Intelligent preheating mirror field scheduling method and device, computer equipment and storage medium

By monitoring and adjusting the temperature change rate of the heat absorbing screen and dynamically adjusting the heliostat queue, the problem of low preheating scheduling efficiency in tower solar photothermal power generation is solved, and a more efficient and flexible preheating process is achieved. Ensures the stable operation of the system.

CN119022483APending Publication Date: 2024-11-26BEIJING JUSHUHE TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411131402.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-18
Publication Date
2024-11-26

AI Technical Summary

Technical Problem

In the field of tower solar photothermal power generation, the prior art has low scheduling efficiency and safety hazards when preheating the mirror field, making it difficult to flexibly deal with different weather conditions.

Method used

By monitoring the temperature and temperature change rate of the heat absorbing screen, comparing the heating rate and cooling rate thresholds, dynamically adjusting the preheating heliostat queue, evacuate or join the heliostat to optimize the preheating process, and if necessary, from the adjacent heat absorbing screen from the adjacent heat absorbing screen Delegate the helioscope to improve preheating efficiency.

Benefits of technology

It improves preheating efficiency, shortens preheating time, enhances the flexibility of mirror field scheduling, and ensures that the heat absorber reaches a stable operating state when starting.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119022483A_ABST
    Figure CN119022483A_ABST
Patent Text Reader

Abstract

The invention relates to an intelligent preheating mirror field scheduling method and device, computer equipment and a storage medium. The method comprises the following steps: controlling a preheating heliostat queue of each heat absorption screen to preheat a heat absorber; the temperature and the temperature change rate of each heat absorption screen are obtained; evacuating heliostats in the preheating heliostat queue or adding heliostats into the preheating heliostat queue according to the comparison between the temperature change rate and a heating rate threshold value and between the temperature change rate and a cooling rate threshold value; and when the preheating heliostat queue of the first heat absorption screen cannot heat the first heat absorption screen to the preheating temperature, heliostats in the preheating heliostat queue of the adjacent second heat absorption screen are controlled to heat the first heat absorption screen. By adopting the method, the preheating safety and efficiency can be improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of solar energy technology, and in particular to an intelligent preheating mirror field scheduling method, device, computer equipment and storage medium. Background Art

[0002] In the field of tower solar thermal power generation, the heliostats in the mirror field are controlled to emit sunlight to the absorber in the mirror field, thereby heating the absorber. When the tower solar thermal power station is started, the absorber needs to be preheated to a certain temperature before the entire power station can enter a stable operating state. The existing technology is inefficient in scheduling the mirror field during preheating and there are safety hazards. Summary of the invention

[0003] Based on this, it is necessary to provide an intelligent preheating mirror field scheduling method, device, computer equipment and computer-readable storage medium to address the above technical problems.

[0004] In a first aspect, the present application provides a smart preheating mirror field scheduling method, wherein the method comprises:

[0005] Controlling the preheating heliostat queues of each heat absorbing screen to preheat the heat absorber;

[0006] Obtaining the temperature of each of the heat absorbing screens and their temperature change rates;

[0007] According to the comparison between the temperature change rate and the heating rate threshold and the cooling rate threshold, evacuate the heliostats in the preheating heliostat queue or add the heliostats to the preheating heliostat queue; and

[0008] When the preheating heliostat array of the first heat absorbing screen cannot heat the first heat absorbing screen to the preheating temperature, the heliostats in the preheating heliostat array of the adjacent second heat absorbing screen are controlled to heat the first heat absorbing screen.

[0009] In one of the embodiments, when the heating rate is higher than the heating rate threshold or the temperature of any heat absorbing screen is higher than the preheating temperature extreme value, the mirrors close to the inner ring in the preheating heliostat array are evacuated.

[0010] In one of the embodiments, when the cooling rate is higher than the cooling rate threshold, a spare heliostat is selected to join the preheating heliostat queue.

