Active power distribution network operation state evaluation method combining subjective and objective weights
By combining the evaluation method of subjective and objective weights, the distribution network evaluation index weight is calculated using the FBWM and CRITIC method, and applied to the MARCOS method, the complexity and dependence problems of distribution network status evaluation are solved, and more accurate and dynamic Evaluation results.
Patent Information
- Application Number
- CN202411152926.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-21
- Publication Date
- 2024-11-26
AI Technical Summary
The calculation process of the existing distribution network status evaluation method is complex and may cause subjective arbitraryness. The evaluation standards rely too much on operating data, making it difficult to accurately reflect the operating status of the distribution network.
The operating status evaluation method of the active distribution network combined with subjective and objective weights is adopted, and the weight of the evaluation index is calculated through the subjective and objective weighting method of FBWM and the improved CRITIC objective empowerment method, and applied to the improved MARCOS method to obtain the operating status of the distribution network. Evaluation results.
The calculation process is simplified, subjective arbitrary is reduced, the accuracy of the evaluation results and the resolution in response to changes in the distribution network state are improved, and the comparability and dynamicity of the evaluation results are ensured.
Smart Images

Figure CN119026992A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of distribution network status assessment, and in particular relates to the design of an active distribution network operating status assessment method combining subjective and objective weights. Background Art
[0002] With the continuous advancement of the construction of smart distribution networks and the access of various new power equipment, especially the access of distributed new energy, the structure and operation status of distribution networks have become more and more complex. In order to enable power management personnel to quickly and intuitively understand the current operation status of the distribution network, and provide multi-angle guidance for the subsequent optimization of the distribution network operation status, and realize the long-term safe and reliable operation of the distribution network, a scientific and comprehensive evaluation method is established to comprehensively evaluate the operation status of the distribution network, which can solve the real-time perception problem of the operation status of the active distribution network. The operation status of the distribution network cannot be directly obtained by a certain mathematical model through numerical methods. The existing research on the evaluation method of the distribution network operation status is mainly based on multi-index weighted comprehensive evaluation. This type of method is affected by the completeness of the evaluation index data, that is, the more evaluation indicators there are, the more accurate the evaluation of the distribution network operation status. At the same time, the calculation method of the index weight will also affect the accuracy of the evaluation results. Constructing a scientific and reasonable weighting method is an important research direction in this field. After determining the index weight, the rationality of the evaluation method for comprehensive index data is also an important factor affecting the status evaluation results. Since the data that existing measurement devices in the distribution network can provide are limited and the indicators available for evaluating the operating status of the distribution network are relatively fixed, existing research mainly focuses on improving the indicator weighting method and comprehensive evaluation method in the evaluation problem.
[0003] There are many improvements on the state assessment methods in existing research, including: (1) using improved grey correlation analysis and game set model to finally establish a multi-level assessment model for power grid security; (2) establishing a multi-operator hierarchical analysis fuzzy evaluation model to comprehensively evaluate the power grid operation; (3) using the fishbone diagram method to establish a distribution network operation effect evaluation index system based on the three dimensions of source-grid-load, and using the month-on-month score rank and comparison evaluation method to comprehensively evaluate the distribution network; (4) using a comprehensive evaluation method that combines fuzzy comprehensive evaluation and centroid method, and combining the hierarchical analysis method and anti-entropy weight method to improve the indicator weights, so as to achieve a comprehensive and objective evaluation of the real-time operation quality of the power grid.
[0004] The calculation process of the above research is relatively complicated and may cause subjective arbitrariness, and the evaluation criteria are too dependent on the operating data of the distribution network. Summary of the invention
[0005] The purpose of the present invention is to solve the problems that the calculation process of the existing distribution network status assessment method is relatively complicated and may cause subjective arbitrariness, and the assessment standard is too dependent on the operating data of the distribution network. An active distribution network operating status assessment method combining subjective and objective weights is proposed.
[0006] The technical solution of the present invention is: a method for evaluating the operating status of an active distribution network combining subjective and objective weights, comprising the following steps:
[0007] S1. Construct an active distribution network operation status evaluation index system.
[0008] S2. Collect the subjective opinions of experts on the evaluation indicators, and based on the subjective opinions, use the FBWM subjective weighting method to calculate the subjective weights of the evaluation indicators.
