Method for determining participation of energy storage cluster in frequency modulation auxiliary service based on master-slave game

Through the master-slave game method, the frequency modulation participation scheme of the energy storage cluster is optimized, which solves the problems of low energy storage utilization and low frequency modulation, and improves the economic benefits and grid stability of the energy storage cluster.

CN119029924AActive Publication Date: 2024-11-26NORTH CHINA ELECTRIC POWER UNIV

Patent Information

Application Number
CN202411110799.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-13
Publication Date
2024-11-26
Estimated Expiration
2044-08-13

AI Technical Summary

Technical Problem

The problem of low actual utilization rate of energy storage and low participation in frequency regulation exists in the energy storage industry, especially in absorbing renewable energy and maintaining grid stability.

Method used

Using the master-slave game method, a frequency modulation compensation benefit model for energy storage clusters and thermal power clusters is constructed. Through the frequency modulation service purchase cost model, the frequency modulation capacity and frequency modulation mileage of each period are determined, and the frequency modulation participation scheme of energy storage clusters is optimized to maximize the Frequency regulation benefits of energy storage clusters.

Benefits of technology

The utilization rate of energy storage clusters and the degree of participation in frequency regulation have been improved, the cost compensation pricing of energy storage clusters has been achieved, the enthusiasm for participation in frequency regulation auxiliary services has been enhanced, and the stability of the power grid has been improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119029924A_ABST
    Figure CN119029924A_ABST
Patent Text Reader

Abstract

The invention discloses a method for determining participation of an energy storage cluster in a frequency modulation auxiliary service based on a master-slave game. The method comprises the following steps: constructing an energy storage cluster frequency modulation compensation income model; constructing a thermal power cluster frequency modulation compensation income model; constructing a frequency modulation service purchase cost model; taking the frequency modulation service purchase cost model as a lower-layer model, taking the energy storage cluster frequency modulation compensation income model and the thermal power cluster frequency modulation compensation income model as an upper-layer model, and solving a decision model comprising the upper-layer model and the lower-layer model to determine the frequency modulation capacity and the frequency modulation mileage of each energy storage subject in different time periods; the scheme is used as a frequency modulation participation scheme of the energy storage cluster.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of energy storage configuration, and in particular to a method for determining an energy storage cluster to participate in frequency regulation auxiliary services based on a master-slave game. Background Art

[0002] The energy storage industry plays an important role in reducing carbon emissions and absorbing renewable energy. Energy storage has the advantages of large capacity, fast response, and high efficiency. It can better solve the problems caused by the grid connection of new energy. It can also provide auxiliary services such as frequency regulation, peak regulation, and voltage regulation to maintain the voltage and frequency stability of the power grid and reduce the waveform distortion rate of power quality. However, there are currently problems such as low actual utilization of energy storage and low degree of participation in frequency regulation.

[0003] Therefore, a method based on master-slave game to determine the participation of energy storage clusters in frequency regulation auxiliary services is needed. Summary of the invention

[0004] To this end, the present invention provides a method for determining the participation of an energy storage cluster in frequency regulation auxiliary services based on master-slave game, in an effort to solve or at least alleviate the above problems.

[0005] According to a first aspect of the present invention, a method for determining that an energy storage cluster participates in frequency regulation auxiliary services based on a master-slave game is provided, the method comprising: constructing an energy storage cluster frequency regulation compensation benefit model, including an energy storage cluster frequency regulation benefit function with the goal of maximizing the frequency regulation benefit of the energy storage cluster, wherein the decision variables include the frequency regulation capacity, frequency regulation mileage, and frequency regulation mileage quotation declared by each energy storage entity in the energy storage cluster at different time periods; constructing a thermal power cluster frequency regulation compensation benefit model, including a thermal power cluster frequency regulation benefit function with the goal of maximizing the frequency regulation benefit of the thermal power cluster, wherein the decision variables include the frequency regulation capacity, frequency regulation mileage, and frequency regulation mileage quotation declared by each thermal power entity in the thermal power cluster at different time periods price; construct a frequency regulation service purchase cost model, including a frequency regulation service purchase cost function with the goal of minimizing the cost of purchasing frequency regulation services, whose decision variables include the clearing prices of frequency regulation mileages in different time periods, and the frequency regulation capacity and frequency regulation mileages of each energy storage entity and each thermal power unit that have won the bid in different time periods; use the frequency regulation service purchase cost model as the lower model, the energy storage cluster frequency regulation compensation revenue model and the thermal power cluster frequency regulation compensation revenue model as the upper model, and solve the decision model including the upper model and the lower model to determine the frequency regulation capacity and frequency regulation mileage of each energy storage entity that has won the bid in different time periods as the frequency regulation participation plan of the energy storage cluster.

[0006] According to a second aspect of the present invention, there is provided a computing device comprising: one or more processors; a memory; and one or more programs, wherein the one or more programs are stored in the memory and are configured to be executed by the one or more processors, and the one or more programs include instructions for executing a method for determining the participation of an energy storage cluster in a frequency regulation auxiliary service based on a master-slave game according to the present invention.

[0007] The present invention constructs a frequency regulation service purchase cost model as a lower-level model, and an energy storage cluster frequency regulation compensation benefit model and a thermal power cluster frequency regulation compensation benefit model as upper-level models. The decision model including the upper-level model and the lower-level model is solved to determine the frequency regulation capacity and frequency regulation mileage of each energy storage entity that wins the bid in different time periods as a frequency regulation participation plan for the energy storage cluster, so as to maximize the frequency regulation benefits of the energy storage cluster, allow the energy storage cluster to participate in frequency regulation as much as possible, and improve the utilization rate of the energy storage cluster.

