Pile foundation quality detection device and method

By using the cross mount and extension components of the anchor rod in the pile foundation mass detection device, combined with the drive motor and the groundbreaking assembly, the stability of the anchor rod in the soil is solved, and more accurate detection data and more efficient detection are achieved. process.

CN119021292AInactive Publication Date: 2024-11-26JIANGSU JIUXIN ENG TESTING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411375792.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-30
Publication Date
2024-11-26
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

After the anchor rod has fully entered the ground, the existing pile foundation mass detection device has a large pressure on the outer surface of the arcuate surface, which makes it difficult for the connecting claws to extend, affecting the stability of anchor rod fixation and the accuracy of the detection data.

Method used

A pile foundation quality detection device is designed, using a cross mounting frame and an anchor rod. Extension components are arranged inside the anchor rod. The extension components include a drive motor, an extension sleeve, a slope plate and a broken earth assembly. The extension sleeve is controlled to tangle along the anchor rod through the drive motor. The direction extends, the inclined plates are deployed to improve grip, and the broken plates and contact wheels work together to cut the soil, assisting the broken assembly to reduce resistance through the rotary rod and contact ring.

Benefits of technology

The stability and grip of anchors in the soil are improved, the stability of pile foundation inspection and the accuracy of inspection data are ensured, and the resistance of extended components in the soil is reduced, making it easier to recover and reuse.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119021292A_ABST
    Figure CN119021292A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of pile foundation detection, and discloses a pile foundation quality detection device and method.The pile foundation quality detection device comprises a cross-shaped installation frame, a pressure detector is fixedly installed at the center of the cross-shaped installation frame, and an anchor rod is detachably installed at the bottom of the cross-shaped installation frame; an extending assembly capable of improving the soil grabbing and positioning capacity of the anchor rod is arranged in the anchor rod. According to the pile foundation quality detection device and method, the extension assembly is arranged, before the pile foundation is detected, four sets of anchor rods are arranged on the periphery of the pile foundation at equal intervals, the extension sleeve is controlled by the driving motor to stretch out of soil around the anchor rods in the tangential direction of the anchor rods, and the extension sleeve is matched with the top plate and the sliding plate; the inclined plates on the upper side and the lower side of the extension sleeve are jacked up and spread outwards by a small section, then the effect of expanding the contact area between the extension sleeve and soil is achieved, the road holding force of the extension sleeve is improved, and it is guaranteed that the anchor rod is stably arranged in the soil.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of pile foundation detection, and in particular to a pile foundation quality detection device and method. Background Art

[0002] Pile foundation quality inspection is a very important task in construction projects. It can evaluate the quality and bearing capacity of pile foundations. Pile foundation static load test is a technology used in engineering to detect the bearing capacity of pile foundations. In static load test, the load acting on the pile is generally provided by a reaction device. The ease of use of the reaction device directly affects the process and results of the test. Commonly used ones are pile load reaction devices and anchor pile reaction devices.

[0003] According to a disclosed pile foundation quality inspection device and method (Announcement No.: CN117569392A), in the above application, the cooperation of the second motor and the adjustment mechanism can drive the connecting claw in the through opening to rotate, so that the connecting claw is inserted into the soil layer around the anchor rod. When the anchor rod is subjected to an upward force, the connecting claw can provide a greater adhesion force to the anchor rod. At the same time, after the inspection is completed, the connecting claw can be rotated and reset, so that it will not affect the next use of the connecting claw, and there is no need to install and disassemble the connecting claw, which greatly improves the efficiency of pile foundation inspection.

[0004] However, during the actual use of the above-mentioned equipment, after the anchor rod is completely inserted into the ground, its curved outer surface is subjected to greater pressure from the soil, and the connecting claw needs to overcome the pressure from the soil in order to extend out of the anchor rod. However, due to the insertion of the anchor rod, the soil around it has been compacted and reinforced, which to a certain extent hinders the outward extension of the connecting claw, thereby affecting the stability of the anchor rod fixation during the subsequent pile foundation inspection, thereby affecting the accuracy of the pile foundation quality inspection data. In view of this, we propose a pile foundation quality inspection device and method. Summary of the invention

[0005] The purpose of the present invention is to provide a pile foundation quality detection device and method to solve the problems raised in the above background technology.

[0006] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a pile foundation quality detection device, comprising a cross mounting frame, a pressure detector is fixedly installed at the center of the cross mounting frame, an anchor rod is detachably installed at the bottom of the cross mounting frame, an extension component which can improve the anchor rod's ability to grip and position the soil is arranged inside the anchor rod, an extension groove is opened on the curved outer wall of the anchor rod, an extension sleeve is movably installed inside the extension groove, an inclined plate is hinged on the outer wall of the extension sleeve, a soil crushing component which can prevent the extension sleeve inserted into the soil from retreating due to external force is arranged inside the inclined plate, and an auxiliary soil breaking component which can lift the extension sleeve and insert it into the soil near the anchor rod is arranged inside the end of the extension sleeve away from the anchor rod.

