Construction task processing method and device
By obtaining construction task data and personnel data, determining task processing strategies, optimizing task configuration and job configuration, the problems of unreasonable task allocation and waste of resources in traditional construction task allocation methods are solved, and the execution efficiency of construction tasks is improved.
Patent Information
- Application Number
- CN202411490034.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-24
- Publication Date
- 2024-11-26
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The traditional method of assignment of construction tasks relies on manual judgment, resulting in unreasonable assignment of tasks and waste of resources, thereby reducing the efficiency of implementation of construction tasks.
By obtaining construction task data and personnel data, determine task processing strategies, including matching jobs and personnel, optimizing task configuration and job configuration, minimizing task processing time and improving resource utilization.
It improves the rationality and efficiency of task allocation, solves the problem of inefficient implementation of construction tasks, and realizes efficient matching and flexible scheduling of task processing.
Smart Images

Figure CN119026874A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of task management, and in particular to a construction task processing method and device. Background Art
[0002] With the rapid development of the home improvement industry, the complexity and diversity of construction tasks are increasing, which puts higher demands on workers' skills and matching accuracy. However, the traditional construction task allocation method often relies on manual judgment and decision-making, which is prone to problems such as unreasonable task allocation and waste of resources, which leads to low efficiency in the execution of construction tasks. Summary of the invention
[0003] In order to solve the above-mentioned problems in the prior art, the present invention provides a construction task processing method and device, which are used to solve the technical problem of low execution efficiency of construction tasks.
[0004] In a first aspect, the present application provides a construction task processing method, comprising: Acquire construction task data of a target task, wherein the construction task data includes at least one subtask in the target task and corresponding task data, wherein the task data includes task characteristic data and work type characteristic data, wherein the task characteristic data is used to indicate the execution of the subtask, and the work type characteristic data is used to describe the relevant data configured by at least one target work type required for any subtask when executing the subtask; Acquire personnel data of each processing personnel, wherein the personnel data includes personnel race data and capability assessment data; Based on the construction task data and the personnel data, determine the task processing strategy corresponding to the target task meeting the preset task requirement conditions, wherein the task processing strategy is used to indicate the target processing personnel and the corresponding one or more target subtasks scheduled to achieve the target task; The target task is executed according to the task processing strategy.
[0005] In one possible implementation, the task characteristic data includes the construction task duration of the target task and the task sequence, task duration, and task location of the subtask; the work type characteristic data includes at least one target work type related to any subtask and the work type sequence and work type duration corresponding to the target work type when implementing the subtask.
[0006] In a possible implementation, the obtaining of the construction task data of the target task includes: Acquire task description data of the target task, wherein the task description data includes task requirement data, task quantity data, and construction location data; Extracting information from the task description data to obtain the target type of work involved in the target task; Based on the task requirement data and the target type of work, a construction sequence is determined, wherein the construction sequence includes a task sequence of the subtask and a type of work sequence of the target type of work related to the subtask; Determine construction duration data based on the task quantity data and preset work type efficiency data, wherein the construction duration data includes the task duration of the subtask, the work type duration of the target work type related to the subtask, and the construction task duration of the target task; Based on the construction location data, a task location of the subtask is determined.
[0007] In a possible implementation, determining the construction sequence based on the task requirement data and the target type of work includes: Based on the task requirement data, determine a first association feature, a second association feature, and a third association feature, wherein the first association feature is used to indicate a dependency relationship between the subtasks, the second association feature is used to indicate a dependency relationship between the target types of work, and the third association feature is used to indicate a dependency relationship between the subtasks and the target type of work; According to the second association feature, a topological structure graph is constructed, wherein a node in the topological structure graph represents a target type of work, and an edge in the topological structure graph represents the second association feature between two connected nodes; Performing topological sorting on the topological structure diagram to obtain a job sorting result; Based on the first association feature, the second association feature, the third association feature and the work type ranking result, a task sequence of the subtask and a work type sequence of the target work type are determined.
[0008] In a possible implementation, the obtaining of personnel data of each processing personnel includes: Acquire the capability data of the processing personnel, wherein the capability data includes skill level data, years of experience data and work efficiency data, wherein the work efficiency data includes the performance evaluation data of the processing personnel for any historical task, task completion time data and quality evaluation data; Calculating a capability assessment value based on the skill level data, the years of experience data, and the work efficiency data; The capability assessment values are graded to match corresponding capability grades as capability assessment data of the processing personnel.
[0009] In a possible implementation, the personnel data further includes personnel location data, and the determining, based on the construction task data and the personnel data, a corresponding task processing strategy when the target task meets a preset task requirement condition includes: For any subtask, based on the personnel type data of the processing personnel and the target type of work, a type of work matching score is obtained to indicate whether the processing personnel matches the target type of work; Based on the capability level, determining a corresponding capability level score; Determining a corresponding distance score based on the personnel location data and the task location of the subtask; Determining a corresponding experience score based on the years of experience data of the processing personnel; Obtaining task matching weights, wherein the task matching weights include job type matching weights, skill weights, distance weights, and experience weights; Determine a task matching score based on the task matching weight and in combination with at least one of the job type matching score, the ability level score, the distance score, and the experience score; Screening out the processing personnel corresponding to the task when the task matching score reaches a preset matching threshold as the dispatchable personnel; Traverse the dispatchable personnel corresponding to each of the subtasks, and based on the task characteristic data and the job characteristic data, determine the target processing personnel and the target subtask to be performed by the target processing personnel when the target task meets the task requirement conditions, wherein the task requirement conditions include that the task processing time of the target task is less than a preset processing time threshold.
[0010] In a possible implementation, executing the target task according to the task processing strategy includes: Acquire the status data of the target processing personnel when executing the target task, and update the work efficiency data of the target processing personnel, wherein the status data includes the current employee location data, attendance status data and work progress data; Based on the status data and / or the updated work efficiency data, the dispatchable personnel for each subtask and the corresponding task processing strategy are adjusted.
