Water heater and control method thereof

By designing the heating water pipe, inlet pipe, return water pipe and valve structure in the water heater, the independent preheating mode of the main water point and the secondary water point is achieved, and the problem of being unable to preheat at the same time in the prior art is solved, reducing the waiting time and Reduced costs.

CN119022460APending Publication Date: 2024-11-26VATTI CORP LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310598676.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-05-25
Publication Date
2024-11-26

AI Technical Summary

Technical Problem

The existing water heaters cannot preheat the main water point and the secondary water point at the same time when preheating, resulting in the waiting time for the hot water point to be too long, and the home improvement pipeline has been paved and difficult to rearrange it to solve this problem.

Method used

Design a water heater, including heating water pipes, inlet pipes, return water pipes, cold water pipes and valve structures, and realize independent preheating mode of the main water point and the secondary water point through the flowmeter and controller, allowing the home improvement water pipes without the need to be repainted In the case of the case, switch the preheating mode to form the corresponding preheating water path.

Benefits of technology

Effectively reduces the time for users to wait for hot water at the main water point and the secondary water point, and solves the problem that in the prior art, the main water point can only be preheated but cannot be preheated at the same time. It has a simple structure and relatively costly Low.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119022460A_ABST
    Figure CN119022460A_ABST
Patent Text Reader

Abstract

The invention discloses a water heater and a control method thereof. The water heater comprises a shell. The heating water pipe is arranged in the shell; the first end of the water inlet pipe is connected with the water inlet of the heating water pipe, and the second end is connected with a water supply pipe outside the water heater; the first end of the hot water pipeline is connected with the water outlet of the heating water pipe, and the second end is connected with the hot water inlet of the main water point; the first end of the water return pipeline is connected with the water inlet of the heating water pipe, and the second end is connected with the hot water pipeline; the first end of the cold water pipeline is connected with the cold water inlet of the main water consumption point, and the second end is connected with a water supply pipe outside the water heater; the first end of the cold water branch is connected with the cold water inlet of the secondary water point, and the second end is connected with the cold water pipeline; the first end of the hot water branch is connected with the hot water inlet of the secondary water point, and the second end is connected with the hot water pipeline; the valve structure is arranged among the first end of the water return pipeline, the water inlet of the heating water pipe and the first end of the water inlet pipe.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of household appliances, and in particular to a water heater and a control method thereof. Background Art

[0002] When the zero-cold-water water heater starts the preheating function, the built-in water pump drives the stored water in the hot water pipe and return pipe outside the machine to circulate and heat. After preheating, the hot water fills the main hot water pipe, so that hot water can be used immediately. When the user's home installation pipeline is equipped with multiple hot water terminals, the return pipe is usually connected to the farthest hot water terminal (the main water point of the main bathroom). Since the stored water in the hot water pipe branch (the secondary water point of the guest bathroom) does not participate in the circulation preheating, the hot water branch is still cold water after the preheating is completed. At this time, when the hot water terminal of the hot water pipe branch is opened, the cold water in the hot water pipe branch will flow out first, and then the hot water in the main hot water pipe will flow out. The longer the hot water pipe branch, the longer the waiting time for hot water, which directly affects the user experience.

[0003] In addition, most users' home piping has been pre-laid, and it is difficult to solve the problem of hot water pipe branches waiting too long for hot water after preheating by re-laying the pipes.

[0004] Therefore, a water heater is urgently needed to solve the above-mentioned technical problems. Summary of the invention

[0005] The present invention aims to solve at least one of the problems existing in the existing related technologies to a certain extent. To this end, the present invention proposes a water heater that can preheat the main water use points and secondary water use points without re-laying the household water pipelines, thereby reducing the waiting time for hot water at the secondary water use points, and has a simple structure and low cost.