[0007] Preferably, the extension component includes a driving motor, which is fixedly mounted on the inner wall of the anchor rod, and a rotating shaft is fixedly mounted on the output end of the driving motor, and a transmission gear is fixedly mounted on the rotating shaft, and a fixing rod is fixedly mounted on the inner wall of the anchor rod, and a transmission sleeve is sleeved on the outer wall of the fixing rod away from the inner wall of the anchor rod, and the transmission sleeve is slidably mounted inside the extension sleeve, and a transmission cavity is defined in the inner wall of the transmission sleeve, and teeth are provided on the inner walls on both sides of the transmission cavity, and small gears are rotatably mounted on the inner walls on the left and right sides of the fixing rod, and a telescopic rod is fixedly connected to the end of the transmission sleeve, and a reset spring is sleeved on the arc-shaped outer wall of the telescopic rod, and a connecting cavity is defined in the inner wall of the extension sleeve, and a top plate is hinged on the outer wall of the transmission sleeve, and a sliding plate is hinged on the end of the top plate away from the transmission sleeve.

[0008] Preferably, the extension sleeve remains parallel to the tangent direction of the curved outer surface of the anchor rod, so that the extension sleeve can more easily enter the soil near the anchor rod when it is extended from the inside of the anchor rod. A toothed belt that can mesh with a transmission gear is provided on the outer wall of the extension sleeve close to the center of the anchor rod to cooperate with the transmission gear for transmission.

[0009] Preferably, storage grooves with a size matching that of the inclined plate are provided on the upper and lower outer surfaces of the extension sleeve, so that the inclined plate can be stored after the extension operation is completed.

[0010] Preferably, the soil crushing assembly includes a sliding cavity, which is opened inside the inclined plate, and the sliding plate is arranged in the sliding cavity. A support plate is hinged on the upper surface of the sliding plate, and a breaking plate is hinged on one end of the support plate away from the sliding plate. The breaking plate is hinged to the top inner wall of the inclined plate, and an arc groove is opened on the outer surface of one end of the breaking plate away from the hinge point with the inclined plate, and a crushing assembly is arranged inside the breaking plate to prevent the breaking plate from getting stuck and unable to be recovered.

[0011] Preferably, the width of the sliding cavity is matched with the sliding plate, and the length of the sliding plate is smaller than the length of the sliding cavity, so that the sliding plate can only slide relatively in the horizontal direction inside the sliding cavity.

[0012] Preferably, the crushing assembly includes a swinging chamber, which is opened inside the breaking plate, a contact wheel is rotatably installed on the inner wall of the swinging chamber, a cam is coaxially fixedly installed on the contact wheel, a mounting plate is slidably installed on the inner wall of the swinging chamber, a contact block is fixedly installed on the outer wall of the mounting plate on the side close to the cam, a small spring is fixedly connected to the outer wall of the mounting plate on the side away from the contact block, and a triangular tooth is fixedly installed on the end of the mounting plate.

[0013] Preferably, a contact cavity is opened at one end of the swing cavity close to the contact wheel, and the contact wheel is rotatably installed inside the contact cavity, so that the arc-shaped outer surface of the contact wheel can contact the external soil. The number of the cams is set to two groups, and the two groups of cams are mirror-imaged on the upper and lower sides of the contact wheel. The number of the contact blocks is the same as the number of cams, and the two are arranged in a one-to-one correspondence, so that the cams periodically contact the contact blocks and generate extrusion as the contact wheel rotates. The number of the triangular teeth is set to multiple groups, and the multiple groups of triangular teeth are evenly distributed in a linear array on the end surface of the mounting plate, and the center line of the triangular teeth is aligned with the center line of the arc groove to cooperate with the arc groove to crush the soil blocks.

[0014] Preferably, the auxiliary earth-breaking component includes a rotating rod, a rotating cavity is formed on the inner wall of one end of the extension sleeve away from the anchor rod, the rotating rod is rotatably installed inside the rotating cavity, a sleeve is passed through and fixedly installed on the rotating rod, a contact ring is sleeved on the arc-shaped outer wall of the sleeve, a spiral sheet is fixedly installed on the arc-shaped outer wall of the sleeve, a notch groove is formed on the outer surface of the spiral sheet, the outer surface of the extension sleeve away from the anchor rod is arranged to be inclined to enhance the earth-breaking and excavation effect of the extension sleeve in the soil, and a straight groove is formed on the arc-shaped outer wall of the contact ring to enhance the contact and transmission effect between the contact ring and the external soil.