[0011] In a possible implementation, executing the target task according to the task processing strategy includes: Acquire the status history data of the processing personnel and the configured target subtask, wherein the status history data includes the work efficiency data and attendance history data; Based on the state history data, the task data of the configured target subtask and the state data, a state prediction is performed on the processing personnel to obtain state prediction data; Based on the state prediction data, the dispatchable personnel for each subtask and the corresponding task processing strategy are adjusted.
[0012] In a possible implementation, the following steps are performed to adjust the schedulable personnel and the corresponding task processing strategy, including: Acquire task status data associated with the task requirement condition when executing the target task, the task status data including at least one of task quality, task processing time, task resource utilization rate and task cost; Based on the task status data, determining a first characteristic relationship, the first characteristic relationship being used to indicate a degree of correlation between the task processing strategy and the task data; Determining a second characteristic relationship based on the task matching score of the target processing personnel, wherein the second characteristic relationship is used to indicate the degree of correlation between the target processing personnel and the task data; Determine a third characteristic relationship based on at least one of the status data, work efficiency data and status prediction data of the target processing personnel, wherein the third characteristic relationship is used to indicate the degree of influence of the target processing personnel on the task processing strategy; Determining an execution efficiency value of the task processing strategy based on the first characteristic relationship, the second characteristic relationship, and the third characteristic relationship; When the execution efficiency value is lower than a preset efficiency threshold, the task matching weight is updated, so that the dispatchable personnel of the subtask and the corresponding task processing strategy are adjusted based on the updated task matching weight.
[0013] In a second aspect, the present application provides a construction task processing device, comprising: A task data acquisition module, used to acquire construction task data of a target task, wherein the construction task data includes at least one subtask in the target task and corresponding task data, wherein the task data includes task feature data and work type feature data, wherein the task feature data is used to indicate the execution of the subtask, and the work type feature data is used to describe the relevant data configured by at least one target work type required for any subtask when executing the subtask; A personnel data acquisition module is used to acquire personnel data of each processing personnel, wherein the personnel data includes personnel race data and capability assessment data; A task matching module is used to determine, based on the construction task data and the personnel data, a corresponding task processing strategy when the target task meets the preset task requirement conditions, wherein the task processing strategy is used to indicate the target processing personnel and the corresponding one or more target subtasks to be scheduled to achieve the target task; The task execution module is used to execute the target task according to the task processing strategy.
[0014] The construction task processing method and device provided in the present application obtain the construction task data of the target task, analyze the task characteristic data of the subtasks in the target task and the type of work characteristic data of the target type of work required for the subtask, and obtain the worker data of the processing personnel, taking into account the personnel type data and capability evaluation data of the processing personnel, thereby achieving efficient matching of the target task and the processing personnel, so as to form a task processing strategy that meets the preset task requirement conditions and then execute it, realize flexible scheduling of the processing personnel, and improve the rationality and efficiency of task allocation, thereby solving the problem of low execution efficiency of construction tasks. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 A flowchart of a construction task processing method provided in an embodiment of the present application; Figure 2 A schematic diagram of a process for obtaining construction task data provided in an embodiment of the present application; Figure 3 A schematic diagram of a process for obtaining a construction sequence provided in an embodiment of the present application; Figure 4 A flowchart of a task processing strategy for obtaining an embodiment of the present application is provided; Figure 5 A schematic diagram of a process for adjusting a task processing strategy provided in an embodiment of the present application; Figure 6 A schematic diagram of the structure of a construction task processing device provided in an embodiment of the present application. DETAILED DESCRIPTION
[0016] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0017] At present, with the rapid development of the home improvement industry, the complexity and diversity of construction tasks are increasing, which puts higher requirements on workers' skills and matching accuracy. However, the traditional construction task allocation method often relies on manual judgment and decision-making, which is prone to problems such as unreasonable task allocation and waste of resources, which leads to low efficiency in the execution of construction tasks.
[0018] Based on the above problems, this application achieves matching of target tasks and processing personnel by analyzing the task characteristic data of subtasks in the target tasks and the job characteristic data of the target jobs required for the subtasks, as well as taking into account the personnel type data and capability assessment data of the processing personnel, thereby improving the rationality and efficiency of task matching.
[0019] Figure 1 A flowchart of a construction task processing method provided in an embodiment of the present application, the construction task processing method includes steps S101 to S104.
[0020] S101. Acquire construction task data of a target task, wherein the construction task data includes at least one subtask in the target task and corresponding task data, wherein the task data includes task characteristic data and work type characteristic data, wherein the task characteristic data is used to indicate the execution of the subtask, and the work type characteristic data is used to describe the relevant data configured for at least one target work type required for any subtask when executing the subtask.
[0021] It should be noted that the target task can be a home improvement construction task, a heating installation task, etc. The target task includes one or more subtasks, and each subtask involves at least one target type of work. The task data represents the task sequence, task duration, task location, etc. of the subtasks (i.e., task feature data) and the type of work duration, type of work sequence, etc. of the type of work in each subtask (i.e., type of work feature data).
[0022] For example, taking home improvement construction tasks as an example, subtasks may include water and electricity renovation tasks, wall and floor treatment tasks, furniture customization tasks, etc. The water and electricity renovation tasks involve plumbers, electricians and other trades, the wall and floor treatment tasks involve masons and other trades, and the furniture customization tasks involve carpenters, home designers and other trades.
[0023] In some embodiments, the task characteristic data includes the construction task duration of the target task and the task sequence, task duration, and task location of the subtask; the work type characteristic data includes at least one target work type related to any subtask and the work type sequence and work type duration corresponding to the target work type when implementing the subtask.
