Continuous-discontinuous fluid-solid coupling simulation method and system for multi-sequence splitting grouting
Through the continuous-discontinuous flow-solid coupling simulation method, the diffusion and reinforcement characteristics of multi-sequence split grouting in water-rich and dense weak surrounding rocks were analyzed, and the problem of poor grouting treatment effect in the existing technology was solved, and the Scientific visualization and accurate reinforcement effect evaluation.
Patent Information
- Application Number
- CN202411050769.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-01
- Publication Date
- 2024-11-26
AI Technical Summary
The existing technology has poor effect in water-rich, dense and weak surrounding rock environments, and the diffusion range and reinforcement characteristics of multiple sequence split grouting are unclear, making it difficult to achieve scientific visual analysis.
The continuous-discontinuous flow-solid coupling simulation method of multi-sequence split grouting is used to monitor the geostress, stress, grouting pressure and porosity in real time, and the reinforcement effect of different grouting parameters is analyzed. Influence, provide mechanical performance testing and effect evaluation.
A scientific visualization of the entire process of multi-sequence split grouting diffusion and reinforcement is realized, revealing the slurry expansion mode, slurry diffusion path and reinforcement range, providing efficient and accurate numerical calculation basis, and supporting the theory and technology of actual engineering support.
Smart Images

Figure CN119026500A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of tunnel splitting grouting reinforcement, and in particular to a continuous-discontinuous fluid-solid coupling simulation method and system for multi-sequence splitting grouting. Background Art
[0002] In recent years, tunnels and underground projects have expanded to the western regions, which are full of mountains and steep hills. As a large number of water diversion tunnels, deep and long tunnels and other projects are being or will be put into construction, major water and mud inrush engineering disasters have occurred frequently due to the influence of topography and complex adverse geological environment. For example, in the construction of water diversion projects in the southwest region, an unconventional engineering geological environment with rich water, dense and weak surrounding rock was encountered. The construction under this environment encountered many major mud and water inrush disasters, and fell into the dilemma of repeated grouting treatment and repeated disasters, which endangered the safety of engineering construction and caused serious delays in the progress of engineering construction. Therefore, grouting treatment technology has become a key research direction widely concerned by the academic and engineering circles.
[0003] Current engineering practice shows that a single type of grouting treatment scheme of penetration, compaction or splitting is not suitable for the above special geological conditions: because the strata are squeezed and ground for a long time in the high-pressure active fault zone, the rock particles are very small, and the high ground stress conditions make the strata dense, so conventional cement slurry and ultrafine cement slurry cannot penetrate into the strata, so the penetration grouting treatment scheme has little effect. In addition, in dense strata, if the grouting pressure is too small, it will not form an effective splitting slurry vein, and only the strata around the grouting hole will be compacted, and the reinforcement effect will be weak; if the grouting pressure is too large, the slurry vein splitting will spread far, often beyond the range of the grouting reinforcement circle, and a single continuous splitting grouting will often develop in a single splitting direction, and the grouting reinforcement effect will be poor.
[0004] To this end, a multi-sequence splitting grouting method has been proposed. By adjusting key parameters such as the grouting interval time of multi-sequence splitting grouting, the splitting slurry veins are affected by the previous solidification slurry and diffuse in multiple directions to reinforce the formation. Branch-like and network-like splitting slurry veins can be produced in the grouting reinforced formation, thereby improving the grouting reinforcement effect.
[0005] However, the diffusion range and reinforcement characteristics of the multi-sequence splitting grouting scheme are still unclear. The diffusion and reinforcement process of different sequence splitting slurries in the grouting project is a hidden project. Both field tests and indoor tests are difficult to intuitively visualize the diffusion and reinforcement process of the multi-sequence splitting slurry. It is impossible to achieve scientific visualization of the entire process of multi-sequence splitting grouting diffusion and reinforcement, and it is impossible to effectively analyze the effect of multi-sequence splitting grouting under specific conditions. Summary of the invention
[0006] To address the deficiencies of the above-mentioned prior art, the present invention provides a continuous-discontinuous fluid-solid coupling simulation method and system for multi-sequence splitting grouting, which realizes the scientific visualization of the whole process of diffusion and reinforcement of multi-sequence splitting grouting through simulation and numerical analysis, reveals the slurry expansion mode, slurry vein diffusion path, reinforcement range, etc. in the multi-sequence splitting grouting process, and can provide grouting reinforcement performance, mechanical properties test and effect evaluation of the improvement degree for rock and soil bodies containing multiple splitting slurry veins, provides efficient and accurate numerical calculation basis for clarifying the effect of different grouting parameters on multi-sequence splitting grouting reinforcement effect, and provides theoretical and technical support for actual engineering.
[0007] In a first aspect, the present invention provides a continuous-discontinuous fluid-solid coupling simulation method for multi-sequence splitting grouting.
