AI Technical Summary
In the prior art, the copper steel sliding contact insulator of bridge cranes lacks special tools, resulting in low replacement efficiency, high safety risks, and easy to damage the parallelism of sliding contact lines. It requires multiple people to operate, which poses a hidden danger of falling from high altitudes and labor costs. Large investment.
A tool including steel bars, adjustment devices, locking devices, rocker and anti-fall chains was designed. Through the cooperation of these components, the sliding contact insulators can be replaced quickly and conveniently, reducing labor costs and increasing labor costs. security.
This tool makes it only takes one person to replace the insulator, which shortens the time by 30 minutes, reduces safety risks, avoids hidden dangers of falling from high altitudes, and reduces damage to the parallelism of the sliding contact line, improving operational efficiency and safety.
Smart Images

Figure CN119029728A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of bridge cranes, and in particular to a tool and a method for replacing a copper-steel busbar insulator of a bridge crane. Background Art
[0002] A bridge crane is a type of lifting equipment that is horizontally mounted above workshops, warehouses and material yards to lift materials. Because its two ends are located on tall concrete columns or metal supports, its shape is like a bridge. The bridge of the bridge crane runs longitudinally along the tracks laid on the elevated platforms on both sides. The space under the bridge can be fully utilized to lift materials without being hindered by ground equipment. It is the most widely used and largest number of lifting machinery.
[0003] The operation of bridge cranes in steel mills requires the contact between the collector and the busbar to transmit power to the various mechanisms of the crane. The busbar is powered by three-phase four-wire power supply, which is divided into A, B, C, and D phases. The insulators of the busbar are mainly used to support and isolate the insulators of the conductive parts. They play the role of support (insulators can support the busbar to keep it at an appropriate height and position, ensuring good contact between the busbar and the bridge crane) and insulation (with good electrical insulation performance, which can prevent current from leaking to the ground or the surrounding environment, ensuring the safe operation of the system). Bridge cranes in steel mills lift high-temperature molten metal, are busy in production, and have large changes in the working environment (large changes in temperature and load). After a certain period of use, when the busbar insulators burst, age, or the insulation does not meet the requirements, they need to be replaced manually in time, otherwise the busbar will be deformed and production will be interrupted. Therefore, the replacement of insulators must be fast and safe to ensure smooth production;
[0004] There were no special tools for replacing the original insulators. The prepared tools included a plum wrench, 2 crowbars, 3 or more double-hook safety belts, and 3 or more 15m fall arresters. The personnel had to carry tools weighing up to 50Kg to the site, and the replacement work mainly relied on crowbars and wrenches. The efficiency was low, the safety risk was high, and the manpower cost investment was large. The parallelism of the busbar would often be damaged. After the insulators were replaced, it would take a long time to repair the parallelism of the busbar. In addition, if there was any carelessness or improper cooperation during the operation, the insulators and crowbars would pose a safety risk of falling objects from high altitudes. The operators also had the hidden danger of falling from a height on the busbar due to improper force. Summary of the invention
[0005] In view of the deficiencies in the prior art, the present invention provides a tool and method for replacing the copper-steel busbar insulator of a bridge crane, which solves the problem that there are no special tools for replacing insulators. The prepared tools include a plum blossom wrench, 2 crowbars, more than 3 double-hook safety belts, and more than 3 15m fall arresters. Personnel need to carry tools weighing up to 50 kg to the site, and mainly rely on crowbars and wrenches for replacement work, which has low efficiency, high safety risks, and high labor costs. The parallelism of the busbar is often damaged. After the insulator is replaced, it takes a long time to repair the parallelism of the busbar. In addition, if there is any carelessness or improper cooperation during the operation, the insulators and crowbars will pose a safety risk of falling objects from high altitudes. The operators also have the problem of falling from a height on the busbar due to improper force.
[0006] To achieve the above object, the present invention is implemented through the following technical scheme: a tool for replacing the copper-steel busbar insulator of a bridge crane, comprising:
[0007] A steel bar, with a support rod disposed below one side of the steel bar;
[0008] An adjusting device is installed on one side of the steel bar; a locking device is arranged on one side of the adjusting device; wherein the adjusting device adjusts the overall layout of the tool for replacing the copper-steel busbar insulator of the bridge crane, and the locking device limits the adjusting device.
[0009] Preferably, the support rod is T-shaped.
