Construction method for connecting bottom plate and basement top plate in high-proportion non-basement area

By synchronously setting the base plate and top plate construction outside the distance range in the construction of high-proportion basement areas without basements, setting up steel bar connectors and pouring concrete, the problem of long construction period is solved, rapid connection and efficient construction are achieved, and cost is reduced.

CN119021273APending Publication Date: 2024-11-26CHINA CONSTRUCTION EIGHTH BUREAU GENERAL CONTRACTING CONSTRUCTION CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411399466.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-09
Publication Date
2024-11-26

AI Technical Summary

Technical Problem

When the existing technology has a high proportion of basement areas without basements, the construction period will be long, which will affect the construction efficiency and cost.

Method used

Synchronize the base plate and top plate of the basement outside the set distance range, set up steel bar connectors, pour concrete at the connection, pull out the enclosed piles, backfill the fertilizer grooves and earth finish, shorten the construction period and improve construction efficiency.

Benefits of technology

By synchronous construction and connecting steel bars, the bottom plate and the top plate are quickly connected, avoiding the impact of enclosure removal on the structure, controlling the construction progress and efficiency, shortening the construction period and saving costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119021273A_ABST
    Figure CN119021273A_ABST
Patent Text Reader

Abstract

The invention relates to a construction method for connecting a bottom plate with a basement top plate in a high-proportion non-basement area. The construction method comprises the following steps that the bottom plate outside a set distance range outside a basement setting area is constructed; foundation pit supporting and earth excavation of the basement setting area are synchronously constructed to form a foundation pit of the basement; constructing a basement bottom plate, a basement outer wall and a basement top plate at the bottom of the foundation pit; when the basement top plate is constructed, steel bar connectors are arranged on the corresponding side faces of the basement top plate; fertilizer groove backfilling is conducted on the outer side of the basement outer wall; a fender post for foundation pit supporting is pulled out; connecting steel bars are arranged between the bottom plate and the basement top plate, and concrete is poured at the connecting steel bars to complete connecting construction of the bottom plate and the basement top plate in the non-basement area. According to the method, part of the bottom plate (namely the bottom plate outside the set distance range) of the basement-free area and the basement are synchronously constructed, subsequent connection construction is conducted at the reserved connecting position, and the construction progress and efficiency can be better controlled.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of building structure construction, and in particular to a construction method for connecting a bottom plate of a high-proportion non-basement area with a basement top plate. Background Art

[0002] In the prior art, the connection between the area without a basement and the area with a basement is usually carried out in the order of "deep first and shallow later", that is, the basement area is constructed first and then the area without a basement. During the construction of the area without a basement, the connection between the area without a basement and the basement area is constructed. If the construction scope of the area without a basement accounts for a low proportion, it will have little impact on the constructed structure of the basement area and the overall construction period. However, if the construction scope of the area without a basement accounts for a high proportion, there are many processes from the foundation pit support to the basement top plate construction, which takes a long time to construct and has a great impact on the construction period. Summary of the invention

[0003] The purpose of the present invention is to overcome the defects of the prior art and provide a construction method for connecting the bottom plate of a high-proportion area without a basement with the top plate of the basement, so as to solve the problem of long construction period in the high-proportion area of ​​the existing construction method.

[0004] The technical solution to achieve the above purpose is:

[0005] The present invention provides a construction method for connecting a bottom plate of a high-proportion non-basement area with a basement top plate, comprising the following steps:

[0006] Construction of basement floor outside the set distance range outside the area where the basement is set;

[0007] Simultaneously construct the foundation pit support and earth excavation of the basement setting area to form the basement foundation pit;

[0008] Construct the basement floor slab, basement exterior wall and basement roof slab at the bottom of the foundation pit;

[0009] When constructing the basement top slab, a steel bar connector is installed on the side corresponding to the basement top slab;

[0010] Backfill the manure trough on the outside of the basement exterior wall;

[0011] Pull out the retaining piles used for foundation pit support;

[0012] Connecting steel bars are set between the bottom plate and the basement top plate, and concrete is poured at the connecting steel bars to complete the connection construction between the bottom plate and the basement top plate in the area without a basement.

