Construction management system and method, electronic equipment and storage medium
By extracting and reviewing the key parameters of the construction briefing information in the construction management system and generating a QR code for acceptance, the problem of inconsistent with the technical briefing information on the construction site is solved, the construction efficiency and safety management are improved, and management costs are reduced.
Patent Information
- Application Number
- CN202411141913.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-20
- Publication Date
- 2024-11-26
AI Technical Summary
In the prior art, it is difficult to implement the construction content in full accordance with the technical briefing data, and the information transmission efficiency is low, resulting in the construction site inconsistent with the technical briefing data, which increases the difficulty of safety management and management costs.
It provides a construction management system, including extraction modules, audit modules, generation modules and management acceptance modules, which are used to extract key parameters from the construction briefing materials, conduct reviews, and generate QR codes to facilitate acceptance and management of the construction site.
Through timely review and acceptance, the accuracy and efficiency of construction content are improved, the difficulty and management cost of safety management are reduced, and construction quality and safety awareness are enhanced.
Smart Images

Figure CN119027058A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of digital construction management, and in particular to a construction management system, method, electronic equipment and storage medium. Background Art
[0002] Technical briefing materials are an extremely important part of technical management work for construction companies. At present, due to the low efficiency of information transmission, it is difficult to implement the construction content in full accordance with the technical briefing materials. In addition, it is difficult to review the technical briefing materials and inspect the construction work surface. Safety management is difficult and it is easy to cause safety accidents. Summary of the invention
[0003] In order to solve the above technical problems, the embodiments of the present application provide a construction management system, method, electronic device and storage medium.
[0004] In a first aspect, an embodiment of the present application provides a construction management system, the system comprising: an extraction module, an audit module, a generation module, and a management and acceptance module;
[0005] The extraction module is used to extract multiple key parameters from the construction briefing materials;
[0006] The review module is used to review the construction briefing materials and the key parameters;
[0007] The generating module is used to generate a QR code according to the construction briefing materials and the key parameters when the construction briefing materials and the key parameters are reviewed and approved;
[0008] The management and acceptance module is used to inspect the construction work surface according to the construction briefing materials and the key parameters.
[0009] Furthermore, the extraction module is also used to divide each of the key parameters into necessary parameters and general parameters according to their importance;
[0010] The audit module is also used to determine the parameters to be audited from the required parameters and the general parameters, and to determine whether the parameters to be audited and the construction briefing materials are accurate. If the parameters to be audited and the construction briefing materials are accurate, the audit is passed.
[0011] Furthermore, the system also includes: a personnel management module and a learning module;
[0012] The personnel management module is used to input the information of each construction personnel and construction management personnel in the area to be constructed, and determine the first-level management authority, the second-level management authority and the third-level management authority;
[0013] The learning module is used to determine the target construction type according to the construction briefing materials to be constructed, determine multiple target construction types according to the information of each construction personnel, determine at least one corresponding target construction personnel information according to each target construction type, and display a learning interface according to the construction briefing materials to be constructed.
[0014] Furthermore, the system further comprises: a modification module and a division module;
[0015] The modification module is used to import the construction briefing materials to be prepared, modify the construction briefing materials online, and send the modified construction briefing materials to the extraction module;
[0016] The division module is used to divide the construction site for which the construction briefing material is to be prepared into a conventional construction plan site and an unconventional construction plan site according to the degree of danger.
[0017] Furthermore, the management acceptance module is also used to obtain an acceptance picture of the key parameter area in the construction work surface, determine a plurality of key parameters to be accepted based on the acceptance picture of the key parameter area, compare each of the key parameters to be accepted with each of the key parameters in the construction briefing materials to obtain a comparison result, and determine the acceptance result based on the comparison result.
[0018] Furthermore, the system also includes: a third-party supervision module;
[0019] The management acceptance module includes: an internal acceptance submodule and a joint acceptance submodule;
[0020] The internal acceptance submodule is used to accept the conventional construction plan site or the unconventional construction plan site through the first-level management authority to obtain a first acceptance result;
[0021] The joint acceptance submodule is used to conduct a second acceptance on-site of the unconventional construction plan through the second-level management authority to obtain a second acceptance result;
[0022] The third-party supervision module is used to accept the first acceptance result and the second acceptance result through the third-level management authority to obtain a third acceptance result.