[0010] Preferably, the adjusting device comprises:
[0011] A sleeve rod movably connected to the outer wall of the steel bar;
[0012] A push rod is installed below the sleeve rod;
[0013] Tooth grooves are machined on one side of the steel bar;
[0014] A bracket is rotatably connected to the upper side of the sleeve rod;
[0015] A first pin is installed inside the bracket;
[0016] A gear meshingly connected to the outer wall of the tooth groove and fixedly connected to the first pin shaft;
[0017] The bracket drives the gear to move along the tooth groove, thereby changing the position between the sleeve rod and the steel bar.
[0018] Preferably, the push rod is T-shaped.
[0019] Preferably, a rocker is installed on the outer wall of the bracket, and a grip ball is provided at the end of the rocker.
[0020] Preferably, a fall prevention chain is provided at the end of the steel bar.
[0021] Preferably, the locking device comprises:
[0022] A second pin is installed inside the bracket;
[0023] A limiting plate, pressed against the outer wall of the gear;
[0024] The torsion spring is sleeved on the outer wall of the second pin shaft, and both ends extend to the outside of the limiting plate, and the upper end is tightly pressed against the outer wall of the bracket; wherein the limiting plate can limit the gear.
[0025] The present invention also provides a method for replacing a copper-steel busbar insulator of a bridge crane, the method using the above-mentioned tool for replacing a copper-steel busbar insulator of a bridge crane, and the method comprising the following steps:
[0026] Step 1: Before replacing the insulator, power off the bridge crane in the same span of the plant, install a grounding short-circuit wire, and ensure that the equipment is completely powered off;
[0027] Step 2: Drive the bridge crane to the position where the insulator needs to be replaced, and remove the fixing screws of the insulator and the insulators on both sides;
[0028] Step 3: Use the tool for replacing the copper-steel busbar insulator of the bridge crane to lift the busbar on the insulator to be replaced, remove the insulator to be replaced, replace it with a new one, tighten the screws, and tighten the fixing screws on the adjacent insulators on both sides;
[0029] Step 4: Use the tool for replacing the copper-steel busbar insulator of the bridge crane to lower the busbar to its original position.
[0030] Preferably, before executing step 1, the method further includes:
[0031] Prepare tools before operation, including new insulators, screwdrivers, wrenches, a safety rope and tools for replacing copper-steel busbar insulators of bridge cranes.
[0032] Preferably, the step three comprises:
[0033] First, the tool for replacing the copper-steel busbar insulator of the bridge crane is set between two busbars;
[0034] Subsequently, the position between the two busbars is changed by using the adjusting device, and the insulator can be replaced at this time.
[0035] The present invention provides a tool and method for replacing a copper-steel busbar insulator of a bridge crane, which has the following beneficial effects:
[0036] The tool for replacing the copper-steel busbar insulator of a bridge crane is convenient and lightweight through the cooperation of steel bars, adjustment devices, locking devices, rockers, support rods and anti-fall chains. It can be disassembled and easily placed in the electrician's tool bag after use, thereby improving convenience and ease while also improving work efficiency and safety. The original replacement method required more than three people to operate simultaneously, but now only one person is needed. It only takes 20 minutes to replace one insulator, saving 30 minutes compared to the original working method. It is efficient and quick, solves the hidden danger of falling from a height when using a crowbar, and also reduces the investment in labor costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0037] Figure 1 A schematic structural diagram of a tool for replacing a copper-steel busbar insulator of a bridge crane provided by an embodiment of the present invention;
[0038] Figure 2 It is a structural schematic diagram of another tool for replacing copper-steel busbar insulators of a bridge crane according to the present invention;
[0039] Figure 3 for Figure 2 Schematic diagram of the structure of the middle bracket, torsion spring and rocker.
[0040] In the figure: 1. steel bar; 2. adjusting device; 201. tooth groove; 202. sleeve rod; 203. push rod; 204. bracket; 205. gear; 206. first pin shaft; 3. locking device; 301. limit plate; 302. torsion spring; 303. second pin shaft; 4. rocker; 5. grip ball; 6. anti-fall chain; 7. support rod. DETAILED DESCRIPTION
[0041] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0042] By those skilled in the art, the components in this case are connected in sequence. The specific connection and operation sequence should refer to the following working principle. The detailed connection means are well-known technologies in the art. The following mainly introduces the working principle and process.