[0015] A pile foundation quality detection method comprises the following steps:

[0016] S1. Calibrate position: align the center of the cross mounting frame with the center of the pile foundation to be tested, and drive the corresponding anchor rod into the coordinate for positioning;

[0017] S2. Driving anchor rods: driving four groups of anchor rods into the soil in sequence according to the previous positioning;

[0018] S3, stabilizing the anchor rod: starting the driving motor, cooperating with the setting of the extension assembly, so that the extension sleeves corresponding to the several extension assemblies inside the anchor rod are all extended and inserted into the soil near the anchor rod, maintaining the gripping force between the anchor rod and the soil;

[0019] S4. Inspection and installation: Assemble the top of the anchor rod with the bottom of the cross mounting frame, and debug the pressure detector;

[0020] S5, pressure detection: start the pressure detector, start the external lifting equipment to pull the cross mounting frame upwards, adjust according to the reading of the pressure detector, and keep measuring until the target pressure value is reached to obtain the quality of the pile foundation to be detected;

[0021] S6. Backfilling of boreholes: After the inspection is completed, the anchor rods are removed and concrete mortar is backfilled into the borehole until it is completely filled to close the borehole.

[0022] Compared with the prior art, the present invention provides a pile foundation quality detection device and method, which has the following beneficial effects:

[0023] 1. The pile foundation quality inspection device and method are provided with an extension component. Before inspecting the pile foundation, four groups of anchor rods are arranged at equal distances around the pile foundation, and the extension sleeve is controlled by a driving motor to extend into the soil around the anchor rod along the tangent direction of the anchor rod, and cooperates with the top plate and the sliding plate to lift the inclined plates on the upper and lower sides of the extension sleeve to expand it outward a small section, thereby achieving the effect of expanding the contact area between the extension sleeve and the soil, improving the grip of the extension sleeve, and ensuring the stability of the anchor rod in the soil.

[0024] 2. The pile foundation quality inspection device and method are provided with a soil crushing assembly. When the extension sleeve is extended into the soil around the anchor rod, the inclined plate is expanded outward and a breaker plate with an arc groove is simultaneously expanded on the inclined plate to improve the gripping force of the breaker plate on the soil around the extension sleeve. Moreover, since its inclination direction is opposite to that of the inclined plate, the possible lateral deviation of the extension sleeve can be suppressed in the horizontal direction, thereby further improving the stability of the anchor rod inserted into the soil and ensuring the stability during the pile foundation quality inspection.

[0025] 3. The pile foundation quality detection device and method, by providing a crushing assembly, drives the contact wheel to rotate when relative displacement occurs between the breaker plate and the soil, so that the cam periodically squeezes the contact block, and cooperates with the small spring provided between the mounting plate and the end of the swing groove, so that the mounting plate drives the multiple groups of triangular teeth provided at its end to perform a small reciprocating motion in the swing groove, thereby cutting and crushing the soil at the edge of the breaker plate to the left and right, thereby promoting a better separation of the breaker plate from the soil, avoiding the breaker plate from getting stuck, and affecting the subsequent recovery and reuse of the device.

[0026] 4. The pile foundation quality inspection device and method are provided with an auxiliary soil-breaking component. When the extension sleeve is excavated in the soil, the soil drives the contact ring to drive the rotating rod and the sleeve to rotate, thereby cutting and crushing the soil in the excavation direction of the extension sleeve, so as to facilitate the excavation of the extension sleeve and reduce resistance, thereby improving the excavation and tightening stability of the extension component to the soil, thereby ensuring the implementation of subsequent pile foundation quality inspection operations. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 It is a schematic diagram of the main structure of the present invention;

[0028] Figure 2 It is a schematic diagram of the cross-sectional structure of the anchor rod of the present invention;

[0029] Figure 3 It is a schematic diagram of the local structure of the extension assembly of the present invention;

[0030] Figure 4 This is a schematic cross-sectional view of the extension sleeve of the present invention;

[0031] Figure 5 It is an exploded schematic diagram of the fixing rod and the transmission sleeve of the present invention;

[0032] Figure 6 It is a schematic diagram of the cross-sectional structure of the inclined plate of the present invention;

[0033] Figure 7 This is a schematic diagram of the cross-sectional structure of the breaking plate of the present invention;

[0034] Figure 8 It is a schematic diagram of the structure of the swing assembly of the present invention;

[0035] Fig. 9 It is a schematic diagram of the structure of the auxiliary earth-breaking component of the present invention.

