Double-layer optimization method for coordinated operation of wind power and energy storage system

Through the dual-layer optimization method of wind power and energy storage systems, the operation of wind farms and energy storage systems is coordinated, and the complexity of power grid scheduling and wind curtailment caused by wind power resource fluctuations is solved, and efficient resource utilization and cost optimization are achieved.

CN119029978APending Publication Date: 2024-11-26CHONGQING UNIV OF POSTS & TELECOMM

Patent Information

Application Number
CN202411129406.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-16
Publication Date
2024-11-26

AI Technical Summary

Technical Problem

The intermittent and volatility of wind power resources lead to increased grid scheduling complexity, increased wind waste and system operating costs, and the existing technology has failed to effectively optimize the synergy between wind power and energy storage systems, limiting the overall optimization of the system.

Method used

The two-layer optimization method of coordinated operation of wind power and energy storage systems is adopted, and the joint scheduling of wind farm and energy storage system is optimized through the coordinated work of the power grid optimization layer and the energy storage system optimization layer, combined with the multi-objective double-layer optimization model and fuzzy algorithm, Achieve optimal configuration of system resources and safe and stable operation of the power grid.

Benefits of technology

It significantly improves wind power utilization, reduces wind curtailment, reduces the total operating cost of the system, extends the service life of the energy storage system, and improves the power grid's ability to respond to wind power fluctuations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119029978A_ABST
    Figure CN119029978A_ABST
Patent Text Reader

Abstract

The invention requests to protect a double-layer optimization method for coordinated operation of wind power and an energy storage system, and efficient utilization of wind power and stable operation of a power grid are realized through cooperative work of a power grid optimization layer and an energy storage system optimization layer. Wherein the power grid optimization layer optimizes the scheduling of a traditional thermal power generating unit and a wind power generating unit through optimization algorithms such as mixed integer linear programming (MILP) and the like, formulates a day-ahead planning scheme of a power grid, and sends acceptable wind power plant planning output power of the power grid to the energy storage system optimization layer; the energy storage system optimization layer designs a charging and discharging strategy of the energy storage system according to an output result of the power grid optimization layer, optimizes power and capacity of the energy storage system, and feeds back probability distribution of wind power and energy storage system joint output power to related constraints of the power grid optimization layer; and the optimal collaborative operation result of the wind power and energy storage system is obtained through multiple iterative calculations.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of power system optimization, and mainly relates to a double-layer optimization method for coordinated operation of wind power and energy storage systems. Background Art

[0002] With the growth of global energy demand and the enhancement of environmental protection awareness, wind energy, as a clean and renewable energy, is gaining increasing attention and its share in the power system is gradually increasing. However, wind energy resources are significantly intermittent and volatile, which poses a great challenge to the stable operation of the power system.

[0003] Traditional power systems mainly rely on highly controllable power generation methods such as thermal power and hydropower, which can flexibly adjust output power according to power demand to ensure the stability of the power grid. However, the randomness and uncertainty of wind power make its output power difficult to predict, which not only increases the complexity of power grid dispatch, but also may lead to safety and economic problems of the power system. For example, a sudden drop in wind power output may require thermal power units to respond quickly to fill the gap, but this is often accompanied by high startup costs and efficiency losses; conversely, when wind power output is too high and load demand is low, it may cause grid overload and increase the occurrence of wind abandonment.

[0004] In order to meet the challenges brought by wind power access, energy storage systems have emerged as a key technology. Energy storage systems can store excess electricity when there is an oversupply of electricity and release electricity when there is an undersupply of electricity, thereby smoothing the fluctuations in wind power output and balancing electricity supply and demand. However, the high cost and limited capacity of energy storage systems limit their widespread application. Therefore, how to optimize the configuration and charging and discharging strategies of energy storage systems to maximize their economic benefits and reduce system operating costs has become the focus of current research.

[0005] In existing technologies, the dispatch of wind power and energy storage systems is usually carried out separately, which leads to limitations in overall system optimization. Traditional dispatch methods may not fully consider the role of energy storage systems, or ignore the synergistic effects of wind power and energy storage systems during the optimization process, resulting in inefficient system operation. In addition, the grid has limited ability to respond to fluctuations in wind power output, which may lead to higher wind curtailment rates and system operating costs.

[0006] In order to solve the above problems, the present invention proposes a two-layer optimization method for the coordinated operation of wind power and energy storage systems. This method realizes the joint scheduling of wind farms and energy storage systems through the coordinated work of the power grid optimization layer and the energy storage system optimization layer, thereby maximizing the utilization rate of wind power, reducing wind abandonment, and optimizing the system economy while ensuring the safety of the power grid. This model not only takes into account the scheduling constraints of the power grid, but also combines the charging and discharging characteristics of the energy storage system, so that the power grid can better cope with the uncertainty and volatility of wind power. Through this optimization model, the total operating cost of the system can be effectively reduced, and the acceptance capacity of wind power in the power grid can be improved.