[0024] In this embodiment, the task feature data acts on the execution of subtasks, and the type of work feature data is used to describe the relevant data of at least one target type of work in each subtask. For example, taking the home improvement construction task as an example, the subtasks may include water and electricity transformation tasks, wall and floor treatment tasks, furniture customization tasks, etc., and the task sequence in the task feature data may be water and electricity transformation tasks, wall and floor treatment tasks, and furniture customization tasks. Among them, for the water and electricity transformation task, the type of work sequence of the plumber and electrician can be carried out simultaneously, and the duration of their types of work can be consistent with the task duration of the water and electricity transformation task.
[0025] Therefore, this embodiment has strong scalability and customizability by determining the task sequence, task duration, task location of the subtasks, as well as the work type sequence and work type duration of the target work type in each subtask. It is suitable for task projects of different scales and needs. At the same time, it realizes flexible and reasonable task configuration and work type configuration, thereby improving the efficiency and accuracy of task processing.
[0026] S102: Acquire personnel data of each processing personnel, wherein the personnel data includes personnel race data and capability assessment data.
[0027] In this application, each processing personnel records their own personnel type data (such as plumber, electrician, carpenter, designer, etc.) and ability assessment data, which is used to indicate the evaluation data of the processing personnel in terms of skills, years of experience, certification, etc. Optionally, the personnel data may also include personnel location data used to characterize the current location of the processing personnel, status data (such as work efficiency data, attendance status, rest time, etc.), etc. The work efficiency data includes the performance evaluation data of the processing personnel for any historical task, the task completion time data, and the quality evaluation data.
[0028] S103. Based on the construction task data and the personnel data, determine the corresponding task processing strategy when the target task meets the preset task requirement conditions. The task processing strategy is used to indicate the target processing personnel scheduled to achieve the target task and the corresponding one or more target subtasks.
[0029] S104: Execute the target task according to the task processing strategy.
[0030] In the present application, the task requirement condition may be to minimize the task processing time of the target task (such as the task processing time of the target task is less than a preset processing time threshold), the task completion quality reaches a preset high quality threshold, the task resource utilization rate is higher than a preset utilization rate threshold, and the task cost is lower than a preset low cost threshold, etc., and the present application does not limit this. The task processing strategy may include at least one target processing personnel and one or more target subtasks corresponding to each target processing personnel, or in other words, the task processing strategy includes one or more target processing personnel in the subtask and the processing time of the target processing personnel.
[0031] Exemplarily, taking the task requirement of minimizing the task processing time of the target task as an example, combined with the construction task time of the target task, the task sequence, task duration, and task location of the subtasks, as well as the type of work sequence and type of work duration of the target job in the subtasks, and the personnel data and capability assessment data of the processing personnel, the purpose of minimizing the task processing time of the target task is achieved by reasonably optimizing the configuration of the subtasks (such as the task sequence and type of work sequence of the subtasks) and matching efficient processing workers (taking into account the skill capabilities, experience, work efficiency, working status, rest time, current location, etc. of the processing personnel), so as to form a corresponding task processing strategy and execute the target task according to the task processing strategy.
[0032] The construction task processing method provided in this embodiment obtains the construction task data of the target task, analyzes the task characteristic data of the subtasks in the target task and the type of work characteristic data of the target type of work required for the subtask, and obtains the worker data of the processing personnel, taking into account the personnel type data and capability evaluation data of the processing personnel, thereby achieving efficient matching between the target task and the processing personnel, so as to form a task processing strategy that meets the preset task requirement conditions and then execute it, realize flexible scheduling of processing personnel, and improve the rationality and efficiency of task allocation, thereby solving the problem of low execution efficiency of construction tasks.
[0033] In some embodiments, Figure 2 This is a flow chart of obtaining construction task data provided in an embodiment of the present application. This embodiment provides a method for obtaining construction task data, which includes steps S201 to S205.
[0034] S201, obtaining task description data of the target task, wherein the task description data includes task requirement data, task quantity data and construction location data; S202, extracting information from the task description data to obtain the target type of work involved in the target task; S203, determining a construction sequence based on the task requirement data and the target type of work, wherein the construction sequence includes a task sequence of the subtask and a type of work sequence of the target type of work related to the subtask; S204, determining construction duration data based on the task quantity data and preset work type efficiency data, wherein the construction duration data includes the task duration of the subtask, the work type duration of the target work type related to the subtask, and the construction task duration of the target task; S205: Determine the task location of the subtask based on the construction location data.
[0035] In this embodiment, the task description data includes task requirement data, task quantity data, and construction location data. The task requirement data may indicate the type of work requirements, task target requirements (corresponding to the task requirement conditions), etc. The task quantity data may indicate the number of subtasks, estimated task duration, etc. Then, the task description data is subjected to text preprocessing (such as word segmentation and stop word removal), the type of work requirements are extracted, and a list of type of work requirements is generated. Optionally, the list of type of work requirements is mapped to a preset type of work classification list to obtain one or more target types of work for the target task. Optionally, construction types of work are created based on the construction characteristics and skill requirements of the decoration industry, and the types of work are classified using a tree structure to extract the target types of work.
[0036] Furthermore, based on the target type of work and task target requirements, a general construction planning template can be created, and the template can be customized to facilitate the rapid development of a construction sequence. The construction sequence includes the task sequence for executing subtasks and the type of work sequence for the target type of work in each subtask. The construction planning template is used to indicate the dependencies and execution order between subtasks. For example, some tasks may need to be completed after other tasks are completed.
[0037] Based on the task volume data and work type efficiency data, linear programming or heuristic algorithms are used to calculate the construction duration data, such as the task duration of subtasks, the work type duration of the target work type in each subtask, and the task processing time of the target task, to effectively and flexibly control the construction duration data, ensure that the construction progress meets expectations, and ensure the efficiency of task processing.