[0023] Furthermore, the system further comprises: a display module;
[0024] The display module is used to display the QR code and basic construction information, wherein the basic construction information includes: the name of the construction briefing material to be constructed, the construction time, the number of construction personnel and the construction period.
[0025] In a second aspect, an embodiment of the present application provides a construction management method, the construction management method comprising:
[0026] Extract multiple key parameters from the construction briefing materials;
[0027] Review the construction briefing materials and key parameters;
[0028] When the construction briefing materials and the key parameters are reviewed and approved, a QR code is generated according to the construction briefing materials and the key parameters;
[0029] The construction work surface is inspected and accepted based on the construction briefing materials and the key parameters.
[0030] In a third aspect, an embodiment of the present application provides an electronic device, including a memory and a processor, wherein the memory is used to store a computer program, and when the computer program is run by the processor, the construction management method provided in the second aspect is executed.
[0031] In a fourth aspect, an embodiment of the present application provides a computer-readable storage medium storing a computer program, which executes the construction management method provided in the second aspect when running on a processor.
[0032] The construction management system, method, electronic device and storage medium provided by the present application include: an extraction module for extracting multiple key parameters from the construction briefing materials; an audit module for auditing the construction briefing materials and each of the key parameters; a generation module for generating a QR code based on the construction briefing materials and each of the key parameters when the construction briefing materials and each of the key parameters are audited; a management acceptance module for accepting the construction work surface based on the construction briefing materials and each of the key parameters. By timely auditing the construction briefing materials and key parameters, and timely accepting the construction work surface, the efficiency of receiving and covering the construction work surface is improved, the difficulty of safety management is reduced, and the management cost is reduced. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] In order to more clearly illustrate the technical solution of the present application, the following is a brief introduction to the drawings required for use in the embodiments. It should be understood that the following drawings only illustrate certain embodiments of the present application and should not be regarded as limiting the scope of protection of the present application. In each of the drawings, similar components are numbered similarly.
[0034] Figure 1 A schematic diagram of a module of a construction management system provided by an embodiment of the present application is shown;
[0035] Figure 2Another schematic diagram of a construction management system provided by an embodiment of the present application is shown;
[0036] Figure 3 A schematic diagram of a process of a construction management method provided by an embodiment of the present application is shown;
[0037] Figure 4 Another schematic diagram of the construction management method provided by the embodiment of the present application is shown;
[0038] Figure 5 A schematic diagram of the structure of an electronic device provided in an embodiment of the present application is shown.
[0039] Icons: 100-construction management system; 101-extraction module; 102-review module; 103-generation module; 104-management acceptance module; 105-modification module; 106-division module; 107-third-party supervision module; 108-display module; 109-learning module; 500-electronic device, 501-transceiver, 502-processor, 503-memory. DETAILED DESCRIPTION
[0040] The technical solutions in the embodiments of the present application will be described clearly and completely below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, rather than all of the embodiments.
[0041] The components of the embodiments of the present application generally described and shown in the drawings herein may be arranged and designed in various configurations. Therefore, the following detailed description of the embodiments of the present application provided in the drawings is not intended to limit the scope of the application claimed for protection, but merely represents the selected embodiments of the present application. Based on the embodiments of the present application, all other embodiments obtained by those skilled in the art without making creative work belong to the scope of protection of the present application.
[0042] Hereinafter, the terms "including", "having" and their cognates, which may be used in various embodiments of the present application, are intended only to indicate specific features, numbers, steps, operations, elements, components, or combinations of the foregoing items, and should not be understood as first excluding the existence of one or more other features, numbers, steps, operations, elements, components, or combinations of the foregoing items or adding the possibility of one or more features, numbers, steps, operations, elements, components, or combinations of the foregoing items.
[0043] Furthermore, the terms “first”, “second”, “third”, etc. are merely used for distinguishing descriptions and are not to be understood as indicating or implying relative importance.
[0044] Unless otherwise defined, all terms (including technical terms and scientific terms) used herein have the same meanings as those generally understood by those skilled in the art to which the various embodiments of the present application belong. The terms (such as those defined in generally used dictionaries) will be interpreted as having the same meanings as the contextual meanings in the relevant technical field and will not be interpreted as having idealized meanings or overly formal meanings unless clearly defined in the various embodiments of the present application.