[0013] A further improvement of the construction method for connecting the bottom plate of a high-proportion non-basement area with the top plate of the basement of the present invention is that the set distance is 2m to 4m.

[0014] A further improvement of the construction method for connecting the bottom plate of a high-proportion non-basement area with the top plate of a basement is that, when constructing the basement bottom plate, a plain concrete replacement support belt is constructed on the top area of ​​one side of the basement bottom plate close to the retaining piles;

[0015] After the basement floor and plain concrete replacement support belt meet the design requirements, remove the internal support.

[0016] A further improvement of the construction method for connecting the bottom plate of a high-proportion non-basement area with the basement top plate of the present invention is that after the basement exterior wall construction is completed and the formwork is removed, the basement exterior wall waterproofing and the basement exterior wall waterproofing protective layer are constructed.

[0017] A further improvement of the construction method for connecting the bottom slab of a high-proportion area without a basement with the top slab of the basement of the present invention is that when setting the connecting steel bars, one end of the connecting steel bars is connected to the steel bar connector, and two sections of the connecting steel bars are connected to the steel bars reserved during the bottom slab construction.

[0018] A further improvement of the construction method of connecting the bottom plate of a high-proportion non-basement area with the top plate of the basement of the present invention is that the thickness of the constructed top plate of the basement is less than the thickness of the bottom plate;

[0019] Steel bar connectors are arranged at corresponding positions on the outer wall of the basement to connect corresponding connecting steel bars.

[0020] A further improvement of the construction method for connecting the bottom plate of a high-proportion area without a basement with the top plate of a basement in the present invention is that before setting the connecting steel bars, the earthwork at the connection between the bottom plate and the top plate of the basement is trimmed, brick membranes are laid, and cushion layers are constructed.

[0021] The construction method for connecting the bottom plate of the high-proportion non-basement area with the basement top plate of the present invention has the following beneficial effects:

[0022] The present invention simultaneously constructs a portion of the bottom plate in the area without a basement (that is, the bottom plate outside a set distance range) and the basement, and reserves a connection point for subsequent connection construction, which can better control the construction progress and efficiency.

[0023] The construction method of the present invention can pull out the retaining piles after the fertilizer trough is backfilled, and the structure at the connection between the construction floor and the basement can quickly connect the floor and the basement top plate, avoiding the influence on the stability of the structure after the outer retaining of the basement is removed.

[0024] The present invention arranges a steel bar connector at the top plate of the basement, provides a working space for the limited construction work space of the steel bar connection at the connection, and facilitates the steel bar construction at the connection. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1It is a structural schematic diagram of the synchronous construction of a part of the bottom plate and the basement in the construction method of connecting the bottom plate of a high-proportion non-basement area with the basement top plate of the present invention.

[0026] Figure 2 It is a structural schematic diagram of constructing a basement exterior wall and a basement top plate in a construction method for connecting a bottom plate of a high-proportion non-basement area with a basement top plate of the present invention.

[0027] Figure 3 It is a structural schematic diagram of the construction connection steel bars in the construction method of connecting the bottom plate of the high-proportion non-basement area with the basement top plate of the present invention.

[0028] Figure 4 The present invention is a flow chart of a construction method for connecting the bottom plate of a high-proportion non-basement area with the top plate of the basement. DETAILED DESCRIPTION

[0029] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.

[0030] See also Figure 1 The present invention provides a construction method for connecting the bottom plate of a high-proportion area without a basement with the top plate of the basement. The connection position of the bottom plate and the top plate of the basement in the area without a basement is reserved before construction, and the bottom plates of the other areas without a basement are interspersed with construction in advance, while solving the technical difficulties of the connection, which has a positive effect on shortening the construction period and saving costs. The construction method for connecting the bottom plate and the top plate of the basement in a high-proportion area without a basement according to the present invention is described below in conjunction with the accompanying drawings.