[0006] The above purpose is achieved through the following technical solutions:

[0007] A water heater, comprising:

[0008] case;

[0009] A heating water pipe is arranged in the shell;

[0010] A water inlet pipe, a first end of which is connected to the water inlet of the heating water pipe, and a second end of which is connected to the water supply pipe outside the water heater;

[0011] A hot water pipe, a first end of which is connected to the water outlet of the heating water pipe, and a second end of which is connected to the hot water inlet of the main water point;

[0012] A water return pipe, a first end of which is connected to the water inlet of the heating water pipe, and a second end of which is connected to the hot water pipe;

[0013] A cold water pipe, a first end of which is connected to the cold water inlet of the main water point, and a second end of which is connected to the water supply pipe outside the water heater;

[0014] A cold water branch, a first end of which is connected to the cold water inlet of the secondary water point, and a second end of which is connected to the cold water pipeline;

[0015] A hot water branch, a first end of which is connected to the hot water inlet of the secondary water point, and a second end of which is connected to the hot water pipeline;

[0016] The valve structure is arranged between the first end of the return water pipe, the water inlet of the heating water pipe and the first end of the water inlet pipe, and is used to close or open the return water pipe, the heating water pipe and one of the water inlet pipes.

[0017] Optionally, the valve structure is a three-way switching valve; or

[0018] The valve structure includes an inlet solenoid valve and a return solenoid valve. The inlet solenoid valve is arranged between the water inlet of the heating water pipe and the first end of the water inlet pipe, and is used to close or open one of the heating water pipe and the water inlet pipe. The return solenoid valve is arranged at the first end of the return water pipe, and is used to close or open the return water pipe.

[0019] Optionally, a first one-way valve is further included, which is arranged in the return water pipe and is used to prevent water from flowing from the first end of the return water pipe to the second end of the return water pipe.

[0020] Optionally, it also includes a water pipe and a second one-way valve, wherein the water pipe is arranged between the cold water branch and the hot water branch for connecting the hot water branch and the cold water branch, and the second one-way valve is arranged in the water pipe for preventing water from flowing from the hot water branch to the cold water branch via the water pipe.

[0021] Optionally, the water pipe is arranged at one end of the cold water branch and the hot water branch close to the secondary water use point.

[0022] Optionally, it also includes a controller arranged on the shell, a water pump and a flow meter arranged on the heating water pipe, a return water temperature probe arranged at the water inlet of the heating water pipe, and an outlet water temperature probe arranged at the water outlet of the heating water pipe, and the valve structure, the water pump, the flow meter, the return water temperature probe and the outlet water temperature probe are all communicatively connected to the controller.

[0023] Another aspect of the present invention provides a control method for the water heater as described above, characterized in that it comprises the following steps:

[0024] When the user selects the preheating mode of the main water use point, the main water use point and the secondary water use point are both in a closed state, the water pump of the water heater runs to pump water into the heating water pipe, and when the flow meter of the water heater installed on the heating water pipe detects that the water flow in the heating water pipe reaches the startup flow, the water heater runs to heat the water in the heating water pipe, and thereafter, when the flow meter installed on the heating water pipe detects that the water flow in the heating water pipe reaches a preset value, the controller of the water heater instructs the valve structure to close the first end of the water inlet pipe to form a preheating water circuit for the main water use point between the heating water pipe, the hot water pipe, and the return water pipe.

[0025] Optionally, the method further comprises the following steps:

[0026] When the user selects the secondary water use point preheating mode, the main water use point and the secondary water use point are both in a closed state, the water pump of the water heater runs to pump water into the heating water pipe, and when the flow meter installed on the heating water pipe of the water heater detects that the water flow in the heating water pipe reaches the startup flow, the water heater runs to heat the water in the heating water pipe. Thereafter, when the flow meter installed on the heating water pipe of the water heater detects that the water flow in the heating water pipe reaches a preset value, the controller of the water heater instructs the valve structure to close the first end of the return water pipe, so that a preheating circuit for the secondary water use point is formed between the heating water pipe, the front section of the hot water pipe, the hot water branch, the water pipe, the cold water branch, the front section of the cold water pipe and the water inlet pipe.