[0009] S3. Collect distribution network operation data, and use the CRITIC objective weighting method to obtain the objective weights of the evaluation indicators based on the operation data.
[0010] S4. Obtain the combined weight of the evaluation indicators according to the subjective weight and objective weight of the evaluation indicators.
[0011] S5. Apply the combined weights of the evaluation indicators to the extended matrix of the improved MARCOS method, and obtain the evaluation results of the active distribution network operation status according to the improved MARCOS method.
[0012] Furthermore, the active distribution network operation status evaluation index system in step S1 includes a target layer, a criterion layer and a basic layer; the target layer is the operation status of the distribution network; the criterion layer includes safety, economy, quality and reliability; the basic layer includes line load rate, main transformer load rate, overvoltage limit rate, line power factor limit rate, substation comprehensive line loss rate, power flow reverse rate, three-phase imbalance rate, voltage deviation rate, fault shutdown rate and power supply reliability rate.
[0013] Further, step S2 includes the following sub-steps:
[0014] S21. According to the active distribution network operation status evaluation index system, an evaluation index set consisting of n evaluation indicators is obtained.
[0015] S22. Determine the most important indicator η in the evaluation indicator set B and the least important index η W .
[0016] S23. Constructing the most important index η through the fuzzy comment variables of experts B The preference vector Y of all indicators in the relative evaluation indicator set B :
[0017] Y B =(aB1 ,a B2 ,…,a Bn )
[0018] where a Bj Represents the most important indicator η B The fuzzy comparison value with the j-th evaluation indicator, j=1,2,...,n.
[0019] S24. Constructing the least important index η through the fuzzy comment variables of experts W The preference vector Y of all indicators in the relative evaluation indicator set W :
[0020] Y W =(a 1W ,a 2W ,…,a nW )
[0021] where a jW Represents the jth evaluation index and the least important index η W The fuzzy contrast value of .
[0022] S25. The fuzzy comment variables of the experts are converted into triangular fuzzy numbers, and the subjective weight vector [α1, α2, …, α n ]:
[0023]
[0024] where α B Represents the most important indicator weight, α j represents the subjective weight of the jth evaluation indicator, α W Represents the least important indicator weight, R(α j ) represents α j The graded integral, l j Represents α j The lower bound of the triangular fuzzy number, m j Represents α j The most likely value of the triangular fuzzy number, u j Represents α j The upper bound of triangular fuzzy numbers.
[0025] Further, step S3 includes the following sub-steps:
[0026] S31, collect m groups of distribution network operation data, each group of data includes n evaluation indicators, and construct an evaluation matrix P:
[0027]
[0028] where ρ ijrepresents the j-th evaluation index of the i-th group of data, i = 1, 2, ..., m, j = 1, 2, ..., n.
[0029] S32, normalize each evaluation index in the evaluation matrix to obtain a forward normalized matrix P * :
[0030]
[0031] in Represents the jth evaluation indicator of the i-th group of data after normalization.
[0032] S33, calculate the forward normalization matrix P * The standard deviation σ of each evaluation metric in j The correlation coefficient between the index and kj :
[0033]
[0034] in represents the mean value of the jth evaluation indicator, Represents the forward normalized matrix P * The covariance between the kth evaluation indicator and the jth evaluation indicator, σ j represents the standard deviation of the jth evaluation indicator, σ k represents the standard deviation of the kth evaluation indicator, k = 1, 2, ..., n.
[0035] S34, according to the standard deviation σ of each evaluation indicator j Calculate the amount of information X in each evaluation indicator j :
[0036]
[0037] S35, according to the correlation coefficient λ kj Quantify the conflict between evaluation indicators and get more information j The impact of quantified evaluation indicators on the evaluation results is obtained by comprehensively considering the conflicts between evaluation indicators and the impact of evaluation indicators on the evaluation results to obtain the preliminary objective weight vector w = [w1, w2, ..., w n ].
[0038] S36. Set each preliminary objective weight w j The variable weight coefficient γ j :
[0039]
[0040] Where μ represents the gain coefficient, k jRepresents the slope of the linear regression trend line of the j-th evaluation indicator data.