[0031] See also Figure 4 , showing a flow chart of the construction method of connecting the bottom plate of the high-proportion non-basement area with the basement top plate of the present invention. Figure 4 , the construction method of connecting the bottom plate of the high-proportion basement-free area with the basement top plate of the present invention is explained.

[0032] like Figure 4 As shown, the construction method of connecting the bottom plate of the high-proportion non-basement area with the basement top plate of the present invention comprises the following steps:

[0033] Construction of basement floor outside the set distance range outside the area where the basement is set;

[0034] Simultaneously construct the foundation pit support and earth excavation of the basement setting area to form the basement foundation pit;

[0035] Construct the basement floor slab, basement exterior wall and basement roof slab at the bottom of the foundation pit;

[0036] When constructing the basement top slab, a steel bar connector is installed on the side corresponding to the basement top slab;

[0037] Backfill the manure trough on the outside of the basement exterior wall;

[0038] Pull out the retaining piles used for foundation pit support;

[0039] Connecting steel bars are set between the bottom plate and the basement top plate, and concrete is poured at the connecting steel bars to complete the connection construction between the bottom plate and the basement top plate in the area without a basement.

[0040] Furthermore, if Figure 1 For example, if the set distance is 2m, the bottom plate 21 is first constructed within a range of 2m outside the foundation pit, and a certain length of the steel bar ends in the bottom plate 21 is reserved to form a reserved steel bar 211, and the length of the reserved steel bar 211 is adapted to the set distance, such as 2m.

[0041] While constructing the basement 21, the basement area is constructed simultaneously, including the foundation pit support and earth excavation of the basement area. The foundation pit support includes the construction of retaining piles 221. In the process of digging downward to form the foundation pit 22, internal supports 222 are set. The ends of the internal supports 222 are supported on the retaining piles 221. A corbel is also set at the end of the internal support 222. The corbel is connected to the retaining piles 221 to provide support for the internal support 222.

[0042] After the foundation pit 22 is excavated, the basement floor 23 is constructed. When constructing the basement floor 23, a plain concrete replacement support belt 24 is constructed on the top area of ​​one side of the basement floor 23 close to the retaining pile 221; after the basement floor 23 and the plain concrete replacement support belt 24 meet the design requirements, the internal support 222 is removed.

[0043] Furthermore, if Figure 1 As shown, the plain concrete replacement support belt 24 is supported on the inner side of the retaining pile 221, and a connecting guide wall 241 is constructed on the top surface of the plain concrete replacement support belt 24 corresponding to the position of the basement outer wall. Figure 2 As shown, to facilitate the construction of the basement exterior wall 25.

[0044] A reinforcement beam 242 having a cross-sectional size larger than that of the connecting guide wall 241 is arranged at a position on the bottom surface of the plain concrete replacement support belt 24 corresponding to the connecting guide wall 241 .

[0045] After the construction of the basement outer wall 25 is completed, the template of the basement outer wall is removed, and then the basement outer wall waterproofing 29 and the basement outer wall waterproofing protective layer 30 are constructed on the outer side of the basement outer wall 25. The basement outer wall waterproofing 29 can be made by laying waterproofing coiled material, the bottom of which is laid on the surface of the plain concrete replacement support belt 24, and then turned up and pasted on the outer side of the connecting guide wall 241 and the basement outer wall 25, so that after the fertilizer tank backfill 27 is backfilled, the fertilizer tank backfill 27 can press the waterproofing coiled material set on the upper surface of the plain concrete replacement support belt 24, which plays a good waterproofing role on the connection between the plain concrete replacement support belt 24, the connecting guide wall 241 and the basement outer wall 25.

[0046] Furthermore, the thickness of the constructed basement top plate 26 is smaller than the thickness of the bottom plate 21 ; a steel bar connector 28 is provided at a corresponding position on the basement outer wall 25 to connect the corresponding connecting steel bars 31 .

[0047] A steel bar connector 28 is reserved on the side of the basement top plate 26 to facilitate the connection of corresponding connecting steel bars 31 .

