Project management method and device, medium, electronic equipment and program product

Through the online application and review function of the project management system, the problems of low efficiency and high cost in the existing technology are solved, and efficient project management processes and cost reduction are achieved.

CN119027048APending Publication Date: 2024-11-26NAT ENERGY GRP NORTH CHINA ELECTRIC POWER CO LTD LANGFANG THERMAL POWER PLANT
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411066541.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-05
Publication Date
2024-11-26

AI Technical Summary

Technical Problem

In the prior art, project management is inefficient, especially when the data volume is large, management is complex and costly, resulting in reduced efficiency.

Method used

Provides a project management method. Through the homepage of the project management system, the project application module can be displayed. Users can apply and review projects online. The system automatically calculates and displays the review results, including multiple declaration units to meet the needs of different types of projects.

Benefits of technology

It improves the efficiency of project management, reduces management costs, realizes online application and review, and simplifies the project management process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119027048A_ABST
    Figure CN119027048A_ABST
Patent Text Reader

Abstract

The invention relates to a project management method and device, a medium, electronic equipment and a program product. The method comprises the steps of displaying a home page of a project management system; in response to a project declaration operation on the project declaration module, displaying a target declaration page corresponding to the project declaration operation; in response to an input operation on the target declaration page, determining target project information of the to-be-declarated project corresponding to the input operation, and in response to a submission operation on the target project information, sending the target project information to a terminal device of a project auditor, so that the project auditor audits the to-be-declarated project; and after receiving an auditing result of the project to be reported from the terminal device, displaying the auditing result. In the project management system, the to-be-declared project is declared and audited in an online manner, and the corresponding audit result is displayed, so that the project management efficiency can be improved, and the project management cost can be reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present disclosure relates to the field of visualization technology, and in particular, to a project management method, device, medium, electronic device and program product. Background Art

[0002] Project management is mainly the process of effectively planning, organizing, directing and controlling projects through systematic methods. In related technologies, enterprise projects are managed by relevant personnel, but when enterprise projects are managed by relevant personnel, management efficiency may be low. Summary of the invention

[0003] The purpose of the present disclosure is to provide a project management method, device, medium, electronic device and program product to solve the technical problems existing in the related technology.

[0004] In order to achieve the above objectives, the first disclosure provides a project management method, the method comprising: Displaying a homepage of the project management system, wherein the homepage displays a project declaration module, and the project declaration module is used for users to declare projects; In response to a project declaration operation on the project declaration module, a target declaration page corresponding to the project declaration operation is displayed, wherein the target declaration page is used for users to declare different types of projects; In response to an input operation on the target declaration page, determining target project information of the project to be declared corresponding to the input operation, and in response to a submission operation of the target project information, sending the target project information to a terminal device of a project reviewer so that the project reviewer can review the project to be declared; After receiving the audit result of the project to be reported by the project auditor from the terminal device, the audit result is displayed.

[0005] Optionally, in response to an input operation on the target declaration page, determining target project information of the project to be declared corresponding to the input operation includes: In response to an input operation in the first declaration unit or the second declaration unit on the target declaration page, target project information of the project to be declared corresponding to the input operation is determined, wherein the target project information includes intellectual property achievement information, project content release information, content completeness and project completion degree; the first declaration unit is used for users to declare scientific and technological innovation projects, and the second declaration unit is used for users to declare quality management projects.

[0006] Optionally, the audit result is obtained in the following manner: Determine the status information of the intellectual property achievements in the project to be declared based on the intellectual property achievement information, and determine the intellectual property score of the project to be declared based on the status information, wherein different types of intellectual property achievements have different corresponding intellectual property scores under the same status information; Determine the duration and form of publishing the project content in the project to be reported based on the project content release information, and determine the project content release score of the project to be reported based on the duration and the release form; Determine the progress of the project content completion of the project to be reported based on the content completeness, and determine the content completeness score of the project to be reported based on the project content completion progress and preset scoring rules; In response to scoring operations of multiple first users on the project completion in the project management system, determining an average score corresponding to the scoring operations of the multiple first users as the project completion score of the project to be reported, wherein the multiple first users are not involved in the project to be reported; In response to scoring operations of multiple second users on the intellectual property achievement information, the project content release information, the content completeness, and the project completion in the project management system, a weighted average of the scores corresponding to the scoring operations of the multiple second users is determined as the additional score of the project to be reported, wherein the multiple second users have different job levels; The intellectual property score, the project content release score, the content completeness score, the project completion score and the additional score are added together to obtain the audit result.

[0007] Optionally, in response to an input operation on the target declaration page, determining target project information of the project to be declared corresponding to the input operation includes: In response to an input operation of a third reporting unit on the target reporting page, determining target project information of a project to be reported corresponding to the input operation, wherein the target project information includes the amount of energy saving of the enterprise and the amount of electricity consumption of the enterprise, and the third reporting unit is used for users to report energy saving projects; Accordingly, the audit results are obtained in the following manner: The audit result is determined based on the enterprise's energy saving amount, the enterprise's electricity consumption and a preset energy saving threshold.

[0008] Optionally, in response to an input operation on the target declaration page, determining target project information of the project to be declared corresponding to the input operation includes: In response to an input operation in the fourth reporting unit on the target reporting page, determining target project information of the project to be reported corresponding to the input operation, wherein the target project information includes the journal in which the paper is published, the year in which the paper is published, and the content of the paper, and the fourth reporting unit is used for users to report papers; Accordingly, the audit results are obtained in the following manner: According to the publication years of the papers, determine the target papers published within the preset period in the project to be applied, and determine the paper publication score according to the corresponding journals of the target papers; In response to scoring operations of multiple third users on the paper content in the project management system, an average score corresponding to the scoring operations of the multiple third users is determined as the paper content score of the project to be applied for, wherein the multiple third users are technicians in the technical field to which the project to be applied belongs; The paper publication score and the paper content score are added together to obtain the review result.

[0009] Optionally, in response to an input operation on the target declaration page, determining target project information of the project to be declared corresponding to the input operation includes: In response to an input operation of the fifth declaration unit on the target declaration page, determining target project information of the project to be declared corresponding to the input operation, wherein the target project information includes patent information, software copyright information and trademark information, and the fifth declaration unit is used for users to declare intellectual property information; Accordingly, the audit results are obtained in the following manner: In response to the fourth user's review operation on the project to be reported in the project management system, the review result corresponding to the review operation is obtained, wherein the fourth user is the management personnel who reviews the project to be reported, and the review result includes a review pass result and a review fail result.