[0008] A continuous-discontinuous fluid-solid coupling simulation method for multi-sequence splitting grouting, comprising:
[0009] Obtaining the occurrence environment parameters and physical and mechanical parameters of the injected medium within the target surrounding rock range for splitting grouting, and obtaining the physical and mechanical parameters of the injected slurry;
[0010] According to the acquired parameter data, a two-dimensional grouting DEM model of single-hole multi-sequence splitting grouting is constructed, and a two-dimensional surrounding rock FDM model is established outside the two-dimensional grouting DEM model to form a continuous-discontinuous fluid-solid coupling model, so as to perform boundary coupling simulation between discontinuous DEM and continuous FDM.
[0011] Based on the continuous-discontinuous fluid-solid coupling model, the continuous-discontinuous fluid-solid coupling effect is applied, and multi-sequence splitting grouting simulation is carried out under different grouting key parameter conditions. The ground stress, grouting pressure and porosity in the model are monitored in real time during the simulation process. The influence of different grouting key parameters in multi-sequence splitting grouting on the surrounding rock stress around the grouting, the seepage effect in the formation range, and the reinforcement effect of the injected medium are analyzed according to the monitoring data.
[0012] In a second aspect, the present invention provides a continuous-discontinuous fluid-solid coupling simulation system for multi-sequence splitting grouting.
[0013] A continuous-discontinuous fluid-solid coupling simulation system for multi-sequence splitting grouting, comprising:
[0014] The parameter data acquisition module is used to obtain the occurrence environment parameters and physical and mechanical parameters of the injected medium within the target surrounding rock to be split and grouted, and to obtain the physical and mechanical parameters of the injected slurry;
[0015] The continuous-discontinuous fluid-solid coupling model construction module is used to construct a two-dimensional grouting DEM model of single-hole multi-sequence splitting grouting according to the acquired parameter data, and to expand the two-dimensional grouting DEM model to establish a two-dimensional surrounding rock FDM model to form a continuous-discontinuous fluid-solid coupling model, so as to perform boundary coupling simulation between discontinuous DEM and continuous FDM;
[0016] The multi-sequence splitting grouting simulation module is used to apply continuous-discontinuous fluid-solid coupling based on the continuous-discontinuous fluid-solid coupling model, and carry out multi-sequence splitting grouting simulation under different grouting key parameter conditions. During the simulation process, the ground stress, grouting pressure and porosity in the model are monitored in real time. According to the monitoring data, the influence of different grouting key parameters in multi-sequence splitting grouting on the surrounding rock stress around the grouting, the seepage effect in the formation range, and the reinforcement effect of the injected medium are analyzed.
[0017] In a third aspect, the present invention further provides an electronic device comprising a memory and a processor, and computer instructions stored in the memory and executed on the processor, wherein when the computer instructions are executed by the processor, the steps of the method described in the first aspect are completed.
[0018] In a fourth aspect, the present invention further provides a computer-readable storage medium for storing computer instructions, which, when executed by a processor, complete the steps of the method described in the first aspect.
[0019] One or more of the above technical solutions have the following beneficial effects:
[0020] 1. The present invention provides a continuous-discontinuous fluid-solid coupling simulation method and system for multi-sequence splitting grouting. A continuous-discontinuous coupling model of multi-sequence splitting grouting is established by means of simulation and numerical analysis. Multi-sequence splitting grouting simulations of different orders are carried out in discontinuous media to obtain the variation law of slurry diffusion and reinforcement characteristics within the grouting reinforcement circle. Moreover, stress transfer in a larger range of continuously injected media is simulated to obtain the influence law of different orders of multi-sequence splitting grouting outside the grouting reinforcement circle. In this way, scientific visualization of the whole process of multi-sequence splitting grouting diffusion and reinforcement is realized, and the slurry expansion mode, slurry vein diffusion path, reinforcement range, etc. in the multi-sequence splitting grouting process are revealed. In addition, mechanical property tests and effect evaluations of grouting reinforcement performance and improvement degree can be provided for rock and soil bodies containing multiple splitting slurry veins. This provides an efficient and accurate numerical calculation basis for explaining the effect of different grouting parameters on the reinforcement effect of multi-sequence splitting grouting, and provides theoretical and technical support for practical engineering.
[0021] 2. The present invention obtains the influence of groundwater seepage in a water-rich environment on the injected medium and the diffusion characteristics of multi-order splitting slurry through coupled simulation calculation of DEM and CFD parts. The CFD part calculates the porosity parameter information of the injected medium particles in real time, updates the fluid grid permeability coefficient at each time step, and realizes accurate calculation of the seepage effect in a water-rich environment.
[0022] 3. The present invention realizes the time-varying effect characteristics of slurry viscosity in multi-sequence splitting grouting simulation by updating the slurry viscosity values under different time step conditions in real time. Through this multi-sequence splitting grouting model, it is beneficial to obtain more accurate simulation calculation results, and can show the dynamic development process of multi-sequence splitting grouting diffusion and reinforcement, providing guidance for multi-sequence splitting grouting control technology. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] The accompanying drawings in the specification, which constitute a part of the present invention, are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute improper limitations on the present invention.
[0024] Figure 1 It is an implementation flow chart of the continuous-discontinuous fluid-solid coupling simulation method of multi-sequence splitting grouting in an embodiment of the present invention;
[0025] Figure 2 A schematic diagram of a two-dimensional grouting DEM model constructed in an embodiment of the present invention;
[0026] Figure 3 Schematic diagram of a continuous-discontinuous fluid-solid coupling model constructed in an embodiment of the present invention;
[0027] Figure 4 It is a time-varying effect curve diagram of the slurry viscosity of the injected slurry in the embodiment of the present invention.
