 6 to the compensation distance, the prefabricated holding member 5 is placed between the anchor 6 and the anchor pad on the surface of the engineering structure. After the placement is completed, the tensioning device 3 is controlled to slowly return the anchor until it fits the prefabricated holding member 5 to achieve locking, thereby locking the compensation load value to compensate for the prestress loss of the target anchor cable.
[0084] The system adopts the method of clamping and tightening the anchor 6 as a whole by the anchor clamping part 1, which solves the problem that the reserved length is insufficient and cannot be clamped due to the retraction of the anchor cable, and it is not necessary to clamp and lock the anchor cables one by one during clamping, which simplifies the operation process and improves work efficiency. The system also realizes precise prestressed rapid locking and reinforcement of the target anchor cable through the prefabricated force-bearing component 5, which is convenient, fast, safe and reliable.
[0085] The above is an introduction to the post-construction anchor cable prestress detection coupling extension system. The following is a detailed introduction to the various components of the system. Figure 2-6 , Figure 8-12 .
[0086] The above-mentioned anchor clamping part specifically includes:
[0087] Clip set 11, for a schematic diagram of the structure of clip set 11, see Figure 2 This part includes a plurality of conical clips 111, and the inner and outer sides of the conical clips have anti-slip threads ( Figure 2 The outer anti-slip thread pattern is not shown in the figure), and the multiple conical clips 111 are used to clamp and tighten the anchor of the target anchor cable.
[0088] Among them, the clip group 11 is generally composed of 2-4 conical clips 111, the thickness of the conical clip 111 gradually increases from the bottom to the top, the inner and outer sides of the conical clip 111 are provided with anti-slip thread patterns, and the outer diameter of the clip group 11 matches the inner diameter of the steel hoop 12. When in use, the inner side of the clip group 11 is evenly fitted to the target anchor 6 in the circumferential direction, and the outer side is evenly fitted to the steel hoop 12 in the circumferential direction.
[0089] Steel ferrule 12, structural diagram of steel ferrule 12 (with threads all over the inside and outside) Figure 3 The steel hoop 12 includes a steel hoop large diameter portion 121 and a steel hoop small diameter portion 122 .
[0090] The schematic diagram of the combined structure of the clip set 11 and the steel hoop 12 is shown in FIG. Figure 4The inner thread of the large diameter portion 121 of the steel ferrule is connected to the anti-slip thread pattern on the outer sides of the plurality of conical clips 111 .
[0091] Among them, the outer thread of the small diameter part 122 of the steel hoop is screwed with the inner thread of the steel support ring 14, and the outer thread of the large diameter part 121 of the steel hoop is screwed with the inner thread of the cylindrical support cylinder 13. By axially receiving the load transmitted when the cylindrical support cylinder 13 is screwed, an extrusion bite force is applied to the clip group 11 that is fitted with the target anchor 6.
[0092] The cylindrical support cylinder 13, the schematic diagram of the cylindrical support cylinder 13 can be seen in Figure 5 The thread inside the open end of the cylindrical support cylinder 13 is connected to the thread outside the steel sleeve 12, and the thread of the center through hole on the end face is screwed to the top end of the steel pulling rod 2.
[0093] The steel pull rod 2 can be connected to the cylindrical support cylinder 13. For a schematic diagram of the connection structure between the steel pull rod 2 and the cylindrical support cylinder 13, please refer to Figure 8 The cylindrical support cylinder 13 is in the shape of a hollow cylinder, with an open bottom and no end face, a central through hole 131 on the top end face, and a thread on the inside. There is a through circular hole in the center of the top end face of the cylindrical support cylinder, which is a central through hole. The inner side of the central through hole 131 has a thread and can be screwed to one end of the steel pull rod 2. By receiving the tensile load transmitted from the steel pull rod 2, tension is applied to the steel hoop 12 component.
[0094] Steel support ring 14, schematic diagram of steel support ring (with internal thread on the inner side) Figure 6 The inner thread of the steel support ring 14 is connected to the thread of the small diameter portion of the steel hoop 12 , and the outer ring portion of the steel support ring 14 is tightly fastened to the top of the clip group 11 .