[0010] Optionally, in response to an input operation on the target declaration page, determining target project information of the project to be declared corresponding to the input operation includes: In response to an input operation in the sixth declaration unit on the target declaration page, determining target project information of the project to be declared corresponding to the input operation, wherein the target project information includes organizational science and technology project information and organizational intellectual property information, and the sixth declaration unit is used for users to declare organizational honor information; Accordingly, the audit results are obtained in the following manner: Determine the type of the project to be applied for based on the information of the organized science and technology project, and determine the score of the organized science and technology project for the project to be applied for based on the reward information corresponding to the science and technology project type; Determine the type of intellectual property achievements of the project to be reported based on the organizational intellectual property information, and determine the organizational intellectual property score of the project to be reported based on the type of intellectual property achievements; Add the organization's science and technology project score and the organization's intellectual property score to obtain the audit result.

[0011] Optionally, in response to an input operation on the target declaration page, determining target project information of the project to be declared corresponding to the input operation includes: In response to an input operation of the seventh reporting unit on the target reporting page, determining target project information of the project to be reported corresponding to the input operation, wherein the target project information includes enterprise development suggestions and enterprise employee life suggestions, and the seventh reporting unit is used for users to report enterprise suggestion information; Accordingly, the audit results are obtained in the following manner: In response to the review operation of the target project information by multiple fifth users in the project management system, the review result corresponding to the review operation is obtained, wherein the multiple fifth users have different job levels, and the review result includes a review pass result and a review fail result.

[0012] In a second aspect, the present disclosure provides a project management device, including a first display module, a second display module, a determination module, and the third display module; The first display module is used to display the homepage of the project management system, wherein the homepage displays a project declaration module, and the project declaration module is used for users to declare projects; The second display module is used to respond to the project declaration operation of the project declaration module and display a target declaration page corresponding to the project declaration operation, wherein the target declaration page is used for users to declare different types of projects; The management module is used to determine the target project information of the project to be reported corresponding to the input operation in response to the input operation on the target reporting page, and send the target project information to the terminal device of the project reviewer in response to the submission operation of the target project information, so that the project reviewer can review the project to be reported; The third display module is used to display the review result of the project to be reported after receiving the review result of the project reviewer on the project to be reported from the terminal device.

[0013] Optionally, the management module is used to: In response to an input operation in the first declaration unit or the second declaration unit on the target declaration page, target project information of the project to be declared corresponding to the input operation is determined, wherein the target project information includes intellectual property achievement information, project content release information, content completeness and project completion degree; the first declaration unit is used for users to declare scientific and technological innovation projects, and the second declaration unit is used for users to declare quality management projects.

[0014] Optionally, the audit result is obtained in the following manner: Determine the status information of the intellectual property achievements in the project to be declared based on the intellectual property achievement information, and determine the intellectual property score of the project to be declared based on the status information, wherein different types of intellectual property achievements have different corresponding intellectual property scores under the same status information; Determine the duration and form of publishing the project content in the project to be reported based on the project content release information, and determine the project content release score of the project to be reported based on the duration and the release form; Determine the progress of the project content completion of the project to be reported based on the content completeness, and determine the content completeness score of the project to be reported based on the project content completion progress and preset scoring rules; In response to scoring operations of multiple first users on the project completion in the project management system, determining an average score corresponding to the scoring operations of the multiple first users as the project completion score of the project to be reported, wherein the multiple first users are not involved in the project to be reported; In response to scoring operations of multiple second users on the intellectual property achievement information, the project content release information, the content completeness, and the project completion in the project management system, a weighted average of the scores corresponding to the scoring operations of the multiple second users is determined as the additional score of the project to be reported, wherein the multiple second users have different job levels; The intellectual property score, the project content release score, the content completeness score, the project completion score and the additional score are added together to obtain the audit result.

[0015] Optionally, the management module is used to: In response to an input operation of a third reporting unit on the target reporting page, determining target project information of a project to be reported corresponding to the input operation, wherein the target project information includes the amount of energy saving of the enterprise and the amount of electricity consumption of the enterprise, and the third reporting unit is used for users to report energy saving projects; Accordingly, the audit results are obtained in the following manner: The audit result is determined based on the enterprise's energy saving amount, the enterprise's electricity consumption and a preset energy saving threshold.

[0016] Optionally, the management module is used to: In response to an input operation in the fourth reporting unit on the target reporting page, determining target project information of the project to be reported corresponding to the input operation, wherein the target project information includes the journal in which the paper is published, the year in which the paper is published, and the content of the paper, and the fourth reporting unit is used for users to report papers; Accordingly, the audit results are obtained in the following manner: According to the publication years of the papers, determine the target papers published within the preset period in the project to be applied, and determine the paper publication score according to the corresponding journals of the target papers; In response to scoring operations of multiple third users on the paper content in the project management system, an average score corresponding to the scoring operations of the multiple third users is determined as the paper content score of the project to be applied for, wherein the multiple third users are technicians in the technical field to which the project to be applied belongs; The paper publication score and the paper content score are added together to obtain the review result.

[0017] Optionally, the management module is used to: In response to an input operation of the fifth declaration unit on the target declaration page, determining target project information of the project to be declared corresponding to the input operation, wherein the target project information includes patent information, software copyright information and trademark information, and the fifth declaration unit is used for users to declare intellectual property information; Accordingly, the audit results are obtained in the following manner: In response to the fourth user's review operation on the project to be reported in the project management system, the review result corresponding to the review operation is obtained, wherein the fourth user is the management personnel who reviews the project to be reported, and the review result includes a review pass result and a review fail result.

[0018] Optionally, the management module is used to: In response to an input operation in the sixth declaration unit on the target declaration page, determining target project information of the project to be declared corresponding to the input operation, wherein the target project information includes organizational science and technology project information and organizational intellectual property information, and the sixth declaration unit is used for users to declare organizational honor information; Accordingly, the audit results are obtained in the following manner: Determine the type of the project to be applied for based on the information of the organized science and technology project, and determine the score of the organized science and technology project for the project to be applied for based on the reward information corresponding to the science and technology project type; Determine the type of intellectual property achievements of the project to be reported based on the organizational intellectual property information, and determine the organizational intellectual property score of the project to be reported based on the type of intellectual property achievements; Add the organization's science and technology project score and the organization's intellectual property score to obtain the audit result.

[0019] Optionally, the management module is used to: In response to an input operation of the seventh reporting unit on the target reporting page, determining target project information of the project to be reported corresponding to the input operation, wherein the target project information includes enterprise development suggestions and enterprise employee life suggestions, and the seventh reporting unit is used for users to report enterprise suggestion information; Accordingly, the audit results are obtained in the following manner: In response to the review operation of the target project information by multiple fifth users in the project management system, the review result corresponding to the review operation is obtained, wherein the multiple fifth users have different job levels, and the review result includes a review pass result and a review fail result.