[0028] Among them, 1. horizontal constraint wall structure; 2. vertical constraint wall structure; 3. grouting pipe wall structure; 4. front end plugging head of grouting pipe; 5. grouting plate; 6. grouting hole; 7. vertical ground stress; 8. horizontal ground stress; 9. injected slurry; 10. injected medium. DETAILED DESCRIPTION
[0029] It should be noted that the following detailed descriptions are exemplary only, are intended to describe specific embodiments, are intended to provide further explanation of the present invention, and are not intended to limit exemplary embodiments according to the present invention. Unless otherwise specified, all technical and scientific terms used herein have the same meanings as those of ordinary skill in the art to which the present invention belongs. In addition, it should also be understood that when the terms "comprising" and / or "including" are used in this specification, it indicates the presence of features, steps, operations, devices, components and / or combinations thereof.
[0030] Embodiment 1
[0031] As pointed out in the background technology, multi-sequence splitting grouting can make the splitting slurry veins diffuse in multiple directions and reinforce the stratum by adjusting the grouting interval time, and can produce tree-like and network-like splitting slurry veins in the grouting reinforced stratum. However, the diffusion range and reinforcement characteristics of the multi-sequence splitting grouting scheme are still unclear, and the diffusion and reinforcement process of different sequence splitting slurries in the grouting project is a concealed project. It is difficult to realize intuitive visualization of the diffusion and reinforcement process of the multi-sequence splitting slurry in both field tests and indoor tests.
[0032] To this end, this embodiment provides a continuous-discontinuous fluid-solid coupling simulation method for multi-sequence splitting grouting. Through simulation and numerical calculation, the scientific visualization of the entire process of multi-sequence splitting grouting diffusion and reinforcement is achieved, and conclusions such as the diffusion mode and range, reinforcement mechanism and characteristics of multi-sequence splitting grouting slurry (i.e., injected slurry) are obtained, which can provide theoretical and technical support for actual engineering.
[0033] Specifically, the continuous-discontinuous fluid-solid coupling simulation method for multi-sequence splitting grouting proposed in this embodiment is as follows: Figure 1 As shown, the specific steps include:
[0034] Step S1, obtaining the occurrence environment parameters and physical and mechanical parameters of the injected medium within the target surrounding rock to be split and grouted, and obtaining the physical and mechanical parameters of the injected slurry;
[0035] Step S2, constructing a two-dimensional grouting DEM model of single-hole multi-sequence splitting grouting according to the acquired parameter data, and expanding the two-dimensional grouting DEM model to establish a two-dimensional surrounding rock FDM model to form a continuous-discontinuous fluid-solid coupling model, so as to perform boundary coupling simulation between discontinuous DEM and continuous FDM;
[0036] Step S3, based on the continuous-discontinuous fluid-solid coupling model, apply the continuous-discontinuous fluid-solid coupling effect, and carry out multi-sequence splitting grouting simulation under different grouting key parameter conditions, monitor the ground stress, grouting pressure and porosity in the model in real time during the simulation process, and analyze the influence of different grouting key parameters in the multi-sequence splitting grouting on the surrounding rock stress around the grouting, the seepage effect in the formation range, and the reinforcement effect of the injected medium according to the monitoring data.
[0037] The following content introduces the continuous-discontinuous fluid-solid coupling simulation method of multi-sequence splitting grouting proposed in this embodiment in more detail.
[0038] Step S1, understanding the engineering background. Obtain the occurrence environment parameters and physical and mechanical parameters of the injected medium within the target surrounding rock range for splitting grouting, and obtain the physical and mechanical parameters of the injected slurry.
[0039] In step S1, the geological survey data is fully mastered to (1) obtain and understand the occurrence environment of the injected medium, including but not limited to: three-dimensional geostress environmental parameters, degree of fracture development, groundwater distribution, etc.; (2) obtain and understand the physical and mechanical parameters of the injected medium, including but not limited to: density, porosity, water content, particle grading, compressive strength, shear strength, tensile strength, etc.; (3) obtain and understand the physical and mechanical parameters of the injected slurry, including but not limited to: viscosity, initial setting time, compressive strength after setting, shear strength after setting, slurry ratio, slurry viscosity time-varying curve, etc., wherein the injected slurry includes single-liquid slurry and double-liquid slurry, and the slurry ratio includes the water-cement ratio of the single slurry and the volume ratio of the double-liquid slurry.
[0040] (1) Regarding the storage environment of the injected medium:
[0041] Understand the special geological conditions that affect grouting reinforcement projects, such as the three-dimensional geostress distribution characteristics in the injected medium and the groundwater storage environment, and grasp the real environment of the injected medium in the surrounding rock.
[0042] (2) Physical and mechanical parameters of the injected medium:
[0043] For the injected medium within the target surrounding rock range of grouting treatment, on-site in-situ mechanical measurement tests are carried out, including but not limited to: obtaining the compressive strength of the injected medium through on-site in-situ probing or rebound tests; obtaining the shear strength of the injected medium through on-site in-situ cross-plate shear tests.
