Main transformer load balancing optimization method based on user time domain load characteristics

By combining the load characteristics analysis of electricity users and flexible resource characteristics, a power scheduling strategy is generated, the problem of load imbalance of the main transformer is solved, load balancing is achieved, equipment utilization rate and power supply stability are improved, and operating costs are reduced.

CN119029864AActive Publication Date: 2024-11-26XUANCHENG POWER SUPPLY OF ANHUI ELECTRIC POWER CORP
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
CN202411146085.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-20
Publication Date
2024-11-26
Estimated Expiration
2044-08-20

AI Technical Summary

Technical Problem

The prior art is difficult to effectively balance the load of the main transformer, resulting in overload and underload, affecting the power supply needs of electricity users, and causing energy waste and increased operating costs.

Method used

By analyzing the load characteristic change test curve of electricity users, load fluctuation rules and characteristic groups are obtained, combined with the characteristics of flexible resources, an electricity scheduling strategy is generated, and optimization is performed in the high-voltage substation to achieve balancing of main variable load.

Benefits of technology

It improves the utilization rate of equipment, avoids redundant investment in the power grid, ensures the power supply stability of electricity users, reduces energy waste, and reduces operating costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119029864A_ABST
    Figure CN119029864A_ABST
Patent Text Reader

Abstract

The invention relates to the field of load balancing optimization, and discloses a user time domain load characteristic-based main transformer load balancing optimization method, which comprises the following steps of: firstly, carrying out power utilization test analysis on different power utilization users in a target park to obtain load fluctuation rules and load characteristic groups of the different power utilization users; and generating a target power utilization strategy in combination with the characteristics of flexible resources in the target park under different dimensions, and finally performing main transformer load balancing optimization in the high-voltage transformer substation according to the target power utilization strategy. According to the method, the time domain load characteristics of the electricity users in the electricity utilization process can be combined, the aim of balancing and optimizing the main compiled load of the high-voltage transformer substation for supplying power to the electricity users is achieved, the utilization rate of equipment is improved, and the problems of redundant investment of a power grid and the like are avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of load balancing optimization, in particular to a main transformer load balancing optimization method based on user time domain load characteristics. Background Art

[0002] The main transformer load usually refers to the power or current of the main transformer (a transformer used to transmit power to the power system or user in a power plant or substation) under load operation. This load can be electrical equipment or other transformers in the power system, which are connected to the power grid through the main transformer to consume electrical energy. When the substation outputs loads to different power users, if the main transformer load in the substation is unbalanced, the transformer in the substation will be overloaded, leading to problems such as overheating and insulation aging, and even causing failures or shutdowns, while other transformers may be in a low-load state, resulting in resource waste. Through balanced optimization, it can be ensured that each transformer operates within a reasonable load range to avoid overload and underload, because overload and underload will affect the power demand of power users, resulting in insufficient power supply to some power users. At the same time, balanced optimization of the main transformer load can make the best use of the power resources in the system, reduce energy waste caused by load imbalance, improve power transmission, and reduce operating costs. Therefore, a main transformer load balancing optimization method with user time domain compliance characteristics is proposed. Summary of the invention

[0003] The present invention overcomes the shortcomings of the prior art and provides a main transformer load balancing optimization method based on user time domain load characteristics.

[0004] In order to achieve the above object, the technical solution adopted by the present invention is:

[0005] A first aspect of the present invention provides a main transformer load balancing optimization method based on user time domain load characteristics, comprising the following steps:

[0006] Conduct power consumption test analysis through high-voltage substations, and calculate the load fluctuation law and load characteristic group of load characteristic change test curves of different power users based on the power consumption test analysis results;

[0007] Obtain the characteristics of the flexible resources in the target park in different dimensions, and combine the characteristics of the flexible resources in the target park in different dimensions and the load characteristic group of the load characteristic change test curve to obtain different power dispatching strategies;

[0008] A target power dispatching strategy is obtained, the target power dispatching strategy is introduced into the main transformer load of the high-voltage substation to perform an execution effect analysis, and the main transformer load in the high-voltage substation is balanced and optimized based on the analysis result.

[0009] Furthermore, in a preferred embodiment of the present invention, the power consumption test analysis is performed by the high-voltage substation, and based on the power consumption test analysis results, the load fluctuation law and load characteristic group of the load characteristic change test curve of different power users are calculated, specifically:

[0010] Acquire a target park, wherein the target park includes different electricity users, and acquire a high-voltage substation, which is a power supply source for the target park;

[0011] Preset a power consumption test time, during which the total load of the high-voltage substation is tested in real time, and the total load of the high-voltage substation is analyzed to determine the load received by different power users;

[0012] Convert the parameter format of the loads received by different electricity users into a time series format, construct a load characteristic change test curve for different electricity users based on the loads received by different electricity users in the time series format, and extract load characteristic indicators from the load characteristic change test curve, wherein the load characteristic indicators include a peak load value, a valley load value, and an average load value in the load characteristic change test curve;