[0008] Furthermore, when generating the frequency regulation participation plan for the energy storage cluster, the frequency regulation market revenue of the energy storage cluster includes the frequency regulation capacity compensation revenue determined based on the winning frequency regulation capacity and the frequency regulation capacity compensation price, which can compensate the energy storage cluster in terms of revenue. In the process of maximizing the frequency regulation revenue, the energy storage cluster can flexibly set pricing by considering the compensation in terms of revenue, thereby increasing the winning capacity, improving the utilization rate of energy storage, achieving cost compensation pricing for the energy storage cluster, and establishing a compensation mechanism for the energy storage cluster's participation in frequency regulation ancillary services. BRIEF DESCRIPTION OF THE DRAWINGS

[0009] In order to achieve the above and related purposes, the present invention describes certain illustrative aspects in conjunction with the following description and the accompanying drawings, which indicate various ways in which the principles disclosed in the present invention can be practiced, and all aspects and their equivalents are intended to fall within the scope of the claimed subject matter. By reading the following detailed description in conjunction with the accompanying drawings, the above and other purposes, features and advantages disclosed by the present invention will become more apparent. Throughout the present disclosure, the same reference numerals generally refer to the same parts or elements.

[0010] Figure 1 A schematic diagram showing the change in peak-to-valley difference throughout the year after wind power is connected;

[0011] Figure 2 A schematic diagram showing thermal power and energy storage participating in grid frequency regulation according to an exemplary embodiment is shown;

[0012] Figure 3 A method for determining that an energy storage cluster participates in frequency regulation auxiliary services based on master-slave game according to an exemplary embodiment of the present invention is shown;

[0013] Figure 4 A schematic diagram of a decision model according to an exemplary embodiment of the present invention is shown;

[0014] Figure 5 A schematic diagram showing the frequency regulation mileage demand and frequency regulation capacity demand for each time period;

[0015] Figure 6 A schematic diagram showing the frequency regulation capacity of thermal power units and energy storage entities that won bids in each period;

[0016] Figure 7 A schematic diagram showing the frequency regulation mileage of thermal power units and energy storage entities that won the bid in each period;

[0017] Figure 8 A schematic diagram showing the frequency regulation mileage quotation of energy storage entities and thermal power units is shown;

[0018] Fig. 9 A schematic diagram showing the frequency regulation mileage quotation and frequency regulation mileage clearing price of the energy storage entity;

[0019] Fig.10 A structural block diagram of a computing device according to an exemplary embodiment of the present invention is shown. DETAILED DESCRIPTION

[0020] Exemplary embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. Although exemplary embodiments of the present disclosure are shown in the accompanying drawings, it should be understood that the present disclosure can be implemented in various forms and should not be limited by the embodiments set forth herein. On the contrary, these embodiments are provided in order to enable a more thorough understanding of the present disclosure and to enable the scope of the present disclosure to be fully conveyed to those skilled in the art. The same reference numerals generally refer to the same components or elements.

[0021] Frequency regulation and peak regulation are two different types of power auxiliary services. Power auxiliary services refer to services provided by thermal power, hydropower, nuclear power, wind power, photovoltaic power generation, solar thermal power generation, pumped storage, self-contained power plants and other power generation grid-connected entities, electrochemical, compressed air, flywheel and other new energy storage, traditional high-load industrial loads, commercial and industrial interruptible loads, electric vehicle charging networks and other adjustable loads that can respond to power dispatching instructions (including aggregation through aggregators, virtual power plants, etc.) in addition to normal power production, transmission and use, in order to maintain the safe and stable operation of the power system, ensure the quality of power and promote the consumption of clean energy.

[0022] Frequency regulation refers to the service provided by the grid-connected entities to reduce the frequency deviation by adjusting the active output through the speed regulation system, automatic power control and other means when the power system frequency deviates from the target frequency. Frequency regulation is divided into primary frequency regulation and secondary frequency regulation. Primary frequency regulation refers to the service provided by the grid-connected entities such as new energy and energy storage to reduce the frequency deviation by adjusting the active output through the automatic response of the speed regulation system when the power system frequency deviates from the target frequency. Secondary frequency regulation refers to the service provided by the grid-connected entities to track the instructions issued by the power dispatching agency through automatic power control technologies, including automatic generation control (AGC) and automatic power control (APC), and adjust the power generation and consumption in real time according to a certain regulation rate to meet the power system frequency and interconnection line power control requirements.

[0023] Peak shaving refers to the service provided by grid-connected entities to adjust power generation and consumption or start and stop equipment according to dispatch instructions in order to track the peak and valley changes in system load and changes in renewable energy output.

[0024] Using energy storage to achieve frequency and peak regulation can effectively solve problems such as insufficient grid regulation capacity and increased difficulty in frequency stability caused by a high proportion of renewable energy in the grid.

[0025] Energy storage specifically refers to a device that stores energy through a medium or device and releases it when needed. Its working process includes the input and output of energy and matter, energy conversion and storage, etc. The energy stored in energy storage can come from renewable energy. Energy storage access to the electricity market can promote the consumption of renewable energy such as wind and light and optimize market configuration to a certain extent. In addition, energy storage, as a new and flexible market entity, has multiple values ​​in participating in the electricity auxiliary service market transactions.

[0026] Renewable energy refers to non-fossil energy such as wind energy, solar energy, hydropower, biomass energy, geothermal energy, etc. High proportion of renewable energy refers to the penetration rate of renewable energy system, which refers to the percentage of electricity generated by a certain renewable energy relative to the total power generation or consumption in the power grid. When actually defining high proportion of renewable energy, a preset penetration rate limit can be set. When the penetration rate in the power grid reaches the penetration rate limit, the renewable energy in the power grid can be determined as high proportion of renewable energy.

[0027] Renewable energy, such as wind energy and solar energy, has the characteristics of intermittent supply, randomness and high volatility. Taking the impact of high-proportion wind power access to the power system on the peak load regulation of the power grid as an example, its impact on the peak load regulation of the power grid can be divided into two situations: positive peak load regulation scenario and negative peak load regulation scenario. The positive peak load regulation scenario reflects that the high-proportion wind power is superimposed on the load curve as a negative load, which reduces the peak-to-valley difference of the net load curve. On the contrary, the negative peak load regulation scenario indicates that the high-proportion wind power access to the grid further increases the peak-to-valley difference of the net load curve. The peak-to-valley difference of the net load curve refers to the difference between the peak value and the valley value of the net load curve of the power grid.