[0048] The fertilizer tank is backfilled outside the basement outer wall 25. The fertilizer tank is backfilled with soil excavated from the foundation pit. After the backfilling is completed, the retaining piles 221 are pulled out. The retaining piles 221 are preferably supported by steel sections, and the steel sections are driven into the soil for support. Alternatively, the form of internal steel sections and external cast-in-place piles is adopted. In this way, only the internal steel sections need to be pulled out, and the internal of the external cast-in-place piles can be cut so that the top is flush with the top of the bottom plate 21. If a pile hole is formed after the retaining piles 221 are pulled out, plain concrete is poured for compaction.

[0049] like Figure 3 As shown, before setting the connecting steel bars 31, the earthwork at the connection between the bottom plate 21 and the basement top plate 26 is trimmed, brick membranes are laid, and cushion layers are constructed.

[0050] Furthermore, when the connecting steel bar 31 is provided, one end of the connecting steel bar 31 is connected to the steel bar connector 28 , and the other end of the connecting steel bar 31 is connected to the reserved steel bar 211 during the construction of the bottom plate 21 .

[0051] The end of the connecting steel bar 31 connected to the reserved steel bar 211 is fully threaded, and the fully threaded end can meet the requirements of effective connection with the reserved steel bar, so that the steel bar construction at the connection is convenient and efficient.

[0052] After the connecting steel bars 31 are constructed, concrete is poured at the connection to form a connecting structure 32 .

[0053] The present invention is described in detail above in conjunction with the embodiments of the accompanying drawings. A person skilled in the art can make various variations of the present invention according to the above description. Therefore, certain details in the embodiments should not constitute a limitation of the present invention, and the scope of protection of the present invention shall be defined by the scope of the attached claims.

Claims

1. A construction method for connecting the bottom plate of a high-proportion non-basement area with the top plate of a basement, characterized in that: The steps include: The basement slab outside the set distance range outside the construction basement setting area; Simultaneously construct the foundation pit support and earth excavation of the basement setting area to form the basement foundation pit; Construct the basement floor slab, basement exterior wall and basement roof slab at the bottom of the foundation pit; When constructing the basement top slab, a steel bar connector is installed on the side corresponding to the basement top slab; Backfill the manure trough on the outside of the basement exterior wall; Pull out the retaining piles used for foundation pit support; Connecting steel bars are set between the bottom plate and the basement top plate, and concrete is poured at the connecting steel bars to complete the connection construction between the bottom plate and the basement top plate in the area without a basement.

2. The construction method for connecting the bottom plate of a high-proportion non-basement area with the top plate of a basement as claimed in claim 1, characterized in that: The set distance is 2m to 4m.

3. The construction method for connecting the bottom plate of a high-proportion non-basement area with the top plate of a basement as claimed in claim 1, characterized in that: When constructing the basement floor, a plain concrete replacement support strip is constructed on the top area of ​​the basement floor near the retaining piles; After the basement floor and plain concrete replacement support belt meet the design requirements, remove the internal support.

4. The construction method for connecting the bottom plate of a high-proportion non-basement area with the top plate of a basement as claimed in claim 1, characterized in that: After the basement exterior wall construction is completed and the formwork is removed, the basement exterior wall waterproofing and the basement exterior wall waterproofing protective layer are constructed.

5. The construction method for connecting the bottom plate of a high-proportion non-basement area with the top plate of a basement as claimed in claim 1, characterized in that: When setting the connecting steel bar, one end of the connecting steel bar is connected to the steel bar connector, and two sections of the connecting steel bar are connected to the steel bars reserved during the bottom plate construction.

6. The construction method for connecting the bottom plate of a high-proportion non-basement area with the top plate of a basement as claimed in claim 1, characterized in that: The thickness of the top slab of the basement being constructed is less than the thickness of the bottom slab; Steel bar connectors are arranged at corresponding positions on the outer wall of the basement to connect corresponding connecting steel bars.

7. The construction method for connecting the bottom plate of a high-proportion non-basement area with the top plate of a basement as claimed in claim 1, characterized in that: Before setting the connecting steel bars, the earthwork at the connection between the bottom plate and the basement top plate is trimmed, brick membranes are laid, and cushion layers are constructed.