[0027] Optionally, the method further comprises the following steps:

[0028] When the water heater is in standby mode, the controller of the water heater instructs the valve structure to close the first end of the return pipe. When the main water use point and / or the secondary water use point are opened, and the flow meter installed on the heating water pipe of the water heater detects that the water flow in the heating water pipe reaches the startup flow, the water heater runs to heat the water in the heating water pipe to output hot water for bathing.

[0029] Optionally, when the return water temperature probe arranged at the water inlet of the heating water pipe detects the preheating water circuit of the main water use point, or when the return water temperature of the preheating water circuit of the secondary water use point reaches a preset value, the controller instructs the water heater to switch to standby mode.

[0030] Compared with the prior art, the present invention has at least the following beneficial effects:

[0031] The water heater provided by the present invention can enable the water heater to switch among ordinary shower mode, main water point preheating mode and secondary water point preheating mode. It can realize water preheating of main water point and secondary water point without re-laying household water pipelines, effectively reducing the waiting time for users to use hot water at main water point and secondary water point, solving the technical problem that only main water point preheating can be realized in the prior art, but secondary water point preheating cannot be realized at the same time. It has a simple structure, is easy to realize and has low cost. BRIEF DESCRIPTION OF THE DRAWINGS

[0032] Figure 1 It is a schematic diagram of the structure and water flow when the water heater provided by the first specific embodiment of the present invention is in standby mode and the main water point is opened;

[0033] Figure 2 It is a schematic diagram of the structure and water flow of the water heater provided in the first specific embodiment of the present invention when it is in the main water point preheating mode;

[0034] Figure 3 It is a schematic diagram of the structure and water flow of the water heater provided in the first specific embodiment of the present invention when it is in the secondary water point preheating mode;

[0035] Figure 4 It is a schematic diagram of the installation of the valve structure of the water heater provided in the second specific embodiment of the present invention.

[0036] In the figure:

[0037] 1. Shell; 11. Heating water pipe;

[0038] 21. Three-way conversion valve; 221. Water inlet solenoid valve; 222. Water return solenoid valve;

[0039] 3. The first one-way valve;

[0040] 4. Return water temperature probe;

[0041] 5. Water pump;

[0042] 6. Flow meter;

[0043] 7. Water outlet temperature probe;

[0044] 8. Display;

[0045] 9. Controller;

[0046] 10. Second one-way valve;

[0047] 100, hot water pipe; 101, hot water branch; 200, cold water pipe; 201, cold water branch; 300, return pipe; 400, main water point; 500, secondary water point; 600, water inlet pipe; 700, water supply pipe; 800, water pipe. DETAILED DESCRIPTION

[0048] The following examples illustrate the present invention, but the present invention is not limited to these examples. Modifications to the specific embodiments of the present invention or equivalent replacement of some technical features without departing from the spirit of the present invention should be included in the scope of the technical solution claimed by the present invention.