[0041] S37, according to the variable weight coefficient γ j Dynamically adjust the initial objective weight w j , we get the objective weight vector of the evaluation index β = [β1,β2,…,β n ]:
[0042]
[0043] where γ=[γ1,γ2,…,γ n ] represents the variable weight coefficient vector.
[0044] Furthermore, in step S4, the minimum discriminant information principle is used to calculate the combined weight of the evaluation index:
[0045]
[0046] where J(·) represents the objective function of the minimum discriminant information principle, ω=[ω1,ω2,…,ω n ] represents the combination weight vector, ω j represents the combined weight of the jth evaluation index, α j represents the subjective weight of the jth evaluation indicator, β j represents the objective weight of the jth evaluation indicator.
[0047] Further, step S5 includes the following sub-steps:
[0048] S51, normalize the matrix P * As the initial evaluation matrix of the MARCOS method, the positive ideal solution matrix is introduced into the initial evaluation matrix and the negative ideal solution matrix Form the expansion matrix D:
[0049]
[0050] in represents the worst indicator value of the jth evaluation indicator, Represents the optimal indicator value of the jth evaluation indicator.
[0051] S52, using the combined weight vector ω to weight the extended matrix D, to obtain the weighted matrix D ω :
[0052]
[0053] S53, calculate weighted matrix D ω The utility of the elements in relative to the positive ideal solution and the negative ideal solution:
[0054]
[0055] in and They represent the utility of the i-th group of indicator data relative to the positive ideal solution and the negative ideal solution respectively.
[0056] S54, according to and Calculate the utility function f(χ i ):
[0057]
[0058] in and are the utility functions associated with the positive ideal solution and the negative ideal solution, respectively.
[0059] S55. Using the value of the utility function as an evaluation result of the active distribution network operation status.
[0060] The beneficial effects of the present invention are:
[0061] (1) The present invention adopts a combined weighting method that combines the FBWM subjective weighting method and the improved CRITIC objective weighting method, which solves the dependence of the traditional method evaluation criteria on the distribution network operation data, can accurately distinguish data from different time periods, and ensures that data from different groups are comparable.
[0062] (2) The present invention introduces triangular fuzzy numbers into the FBWM subjective weighting method, which can give a reasonable subjective weight distribution and simplify the calculation process, thus avoiding the more complicated calculation process and possible subjective arbitrariness of the traditional method.
[0063] (3) The present invention takes into account the changes in the importance of indicators when they are optimized and degraded in the improved CRITIC objective weighting method, which makes up for the lack of dynamic weights in the conventional objective weighting method and effectively improves the resolution of the evaluation method in responding to changes in the distribution network state. BRIEF DESCRIPTION OF THE DRAWINGS
[0064] Figure 1 The figure shows a flow chart of an active distribution network operating status assessment method combining subjective and objective weights provided by an embodiment of the present invention.
[0065] Figure 2 Shown is a schematic diagram of an active distribution network operating status evaluation index system provided by an embodiment of the present invention.
[0066] Figure 3 The figure shows a time series change diagram of the evaluation index after forward transformation provided by an embodiment of the present invention.
[0067] Figure 4Shown is a criterion layer indicator evaluation score diagram for scenario I provided in an embodiment of the present invention.
[0068] Figure 5 Shown is a target layer comprehensive indicator evaluation score diagram for scenario I provided in an embodiment of the present invention.
[0069] Figure 6 Shown is a criterion layer indicator evaluation score diagram for scenario II provided in an embodiment of the present invention.
[0070] Figure 7 Shown is a target layer comprehensive indicator evaluation score diagram for scenario II provided in an embodiment of the present invention.
[0071] Figure 8 Shown is a criterion layer indicator evaluation score diagram for scenario III provided in an embodiment of the present invention.
[0072] Fig. 9 Shown is a target layer comprehensive index evaluation score diagram for scenario III provided in an embodiment of the present invention.
[0073] Fig.10 Shown is a comparison chart of criterion layer indicator evaluation scores provided by an embodiment of the present invention.
[0074] Fig.11 Shown is a comparison chart of target layer comprehensive indicator evaluation scores provided by an embodiment of the present invention. DETAILED DESCRIPTION
[0075] Now, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings. It should be understood that the embodiments shown and described in the accompanying drawings are only exemplary and are intended to explain the principles and spirit of the present invention, rather than to limit the scope of the present invention.