[0036] In the figure: 1. cross mounting frame; 2. pressure detector; 3. anchor rod; 4. extension assembly; 41. drive motor; 42. rotating shaft; 43. transmission gear; 44. fixing rod; 45. transmission sleeve; 46. extension sleeve; 47. transmission cavity; 48. tooth pattern; 49. pinion; 410. telescopic rod; 411. reset spring; 412. connecting cavity; 413. top plate; 414. sliding plate; 415. inclined plate; 5. soil breaking assembly; 51. sliding cavity; 52. support plate; 53. soil breaking plate; 54. arc groove; 6. crushing assembly; 61. swing cavity; 62. contact wheel; 63. cam; 64. mounting plate; 65. contact block; 66. triangular tooth; 67. small spring; 7. auxiliary soil breaking assembly; 71. rotating rod; 72. sleeve; 73. contact ring; 74. spiral sheet; 75. notch groove. DETAILED DESCRIPTION

[0037] like Figure 1-Figure 9As shown, the present invention provides a technical solution: a pile foundation quality detection device and method, including a cross mounting frame 1, a pressure detector 2 is fixedly installed at the center of the cross mounting frame 1, an anchor rod 3 is detachably installed at the bottom of the cross mounting frame 1, and an extension component 4 is arranged inside the anchor rod 3 to improve the gripping and positioning ability of the anchor rod 3 on the soil. The extension component 4 includes a driving motor 41, a rotating shaft 42, a transmission gear 43, a fixing rod 44, a transmission sleeve 45, an extension sleeve 46, a transmission cavity 47, a tooth pattern 48, a pinion 49, a telescopic rod 410, a reset spring 411, a connecting cavity 412, a top plate 413, a sliding plate 414 and an inclined plate 415.

[0038] In one embodiment of the present invention, a driving motor 41 is fixedly mounted on the inner wall of the anchor rod 3, a rotating shaft 42 is fixedly mounted on the output end of the driving motor 41, a transmission gear 43 is passed through and fixedly mounted on the rotating shaft 42, a fixing rod 44 is fixedly mounted on the inner wall of the anchor rod 3, a transmission sleeve 45 is sleeved on the outer wall of the fixing rod 44 away from the inner wall of the anchor rod 3, an extension sleeve 46 is sleeved on the outer wall of the transmission sleeve 45, a transmission cavity 47 is opened on the inner wall of the transmission sleeve 45, and teeth 48 are arranged on the inner walls on both sides of the transmission cavity 47, and pinions 49 are rotatably mounted on the inner walls on the left and right sides of the fixing rod 44, a telescopic rod 410 is fixedly connected to the end of the transmission sleeve 45, a return spring 411 is sleeved on the arc-shaped outer wall of the telescopic rod 410, a connecting cavity 412 is opened on the inner wall of the extension sleeve 46, a top plate 413 is hinged on the outer wall of the transmission sleeve 45, a sliding plate 414 is hinged on the end of the top plate 413 away from the transmission sleeve 45, and an inclined plate 415 is hinged on the outer wall of the extension sleeve 46.

[0039] Furthermore, there are four groups of anchor rods 3, and the four groups of anchor rods 3 are evenly distributed in a circular array at the bottom of the cross mounting frame 1, and the center of the cross mounting frame 1 is aligned with the center of the pile foundation when the equipment is erected, so that the four groups of anchor rods 3 are equidistantly arranged around the pile foundation, thereby providing a stable gripping force for the pressure detector 2 and the cross mounting frame 1 when the pile foundation is detected. At the same time, the bottom of the anchor rod 3 is set in a conical shape to facilitate the anchor rod 3 to be driven into the soil near the pile foundation. In addition, the interior of the anchor rod 3 is set in a hollow shape to facilitate the installation and erection of structures such as the extension component 4. Specifically, an installation bin is set at the top of the anchor rod 3 to facilitate the installation of the drive motor 41, and the end of the rotating shaft 42 is rotatably connected to the inner wall of the anchor rod 3, so that the rotating shaft 42 can rotate relatively stably inside the anchor rod 3 when the drive motor 41 is started. At the same time, a vent is opened on the top outer wall of the anchor rod 3 to facilitate the heat dissipation of the drive motor 41 and the arrangement of the power supply wires of the drive motor 41.