[0044] Furthermore, sufficient typical injected medium samples were obtained through on-site sampling and wrapped with plastic wrap to carry out indoor physical and mechanical tests. Among them, the density of the injected medium under different confining pressure conditions was obtained through density test; the initial moisture content of the injected medium was determined through moisture content test; the original particle size distribution of the injected medium was obtained through particle size analysis test; the initial porosity in the injected medium was obtained through porosity determination test; and the cohesion and internal friction angle of the injected medium were obtained through geotechnical triaxial test.
[0045] (3) Physical and mechanical parameters of the injected slurry:
[0046] For the injected slurry, the physical parameters of the slurry are measured: if the slurry is conventional cement or ultrafine cement single-liquid slurry, the physical and mechanical parameters such as the initial setting time, compressive strength of the slurry after solidification, and shear strength of the slurry after solidification need to be measured; if the slurry is a quick-setting two-liquid slurry represented by cement-water glass, the physical and mechanical parameters such as the initial setting time of the slurry, the phase change time of the slurry from fluid to solid, the compressive strength of the slurry after solidification, and the shear strength of the slurry after solidification need to be measured.
[0047] On the basis of obtaining the above parameters, through further calculation, the applicability models of the injected medium contact model in the linear model, parallel bonding model and other applicability models and their inter-particle mesoscopic parameters are obtained, and the applicability models of the slurry medium contact model in the linear model, JKR bonding model and other applicability models and their inter-particle mesoscopic parameters are obtained. Specifically, according to the particle grading of the injected medium, numerical calculation models such as triaxial test numerical calculation model, shear test numerical calculation model, concrete slump numerical calculation model are established to perform numerical simulation calculations, compare the calculation results with the indoor test results, compare the simulated fracture results and actual rock splitting results under different contact parameter conditions, determine the appropriate and applicable contact parameters, and check the inter-particle contact parameters (the checking process is parameter acquisition), and calibrate the inter-particle contact parameters of the injected medium. Among them, the inter-particle contact parameters assigned in the numerical calculation model are ensured to be accurate through verification, and the obtained calculation results are ensured to be consistent with the actual physical phenomena, which can prove the correctness of the adopted contact parameters.
[0048] Step S2, establishing a multi-sequence splitting grouting model. According to the physical and mechanical properties and occurrence environment of the injected medium, servo loading of ground stress in different directions is realized, parameters of the injected medium and the injected slurry are given, and a continuous-discontinuous fluid-solid coupling model of the multi-sequence splitting grouting model is established.
[0049] In step S2, firstly, a two-dimensional grouting DEM model of single-hole multi-sequence splitting grouting is constructed according to the acquired parameter data. Specifically, according to the size of the preset grouting model, a single-hole multi-sequence splitting grouting model, i.e., a two-dimensional grouting DEM model, is established, which includes: upper and lower boundaries of the grouting model, a single grouting pipe, a matching grouting stopper, a grouting plate and other wall structures, and also establishes the slurry particle materials injected by the single-hole multi-sequence splitting grouting, including: slurry particles and injected medium particles.
[0050] like Figure 2As shown, the present embodiment can build a splitting grouting model with different sequences, including a ground stress loading system, a grouting loading system, an injected medium and slurry, etc. Among them, the ground stress loading system includes: a horizontal constraint wall structure 1 of a multi-sequence splitting grouting model, a vertical constraint wall structure 2 of a multi-sequence splitting grouting model, horizontal ground stress 8, and vertical ground stress 7, which are used to restore the ground stress conditions of the in-situ storage environment of the injected medium; the grouting loading system includes: a grouting pipe wall structure 3 (hereinafter referred to as a grouting pipe 3), a front end plugging head 4 of a grouting pipe, a grouting plate 5, and a grouting hole 6, which are used to constrain the movement range of slurry particles, restore the on-site splitting grouting construction process, and simulate the multi-sequence splitting grouting construction process; the injected slurry 9 needs to set the slurry contact model and parameters according to the measured physical and mechanical parameters of the slurry; the injected medium 10 needs to set the particle size, particle grading, particle contact model and parameters of the medium according to the measured physical and mechanical parameters of the injected medium.
[0051] The construction process of the above model is:
[0052] First, according to the size of the preset grouting model, determine the calculation domain range, and establish the upper and lower boundary wall structures of the servo geostress (this structure reflects the size of the two-dimensional grouting model). Specifically, under the condition of determining the size of the grouting model, select the calculation domain range preferentially. If the calculation domain range is too small, it will not meet the calculation requirements. If the calculation domain range is too large, the calculation efficiency will be reduced. The calculation domain range can be appropriately expanded according to the size of the calculation model. Usually, the calculation domain range can be expanded to 1.2-1.5 times the size of the calculation model.
[0053] Secondly, a wall structure consisting of a single grouting pipe, a grouting plug and a grouting plate is established inside the upper and lower boundary wall structures.