[0013] Based on the load characteristic index, the load fluctuation range of the load characteristic change test curve is calculated; based on the load fluctuation range of the load characteristic change test curve, the load fluctuation law of the load characteristic change test curve is calculated, wherein the load fluctuation law of the load characteristic change test curve includes a periodic change law and a seasonal change law;

[0014] Calculating and marking a peak load point on the load characteristic change test curve, wherein the peak load point is a period in the load characteristic change test curve where the load value is greater than the average load value;

[0015] A regularity analysis is performed on the peak load points on the load characteristic change test curves of all electricity users, and load characteristic groups of the load characteristic change test curves of different electricity users are generated based on the regularity analysis results.

[0016] Furthermore, in a preferred embodiment of the present invention, the peak load points on the load characteristic change test curves of all electricity users are analyzed regularly, and load characteristic groups of the load characteristic change test curves of different electricity users are generated based on the regularity analysis results, specifically:

[0017] Preset the maximum threshold of the number of occurrences of peak load points, analyze the peak load points on the load characteristic change test curve of the electricity user, and calculate the peak load time domain overlap in the load characteristic change test curve during the electricity test time;

[0018] The peak load time domain overlap represents whether the number of occurrences of the peak load point is greater than the maximum threshold of the number of occurrences;

[0019] On the load characteristic change test curve of the electricity user, calculate the peak load time domain deviation of the load characteristic change test curve during the electricity test time, wherein the peak load time domain deviation is the difference between the load value at the peak load point and the average load value;

[0020] The peak load time domain coincidence and the peak load time domain deviation of the load characteristic change test curve are collectively referred to as the load characteristic group of the load characteristic change test curve.

[0021] Furthermore, in a preferred embodiment of the present invention, the characteristics of the flexible resources in the target park in different dimensions are obtained, and different power dispatching strategies are obtained by combining the characteristics of the flexible resources in the target park in different dimensions and the load characteristic group of the load characteristic change test curve, specifically:

[0022] In the target park, all flexible resources are obtained, wherein all flexible resources include distributed new energy, distributed energy storage and adjustable loads;

[0023] Collecting electricity consumption data of all flexible resources, and performing data preprocessing on the electricity consumption data of all flexible resources, wherein the data preprocessing includes data cleaning and data standardization processing on the electricity consumption data of the flexible resources to obtain preprocessed electricity consumption data of the flexible resources;

[0024] Based on the pre-processed electricity consumption data of the flexible resources, the time characteristic analysis and the space characteristic analysis of the flexible resources are performed to obtain the regulation characteristics and the distribution characteristics of the flexible resources in the time dimension, and obtain the regulation characteristics and the distribution characteristics of the flexible resources in the space dimension;

[0025] Combining the regulation and distribution characteristics of flexible resources in the time and space dimensions, as well as the load characteristic change test curves of different users, the target park's electricity consumption complementary characteristics are obtained;

[0026] A big data network is obtained, and based on the big data network, a high-voltage substation is retrieved based on the complementary characteristics of electricity consumption in a target park, and a load scheduling strategy for scheduling the total load generated by itself in the target park so that the generated load acts on different electricity users is calibrated as a power scheduling strategy.

[0027] Furthermore, in a preferred embodiment of the present invention, the target power dispatching strategy is obtained, the target power dispatching strategy is introduced into the main transformer load of the high-voltage substation for execution effect analysis, and the main transformer load in the high-voltage substation is balanced and optimized based on the analysis result, specifically:

[0028] The power consumption plan of the target park is obtained, and the grey correlation method is introduced to calculate the correlation value between different power scheduling strategies and the power consumption plan of the target park, which is calibrated as a type of correlation value;

[0029] Preset a correlation value threshold, select a type of power dispatch strategy corresponding to a correlation value within the correlation value threshold, and mark it as a target power dispatch strategy;

[0030] Preset load output time, during which the total load value range that the high-voltage substation needs to output after load output to all electricity users under the target electricity dispatching strategy is calculated and calibrated as the standard output total load value range;

[0031] Obtain the load state parameters of the high-voltage substation under the target power dispatching strategy, and based on the load state parameters of the high-voltage substation under the target power dispatching strategy, calculate the actual total load value output by the high-voltage substation during the load output time, and calibrate it as the actual output total load value;

[0032] If the actual output total load value is maintained within the standard output total load value range, the main transformer load in the high-voltage substation is calibrated as a qualified main transformer load;

[0033] Balance and optimize the qualified main transformer load so that the execution effect meets the expected value when the qualified main transformer load executes the target power dispatching strategy.