[0045] As an extremely important technical management work content of construction enterprises, technical disclosure materials are the main basis and reference for construction, and are also the main items for engineering quality pre-control. Its purpose is to make the technicians and workers involved in the construction of construction projects familiar with the characteristics, design intentions, technical requirements, construction technology and issues that should be paid attention to. However, with the rapid development of urban construction, the standardization of construction, lightweight and on-site management have become increasingly prominent, making it particularly important to give technical disclosure materials and key construction processes to the front-line construction to guide construction. At present, due to the characteristics of low information transmission efficiency, delayed data update, poor disclosure dynamics, etc., it is difficult to implement the construction content completely in accordance with the technical disclosure materials, scientific organization of construction is difficult, and on-site management is difficult. There are often problems that the on-site construction is inconsistent with the technical disclosure materials. The "two skins" phenomenon between the construction plan and the actual on-site is particularly prominent. Not only is it difficult to monitor the on-site quality and progress, but more importantly, it is difficult to manage the safety of dangerous and super-dangerous projects. Safety accidents often occur due to insufficient disclosure and the incomplete coverage of the disclosure target population. In order to solve the above problems, this application proposes a construction management system.
[0046] Example 1
[0047] The present application embodiment provides a construction management system 100, see Figure 1 , the construction management system 100 includes:
[0048] The extraction module 101 is used to extract multiple key parameters from the construction briefing materials; the review module 102 is used to review the construction briefing materials and the key parameters; the generation module 103 is used to generate a QR code based on the construction briefing materials and the key parameters when the construction briefing materials and the key parameters are reviewed and approved; the management and acceptance module 104 is used to accept the construction work surface based on the construction briefing materials and the key parameters.
[0049] It should be noted that, in step 1, the key parameters of the construction briefing materials are extracted through the extraction module 101, and uploaded to the digital platform in real time. Step 2, the construction briefing materials and key parameters are generated by the generation module 103 at the same time. Step 3, a display module 108 is established on site in the construction area of the scheme, and the construction personnel obtain the key parameters of the construction content by scanning the QR code on the display module 108. Step 4, using the real-time and high transmission efficiency of the digital platform, the key parameters after adjustment can be viewed in real time after the construction briefing materials are modified through the modification module 105. Step 5, by pre-determining the required construction work types, the construction personnel determined according to the different types of construction work are given access to the learning interface of the construction briefing materials through the learning module 109. Step 6, if the construction is completed according to the construction briefing materials, the construction area operation pictures and key parameter area acceptance pictures are uploaded, and the construction project is closed after acceptance by the management acceptance module 104 and acceptance is passed. Step 7: All acceptance contents of all projects are reviewed and managed through the third-party supervision module 107. If the acceptance does not meet the compliance requirements, it will be processed immediately.
[0050] The above steps have improved the review efficiency and accuracy of the construction briefing materials, enabled real-time monitoring and early warning of construction risks, and accurately dispatched resources based on the construction briefing materials, thereby improving construction quality and reducing management costs.
[0051] Furthermore, if Figure 2 As shown, the extraction module 101 is also used to divide each of the key parameters into necessary parameters and general parameters according to their importance;
[0052] The audit module 102 is also used to determine the parameters to be audited from the required parameters and the general parameters, and to determine whether the parameters to be audited and the construction briefing materials to be reviewed are accurate. If the parameters to be audited and the construction briefing materials to be reviewed are accurate, the audit is passed.
[0053] It can be understood that the key parameters in the construction briefing materials are divided into necessary parameters and general parameters according to their importance through the extraction module 101; the necessary parameters are mandatory requirements and are the main control points for construction quality; the general parameters are the construction measures that generally affect the construction effect.
[0054] At the same time, the key parameters are divided into technical parameters, safety parameters and other parameters. When the construction management personnel review the key points, they can directly review the divided parameters according to the construction operation surface to see whether the key points extracted from the construction operation surface map are consistent with the corresponding key points in the construction briefing materials.
[0055] By conducting detailed audits on key points, the accuracy of construction audits has been improved, the audit process has become more targeted, and risk management capabilities have been further enhanced.
[0056] Furthermore, the system also includes: a personnel management module, which is used to input the information of each construction personnel and the construction management personnel in the area to be constructed, and determine the first-level management authority, the second-level management authority and the third-level management authority; a learning module 109, which is used to determine the target construction work type according to the construction briefing materials to be constructed, determine multiple target construction work types according to the information of each construction personnel, determine at least one corresponding target construction personnel information according to each target construction work type, and display the learning interface according to the construction briefing materials to be constructed.