[0038] Furthermore, the task location of each subtask is identified through the construction location data of the target task. Therefore, by analyzing the task location and the personnel location data of the processing personnel, this embodiment can consider giving priority to processing personnel with a close distance to reduce the moving time and improve the efficiency of task processing.
[0039] Therefore, this embodiment improves the efficiency of task processing by acquiring the target type of work, construction sequence, construction duration data and task location of sub-tasks, facilitates matching with the type of work, ability, location and other data of the processing personnel, improves the rationality and flexibility of task processing, and ensures efficient and stable execution of tasks.
[0040] In some embodiments, Figure 3 This is a flow chart of obtaining a construction sequence provided in an embodiment of the present application. This embodiment provides a method for obtaining a construction sequence, which includes steps S301 to S304.
[0041] S301, based on the task requirement data, determining a first association feature, a second association feature, and a third association feature, wherein the first association feature is used to indicate a dependency relationship between the subtasks, the second association feature is used to indicate a dependency relationship between the target types of work, and the third association feature is used to indicate a dependency relationship between the subtasks and the target type of work; S302: construct a topological structure graph according to the second association feature, wherein a node in the topological structure graph represents a target type of work, and an edge in the topological structure graph represents a second association feature between two connected nodes; S303, topologically sorting the topological structure diagram to obtain a job sorting result; S304: Determine the task sequence of the subtask and the work type sequence of the target work type based on the first association feature, the second association feature, the third association feature and the work type ranking result.
[0042] In this embodiment, regarding the task sequence of configured subtasks and the work type sequence of the target work type in each subtask, the first association feature is determined based on the task requirement data (such as minimizing the task processing time) to characterize the dependency relationship between the subtasks. Taking into account the interaction and correlation between the subtasks, the rationality of the task sequence is improved, which facilitates improving the efficiency of task execution.
[0043] Furthermore, by determining the second association feature to characterize the dependency between various types of work, for example, a certain type of work must be performed after another type of work is completed. Taking into account the correlation between the types of work, that is, the correlation between one or more types of work in each subtask and the correlation between a type of work in any subtask and the types of work in other subtasks, reasonable configuration can be achieved, which can greatly improve the task processing efficiency.
[0044] Furthermore, by determining the third association feature to characterize the dependency between the types of work and the subtasks, the correlation between the subtasks and the types of work is taken into account, that is, the correlation between each subtask and one or more types of work within the subtask, and the correlation between any subtask and the types of work within other subtasks.
[0045] In addition, based on the second association feature, a topological structure diagram is constructed to perform topological sorting to obtain possible node combinations with association relationships, that is, the topological results of the types of work with dependency relationships. Subsequently, based on the first association feature, the second association feature, the third association feature and the type of work sorting results, the task sequence of the subtasks and the type of work sequence of the target type of work are determined, which improves the rationality and accuracy of the construction sequence configuration.
[0046] Therefore, this embodiment considers various associations between subtasks and target types of work by determining the first association feature, the second association feature, and the third association feature, thereby improving the rationality of the construction sequence configuration and the task execution efficiency.
[0047] In some embodiments, obtaining the personnel data of each processing personnel includes: Acquire the capability data of the processing personnel, wherein the capability data includes skill level data, years of experience data and work efficiency data, wherein the work efficiency data includes the performance evaluation data of the processing personnel for any historical task, task completion time data and quality evaluation data; Calculating a capability assessment value based on the skill level data, the years of experience data, and the work efficiency data; The capability assessment values are graded to match corresponding capability grades as capability assessment data of the processing personnel.
[0048] In this embodiment, the skill level data may include skill capabilities and certificate authentication. The work efficiency data may be performance evaluation data, task completion time data, and quality evaluation data corresponding to each task execution, which are used to indicate the work efficiency of the processing staff. Then, the skill level data, years of experience data, and work efficiency data are used to evaluate the work ability of the processing staff, so as to classify the work ability of each processing staff into levels, such as primary, intermediate, and senior. Therefore, this embodiment improves the accuracy of the processing staff ability evaluation, which is convenient for improving the efficiency of task processing.
[0049] In some embodiments, Figure 4 This is a flow chart of obtaining a task processing strategy provided in an embodiment of the present application. This embodiment provides a method for obtaining a task processing strategy, which includes steps S401 to S408.
[0050] S401: for any subtask, based on the personnel type data of the processing personnel and the target type of work, obtaining a type of work matching score for indicating whether the processing personnel matches the target type of work; S402, determining a corresponding ability level score based on the ability level; S403, determining a corresponding distance score based on the personnel location data and the task location of the subtask; S404, determining a corresponding experience score based on the experience years data of the processing personnel; S405, obtaining task matching weights, wherein the task matching weights include job type matching weights, skill weights, distance weights, and experience weights; S406, determining a task matching score based on the task matching weight and in combination with at least one of the job type matching score, the ability level score, the distance score, and the experience score; S407, screening out the processing personnel corresponding to when the task matching score reaches a preset matching threshold as dispatchable personnel; S408. Traverse the dispatchable personnel corresponding to each of the subtasks, and based on the task characteristic data and the job characteristic data, determine the target processing personnel and the target subtask to be performed by the target processing personnel when the target task meets the task requirement conditions, wherein the task requirement conditions include that the task processing time of the target task is less than a preset processing time threshold.
[0051] In this embodiment, for job type matching, the target job type is matched with the employee job type data of each processing personnel to obtain a job type matching score, for example, a match is 1, and a mismatch is 0. For the ability level, the ability assessment data of the processing employee is mapped to the corresponding ability level score, with a senior level of 1, an intermediate level of 0.7, and a primary level of 0.3. For the distance score, an inverse proportional relationship can be used. The closer the distance between the personnel location data and the task location, the higher the distance score, which is convenient for considering the task processing efficiency. For example, the formula example: A=1 / (1+C), the distance score is A, and the distance between the personnel location data and the task location is C (such as when C<10KM, A is 1; when 20KM>C>10KM, A is 0.9; when 30KM>C>20KM, A is 0.8, and so on). For the years of experience, the score is scored according to the years of experience data of the processing personnel. For example, 0.1 points are added for each additional year of experience, and the maximum does not exceed 1 point.