[0054] Among them, when establishing the grouting plate wall structure (i.e., the grouting plate 5), it is necessary to combine the piston grouting pump commonly used in grouting projects to realize the simulation of pressurizing the injected slurry 9. The piston grouting pump continuously and rapidly and constantly moves back and forth in the grouting pipe 3 through the grouting plate 5, providing a power source for the injected slurry 9 to flow in the grouting pipe 3. Therefore, the grouting plate 5 should also maintain a uniform advancement state during the constant pressure splitting grouting process. The change process of the grouting pressure P during the grouting process is reflected in the change law of the pressure value of the grouting plate wall structure. Therefore, a monitoring unit is also required to monitor and record the pressure value (i.e., grouting pressure) of the grouting plate wall structure.
[0055] In addition, when establishing the two-dimensional grouting model and grouting loading system, the model range should be appropriately selected in combination with the field test and the indoor test. A too small grouting model will cause the slurry diffusion and reinforcement characteristics to be significantly affected by the boundary conditions, further affecting the accuracy and effectiveness of the numerical calculation results; while an overly large grouting model will cause the particles of the injected medium 10 to increase exponentially, resulting in a decrease in calculation efficiency; the specific selection and setting should be considered in terms of the proportional relationship between the grouting pipe 3 and the grouting model size. Usually, the model structure size can be more than 10 times and less than 20 times the diameter of the grouting pipe structure, which can avoid the adverse effect of the boundary effect on the grouting diffusion, and at the same time avoid the reduction of calculation efficiency caused by the overly large calculation model. In addition, the upper and lower boundary wall structures (i.e., the horizontal constraint wall structure 1 and the vertical constraint wall structure 2) in the two-dimensional grouting model should be able to realize servo loading functions of different sizes to ensure the two-dimensional horizontal and vertical servo loading of the injected medium 10 during the multi-sequence splitting grouting process.
[0056] Then, according to the original particle grading of the injected medium and the injected slurry, the injected medium particles and the injected slurry particles are generated. Among them, the viscosity of the injected slurry particles is configured according to the time-varying curve of the slurry viscosity; according to the physical and mechanical parameters of the injected medium and the injected slurry, the contact model and parameters between each particle are calibrated.
[0057] Specifically, when generating the particles of the injected medium 10 and the injected slurry 9, the particles of the injected medium 10 need to be generated according to the original particle grading of the injected medium determined by the test; the particles of the injected slurry 9 need to determine the particle radius of the slurry according to the relationship between the injected medium and the slurry, that is, the particle size of the injected slurry 9 particles is usually determined according to the particle size of the injected medium particles in the target area required for grouting under the geological conditions of the engineering site. The corresponding relationship between the particle size of the injected medium and the slurry needs to be assigned according to different engineering applications, and is not specifically limited here. In addition, according to the calibration results of the particle parameters in the indoor test, the injected medium is assigned the initial strength parameters under the action of the linear model and the parallel bonding model.
[0058] In addition, in traditional grouting simulation, the slurry viscosity coefficient is often set to a constant value, but in actual grouting engineering, the slurry viscosity μ changes with time t(s), that is, there is a time-varying effect of slurry viscosity, and this effect has a significant impact on the slurry diffusion and reinforcement characteristics. Therefore, in this embodiment, the viscosity coefficient between slurry particles is set to a function that changes with the increase of the calculation time step, that is, according to Figure 4 The viscosity of the slurry is configured according to the time-varying curve of the slurry viscosity shown in the figure, which can effectively improve the accuracy of single splitting grouting and is of great significance to the control technology of multi-sequence splitting grouting.
[0059] Finally, based on the established upper and lower boundary wall structures, a single grouting pipe, a grouting pipe wall structure, a grouting plug, a grouting plate, and the generated injected medium particles and injected slurry particles, the construction of a two-dimensional grouting DEM model was completed.
[0060] In step S2, a two-dimensional surrounding rock FDM model is then established outside the two-dimensional grouting DEM model to form a continuous-discontinuous fluid-solid coupling model, so as to perform boundary coupling simulation between the discontinuous DEM and the continuous FDM, and further realize the analysis of the influence of multiple sequential splitting grouting on the stability of the surrounding rock mass.
[0061] Specifically, outside the slurry diffusion range (i.e., the grouting reinforcement circle range), a two-dimensional surrounding rock FDM model (i.e., the FDM calculation area) is expanded and established to constitute a continuous-discontinuous fluid-solid coupling model of the multi-sequence splitting grouting model. Through continuous FDM-discontinuous DEM coupling calculation, the mechanical properties of the DEM calculation area within the grouting reinforcement circle to the FDM calculation area outside the grouting reinforcement circle can be transferred, and then the influence law of the disturbance on the surrounding rock mass can be obtained.
[0062] Among them, coupling calculation is performed for each sequence of splitting grouting: the DEM calculation area is affected by the splitting grouting, the injected medium particles expand outward, and the calculation parameters such as stress, strain, flow field pressure are transmitted to the boundary of the DEM calculation area by the central grouting pipe, and then transmitted to the boundary of the FDM calculation area. Based on the above method, the influence law of the disturbance on the surrounding rock mass can be obtained according to the size of the calculation parameters received by the boundary of the FDM calculation area of multiple sequence splitting grouting.