[0095] Among them, the steel support ring 14 has an annular cross-section and a thread on the inner side. After being screwed and tightened with the outer side of the small diameter part 122 of the steel hoop, the steel support ring 14 will tightly buckle the top of the clip group 11, and act on the additional plate group together with the steel hoop 12, playing a bite limit role on the clip group 11, limiting and synchronizing the displacement of the clip group 11, and forming an effective tightening and clamping force on the target anchor 6, that is, the clip group 11 is tightened by the steel hoop 12 and the steel support ring 14, so that the clip group 111 locks the anchor, so that the anchor 6 can follow the anchor clamping part to move during the construction process.
[0096] The above parts can form an anchor clamping part 1 to clamp the anchor to form a tightening clamping force, and the tensioning device 3 is connected to the steel pull rod 2 to tension the anchor cable fixed by the anchor 6. The common practice in the existing related technology is to first pass the tool anchor with thread through the existing anchor cable and align and stack it on the outside of the existing working anchor, then use the matching clip to tighten and clamp each anchor cable, and then use the pull rod or steel strand roller to rotate the tool anchor to achieve the extension and fixation of the reserved anchor cable. The anchor clamping part 1 simplifies the common process in the related technology through the combination of connecting various components. The anchor cables are no longer fixed one by one, but all anchor cables are fixed by fixing the anchor 6 where the anchor cables are located, and there is no problem of being unable to clamp the anchor cables due to insufficient reserved length. (Beneficial effects are derived) At the same time, the combination of the anchor clamping part 1 proposed in this embodiment also improves the modularization and standardization level of the components, enhances the versatility and adaptability, and can meet the under-anchor prestressed detection and compensatory tension locking of anchor cable structures of different designs and complex scene conditions. It not only effectively solves the technical problem that the retraction length of the in-service anchor cable steel strand is too short to be implemented, but also realizes simple, fast and efficient implementation of complex application scenarios, greatly simplifies the operation process, and improves work efficiency.
[0097] The tensioning device 3 is specifically a hollow jack. The steel pull rod 2 can be passed through the hollow jack. After the tightening is completed, the hollow jack drives the anchor clamping part 1 through the steel pull rod 2 to tension the anchor 6.
[0098] For the specific structure of the above support frame 4, please refer to Fig. 9 , Fig. 9 Schematic diagram of support frame 4. Support frame 4 specifically includes two annular support plates and at least four steel columns. This part plays a supporting role for the tensioning device.
[0099] Among them, the support frame 4 is the main force-bearing component of the entire system, which can transmit the reaction force generated by the tensioning device 3 during tensioning to the surface of the engineering structure, ensuring that the tensioning device 3 can apply an outward pulling force to the anchor clamp 1. At the same time, a reserved hole for installing a displacement meter is provided on the outer side of the support frame 4, and the displacement meter assembly can be installed on the support frame, which is convenient for real-time and accurate measurement of the anchor displacement.
[0100] The displacement meter assembly includes a displacement meter, a displacement reference plate 42, and a displacement meter mounting plate 41. For specific mounting positions, see Fig.10 , Fig.11 , Fig.10 This is a schematic diagram of the installation position of the displacement meter mounting plate. Fig.11The figure is a schematic diagram of the installation position of the displacement reference plate. The displacement reference plate 42 is installed on the thread of the end of the steel pull rod 2 close to the cylindrical support cylinder 13, and the displacement meter installation plate 41 is fixed in the reserved hole of the annular support plate close to the engineering structure. The displacement meter is installed on the displacement meter installation plate 41 to measure the displacement of the anchor 6 in real time, so that the system is more accurate when prestressing the anchor cable, which is convenient for observation and control of the system.