[0052] Furthermore, the job matching weight for job matching, the skill weight for ability level, the experience weight for years of experience, and the distance weight for task distance are obtained. In this way, the task matching weight is weighted with the job matching score, the ability level score, the distance score, and the experience score to obtain the task matching score. It should be noted that in the process of calculating the task matching score, it is not limited to one or more of job matching, ability level, years of experience, and task distance, and can be determined based on task requirements. At the same time, the value of each task matching weight can be determined based on the task requirements, which improves flexibility and fit. For example, the task matching score = (job matching score × 0.5) + (ability level score × 0.25) + (experience score × 0.15) + (distance score × 0.1).
[0053] For example, for a certain subtask, worker A has the following: job type matching score: 0.8; ability level score: 0.7; experience score: 0.6; distance score: 0.9; task matching score: (0.8×0.5)+(0.7×0.25)+(0.6×0.15)+(0.9×0.1) = 0.755. Worker B has the following: job type matching score: 0.6; ability level score: 0.8; experience score: 0.5; distance score: 0.7; task matching score: (0.6×0.5)+(0.8×0.25)+(0.5×0.15)+(0.7×0.1)=0.645. Worker C: Work type matching score: 0.9; Ability level score: 0.6; Experience score: 0.8; Distance score: 0.4; Task matching score: (0.9×0.5)+(0.6×0.25)+(0.8×0.15)+(0.4×0.1)=0.76. It can be seen that if the matching threshold is set to 0.7, workers A and C will be selected as dispatchable personnel for easy subsequent selection.
[0054] Furthermore, for each subtask, we screen out the processing personnel with a large task matching score, assign tasks to the processing personnel according to the score, and give priority to workers with a high matching degree as dispatchable personnel, so as to select personnel who have a significant impact on the task. Then, we traverse all subtasks, consider the various associations between subtasks and types of work, and according to the task matching score of the processing personnel, we screen out the target processing personnel and the target subtasks that the target processing personnel need to perform when the target task meets the task requirements from the dispatchable personnel.
[0055] Therefore, this embodiment takes into account job type matching, ability level, years of experience and task distance, improves the accuracy and rationality of task matching, and facilitates improving the efficiency of task processing.
[0056] In some embodiments, executing the target task according to the task processing strategy includes: Acquire the status data of the target processing personnel when executing the target task, and update the work efficiency data of the target processing personnel, wherein the status data includes the current employee location data, attendance status data and work progress data; Based on the status data and / or the updated work efficiency data, the dispatchable personnel for each subtask and the corresponding task processing strategy are adjusted.
[0057] In this embodiment, the state data of the target processing personnel during the execution of the target task is obtained through the Internet of Things device or mobile application, so as to realize real-time tracking of the processing personnel's work efficiency, location, attendance status (such as whether they are on duty, rest time, etc.) and work progress, etc., which helps to understand the currently idle processing personnel and the processing personnel who are closer to the task location. The work efficiency data can be updated according to each task to facilitate the next task matching.
[0058] Optionally, when abnormal situations such as absence of personnel and work progress delay occur, the task processing strategy is adjusted, for example, the task is quickly reallocated to other qualified processing personnel to ensure that the construction progress is not affected. Therefore, this embodiment monitors the status data of processing personnel to achieve flexible adjustment of personnel allocation, can respond to different emergencies, and improve the efficiency of task processing.
[0059] In some embodiments, executing the target task according to the task processing strategy includes: Acquire the status history data of the processing personnel and the configured target subtask, wherein the status history data includes the work efficiency data and attendance history data; Based on the state history data, the task data of the configured target subtask and the state data, a state prediction is performed on the processing personnel to obtain state prediction data; Based on the state prediction data, the dispatchable personnel for each subtask and the corresponding task processing strategy are adjusted.
[0060] In this embodiment, a machine learning model is used to predict the future work status of the target processing personnel based on the status history data and real-time data (such as status data, updated work efficiency data, etc.), such as predicting the task completion time, task completion quality, etc. Therefore, this embodiment is conducive to predicting and adjusting task allocation in advance to cope with possible problems or changes.
[0061] In an optional embodiment, in order to adjust the dispatchable personnel for each subtask and the corresponding task processing strategy, this embodiment can adjust the task sequence, task duration and other parameters in the task feature data, the type of work duration and type of work sequence in the type of work feature data, and adjust the task matching weight through the status data, work efficiency data and status prediction data, so as to redetermine the task matching score of the processing personnel, and then redetermine the dispatchable personnel and the corresponding task processing strategy.
[0062] In another alternative embodiment, Figure 5 This is a flow chart of adjusting a task processing strategy provided in an embodiment of the present application. This embodiment provides a method for adjusting a task processing strategy, and the method includes steps S501 to S506.
[0063] S501, acquiring task status data associated with the task requirement condition when executing the target task, the task status data including at least one of task quality, task processing time, task resource utilization rate and task cost; S502: determining a first characteristic relationship based on the task status data, where the first characteristic relationship is used to indicate a correlation degree between the task processing strategy and the task data; S503: determining a second characteristic relationship based on the task matching score of the target processing personnel, where the second characteristic relationship is used to indicate the degree of correlation between the target processing personnel and the task data; S504: determining a third characteristic relationship based on at least one of the status data, work efficiency data, and status prediction data of the target processing personnel, wherein the third characteristic relationship is used to indicate the degree of influence of the target processing personnel on the task processing strategy; S505, determining an execution efficiency value of the task processing strategy based on the first characteristic relationship, the second characteristic relationship, and the third characteristic relationship; S506: When the execution efficiency value is lower than a preset efficiency threshold, the task matching weight is updated, so that the dispatchable personnel of the subtask and the corresponding task processing strategy are adjusted based on the updated task matching weight.