[0076] The embodiment of the present invention provides an active distribution network operation status evaluation method combining subjective and objective weights, such as Figure 1 As shown, the following steps S1 to S5 are included:
[0077] S1. Construct an active distribution network operation status evaluation index system.
[0078] In the embodiment of the present invention, Figure 2 As shown in the figure, the active distribution network operation status evaluation index system includes the target layer, the criterion layer and the basic layer.
[0079] The target layer is the operating status of the distribution network, and its evaluation results represent the overall operating status of the distribution network.
[0080] The criteria layer includes safety, economy, quality and reliability, and its evaluation results represent the status of the distribution network from different perspectives.
[0081] The basic layer includes line load rate, main transformer load rate, overvoltage limit rate, line power factor limit rate, substation comprehensive line loss rate, power flow reverse rate, three-phase imbalance rate, voltage deviation rate, fault outage rate and power supply reliability rate, which are all indicator data directly obtained or indirectly calculated in the distribution network data acquisition system.
[0082] S2. Collect the subjective opinions of experts on the evaluation indicators, and based on the subjective opinions, use the FBWM (Fuzzy bestworstmulti criteria decision making method) subjective weighting method to calculate the subjective weights of the evaluation indicators.
[0083] Step S2 includes the following sub-steps S21 to S25:
[0084] S21. According to the active distribution network operation status evaluation index system, an evaluation index set consisting of n evaluation indicators is obtained.
[0085] S22. Determine the most important indicator η in the evaluation indicator set B and the least important index η W .
[0086] S23. Constructing the most important index η through the fuzzy comment variables of experts B The preference vector Y of all indicators in the relative evaluation indicator set B :
[0087] Y B =(a B1 ,a B2 ,…,a Bn )
[0088] where a Bj Represents the most important indicator η B The fuzzy comparison value with the j-th evaluation indicator, j=1,2,...,n.
[0089] S24. Constructing the least important index η through the fuzzy comment variables of experts W The preference vector Y of all indicators in the relative evaluation indicator set W :
[0090] Y W =(a 1W ,a 2W ,…,a nW )
[0091] where a jW Represents the jth evaluation index and the least important index η W The fuzzy contrast value of .
[0092] S25. The fuzzy comment variables of the experts are converted into triangular fuzzy numbers, and the subjective weight vector [α1, α2, …, α n ]:
[0093]
[0094] where α B Represents the most important indicator weight, α j represents the subjective weight of the jth evaluation indicator, α W Represents the least important indicator weight, R(α j ) represents α j The graded integral, l j Represents α j The lower bound of the triangular fuzzy number, m j Represents α j The most likely value of the triangular fuzzy number, u j Represents α j The upper bound of triangular fuzzy numbers.
[0095] In the embodiment of the present invention, triangular fuzzy numbers are used to convert fuzzy comments into quantitative values. The fuzzy comment conversion rules are shown in Table 1.
[0096] Table 1
[0097]
[0098] S3. Collect distribution network operation data, and use the CRITIC objective weighting method to obtain the objective weights of the evaluation indicators based on the operation data.
[0099] Step S3 includes the following sub-steps S31 to S37:
[0100] S31, collect m groups of distribution network operation data, each group of data includes n evaluation indicators, and construct an evaluation matrix P:
[0101]
[0102] where ρ ij represents the j-th evaluation index of the i-th group of data, i = 1, 2, ..., m, j = 1, 2, ..., n.
[0103] S32, normalize each evaluation index in the evaluation matrix to obtain a forward normalized matrix P * :
[0104]
[0105] in Represents the jth evaluation indicator of the i-th group of data after normalization.
[0106] S33, calculate the forward normalization matrix P * The standard deviation σ of each evaluation metric in j The correlation coefficient between the index and kj :
[0107]
[0108]
[0109] in represents the mean value of the jth evaluation indicator, Represents the forward normalized matrix P * The covariance between the kth evaluation indicator and the jth evaluation indicator, σ j represents the standard deviation of the jth evaluation indicator, σ k represents the standard deviation of the kth evaluation indicator, k = 1, 2, ..., n.