[0011] In one embodiment, the heliostats withdrawn from the preheating heliostat queue or added to the preheating heliostat queue are heliostats that have successfully corrected their deviation.

[0012] In one embodiment, when the cooling rate is higher than the cooling rate threshold, selecting a spare heliostat to join the preheating heliostat queue includes:

[0013] When the cooling rate of the bottom area of ​​each heat absorbing screen is higher than the cooling rate threshold, the mid-to-far mirrors are selected to join the preheating heliostat queue.

[0014] In one embodiment, when the cooling rate is higher than the cooling rate threshold, selecting a spare heliostat to join the preheating heliostat queue includes:

[0015] When the cooling rates of the middle and upper regions of each heat absorbing screen are higher than the cooling rate threshold, a nearby mirror is selected to join the preheating queue.

[0016] In one of the embodiments, if there are no available heliostats in the preheating heliostat queue of the second heat absorption screen, the heliostats in the preheating heliostat queue of the adjacent third heat absorption screen are controlled to heat the first heat absorption screen.

[0017] In a second aspect, the present application further provides a preheating mirror field scheduling device, which includes:

[0018] A control module, used for controlling the preheating heliostat queues of each heat absorbing screen to preheat the heat absorber;

[0019] A temperature acquisition module, used to acquire the temperature of each of the heat absorbing screens and the rate of temperature change thereof;

[0020] a scheduling module, configured to evacuate the heliostats in the preheating heliostat queue or add the heliostats to the preheating heliostat queue according to a comparison between the temperature change rate and a heating rate threshold and a cooling rate threshold; and

[0021] The compensation module is used for controlling the heliostats in the preheating heliostat queue of the adjacent second heat absorbing screen to heat the first heat absorbing screen when the preheating heliostat queue of the first heat absorbing screen cannot heat the first heat absorbing screen to the preheating temperature.

[0022] In a third aspect, the present application further provides a computer device. The computer device includes a memory and a processor, the memory stores a computer program, and the processor implements the following steps when executing the computer program:

[0023] Controlling the preheating heliostat queues of each heat absorbing screen to preheat the heat absorber;

[0024] Obtaining the temperature of each of the heat absorbing screens and their temperature change rates;

[0025] According to the comparison between the temperature change rate and the heating rate threshold and the cooling rate threshold, evacuate the heliostats in the preheating heliostat queue or add the heliostats to the preheating heliostat queue; and

[0026] When the preheating heliostat array of the first heat absorbing screen cannot heat the first heat absorbing screen to the preheating temperature, the heliostats in the preheating heliostat array of the adjacent second heat absorbing screen are controlled to heat the first heat absorbing screen.

[0027] In a fourth aspect, the present application further provides a computer-readable storage medium. The computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the following steps are implemented:

[0028] Controlling the preheating heliostat queues of each heat absorbing screen to preheat the heat absorber;

[0029] Obtaining the temperature of each of the heat absorbing screens and their temperature change rates;

[0030] According to the comparison between the temperature change rate and the heating rate threshold and the cooling rate threshold, evacuate the heliostats in the preheating heliostat queue or add the heliostats to the preheating heliostat queue; and

[0031] When the preheating heliostat array of the first heat absorbing screen cannot heat the first heat absorbing screen to the preheating temperature, the heliostats in the preheating heliostat array of the adjacent second heat absorbing screen are controlled to heat the first heat absorbing screen.

[0032] The intelligent preheating mirror field scheduling method, device, computer equipment and storage medium monitor the temperature of the heat absorbing screen and transfer some preheating heliostats between the heat absorbing screens with insufficient preheating heliostats and the heat absorbing screens with excess preheating heliostats for preheating. As a result, when preheating the absorber, the scheduling of the heliostats in the mirror field is more flexible, and can be flexibly adjusted in response to the current weather conditions, thereby improving the preheating efficiency and shortening the preheating time. BRIEF DESCRIPTION OF THE DRAWINGS

[0033] Figure 1 A schematic diagram of a flow chart of an intelligent preheating method in one embodiment;

[0034] Figure 2 A schematic diagram of each heat absorbing screen on a heat absorber in one embodiment;

[0035] Figure 3 is a schematic diagram of various regions of a single heat absorbing screen in one embodiment;

[0036] Figure 4 It is a structural block diagram of a mirror field intelligent operation device in one embodiment;

[0037] Figure 5 FIG. 4 is a diagram showing the internal structure of a computer device in one embodiment. DETAILED DESCRIPTION

[0038] In order to make the purpose, technical solution and advantages of the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.