[0057] In this embodiment, after determining the types of construction work required at the construction site, construction personnel are determined for the types of construction work, and access to the learning interface is enabled for all construction personnel. Construction management personnel can view the learning status of the construction briefing materials in real time through the platform. If the construction personnel do not have a learning completion record, they are not allowed to enter the construction site. By increasing the construction personnel's understanding of the construction briefing materials, the safety awareness of the construction personnel is improved, the construction efficiency is improved, and the standardization of the construction process is increased.
[0058] Furthermore, the system further comprises: a modification module 105, which is used to import the construction briefing materials to be prepared, modify the construction briefing materials online, and send the modified construction briefing materials to the extraction module 101;
[0059] The division module 106 is used to divide the construction site for which the construction briefing material is to be provided into a conventional construction plan site and an unconventional construction plan site according to the degree of danger.
[0060] It should be understood that by dividing the construction sites to be briefed according to the degree of danger, conventional construction plans can be inspected internally on site, while highly dangerous and super-dangerous plans require the company's participation in joint inspection. By inspecting construction sites with high danger levels multiple times and rationally allocating resources for personnel inspection, the safety awareness of construction personnel can be further improved.
[0061] Furthermore, the management acceptance module 104 is also used to obtain a key parameter area acceptance map in the construction work surface, determine a plurality of key parameters to be accepted based on the key parameter area acceptance map, compare each of the key parameters to be accepted with each of the key parameters in the construction briefing materials to obtain a comparison result, and determine the acceptance result based on the comparison result.
[0062] It should be noted that by obtaining the construction area work drawing and the key parameter area acceptance drawing in the construction work surface, the construction area work drawing is compared with the materials to be briefed on the construction to determine whether the construction area work is correct, and multiple key parameters to be accepted are extracted according to the key parameter area acceptance drawing, and the key parameters to be accepted are compared with the key parameters of the materials to be briefed on the construction. If they are consistent, the acceptance is qualified; if not, the acceptance is unqualified, and the unqualified items are output for corresponding rectification.
[0063] Furthermore, the system also includes: a third-party supervision module 107;
[0064] The management acceptance module 104 includes: an internal acceptance submodule and a joint acceptance submodule; the internal acceptance submodule is used to perform acceptance on the conventional construction plan site or the unconventional construction plan site through the first-level management authority to obtain a first acceptance result; the joint acceptance submodule is used to perform a second acceptance on the unconventional construction plan site through the second-level management authority to obtain a second acceptance result; the third-party supervision module 107 is used to perform acceptance on the first acceptance result and the second acceptance result through the third-level management authority to obtain a third acceptance result.
[0065] It should be noted that if Figure 3 As shown, the first-level management authority is the project management department's management authority over the internal acceptance sub-module, the second-level management authority is the project management department's management authority over the joint acceptance sub-module, and the third-level management authority is the company-level management personnel's management authority over the third-party supervision module 107.
[0066] It is further explained that the review to be completed by the third-party supervision module 107 includes review items such as approval, rejection, and approval after modification; the third-party supervision module 107 supervises and checks all projects entered into this system and the construction content that has been completed and accepted, and handles any non-compliance with the standards as soon as possible.
[0067] It should be understood that the joint acceptance sub-module needs to initiate a joint acceptance application form in advance. The content of the joint acceptance application form includes: acceptance time, parts to be accepted, key acceptance content, acceptance personnel and acceptance precautions, etc. By obtaining the joint acceptance application form, the company can further supervise the acceptance process, standardize the acceptance process, improve the acceptance quality and construction quality, and reduce possible safety accidents.
[0068] Furthermore, the system also includes: a display module 108, which is used to display the QR code and basic construction information, and the basic construction information includes: the name of the construction briefing material to be completed, the construction time, the number of construction personnel and the construction period.
[0069] It should be noted that by setting up the display module 108 in the construction area, the contents of the construction briefing materials can be easily absorbed by the construction personnel, thereby improving the construction efficiency and quality.
[0070] For example, a construction guide sign is set up, which contains basic construction information. At the same time, a QR code is pasted on the construction guide sign, and construction personnel can obtain the briefing information by scanning the QR code. Moreover, the briefing information QR code is a dynamic QR code. When the briefing information is changed, the content on the QR code is updated synchronously, which facilitates the site to receive the adjusted briefing information for construction more quickly, speeds up the circulation of information, and makes the briefing information for construction dynamically updated. Construction personnel can check the briefing information for construction at any time.