[0043] There were no special tools for replacing the original insulators. The prepared tools included a plum wrench, 2 crowbars, 3 or more double-hook safety belts, and 3 or more 15m fall arresters. The personnel had to carry tools weighing up to 50Kg to the site, and the replacement work mainly relied on crowbars and wrenches. The efficiency was low, the safety risk was high, and the manpower cost investment was large. The parallelism of the busbar would often be damaged. After the insulators were replaced, it would take a long time to repair the parallelism of the busbar. In addition, if there was any carelessness or improper cooperation during the operation, the insulators and crowbars would pose a safety risk of falling objects from high altitudes. The operators also had the hidden danger of falling from a height on the busbar due to improper force.
[0044] In view of this, an embodiment of the present invention provides a tool for replacing the copper-steel busbar insulator of a bridge crane. Through the cooperation of steel bars, adjustment devices, locking devices, rocker arms, support rods and anti-fall chains, the tool for quickly replacing the busbar insulator is convenient and lightweight, and can be disassembled and easily placed in the electrician's tool bag after use, thereby improving convenience and convenience while also improving work efficiency and safety. The original replacement method required more than three people to operate at the same time, but now only one person is needed to operate, and it only takes 20 minutes to replace one insulator, saving 30 minutes compared to the original working method. It is efficient and fast, solves the hidden danger of falling from a height when using a crowbar, and also reduces the investment in labor costs.
[0045] Embodiment 1: Figure 1 , Figure 2 and Figure 3 It can be seen that the tool for replacing the copper-steel busbar insulator of the bridge crane includes a steel bar 1, an adjusting device 2, a locking device 3, an anti-falling chain 6 and a support rod 7, and the support rod 7 is arranged below one side of the steel bar 1. The adjusting device 2 is installed on one side of the steel bar 1; the locking device 3 is arranged on one side of the adjusting device 2; wherein the adjusting device 2 adjusts the overall layout of the tool for replacing the copper-steel busbar insulator of the bridge crane, and the locking device 3 limits the adjusting device 2.
[0046] In the specific implementation process, it is worth pointing out that the tools that need to be prepared before the operation: new insulators, screwdrivers, wrenches, 1 safety rope and tools for replacing the copper-steel busbar insulators of the bridge crane can optimize more than 1 manpower, labor and material resources. Before replacing the insulators, the bridge cranes with the same span in the factory must be powered off, and grounding short-circuit wires must be installed to ensure that the equipment has been completely powered off and verify that the busbar is completely without electricity before the next operation can be carried out to prevent the risk of electric shock. During the operation, a span of the bridge crane must be powered off. The crane has 4 busbars, each of which is about 400 meters long. The insulators supporting each busbar are installed at intervals of 1.2 meters. When one of them needs to be replaced, the bridge crane is driven to the position where the insulator needs to be replaced, and the fixing screws of the insulator and the insulators on both sides are removed, that is, among the three adjacent insulators A, B, and C, if B is replaced, the fixing screws of the insulators A and C need to be removed as well, so that the busbar pressing on the insulator B has enough lifting space to take out the insulator B. After removing the three sets of screws, use a tool to lift the busbar on the B insulator 20mm, remove the B insulator, replace it with a new one, tighten the screws, and tighten the fixing screws on the A and C insulators adjacent to each other on both sides. When use is finished, you can use the tool for replacing the copper-steel busbar insulator of the bridge crane to lower the busbar to its original position. Because the tool for replacing the copper-steel busbar insulator of the bridge crane does not destroy the parallelism of the busbar, there is no need to repair the balance of the busbar. After replacing the busbar insulator, remove the grounding short-circuit wire, supply power, and start trial operation.
[0047] Specifically, when using the tool for replacing the copper-steel busbar insulator of a bridge crane, the staff first sets up the tool for replacing the copper-steel busbar insulator of a bridge crane between two busbars, and then uses the adjusting device 2 to change the position between the two busbars. At this time, the insulator can be replaced, and during adjustment, the locking device 3 can limit the adjusting device 2.
[0048] Embodiment 2: By Figure 1 , Figure 2 and Figure 3 It can be seen that the adjustment device 2 includes a sleeve rod 202, a push rod 203, a bracket 204, a gear 205 and a first pin 206. The sleeve rod 202 is movably connected to the outer wall of the steel bar 1; the push rod 203 is installed below the sleeve rod 202; the tooth groove 201 is processed on the upper side of the steel bar 1; the bracket 204 is rotatably connected to the upper side of the sleeve rod 202; the first pin 206 is installed inside the bracket 204; the gear 205 is meshed and connected to the outer wall of the tooth groove 201, and is fixedly connected to the first pin 206; wherein the bracket 204 drives the gear 205 to move along the tooth groove 201, thereby changing the position between the sleeve rod 202 and the steel bar 1.