[0049] Embodiment 1

[0050] Please refer to Figure 1-Figure 3 The present invention provides a water heater, comprising a housing 1, a heating water pipe 11, a water inlet pipe 600, a hot water pipe 100, a return water pipe 300, a cold water pipe 200, a cold water branch 201, a hot water branch 101 and a valve structure. The heating water pipe 11 is arranged in the housing 1. The first end of the water inlet pipe 600 is connected to the water inlet of the heating water pipe 11, and the second end is connected to the water supply pipe 700 outside the water heater. The first end of the hot water pipe 100 is connected to the water outlet of the heating water pipe 11, and the second end is connected to the hot water inlet of the main water point 400. The first end of the return water pipe 300 is connected to the water inlet of the heating water pipe 11, and the second end is connected to the hot water pipe 100. The first end of the cold water pipe 200 is connected to the cold water inlet of the main water point 400, and the second end is connected to the water supply pipe 700 outside the water heater. The first end of the cold water branch 201 is connected to the cold water inlet of the secondary water point 500, and the second end is connected to the cold water pipe 200. The first end of the hot water branch 101 is connected to the hot water inlet of the secondary water point 500, and the second end is connected to the hot water pipe 100. The valve structure is arranged between the first end of the return water pipe 300, the water inlet of the heating water pipe 11 and the first end of the water inlet pipe 600, and is used to close or conduct one of the return water pipe 300, the heating water pipe 11 and the water inlet pipe 600, so that the water heater can switch among the three modes of ordinary shower mode, main water point preheating mode and secondary water point preheating mode, and further enable the water heater to switch among the three modes of ordinary shower mode, main water point preheating mode and secondary water point preheating mode, and can realize water flow preheating of the main water point and the secondary water point without re-laying the household water pipeline, effectively reducing the waiting time for users to use hot water at the main water point 400 and the secondary water point 500, solving the technical problem that only the main water point 400 can be preheated, but the secondary water point 500 cannot be preheated at the same time in the prior art, and the structure is simple, easy to realize, and the cost is low.

[0051] When the water heater is running, its control method is as follows:

[0052] When the user selects the main water point preheating mode, the main water point 400 and the secondary water point 500 are both in a closed state, and the water pump 5 of the water heater runs to pump water into the heating water pipe 11. When the flow meter 6 of the water heater installed on the heating water pipe 11 detects that the water flow in the heating water pipe 11 reaches the startup flow, the water heater runs to heat the water in the heating water pipe 11. Afterwards, when the flow meter 6 of the water heater installed on the heating water pipe 11 detects that the water flow in the heating water pipe 11 reaches a preset value, the controller 9 of the water heater instructs the valve structure to close the first end of the water inlet pipe 600, so that a preheating water circuit for the main water point 400 is formed between the heating water pipe 11, the hot water pipe 100, and the return water pipe 300.

[0053] When the user selects the secondary water point preheating mode, the main water point 400 and the secondary water point 500 are both in a closed state, and the water pump 5 of the water heater runs to pump water into the heating water pipe 11. When the flow meter 6 of the water heater installed on the heating water pipe 11 detects that the water flow in the heating water pipe 11 reaches the startup flow, the water heater runs to heat the water in the heating water pipe 11. Thereafter, when the flow meter 6 of the water heater installed on the heating water pipe 11 detects that the water flow in the heating water pipe 11 reaches a preset value, the controller 9 of the water heater instructs the valve structure to close the first end of the return pipe 300, so that a preheating circuit for the secondary water point 500 is formed between the heating water pipe 11, the front section of the hot water pipe 100, the hot water branch 101, the water pipe 800, the cold water branch 201, the front section of the cold water pipe 200 and the water inlet pipe 600.

[0054] When the water heater is in standby mode, the controller 9 of the water heater instructs the valve structure to close the first end of the return pipe 300. When the main water use point 400 and / or the secondary water use point 500 are opened, and the flow meter 6 installed on the heating water pipe 11 of the water heater detects that the water flow in the heating water pipe 11 reaches the startup flow, the water heater runs to heat the water in the heating water pipe 11 to output hot water for bathing.

[0055] When the return water temperature probe 4 arranged at the water inlet of the heating water pipe 11 detects the preheating water circuit of the main water use point 400, or when the return water temperature of the preheating water circuit of the secondary water use point 500 reaches a preset value, the controller 9 instructs the water heater to switch to standby mode.

[0056] It should be noted that buttons for the primary water point preheating mode and the secondary water point preheating mode may be provided on the water heater controller 9 so that the user can select different preheating modes.

[0057] Optionally, the valve structure is a three-way conversion valve 21 .

[0058] Optionally, a first one-way valve 3 is further included. The first one-way valve 3 is arranged in the return pipe 300 to prevent water from flowing from the first end of the return pipe 300 to the second end of the return pipe 300 .