[0020] In a third aspect, the present disclosure provides a non-temporary computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements the steps of any one of the methods provided in the first aspect of the present disclosure.

[0021] In a fourth aspect, the present disclosure provides an electronic device, including: a memory having a computer program stored thereon; A processor is used to execute the computer program in the memory to implement the steps of any one of the methods provided in the first aspect of the present disclosure.

[0022] In a fifth aspect, the present disclosure provides a computer program product, including a computer program, which, when executed by a processor, implements the steps of any one of the methods provided in the first aspect of the present disclosure.

[0023] Through the above technical solution, in the project management system, in response to the triggering operation of the project declaration module in the homepage of the project management system, the target project declaration page is displayed, and in response to the input operation in the target declaration page, the target project information of the project to be declared is determined. Afterwards, in response to the submission operation of the target project information, the target project information can be sent to the terminal device of the project auditor so that the project auditor can audit the declared project. Afterwards, after receiving the audit result of the declared project by the project auditor from the terminal device, the audit result is displayed. By using an online method to declare and audit the declared project in the project management system and displaying the corresponding audit results, compared with the management of the project by relevant personnel in the related technology, the efficiency of project management can be improved, and the management cost of the project can be reduced.

[0024] Other features and advantages of the present disclosure will be described in detail in the following detailed description. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] The accompanying drawings are used to provide a further understanding of the present disclosure and constitute a part of the specification. Together with the following specific embodiments, they are used to explain the present disclosure but do not constitute a limitation of the present disclosure. In the accompanying drawings: Figure 1 It is a schematic diagram showing a project management method according to an exemplary embodiment of the present disclosure.

[0026] Figure 2 It is a schematic diagram showing a project management device according to an exemplary embodiment of the present disclosure.

[0027] Figure 3 It is a block diagram of an electronic device according to an exemplary embodiment. DETAILED DESCRIPTION

[0028] The specific implementation of the present disclosure is described in detail below in conjunction with the accompanying drawings. It should be understood that the specific implementation described herein is only used to illustrate and explain the present disclosure, and is not used to limit the present disclosure.

[0029] It should be noted that all actions of acquiring signals, information or data in the present disclosure are carried out in compliance with the relevant data protection laws and policies of the country where the device is located and with the authorization given by the owner of the corresponding device.

[0030] The inventors have found that when an enterprise's projects are managed offline by relevant personnel, when the amount of project data is large, the management complexity increases, and it may lead to high management costs and reduced management efficiency.

[0031] In view of this, the present disclosure provides a project management method, device, medium, electronic device and program product to solve the technical problems existing in the above-mentioned related technologies.

[0032] like Figure 1 As shown, Figure 1 is a schematic diagram showing a project management method according to an exemplary embodiment of the present disclosure, with reference to Figure 1 ,include: S101: Displaying a homepage of a project management system, wherein the homepage displays a project declaration module, and the project declaration module is used for users to declare projects; S102: In response to a project declaration operation on the project declaration module, a target declaration page corresponding to the project declaration operation is displayed, wherein the target declaration page is used for users to declare different types of projects; S103: In response to an input operation on the target application page, determining target project information of the project to be applied corresponding to the input operation, and in response to a submission operation of the target project information, sending the target project information to a terminal device of a project reviewer so that the project reviewer can review the project to be applied; S104: After receiving the audit result of the project to be reported by the project auditor from the terminal device, display the audit result.

[0033] Through the above technical solution, in the project management system, in response to the triggering operation of the project declaration module in the homepage of the project management system, the target project declaration page is displayed, and in response to the input operation in the target declaration page, the target project information of the project to be declared is determined, and then in response to the submission operation of the target project information, the target project information can be sent to the terminal device of the project auditor so that the project auditor can audit the declared project. Afterwards, after receiving the audit result of the declared project by the project auditor from the terminal device, the audit result is displayed. By using an online method to declare and audit the declared project in the project management system and displaying the corresponding audit result, compared with the management of the project by relevant personnel in the related art, the efficiency of project management can be improved, and the management cost of the project can be reduced.

[0034] In order to enable those skilled in the art to better understand the project management method provided by the present disclosure, the above steps are described in detail with examples below.

[0035] For example, the project management system can be used to apply for projects and review the project information of the corresponding projects. The project application module can be used for users to apply for projects. Among them, the project can be a scientific and technological innovation project, intellectual property data, and project information related to the organization, which is not specifically limited in the embodiments of the present disclosure.

[0036] On the homepage of the project management system, a project application module can be displayed so that when the user needs to apply for a project, he can click on the project application module to determine the target project information of the project to be applied for. Among them, the project application module can be used to apply for scientific and technological innovation projects, intellectual property data, quality management projects, energy-saving projects and papers, and this embodiment of the present disclosure does not make specific limitations on this. The project to be applied for can be a project in the project selection pool, wherein the project selection pool can include multiple projects that have been accepted.

[0037] For example, the project declaration operation can be a click operation on the project declaration module, or it can be a sliding operation on the project declaration module, and the embodiments of the present disclosure do not specifically limit this. The target declaration page can be used to fill in the target project information of the project to be declared. After responding to the project declaration operation on the project declaration module, the target declaration page corresponding to the project declaration operation can be displayed on the page of the project management system. And the target declaration page can be used to declare projects with corresponding declaration functions of the project management module. For example, when the project management module declares a scientific and technological innovation project, the target declaration page can be used to declare projects that need to be filled in related to the scientific and technological innovation project. When the project management module declares a quality management project, the target declaration page can be used to declare quality management projects that need to be filled in related to the quality management project.

[0038] By using the project application module to apply for different projects, unified online management of projects can be achieved, thereby improving project management efficiency.

[0039] For example, the input operation can be for the user to input relevant information on the corresponding page. When responding to the input operation in the area corresponding to the target declaration page, the target project information of the project to be declared corresponding to the input operation can be determined. After that, the target project information can be submitted, and the project management system can send the target project information to the terminal device corresponding to the project reviewer so that the reviewer can review the project to be declared. Among them, the terminal device can be a mobile phone, a computer, and a tablet, and this embodiment of the present disclosure does not make specific limitations on this.

[0040] In a possible manner, in response to an input operation on the target declaration page, determining target project information of the project to be declared corresponding to the input operation includes: In response to an input operation in the first declaration unit or the second declaration unit on the target declaration page, target project information of the project to be declared corresponding to the input operation is determined, wherein the target project information includes intellectual property achievement information, project content release information, content completeness and project completion degree; the first declaration unit is used for users to declare scientific and technological innovation projects, and the second declaration unit is used for users to declare quality management projects.

[0041] It should be understood that scientific and technological innovation projects may include technological innovation projects, management innovation projects, and information technology innovation projects, and the embodiments of the present disclosure do not specifically limit this. Quality management projects may be used to identify and eliminate defects in products or services, thereby improving the consistency and efficiency of product quality or service interaction. Among them, quality management projects may belong to scientific and technological innovation projects.