[0028] Figure 1 The figure shows the change of peak-to-valley difference throughout the year after wind power access. Figure 1 As shown, in a certain year, the number of days with wind power anti-peak regulation scenarios in a certain province's power grid reached 224 days, accounting for 61.4% of the total days of the year. After a high proportion of wind power was connected, the maximum change in the peak-to-valley difference of the net load of the power system reached 3380.42MW; after the province's wind power was connected on these days, the system peak regulation pressure increased.

[0029] Under the influence of factors such as high proportion of renewable energy access to the power grid and changes in user power load, when the power supply cannot match the required power consumption, the frequency of the power grid will change; for example, when the power consumption of users increases, but the power generation provided by the power grid does not increase accordingly, the voltage in the power grid will drop, which will lead to a decrease in the frequency of the power grid. Therefore, it is necessary to adjust the frequency of the power grid. In order to improve the stability of the power grid operation and reduce the peak-to-valley difference of the net load curve of the power grid, it is necessary to peak the power grid.

[0030] Figure 2 A schematic diagram of thermal power and energy storage participating in grid frequency regulation in an exemplary embodiment is shown. When the load-active power balance of the grid is broken, the grid frequency will change. At this time, the speed regulator of the thermal power generator set will first perform a frequency regulation, which controls the output of each unit by changing the opening of the speed regulator control valve, so as to balance it as much as possible with the change of the external disturbance. The reaction speed of the primary frequency regulation is in seconds, but due to the droop characteristics of the generator set, when the system returns to the power balance state, the frequency has not returned to the rated value, which belongs to differential regulation. To this end, in order to achieve differential frequency adjustment, secondary frequency regulation must be further performed on this basis. In the secondary frequency regulation, the generator set needs to correct the output of the generator set according to the ACE signal, and its reaction speed is relatively slow compared to the primary frequency regulation. In the operation of the power grid, ACE means regional control deviation.

[0031] Since the climbing rate of traditional units is low and the frequency recovery is slow, energy storage is added to participate in the secondary frequency regulation of the power grid. The energy storage needs to output quickly according to the frequency regulation instructions assigned by the controller to reduce the frequency deviation, so that the power grid can reach the final balance point faster.

[0032] When the grid frequency is modulated, the output power of the generator set is controlled to track the real-time changes of the load disturbance. When the grid has a frequency deviation, the frequency deviation and the exchange power deviation of the interconnection line in the grid are generally linearly combined to form a regional control error signal, which is used as feedback to control the frequency modulation, that is, to generate an ACE signal. The thermal power and energy storage receiving controllers generate a frequency deviation based on the frequency modulation instructions distributed by the ACE signal, and the energy storage and each unit jointly output the frequency deviation, so as to balance the system power generation and load demand to maintain the stability of the system frequency, and ensure that the exchange power of the interconnection line in the grid is within the normal range.

[0033] According to one embodiment of the present invention, when energy storage participates in frequency modulation in the present invention, multiple energy storages will participate in frequency modulation together. Multiple energy storages can be managed by a unified energy storage operator. The energy storage operator allows each energy storage to participate in frequency modulation in the form of an energy storage cluster. The energy storage cluster includes multiple energy storage entities. The energy storage operator uniformly sets the frequency modulation capacity, frequency modulation mileage, and frequency modulation mileage quotation declared by each energy storage entity to maximize the peak-shaving benefits of the entire energy storage cluster.

[0034] According to one embodiment of the present invention, the energy storage cluster participates in the frequency regulation by bidding in the frequency regulation market, with the winning frequency regulation capacity and frequency regulation mileage as the limit. The energy storage cluster also needs to compete with the thermal power cluster, and the energy storage cluster and the thermal power cluster jointly participate in the frequency regulation to meet the peak regulation demand in the peak regulation market. The thermal power cluster includes multiple thermal power units, and the thermal power cluster also uniformly arranges the frequency regulation capacity, frequency regulation mileage and frequency regulation mileage quotation declared by each thermal power unit to maximize the frequency regulation benefits of the entire thermal power cluster.

[0035] The frequency regulation market is a kind of power auxiliary service market. The frequency regulation market can be realized as a day-ahead spot market. The frequency regulation service provided by the energy storage cluster is organized into market transactions in the form of day-ahead dispatch, including receiving the frequency regulation demand of each demand party in each time period, obtaining the total frequency regulation demand in each time period, including the frequency regulation capacity demand and the frequency regulation mileage demand; receiving the frequency regulation capacity, frequency regulation mileage and frequency regulation mileage quotation declared by each energy storage entity and thermal power unit in each time period; clearing from low to high according to the frequency regulation mileage quotation, and determining the clearing price of the frequency regulation mileage in each time period when the expected transaction capacity meets the frequency regulation demand in the time period; finally, trading is carried out according to the clearing price of the frequency regulation mileage and the frequency regulation capacity compensation price, determining the winning frequency regulation capacity and frequency regulation mileage of the energy storage cluster and the thermal power cluster, obtaining the frequency regulation participation plan of the energy storage cluster and the thermal power cluster, and implementing frequency regulation according to the frequency regulation participation plan.

[0036] Figure 3 A method for determining that an energy storage cluster participates in frequency regulation auxiliary services based on master-slave game according to an exemplary embodiment of the present invention is shown. Figure 3As shown, first, step 310 is executed to construct an energy storage cluster frequency regulation revenue compensation model, including an energy storage cluster frequency regulation revenue function with the goal of maximizing the energy storage cluster frequency regulation revenue, and its decision variables include the frequency regulation capacity, frequency regulation mileage and frequency regulation mileage quotation declared by each energy storage entity in different time periods.