[0059] Optionally, it also includes a water pipe 800 and a second one-way valve 10. The water pipe 800 is arranged between the cold water branch 201 and the hot water branch 101, and is used to connect the hot water branch 101 and the cold water branch 201. The second one-way valve 10 is arranged in the water pipe 800, and is used to prevent water from flowing from the hot water branch 101 to the cold water branch 201 via the water pipe 800.

[0060] Optionally, the water pipe 800 is arranged at one end of the cold water branch 201 and the hot water branch 101 close to the secondary water use point 500 to ensure the amount of preheated water at the secondary water use point 500 as much as possible, thereby reducing the time the secondary water use point 500 waits for hot water.

[0061] Optionally, the controller 9 is arranged on the housing 1. The water pump 5 and the flow meter 6 are both arranged on the hot water pipe.

[0062] Optionally, it also includes a water outlet temperature probe 7 arranged at the water outlet of the heating water pipe 11, and the water outlet temperature probe 7 is used to detect the water outlet temperature of the water heater.

[0063] Optionally, a display 8 is also included for displaying the real-time outlet water temperature of the water heater.

[0064] Furthermore, the valve structure, the display 8 , the water pump 5 , the flow meter 6 , the return water temperature probe 4 and the outlet water temperature probe 7 are all communicatively connected to the controller 9 .

[0065] Embodiment 2

[0066] Please refer to Figure 4 The difference between Example 2 and Example 1 is that the valve structure includes an inlet solenoid valve 221 and a return solenoid valve 222. The inlet solenoid valve 221 is arranged between the water inlet of the heating water pipe 11 and the first end of the water inlet pipe 600, and is used to close or conduct one of the heating water pipe 11 and the water inlet pipe 600. The return solenoid valve 222 is arranged at the first end of the return water pipe 300, and is used to close or conduct the return water pipe 300.

[0067] The above are only some embodiments of the present invention. For those skilled in the art, several modifications and improvements can be made without departing from the creative concept of the present invention, which all belong to the protection scope of the present invention.

Claims

1. A water heater, characterized in that: include: Housing (1); A heating water pipe (11) is arranged in the housing (1); A water inlet pipe (600), a first end of which is connected to the water inlet of the heating water pipe (11), and a second end of which is connected to a water supply pipe (700) outside the water heater; A hot water pipe (100), a first end of which is connected to the water outlet of the heating water pipe (11), and a second end of which is connected to the hot water inlet of the main water point (400); A return water pipe (300), a first end of which is connected to the water inlet of the heating water pipe (11), and a second end of which is connected to the hot water pipe (100); A cold water pipe (200), a first end of which is connected to the cold water inlet of the main water point (400), and a second end of which is connected to the water supply pipe (700) outside the water heater; A cold water branch (201), a first end of which is connected to the cold water inlet of the secondary water point (500), and a second end of which is connected to the cold water pipeline (200); A hot water branch (101), a first end of which is connected to the hot water inlet of the secondary water point (500), and a second end of which is connected to the hot water pipeline (100); The valve structure is arranged between the first end of the return water pipe (300), the water inlet of the heating water pipe (11) and the first end of the water inlet pipe (600), and is used to close or open one of the return water pipe (300), the heating water pipe (11) and the water inlet pipe (600).

2. The water heater according to claim 1, characterized in that: The valve structure is a three-way conversion valve (21); or The valve structure comprises a water inlet solenoid valve (221) and a water return solenoid valve (222); the water inlet solenoid valve (221) is arranged between the water inlet of the heating water pipe (11) and the first end of the water inlet pipe (600), and is used to close or open one of the heating water pipe (11) and the water inlet pipe (600); the water return solenoid valve (222) is arranged at the first end of the water return pipe (300), and is used to close or open the water return pipe (300).