[0064] In this embodiment, when the task processing strategy is executed, by evaluating the task status data related to the task requirement conditions, based on the correlation between the task processing strategy and the task data (such as the task sequence of the subtask, the type of work sequence, the type of work duration, etc.), it is possible to reflect the degree of influence of the task flow planning and personnel configuration in the task data on the task status data generated when the task processing strategy is executed. Then, based on the degree of association between the subtask and the target processing personnel, the accuracy and degree of influence between the task and the personnel configuration are taken into account. Furthermore, through the state data, work efficiency data and state prediction data of the target processing personnel when performing the task, it is possible to reflect the degree of influence and fit of the characteristics and personnel configuration of the target processing personnel on the task processing strategy, for example, the degree of influence of factors such as the type of work matching, skill level, experience, distance, attendance status, etc. of the target processing personnel on minimizing the task processing duration of the target task. Thus, based on the first characteristic relationship, the second characteristic relationship and the third characteristic relationship, the execution efficiency value of the task processing strategy is determined, and when the execution efficiency value is low, the adjustment of the task processing strategy is triggered. Optionally, you can adjust parameters such as task sequence and task duration in the task feature data, type of work duration and type of work sequence in the type of work feature data, or adjust the task matching weight to redefine the task matching score of the processing personnel, thereby redetermining the dispatchable personnel and the corresponding task processing strategy.
[0065] Therefore, this embodiment determines the execution efficiency of the task processing strategy through the influence relationship between task characteristics, personnel characteristics and task processing strategy, realizes real-time and flexible triggering of adjustment strategy, and ensures high efficiency of task processing.
[0066] Figure 6 The present invention provides a schematic diagram of a construction task processing device according to an embodiment of the present invention. The construction task processing device 600 includes: The task data acquisition module 601 is used to acquire the construction task data of the target task, wherein the construction task data includes at least one subtask in the target task and the corresponding task data, wherein the task data includes task characteristic data and work type characteristic data, wherein the task characteristic data is used to indicate the execution of the subtask, and the work type characteristic data is used to describe the relevant data configured by at least one target work type required for any subtask when executing the subtask; A personnel data acquisition module 602 is used to acquire personnel data of each processing personnel, wherein the personnel data includes personnel race data and capability assessment data; The task matching module 603 is used to determine the corresponding task processing strategy when the target task meets the preset task requirement conditions based on the construction task data and the personnel data, and the task processing strategy is used to indicate the target processing personnel and the corresponding one or more target subtasks scheduled to achieve the target task; The task execution module 604 is used to execute the target task according to the task processing strategy.
[0067] In some embodiments, the task characteristic data includes the construction task duration of the target task and the task sequence, task duration, and task location of the subtask; the work type characteristic data includes at least one target work type related to any subtask and the work type sequence and work type duration corresponding to the target work type when implementing the subtask.
[0068] In some embodiments, the task data acquisition module 601 includes: A task description data acquisition unit, used to acquire task description data of the target task, wherein the task description data includes task requirement data, task quantity data and construction location data; An information extraction unit, used to extract information from the task description data to obtain the target type of work involved in the target task; A construction sequence determination unit, configured to determine a construction sequence based on the task requirement data and the target type of work, wherein the construction sequence includes a task sequence of the subtask and a type of work sequence of the target type of work related to the subtask; A construction duration determination unit, configured to determine construction duration data based on the task quantity data and preset work type efficiency data, wherein the construction duration data includes the task duration of the subtask, the work type duration of the target work type related to the subtask, and the construction task duration of the target task; A task location determination unit is used to determine the task location of the subtask based on the construction location data.
[0069] In some embodiments, the construction sequence determination unit includes: A correlation feature extraction unit, configured to determine, based on the task requirement data, a first correlation feature, a second correlation feature, and a third correlation feature, wherein the first correlation feature is used to indicate a dependency relationship between the subtasks, the second correlation feature is used to indicate a dependency relationship between the target types of work, and the third correlation feature is used to indicate a dependency relationship between the subtasks and the target type of work; A topology graph construction unit is used to construct a topology graph according to the second association feature, wherein a node in the topology graph represents a target type of work, and an edge in the topology graph represents the second association feature between two connected nodes; A topological sorting unit, used to perform topological sorting on the topological structure diagram to obtain a work type sorting result; A sequence determination unit is used to determine the task sequence of the subtask and the work type sequence of the target work type based on the first association feature, the second association feature, the third association feature and the work type sorting result.
[0070] In some embodiments, the personnel data acquisition module 602 includes: A capability data acquisition unit, used to acquire capability data of a processing personnel, wherein the capability data includes skill level data, years of experience data, and work efficiency data, wherein the work efficiency data includes performance evaluation data of the processing personnel for any historical task, task completion time data, and quality evaluation data; A capability evaluation unit, configured to calculate a capability evaluation value based on the skill level data, the years of experience data, and the work efficiency data; The grading unit is used to grade the capability evaluation values to match corresponding capability grades as capability evaluation data of the processing personnel.