[0039] Figure 1 FIG. 1 is a flow chart of a method for scheduling a smart preheating mirror field in an embodiment. Figure 1 As shown, a smart preheating mirror field scheduling method is provided. This embodiment uses the method applied to a server as an example for illustration. It can be understood that the method can also be applied to a terminal, and can also be applied to a system including a terminal and a server, and is implemented through the interaction between the terminal and the server. In this embodiment, the method includes steps 101 to 104.

[0040] Step 101: Control the preheating heliostat queues of each heat absorbing screen to preheat the heat absorber.

[0041] Figure 2 FIG. 1 is a schematic diagram of each heat absorbing screen on a heat absorber in an embodiment. The heat absorber can be formed by enclosing a plurality of rectangular heat absorbing screens (e.g., 8, 12, or 14, etc.). Figure 2 As shown, each heat absorbing screen faces a different direction. When the mirror field is in operation, a group of heliostats in the corresponding direction can be assigned to each heat absorbing screen, and the group of heliostats is designated to reflect sunlight onto the corresponding specific heat absorbing screen. For the convenience of description, the heliostats designated to irradiate sunlight onto a certain heat absorbing screen can be referred to as "heliostats of the heat absorbing screen", and the heliostats designated to irradiate sunlight onto a certain heat absorbing screen for preheating can be referred to as "preheating heliostats of the heat absorbing screen", and the collection of preheating heliostats of a certain heat absorbing screen constitutes the "preheating heliostat queue" of the heat absorbing screen.

[0042] The so-called preheating is that in the solar thermal power station, the temperature of the heat transfer medium will be reduced (for example, to 240℃) at night due to the lack of sunlight, which is much lower than the temperature of the heat transfer medium during normal operation during the day (for example, 350-400℃). When the solar thermal power station is started in the morning to collect heat energy, the temperature of the heat transfer medium that has cooled down at night needs to be reheated to a higher temperature (for example, 320℃) to prevent damage caused by rapid temperature rise of various system components if the system directly enters normal operation.

[0043] Step 102: Obtain the temperature of each heat absorbing screen and its temperature change rate.

[0044] like Figure 3As shown, each heat absorbing screen can be divided into three regions: upper, middle and lower. The temperature of the heat absorbing screen is determined by obtaining the temperature of each region and calculating their average value. The average temperature is obtained at intervals, so that the temperature change rate can be calculated. The temperature change rate of each region can also be calculated.

[0045] Step 103: according to the comparison between the temperature change rate and the temperature rise rate threshold and the temperature fall rate threshold, evacuate the heliostats in the preheating heliostat queue or add the heliostats to the preheating heliostat queue.

[0046] According to the many limitations of system operation (such as the limitations of the properties of the heat transfer medium, and the limitations of the heat absorber and pipeline materials), a temperature rise rate threshold and a temperature drop rate threshold are set. When the temperature change rate exceeds the temperature rise rate threshold and the temperature drop rate threshold, the heat absorber or pipeline material may be irreversibly damaged.

[0047] In some embodiments, when the heating rate is higher than the heating rate threshold or the temperature of any heat absorption screen is higher than the preheating temperature limit, the mirrors close to the inner ring in the preheating heliostat array are evacuated.