[0042] The target declaration page may include multiple declaration units, and the types of declared projects for each declaration unit are different. The information that needs to be input corresponding to the first declaration unit and the second declaration unit may include intellectual property achievement information, project content release information, content completeness, and project completion, and the embodiments of the present disclosure do not specifically limit this. When a user performs an input operation on the first declaration unit or the second declaration unit in the target declaration page, the intellectual property achievement information, project content release information, content completeness, and project completion of the project to be declared corresponding to the input operation can be determined.

[0043] In a possible manner, the audit result is obtained by: Determine the status information of the intellectual property achievements in the project to be declared based on the intellectual property achievement information, and determine the intellectual property score of the project to be declared based on the status information, wherein different types of intellectual property achievements have different corresponding intellectual property scores under the same status information; Determine the duration and form of publishing the project content in the project to be reported based on the project content release information, and determine the project content release score of the project to be reported based on the duration and the release form; Determine the progress of the project content completion of the project to be reported based on the content completeness, and determine the content completeness score of the project to be reported based on the project content completion progress and preset scoring rules; In response to scoring operations of multiple first users on the project completion in the project management system, determining an average score corresponding to the scoring operations of the multiple first users as the project completion score of the project to be reported, wherein the multiple first users are not involved in the project to be reported; In response to scoring operations of multiple second users on the intellectual property achievement information, the project content release information, the content completeness, and the project completion in the project management system, a weighted average of the scores corresponding to the scoring operations of the multiple second users is determined as the additional score of the project to be reported, wherein the multiple second users have different job levels; The intellectual property score, the project content release score, the content completeness score, the project completion score and the additional score are added together to obtain the audit result.

[0044] It should be understood that when the target project information of the project to be reported input by the first reporting unit or the second reporting unit is input into the terminal device of the reviewer, it can be scored according to different types of target project information, and the scored values ​​can be added together to obtain the score of the project to be reported.

[0045] Intellectual property achievement information may include information such as patents and papers of the project to be applied for. When scoring based on the intellectual property achievement information, the score corresponding to each intellectual property of the project to be applied for can be determined based on the status information of the intellectual property achievements, and multiple scores can be added together to obtain the intellectual property score. For example, in the intellectual property achievement information, 5 points can be scored for accepted invention patents, 10 points for authorized invention patents, 5 points for authorized utility model patents, 5 points for authorized software copyrights, and 3 points for published papers. When the intellectual property achievement information includes multiple patents or multiple papers, each patent or each paper can be scored separately, and the sum of all patent scores and the sum of all paper scores can be added together to obtain the intellectual property score.

[0046] Project content release information can be information in which the project leader explains the project content in detail. When scoring the project content release information, the score can be given according to the release format and duration of the project content release information. For example, when the project content release information corresponds to a video and the duration of the video reaches a preset duration, the project content release information can be scored 5 points. The preset duration can be a fixed value or a range of numbers.

[0047] The content completeness can be the completeness of the overall content of the project when the project is accepted. And the content completion score of the project to be reported can be determined based on the project content completeness and the preset scoring rules. Among them, the preset scoring rules can be the corresponding rules between the completeness of the overall content of different projects and the points.

[0048] The project completion degree can be the degree of completion of the project when the project is accepted. The project completion degree can be scored by multiple first users, and the average score corresponding to the scoring operations of the multiple first users is determined as the project completion score of the project to be reported. And multiple first users are not involved in the project to be reported. For example, when scoring the project completion degree, the project management system can automatically block the personnel who participated in the project to be reported, thereby enabling multiple first users who did not participate in the project to be reported to score the project completion degree.

[0049] When multiple second users score the intellectual property achievement information, project content release information, content completeness and project completion in the project management system, the interval range of their scores is [0,100]. At the same time, the weighted average is calculated according to the weight corresponding to the second user. For example, when the second user is the general manager of the enterprise, the weight of the corresponding score can be set to 15%, and when the second user is the deputy general manager of the enterprise, the weight of the corresponding score can be set to 10%. This is not specifically limited in the embodiment of the present disclosure. Among them, the subsidiary score can be calculated by the following expression.

[0050]

[0051] Wherein, D is the subsidiary score, A is the rating value of the first user, t is the weight of the rating value of the first user, and n is the number of first users.

[0052] Then, the intellectual property score, project content release score, content integrity score, project completion score and the additional score can be added together to obtain the audit result. The audit result can be calculated by the following expression.

[0053]

[0054] Among them, B is the audit result, E is the intellectual property score, F is the project content release score, G is the content completeness score, and C is the project completion score.

[0055] When the first application unit applies for multiple scientific and technological innovation projects, the audit results corresponding to each scientific and technological innovation project can be compared, and then the personnel corresponding to the corresponding scientific and technological innovation project can be motivated according to the comparison results. When the second application unit applies for multiple quality management projects, the audit results corresponding to each quality management project can be compared, so as to motivate the personnel corresponding to the corresponding quality management project according to the comparison results.

[0056] In a possible manner, in response to an input operation on the target declaration page, determining target project information of the project to be declared corresponding to the input operation includes: In response to an input operation of a third reporting unit on the target reporting page, determining target project information of a project to be reported corresponding to the input operation, wherein the target project information includes the amount of energy saving of the enterprise and the amount of electricity consumption of the enterprise, and the third reporting unit is used for users to report energy saving projects; Accordingly, the audit results are obtained in the following manner: The audit result is determined based on the enterprise's energy saving amount, the enterprise's electricity consumption and a preset energy saving threshold.

[0057] It should be understood that energy-saving projects can be used to reduce energy consumption and improve energy efficiency. When the user performs an input operation on the third reporting unit in the target reporting page, the enterprise energy saving and enterprise electricity consumption of the project to be reported corresponding to the input operation can be determined. Accordingly, the audit result is determined based on the enterprise energy saving and enterprise electricity consumption and the preset energy saving threshold. Among them, the audit result can be different levels of energy saving rankings.

[0058] The preset energy-saving threshold may include: when the enterprise's energy saving amount is within the first energy-saving threshold range, and the enterprise's electricity consumption is within the first electricity consumption threshold range, the audit result may be a first-level energy-saving ranking. When the enterprise's energy saving amount is within the second energy-saving threshold range, and the enterprise's electricity consumption is within the second electricity consumption threshold range, the audit result may be a second-level energy-saving ranking. When the enterprise's energy saving amount is within the third energy-saving threshold range, and the enterprise's electricity consumption is within the third electricity consumption threshold range, the audit result may be a third-level energy-saving ranking. Among them, the minimum value of the first energy-saving threshold range is greater than the maximum value of the second energy-saving threshold range, and the minimum value of the second energy-saving threshold range is greater than the maximum value of the third energy-saving range. The minimum value of the first electricity consumption threshold range is greater than the maximum value of the second electricity consumption threshold range, and the minimum value of the second electricity consumption threshold range is greater than the maximum value of the third electricity consumption threshold range.