[0071] In some embodiments, the personnel data acquisition module 602 includes: the personnel data also includes personnel location data; The task matching module 603 includes: A job type matching analysis unit, for obtaining, for any subtask, a job type matching score for indicating whether the processing personnel matches the target job type based on the personnel type data of the processing personnel and the target job type; A capability analysis unit, for determining a corresponding capability level score based on the capability level; a distance analysis unit, configured to determine a corresponding distance score based on the personnel position data and the task position of the subtask; An experience analysis unit, for determining a corresponding experience score based on the experience years data of the processing personnel; A weight acquisition unit, used to acquire task matching weights, wherein the task matching weights include job type matching weights, skill weights, distance weights, and experience weights; A weighted calculation unit, configured to determine a task matching score based on the task matching weight and in combination with at least one of the job type matching score, the ability level score, the distance score, and the experience score; A personnel screening unit, used to screen out the corresponding processing personnel when the task matching score reaches a preset matching threshold as dispatchable personnel; A strategy determination unit is used to traverse the dispatchable personnel corresponding to each of the subtasks, and based on the task characteristic data and the job characteristic data, determine the target processing personnel and the target subtask to be performed by the target processing personnel when the target task meets the task requirement conditions, wherein the task requirement conditions include that the task processing time of the target task is less than a preset processing time threshold.
[0072] In some embodiments, the task execution module 604 includes: A personnel status acquisition unit, used to acquire the status data of the target processing personnel when executing the target task, and update the work efficiency data of the target processing personnel, wherein the status data includes the current employee location data, attendance status data and work progress data; The first adjustment unit is used to adjust the dispatchable personnel of each subtask and the corresponding task processing strategy based on the status data and / or the updated work efficiency data.
[0073] In some embodiments, the task execution module 604 includes: A historical data acquisition unit, used to acquire the status historical data of the processing personnel and the configured target subtask, wherein the status historical data includes the work efficiency data and attendance historical data; A state prediction unit, configured to perform state prediction on the processing personnel based on the state history data, the task data of the configured target subtask and the state data, so as to obtain state prediction data; The second adjustment unit is used to adjust the dispatchable personnel of each subtask and the corresponding task processing strategy based on the state prediction data.
[0074] In some embodiments, the task execution module 604 includes: A task status acquisition unit, used to acquire task status data associated with the task requirement condition when executing the target task, wherein the task status data includes at least one of task quality, task processing time, task resource utilization rate and task cost; A first characteristic relationship determining unit, configured to determine a first characteristic relationship based on the task state data, wherein the first characteristic relationship is used to indicate a correlation degree between the task processing strategy and the task data; A second characteristic relationship determining unit, configured to determine a second characteristic relationship based on the task matching score of the target processing personnel, wherein the second characteristic relationship is used to indicate a degree of correlation between the target processing personnel and the task data; A third characteristic relationship determining unit, configured to determine a third characteristic relationship based on at least one of the status data, work efficiency data, and status prediction data of the target processing personnel, wherein the third characteristic relationship is used to indicate the degree of influence of the target processing personnel on the task processing strategy; an execution efficiency evaluation unit, configured to determine an execution efficiency value of the task processing strategy based on the first characteristic relationship, the second characteristic relationship, and the third characteristic relationship; A strategy adjustment unit is used to trigger the update of the task matching weight when the execution efficiency value is lower than a preset efficiency threshold, so as to adjust the dispatchable personnel of the subtask and the corresponding task processing strategy based on the updated task matching weight.
[0075] The device of the embodiments of the present application can execute the method provided by the embodiments of the present application, and the implementation principles are similar. The actions performed by each module in the device of each embodiment of the present application correspond to the steps in the method of each embodiment of the present application. For the detailed functional description of each module of the device, please refer to the description in the corresponding method shown in the previous text, which will not be repeated here.
[0076] In the description of the embodiments of the present invention, the terms "first", "second", "third", and "fourth" are used for descriptive purposes only and are not to be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Thus, a feature defined as "first", "second", "third", and "fourth" may explicitly or implicitly include one or more of the features. In the description of the present invention, unless otherwise specified, "multiple" means two or more.
[0077] In the description of the embodiments of the present invention, it should be understood that "-" and "~" represent the range between two values, and the range includes the endpoints. For example: "AB" represents a range greater than or equal to A and less than or equal to B. "A~B" represents a range greater than or equal to A and less than or equal to B.
[0078] In the description of the embodiments of the present invention, the term "and / or" herein is merely a description of the association relationship of associated objects, indicating that three relationships may exist. For example, A and / or B may represent: A exists alone, A and B exist at the same time, and B exists alone. In addition, the character " / " herein generally indicates that the associated objects before and after are in an "or" relationship.
[0079] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A construction task processing method, It is characterized in that include: Acquire construction task data of a target task, wherein the construction task data includes at least one subtask in the target task and corresponding task data, wherein the task data includes task characteristic data and work type characteristic data, wherein the task characteristic data is used to indicate the execution of the subtask, and the work type characteristic data is used to describe the relevant data configured by at least one target work type required for any subtask when executing the subtask; Acquire personnel data of each processing personnel, wherein the personnel data includes personnel race data and capability assessment data; Based on the construction task data and the personnel data, determine the task processing strategy corresponding to the target task meeting the preset task requirement conditions, wherein the task processing strategy is used to indicate the target processing personnel and the corresponding one or more target subtasks scheduled to achieve the target task; The target task is executed according to the task processing strategy.
2. The construction task processing method according to claim 1, It is characterized in that The task characteristic data includes the construction task duration of the target task and the task sequence, task duration, and task location of the subtask; the work type characteristic data includes at least one target work type related to any subtask and the work type sequence and work type duration corresponding to the target work type when implementing the subtask.
3. The construction task processing method according to claim 2, It is characterized in that The step of obtaining the construction task data of the target task includes: Acquire task description data of the target task, wherein the task description data includes task requirement data, task quantity data, and construction location data; Extracting information from the task description data to obtain the target type of work involved in the target task; Based on the task requirement data and the target type of work, a construction sequence is determined, wherein the construction sequence includes a task sequence of the subtask and a type of work sequence of the target type of work related to the subtask; Determine construction duration data based on the task quantity data and preset work type efficiency data, wherein the construction duration data includes the task duration of the subtask, the work type duration of the target work type related to the subtask, and the construction task duration of the target task; Based on the construction location data, a task location of the subtask is determined.