[0034] Furthermore, in a preferred embodiment of the present invention, the balanced optimization of the qualified main transformer load is performed so that the execution effect of the qualified main transformer load when executing the target power dispatching strategy meets the expected value, specifically:

[0035] A main transformer load control device is connected to the qualified main transformer load, wherein the main transformer load control device is capable of adjusting the output load of the qualified main transformer load;

[0036] The target power dispatching strategy is introduced into the main transformer load control device, and the qualified main transformer load is operated. During the operation of the qualified main transformer load, the load fluctuation law when different power users receive the load is calculated in real time, and the similarity between the load fluctuation law when the power user receives the load and the load fluctuation law of the load characteristic change test curve is calculated, which is calibrated as the load fluctuation law similarity;

[0037] A load fluctuation pattern similarity threshold is preset. If the load fluctuation pattern similarity of all electricity users is maintained within the load fluctuation similarity threshold, there is no need to perform load balancing optimization on the qualified main transformer load;

[0038] If there are electricity users whose load fluctuation pattern similarity does not remain within the load fluctuation similarity threshold, the main transformer load control device will be intelligently output load adjusted so that during the operation of the qualified main transformer load, the load fluctuation pattern similarity of all electricity users is maintained within the load fluctuation similarity threshold.

[0039] The second aspect of the present invention further provides a main transformer load balancing optimization system based on user time domain load characteristics, the main transformer load balancing optimization system includes a memory and a processor, the memory stores a main transformer load balancing optimization method, and when the main transformer load balancing optimization method is executed by the processor, the following steps are implemented:

[0040] Conduct power consumption test analysis through high-voltage substations, and calculate the load fluctuation law and load characteristic group of load characteristic change test curves of different power users based on the power consumption test analysis results;

[0041] Obtain the characteristics of the flexible resources in the target park in different dimensions, and combine the characteristics of the flexible resources in the target park in different dimensions and the load characteristic group of the load characteristic change test curve to obtain different power dispatching strategies;

[0042] A target power dispatching strategy is obtained, the target power dispatching strategy is introduced into the main transformer load of the high-voltage substation to perform an execution effect analysis, and the main transformer load in the high-voltage substation is balanced and optimized based on the analysis result.

[0043] The present invention solves the technical defects existing in the background technology, and the present invention has the following beneficial effects: firstly, the power consumption test and analysis of different power users in the target park are carried out to obtain the load fluctuation law and load characteristic group of different power users, and the target power consumption strategy is generated in combination with the characteristics of flexible resources in different dimensions in the target park, and finally the main transformer load balancing optimization is performed in the high-voltage substation according to the target power consumption strategy. The present invention can combine the time domain load characteristics of power users in the process of power consumption to achieve the purpose of optimizing the main transformer load balancing of the high-voltage substation that supplies power to them, improve the utilization rate of equipment, and avoid the problems of redundant power grid investment. BRIEF DESCRIPTION OF THE DRAWINGS

[0044] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, drawings of other embodiments can be obtained based on these drawings without paying creative work.

[0045] Figure 1 A flow chart of a main transformer load balancing optimization method based on user time domain load characteristics is shown;

[0046] Figure 2 A flow chart of a method for optimizing the load balance of a main transformer in a high-voltage substation is shown;

[0047] Figure 3 A program view of a main transformer load balancing optimization system based on user time domain load characteristics is shown. DETAILED DESCRIPTION

[0048] In order to more clearly understand the above-mentioned purpose, features and advantages of the present invention, the present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments. It should be noted that the embodiments of the present application and the features in the embodiments can be combined with each other without conflict.

[0049] In the following description, many specific details are set forth to facilitate a full understanding of the present invention. However, the present invention may also be implemented in other ways different from those described herein. Therefore, the protection scope of the present invention is not limited to the specific embodiments disclosed below.

[0050] Figure 1 A flow chart of a main transformer load balancing optimization method based on user time domain load characteristics is shown, comprising the following steps:

[0051] S102: Performing power consumption test analysis through the high-voltage substation, and calculating the load fluctuation law and load characteristic group of the load characteristic change test curve of different power users based on the power consumption test analysis result;

[0052] S104: Acquire the characteristics of the flexible resources in the target park in different dimensions, and obtain different power dispatching strategies by combining the characteristics of the flexible resources in the target park in different dimensions and the load characteristic group of the load characteristic change test curve;

[0053] S106: Obtain a target power dispatching strategy, import the target power dispatching strategy into the main transformer load of the high-voltage substation to perform an execution effect analysis, and perform a balanced optimization of the main transformer load in the high-voltage substation based on the analysis result.