[0048] In a mirror field, heliostats are usually arranged around the absorber. The mirrors that are closer to the absorber are called inner ring mirrors, and the mirrors that are medium or far away from the absorber are called medium and far mirrors. The mirrors in the inner ring usually have a smaller spot, a larger energy density and more accurate calibration. When the heating rate is too high, the inner ring heliostats will no longer reflect sunlight onto the absorber, that is, the inner ring heliostats will be evacuated, which can slow down the heating rate of the absorber more quickly and effectively, and prevent a series of problems caused by the excessive heating rate of the absorber (such as material degeneration, deformation, sensor failure, etc.).

[0049] In some embodiments, when the cooling rate is higher than the cooling rate threshold, a spare heliostat is selected to join the preheating heliostat queue.

[0050] When the cooling rate is higher than the cooling rate threshold, a series of problems will also be caused (such as material degeneration, deformation, sensor failure, etc.) There are some heliostats in the system marked as preheating standby heliostats, in which case they will be added to the preheating heliostat queue for preheating, thereby preventing problems from occurring and ensuring the efficiency of preheating.

[0051] In some embodiments, when the cooling rate of the bottom area of ​​each heat absorbing screen is higher than the cooling rate threshold, the mid-to-far mirrors are selected to join the preheating heliostat queue.

[0052] Due to the limitation of reflection angle and the enclosure of sunshade and protective plate around the heat absorber, the sunlight reflected by the mid- and far-distance heliostats can better illuminate the bottom area of ​​the heat absorber. If you blindly use the nearby heliostats to try to slow down the cooling rate or increase the temperature of the heat absorber, it may only increase the temperature of the upper and middle areas of the heat absorber and make it overheated, while the temperature of the lower area will still cool down too fast.

[0053] In some embodiments, when the cooling rates of the middle and upper regions of each heat absorption screen are higher than the cooling rate threshold, a nearby mirror is selected to join the preheating queue.

[0054] At this time, it is more efficient to use nearby heliostats to illuminate the middle and upper areas of the heat absorption screen. Since these nearby heliostats usually have smaller light spots, higher energy density and more precise calibration, the preheating time can be shortened.

[0055] In some embodiments, the heliostats withdrawn from the preheating heliostat queue or the heliostats added to the preheating heliostat queue are heliostats that have successfully corrected their deviations.

[0056] A mirror that has been successfully corrected is more likely to reflect sunlight more accurately and provide more solar energy, or heat energy, to the heat absorber. As a result, the heating rate and cooling rate of the heat absorber can be adjusted more quickly and efficiently.

[0057] Step 104 : when the preheating heliostat queue of the first heat absorbing screen cannot heat the first heat absorbing screen to the preheating temperature, controlling the heliostats in the preheating heliostat queue of the adjacent second heat absorbing screen to heat the first heat absorbing screen.

[0058] In some embodiments, if there are no available heliostats in the preheating heliostat queue of the second heat absorption screen and the heat absorption screen has no redundant spare heliostats, the heliostats in the preheating heliostat queue of the adjacent third heat absorption screen are controlled to heat the first heat absorption screen.

[0059] As mentioned above, a fixed number of heliostats are allocated to each heat absorbing screen for preheating. However, in actual operation, depending on the sun angle and cloud distribution, some heat absorbing screens may have insufficient heliostats, while some heat absorbing screens may have surplus preheating heliostats. Therefore, the heat absorbing screens with insufficient preheating heliostats can borrow some preheating heliostats from the heat absorbing screens with surplus preheating heliostats for preheating.

[0060] As a result, when preheating the absorber, the scheduling of the heliostats in the mirror field is more flexible, and flexible adjustments can be made to the current weather conditions. Surplus preheating heliostats can be transferred to the absorber screens that lack preheating heliostats, which improves the preheating efficiency and shortens the preheating time.