[0101] The prefabricated force-bearing member 5 is composed of a plurality of arc-shaped prefabricated rigid pad monomers 51. The prefabricated force-bearing member 5 has a through hole in the center. For the specific structure, please refer to Fig.12 , Fig.13 , Fig.12 This is a schematic diagram of prefabricated bearing components. Fig.13 It is a schematic diagram of a prefabricated rigid pad monomer. After the anchor cable is tensioned to the specified position, a prefabricated bearing member 5 of appropriate thickness is placed between the anchor 6 and the anchor pad for prestress compensation. In this part, a prefabricated bearing member 51 composed of a prefabricated rigid pad 5 is used, and has a circular through hole in the middle. The number and diameter of the circular holes are selected according to the target anchor to adapt to the project implementation. It is mostly made of manganese steel and carbon steel, and the conventional thickness varies from 1.5cm, 2.0cm, 2.5cm, 3.0cm, and 3.5cm.
[0102] The following is a detailed description of the installation of the post-construction anchor cable prestressing reinforcement system in this embodiment in conjunction with the accompanying drawings. The installation process is as follows: Fig.13 As shown, the method includes steps S110-S180:
[0103] S110: The anchor 6 for fixing the target anchor cable is evenly fitted in the circumferential direction through the anti-slip thread pattern on the inner side of the clip set 11, and the inner diameter thread of the large diameter portion 121 of the steel sleeve is connected to the anti-slip thread pattern on the outer side of the clip set 11;
[0104] S120: Connect the steel support ring 14 to the outer diameter thread of the small diameter portion 122 of the steel hoop, so that the outer ring portion of the steel support ring 14 is tightly attached to the top of the clip set 11.
[0105] Among them, in this step, the steel support ring 14 limits the displacement of the clip group 11 after being connected to the steel hoop 12, and through the joint action with the clip group 11 and the steel hoop 12, forms an effective tightening clamping force on the anchor 6 of the target anchor cable.
[0106] S130: Connect the thread inside the open end of the cylindrical support cylinder 13 with the thread outside the large diameter portion 121 of the steel hoop.
[0107] Among them, in this step, the interior of the cylindrical drag cylinder 13 is still hollow after completing the connection with the steel sleeve 12. The hollow part can play a role in placing the anchor cable reserved on the outside of the anchor 6, so that the reserved anchor cable does not affect the anchor clamping part 1 during the anchor 6 clamping process.
[0108] S140: The thread of the central through hole on the end face of the cylindrical support cylinder 13 is screwed and fastened with the top thread of the steel pulling rod 2.
[0109] S150: The support frame 4 is fixed to the surface of the engineering structure through the cylindrical support cylinder 13 and the steel pull rod 2.
[0110] S160: Pass the steel pull rod 2 through the tensioning device 3 and tighten it.
[0111] S170: a hole is punched on the support frame 4 and a displacement meter mounting plate 41 is installed, and the displacement meter is installed on the displacement meter mounting plate 41 .
[0112] S180: Install the displacement reference plate 42 on the thread of one end of the steel pulling rod 2 close to the cylindrical supporting cylinder 13.
[0113] After the installation in this step is completed, the assembly of the equipment is completed.
[0114] This system uses a new structure composed of a clip group 11 and a steel hoop 12 to clamp the anchor 6 as a whole. The tensioning device 3 provides load to pull the steel pull rod 2. The steel pull rod 2 drives the cylindrical support cylinder 13, the steel hoop 12, the steel support ring 14 and the clip group 11 to move together in sequence through threaded connection. The clip group 11 further tightens and clamps the anchor 6 for synchronous movement, thereby achieving prestressed tension compensation for the anchor cable fixed by the anchor 6. After the target anchor cable is stretched to the specified position, a prefabricated bearing member 5 of appropriate thickness is placed between the anchor 6 and the anchor pad to achieve rapid reinforcement and locking of the prestress of the anchor cable.