[0037] The energy storage cluster frequency regulation revenue function includes: determining the energy storage cluster frequency regulation revenue based on the energy storage cluster frequency regulation market revenue and the energy storage cluster frequency regulation service cost. The energy storage cluster frequency regulation revenue function can be expressed according to the following formula:

[0038] max F ES =F EC -C ES

[0039] F ES is the frequency regulation benefit of the energy storage cluster, F EC is the energy storage cluster frequency regulation market revenue, C ES is the frequency regulation service cost of the energy storage cluster. max F ES It indicates that the energy storage cluster frequency regulation revenue function aims to maximize the energy storage cluster frequency regulation revenue. The energy storage cluster frequency regulation revenue is the revenue obtained by the energy storage cluster after deducting the energy storage cluster frequency regulation service cost. The energy storage cluster frequency regulation market revenue is the revenue obtained by the energy storage cluster from the frequency regulation market. The energy storage cluster frequency regulation service cost is the cost required for the energy storage cluster to provide frequency regulation services.

[0040] The energy storage cluster frequency regulation market revenue is determined based on the winning frequency regulation capacity, frequency regulation mileage, frequency regulation capacity compensation price, frequency regulation mileage clearing price, and the comprehensive frequency regulation performance indicators of each energy storage entity, including:

[0041]

[0042] are the frequency regulation capacity compensation price and frequency regulation mileage clearing price in period t, are the frequency regulation capacity and frequency regulation mileage won by the kth energy storage entity in period t, n ES,k is the comprehensive frequency regulation performance index of the kth energy storage entity. Among them, the frequency regulation capacity compensation price can be determined according to market conditions. Among them, the value range of t is 1-T, T is the total number of time periods obtained by dividing a day (i.e., the scheduling day for the energy storage cluster and the thermal power cluster to participate in the peak regulation) into fixed time periods. If each time period is 1 hour, T can be 24. The value range of k is 1-K, and K is the number of energy storage entities included in the energy storage cluster.

[0043] According to one embodiment of the present invention, Determined according to the frequency regulation market. In the energy storage cluster frequency regulation market revenue, the frequency regulation capacity compensation price brings the frequency regulation capacity compensation revenue. The party receiving the frequency regulation service can make expenditures to realize cost compensation for the energy storage cluster providing the frequency regulation service; in specific implementation, the frequency regulation service provider, such as the energy storage cluster, will determine the final frequency regulation revenue of the energy storage cluster based on the frequency regulation market revenue of the energy storage cluster, including the frequency regulation capacity compensation revenue, so as to flexibly determine the declared price for providing frequency regulation services, that is, flexible pricing based on cost compensation. By implementing cost compensation pricing in the frequency regulation market, not only can the pricing of the frequency regulation service provided by the energy storage cluster be reduced, but also the enthusiasm of the energy storage cluster to provide frequency regulation services in the frequency regulation market can be promoted, so that the energy storage cluster can better participate in frequency regulation services.

[0044] The cost of energy storage cluster frequency regulation service is determined based on the winning frequency regulation capacity and frequency regulation unit cost, including:

[0045]

[0046] MC 1,k is the unit cost of frequency regulation of the kth energy storage entity.

[0047] The constraints of the frequency regulation compensation revenue model for energy storage clusters include: declared frequency regulation capacity constraints, declared frequency regulation mileage constraints, frequency regulation mileage quotation constraints, state of charge constraints, and power and electricity margin constraints for frequency regulation services.

[0048] Frequency regulation capacity constraints include:

[0049]

[0050] is the frequency regulation capacity declared by the kth energy storage entity in period t, The maximum frequency regulation capacity that the k-th energy storage entity is allowed to declare.

[0051]

[0052] is the frequency regulation mileage reported by the kth energy storage entity in period t, is the maximum frequency regulation mileage allowed to be declared by the kth energy storage entity, s ES,k It is the historical frequency regulation mileage calling coefficient (frequency regulation mileage multiplier) of the kth energy storage entity.

[0053] Frequency regulation mileage quotation constraints include:

[0054]

[0055] are the minimum frequency regulation mileage quotation and the maximum frequency regulation mileage quotation allowed by the k-th energy storage entity, The frequency regulation mileage quotation for the kth energy storage entity in period t.

[0056] State of charge constraints include:

[0057]

[0058] S k,t , S k,t-1 are the charge of the kth energy storage entity in period t and the charge of period t-1, respectively. are the charging power and discharging power of the kth energy storage entity in period t, are the charging efficiency and discharging efficiency of the kth energy storage entity, respectively, Δt1 and Δt2 are the charging time and discharging time in time period t, respectively. According to one embodiment of the present invention, the discharging of the energy storage entity during the discharging time can be specifically realized as a process of providing frequency modulation service.

[0059] S k,min S ESS,k ≤S k,t ≤S k,max S ESS,k

[0060] S k,min and S k,max are the minimum state of charge and maximum state of charge allowed by the kth energy storage entity, S ESS,k is the rated capacity of the kth energy storage entity, S k,t is the charge of the kth energy storage entity in time period t. The state of charge is the ratio of the charge to the rated capacity.

[0061] S T =S0

[0062] S T S0 and S1 are the battery charge states at the end and start of the energy storage entity's scheduling day, respectively. This formula indicates that the charge of the energy storage entity at the end of the scheduling day is equal to the charge of the energy storage entity at the start of the scheduling day.

[0063] Since the energy storage cluster needs to participate in both the electric energy market and the frequency regulation auxiliary service market, a portion of capacity needs to be reserved for AGC calls. Therefore, the energy storage cluster needs to reserve power and electricity margins. The power and electricity margin constraints of the frequency regulation service include:

[0064]

[0065] and are the maximum charging power and maximum discharging power allowed for the kth energy storage entity respectively.

[0066]

[0067] t AGCThe AGC continuous operation time required when the energy storage cluster is called. AGC is an automatic power generation control system.