[0054] Furthermore, in a preferred embodiment of the present invention, the power consumption test analysis is performed by the high-voltage substation, and based on the power consumption test analysis results, the load fluctuation law and load characteristic group of the load characteristic change test curve of different power users are calculated, specifically:

[0055] Acquire a target park, wherein the target park includes different electricity users, and acquire a high-voltage substation, which is a power supply source for the target park;

[0056] Preset a power consumption test time, during which the total load of the high-voltage substation is tested in real time, and the total load of the high-voltage substation is analyzed to determine the load received by different power users;

[0057] Convert the parameter format of the loads received by different electricity users into a time series format, construct a load characteristic change test curve for different electricity users based on the loads received by different electricity users in the time series format, and extract load characteristic indicators from the load characteristic change test curve, wherein the load characteristic indicators include a peak load value, a valley load value, and an average load value in the load characteristic change test curve;

[0058] Based on the load characteristic index, the load fluctuation range of the load characteristic change test curve is calculated; based on the load fluctuation range of the load characteristic change test curve, the load fluctuation law of the load characteristic change test curve is calculated, wherein the load fluctuation law of the load characteristic change test curve includes a periodic change law and a seasonal change law;

[0059] A peak load point is calculated and marked on the load characteristic change test curve, wherein the peak load point is a period in the load characteristic change test curve where the load value is greater than the average load value.

[0060] It should be noted that there are multiple different types of users in the target park. Different users all need electricity, but the electricity consumption levels of different users are different. Therefore, the load when supplying electricity to different users through the substation in the park is also different. It is necessary to adjust the load of the main transformer of the substation according to the user's electricity consumption level so that the load can meet the needs of users when supplying electricity to different users. Before adjusting the load of the main transformer, it is necessary to determine the law of load consumption of different users, so it is necessary to conduct electricity consumption tests of different users to determine the law of electricity consumption of different users. First, the total load provided by the high-voltage substation is determined, and based on the total load, the loads received by different users during the electricity consumption test time can be calculated, and the load characteristic change test curve of different users can be constructed at the same time. To construct the load characteristic change test curve, the parameter format of the load received by different electricity users needs to be converted into a time series format to facilitate the determination of the load change trend over time, and to achieve the purpose of analyzing the load characteristics of different industrial users from a time domain perspective. Based on the load characteristic change test curve, the load fluctuation law can be calculated and the peak load point can be determined. Among them, the peak load point can be used to determine different load feature groups in the load characteristic change test curve, such as peak load time domain overlap and peak load time domain deviation.

[0061] Furthermore, in a preferred embodiment of the present invention, the peak load points on the load characteristic change test curves of all electricity users are analyzed regularly, and load characteristic groups of the load characteristic change test curves of different electricity users are generated based on the regularity analysis results, specifically:

[0062] Preset the maximum threshold of the number of occurrences of peak load points, analyze the peak load points on the load characteristic change test curve of the electricity user, and calculate the peak load time domain overlap in the load characteristic change test curve during the electricity test time;

[0063] The peak load time domain overlap represents whether the number of occurrences of the peak load point is greater than the maximum threshold of the number of occurrences;

[0064] On the load characteristic change test curve of the electricity user, calculate the peak load time domain deviation of the load characteristic change test curve during the electricity test time, wherein the peak load time domain deviation is the difference between the load value at the peak load point and the average load value;

[0065] The peak load time domain coincidence and the peak load time domain deviation of the load characteristic change test curve are collectively referred to as the load characteristic group of the load characteristic change test curve.

[0066] It should be noted that the peak load time domain overlap is that multiple peak load points frequently appear in a certain time period, forming a time domain overlap phenomenon. The peak load time domain overlap helps to identify the critical load period in the power system and provide a basis for formulating power supply plans and adjusting power generation strategies, so it needs to be determined. The peak load time domain deviation is the degree of change between the peak load point and the expected compliance level. Under normal circumstances, the causes of the deviation include but are not limited to sudden increases in electricity demand, equipment failures, weather changes, etc. The peak load time domain deviation can evaluate the stability and resilience of the power system, as well as its ability to respond to emergencies. After determining the peak load time domain overlap and peak load time domain deviation of the load characteristic change test curve of different electricity users, the load characteristic group of the load characteristic change test curve can be obtained. The load characteristic group can be used to balance and optimize the main transformer load.

[0067] Furthermore, in a preferred embodiment of the present invention, the characteristics of the flexible resources in the target park in different dimensions are obtained, and different power dispatching strategies are obtained by combining the characteristics of the flexible resources in the target park in different dimensions and the load characteristic group of the load characteristic change test curve, specifically:

[0068] In the target park, all flexible resources are obtained, wherein all flexible resources include distributed new energy, distributed energy storage and adjustable loads;

[0069] Collecting electricity consumption data of all flexible resources, and performing data preprocessing on the electricity consumption data of all flexible resources, wherein the data preprocessing includes data cleaning and data standardization processing on the electricity consumption data of the flexible resources to obtain preprocessed electricity consumption data of the flexible resources;

[0070] Based on the pre-processed electricity consumption data of the flexible resources, the time characteristic analysis and the space characteristic analysis of the flexible resources are performed to obtain the regulation characteristics and the distribution characteristics of the flexible resources in the time dimension, and obtain the regulation characteristics and the distribution characteristics of the flexible resources in the space dimension;

[0071] Combining the regulation and distribution characteristics of flexible resources in the time and space dimensions, as well as the load characteristic change test curves of different users, the target park's electricity consumption complementary characteristics are obtained;

[0072] A big data network is obtained, and based on the big data network, a high-voltage substation is retrieved based on the complementary characteristics of electricity consumption in a target park, and a load scheduling strategy for scheduling the total load generated by itself in the target park so that the generated load acts on different electricity users is calibrated as a power scheduling strategy.