[0049] The support rod 7 is T-shaped. The push rod 203 is T-shaped. In this way, the support rod 7 and the push rod 203 can stably clamp the object to be clamped. More importantly, the T-shaped support rod 7 and the push rod 203 can make the tool conveniently and stably support or clamp on two adjacent busbars, making it more convenient to remove the insulator bolts.
[0050] In the specific implementation process, it is worth pointing out that when the sleeve rod 202 moves, the position between the push rod 203 and the support rod 7 can be changed, and then the position between the two busbars can be changed.
[0051] Furthermore, a rocker 4 is installed on the outer wall of the bracket 204 , and a grip ball 5 is provided at the end of the rocker 4 .
[0052] In the specific implementation process, it is worth pointing out that the design of the grip ball 5 allows the staff to shake the joystick 4 more conveniently.
[0053] Furthermore, a fall prevention chain 6 is provided at the end of the steel bar 1 .
[0054] During the specific implementation process, it is worth pointing out that the staff can use the anti-fall chain 6 to connect with the steel bar 1, thereby effectively preventing the tool for replacing the copper-steel busbar insulator of the bridge crane from falling from a high altitude, thereby improving the safety of use.
[0055] Specifically, based on the above-mentioned embodiment 1, when the position of the push rod 203 needs to be changed, the staff shakes the joystick 4, and the joystick 4 can drive the bracket 204 to move, and then the position of the gear 205 and the tooth groove 201 can be changed, and then the position of the sleeve rod 202 can be changed, thereby changing the position of the push rod 203.
[0056] Embodiment 3: By Figure 2 and 3 It can be seen that the locking device 3 includes a limit plate 301, a torsion spring 302 and a second pin 303. The second pin 303 is installed inside the bracket 204; the limit plate 301 is pressed against the outer wall of the gear 205; the torsion spring 302 is sleeved on the outer wall of the second pin 303, and both ends extend to the outside of the limit plate 301, and the upper end is pressed against the outer wall of the bracket 204; wherein the limit plate 301 can limit the gear 205.
[0057] In the specific implementation process, it is worth pointing out that when the torsion spring 302 is deformed, it will give a reverse force to the limiting plate 301, so that the limiting plate 301 can firmly clamp the gear 205, so as to limit the gear 205 and the steel bar 1.
[0058] Specifically, based on the above-mentioned embodiment 1 and embodiment 2, when the torsion spring 302 is deformed, the torsion spring 302 will drive the limiting plate 301 to move, so that the limiting plate 301 can be tightly pressed against the gear 205, thereby limiting the gear 205.
[0059] Embodiment 4: This embodiment provides a method for replacing the copper-steel busbar insulator of a bridge crane, the method adopts the above-mentioned tool for replacing the copper-steel busbar insulator of a bridge crane, and prepares the tools before the operation, the tools include a new insulator, a screwdriver, a wrench, a safety rope and the tool for replacing the copper-steel busbar insulator of a bridge crane. The method comprises the following steps:
[0060] Step 1: Before replacing the insulator, power off the bridge crane in the same span of the plant, install a grounding short-circuit wire, and ensure that the equipment is completely powered off;
[0061] Step 2: Drive the bridge crane to the position where the insulator needs to be replaced, and remove the fixing screws of the insulator and the insulators on both sides;
[0062] Step 3: Use the tool for replacing the copper-steel busbar insulator of the bridge crane to lift the busbar on the insulator that needs to be replaced, remove the insulator that needs to be replaced, and then replace it with a new one. Specifically, first, set up the tool for replacing the copper-steel busbar insulator of the bridge crane between the two busbars; then, use the adjustment device 2 to change the position between the two busbars, and then the insulator can be replaced. Then tighten the screws and tighten the fixing screws on the adjacent insulators on both sides;
[0063] Step 4: Use the tool for replacing the copper-steel busbar insulator of the bridge crane to lower the busbar to its original position.
[0064] The present invention provides a tool and method for replacing a copper-steel busbar insulator of a bridge crane, which has the following beneficial effects:
[0065] The tool for replacing the copper-steel busbar insulator of a bridge crane is convenient and lightweight through the cooperation of a steel bar 1, an adjustment device 2, a locking device 3, a rocker 4, a support rod 7 and an anti-fall chain 6. The tool can be disassembled and easily placed in the electrician's tool bag after use, thereby improving convenience and convenience while also improving work efficiency and safety. The original replacement method required more than three people to operate simultaneously, but now only one person is needed to operate, and it only takes 20 minutes to replace one insulator, which saves 30 minutes compared to the original working method. It is efficient and quick, solves the hidden danger of falling from a height when using a crowbar, and also reduces the investment in labor costs.