[0059] In a possible manner, in response to an input operation on the target declaration page, determining target project information of the project to be declared corresponding to the input operation includes: In response to an input operation in the fourth reporting unit on the target reporting page, determining target project information of the project to be reported corresponding to the input operation, wherein the target project information includes the journal in which the paper is published, the year in which the paper is published, and the content of the paper, and the fourth reporting unit is used for users to report papers; Accordingly, the audit results are obtained in the following manner: According to the publication years of the papers, determine the target papers published within the preset period in the project to be applied, and determine the paper publication score according to the corresponding journals of the target papers; In response to scoring operations of multiple third users on the paper content in the project management system, an average score corresponding to the scoring operations of the multiple third users is determined as the paper content score of the project to be applied for, wherein the multiple third users are technicians in the technical field to which the project to be applied belongs; The paper publication score and the paper content score are added together to obtain the review result.

[0060] It should be understood that when the user performs input operations on the fourth application unit in the target application page, the journal in which the paper is published, the year in which the paper is published, and the content of the paper corresponding to the input operation can be determined.

[0061] Accordingly, when the reviewers review the projects to be applied for, the target papers published within the preset period can be determined according to the years in which the papers were published. Among them, the preset period can be the period of the last two years, and the embodiments of the present disclosure do not make specific limitations on this. Then, the paper publication score is determined according to the journal in which the target paper is published. For example, when the journal in which the target paper is published is an ordinary journal, the paper publication score can be 10 points, when the journal in which the target paper is published is any one of HowNet, VIP and Wanfang, the paper publication score can be 20 points, and when the journal in which the target paper is published is a core journal, the paper publication score can be 80 points, and the embodiments of the present disclosure do not make specific limitations on this.

[0062] After that, the paper content can be scored by multiple third users, and the average score corresponding to the scoring operation can be determined as the paper content value. Finally, the paper content and the paper publication score can be added to obtain the review result. When the fourth application unit submits multiple papers, the review results corresponding to the multiple papers can be compared, and the papers can be ranked according to the comparison results, and the paper-related personnel with the corresponding rankings can be rewarded.

[0063] In a possible manner, in response to an input operation on the target declaration page, determining target project information of the project to be declared corresponding to the input operation includes: In response to an input operation of the fifth declaration unit on the target declaration page, determining target project information of the project to be declared corresponding to the input operation, wherein the target project information includes patent information, software copyright information and trademark information, and the fifth declaration unit is used for users to declare intellectual property information; Accordingly, the audit results are obtained in the following manner: In response to the fourth user's review operation on the project to be reported in the project management system, the review result corresponding to the review operation is obtained, wherein the fourth user is the management personnel who reviews the project to be reported, and the review result includes a review pass result and a review fail result.

[0064] It should be understood that when the user performs an input operation on the fifth declaration unit in the target declaration page, the patent information, software copyright information and trademark information of the project to be declared corresponding to the input operation can be determined. And the patent information, software copyright information and trademark information can all be the intellectual property achievement information in the project to be declared.

[0065] Accordingly, after receiving the patent information, software copyright information and trademark information, the reviewer can review the project to be applied for based on the patent information, software copyright information and trademark information, so that when the review result is passed, the reviewer can submit the corresponding project to be applied for externally.

[0066] In a possible manner, in response to an input operation on the target declaration page, determining target project information of the project to be declared corresponding to the input operation includes: In response to an input operation in the sixth declaration unit on the target declaration page, determining target project information of the project to be declared corresponding to the input operation, wherein the target project information includes organizational science and technology project information and organizational intellectual property information, and the sixth declaration unit is used for users to declare organizational honor information; Accordingly, the audit results are obtained in the following manner: Determine the type of the project to be applied for based on the information of the organized science and technology project, and determine the score of the organized science and technology project for the project to be applied for based on the reward information of the science and technology project type; Determine the type of intellectual property achievements of the project to be reported based on the organizational intellectual property information, and determine the organizational intellectual property score of the project to be reported based on the type of intellectual property achievements; Add the organization's science and technology project score and the organization's intellectual property score to obtain the audit result.

[0067] It should be understood that in a project management system, when an organization needs to be scored, the projects that the organization has participated in can be extracted, and the score of the corresponding organization can be determined based on the extracted projects. The organization can be an individual, a team, or a new expert in a corresponding position, which is not specifically limited in this embodiment.

[0068] When the organization's technology project information and organization's intellectual property information are input in the sixth declaration unit, the audit result of the corresponding organization can be determined based on the organization's technology project information and organization's intellectual property information. Among them, the intellectual property information may include invention patents, utility model patents, software copyrights, and papers, which are not specifically limited in the embodiments of the present disclosure. And the organization's technology project information may be the technology projects led by the organization in a preset year.

[0069] When determining the organizational science and technology project score based on the organizational science and technology project information, it can be determined based on the reward information corresponding to the science and technology project type of the project to be applied for. For example, when the science and technology project type is a science and technology innovation project, and the science and technology innovation project wins the third prize at the enterprise level, the organizational science and technology project score can be counted as 10 points, when the science and technology innovation project wins the second prize, the organizational science and technology project score can be counted as 20 points, and when the science and technology innovation project wins the first prize, the organizational science and technology project score can be counted as 30 points. Among them, different science and technology project types can correspond to different reward information, and the organizational science and technology project scores accumulated by different reward information can be the same, different, or partially the same.

[0070] When determining the organization's intellectual property score based on the organization's intellectual property information, the type of intellectual property achievements in the organization's intellectual property information can be determined. And the intellectual property score is determined based on the type of the intellectual property achievement. For example, when the type of intellectual property achievement is an authorized invention patent, the intellectual property score can be 20 points, when the type of intellectual property achievement is an authorized utility model patent, the intellectual property score can be 10 points, when the type of intellectual property achievement is an authorized software copyright, the intellectual property score can be 10 points, and when the type of intellectual property achievement is a published professional paper, the intellectual property score can be 3 points. After that, the organization's science and technology project score can be added to the organization's intellectual property score to obtain the audit result. The corresponding points for different organizations may be different.

[0071] When the organization is a team and the project management system includes multiple teams, the audit results corresponding to each team can be calculated, and the multiple audit results can be compared and ranked, and then the top-ranked teams can be rewarded.