[0115] The present application also provides a post-construction anchor cable prestressing reinforcement method applied to the above-mentioned post-construction anchor cable prestressing reinforcement system. Please continue to refer to Fig.14 , Fig.14 The present invention is a flow chart of a method for reinforcing anchor cables prestressed after construction, and the method comprises:
[0116] S210: Obtaining the design requirements of the target anchor cable;
[0117] S220: Using the graded loading method in the design requirements, controlling the tensioning device 3 to load the load in grades, and obtaining the displacement of the anchor 6 under each graded load;
[0118] Among them, the graded loading method is to apply load to the clamped anchor 6 in multiple times through the tensioning device 3 according to the design requirements. When applying the load, the load on the anchor 6 is gradually increased. After each load is applied, the current load is maintained for a period of time before the load can be further increased. At the same time, after each load is applied, the displacement of the anchor 6 under the current load is recorded, and the load-displacement curve is drawn according to the applied load and the displacement of the anchor 6, which is convenient for analyzing the prestress test results. The purpose of adopting the graded loading method is to reduce the loss of prestress and ensure the stability of the anchor cable.
[0119] S230: Obtaining a prestress test result based on each graded load and the displacement of the anchor 6 corresponding to the load;
[0120] S240: Obtaining reinforcement parameters that need to be compensated according to the design requirements and the prestressing test results;
[0121] S250: Control the tensioning device 3 to provide compensating tensioning force according to the reinforcement parameters to compensate for the prestress lost by the target anchor cable. When the target anchor cable retracts to the surface of the placed prefabricated bearing member, locking is achieved; wherein the compensation load value after re-measuring locking is the actual locking compensation load value.
[0122] Among them, the above-mentioned method of compensating the prestress lost by the target anchor cable is to select a prefabricated holding member 5 of appropriate thickness and place it between the anchor 6 and the anchor pad after the tensioning device 3 completes the tensioning of the anchor cable according to the parameters. The thickness of the prefabricated holding member 5 should be selected to ensure that after the anchor is retracted and locked, the actual locking compensation load value of the anchor cable still meets the design requirements. After the placement is completed, the tensioning device 3 is controlled to slowly release the hydraulic system pressure to retract the anchor 6 until it contacts the prefabricated holding member 5. At this time, the prefabricated holding member 5 bears part of the prestress to achieve locking reinforcement.
[0123] When the above-mentioned system is assembled, the reinforcement parameters can be obtained according to the above method. The reinforcement parameters can be the design compensation load value and the reference value of the anchor cable elongation, etc., and the prestress loss of the target anchor cable can be compensated according to the reinforcement parameters. The design requirements can be specifically:
[0124] (1) Design prestress value: the theoretical tension control force determined during the design of the anchor cable, which is the main criterion for prestress detection and compensation. For example, the design prestress value of a certain anchor cable is 500kN.
[0125] (2) Prestress compensation rate: that is, the percentage of the prestress value of the anchor cable after compensation tensioning to its design prestress value. For example, based on the slope stability and prevention and control requirements, the prestress is compensated to 90% or 95% of the design value. This parameter is crucial to determine the target value of compensation tensioning.
[0126] (3) Anchor cable parameters: including total length of anchor cable, anchoring section length, free section length, number of anchor cables and specifications (such as steel strand diameter). These parameters are used to calculate the theoretical elongation value of anchor cable during compensatory tensioning, which serves as an important reference for controlling the compensatory tensioning process. For example, the total length of an anchor cable is 20m, of which the anchoring section length is 8m, the free section length is 12m, and 4 φ15.24 steel strands are used.
[0127] This method can integrate the prestress detection and compensation tensioning operations into one, so that the entire prestress detection and compensation tensioning process can be carried out continuously. Compared with the usual practice in the relevant technology, it saves the process of replacing the prestress detection equipment with the compensation tensioning equipment after the prestress detection is completed, shortens the construction time, and improves work efficiency. This method can also obtain accurate measurement data and compensation parameters, and with the use of the standardized bearing components in the aforementioned embodiment, accurate prestress compensation can be achieved.
[0128] The prestress detection result obtained based on each graded load and the displacement of the anchor 6 corresponding to the load includes:
[0129] Draw a load-displacement curve based on each graded load and the displacement of the anchor 6 corresponding to the load;
[0130] According to the load-displacement curve, the current prestress level and the current anchoring performance of the target anchor cable are obtained;
[0131] The above current prestress level and current anchoring performance are taken as prestress detection results.