[0068] Subsequently, step 320 is executed to construct a thermal power cluster frequency regulation compensation benefit model, including a thermal power cluster frequency regulation benefit function with the goal of maximizing the thermal power cluster frequency regulation benefit, and its decision variables include the frequency regulation capacity, frequency regulation mileage and frequency regulation mileage quotation declared by each thermal power entity in the thermal power cluster in different time periods.

[0069] Among them, the thermal power cluster frequency regulation revenue function includes: determining the thermal power cluster frequency regulation revenue based on the thermal power cluster frequency regulation market revenue and the thermal power cluster frequency regulation service cost. The thermal power cluster frequency regulation revenue function can be expressed according to the following formula:

[0070]

[0071] F G is the frequency regulation benefit of thermal power cluster, F GC The market revenue of thermal power cluster frequency regulation is is the frequency regulation service cost of thermal power cluster. max F G It indicates that the thermal power cluster frequency regulation revenue function aims to maximize the thermal power cluster frequency regulation revenue. The thermal power cluster frequency regulation revenue is the revenue obtained by the thermal power cluster after deducting the thermal power cluster frequency regulation service cost. The thermal power cluster frequency regulation market revenue is the revenue obtained by the thermal power cluster from the frequency regulation market. The thermal power cluster frequency regulation service cost is the cost required for the thermal power cluster to provide frequency regulation services.

[0072] The frequency regulation market revenue of thermal power units is determined based on the frequency regulation capacity, frequency regulation mileage, frequency regulation capacity compensation price, frequency regulation mileage clearing price and the comprehensive frequency regulation performance indicators of each thermal power unit, including:

[0073]

[0074] are the frequency regulation capacity and frequency regulation mileage of the mth thermal power unit in period t, respectively. G,m is the comprehensive frequency regulation performance index of the mth thermal power unit.

[0075] According to one embodiment of the present invention, Determined according to the frequency regulation market. In the thermal power cluster frequency regulation market revenue, the frequency regulation capacity compensation price brings the frequency regulation capacity compensation revenue. The party receiving the frequency regulation service can make expenditures to realize cost compensation for the thermal power cluster providing the frequency regulation service; in specific implementation, the frequency regulation service provider, such as the thermal power cluster, will determine the final thermal power cluster frequency regulation income based on the thermal power cluster frequency regulation market income including the frequency regulation capacity compensation income, so as to flexibly determine the declared price for providing frequency regulation services, that is, flexible pricing based on cost compensation. By conducting cost compensation pricing in the frequency regulation market, it is not only possible to reduce the pricing of the thermal power cluster's frequency regulation services, but also to promote the enthusiasm of the thermal power cluster to provide frequency regulation services in the frequency regulation market, so that the thermal power cluster can better participate in frequency regulation services.

[0076]

[0077] MC 2,k is the unit cost of frequency regulation of the kth thermal power unit.

[0078] The constraints of the frequency regulation compensation revenue model for thermal power clusters include: declared frequency regulation capacity constraints, declared frequency regulation mileage constraints, frequency regulation mileage quotation constraints, thermal power unit output constraints and climbing and sliding constraints.

[0079] The declared frequency regulation capacity constraints include:

[0080]

[0081] is the frequency regulation capacity declared by the kth thermal power entity in period t, The maximum frequency regulation capacity that the k-th energy storage entity is allowed to declare.

[0082] The declared frequency regulation mileage constraints include:

[0083]

[0084] is the frequency regulation mileage reported by the kth thermal power entity in period t, is the maximum frequency regulation mileage allowed to be declared by the kth energy storage entity, s G,m It is the historical frequency regulation mileage calling coefficient (frequency regulation mileage multiplier) of the mth thermal power unit.

[0085] Frequency regulation mileage quotation constraints include:

[0086]

[0087] are the minimum and maximum frequency regulation mileage bids allowed for the mth thermal power unit, The frequency regulation mileage quotation of the kth thermal power entity in period t.

[0088] Output constraints of thermal power units include:

[0089]

[0090] Q m,min , Q m,max are the minimum and maximum outputs allowed for the mth thermal power unit, Q m,t The output of the mth thermal power unit in period t.

[0091] Slope climbing and landslide constraints include:

[0092] When Q m,t Greater than Q m,t-1 hour:

[0093] Q m,t -Q m,t-1 ≤V m

[0094] Q m,t-1 is the output of the mth thermal power unit in the t-1 period, V m is the maximum ramp rate of the mth thermal power unit;

[0095] When Q m,t Less than Q m,t-1 hour:

[0096] Q m,t-1 -Q m,t ≤D m

[0097] D m The maximum landslide rate of the mth thermal power unit.

[0098] Subsequently, step 330 is executed to construct a frequency regulation service purchase cost model, including a frequency regulation service purchase cost function with the goal of minimizing the cost of purchasing frequency regulation services, whose decision variables include the clearing price of frequency regulation mileage in different time periods, and the winning frequency regulation capacity and frequency regulation mileage of each energy storage entity and each thermal power unit in different time periods.

[0099] Among them, the frequency modulation service purchase cost function includes:

[0100]

[0101] F L The cost of purchasing frequency regulation services includes the cost of purchasing the frequency regulation capacity provided by energy storage clusters and thermal power clusters and the cost of frequency regulation mileage.

[0102] The constraints of the frequency regulation service purchase cost model include: frequency regulation demand balance constraints and clearing rule constraints.

[0103] Frequency regulation demand balance constraints include frequency regulation capacity demand balance constraints and frequency regulation mileage demand balance constraints.

[0104] The frequency regulation capacity demand balancing constraints include:

[0105]

[0106] is the frequency regulation capacity demand during period t.

[0107] The frequency regulation mileage demand balance constraints include:

[0108]

[0109] is the frequency regulation mileage demand in period t.

[0110] The clearing rule constraints include:

[0111]

[0112] represents the frequency regulation mileage that can be called by energy storage cluster k in period t, It indicates the frequency regulation mileage value that can be used by thermal power unit m in period t.