3. The water heater according to claim 1, characterized in that: It also includes a first one-way valve (3), which is arranged in the return water pipe (300) and is used to prevent water from flowing through the first end of the return water pipe (300) to the second end of the return water pipe (300).

4. The water heater according to claim 1, characterized in that: The invention also comprises a water pipe (800) and a second one-way valve (10); the water pipe is arranged between the cold water branch (201) and the hot water branch (101) and is used to conduct the hot water branch (101) and the cold water branch (201); the second one-way valve (10) is arranged in the water pipe (800) and is used to prevent water from flowing from the hot water branch (101) to the cold water branch (201) via the water pipe (800).

5. The water heater according to claim 4, characterized in that: The water pipe (800) is arranged at one end of the cold water branch (201) and the hot water branch (101) close to the secondary water point (500).

6. The water heater according to any one of claims 1 to 5, characterized in that: The invention also comprises a controller (9) arranged on the shell (1), a water pump (5) and a flow meter (6) arranged on the heating water pipe (11), a return water temperature probe (4) arranged at the water inlet of the heating water pipe (11), and an outlet water temperature probe (7) arranged at the water outlet of the heating water pipe (11); the valve structure, the water pump (5), the flow meter (6), the return water temperature probe (4) and the outlet water temperature probe (7) are all connected to the controller (9) for communication.

7. A method for controlling a water heater according to any one of claims 1 to 5, characterized in that: The following steps are involved: When the user selects the main water point preheating mode, the main water point (400) and the secondary water point (500) are both in a closed state, the water pump (5) of the water heater operates to pump water into the heating water pipe (11), and when the flow meter (6) of the water heater installed on the heating water pipe (11) detects that the water flow in the heating water pipe (11) reaches the startup flow, the water heater operates to heat the water in the heating water pipe (11), and then, when the flow meter (6) of the water heater installed on the heating water pipe (11) detects that the water flow in the heating water pipe (11) reaches a preset value, the controller (9) of the water heater instructs the valve structure to close the first end of the water inlet pipe (600), so that a preheating circuit for the main water point (400) is formed between the heating water pipe (11), the hot water pipe (100), and the return water pipe (300).

8. The control method of the water heater according to claim 7, characterized in that: The following steps are also included: When the user selects the secondary water point preheating mode, the primary water point (400) and the secondary water point (500) are both in a closed state, the water pump (5) of the water heater operates to pump water into the heating water pipe (11), and when the flow meter (6) of the water heater installed on the heating water pipe (11) detects that the water flow in the heating water pipe (11) reaches the start-up flow, the water heater operates to heat the water in the heating water pipe (11), and then, when the flow meter (6) of the water heater installed on the heating water pipe (11) When the flow meter (6) detects that the water flow in the heating water pipe (11) reaches a preset value, the controller (9) of the water heater instructs the valve structure to close the first end of the return water pipe (300), so that a preheating water circuit for the secondary water use point (500) is formed between the heating water pipe (11), the front section of the hot water pipe (100), the hot water branch (101), the water pipe (800), the cold water branch (201), the front section of the cold water pipe (200), and the water inlet pipe (600).

9. The control method of the water heater according to claim 8, characterized in that: The following steps are also included: When the water heater is in standby mode, the controller (9) of the water heater instructs the valve structure to close the first end of the return pipe (300). When the main water point (400) and / or the secondary water point (500) are opened, and the flow meter (6) of the water heater installed on the heating water pipe (11) detects that the water flow in the heating water pipe (11) reaches the startup flow, the water heater operates to heat the water in the heating water pipe (11) to output hot water for bathing.

10. The control method of the water heater according to claim 9, characterized in that: When the return water temperature probe (4) arranged at the water inlet of the heating water pipe (11) detects the preheating water circuit of the main water use point (400), or when the return water temperature of the preheating water circuit of the secondary water use point (500) reaches a preset value, the controller (9) instructs the water heater to switch to the standby mode.