[0071] The construction management system 100 provided in this embodiment includes: an extraction module 101, which is used to extract multiple key parameters from the construction briefing materials to be constructed; an audit module 102, which is used to audit the construction briefing materials and each of the key parameters; a generation module 103, which is used to generate a QR code according to the construction briefing materials and each of the key parameters when the construction briefing materials and each of the key parameters are audited; a management acceptance module 104, which is used to accept the construction work surface according to the construction briefing materials and each of the key parameters. By timely auditing the construction briefing materials and key parameters, and timely accepting the construction work surface, the reception and coverage efficiency of the construction work surface is improved, the difficulty of safety management is reduced, and the management cost is reduced.
[0072] Example 2
[0073] The embodiment of the present application provides a construction management method, which is applied to the construction management system provided in Example 1.
[0074] See also Figure 4 , construction management methods include:
[0075] S401, extracting multiple key parameters from the construction briefing materials.
[0076] S402, reviewing the construction briefing materials and the key parameters.
[0077] S403, when the construction briefing materials and the key parameters are reviewed and approved, a QR code is generated according to the construction briefing materials and the key parameters.
[0078] S404: Inspect and accept the construction work surface according to the construction briefing materials and the key parameters.
[0079] The construction management method provided in this embodiment is applied to the construction management system provided in Embodiment 1, and multiple key parameters are extracted from the construction briefing materials to be constructed; the construction briefing materials and each key parameter are reviewed; when the construction briefing materials and each key parameter are reviewed and approved, a QR code is generated according to the construction briefing materials and each key parameter; the construction work surface is inspected and accepted according to the construction briefing materials and each key parameter. By timely reviewing the construction briefing materials and key parameters and timely inspecting the construction work surface, the reception and coverage efficiency of the construction work surface is improved, the difficulty of safety management is reduced, and the management cost is reduced.
[0080] Example 3
[0081] In addition, an embodiment of the present application provides an electronic device, including a memory and a processor, wherein the memory stores a computer program, and when the computer program runs on the processor, the construction management method provided in Example 2 is executed.
[0082] For details, see Figure 5 The electronic device 500 includes: a transceiver 501, a bus interface and a processor 502, wherein the processor 502 is used to: extract multiple key parameters from the construction briefing materials to be constructed; review the construction briefing materials and each of the key parameters; when the construction briefing materials and each of the key parameters are reviewed and approved, generate a QR code according to the construction briefing materials and each of the key parameters; and inspect the construction work surface according to the construction briefing materials and each of the key parameters.
[0083] In the embodiment of the present application, the electronic device 500 further includes: a memory 503. Figure 5 In the embodiment, the bus architecture may include any number of interconnected buses and bridges, specifically linking various circuits of one or more processors represented by processor 502 and memory represented by memory 503. The bus architecture may also link various other circuits such as peripherals, voltage regulators, and power management circuits, which are well known in the art and are therefore not further described herein. The bus interface provides an interface. The transceiver 501 may be a plurality of components, i.e., including a transmitter and a receiver, providing a unit for communicating with various other devices on a transmission medium. The processor 502 is responsible for managing the bus architecture and general processing, and the memory 503 may store data used by the processor 502 when performing operations.
[0084] The electronic device 500 provided in the embodiment of the present application can execute the steps of the construction management method provided in the above method embodiment 2, which will not be described again here to avoid repetition.
[0085] The electronic equipment provided in this embodiment improves the efficiency of acceptance of construction work surfaces and the efficiency of reviewing construction briefing materials, reduces the difficulty of safety management, and reduces management costs by timely reviewing construction briefing materials and key parameters and timely accepting construction work surfaces.
[0086] Example 4
[0087] The present application also provides a computer-readable storage medium, on which a computer program is stored. When the computer program is executed by a processor, the construction management method provided in Example 2 is implemented.
[0088] In this embodiment, the computer-readable storage medium may be a read-only memory (ROM), a random access memory (RAM), a magnetic disk, or an optical disk.
[0089] The computer-readable storage medium provided in this embodiment can implement the construction management method provided in Example 2, and will not be described again here to avoid repetition.
[0090] It should be noted that, in this article, the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, article or terminal including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or terminal. In the absence of further restrictions, an element defined by the sentence "comprises a ..." does not exclude the presence of other identical elements in the process, method, article or terminal including the element.