[0110] S34, according to the standard deviation σ of each evaluation indicator j Calculate the amount of information X in each evaluation indicator j :
[0111]
[0112] Where X j The larger the value is, the greater the amount of information in the j-th evaluation indicator is, and the greater the impact of this evaluation indicator on the evaluation result is.
[0113] S35, according to the correlation coefficient λ kj Quantify the conflict between evaluation indicators and get more information j The impact of quantified evaluation indicators on the evaluation results is obtained by comprehensively considering the conflicts between evaluation indicators and the impact of evaluation indicators on the evaluation results to obtain the preliminary objective weight vector w = [w1, w2, ..., w n ].
[0114] S36. Set each preliminary objective weight w j The variable weight coefficient γ j :
[0115]
[0116] Where μ represents the gain coefficient, and its value is used to adjust the variable weight intensity, k j Represents the slope of the linear regression trend line of the j-th evaluation index data, which is used to represent the changing trend of the evaluation index data.
[0117] S37, according to the variable weight coefficient γ j Dynamically adjust the initial objective weight w j, we get the objective weight vector of the evaluation index β=[β1,β2,…,β n ]:
[0118]
[0119] where γ=[γ1,γ2,…,γ n ] represents the variable weight coefficient vector. The objective weight after weighting is dynamically adjusted to enhance the weight resolution and dynamic response of each evaluation index in the time domain, so that the weight result can more sensitively reflect the changes in the distribution network state.
[0120] S4. Obtain the combined weight of the evaluation indicators according to the subjective weight and objective weight of the evaluation indicators.
[0121] In the embodiment of the present invention, the minimum discriminant information principle is used to calculate the combined weight of the evaluation index:
[0122]
[0123] where J(·) represents the objective function of the minimum discriminant information principle, ω=[ω1,ω2,…,ω n ] represents the combination weight vector, ω j represents the combined weight of the jth evaluation index, α j represents the subjective weight of the jth evaluation indicator, β j represents the objective weight of the jth evaluation indicator.
[0124] S5. Apply the combined weights of the evaluation indicators to the extended matrix of the improved MARCOS (Measurement of alternatives and ranking according to compromise solution) method, and obtain the evaluation results of the active distribution network operation status according to the improved MARCOS method.
[0125] Step S5 includes the following sub-steps S51 to S55:
[0126] S51, normalize the matrix P * As the initial evaluation matrix of the MARCOS method, the positive ideal solution matrix is introduced into the initial evaluation matrix and the negative ideal solution matrix Form the expansion matrix D:
[0127]
[0128] in represents the worst indicator value of the jth evaluation indicator, Represents the optimal indicator value of the jth evaluation indicator.
[0129] In the embodiment of the present invention, AAI and AI are vectors whose elements are set to ε and 1, ε reflects the theoretical lower limit of the evaluation index. If the evaluation index type is different, the value needs to be modified accordingly. After unification, AAI and AI ensure the consistency of the evaluation standard and avoid the difference in the evaluation benchmark caused by different AAI and AI values when using different time series data for evaluation.
[0130] S52, using the combined weight vector ω to weight the extended matrix D, to obtain the weighted matrix D ω :
[0131]
[0132] S53, calculate weighted matrix D ω The utility of the elements in relative to the positive ideal solution and the negative ideal solution:
[0133]
[0134] in and They represent the utility of the i-th group of indicator data relative to the positive ideal solution and the negative ideal solution respectively.
[0135] S54, according to and Calculate the utility function f(χ i ):
[0136]
[0137] in and are the utility functions associated with the positive ideal solution and the negative ideal solution, respectively.
[0138] S55. Using the value of the utility function as an evaluation result of the active distribution network operation status.
[0139] The value of the utility function reflects the overall quality of each indicator of the distribution network. The larger the value, the better the operation of the distribution network. Conversely, the smaller the value, the worse the operation of the distribution network.
[0140] The application effect of the present invention is described in detail below in conjunction with simulation.
[0141] An IEEE 13-node distribution system is established to simulate the heavy-load operation scenario of the actual distribution network in summer, and the rationality of the subjective and objective weight calculation method of the present invention is firstly verified.