[0073] It should be noted that flexible resources refer to distributed renewable energy, distributed energy storage and adjustable loads in the park. Flexible resources in the traditional sense refer to resources that can not only improve the dynamic balance of the energy supply and demand system, but also improve the flexibility and elasticity of the energy supply and demand level of the system. It mainly refers to the power supply that has the ability to quickly adjust the output power and can be directly controlled and dispatched. After the high-voltage substation transmits the load to the flexible resources for load processing, the load will be transmitted to different electricity users. The power consumption data of flexible resources is collected and the resources are pre-processed in order to unify the data in different flexible resources for subsequent processing. It is necessary to obtain the regulation characteristics and distribution characteristics of flexible resources in the time dimension and space dimension, which reflects the volatility and uncertainty of flexible resources in the active distribution network and renewable energy, and also reflects the characteristics of flexible resources affected by the timing characteristics of the active distribution network and its own timing characteristics. The complementary characteristics can be determined by combining the regulation characteristics and distribution characteristics of flexible resources in the time dimension and space dimension, as well as the load characteristic change test curves of different users. The complementary characteristics represent the relationship between the law of user load growth in the park and the characteristics of flexible resources. The complementary characteristics can be used to generate different power dispatching strategies. The purposes of the power dispatching strategies may be different. Some power dispatching strategies aim to be as green and low-carbon as possible, while others aim to achieve the maximum economic benefit in power dispatching. The big data network is a database that stores various possible power consumption solutions.

[0074] Figure 2 A flow chart of a method for optimizing the load balance of a main transformer in a high-voltage substation is shown, comprising the following steps:

[0075] S202: Calculate the power consumption planning of the target park and the correlation value between different power consumption scheduling strategies by using the grey correlation method, and determine the target power consumption scheduling strategy based on the correlation value;

[0076] S204: Calculate the actual total load value output by the high voltage substation during the load output time.

[0077] Determine the qualified main transformer load;

[0078] S206: Balance and optimize the qualified main transformer loads so that the execution effect of the qualified main transformer loads when executing the target power dispatching strategy meets the expected value.

[0079] Furthermore, in a preferred embodiment of the present invention, the actual total load value output by the high-voltage substation during the load output time is calculated. The qualified main transformer load is determined as follows:

[0080] Preset load output time, during which the total load value range that the high-voltage substation needs to output after load output to all electricity users under the target electricity dispatching strategy is calculated and calibrated as the standard output total load value range;

[0081] Obtain the load state parameters of the high-voltage substation under the target power dispatching strategy, and based on the load state parameters of the high-voltage substation under the target power dispatching strategy, calculate the actual total load value output by the high-voltage substation during the load output time, and calibrate it as the actual output total load value;

[0082] If the actual output total load value is maintained within the standard output total load value range, the main transformer load in the high-voltage substation is calibrated as a qualified main transformer load.

[0083] It should be noted that in the high-voltage substation, there is a main transformer load, which refers to the main transformer, that is, the load borne by the transformer in the power plant and substation during operation, which is used to transmit power to the power system or users. Before balancing and optimizing the main transformer load, it is necessary to determine whether the main transformer load is qualified, that is, to determine whether the total load value output by the main transformer load meets the standard requirements. The main transformer load can only be balanced and optimized if it is qualified, otherwise the main transformer load cannot provide load processing. Under the target power dispatching strategy, it is judged whether the actual total load output by the high-voltage substation during the load output time is maintained within the standard value. If it is, it proves that the high-voltage substation is a qualified main transformer load.