[0061] It should be understood that, although the various steps in the flowcharts involved in the above-mentioned embodiments are displayed in sequence according to the indication of the arrows, these steps are not necessarily executed in sequence according to the order indicated by the arrows. Unless there is a clear explanation in this article, the execution of these steps does not have a strict order restriction, and these steps can be executed in other orders. Moreover, at least a part of the steps in the flowcharts involved in the above-mentioned embodiments can include multiple steps or multiple stages, and these steps or stages are not necessarily executed at the same time, but can be executed at different times, and the execution order of these steps or stages is not necessarily to be carried out in sequence, but can be executed in turn or alternately with other steps or at least a part of the steps or stages in other steps.

[0062] Based on the same inventive concept, the embodiment of the present application also provides an intelligent preheating mirror field scheduling device for implementing the intelligent preheating mirror field scheduling method involved above. The implementation scheme for solving the problem provided by the device is similar to the implementation scheme recorded in the above method, so the specific limitations in one or more embodiments of the intelligent preheating mirror field scheduling device provided below can refer to the limitations of the intelligent preheating mirror field scheduling method above, and will not be repeated here.

[0063] In one embodiment, Figure 4 As shown, an intelligent preheating mirror field scheduling device is provided, including: a control module 201, a temperature acquisition module 202, a scheduling module 203 and a compensation module 204, wherein:

[0064] A control module 201 is used to control the preheating heliostat queues of each heat absorbing screen to preheat the heat absorber;

[0065] The temperature acquisition module 202 is used to acquire the temperature of each heat absorbing screen and its temperature change rate;

[0066] A scheduling module 203, configured to evacuate a heliostat from the preheating heliostat queue or add a heliostat to the preheating heliostat queue according to a comparison between the temperature change rate and a heating rate threshold and a cooling rate threshold; and

[0067] The compensation module 204 is configured to control the heliostats in the preheating heliostat queue of the adjacent second heat absorbing screen to heat the first heat absorbing screen when the preheating heliostat queue of the first heat absorbing screen cannot heat the first heat absorbing screen to the preheating temperature.

[0068] Each module in the above-mentioned intelligent preheating mirror field scheduling device can be implemented in whole or in part by software, hardware and a combination thereof. Each of the above-mentioned modules can be embedded in or independent of the processor in the computer device in the form of hardware, or can be stored in the memory in the computer device in the form of software, so that the processor can call and execute the operations corresponding to each of the above modules.

[0069] In one embodiment, a computer device is provided. The computer device may be a server, and its internal structure diagram may be as follows: Figure 5 As shown. The computer device includes a processor, a memory and a network interface connected through a system bus. Among them, the processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program and a database. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The database of the computer device is used to store data related to the mirror field and the absorber. The network interface of the computer device is used to communicate with an external terminal through a network connection. When the computer program is executed by the processor, an intelligent preheating mirror field scheduling method is implemented.

[0070] Those skilled in the art will understand that Figure 5 The structure shown in the figure is only a block diagram of a part of the structure related to the solution of the present application, and does not constitute a limitation on the computer device to which the solution of the present application is applied. The specific computer device may include more or fewer components than those shown in the figure, or combine certain components, or have a different arrangement of components.

[0071] In one embodiment, a computer device is further provided, including a memory and a processor, wherein a computer program is stored in the memory, and the processor implements the steps in the above-mentioned method embodiments when executing the computer program.

[0072] In one embodiment, a computer-readable storage medium is provided, on which a computer program is stored. When the computer program is executed by a processor, the steps in the above-mentioned method embodiments are implemented.

[0073] In one embodiment, a computer program product is provided, including a computer program, which implements the steps in the above method embodiments when executed by a processor.