[0113] Finally, execute step 340, use the frequency regulation service purchase cost model as the lower model, the energy storage cluster frequency regulation compensation benefit model and the thermal power cluster frequency regulation compensation benefit model as the upper model, and solve the decision model including the upper model and the lower model to determine the frequency regulation capacity and frequency regulation mileage of each energy storage entity in different time periods as the frequency regulation participation plan of the energy storage cluster.

[0114] Figure 4 FIG. 4 is a schematic diagram showing a decision model according to an exemplary embodiment of the present invention. Figure 4 As shown, the decision model includes an upper model and a lower model. The upper model includes the frequency regulation compensation benefit model of the energy storage cluster and the frequency regulation compensation benefit model of the thermal power cluster, and the lower model includes the frequency regulation service purchase cost model.

[0115] Solving the decision model including the upper model and the lower model includes: inputting the decision variables of the upper model into the upper model to determine the clearing price; and determining the frequency regulation capacity and frequency regulation mileage of each energy storage entity that has won the bid in different time periods according to the clearing price.

[0116] According to one embodiment of the present invention, the decision model can be specifically implemented as a master-slave game model, in which the lower model is the master model and the upper model is the slave model. The master-slave game model is reflected in that the slave model can only passively receive the market organization process of the master model, and clear according to the prescribed clearing price to determine the frequency modulation benefit.

[0117] According to one embodiment of the present invention, the frequency regulation demand of each demand party in each time period is received to obtain the total frequency regulation demand in each time period, including the frequency regulation capacity demand and the frequency regulation mileage demand; the frequency regulation capacity, frequency regulation mileage and frequency regulation mileage quotation declared by each energy storage entity and thermal power unit in each time period are received; clearing is performed from low to high according to the frequency regulation mileage quotation, and when the expected transaction capacity meets the frequency regulation demand of the time period, the clearing price of the frequency regulation mileage in each time period is determined; finally, transactions are performed according to the clearing price of the frequency regulation mileage and the frequency regulation capacity compensation price, the winning frequency regulation capacity and frequency regulation mileage of the energy storage cluster and the thermal power cluster are determined, the frequency regulation participation plan of the energy storage cluster and the thermal power cluster is obtained, and frequency regulation is implemented according to the frequency regulation participation plan.

[0118] According to one embodiment of the present invention, a thermal power cluster in a certain region contains 3 thermal power units and an energy storage cluster contains 1 energy storage entity. When the frequency regulation market organizes the thermal power cluster and the energy storage cluster to provide frequency regulation services, the frequency regulation market divides the dispatching day into fixed periods of 15 minutes, and each 15 minutes is a dispatching period. The power dispatching agency clears the frequency regulation market at intervals of 1 hour. The required frequency regulation capacity of the system in each clearing period is 5% of the load in the current period. The region also sets time-of-use electricity prices, including: peak electricity price of 1,005 yuan / MWh, time periods include: 9:00-11:00 and 15:00-17:00; peak electricity price of 831 yuan / MWh, time periods include: 8:00-9:00, 13:00-15:00 and 17:00-22:00; valley electricity price of 232 yuan / MWh, time periods include: 11:00-13:00 and 22:00-8:00 the next day.

[0119] Table 1 and Table 2 show the parameters of the thermal power unit and the main energy storage unit, respectively.

[0120] Table 1 Thermal power unit parameters

[0121]

[0122] Table 2 Energy storage main parameters

[0123]

[0124] and are the maximum charging power and maximum discharging power of the kth energy storage entity respectively.

[0125] Figure 5 A schematic diagram showing the frequency regulation mileage demand and frequency regulation capacity demand in each time period.

[0126] The decision model was solved according to the above parameters, and the frequency regulation capacity and frequency regulation mileage of thermal power units and energy storage entities that won the bid in each time period were obtained. Figure 6A schematic diagram showing the frequency regulation capacity won by thermal power units and energy storage entities in each time period. Figure 7 A schematic diagram showing the frequency regulation mileage won by thermal power units and energy storage entities in each time period.

[0127] like Figure 6 and Figure 7 As shown in the figure, the energy storage entity is charged during the period of 11:00-12:00, so the frequency regulation demand during the period of 9:00-12:00 is fully met by the thermal power units. The total installed capacity of the energy storage entity N1 only accounts for 6% of the total installed capacity of the thermal power units, and the total winning capacity accounts for about 51.8% of the total frequency regulation demand, undertaking the main task of the frequency regulation market. Compared with the thermal power units, it has better frequency regulation characteristics. When providing the same frequency regulation mileage, the energy storage responds to the frequency regulation signal faster and can provide more frequency regulation mileage. Therefore, as a high-quality frequency regulation resource, it can be called first in the frequency regulation market.

[0128] Figure 8 The schematic diagram of the energy storage entity and the frequency regulation mileage quotation of the thermal power unit is shown in Figure 8 As shown in the figure, the price of frequency regulation mileage of energy storage entities is between 6-11 yuan / MW, and the price of frequency regulation mileage of thermal power units is between 19-28 yuan, both of which are within the preset quotation range. The price of frequency regulation mileage of energy storage entities is always lower than that of thermal power units. One of the reasons is that the energy storage cluster comprehensively considers the quotation strategies of other entities, frequency regulation capacity compensation income and its own operating characteristics, and makes strategic quotations in the market to maximize its own benefits.

[0129] Fig. 9 The schematic diagram shows the frequency regulation mileage quotation and frequency regulation mileage clearing price of the energy storage entity, as shown in Fig. 9 As shown in the figure, the frequency regulation mileage clearing price in the frequency regulation auxiliary service market is always higher than the frequency regulation mileage quotation of the energy storage entity, and the changing trend of the clearing price is consistent with the changing trend of the frequency regulation mileage quotation of the energy storage entity.