4. The construction task processing method according to claim 3, It is characterized in that The determining of the construction sequence based on the task requirement data and the target type of work includes: Based on the task requirement data, determine a first association feature, a second association feature, and a third association feature, wherein the first association feature is used to indicate a dependency relationship between the subtasks, the second association feature is used to indicate a dependency relationship between the target types of work, and the third association feature is used to indicate a dependency relationship between the subtasks and the target type of work; According to the second association feature, a topological structure graph is constructed, wherein a node in the topological structure graph represents a target type of work, and an edge in the topological structure graph represents the second association feature between two connected nodes; Performing topological sorting on the topological structure diagram to obtain a job sorting result; Based on the first association feature, the second association feature, the third association feature and the work type ranking result, a task sequence of the subtask and a work type sequence of the target work type are determined.
5. The construction task processing method according to claim 4, It is characterized in that The obtaining of personnel data of each processing personnel includes: Acquire the capability data of the processing personnel, wherein the capability data includes skill level data, years of experience data and work efficiency data, wherein the work efficiency data includes the performance evaluation data of the processing personnel for any historical task, task completion time data and quality evaluation data; Calculating a capability assessment value based on the skill level data, the years of experience data, and the work efficiency data; The capability assessment values are graded to match corresponding capability grades as capability assessment data of the processing personnel.
6. The construction task processing method according to claim 5, It is characterized in that The personnel data also includes personnel location data. The task processing strategy corresponding to when the target task meets the preset task requirement conditions is determined based on the construction task data and the personnel data, including: For any subtask, based on the personnel type data of the processing personnel and the target type of work, a type of work matching score is obtained to indicate whether the processing personnel matches the target type of work; Based on the capability level, determining a corresponding capability level score; Determining a corresponding distance score based on the personnel location data and the task location of the subtask; Determining a corresponding experience score based on the years of experience data of the processing personnel; Obtaining task matching weights, wherein the task matching weights include job type matching weights, skill weights, distance weights, and experience weights; Determine a task matching score based on the task matching weight and in combination with at least one of the job type matching score, the ability level score, the distance score, and the experience score; Screening out the processing personnel corresponding to the task when the task matching score reaches a preset matching threshold as the dispatchable personnel; Traverse the dispatchable personnel corresponding to each of the subtasks, and based on the task characteristic data and the job characteristic data, determine the target processing personnel and the target subtask to be performed by the target processing personnel when the target task meets the task requirement conditions, wherein the task requirement conditions include that the task processing time of the target task is less than a preset processing time threshold.
7. The construction task processing method according to claim 6, It is characterized in that The executing the target task according to the task processing strategy includes: Acquire the status data of the target processing personnel when executing the target task, and update the work efficiency data of the target processing personnel, wherein the status data includes the current employee location data, attendance status data and work progress data; Based on the status data and / or the updated work efficiency data, the dispatchable personnel for each subtask and the corresponding task processing strategy are adjusted.
8. The construction task processing method according to claim 7, It is characterized in that The executing the target task according to the task processing strategy includes: Acquire the status history data of the processing personnel and the configured target subtask, wherein the status history data includes the work efficiency data and attendance history data; Based on the state history data, the task data of the configured target subtask and the state data, a state prediction is performed on the processing personnel to obtain state prediction data; Based on the state prediction data, the dispatchable personnel for each subtask and the corresponding task processing strategy are adjusted.
9. The construction task processing method according to claim 8, It is characterized in that The following steps are used to adjust the available personnel and the corresponding task processing strategies, including: Acquire task status data associated with the task requirement condition when executing the target task, the task status data including at least one of task quality, task processing time, task resource utilization rate and task cost; Based on the task status data, determining a first characteristic relationship, the first characteristic relationship being used to indicate a degree of correlation between the task processing strategy and the task data; Determining a second characteristic relationship based on the task matching score of the target processing personnel, wherein the second characteristic relationship is used to indicate the degree of correlation between the target processing personnel and the task data; Determine a third characteristic relationship based on at least one of the status data, work efficiency data and status prediction data of the target processing personnel, wherein the third characteristic relationship is used to indicate the degree of influence of the target processing personnel on the task processing strategy; Determining an execution efficiency value of the task processing strategy based on the first characteristic relationship, the second characteristic relationship, and the third characteristic relationship; When the execution efficiency value is lower than a preset efficiency threshold, the task matching weight is updated, so that the dispatchable personnel of the subtask and the corresponding task processing strategy are adjusted based on the updated task matching weight.
10. A construction task processing device, It is characterized in that include: A task data acquisition module, used to acquire construction task data of a target task, wherein the construction task data includes at least one subtask in the target task and corresponding task data, wherein the task data includes task feature data and work type feature data, wherein the task feature data is used to indicate the execution of the subtask, and the work type feature data is used to describe the relevant data configured by at least one target work type required for any subtask when executing the subtask; A personnel data acquisition module is used to acquire personnel data of each processing personnel, wherein the personnel data includes personnel race data and capability assessment data; A task matching module is used to determine, based on the construction task data and the personnel data, a corresponding task processing strategy when the target task meets the preset task requirement conditions, wherein the task processing strategy is used to indicate the target processing personnel and the corresponding one or more target subtasks to be scheduled to achieve the target task; The task execution module is used to execute the target task according to the task processing strategy.
Citation Information
Patent Citations
Field scheduling management system for building construction
CN116629772A
Project cost real-time analysis management method and management system thereof
CN116822893A
Field construction personnel management and control system and method based on digital twinning
CN116911522A
Engineering project progress management system and method based on big data
CN117350487A
Task allocation method and device, storage medium, equipment and system
CN117808256A
Cited By
Indoor decoration construction optimization method and system based on AI
CN119494450A