[0007] After searching, the application publication number CN112993997A, a method for coordinated dispatching and control of solid-state heat storage and energy storage to improve wind power consumption, belongs to the technical field of wind power consumption. The method is: determine the optimization and coordinated control method of the solid-state heat storage and energy storage system; determine the double-layer optimization model of the solid-state heat storage and energy storage hybrid system according to the wind abandonment characteristics and the constraints of the power system and the thermal system; establish the objective function of the double-layer model of the solid-state heat storage and energy storage system; establish the solid-state heat storage, battery energy storage and power balance constraints according to the operating characteristics of the hybrid system; determine the fuzzy membership function of the objective function of the double-layer model of the solid-state heat storage and energy storage system, corresponding to the satisfaction of each objective function; use the fuzzy algorithm to obtain two satisfaction values; according to the average value, obtain the optimal configuration results of the capacity and efficiency of the solid-state heat storage device, and the capacity and efficiency of the energy storage battery. The present invention realizes the decoupling of electric heating, electric energy storage and heating, and uses solid-state heat storage devices to efficiently solve the problem of clean energy consumption.

[0008] In a method for coordinated dispatching and controlling solid-state heat storage and energy storage to improve wind power consumption, a control strategy for tracking wind power abandonment is mainly adopted. Although this method has certain advantages over constant power operation in improving wind power abandonment consumption, it also has some shortcomings. First, the dispatching of solid-state heat storage and energy storage systems is limited by the constraints of the power grid and thermal system, which may lead to the inability to fully absorb wind abandonment in some cases. Secondly, it is relatively complex to coordinate the dispatching of solid-state heat storage devices and energy storage devices, especially when it is necessary to meet the needs of the power system and the thermal system at the same time. This complexity increases the control difficulty and cost of the system. In addition, the energy conversion efficiency of solid-state heat storage technology is limited. Especially under high load conditions, it may be necessary to rely on the power of the conventional power grid to supplement the heat demand, reducing the energy utilization efficiency of the overall system.

[0009] A two-layer optimization method for the coordinated operation of wind power and energy storage system overcomes the above shortcomings through a multi-objective two-layer optimization model. The upper optimization goal is to maximize the overall benefit of the system, and the lower optimization goal is the optimal power allocation of solid-state thermal storage and battery energy storage systems. This two-layer structure can comprehensively consider multiple factors such as wind power consumption, heating demand, and power grid operation, thereby achieving more efficient resource utilization. By comprehensively analyzing the wind power, heat and electricity demand of the system in different time periods, this method can reasonably release the stored electric energy during the peak period of power load and fully absorb the abandoned wind during the trough period, thereby improving the operational flexibility of the system. In addition, the two-layer optimization model uses fuzzy algorithms to deal with the satisfaction trade-offs between different objectives, thereby achieving the optimal configuration of system resources. Through these improvements, the two-layer optimization method can achieve effective consumption of wind power in a larger range and enhance the overall economy and operational efficiency of the system. Summary of the invention

[0010] The present invention aims to solve the above problems of the prior art. A two-layer optimization method for the coordinated operation of wind power and energy storage system is proposed. The technical solution of the present invention is as follows:

[0011] A two-layer optimization method for coordinated operation of wind power and energy storage system, comprising the following steps:

[0012] First, the upper power grid optimization layer optimizes the combination and dispatch of thermal power units and wind power units through the mixed integer linear programming MILP optimization algorithm, and formulates the day-ahead plan of the power grid;

[0013] Then, the lower energy storage system optimization layer receives the planned output power of the wind farm and designs the charging and discharging strategy of the energy storage system to optimize the power and capacity of the energy storage system;

[0014] Finally, the probability distribution of the joint output of wind power and energy storage system is passed to the relevant constraints of the grid optimization layer. Through multiple iterative calculations, the optimal coordinated operation result of wind power and energy storage system is obtained.

[0015] Furthermore, the upper power grid optimization layer includes two steps for power grid optimization, specifically including:

[0016] (1) Optimize the thermal power and grid-acceptable renewable energy output of the generating units;

[0017] (2) using the unit combination result of step (1), optimizing the planned output power of the wind farm one day before;

[0018] After the two-step optimization, the maximum acceptable and planned output power of the wind farm is sent to the energy storage system optimization layer.