[0130] Table 3 Frequency modulation benefits of market players

[0131]

[0132] Table 3 lists the overall benefits of each market player participating in the frequency regulation auxiliary service market. As shown in Table 3, the thermal power unit G1 bears most of the demand in the electric energy market and is fully generated in almost all periods. Therefore, it no longer participates in the frequency regulation auxiliary service market, and its total frequency regulation benefit is also 0. Other market players all have good benefits. The present invention can reasonably set the quotation and clearing price generation mechanism of market players in the frequency regulation auxiliary service market to encourage market players to participate in frequency regulation auxiliary services and reasonably use high-quality frequency regulation resources.

[0133] The present invention is suitable for execution in a computing device. Fig.10 1 shows a block diagram of a computing device according to an exemplary embodiment of the present invention. In a basic configuration, computing device 1000 includes at least one processing unit 1020 and system memory 1010. According to one aspect, depending on the configuration and type of computing device, system memory 1010 includes, but is not limited to, volatile storage (e.g., random access memory), non-volatile storage (e.g., read-only memory), flash memory, or any combination of such memories. According to one aspect, system memory 1010 includes operating system 1011.

[0134] According to one aspect, operating system 1011, for example, is suitable for controlling the operation of computing device 1000. Furthermore, examples may be practiced in conjunction with graphics libraries, other operating systems, or any other application programs, and are not limited to any particular application or system. Fig.10 This basic configuration is illustrated in FIG by those components within dashed line 1015. According to one aspect, computing device 1000 has additional features or functionality. For example, according to one aspect, computing device 1000 includes additional data storage devices (removable and / or non-removable), such as magnetic disks, optical disks, or tapes.

[0135] As stated above, according to one aspect, a program module 1012 is stored in the system memory 1010. According to one aspect, the program module 1012 can be implemented as one or more computer program products, and the present application does not limit the type of computer program products, for example, it can include: email, word processing application, spreadsheet application, database application, slide show application, painting or computer-aided application, web browser, etc. In some embodiments according to the present application, the computer programs / instructions related to the method 300 for determining the participation of energy storage clusters in frequency regulation auxiliary services based on master-slave game are packaged into a computer program product. When these computer programs / instructions are executed by the processor (i.e., the processing unit 1020), the method 300 for determining the participation of energy storage clusters in frequency regulation auxiliary services based on master-slave game according to the present application is implemented.

[0136] According to one aspect, the examples may be practiced on a circuit comprising discrete electronic components, a packaged or integrated electronic chip containing logic gates, a circuit utilizing a microprocessor, or a single chip containing electronic components or a microprocessor. Fig.10Each or many components shown in can be integrated into a system on chip (SOC) on a single integrated circuit to practice examples. According to one aspect, such a SOC device may include one or more processing units, a graphics unit, a communication unit, a system virtualization unit, and various application functions, all of which are integrated (or "burned") into a chip substrate as a single integrated circuit. When operated via SOC, the functions described in the present invention can be operated via a dedicated logic integrated with other components of the computing device 1000 on a single integrated circuit (chip). Other technologies capable of performing logical operations (such as AND, OR, and NOT) can also be used to practice embodiments of the present invention, including but not limited to mechanical, optical, fluid, and quantum technologies. In addition, embodiments of the present invention can be practiced in a general-purpose computer or in any other circuit or system.

[0137] According to one aspect, the computing device 1000 may also have one or more input devices 1031, such as a keyboard, a mouse, a pen, a voice input device, a touch input device, etc. Output devices 1032 may also be included, such as a display, a speaker, a printer, etc. The aforementioned devices are examples and other devices may also be used. The computing device 1000 may include one or more communication connections 1033 that allow communication with other computing devices 1040. Examples of suitable communication connections 1033 include, but are not limited to: RF transmitters, receivers, and / or transceiver circuits; Universal Serial Bus (USB), parallel and / or serial ports. The computing device 1000 can be communicatively connected to other computing devices 1040 via the communication connection 1033.

[0138] The embodiment of the present invention also provides a non-transitory readable storage medium, which stores instructions, and the instructions are used to make the computing device perform a method according to an embodiment of the present invention. The readable medium of this embodiment includes permanent and non-permanent, removable and non-removable media, and information storage can be implemented by any method or technology. The information can be a computer-readable instruction, a data structure, a module of a program, or other data. Examples of readable storage media include, but are not limited to: phase change memory (PRAM), static random access memory (SRAM), dynamic random access memory (DRAM), other types of random access memory (RAM), read-only memory (ROM), electrically erasable programmable read-only memory (EEPROM), flash memory or other memory technology, read-only compact disc read-only memory (CD-ROM), digital versatile disc (DVD) or other optical storage, magnetic cassette, tape disk storage or other magnetic storage device or any other non-transitory readable storage medium.

[0139] According to one aspect, communication media is implemented by computer readable instructions, data structures, program modules, or other data in a modulated data signal (e.g., a carrier wave or other transport mechanism), and includes any information delivery media. According to one aspect, the term "modulated data signal" describes a signal that has one or more characteristics set or changed in a manner that encodes information in the signal. By way of example and not limitation, communication media includes wired media such as a wired network or direct-wired connection, and wireless media such as acoustic, radio frequency (RF), infrared, and other wireless media.

[0140] It should be noted that, although the computing device shown above only includes a processing unit 1020, a system memory 1010, an input device 1031, an output device 1032, and a communication connection 1033, in a specific implementation, the device may also include other components necessary for normal operation. In addition, it can be understood by those skilled in the art that the device may only include components necessary for implementing the embodiments of the present specification, and need not include all the components shown in the figure.

[0141] In addition, an embodiment of the present invention also includes A10, a method as described in A1, wherein solving the decision model including an upper-level model and a lower-level model includes: inputting the decision variables of the upper-level model into the upper-level model to determine a clearing price; and determining the frequency regulation capacity and frequency regulation mileage of each energy storage entity winning the bid in different time periods according to the clearing price.

[0142] In the case where the program code is executed on a programmable computer, the computing device generally includes a processor, a storage medium readable by the processor (including volatile and non-volatile memory and / or storage elements), at least one input device, and at least one output device. The memory is configured to store the program code; the processor is configured to execute the method of determining the participation of the energy storage cluster in the frequency regulation auxiliary service based on the master-slave game according to the instructions in the program code stored in the memory.