[0040] At the same time, the number of extension sleeves 46 is set in several groups, and several groups of extension sleeves 46 are evenly distributed in the interior of the anchor rod 3 in a spiral array, and an extension groove whose size is adapted to the cross-sectional size of the extension sleeve 46 is opened on the outer wall of the anchor rod 3, and the extension sleeve 46 is arranged inside the extension groove. Specifically, the extension sleeve 46 is parallel to the tangent direction of the arc-shaped outer surface of the anchor rod 3, so that the extension sleeve 46 can more easily enter the soil near the anchor rod 3 when it is extended from the inside of the anchor rod 3. Furthermore, a toothed belt that can mesh with the transmission gear 43 is provided on the outer wall of the extension sleeve 46 close to the center of the anchor rod 3, so that when the driving motor 41 drives the rotating shaft 42 to rotate, it cooperates with the rotation of the transmission gear 43 to drive the extension sleeve 46 to slide outward and then insert it into the soil near the anchor rod 3. At the same time, the size of the fixing rod 44 is adapted to the transmission cavity 47 so that the fixing rod 44 The fixed rod 44 and the transmission sleeve 45 can slide relative to each other, and the pinion 49 meshes with the tooth pattern 48 to realize transmission, and the tooth pattern 48 is arranged in the transmission cavity 47 on the side close to the end of the anchor rod 3, and when the extension sleeve 46 is retracted into the anchor rod 3, the tooth pattern 48 and the pinion 49 are in a non-meshing state, so that the pinion 49 will drive the transmission sleeve 45 to transmit through the tooth pattern 48 only after the transmission sleeve 45 is displaced a certain distance from the fixed rod 44, thereby changing the relative position of the transmission sleeve 45 in the connecting cavity 412, so as to achieve the effect of cooperating with the top plate 413 to lift the inclined plate 415, and then form a slightly outwardly extending contact portion on the outer surfaces of the upper and lower sides of the extension sleeve 46, so as to improve the gripping force between the extension sleeve 46 and the soil near the anchor rod 3, thereby ensuring the stability of the cross mounting frame 1 and the pressure detector 2 during operation and improving the detection accuracy.

[0041] Specifically, storage grooves of a size matching the inclined plate 415 are provided on the upper and lower outer surfaces of the extension sleeve 46, so that the inclined plate 415 can be stored after the extension operation is completed, and finally the extension sleeve 46 is stored into the interior of the anchor rod 3. At the same time, the sliding plate 414 is movably connected to the bottom inner wall of the inclined plate 415, so that the movement of the transmission sleeve 45 in the connecting cavity 412 can drive the top plate 413 to lift the sliding plate 414 and the inclined plate 415 upward, so that the inclined plate 415 deflects to the side away from the extension sleeve 46 with the hinge point between it and the extension sleeve 46 as the rotation center, thereby achieving the effect of expanding the contact area between the extension sleeve 46 and the soil, improving the grip of the extension sleeve 46, and ensuring the stability of the anchor rod 3 set in the soil.

[0042] In addition, the interior of the inclined plate 415 is provided with a soil crushing component 5 which can prevent the extension sleeve 46 inserted into the soil from retreating due to external force. The soil crushing component 5 includes a sliding cavity 51, which is opened inside the inclined plate 415. The sliding plate 414 is arranged in the sliding cavity 51. The upper surface of the sliding plate 414 is hinged with a support plate 52, and the end of the support plate 52 away from the sliding plate 414 is hinged with a soil breaking plate 53, which is hinged to the top inner wall of the inclined plate 415, and an arc groove 54 is opened on the outer surface of the soil breaking plate 53 away from the hinge point between the soil breaking plate 53 and the inclined plate 415.

[0043] Specifically, the width of the sliding cavity 51 is adapted to the sliding plate 414, and the length of the sliding plate 414 is smaller than the length of the sliding cavity 51, so that the sliding plate 414 can only slide relatively in the horizontal direction inside the sliding cavity 51, thereby ensuring the relative stability of the movement of the sliding plate 414. At the same time, a rectangular groove whose width is adapted to the width of the top plate 413 is opened at the bottom of the sliding cavity 51, and the top plate 413 is arranged inside the rectangular groove, so as to ensure that the top plate 413 is stably stressed in the horizontal direction when the inclined plate 415 is lifted upward, and there will be no problem of left and right shaking. In addition, there are two groups of support plates 52 and breaking plates 53, and the two groups of support plates 52 and breaking plates 53 are horizontally arranged in a linear array inside the inclined plate 415, and the upper surface of the inclined plate 415 is opened with a size similar to that of the breaking plates 53 is adapted to receive the groove to ensure that the breaking plate 53 can ensure the flatness of the upper surface of the inclined plate 415 and even the extension sleeve 46 when it is stored. Furthermore, the number of arc grooves 54 is set in multiple groups, and the multiple groups of arc grooves 54 are evenly distributed on the end surface of the breaking plate 53 in a linear array, so that when the extension sleeve 46 extends into the soil around the anchor rod 3, due to the outward expansion of the inclined plate 415, the breaking plate 53 with the arc groove 54 is simultaneously expanded on the inclined plate 415, so as to improve the grip of the breaking plate 53 on the soil around the extension sleeve 46. Moreover, since its inclination direction is opposite to that of the inclined plate 415, it can suppress the possible lateral deviation of the extension sleeve 46 in the horizontal direction, further improve the stability of the anchor rod 3 inserted into the soil, and ensure the stability during the pile foundation quality inspection.