[0066] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions. The sentence "includes an element defined by ... does not exclude the existence of other identical elements in the process, method, article or device including the element".
[0067] In the present invention, unless otherwise clearly stipulated and limited, the terms such as "installation", "setting", "connection", "fixation" and "screw-on" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral one; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium; it can be the internal connection of two elements or the interaction relationship between two elements. Unless otherwise clearly defined, ordinary technicians in this field can understand the specific meanings of the above terms in the present invention according to the specific circumstances.
[0068] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A tool for replacing a copper-steel busbar insulator of a bridge crane, comprising a steel bar (1), Features: A support rod (7) is provided below one side of the steel bar (1), and the tool for replacing the copper-steel busbar insulator of the bridge crane also includes: An adjusting device (2) is installed on one side of the steel bar (1); A locking device (3) is arranged on one side of the adjusting device (2); The adjusting device (2) adjusts the overall layout of the tool for replacing the copper-steel busbar insulator of the bridge crane, and the locking device (3) limits the position of the adjusting device (2).
2. A tool for replacing copper-steel busbar insulators of a bridge crane according to claim 1, Features: The support rod (7) is T-shaped.
3. A tool for replacing copper-steel busbar insulators of a bridge crane according to claim 1, Features: The regulating device (2) comprises: A sleeve rod (202) movably connected to the outer wall of the steel bar (1); A push rod (203) is installed below the sleeve rod (202); A tooth groove (201) is machined on the upper side of one side of the steel bar (1); A bracket (204) is rotatably connected to an upper side of the sleeve rod (202); A first pin (206) is installed inside the bracket (204); A gear (205) meshingly connected to the outer wall of the tooth groove (201) and fixedly connected to the first pin shaft (206); The bracket (204) drives the gear (205) to move along the tooth groove (201), thereby changing the position between the sleeve rod (202) and the steel bar (1).
4. A tool for replacing copper-steel busbar insulators of a bridge crane according to claim 3, Features: The push rod (203) is T-shaped.
5. A tool for replacing copper-steel busbar insulators of a bridge crane according to claim 3, Features: A rocker (4) is installed on the outer wall of the bracket (204), and a grip ball (5) is arranged at the end of the rocker (4).
6. A tool for replacing copper-steel busbar insulators of a bridge crane according to claim 3, Features: An anti-fall chain (6) is provided at the end of the steel bar (1).
7. A tool for replacing copper-steel busbar insulators of a bridge crane according to claim 3, Features: The locking device (3) comprises: A second pin (303) is installed inside the bracket (204); A limiting plate (301) is pressed against an outer wall of the gear (205); A torsion spring (302) is sleeved on the outer wall of the second pin shaft (303), and both ends of the spring extend to the outside of the limit plate (301), and the upper end is tightly pressed against the outer wall of the bracket (204); Wherein, the limiting plate (301) can limit the gear (205).
8. A method for replacing the copper-steel busbar insulator of a bridge crane. Features: The method adopts the tool for replacing the copper-steel busbar insulator of the bridge crane according to claim 1, and the method comprises the following steps: Step 1: Before replacing the insulator, power off the bridge crane in the same span of the plant, install a grounding short-circuit wire, and ensure that the equipment is completely powered off; Step 2: Drive the bridge crane to the position where the insulator needs to be replaced, and remove the fixing screws of the insulator and the insulators on both sides; Step 3: Use the tool for replacing the copper-steel busbar insulator of the bridge crane to lift the busbar on the insulator to be replaced, remove the insulator to be replaced, replace it with a new one, tighten the screws, and tighten the fixing screws on the adjacent insulators on both sides; Step 4: Use the tool for replacing the copper-steel busbar insulator of the bridge crane to lower the busbar to its original position.
9. A method for replacing a copper-steel busbar insulator of a bridge crane according to claim 8, Features: Before executing step 1, the method further includes: Prepare tools before operation, including new insulators, screwdrivers, wrenches, a safety rope and tools for replacing copper-steel busbar insulators of bridge cranes.
10. A method for replacing a copper-steel busbar insulator of a bridge crane according to claim 8, Features: The step three comprises: First, the tool for replacing the copper-steel busbar insulator of the bridge crane is set between two busbars; Subsequently, the position between the two busbars is changed using the adjusting device (2), and the insulator can then be replaced.