[0074] Those skilled in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to the memory, database or other medium used in the embodiments provided in the present application can include at least one of non-volatile and volatile memory. Non-volatile memory can include read-only memory (ROM), magnetic tape, floppy disk, flash memory, optical memory, high-density embedded non-volatile memory, resistive random access memory (ReRAM), magnetoresistive random access memory (MRAM), ferroelectric random access memory (FRAM), phase change memory (PCM), graphene memory, etc. Volatile memory can include random access memory (RAM) or external cache memory, etc. As an illustration and not limitation, RAM can be in various forms, such as static random access memory (SRAM) or dynamic random access memory (DRAM). The database involved in each embodiment provided in this application may include at least one of a relational database and a non-relational database. Non-relational databases may include distributed databases based on blockchains, etc., but are not limited to this. The processor involved in each embodiment provided in this application may be a general-purpose processor, a central processing unit, a graphics processor, a digital signal processor, a programmable logic device, a data processing logic device based on quantum computing, etc., but are not limited to this.

[0075] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0076] The above-described embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the present application. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the present application shall be subject to the attached claims.

Claims

1. An intelligent preheating mirror field scheduling method, wherein: The method comprises: Controlling the preheating heliostat queues of each heat absorbing screen to preheat the heat absorber; Obtaining the temperature of each of the heat absorbing screens and their temperature change rates; According to the comparison between the temperature change rate and the heating rate threshold and the cooling rate threshold, evacuate the heliostats in the preheating heliostat queue or add the heliostats to the preheating heliostat queue; and When the preheating heliostat array of the first heat absorbing screen cannot heat the first heat absorbing screen to the preheating temperature, the heliostats in the preheating heliostat array of the adjacent second heat absorbing screen are controlled to heat the first heat absorbing screen.

2. The intelligent preheating mirror field scheduling method according to claim 1, wherein: When the heating rate is higher than the heating rate threshold or the temperature of any heat absorbing screen is higher than the preheating temperature extreme value, the mirrors close to the inner ring in the preheating heliostat queue are evacuated.

3. The intelligent preheating mirror field scheduling method according to claim 1, wherein: When the cooling rate is higher than the cooling rate threshold, a spare heliostat is selected to join the preheating heliostat queue.

4. The intelligent preheating mirror field scheduling method according to claim 1, wherein: The heliostats withdrawn from the preheating heliostat queue or added to the preheating heliostat queue are heliostats that have successfully corrected their deviations.

5. The intelligent preheating mirror field scheduling method according to claim 3, wherein: When the cooling rate is higher than the cooling rate threshold, selecting a spare heliostat to join the preheating heliostat queue comprises: When the cooling rate of the bottom area of ​​each heat absorbing screen is higher than the cooling rate threshold, the mid-to-far mirrors are selected to join the preheating heliostat queue.

6. The intelligent preheating mirror field scheduling method according to claim 3, wherein: When the cooling rate is higher than the cooling rate threshold, selecting a spare heliostat to join the preheating heliostat queue comprises: When the cooling rates of the middle and upper regions of each heat absorbing screen are higher than the cooling rate threshold, a nearby mirror is selected to join the preheating queue.

7. The intelligent preheating mirror field scheduling method according to claim 1, wherein: If there is no available heliostat in the preheating heliostat queue of the second heat absorption screen, the heliostats in the preheating heliostat queue of the adjacent third heat absorption screen are controlled to heat the first heat absorption screen.

8. An intelligent preheating mirror field scheduling device, characterized in that: The device comprises: A control module, used for controlling the preheating heliostat queues of each heat absorbing screen to preheat the heat absorber; A temperature acquisition module, used to acquire the temperature of each of the heat absorbing screens and the rate of temperature change thereof; a scheduling module, configured to evacuate the heliostats in the preheating heliostat queue or add the heliostats to the preheating heliostat queue according to a comparison between the temperature change rate and a heating rate threshold and a cooling rate threshold; and The compensation module is used for controlling the heliostats in the preheating heliostat queue of the adjacent second heat absorbing screen to heat the first heat absorbing screen when the preheating heliostat queue of the first heat absorbing screen cannot heat the first heat absorbing screen to the preheating temperature.

9. A computer device comprising a memory and a processor, wherein the memory stores a computer program, wherein: When the processor executes the computer program, the steps of the method according to any one of claims 1 to 7 are implemented.

10. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 7 are implemented.