[0044] At the same time, the interior of the breaking plate 53 is provided with a crushing component 6 to prevent the breaking plate 53 from getting stuck and unable to be recovered. The crushing component 6 includes a swinging chamber 61, which is opened inside the breaking plate 53. A contact wheel 62 is rotatably installed on the inner wall of the swinging chamber 61, and a cam 63 is coaxially fixedly installed on the contact wheel 62. A mounting plate 64 is slidably installed on the inner wall of the swinging chamber 61. A contact block 65 is fixedly installed on the outer wall of the mounting plate 64 on the side close to the cam 63, and a small spring 67 is fixedly connected to the outer wall of the mounting plate 64 on the side away from the contact block 65. A triangular tooth 66 is fixedly installed on the end of the mounting plate 64.

[0045] Specifically, a contact cavity is opened at one end of the swing cavity 61 close to the contact wheel 62, and the contact wheel 62 is rotatably installed inside the contact cavity, so that the arc-shaped outer surface of the contact wheel 62 can contact the external soil, and then the contact wheel 62 is driven to rotate through the relative displacement between the breaker plate 53 and the soil. At the same time, there are two groups of cams 63, and the two groups of cams 63 are mirror-imaged on the upper and lower sides of the contact wheel 62. Correspondingly, the number of contact blocks 65 is the same as that of the cams 63, and the two are arranged one by one, so that the cams 63 periodically contact and squeeze the contact blocks 65 as the contact wheel 62 rotates, and at the same time, the small One end of the spring 67 away from the mounting plate 64 is fixedly connected to the inner wall of the end of the swing chamber 61, so that as the cam 63 rotates, the contact block 65 drives the mounting plate 64 to swing back and forth left and right in the swing chamber 61. Specifically, there are multiple groups of triangular teeth 66, and the multiple groups of triangular teeth 66 are evenly distributed in a linear array on the end surface of the mounting plate 64, and the center line of the triangular teeth 66 is aligned with the center line of the arc groove 54, so that the mounting plate 64 that swings back and forth left and right will cut and crush the soil at the edge of the earth-breaking plate 53 left and right, thereby promoting the earth-breaking plate 53 to be better separated from the soil, avoiding it from getting stuck, affecting the subsequent recovery and reuse of the device.

[0046] In an embodiment of the present invention, an auxiliary ground-breaking component 7 for lifting the extension sleeve 46 and inserting it into the soil near the anchor rod 3 is arranged inside the end of the extension sleeve 46 away from the anchor rod 3. The auxiliary ground-breaking component 7 includes a rotating rod 71. A rotating cavity is opened on the inner wall of the end of the extension sleeve 46 away from the anchor rod 3. The rotating rod 71 is rotatably installed inside the rotating cavity. A sleeve 72 is passed through and fixedly installed on the rotating rod 71. A contact ring 73 is sleeved on the arc-shaped outer wall of the sleeve 72. A spiral piece 74 is fixedly installed on the arc-shaped outer wall of the sleeve 72. A notch groove 75 is opened on the outer surface of the spiral piece 74.

[0047] It is worth noting that there are two groups of contact rings 73, and the two groups of contact rings 73 are mirror-imaged at the left and right ends of the sleeve 72. At the same time, straight grooves are provided on the arc-shaped outer wall of the contact ring 73 to improve the contact and transmission effect between the contact ring 73 and the external soil. Specifically, the outer surface of the end of the extension sleeve 46 away from the anchor rod 3 is arranged in an inclined shape to improve the earth-breaking and excavation effect of the extension sleeve 46 in the soil, and the auxiliary earth-breaking component 7 is arranged in the inclined portion, so that when the extension sleeve 46 excavates in the soil, the soil drives the contact ring 73 to drive the rotating rod 71 and the sleeve 72 to rotate. Furthermore, there are multiple groups of notch grooves 75, and the multiple groups of notch grooves 75 are evenly distributed on the outer surface of the spiral sheet 74 in a spiral array, so that when the sleeve 72 continues to rotate, the soil in the excavation direction of the extension sleeve 46 is cut and crushed, so as to facilitate the excavation of the extension sleeve 46 and reduce resistance, thereby improving the excavation and tightening stability of the extension component 4 for the soil, and then ensuring the subsequent pile foundation quality inspection work.