[0084] Furthermore, in a preferred embodiment of the present invention, the balanced optimization of the qualified main transformer load is performed so that the execution effect of the qualified main transformer load when executing the target power dispatching strategy meets the expected value, specifically:

[0085] A main transformer load control device is connected to the qualified main transformer load, wherein the main transformer load control device is capable of adjusting the output load of the qualified main transformer load;

[0086] The target power dispatching strategy is introduced into the main transformer load control device, and the qualified main transformer load is operated. During the operation of the qualified main transformer load, the load fluctuation law when different power users receive the load is calculated in real time, and the similarity between the load fluctuation law when the power user receives the load and the load fluctuation law of the load characteristic change test curve is calculated, which is calibrated as the load fluctuation law similarity;

[0087] A load fluctuation pattern similarity threshold is preset. If the load fluctuation pattern similarity of all electricity users is maintained within the load fluctuation similarity threshold, there is no need to perform load balancing optimization on the qualified main transformer load;

[0088] If there are electricity users whose load fluctuation pattern similarity does not remain within the load fluctuation similarity threshold, the main transformer load control device will be intelligently output load adjusted so that during the operation of the qualified main transformer load, the load fluctuation pattern similarity of all electricity users is maintained within the load fluctuation similarity threshold.

[0089] It should be noted that after determining the qualified main transformer load, it is necessary to realize the balanced optimization of the main transformer load through the main transformer load control device according to the power consumption law of the power users and the power consumption data of all flexible resources. When the target power consumption scheduling strategy acts on the qualified main transformer load, the load fluctuation law when different power users receive the load should be similar to the load fluctuation law of the load characteristic change test curve during the power consumption test, and the similarity between the two is calculated. When the two are similar, there is no need to balance the optimization of the main transformer load, because the load fluctuation law of the load characteristic change test curve is the most suitable load fluctuation law after different power users have been tested, so it is necessary to balance the optimization of the main transformer load so that when the target power consumption scheduling strategy is met, the actual output load fluctuation law is equal to the load fluctuation law of the load characteristic change test curve. The main transformer load control device can be used to perform intelligent output load adjustment to achieve the purpose of balanced optimization of the main transformer load.

[0090] In addition, the main transformer load balancing optimization method based on user time domain load characteristics also includes the following steps:

[0091] After the qualified main transformer load has been intelligently outputted by the main transformer load control device, if there are still electricity users whose load fluctuation law similarity does not remain within the load fluctuation similarity threshold, the qualified main transformer load is calibrated as the qualified main transformer load to be detected;

[0092] When the main transformer load in the high-voltage substation is a qualified main transformer load to be detected, the wiring mode between different power equipment connected to the qualified main transformer load to be detected is obtained in the high-voltage substation, and the electrical parameter range of different power equipment in the high-voltage substation is obtained;

[0093] A mathematical model of the high-voltage substation is established based on the wiring mode between different power equipment and the electrical parameter range of the power equipment in the high-voltage substation, wherein different nodes and corresponding node parameters exist in the mathematical model of the high-voltage substation, and the node parameters reflect the electrical parameters of the power equipment;

[0094] Calculate the node parameters of different nodes in the mathematical model of the high-voltage substation through the power flow calculation software, and mark the nodes whose node parameters are not within the electrical parameter range of the corresponding power equipment as abnormal nodes, and obtain the node parameters of the abnormal nodes;

[0095] Determine the power equipment in the high-voltage substation corresponding to the abnormal node, mark it as abnormal power equipment, and determine the abnormal position in the abnormal power equipment based on the node parameters of the abnormal node;

[0096] Based on the big data network, the correction scheme for abnormal positions in abnormal power equipment is retrieved and output, so that there are no abnormal nodes in all power equipment, and the main transformer load control device continues to perform intelligent output load adjustment on the qualified main transformer load to be detected, so that the similarity of load fluctuation patterns of all electricity users is maintained within the load fluctuation similarity threshold.

[0097] It should be noted that if the similarity of load fluctuation patterns of power users still does not remain within the load fluctuation similarity threshold during the process of balancing and optimizing the qualified main transformer load, it proves that there may be problems with the power equipment connected to the qualified main transformer load, resulting in that even if the main transformer load is balanced and optimized, it is still impossible to achieve the load fluctuation pattern position of all power users within the preset range. Therefore, it is necessary to perform power flow analysis on the power equipment to determine whether there are abnormal nodes in the power equipment. If so, it is determined that there is a fault in the power equipment that needs to be repaired. Power flow analysis can be realized through software such as ETAP to calculate the power flow, obtain the electrical parameters such as voltage and power of each node, and compare the electrical parameters with the standard range to obtain abnormal nodes, and based on the abnormal nodes, obtain the abnormal position of the corresponding power equipment. Finally, the abnormal position maintenance plan is retrieved and output through the big data network, so that all power equipment connected to the qualified main transformer load in the high-voltage substation are free of abnormalities, and the load of the main transformer load is adjusted to achieve that the similarity of load fluctuation patterns of all power users is maintained within the load fluctuation similarity threshold.