[0072] When the organization is an individual, when calculating the audit results, the audit results may include the organization's science and technology project score, the organization's intellectual property score, and the organization's additional score. Among them, the organization's additional score can be the score of the individual's participation in the corresponding project. For example, when an individual leads a subsidiary-level science and technology project, the organization's additional score can be 10 points, when an individual participates in a subsidiary's science and technology project, the organization's additional score can be 5 points, when an individual presides over the group's science and technology project, the organization's additional score can be 20 points, and when an individual participates in a group-level science and technology project, it can be 10 points. When the project management system includes multiple individuals, the audit results corresponding to each individual can be calculated, and ranked according to multiple audit results, and the top-ranked individuals can be rewarded.

[0073] In a possible manner, in response to an input operation on the target declaration page, determining target project information of the project to be declared corresponding to the input operation includes: In response to an input operation of the seventh reporting unit on the target reporting page, determining target project information of the project to be reported corresponding to the input operation, wherein the target project information includes enterprise development suggestions and enterprise employee life suggestions, and the seventh reporting unit is used for users to report enterprise suggestion information; Accordingly, the audit results are obtained in the following manner: In response to the review operation of the target project information by multiple fifth users in the project management system, the review result corresponding to the review operation is obtained, wherein the multiple fifth users have different job levels, and the review result includes a review pass result and a review fail result.

[0074] It should be understood that in the project management system, enterprise development suggestions and enterprise employee life suggestions can also be entered in the seventh application unit of the target application page. And the enterprise development suggestions and enterprise employee life suggestions can be reviewed by multiple fifth users of different job levels. When the enterprise development suggestions and enterprise employee life suggestions are adopted, the corresponding review result is a review pass result, and when the enterprise development suggestions and enterprise employee life suggestions are not adopted, the corresponding review result is a review fail result.

[0075] For example, when the project reviewer completes the review of the project to be reported on the terminal device, the target application page in the project management system can receive the corresponding review results and display them in the review result display column area corresponding to the project to be reported. The project management system also includes a display area, which can be used to display the project to be reported, the review results corresponding to the project to be reported, and the ranking and reward of the project to be reported after comparing multiple review results.

[0076] When the project auditors are auditing the projects to be submitted on the terminal equipment, they can score the corresponding auditors in the project management system, and determine the rewards for the corresponding auditors based on the score. The scoring system can be expressed by the following calculation formula.

[0077]

[0078] Among them, P is the reviewer's score, x is the first score rewarded to the reviewer, For scientific and technological projects that have not been evaluated within the deadline, The total number of science and technology projects in the project selection pool, is the number of days overdue, For scientific and technological projects that were not selected.

[0079] In the project management system, there is also an innovation forum area, which can be used to notify the corresponding enterprises of the development direction of scientific and technological innovation in this year, the midpoint support of the enterprise for projects consistent with the development direction of the whole enterprise, and other important notification matters. In response to input operations in the innovation forum area, various rankings, various exchanges, various case collections, teaching materials, and training courses can be published in the forum.

[0080] By using an online method to apply and review the application projects in the project management system and display the corresponding review results, the efficiency of project management can be improved and the management cost of the project can be reduced compared to the management of projects by relevant personnel in related technologies. In this project management method, a complete set of scientific and technological management and incentive mechanisms can be established to stimulate the innovative vitality of talents and enhance the technological innovation capabilities of enterprises. At the same time, the free and open nature of scientific and technological innovation can be maintained, and relevant personnel are encouraged to spontaneously apply for scientific and technological projects. In this way, the timeliness of incentives can be improved, and the leading role of managers in the scientific and technological management system can be reduced, reducing management costs.

[0081] Based on the same concept, this embodiment also discloses a project management device, referring to Figure 2 , Figure 2 is a schematic diagram showing a project management device according to an exemplary embodiment of the present disclosure, such as Figure 2 As shown, it includes a first display module, a second display module, a determination module and the third display module; The first display module is used to display the homepage of the project management system, wherein the homepage displays a project declaration module, and the project declaration module is used for users to declare projects; The second display module is used to respond to the triggering operation of the project declaration module and display a target declaration page corresponding to the project declaration operation, wherein the target declaration page is used for users to declare different types of projects; The management module is used to determine the target project information of the project to be reported corresponding to the input operation in response to the input operation on the target reporting page, and send the target project information to the terminal device of the project reviewer in response to the submission operation of the target project information, so that the project reviewer can review the project to be reported; The third display module is used to display the review result of the project to be reported after receiving the review result of the project reviewer on the project to be reported from the terminal device.

[0082] Optionally, the management module is used to: In response to an input operation in the first declaration unit or the second declaration unit on the target declaration page, target project information of the project to be declared corresponding to the input operation is determined, wherein the target project information includes intellectual property achievement information, project content release information, content completeness and project completion degree; the first declaration unit is used for users to declare scientific and technological innovation projects, and the second declaration unit is used for users to declare quality management projects.

[0083] Optionally, the audit result is obtained in the following manner: Determine the status information of the intellectual property achievements in the project to be declared based on the intellectual property achievement information, and determine the intellectual property score of the project to be declared based on the status information, wherein different types of intellectual property achievements have different corresponding intellectual property scores under the same status information; Determine the duration and form of publishing the project content in the project to be reported based on the project content release information, and determine the project content release score of the project to be reported based on the duration and the release form; Determine the progress of the project content completion of the project to be reported based on the content completeness, and determine the content completeness score of the project to be reported based on the project content completion progress and preset scoring rules; In response to scoring operations of multiple first users on the project completion in the project management system, determining an average score corresponding to the scoring operations of the multiple first users as the project completion score of the project to be reported, wherein the multiple first users are not involved in the project to be reported; In response to scoring operations of multiple second users on the intellectual property achievement information, the project content release information, the content completeness, and the project completion in the project management system, a weighted average of the scores corresponding to the scoring operations of the multiple second users is determined as the additional score of the project to be reported, wherein the multiple second users have different job levels; The intellectual property score, the project content release score, the content completeness score, the project completion score and the additional score are added together to obtain the audit result.

[0084] Optionally, the management module is used to: In response to an input operation of a third reporting unit on the target reporting page, determining target project information of a project to be reported corresponding to the input operation, wherein the target project information includes the amount of energy saving of the enterprise and the amount of electricity consumption of the enterprise, and the third reporting unit is used for users to report energy saving projects; Accordingly, the audit results are obtained in the following manner: The audit result is determined based on the enterprise's energy saving amount, the enterprise's electricity consumption and a preset energy saving threshold.