[0091] Through the description of the above implementation methods, those skilled in the art can clearly understand that the above-mentioned embodiment methods can be implemented by means of software plus a necessary general hardware platform, and of course by hardware, but in many cases the former is a better implementation method. Based on such an understanding, the technical solution of the present application, or the part that contributes to the prior art, can be embodied in the form of a software product, which is stored in a storage medium (such as ROM / RAM, a magnetic disk, or an optical disk), and includes a number of instructions for a terminal (which can be a mobile phone, a computer, a server, an air conditioner, or a network device, etc.) to execute the methods described in each embodiment of the present application.
[0092] The embodiments of the present application are described above in conjunction with the accompanying drawings, but the present application is not limited to the above-mentioned specific implementation methods. The above-mentioned specific implementation methods are merely illustrative and not restrictive. Under the guidance of the present application, ordinary technicians in this field can also make many forms without departing from the purpose of the present application and the scope of protection of the claims, all of which are within the protection of the present application.
Claims
1. A construction management system, characterized in that: include: Extraction module, review module, generation module and management acceptance module; The extraction module is used to extract multiple key parameters from the construction briefing materials; The review module is used to review the construction briefing materials and the key parameters; The generating module is used to generate a QR code according to the construction briefing materials and the key parameters when the construction briefing materials and the key parameters are reviewed and approved; The management and acceptance module is used to inspect the construction work surface according to the construction briefing materials and the key parameters.
2. The construction management system according to claim 1, characterized in that: The extraction module is further used to divide each of the key parameters into necessary parameters and general parameters according to their importance; The audit module is also used to determine the parameters to be audited from the required parameters and the general parameters, and to determine whether the parameters to be audited and the construction briefing materials are accurate. If the parameters to be audited and the construction briefing materials are accurate, the audit is passed.
3. The construction management system according to claim 1, characterized in that: The system also includes: a personnel management module and a learning module; The personnel management module is used to input the information of each construction personnel and construction management personnel in the area to be constructed, and determine the first-level management authority, the second-level management authority and the third-level management authority; The learning module is used to determine the target construction type according to the construction briefing materials to be constructed, determine multiple target construction types according to the information of each construction personnel, determine at least one corresponding target construction personnel information according to each target construction type, and display a learning interface according to the construction briefing materials to be constructed.
4. The construction management system according to claim 3, characterized in that: The system further comprises: a modification module and a division module; The modification module is used to import the construction briefing materials to be prepared, modify the construction briefing materials online, and send the modified construction briefing materials to the extraction module; The division module is used to divide the construction site for which the construction briefing material is to be prepared into a conventional construction plan site and an unconventional construction plan site according to the degree of danger.
5. The construction management system according to claim 4, characterized in that: The management acceptance module is also used to obtain an acceptance picture of the key parameter area in the construction work surface, determine a plurality of key parameters to be accepted based on the acceptance picture of the key parameter area, compare each of the key parameters to be accepted with each of the key parameters in the construction briefing materials to obtain a comparison result, and determine the acceptance result based on the comparison result.
6. The construction management system according to claim 5, characterized in that: The system also includes: a third-party supervision module; The management acceptance module includes: an internal acceptance submodule and a joint acceptance submodule; The internal acceptance submodule is used to accept the conventional construction plan site or the unconventional construction plan site through the first-level management authority to obtain a first acceptance result; The joint acceptance submodule is used to conduct a second acceptance on-site of the unconventional construction plan through the second-level management authority to obtain a second acceptance result; The third-party supervision module is used to accept the first acceptance result and the second acceptance result through the third-level management authority to obtain a third acceptance result.
7. The construction management system according to claim 1, characterized in that: The system further comprises: a display module; The display module is used to display the QR code and basic construction information, wherein the basic construction information includes: the name of the construction briefing material to be constructed, the construction time, the number of construction personnel and the construction period.
8. A construction management method, characterized in that: Applied to the construction management system according to any one of claims 1 to 7, the method comprises: Extract multiple key parameters from the construction briefing materials; Review the construction briefing materials and key parameters; When the construction briefing materials and the key parameters are reviewed and approved, a QR code is generated according to the construction briefing materials and the key parameters; The construction work surface is inspected and accepted based on the construction briefing materials and the key parameters.
9. An electronic device, characterized in that: The device comprises a memory and a processor, wherein the memory stores a computer program, and the computer program executes the construction management method according to claim 8 when the processor runs the computer program.
10. A computer-readable storage medium, characterized in that: It stores a computer program, which executes the construction management method according to claim 8 when running on a processor.