[0132] Among them, the load-displacement curve reflects the relationship between the applied load and the deformation of the anchor cable, and intuitively presents the current bearing capacity of the anchor cable. Through analysis, the most accurate current prestress level and anchoring performance of the anchor cable can be obtained.
[0133] The above-mentioned prestress detection method can accurately analyze the prestress level and current anchoring performance of the target anchor cable, providing a basis for subsequent analysis of reinforcement parameters.
[0134] According to the design requirements and the prestress test results, the reinforcement parameters that need to be compensated are obtained, including:
[0135] Determine the standard prestressing level and standard anchoring performance in the above design requirements;
[0136] Calculating the standard prestressing level and the current prestressing level, and data to be compensated between the standard anchoring performance and the current anchoring performance;
[0137] Based on the above data to be compensated, a pre-calibrated compensation parameter table is searched to obtain the reinforcement parameters that need to be compensated.
[0138] Among them, the compensation parameter table is mainly used to predict and determine the prestress loss of prestressed anchor cables caused by multiple factors during the construction and use process. The compensation parameter table will mark the relevant data of the anchor cables that need to be tensioned and compensated. By searching the compensation parameter table based on the parameters obtained in advance, the parameters that need to be compensated can be obtained.
[0139] The above method for obtaining reinforcement parameters is analyzed according to the actual situation of the anchor cable, and the obtained reinforcement parameters are more accurate and reliable.
[0140] The above-mentioned controlling the tensioning device 3 to provide the tensioning force according to the reinforcement parameter includes:
[0141] When the tensioning and reinforcing device 3 is controlled to output the load tension, the current load F and displacement S of the target anchor cable are obtained in real time, and a FS model is constructed;
[0142] When the F or the S meets the reinforcement parameter, the tensioning and reinforcing device 3 is controlled to stop output;
[0143] The FS model is a mathematical relationship extracted by regression analysis, curve fitting and other methods to express the relationship between load F and displacement S, and is combined with a graphical representation of the model. The model can analyze and predict the performance and safety of anchor cables under different load conditions, which helps construction personnel monitor the health status of anchor cables and perform fault diagnosis. When the F is greater than the preset load upper limit, the S is greater than the preset displacement upper limit, or the slope of the FS curve at the current moment is greater than the warning value determined by the FS model, the tensioning and reinforcing device 3 is controlled to stop outputting.
[0144] The above FS model can evaluate the state of the anchor cable in real time, and then control the tensioning device 3 in real time, while safely limiting the upper limit of the load and the upper limit of the displacement and monitoring the FS slope curve in real time to prevent the anchor cable from being over-stretched and the slope mutation causing the anchor cable to fail.
[0145] The method described in this embodiment simplifies the construction process, analyzes and calculates various parameters of the target anchor cable, obtains specific parameters that need to be reinforced, and provides accurate data support for the compensation tensioning size of the anchor cable. At the same time, by monitoring various parameters and controlling the tensioning device 3 through parameter feedback, a safe and efficient protection mechanism is formed to protect the safety of the anchor cable and ensure the quality of the project.
[0146] The embodiments of the present application have been described above, and the above description is exemplary, not exhaustive, and is not limited to the disclosed embodiments. Many modifications and changes will be apparent to those of ordinary skill in the art without departing from the scope and spirit of the described embodiments. The selection of terms used herein is intended to best explain the principles of the embodiments, practical applications, or improvements to the technology in the market, or to enable other persons of ordinary skill in the art to understand the embodiments disclosed herein.
Claims
1. Post-construction anchor cable prestress detection coupling extension system, It is characterized in that include: An anchor clamping part, used for clamping and fastening the anchor of the target anchor cable; A steel pull rod, the top end of which is rigidly connected to the anchor clamping portion; A tensioning device, used for clamping a portion of the rod body close to the bottom end of the steel pull rod and outputting a compensating tensioning force; A support frame, one end of which is arranged on the surface of the engineering structure where the anchor is located, and the other end is used to place the tensioning device; A prefabricated bearing member is used to be placed between the anchor and the engineering structure after the tensioning device moves the anchor away from the engineering structure to a compensation distance based on the compensating tensioning force, so as to compensate for the prestress lost by the target anchor cable.