[0098] like Figure 3 As shown, the second aspect of the present invention further provides a main transformer load balancing optimization system based on user time domain load characteristics, the main transformer load balancing optimization system includes a memory 31 and a processor 32, the memory 31 stores a main transformer load balancing optimization method, and when the main transformer load balancing optimization method is executed by the processor 32, the following steps are implemented:

[0099] Conduct power consumption test analysis through high-voltage substations, and calculate the load fluctuation law and load characteristic group of load characteristic change test curves of different power users based on the power consumption test analysis results;

[0100] Obtain the characteristics of the flexible resources in the target park in different dimensions, and combine the characteristics of the flexible resources in the target park in different dimensions and the load characteristic group of the load characteristic change test curve to obtain different power dispatching strategies;

[0101] A target power dispatching strategy is obtained, the target power dispatching strategy is introduced into the main transformer load of the high-voltage substation to perform an execution effect analysis, and the main transformer load in the high-voltage substation is balanced and optimized based on the analysis result.

[0102] The above are only specific embodiments of the present invention, but the protection scope of the present invention is not limited thereto. Any person skilled in the art who is familiar with the technical field can easily think of changes or substitutions within the technical scope disclosed by the present invention, which should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention shall be based on the protection scope of the claims.

Claims

1. A main transformer load balancing optimization method based on user time domain load characteristics, It is characterized in that The following steps are involved: Conduct power consumption test analysis through high-voltage substations, and calculate the load fluctuation law and load characteristic group of load characteristic change test curves of different power users based on the power consumption test analysis results; Obtain the characteristics of the flexible resources in the target park in different dimensions, and combine the characteristics of the flexible resources in the target park in different dimensions and the load characteristic group of the load characteristic change test curve to obtain different power dispatching strategies; A target power dispatching strategy is obtained, the target power dispatching strategy is introduced into the main transformer load of the high-voltage substation to perform an execution effect analysis, and based on the analysis result, the main transformer load in the high-voltage substation is balanced and optimized.

2. According to the main transformer load balancing optimization method based on user time domain load characteristics described in claim 1, It is characterized in that The power consumption test analysis is performed through the high-voltage substation, and based on the power consumption test analysis results, the load fluctuation law and load characteristic group of the load characteristic change test curve of different power users are calculated, specifically: Acquire a target park, wherein the target park includes different electricity users, and acquire a high-voltage substation, which is a power supply source for the target park; Preset a power consumption test time, during which the total load of the high-voltage substation is tested in real time, and the total load of the high-voltage substation is analyzed to determine the load received by different power users; Convert the parameter format of the loads received by different electricity users into a time series format, construct a load characteristic change test curve for different electricity users based on the loads received by different electricity users in the time series format, and extract load characteristic indicators from the load characteristic change test curve, wherein the load characteristic indicators include a peak load value, a valley load value, and an average load value in the load characteristic change test curve; Based on the load characteristic index, the load fluctuation range of the load characteristic change test curve is calculated; based on the load fluctuation range of the load characteristic change test curve, the load fluctuation law of the load characteristic change test curve is calculated, wherein the load fluctuation law of the load characteristic change test curve includes a periodic change law and a seasonal change law; Calculating and marking a peak load point on the load characteristic change test curve, wherein the peak load point is a period in the load characteristic change test curve where the load value is greater than the average load value; A regularity analysis is performed on the peak load points on the load characteristic change test curves of all electricity users, and load characteristic groups of the load characteristic change test curves of different electricity users are generated based on the regularity analysis results.

3. According to the main transformer load balancing optimization method based on user time domain load characteristics described in claim 2, It is characterized in that The peak load points on the load characteristic change test curves of all electricity users are analyzed regularly, and load characteristic groups of the load characteristic change test curves of different electricity users are generated based on the regularity analysis results, specifically: Preset the maximum threshold of the number of occurrences of peak load points, analyze the peak load points on the load characteristic change test curve of the electricity user, and calculate the peak load time domain overlap in the load characteristic change test curve during the electricity test time; The peak load time domain overlap represents whether the number of occurrences of the peak load point is greater than the maximum threshold of the number of occurrences; On the load characteristic change test curve of the electricity user, calculate the peak load time domain deviation of the load characteristic change test curve during the electricity test time, wherein the peak load time domain deviation is the difference between the load value at the peak load point and the average load value; The peak load time domain coincidence and the peak load time domain deviation of the load characteristic change test curve are collectively referred to as the load characteristic group of the load characteristic change test curve.