[0143] By way of example and not limitation, computer readable media include computer storage media and communication media. Computer readable media include computer storage media and communication media. Computer storage media stores information such as computer readable instructions, data structures, program modules or other data. Communication media generally embodies computer readable instructions, data structures, program modules or other data in a modulated data signal such as a carrier wave or other transmission mechanism, and includes any information delivery medium. Any combination of the above is also included within the scope of computer readable media.

Claims

1. A method for determining whether an energy storage cluster participates in frequency regulation auxiliary services based on master-slave game, the method comprising: Construct a frequency regulation compensation revenue model for energy storage clusters, including a frequency regulation revenue function for energy storage clusters that aims to maximize frequency regulation revenue for energy storage clusters. Its decision variables include the frequency regulation capacity, frequency regulation mileage, and frequency regulation mileage quotes declared by each energy storage entity in the energy storage cluster at different time periods. Construct a frequency regulation compensation revenue model for thermal power clusters, including a frequency regulation revenue function for thermal power clusters with the goal of maximizing the frequency regulation revenue of thermal power clusters. Its decision variables include the frequency regulation capacity, frequency regulation mileage, and frequency regulation mileage quotation declared by each thermal power entity in the thermal power cluster at different time periods. Construct a frequency regulation service purchase cost model, including a frequency regulation service purchase cost function with the goal of minimizing the cost of purchasing frequency regulation services. Its decision variables include the clearing price of frequency regulation mileage at different time periods, as well as the frequency regulation capacity and frequency regulation mileage of each energy storage entity and each thermal power unit that won the bid at different time periods. The frequency regulation service purchase cost model is used as the lower model, and the energy storage cluster frequency regulation compensation benefit model and the thermal power cluster frequency regulation compensation benefit model are used as the upper model. The decision model including the upper model and the lower model is solved to determine the frequency regulation capacity and frequency regulation mileage of each energy storage entity in different time periods as the frequency regulation participation plan of the energy storage cluster.

2. The method of claim 1, wherein: The energy storage cluster frequency regulation revenue function includes: determining the energy storage cluster frequency regulation revenue according to the energy storage cluster frequency regulation market revenue and the energy storage cluster frequency regulation service cost, and the energy storage cluster frequency regulation market revenue includes: are the frequency regulation capacity compensation price and frequency regulation mileage clearing price in period t, are the frequency regulation capacity and frequency regulation mileage won by the kth energy storage entity in period t, n ES,k is the comprehensive frequency regulation performance index of the kth energy storage entity. The value range of t is 1-T, T is the total number of time periods obtained by dividing a day into fixed time periods, and the value range of k is 1-K, K is the number of energy storage entities included in the energy storage cluster.

3. The method according to claim 1 or 2, wherein: The constraints of the energy storage cluster frequency regulation compensation revenue model include: declared frequency regulation capacity constraints, declared frequency regulation mileage constraints, frequency regulation mileage quotation constraints, state of charge constraints, and power and electricity margin constraints for frequency regulation services.

4. The method of claim 1, wherein: The thermal power cluster frequency regulation revenue function includes: determining the thermal power cluster frequency regulation revenue according to the thermal power cluster frequency regulation market revenue and the thermal power cluster frequency regulation service cost, and the thermal power cluster frequency regulation market revenue includes: are the frequency regulation capacity compensation price and frequency regulation mileage clearing price in period t, are the frequency regulation capacity and frequency regulation mileage of the mth thermal power unit in period t, respectively. G,m is the comprehensive frequency regulation performance index of the mth thermal power unit, the value range of t is 1-T, T is the total number of time periods obtained by dividing a day into fixed time periods, and the value range of k is 1-K, K is the number of energy storage entities included in the energy storage cluster.

5. The method according to claim 1 or 4, wherein: The constraints of the thermal power cluster frequency regulation compensation benefit model include: declared frequency regulation capacity constraints, declared frequency regulation mileage constraints, frequency regulation mileage quotation constraints, thermal power unit output constraints and climbing and sliding constraints.

6. The method of claim 1, wherein: The frequency modulation service purchase cost function includes: F L Purchase cost for FM service, are the frequency regulation capacity compensation price and frequency regulation mileage clearing price in period t, are the frequency regulation capacity and frequency regulation mileage won by the kth energy storage entity in period t, n ES,k is the comprehensive frequency regulation performance index of the kth energy storage entity, are the frequency regulation capacity and frequency regulation mileage of the mth thermal power unit in period t, respectively. G,m is the comprehensive frequency regulation performance index of the mth thermal power unit, the value range of t is 1-T, T is the total number of time periods obtained by dividing a day into fixed time periods, and the value range of k is 1-K, K is the number of energy storage entities included in the energy storage cluster.

7. The method according to claim 1 or 6, wherein: The constraints of the frequency regulation service purchase cost model include frequency regulation demand balance constraints and clearing rule constraints.

8. The method of claim 7, wherein: The frequency regulation demand balance constraint includes the frequency regulation capacity demand balance constraint: is the frequency regulation capacity demand during period t.

9. The method of claim 8, wherein: The frequency regulation demand balance constraint also includes the frequency regulation mileage demand balance constraint: is the frequency regulation mileage demand in period t.

10. A computing device comprising: one or more processors; Memory; as well as One or more programs, wherein the one or more programs are stored in a memory and configured to be executed by one or more processors, and the one or more programs include instructions for executing the method according to any one of claims 1-9.

Citation Information

Patent Citations

  • Clearing method for participation of multi-element small and micro subjects in spot market based on virtual power plant

    CN112529622A

  • Bidding method of energy storage power station participating in frequency modulation auxiliary service market

    CN114926254A

  • Self-adaptive frequency modulation auxiliary service method for participation of energy storage in novel electricity market

    CN116760068A

Cited By

  • AGC double-layer power distribution method considering participation of battery energy storage cluster

    CN119787458A