2. The system according to claim 1, It is characterized in that The anchor clamping part specifically comprises: A clip set, comprising a plurality of conical clips, wherein the plurality of conical clips are used to clamp and fasten an anchor of a target anchor cable; A steel ferrule, the steel ferrule comprising a large diameter portion and a small diameter portion, the inner diameter thread of the large diameter portion being connected to the anti-slip threads on the outer sides of the plurality of tapered clips; A steel support ring, wherein the inner thread of the steel support ring is connected to the thread of the small diameter portion of the steel hoop, and the outer ring portion of the steel support ring is inlet to the top end of the clip group; A cylindrical support cylinder, wherein the thread inside the open end of the cylindrical support cylinder is connected to the thread outside the steel sleeve, and the thread of the central through hole on the end face is screwed to the top end of the steel pull rod.
3. The system according to claim 1 or 2, It is characterized in that The tensioning device is specifically a hollow jack.
4. The system according to claim 2, It is characterized in that The support frame specifically includes two annular support plates and at least two steel columns.
5. The system according to claim 4, It is characterized in that Also includes: Displacement meter assembly; The displacement meter assembly includes a displacement meter, a displacement reference plate and a displacement meter mounting plate; The displacement reference plate is installed on the thread of one end of the steel pull rod close to the cylindrical support cylinder, the displacement meter mounting plate is fixed in the reserved hole of the annular support plate close to the engineering structure, and the displacement meter is installed on the displacement meter mounting plate for real-time measurement of the displacement of the anchor.
6. The system according to claim 1, It is characterized in that The prefabricated force-holding component is composed of a plurality of arc-shaped prefabricated rigid pad monomers, and a through hole is provided in the center of the prefabricated force-holding component.
7. Post-construction anchor cable prestressing reinforcement method, It is characterized in that Applied to the post-construction anchor cable prestress detection coupling extension system according to any one of claims 1 to 6, the method comprises: Obtaining design requirements for the target anchor cable; Using the graded loading method in the design requirements, controlling the graded loading load of the tensioning device, and obtaining the anchor displacement under each graded load; Obtaining a prestress test result based on each graded load and the anchor displacement corresponding to the load; Obtaining reinforcement parameters that need to be compensated according to the design requirements and the prestress test results; The tensioning device is controlled to provide tensioning force according to the reinforcement parameters to compensate for the prestress lost by the target anchor cable and to achieve locking when the target anchor cable retracts to the surface of the placed prefabricated bearing member; wherein the compensation load value after re-measuring the locking is the actual locking compensation load value.
8. The method according to claim 7, It is characterized in that The prestressing test result is obtained based on each graded load and the anchor displacement corresponding to the load, including: Draw a load-displacement curve based on each graded load and the anchor displacement corresponding to the load; Obtaining the current prestress level and current anchoring performance of the target anchor cable according to the load-displacement curve; The current prestress level and the current anchoring performance are used as prestress detection results.
9. The method according to claim 8, It is characterized in that The step of obtaining the reinforcement parameters to be compensated according to the design requirements and the prestress test results includes: Determine the standard prestressing level and standard anchoring performance in the design requirements; Calculating the standard prestressing level and the current prestressing level, and data to be compensated between the standard anchoring performance and the current anchoring performance; A pre-calibrated compensation parameter table is searched based on the data to be compensated to obtain the reinforcement parameters that need to be compensated.
10. The method according to claim 7, It is characterized in that Controlling the tensioning device to provide tensioning force according to the reinforcement parameters comprises: When controlling the tensioning and reinforcing device to output the load tension, the current load F and displacement S of the target anchor cable are obtained in real time, and a FS model is constructed; When the F or the S meets the reinforcement parameter, the tensioning and reinforcing device is controlled to stop output; Among them, when the F is greater than the preset load upper limit, the S is greater than the preset displacement upper limit, or the slope of the FS curve at the current moment determined based on the FS model is greater than the warning value, the tensioning and reinforcement device is controlled to stop output.