4. According to the main transformer load balancing optimization method based on user time domain load characteristics described in claim 1, It is characterized in that The characteristics of the flexible resources in the target park in different dimensions are obtained, and different power dispatching strategies are obtained by combining the characteristics of the flexible resources in the target park in different dimensions and the load characteristic group of the load characteristic change test curve, specifically: In the target park, all flexible resources are obtained, wherein all flexible resources include distributed new energy, distributed energy storage and adjustable loads; Collecting electricity consumption data of all flexible resources, and performing data preprocessing on the electricity consumption data of all flexible resources, wherein the data preprocessing includes data cleaning and data standardization processing on the electricity consumption data of the flexible resources to obtain preprocessed electricity consumption data of the flexible resources; Based on the pre-processed electricity consumption data of the flexible resources, the time characteristic analysis and the space characteristic analysis of the flexible resources are performed to obtain the regulation characteristics and the distribution characteristics of the flexible resources in the time dimension, and obtain the regulation characteristics and the distribution characteristics of the flexible resources in the space dimension; Combining the regulation and distribution characteristics of flexible resources in the time and space dimensions, as well as the load characteristic change test curves of different users, the target park's electricity consumption complementary characteristics are obtained; A big data network is obtained, and based on the big data network, a high-voltage substation is retrieved based on the complementary characteristics of electricity consumption in a target park, and a load scheduling strategy for scheduling the total load generated by itself in the target park so that the generated load acts on different electricity users is calibrated as a power scheduling strategy.

5. According to the main transformer load balancing optimization method based on user time domain load characteristics described in claim 1, It is characterized in that The target power dispatching strategy is obtained, the target power dispatching strategy is introduced into the main transformer load of the high-voltage substation to perform execution effect analysis, and the main transformer load in the high-voltage substation is balanced and optimized based on the analysis result, specifically: The power consumption plan of the target park is obtained, and the grey correlation method is introduced to calculate the correlation value between different power scheduling strategies and the power consumption plan of the target park, which is calibrated as a type of correlation value; Preset a correlation value threshold, select a type of power dispatch strategy corresponding to a correlation value within the correlation value threshold, and mark it as a target power dispatch strategy; Preset load output time, during which the total load value range that the high-voltage substation needs to output after load output to all electricity users under the target electricity dispatching strategy is calculated and calibrated as the standard output total load value range; Obtain the load state parameters of the high-voltage substation under the target power dispatching strategy, and based on the load state parameters of the high-voltage substation under the target power dispatching strategy, calculate the actual total load value output by the high-voltage substation during the load output time, and calibrate it as the actual output total load value; If the actual output total load value is maintained within the standard output total load value range, the main transformer load in the high-voltage substation is calibrated as a qualified main transformer load; Balance and optimize the qualified main transformer load so that the execution effect meets the expected value when the qualified main transformer load executes the target power dispatching strategy.

6. According to the main transformer load balancing optimization method based on user time domain load characteristics described in claim 5, It is characterized in that The balanced optimization of the qualified main transformer load is performed so that the execution effect of the qualified main transformer load when executing the target power dispatching strategy meets the expected value, specifically: A main transformer load control device is connected to the qualified main transformer load, wherein the main transformer load control device is capable of adjusting the output load of the qualified main transformer load; The target power dispatching strategy is introduced into the main transformer load control device, and the qualified main transformer load is operated. During the operation of the qualified main transformer load, the load fluctuation law when different power users receive the load is calculated in real time, and the similarity between the load fluctuation law when the power user receives the load and the load fluctuation law of the load characteristic change test curve is calculated, which is calibrated as the load fluctuation law similarity; A load fluctuation pattern similarity threshold is preset. If the load fluctuation pattern similarity of all electricity users is maintained within the load fluctuation similarity threshold, there is no need to perform load balancing optimization on the qualified main transformer load; If there are electricity users whose load fluctuation pattern similarity does not remain within the load fluctuation similarity threshold, the main transformer load control device will be intelligently output load adjusted so that during the operation of the qualified main transformer load, the load fluctuation pattern similarity of all electricity users is maintained within the load fluctuation similarity threshold.

7. A main transformer load balancing optimization system based on user time domain load characteristics, It is characterized in that The main transformer load balancing optimization system includes a memory and a processor, wherein the memory stores a main transformer load balancing optimization method program, and when the main transformer load balancing optimization method program is executed by the processor, the main transformer load balancing optimization method steps as described in any one of claims 1 to 6 are implemented: Conduct power consumption test analysis through high-voltage substations, and calculate the load fluctuation law and load characteristic group of load characteristic change test curves of different power users based on the power consumption test analysis results; Obtain the characteristics of the flexible resources in the target park in different dimensions, and combine the characteristics of the flexible resources in the target park in different dimensions and the load characteristic group of the load characteristic change test curve to obtain different power dispatching strategies; A target power dispatching strategy is obtained, the target power dispatching strategy is introduced into the main transformer load of the high-voltage substation to perform an execution effect analysis, and based on the analysis result, the main transformer load in the high-voltage substation is balanced and optimized.

Citation Information

Patent Citations

  • Power distribution network optimization method adapting to power distribution network high capacity load transfer

    CN104917173A

  • Wind power grid-connection system operational reliability evaluation method considering uncertainty factors

    CN107681691A

  • Power distribution network main transformer operation equalization optimization method

    CN110768249A

  • Direct-current interconnection-based power grid power flow regulation and control method

    CN113206503A

  • Source network load storage cooperation control method based on zone area load optimization operation

    CN116154758A