[0085] Optionally, the management module is used to: In response to an input operation in the fourth reporting unit on the target reporting page, determining target project information of the project to be reported corresponding to the input operation, wherein the target project information includes the journal in which the paper is published, the year in which the paper is published, and the content of the paper, and the fourth reporting unit is used for users to report papers; Accordingly, the audit results are obtained in the following manner: According to the publication years of the papers, determine the target papers published within the preset period in the project to be applied, and determine the paper publication score according to the corresponding journals of the target papers; In response to scoring operations of multiple third users on the paper content in the project management system, an average score corresponding to the scoring operations of the multiple third users is determined as the paper content score of the project to be applied for, wherein the multiple third users are technicians in the technical field to which the project to be applied belongs; The paper publication score and the paper content score are added together to obtain the review result.

[0086] Optionally, the management module is used to: In response to an input operation of the fifth declaration unit on the target declaration page, determining target project information of the project to be declared corresponding to the input operation, wherein the target project information includes patent information, software copyright information and trademark information, and the fifth declaration unit is used for users to declare intellectual property information; Accordingly, the audit results are obtained in the following manner: In response to the fourth user's review operation on the project to be reported in the project management system, the review result corresponding to the review operation is obtained, wherein the fourth user is the management personnel who reviews the project to be reported, and the review result includes a review pass result and a review fail result.

[0087] Optionally, the management module is used to: In response to an input operation in the sixth declaration unit on the target declaration page, determining target project information of the project to be declared corresponding to the input operation, wherein the target project information includes organizational science and technology project information and organizational intellectual property information, and the sixth declaration unit is used for users to declare organizational honor information; Accordingly, the audit results are obtained in the following manner: Determine the type of the project to be applied for based on the information of the organized science and technology project, and determine the score of the organized science and technology project for the project to be applied for based on the reward information corresponding to the science and technology project type; Determine the type of intellectual property achievements of the project to be reported based on the organizational intellectual property information, and determine the organizational intellectual property score of the project to be reported based on the type of intellectual property achievements; Add the organization's science and technology project score and the organization's intellectual property score to obtain the audit result.

[0088] Optionally, the management module is used to: In response to an input operation of the seventh reporting unit on the target reporting page, determining target project information of the project to be reported corresponding to the input operation, wherein the target project information includes enterprise development suggestions and enterprise employee life suggestions, and the seventh reporting unit is used for users to report enterprise suggestion information; Accordingly, the audit results are obtained in the following manner: In response to the review operation of the target project information by multiple fifth users in the project management system, the review result corresponding to the review operation is obtained, wherein the multiple fifth users have different job levels, and the review result includes a review pass result and a review fail result.

[0089] Regarding the device in the above embodiment, the specific manner in which each module performs operations has been described in detail in the embodiment of the method, and will not be elaborated here.

[0090] Based on the same concept, the present embodiment also discloses a non-temporary computer-readable storage medium on which a computer program is stored. When the computer program is executed by a processor, the steps of the project management method disclosed in the present embodiment are implemented.

[0091] Based on the same concept, this embodiment also discloses an electronic device, including: a memory having a computer program stored thereon; A processor is used to execute the computer program in the memory to implement the steps of the project management method disclosed in this embodiment.

[0092] Figure 3 FIG. 1 is a block diagram of an electronic device 300 according to an exemplary embodiment. Figure 3 As shown, the electronic device 300 may include: a processor 301 , a memory 302 . The electronic device 300 may also include one or more of a multimedia component 303 , an input / output (I / O) interface 304 , and a communication component 305 .

[0093] The processor 301 is used to control the overall operation of the electronic device 300 to complete all or part of the steps in the above-mentioned project management method. The memory 302 is used to store various types of data to support the operation of the electronic device 300. For example, these data may include instructions for any application or method used to operate on the electronic device 300, and application-related data, such as contact data, messages sent and received, pictures, audio, video, etc. The memory 302 can be implemented by any type of volatile or non-volatile storage device or a combination thereof, such as static random access memory (Static Random Access Memory, referred to as SRAM), electrically erasable programmable read-only memory (Electrically Erasable Programmable Read-Only Memory, referred to as EEPROM), erasable programmable read-only memory (Erasable Programmable Read-Only Memory, referred to as EPROM), programmable read-only memory (Programmable Read-Only Memory, referred to as PROM), read-only memory (Read-Only Memory, referred to as ROM), magnetic memory, flash memory, magnetic disk or optical disk. The multimedia component 303 may include a screen and an audio component. The screen may be, for example, a touch screen, and the audio component is used to output and / or input audio signals. For example, the audio component may include a microphone for receiving external audio signals. The received audio signal may be further stored in the memory 302 or sent through the communication component 305. The audio component also includes at least one speaker for outputting audio signals. The I / O interface 304 provides an interface between the processor 301 and other interface modules, and the other interface modules may be keyboards, mice, buttons, etc. These buttons may be virtual buttons or physical buttons. The communication component 305 is used for wired or wireless communication between the electronic device 300 and other devices. Wireless communication, such as Wi-Fi, Bluetooth, Near Field Communication (NFC), 2G, 3G, 4G, NB-IOT, eMTC, or other 5G, etc., or a combination of one or more of them, is not limited here. Therefore, the corresponding communication component 305 may include: Wi-Fi module, Bluetooth module, NFC module, etc.

[0094] In an exemplary embodiment, the electronic device 300 can be implemented by one or more application specific integrated circuits (ASIC), digital signal processors (DSP), digital signal processing devices (DSPD), programmable logic devices (PLD), field programmable gate arrays (FPGA), controllers, microcontrollers, microprocessors or other electronic components to execute the above-mentioned project management method.

[0095] In another exemplary embodiment, a computer-readable storage medium including program instructions is also provided, and when the program instructions are executed by a processor, the steps of the above-mentioned project management method are implemented. For example, the computer-readable storage medium can be the above-mentioned memory 302 including program instructions, and the above-mentioned program instructions can be executed by the processor 301 of the electronic device 300 to complete the above-mentioned project management method.

[0096] The preferred embodiments of the present disclosure are described in detail above in conjunction with the accompanying drawings; however, the present disclosure is not limited to the specific details in the above embodiments. Within the technical concept of the present disclosure, a variety of simple modifications can be made to the technical solution of the present disclosure, and these simple modifications all fall within the protection scope of the present disclosure.

[0097] It should also be noted that the various specific technical features described in the above specific embodiments can be combined in any suitable manner without contradiction. In order to avoid unnecessary repetition, the present disclosure will not further describe various possible combinations.

[0098] In addition, various embodiments of the present disclosure may be arbitrarily combined, and as long as they do not violate the concept of the present disclosure, they should also be regarded as the contents disclosed by the present disclosure.