[0142] The FBWM subjective weighting method is used to determine the subjective weight of the evaluation index system. At the same time, the subjective weight of the index by the Analytic Hierarchy Process (AHP) is calculated for comparative analysis. The calculation results are shown in Table 2.
[0143] Table 2
[0144]
[0145]
[0146] From the data in Table 2, we can see that the subjective weight results obtained by the two methods are generally similar. For example, the weights of the criteria layer indicators are ranked as safety > reliability > quality > economy. It can be seen that the FBWM weights can effectively reflect the subjective opinions of experts. At the same time, compared with the traditional AHP method, the FBWM method does not need to construct a judgment matrix according to the indicators of each level one by one. It only needs to give the best and worst vectors to calculate the subjective weights, which simplifies the calculation process. The triangular fuzzy number variables introduced by the FBWM method convert the fuzzy statements of experts, which solves the problem that the traditional method does not take into account the subjective arbitrariness of experts.
[0147] The objective weights of the basic layer indicators are determined using the improved CRITIC method of the present invention, and the weights of the CRITIC method before improvement are calculated as a control. The calculation results are shown in Table 3.
[0148] Table 3
[0149]
[0150] As can be seen from Table 3, the improved CRITIC weights are updated according to the degradation trend or optimization trend of different indicators. Figure 3 As shown, among the safety indicators, the line load rate indicator sequence has obviously increased from 87% to 98% before the latest 12th moment, with an obvious optimization trend, and its weight has decreased by 0.07. Similarly, the overvoltage limit rate indicator has decreased from 98% to 93%, with an obvious deterioration trend, and its weight has increased by 0.1, becoming the main indicator affecting the operation status of the distribution network. Among the quality indicators, since the degree of change of the three-phase imbalance rate indicator is not obvious, its indicator weight changes little. It can be seen that the improved CRITIC method in the present invention dynamically adjusts the weight according to the deterioration of the indicator, which can be used to quickly find the main causes of the deterioration of the operation status of the distribution network.
[0151] Secondly, the rationality of the improved MARCOS scoring method in the present invention was verified.
[0152] Set scenario I to no distributed energy access, scenario II to access wind turbines and photovoltaics, and scenario III to access wind turbines, photovoltaics and energy storage.
[0153] Depend on Figure 4 , Figure 5 The analysis shows that:
[0154] from Figure 4 It can be found that the scores of safety and reliability indicators from the 10th to the 21st time sequence dropped significantly, with the lowest values reaching about 51 and 65 respectively. This is because the load in the simulation setting during this period is in an overload state, which affects the degradation of the relevant basic layer indicators of safety and reliability, thereby reducing the values of safety and reliability indicators. The economic and quality indicators have a smaller change range due to the smaller change range of their corresponding basic layer indicators. At the same time, due to the large weight ratio of safety indicators and reliability indicators, the final target layer comprehensive indicators reflect a similar change pattern, that is, they show a lower evaluation value during the overload period, reflecting that the distribution network at this time is not in a normal and healthy operating state.
[0155] Depend on Figure 6 , Figure 7 The analysis shows that:
[0156] contrast Figure 4 and Figure 6 The results show that the safety and reliability index values of the distribution network after connecting to wind and solar power have increased by about 10 to 20 points during the overload period. It can be seen that the power support of distributed energy has alleviated the problem of high load of power equipment under overload conditions. However, due to the uncertainty of wind and solar power output, the size of their shared load is fluctuating. Figure 6 It can also be found that the relevant index values fluctuate significantly. At the same time, due to the flow backflow problem of distributed energy access, the relevant economic indicators are also lower than those in scenario 1. Figure 7 It can be seen that due to the improvement of safety and reliability indicators, the degree of degradation of economy and quality indicators is smaller and their weight is lower. The final comprehensive index value of the target layer has been improved, which correctly reflects the distributed power source sharing the output under heavy load scenarios, thereby optimizing the operation status of the distribution network.