[0048] In the present invention, when in use, first align the center of the cross mounting frame 1 with the center of the pile foundation to be detected, and drive the corresponding anchor rod 3 into the coordinate for positioning, then drive the four groups of anchor rods 3 into the soil in sequence according to the previous positioning, and after the anchor rods 3 enter the predetermined position, start the drive motor 41, cooperate with the rotation of the rotating shaft 42 to drive the transmission gear 43 to rotate, cooperate with the transmission between the transmission gear 43 and the extension sleeve 46, so as to promote the extension sleeve 46 to be inserted into the soil near the anchor rod 3 along the tangent direction of the arc-shaped outer surface of the anchor rod 3. In this process, when the extension sleeve 46 extends outward for a certain distance, the small gears 49 on the left and right sides of the fixing rod 44 will mesh with the tooth pattern 48 to realize transmission, thereby promoting the transmission sleeve 45 Move in the extension sleeve 46 toward the side away from the anchor rod 3, cooperate with the top plate 413 and the sliding plate 414 to lift the inclined plates 415 on the upper and lower sides of the extension sleeve 46, so that it can be expanded outward a small section, thereby achieving the effect of expanding the contact area between the extension sleeve 46 and the soil, improving the grip of the extension sleeve 46, and ensuring the stability of the anchor rod 3 in the soil. Then, the top of the anchor rod 3 is fixedly connected to the bottom of the cross mounting frame 1, and then the pressure detector 2 is started. By starting the external lifting equipment to pull the cross mounting frame 1 upward, it is adjusted according to the reading of the pressure detector 2 until the target measured pressure value is reached. After that, this state is maintained for measurement, and whether the laying quality of the pile foundation to be tested is qualified is determined according to the final measurement result.

[0049] After the inspection, the cross mounting frame 1 and the four anchor rods 3 are first disassembled, and the drive motor 41 is started, so that the rotating shaft 42 drives the transmission gear 43 to rotate in the opposite direction, and finally the extension sleeve 46 is stored. After that, the anchor rod 3 is taken out through the external lifting equipment, and after the construction is completed, the drilled holes left by the anchor rod 3 on the ground are poured with concrete to ensure that the soil strength near the pile foundation will not be greatly affected, thereby ensuring the subsequent use effect of the pile foundation.

[0050] The above generally describes the present invention in detail, but it is obvious to a person skilled in the art that some modifications or improvements can be made to the present invention. Therefore, modifications or improvements that do not depart from the spirit of the present invention are within the scope of protection of the present invention.

Claims

1. A pile foundation quality detection device, comprising a cross mounting frame (1), a pressure detector (2) fixedly mounted at the center of the cross mounting frame (1), and an anchor rod (3) detachably mounted at the bottom of the cross mounting frame (1), characterized in that: The anchor rod (3) is provided with an extension component (4) capable of improving the ability of the anchor rod (3) to grip and position the soil; the curved outer wall of the anchor rod (3) is provided with an extension groove; an extension sleeve (46) is movably installed inside the extension groove; the outer wall of the extension sleeve (46) is hinged with an inclined plate (415); the inclined plate (415) is provided with a soil-breaking component (5) capable of preventing the extension sleeve (46) inserted into the soil from retreating due to external forces; an auxiliary soil-breaking component (7) for lifting the extension sleeve (46) and inserting it into the soil near the anchor rod (3) is provided inside the end of the extension sleeve (46) away from the anchor rod (3).

2. A pile foundation quality detection device according to claim 1, characterized in that: The extension assembly (4) comprises a driving motor (41), the driving motor (41) is fixedly mounted on the inner wall of the anchor rod (3), a rotating shaft (42) is fixedly mounted on the output end of the driving motor (41), a transmission gear (43) is passed through and fixedly mounted on the rotating shaft (42), a fixing rod (44) is fixedly mounted on the inner wall of the anchor rod (3), a transmission sleeve (45) is sleeved on the outer wall of one end of the fixing rod (44) away from the inner wall of the anchor rod (3), the transmission sleeve (45) is slidably mounted inside the extension sleeve (46), and a transmission sleeve (45) is provided on the inner wall of the transmission sleeve (45). The transmission cavity (47) is provided with tooth patterns (48) on both inner walls of the transmission cavity (47), small gears (49) are rotatably mounted on the inner walls of the left and right sides of the fixed rod (44), a telescopic rod (410) is fixedly connected to the end of the transmission sleeve (45), a return spring (411) is sleeved on the arc-shaped outer wall of the telescopic rod (410), a connecting cavity (412) is opened on the inner wall of the extension sleeve (46), a top plate (413) is hingedly connected to the outer wall of the transmission sleeve (45), and a sliding plate (414) is hingedly connected to the end of the top plate (413) away from the transmission sleeve (45).

3. A pile foundation quality detection device according to claim 2, characterized in that: The extension sleeve (46) is kept parallel to the tangent direction of the arc-shaped outer surface of the anchor rod (3), and a toothed belt that can mesh with the transmission gear (43) is provided on the outer wall of the extension sleeve (46) close to the center of the anchor rod (3).