Claims

1. A project management method, characterized in that the method include: Displaying a homepage of the project management system, wherein the homepage displays a project declaration module, and the project declaration module is used for users to declare projects; In response to a project declaration operation on the project declaration module, a target declaration page corresponding to the project declaration operation is displayed, wherein the target declaration page is used for users to declare different types of projects; In response to an input operation on the target declaration page, determining target project information of the project to be declared corresponding to the input operation, and in response to a submission operation of the target project information, sending the target project information to a terminal device of a project reviewer so that the project reviewer can review the project to be declared; After receiving the audit result of the project to be reported by the project auditor from the terminal device, the audit result is displayed.

2. The project management method according to claim 1, characterized in that: The step of determining target project information of the project to be reported corresponding to the input operation in response to the input operation on the target reporting page includes: In response to an input operation in the first declaration unit or the second declaration unit on the target declaration page, target project information of the project to be declared corresponding to the input operation is determined, wherein the target project information includes intellectual property achievement information, project content release information, content completeness and project completion degree; the first declaration unit is used for users to declare scientific and technological innovation projects, and the second declaration unit is used for users to declare quality management projects.

3. The project management method according to claim 2, characterized in that: The audit results are obtained in the following ways: Determine the status information of the intellectual property achievements in the project to be declared based on the intellectual property achievement information, and determine the intellectual property score of the project to be declared based on the status information, wherein different types of intellectual property achievements have different corresponding intellectual property scores under the same status information; Determine the duration and form of publishing the project content in the project to be reported based on the project content release information, and determine the project content release score of the project to be reported based on the duration and the release form; Determine the progress of the project content completion of the project to be reported based on the content completeness, and determine the content completeness score of the project to be reported based on the project content completion progress and preset scoring rules; In response to scoring operations of multiple first users on the project completion in the project management system, determining an average score corresponding to the scoring operations of the multiple first users as the project completion score of the project to be reported, wherein the multiple first users are not involved in the project to be reported; In response to scoring operations of multiple second users on the intellectual property achievement information, the project content release information, the content completeness, and the project completion in the project management system, a weighted average of the scores corresponding to the scoring operations of the multiple second users is determined as the additional score of the project to be reported, wherein the multiple second users have different job levels; The intellectual property score, the project content release score, the content completeness score, the project completion score and the additional score are added together to obtain the audit result.

4. The project management method according to claim 1, characterized in that: The step of determining target project information of the project to be reported corresponding to the input operation in response to the input operation on the target reporting page includes: In response to an input operation of a third reporting unit on the target reporting page, determining target project information of a project to be reported corresponding to the input operation, wherein the target project information includes the amount of energy saving of the enterprise and the amount of electricity consumption of the enterprise, and the third reporting unit is used for users to report energy saving projects; Accordingly, the audit results are obtained in the following manner: The audit result is determined based on the enterprise's energy saving amount, the enterprise's electricity consumption and a preset energy saving threshold.

5. The project management method according to claim 1, characterized in that: The step of determining target project information of the project to be reported corresponding to the input operation in response to the input operation on the target reporting page includes: In response to an input operation in the fourth reporting unit on the target reporting page, determining target project information of the project to be reported corresponding to the input operation, wherein the target project information includes the journal in which the paper is published, the year in which the paper is published, and the content of the paper, and the fourth reporting unit is used for users to report papers; Accordingly, the audit results are obtained in the following manner: According to the publication years of the papers, determine the target papers published within the preset period in the project to be applied, and determine the paper publication score according to the corresponding journals of the target papers; In response to scoring operations of multiple third users on the paper content in the project management system, an average score corresponding to the scoring operations of the multiple third users is determined as the paper content score of the project to be applied for, wherein the multiple third users are technicians in the technical field to which the project to be applied belongs; The paper publication score and the paper content score are added together to obtain the review result.

6. The project management method according to claim 1, characterized in that: The step of determining target project information of the project to be reported corresponding to the input operation in response to the input operation on the target reporting page includes: In response to an input operation of the fifth declaration unit on the target declaration page, determining target project information of the project to be declared corresponding to the input operation, wherein the target project information includes patent information, software copyright information and trademark information, and the fifth declaration unit is used for users to declare intellectual property information; Accordingly, the audit results are obtained in the following manner: In response to the fourth user's review operation on the project to be reported in the project management system, the review result corresponding to the review operation is obtained, wherein the fourth user is the management personnel who reviews the project to be reported, and the review result includes a review pass result and a review fail result.

7. The project management method according to claim 1, characterized in that: The step of determining target project information of the project to be reported corresponding to the input operation in response to the input operation on the target reporting page includes: In response to an input operation in the sixth declaration unit on the target declaration page, determining target project information of the project to be declared corresponding to the input operation, wherein the target project information includes organizational science and technology project information and organizational intellectual property information, and the sixth declaration unit is used for users to declare organizational honor information; Accordingly, the audit results are obtained in the following manner: Determine the type of the project to be applied for based on the information of the organized science and technology project, and determine the score of the organized science and technology project for the project to be applied for based on the reward information corresponding to the science and technology project type; Determine the type of intellectual property achievements of the project to be reported based on the organizational intellectual property information, and determine the organizational intellectual property score of the project to be reported based on the type of intellectual property achievements; Add the organization's science and technology project score and the organization's intellectual property score to obtain the audit result.

8. The project management method according to claim 1, characterized in that: The step of determining target project information of the project to be reported corresponding to the input operation in response to the input operation on the target reporting page includes: In response to an input operation of the seventh reporting unit on the target reporting page, determining target project information of the project to be reported corresponding to the input operation, wherein the target project information includes enterprise development suggestions and enterprise employee life suggestions, and the seventh reporting unit is used for users to report enterprise suggestion information; Accordingly, the audit results are obtained in the following manner: In response to the review operation of the target project information by multiple fifth users in the project management system, the review result corresponding to the review operation is obtained, wherein the multiple fifth users have different job levels, and the review result includes a review pass result and a review fail result.

9. A project management device, characterized in that: It includes a first display module, a second display module, a determination module and the third display module; The first display module is used to display the homepage of the project management system, wherein the homepage displays a project declaration module, and the project declaration module is used for users to declare projects; The second display module is used to respond to the project declaration operation of the project declaration module and display a target declaration page corresponding to the project declaration operation, wherein the target declaration page is used for users to declare different types of projects; The management module is used to determine the target project information of the project to be reported corresponding to the input operation in response to the input operation on the target reporting page, and send the target project information to the terminal device of the project reviewer in response to the submission operation of the target project information, so that the project reviewer can review the project to be reported; The third display module is used to display the review result of the project to be reported after receiving the review result of the project reviewer on the project to be reported from the terminal device.

10. A non-transitory computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 8 are implemented.

11. An electronic device, characterized in that: include: a memory having a computer program stored thereon; A processor, configured to execute the computer program in the memory to implement the steps of the method according to any one of claims 1 to 8.

12. A computer program product, comprising a computer program, characterized in that When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 8 are implemented.