[0063] Furthermore, the continuous-discontinuous fluid-solid coupling effect is applied to the continuous-discontinuous fluid-solid coupling model to realize the seepage destruction effect of the groundwater environment on the injected medium. Specifically, according to the calculated size of the two-dimensional single-hole grouting model, a CFD (Computational Fluid Dynamics) fluid calculation grid is generated within the same size range in the injected medium model, and the porosity parameter information of the injected medium particles is calculated in real time (the porosity can be calculated based on the size of the particle volume within a certain spatial range), and the fluid grid permeability coefficient is updated at each time step to achieve accurate calculation of the seepage effect in the water-rich environment, thereby obtaining the influence of the seepage effect on the injected medium, and at the same time, obtaining the influence of the injected medium on the seepage effect during the multi-sequence splitting grouting process.
[0064] That is, Figure 3 As shown, the multi-sequence splitting grouting model based on continuous-discontinuous medium fluid-solid coupling constructed in this embodiment supplements the influence of water-rich environment on splitting grouting of different sequences, providing a reference for further truly restoring the influence of seepage in the formation on the injected medium; moreover, the FDM continuous medium calculation range is expanded outside the discrete element DEM calculation range, which can realize the simulation of the disturbance influence of splitting grouting of different sequences on the surrounding rock structure.
[0065] Step S3: Based on the continuous-discontinuous fluid-solid coupling model, the continuous-discontinuous fluid-solid coupling effect is applied, and a multi-sequence splitting grouting simulation under different grouting key parameter conditions is carried out. During the simulation process, the ground stress, grouting pressure and porosity in the model are monitored in real time, and the influence of different grouting key parameters in the multi-sequence splitting grouting on the surrounding rock stress around the grouting, the seepage effect in the formation range, and the reinforcement effect of the injected medium are analyzed according to the monitoring data. Among them, the key grouting parameters include the number of grouting times, the grouting interval time, and the grouting pressure.
[0066] Specifically, by setting codes and applying data recording instructions, a real-time monitoring method for parameters such as ground stress, grouting pressure, and porosity is set up to obtain real-time parameter data in the simulation process, and multi-sequence splitting grouting simulation calculations are carried out under different grouting times, different grouting intervals, and different grouting pressures. The influence of different grouting key parameters on the reinforcement effect of multi-sequence splitting grouting is revealed, and the effective parameters of multi-sequence splitting grouting are summarized.
[0067] Based on the above model, multi-sequence splitting grouting simulation is carried out, including:
[0068] First, the first splitting grouting is carried out to generate injection slurry particles in the grouting pipe, and the necessary parameters such as the contact parameters between the injected slurry particles and the side wall of the grouting pipe are given. The servo ground stress loading is turned off to keep the upper and lower boundary wall structure positions constant, that is, to keep the ground stress loading wall structure position constant, so that the injected medium particles and slurry particles are fully balanced. At this time, the grouting hole wall at the end of the grouting pipe is removed, and the grouting plate is used to uniformly pressurize to pump the first splitting injection slurry into the injected medium;
[0069] Secondly, carry out secondary splitting grouting. After the first grouting is completed, the position of the first grouting plate is maintained constant, a new secondary grouting plate is generated on the top of the grouting pipe, and new secondary splitting slurry particles are generated again in the grouting pipe. The necessary parameters such as the contact parameters between the slurry particles and the side walls of the grouting pipe are given, and the contact parameters between particles of different components are updated; the servo ground stress loading is turned off, and the position of the ground stress loading wall structure is kept constant to make the injected medium particles and the slurry particles fully balanced. At this time, the first grouting plate wall is deleted, and the secondary splitting slurry is pumped into the injected medium by uniformly pressurizing the grouting plate.
[0070] Furthermore, multiple splitting groutings are carried out. After the last grouting (i.e., the secondary grouting) is completed, the position of the grouting plate is maintained constant, and a new subsequent (i.e., current sequence) grouting plate is generated on the top of the grouting pipe; the current sequence of injected slurry particles is generated again in the grouting pipe, and necessary parameters such as the contact parameters between the slurry particles and the side wall of the grouting pipe are assigned, and the contact parameters between particles of different components are updated; the slurry particles of this sequence are pumped into the injected medium by the same operation, that is, the servo ground stress loading is turned off, and the position of the ground stress loading wall structure is kept constant, so that the particles of the injected medium and the slurry particles are fully balanced, and the secondary grouting plate wall is deleted at this time, and the subsequent splitting slurry particles are pumped into the injected medium by uniformly pressurizing the grouting plate.
[0071] In the above splitting process, the output image command is called through the fish language to generate the slurry diffusion range images at different grouting times. The dynamic changes of parameters such as grouting pressure and porosity change are obtained through the above monitoring means to analyze the influencing rules.
[0072] This embodiment achieves scientific visualization of the entire process of multi-sequence splitting grouting diffusion and reinforcement by obtaining the influence rules of different orders of multi-sequence splitting grouting outside the grouting reinforcement circle, reveals the slurry expansion mode, slurry vein diffusion path, reinforcement range, etc. in the multi-sequence splitting grouting process, and can provide grouting reinforcement performance and improvement degree effect evaluation for rock and soil bodies containing multiple splitting slurry veins, provides efficient and accurate numerical calculation basis for clarifying the effect of different grouting parameters on multi-sequence splitting grouting reinforcement, and provides theoretical and technical support for actual engineering.