[0157] Depend on Figure 8 , Fig. 9 The analysis shows that:
[0158] contrast Figure 6 and Figure 8 The results show that adding energy storage devices to wind and solar power can effectively improve the output volatility of distributed energy due to the "peak shaving and valley filling" characteristics of energy storage devices. Figure 8The reduction in the fluctuation of the safety and reliability index values can reflect this characteristic of energy storage. At the same time, since the output of photovoltaic power has obvious time characteristics, when photovoltaic power cannot share the load from sequence 1 to sequence 6, the energy storage output shares the load, which effectively suppresses the problem of high load of power equipment and significantly improves the evaluation value of safety and reliability indicators. Since the role of energy storage makes up for the problem of insufficient wind and solar output in the first 6 sequences, its stable output under sufficient capacity also improves the problem of uncertain wind and solar output, thereby improving the operating status of the distribution network. Fig. 9 The comprehensive evaluation results are compared with Figure 7 The improvement correctly reflects this conclusion.
[0159] Depend on Fig.10 , Fig.11 The analysis shows that:
[0160] Due to the problem of intra-group comparison, the evaluation values of the criterion level indicators and the comprehensive indicators of the traditional MARCOS method are lower than those of the improved MARCOS method in time series 1 to 4. Figure 3 It can be seen that the values of each indicator during this period are relatively high, because the indicators are all positively normalized to be benefit-oriented indicators with larger values, and each evaluation indicator is above 90%, so the distribution network status evaluation results should also be at a high level. Fig.11 The evaluation results of the 5th and 9th time series of the reliability index of the criterion layer show that there are obvious differences in the MARCOS evaluation results before and after the improvement. Figure 3 It can be seen that the reliability indicators of the 5th and 9th time series, namely the failure outage rate and the power supply reliability rate, are very close, so there should be no obvious difference in the reliability evaluation results of these two time series. The traditional MARCOS method has a 2-point difference in the results due to the selection of its positive ideal solution and negative ideal solution related to the data within the group. The improved MARCOS method solves the shortcomings of the traditional method in this regard and has higher accuracy.
[0161] Those skilled in the art will appreciate that the embodiments described herein are intended to help readers understand the principles of the present invention, and should be understood that the protection scope of the present invention is not limited to such specific statements and embodiments. Those skilled in the art can make various other specific variations and combinations that do not deviate from the essence of the present invention based on the technical revelations disclosed by the present invention, and these variations and combinations are still within the protection scope of the present invention.
Claims
1. A method for evaluating the operating status of an active distribution network combining subjective and objective weights, characterized in that: The following steps are involved: S1. Construct an active distribution network operation status evaluation index system; S2. Collect the subjective opinions of experts on the evaluation indicators, and use the FBWM subjective weighting method to calculate the subjective weights of the evaluation indicators based on the subjective opinions; S3, collecting distribution network operation data, and using the CRITIC objective weighting method to obtain objective weights of evaluation indicators based on the operation data; S4, obtaining the combined weight of the evaluation indicators according to the subjective weight and objective weight of the evaluation indicators; S5. Apply the combined weights of the evaluation indicators to the extended matrix of the improved MARCOS method, and obtain the evaluation results of the active distribution network operation status according to the improved MARCOS method.
2. The active distribution network operating status assessment method combining subjective and objective weights according to claim 1 is characterized in that: The active distribution network operation status evaluation index system in step S1 includes a target layer, a criterion layer and a basic layer; The target layer is the operating status of the distribution network; The criteria layers include safety, economy, quality and reliability; The basic layer includes line load rate, main transformer load rate, overvoltage limit rate, line power factor limit rate, substation comprehensive line loss rate, power flow reverse rate, three-phase imbalance rate, voltage deviation rate, fault shutdown rate and power supply reliability rate.
3. The active distribution network operating status assessment method combining subjective and objective weights according to claim 1 is characterized in that: The step S2 comprises the following sub-steps: S21. According to the active distribution network operation status evaluation index system, an evaluation index set consisting of n evaluation indicators is obtained; S22. Determine the most important indicator η in the evaluation indicator set B and the least important index η W ; S23. Constructing the most important index η through the fuzzy comment variables of experts B The preference vector Y of all indicators in the relative evaluation indicator set B : AND B (a) B1 ,to B2 ,…,to Bn ) where a Bj Represents the most important indicator η B The fuzzy comparison value with the jth evaluation index, j = 1, 2, ..., n; S24. Constructing the least important index η through the fuzzy comment variables of experts W The preference vector Y of all indicators in the relative evaluation indicator set W : AND W (a) 1W ,to 2W ,…,to nW ) where a jW Represents the jth evaluation index and the least important index η W The fuzzy contrast value of S25. The fuzzy comment variables of the experts are converted into triangular fuzzy numbers, and the subjective weight vector [α1, α2, …, α n ]: where α B Represents the most important indicator weight, α j represents the subjective weight of the jth evaluation indicator, α W Represents the least important indicator weight, R(α j ) represents α j The graded integral, l j Represents α j The lower bound of the triangular fuzzy number, m j Represents α j The most likely value of the triangular fuzzy number, u j Represents α j The upper bound of triangular fuzzy numbers.