4. A pile foundation quality detection device according to claim 2, characterized in that: The upper and lower outer surfaces of the extension sleeve (46) are provided with receiving grooves whose size matches that of the inclined plate (415).

5. A pile foundation quality detection device according to claim 2, characterized in that: The soil crushing component (5) includes a sliding cavity (51), the sliding cavity (51) is opened inside the inclined plate (415), the sliding plate (414) is arranged in the sliding cavity (51), the upper surface of the sliding plate (414) is hinged with a support plate (52), the end of the support plate (52) away from the sliding plate (414) is hinged with a soil breaking plate (53), the soil breaking plate (53) is hinged with the top inner wall of the inclined plate (415), the outer surface of the end of the soil breaking plate (53) away from the hinge point with the inclined plate (415) is provided with an arc groove (54), and the interior of the soil breaking plate (53) is provided with a crushing component (6) that can prevent the soil breaking plate (53) from getting stuck and unable to be recovered.

6. A pile foundation quality detection device according to claim 5, characterized in that: The width of the sliding cavity (51) is matched with the sliding plate (414), and the length of the sliding plate (414) is smaller than the length of the sliding cavity (51).

7. A pile foundation quality detection device according to claim 5, characterized in that: The crushing assembly (6) comprises a swing chamber (61), wherein the swing chamber (61) is arranged inside the earth-breaking plate (53), a contact wheel (62) is rotatably mounted on the inner wall of the swing chamber (61), a cam (63) is coaxially fixedly mounted on the contact wheel (62), a mounting plate (64) is slidably mounted on the inner wall of the swing chamber (61), a contact block (65) is fixedly mounted on the outer wall of the mounting plate (64) on the side close to the cam (63), a small spring (67) is fixedly connected to the outer wall of the mounting plate (64) on the side away from the contact block (65), and a triangular tooth (66) is fixedly mounted on the end of the mounting plate (64).

8. A pile foundation quality detection device according to claim 7, characterized in that: A contact cavity is provided at one end of the swing cavity (61) close to the contact wheel (62), and the contact wheel (62) is rotatably mounted inside the contact cavity. The number of the cams (63) is provided in two groups, and the two groups of cams (63) are mirror-imaged on the upper and lower sides of the contact wheel (62). The number of the contact blocks (65) is the same as the number of the cams (63), and the two are arranged in a one-to-one correspondence. The number of the triangular teeth (66) is provided in multiple groups, and the multiple groups of triangular teeth (66) are evenly distributed in a linear array on the end surface of the mounting plate (64), and the center line of the triangular teeth (66) is aligned with the center line of the arc groove (54).

9. A pile foundation quality detection device according to claim 1, characterized in that: The auxiliary earth-breaking component (7) comprises a rotating rod (71), a rotating cavity is formed on the inner wall of one end of the extension sleeve (46) away from the anchor rod (3), the rotating rod (71) is rotatably mounted inside the rotating cavity, a sleeve (72) is passed through and fixedly mounted on the rotating rod (71), a contact ring (73) is sleeved on the arc-shaped outer wall of the sleeve (72), a spiral sheet (74) is fixedly mounted on the arc-shaped outer wall of the sleeve (72), a notch groove (75) is formed on the outer surface of the spiral sheet (74), and the outer surface of the end of the extension sleeve (46) away from the anchor rod (3) is arranged to be inclined.

10. A pile foundation quality detection method, characterized in that: The detection method is based on a pile foundation quality detection device according to claims 1 to 9, comprising the following steps: S1, calibrating the position: aligning the center of the cross mounting frame (1) with the center of the pile foundation to be tested, and driving the corresponding anchor rod (3) into the coordinates for positioning; S2, driving the anchor rods (3): driving the four groups of anchor rods (3) into the soil in sequence according to the previous positioning; S3, stabilizing the anchor rod (3): starting the driving motor (41), cooperating with the setting of the extension assembly (4), so that the extension sleeves (46) corresponding to the plurality of extension assemblies (4) inside the anchor rod (3) are all extended and inserted into the soil near the anchor rod (3), so as to maintain the gripping force between the anchor rod (3) and the soil; S4, testing and installation: assemble the top of the anchor rod (3) with the bottom of the cross mounting frame (1), and debug the pressure detector (2); S5, pressure detection: start the pressure detector (2), start the external lifting equipment to pull the cross mounting frame (1) upwards, adjust according to the reading of the pressure detector (2), and maintain the state for measurement after reaching the target pressure value to obtain the quality of the pile foundation to be detected; S6. Backfilling the borehole: After the test is completed, the anchor rod (3) is removed and concrete mortar is backfilled into the borehole until it is completely filled to close the borehole.