[0073] Embodiment 2
[0074] This embodiment provides a continuous-discontinuous fluid-solid coupling simulation system for multi-sequence splitting grouting, including:
[0075] The parameter data acquisition module is used to obtain the occurrence environment parameters and physical and mechanical parameters of the injected medium within the target surrounding rock to be split and grouted, and to obtain the physical and mechanical parameters of the injected slurry;
[0076] The continuous-discontinuous fluid-solid coupling model construction module is used to construct a two-dimensional grouting DEM model of single-hole multi-sequence splitting grouting according to the acquired parameter data, and to expand the two-dimensional grouting DEM model to establish a two-dimensional surrounding rock FDM model to form a continuous-discontinuous fluid-solid coupling model, so as to perform boundary coupling simulation between discontinuous DEM and continuous FDM;
[0077] The multi-sequence splitting grouting simulation module is used to apply continuous-discontinuous fluid-solid coupling based on the continuous-discontinuous fluid-solid coupling model, and carry out multi-sequence splitting grouting simulation under different grouting key parameter conditions. During the simulation process, the ground stress, grouting pressure and porosity in the model are monitored in real time. According to the monitoring data, the influence of different grouting key parameters in multi-sequence splitting grouting on the surrounding rock stress around the grouting, the seepage effect in the formation range, and the reinforcement effect of the injected medium are analyzed.
[0078] Embodiment 3
[0079] This embodiment provides an electronic device, including a memory and a processor, and computer instructions stored in the memory and running on the processor. When the computer instructions are run by the processor, the steps in the continuous-discontinuous fluid-solid coupling simulation method of multi-sequence splitting grouting as described above are completed.
[0080] Embodiment 4
[0081] This embodiment also provides a computer-readable storage medium for storing computer instructions. When the computer instructions are executed by a processor, the steps in the continuous-discontinuous fluid-solid coupling simulation method for multi-sequence splitting grouting as described above are completed.
[0082] The steps involved in the above embodiments 2 to 4 correspond to the method embodiment 1, and the specific implementation methods can refer to the relevant description part of embodiment 1. The term "computer-readable storage medium" should be understood as a single medium or multiple media including one or more instruction sets; it should also be understood to include any medium that can store, encode or carry an instruction set for execution by a processor and enable the processor to execute any method in the present invention.
[0083] Those skilled in the art should understand that the modules or steps of the present invention described above can be implemented by a general-purpose computer device, or alternatively, they can be implemented by a program code executable by a computing device, so that they can be stored in a storage device and executed by the computing device, or they can be made into individual integrated circuit modules, or multiple modules or steps therein can be made into a single integrated circuit module for implementation. The present invention is not limited to any specific combination of hardware and software.
[0084] The above description is only a preferred embodiment of the present invention. Although the specific implementation mode of the present invention is described in conjunction with the accompanying drawings, it is not a limitation of the protection scope of the present invention. Those skilled in the art should understand that on the basis of the technical solution of the present invention, various modifications or variations that can be made by those skilled in the art without creative work are still within the protection scope of the present invention.
Claims
1. A continuous-discontinuous fluid-solid coupling simulation method for multi-sequence splitting grouting, characterized in that: include: Obtaining the occurrence environment parameters and physical and mechanical parameters of the injected medium within the target surrounding rock range for splitting grouting, and obtaining the physical and mechanical parameters of the injected slurry; According to the acquired parameter data, a two-dimensional grouting DEM model of single-hole multi-sequence splitting grouting is constructed, and a two-dimensional surrounding rock FDM model is established outside the two-dimensional grouting DEM model to form a continuous-discontinuous fluid-solid coupling model, so as to perform boundary coupling simulation between discontinuous DEM and continuous FDM. Based on the continuous-discontinuous fluid-solid coupling model, the continuous-discontinuous fluid-solid coupling effect is applied, and multi-sequence splitting grouting simulation is carried out under different grouting key parameter conditions. The ground stress, grouting pressure and porosity in the model are monitored in real time during the simulation process. The influence of different grouting key parameters in multi-sequence splitting grouting on the surrounding rock stress around the grouting, the seepage effect in the formation range, and the reinforcement effect of the injected medium are analyzed according to the monitoring data.
2. The continuous-discontinuous fluid-solid coupling simulation method for multi-sequence splitting grouting according to claim 1 is characterized in that: The storage environment parameters of the injected medium include: three-dimensional ground stress environment parameters, fracture development degree, and groundwater distribution; The physical and mechanical parameters of the injected medium include: density, porosity, water content, particle grading, compressive strength, shear strength, and tensile strength; The physical and mechanical parameters of the slurry include viscosity, initial setting time, compressive strength after setting, shear strength after setting, slurry ratio, and slurry viscosity time-varying curve.
3. The continuous-discontinuous fluid-solid coupling simulation method for multi-sequence splitting grouting according to claim 2 is characterized in that: The slurry includes single-liquid slurry and double-liquid slurry, and the slurry ratio includes the water-cement ratio of the single-liquid slurry and the volume ratio of the double-liquid slurry.