4. The active distribution network operating status assessment method combining subjective and objective weights according to claim 1 is characterized in that: The step S3 comprises the following sub-steps: S31, collect m groups of distribution network operation data, each group of data includes n evaluation indicators, and construct an evaluation matrix P: where ρ ij represents the jth evaluation index of the i-th group of data, i = 1, 2, ..., m, j = 1, 2, ..., n; S32, normalize each evaluation index in the evaluation matrix to obtain a forward normalized matrix P * : in Represents the jth evaluation index of the i-th group of data after normalization; S33, calculate the forward normalization matrix P * The standard deviation σ of each evaluation metric in j The correlation coefficient between the index and kj : in represents the mean value of the jth evaluation indicator, Represents the forward normalized matrix P * The covariance between the kth evaluation indicator and the jth evaluation indicator, σ j represents the standard deviation of the jth evaluation indicator, σ k represents the standard deviation of the kth evaluation indicator, k = 1, 2, ..., n; S34, according to the standard deviation σ of each evaluation indicator j Calculate the amount of information X in each evaluation indicator j : S35, according to the correlation coefficient λ kj Quantify the conflict between evaluation indicators and get more information j The impact of quantified evaluation indicators on the evaluation results is obtained by comprehensively considering the conflicts between evaluation indicators and the impact of evaluation indicators on the evaluation results to obtain the preliminary objective weight vector w = [w1, w2, ..., w n ]; S36. Set each preliminary objective weight w j The variable weight coefficient γ j : Where μ represents the gain coefficient, k j Represents the slope of the linear regression trend line of the jth evaluation indicator data; S37, according to the variable weight coefficient γ j Dynamically adjust the initial objective weight w j , we get the objective weight vector of the evaluation index β=[β1,β2,…,β n ]: where γ=[γ1,γ2,…,γ n ] represents the variable weight coefficient vector.
5. The method for evaluating the operating status of an active distribution network combining subjective and objective weights according to claim 4, characterized in that: In step S4, the minimum discriminant information principle is used to calculate the combined weight of the evaluation index: where J(·) represents the objective function of the minimum discriminant information principle, ω=[ω1,ω2,…,ω n ] represents the combination weight vector, ω j represents the combined weight of the jth evaluation index, α j represents the subjective weight of the jth evaluation indicator, β j represents the objective weight of the jth evaluation indicator.
6. The method for evaluating the operating status of an active distribution network combining subjective and objective weights according to claim 5, characterized in that: The step S5 comprises the following sub-steps: S51, normalize the matrix P * As the initial evaluation matrix of the MARCOS method, the positive ideal solution matrix is introduced into the initial evaluation matrix and the negative ideal solution matrix Form the expansion matrix D: in represents the worst indicator value of the jth evaluation indicator, represents the optimal index value of the jth evaluation index; S52, using the combined weight vector ω to weight the extended matrix D, to obtain the weighted matrix D ω : S53, calculate weighted matrix D ω The utility of the elements in relative to the positive ideal solution and the negative ideal solution: in and Respectively represent the utility of the i-th group of indicator data relative to the positive ideal solution and the negative ideal solution; S54, according to and Calculate the utility function f(χ i ): in and are the utility functions associated with the positive ideal solution and the negative ideal solution, respectively; S55. Using the value of the utility function as an evaluation result of the active distribution network operation status.
Citation Information
Cited By
High and medium voltage distribution network coordination index weight determination method based on AHP-XGBoost model
CN120410312A
Self-adaptive evaluation method and system for running state of overhead line system
CN121032284A
Power distribution network toughness quantitative evaluation method combining fuzzy analytic hierarchy process and double objective empowerment
CN121903474A