4. The continuous-discontinuous fluid-solid coupling simulation method for multi-sequence splitting grouting according to claim 1 is characterized in that: Construct a two-dimensional grouting DEM model, including: According to the size of the preset grouting model, determine the calculation domain range and establish the upper and lower boundary wall structures of the servo ground stress; Inside the upper and lower boundary wall structures, a wall structure consisting of a single grouting pipe, a grouting stopper, and a grouting plate is established; According to the original particle grading of the injected medium and the injected slurry, the injected medium particles and the injected slurry particles are generated; wherein, according to the time-varying curve of the slurry viscosity, the viscosity of the injected slurry particles is configured; according to the physical and mechanical parameters of the injected medium and the injected slurry, the contact model and parameters between the particles are calibrated; The construction of the two-dimensional grouting DEM model is completed based on the established upper and lower boundary wall structures, a single grouting pipe, a grouting pipe wall structure, a grouting plug, a grouting plate, and the generated injected medium particles and injected slurry particles.
5. The continuous-discontinuous fluid-solid coupling simulation method for multi-sequence splitting grouting according to claim 1, characterized in that: A coupled calculation is performed for each sequence of split grouting, including: the DEM calculation area, i.e., the two-dimensional grouting DEM model, is affected by the split grouting, the injected medium particles expand outward, and the corresponding calculation parameters are transmitted to the boundary of the DEM calculation area by the central grouting pipe, and then to the boundary of the FDM calculation area; According to the calculation parameter size received by the boundary of the multi-sequence splitting grouting FDM calculation area, the influence law on the disturbance of the surrounding rock mass is obtained.
6. The continuous-discontinuous fluid-solid coupling simulation method for multi-sequence splitting grouting according to claim 1, characterized in that: The key parameters of grouting include the number of grouting times, the interval time between grouting times and the grouting pressure.
7. The continuous-discontinuous fluid-solid coupling simulation method for multi-sequence splitting grouting according to claim 1, characterized in that: Conduct multi-sequence splitting grouting simulation, including: Carry out the first split grouting, generate injection slurry particles in the grouting pipe, assign contact parameters between the injection slurry particles and the side wall of the grouting pipe, turn off the servo ground stress loading, keep the upper and lower boundary wall structure positions constant, then remove the grouting hole wall at the end of the grouting pipe, use the grouting plate to uniformly pressurize, and pump the injection slurry into the injected medium; Carry out multiple splitting grouting. After the last grouting is completed, the position of the grouting plate is maintained constant, and the current sequence of grouting plates is generated at the top of the grouting pipe; the current sequence of injected slurry particles is generated in the grouting pipe, the contact parameters between the slurry particles and the side wall of the grouting pipe are assigned, and the contact parameters between particles of different components are updated. The same operation is used to pump the slurry particles of this sequence into the injected medium.
8. A continuous-discontinuous fluid-solid coupling simulation system for multi-sequence splitting grouting, characterized in that: include: The parameter data acquisition module is used to obtain the occurrence environment parameters and physical and mechanical parameters of the injected medium within the target surrounding rock to be split and grouted, and to obtain the physical and mechanical parameters of the injected slurry; The continuous-discontinuous fluid-solid coupling model construction module is used to construct a two-dimensional grouting DEM model of single-hole multi-sequence splitting grouting according to the acquired parameter data, and to expand the two-dimensional grouting DEM model to establish a two-dimensional surrounding rock FDM model to form a continuous-discontinuous fluid-solid coupling model, so as to perform boundary coupling simulation between discontinuous DEM and continuous FDM; The multi-sequence splitting grouting simulation module is used to apply continuous-discontinuous fluid-solid coupling based on the continuous-discontinuous fluid-solid coupling model, and carry out multi-sequence splitting grouting simulation under different grouting key parameter conditions. During the simulation process, the ground stress, grouting pressure and porosity in the model are monitored in real time. According to the monitoring data, the influence of different grouting key parameters in multi-sequence splitting grouting on the surrounding rock stress around the grouting, the seepage effect in the formation range, and the reinforcement effect of the injected medium are analyzed.
9. An electronic device, characterized in that: The method comprises a memory and a processor and computer instructions stored in the memory and executed on the processor. When the computer instructions are executed by the processor, the steps of a continuous-discontinuous fluid-solid coupling simulation method for multi-sequence splitting grouting as claimed in any one of claims 1 to 7 are completed.
10. A computer-readable storage medium, characterized in that: Used to store computer instructions, which, when executed by a processor, complete the steps of a continuous-discontinuous fluid-solid coupling simulation method for multi-sequence splitting grouting as claimed in any one of claims 1 to 7.
Citation Information
Cited By
Fractured rock mass permeation-splitting grouting simulation method and system
CN119989667A
Splitting grouting discrete element numerical simulation method based on slurry viscosity time-varying characteristic
CN121145583A
Pore medium multi-sequence splitting lap-joint net-forming grouting control method and system
CN121162309A
Pore medium multi-sequence split lapping netting grouting control method and system
CN121162309B
Method and system for determining coal slurry interface competitive fracture grouting pressure limit and slurry performance
CN122904806B