[0019] Furthermore, the optimization goal of step (1) is to minimize the grid operation cost and maximize the use of renewable energy under the premise of safe operation, that is, to minimize the operation cost of thermal power units. Its objective function F1 is:

[0020]

[0021] in, is the output of unit i in period t; f i (·) is the variable cost function of unit i; is the startup cost of unit i; T is 24 hours a day; N G is the number of units; y i,t is an activation state binary variable, equal to 1 if unit i is activated during period t; is the downtime cost of unit i; z i,t is the shutdown state variable. If unit i is shut down during period t, it is equal to 1; u i,t is the on / off state, which is equal to 1 if unit i is turned on during period t; is the maximum wind power output that can be absorbed;

[0022] The constraints are:

[0023]

[0024]

[0025] Among them, P i G,max and P i G,min are the maximum and minimum power generation levels of unit i respectively; P i ramp is the climbing limit of unit i; P l max and P l min are the maximum and minimum active power transmission limits of line l respectively; k l,i , k l,w , k l,b is the transmission allocation factor; is the predicted power demand of bus b at time t; T i,on , T i,off are the total startup and shutdown time of unit i respectively; are the maximum number of startups and shutdowns of unit i respectively; N b is the total number of lines.

[0026] The input limit of thermal power is shown in formula (2); the ramp limit constraint is shown in formula (3); formulas (4) and (5) represent the relationship between binary variables; the minimum startup and shutdown time constraints are shown in formulas (6) and (7) respectively; the maximum startup and shutdown time constraints are shown in formulas (8) and (9) respectively; formulas (10) and (11) are the reserve capacity constraints, where r u,i,t 、r d,i,t are the upward and downward reserves of unit i respectively; formula (12) is the transmission constraint; formula (13) is the power balance constraint.

[0027] Furthermore, in step (2), considering the acceptance capacity of the power grid, the combination of thermal power units obtained in step (1) is still optimized to minimize the power grid operation cost. The optimization objective function is as follows:

[0028]

[0029] in, is the planned output power of the wind farm; under the premise of minimizing the cost of thermal power, the planned output power of the wind farm is the planned output power after considering the increased power of the thermal power units;

[0030] The planned output power constraints of the wind farm optimization in step (2) do not include the reserve constraints and the start-stop constraints of the thermal power units. In addition, it is necessary to add relevant constraints of wind power, including output constraints and ramp rate constraints, as follows:

[0031]

[0032] in, and are the upper and lower limits of the wind turbine climbing power respectively; P w,t is the output of the wind turbine at time t.

[0033] Furthermore, the model of the energy storage system optimization layer specifically includes:

[0034] In order to extend the service life of the energy storage system as much as possible, the allowable fluctuation range of the combined output of wind power and energy storage system is set to ±15% of the planned output power of the wind farm; when the combined output of wind power and energy storage system exceeds the allowable range, the over-power will be penalized, and the penalty will be added to the optimization target as part of the wind farm operation cost; the optimization objective function is:

[0035]

[0036] Among them, t is the time index; and is the maximum power and capacity of the energy storage system, C ESS is the equipment cost of the energy storage system; C lossThe loss caused by the energy storage system due to its charging and discharging behavior; is the penalty cost; all costs are equivalent to the daily cost, D T is the total number of days;

[0037] The cost of the energy storage system consists of battery cost and converter cost. The battery cost is proportional to the installed capacity, and the converter cost is proportional to the installed power of the energy storage system. That is, the equivalent daily cost is:

[0038]

[0039] Among them, T ESS is the energy storage life; VSC is the converter cost per MW; ESS is the battery cost per MWh;

[0040] The losses of the energy storage system are caused by its charging and discharging behavior, which can be described as follows:

[0041]

[0042] Where, d is the daily index; C wind represents the on-grid electricity price of wind power, P t dis and P t ch are the discharge and charge power of energy storage respectively; S SOC (d) is the state of charge of the energy storage on the dth day; the charge amount minus the discharge amount, excluding the influence of the initial and final SOC values ​​within one day, the charge and discharge loss can be obtained, which can be converted into an economic indicator through the grid-connected electricity price.

[0043] Furthermore, when the combined output of wind power and energy storage systems exceeds the permitted range, a penalty will be imposed for the over-power, and the penalty cost will be calculated as follows:

[0044]

[0045] Among them, C wind is the on-grid electricity price of wind power; P t WESS It is the combined output of wind power and energy storage system; P t WESS,max and P t WESS,minThey are the maximum and minimum values ​​of the combined output of wind power and energy storage systems. When the combined output power of wind power and energy storage systems is within the allowable range, there is no penalty; when the combined output power exceeds the allowable range of renewable energy, the excess power will be penalized at half of the grid-connected electricity price; when the combined output power exceeds the maximum acceptable power of renewable energy, the excess power will be penalized at 1 times the grid-connected electricity price; this part cannot generate income, which is equivalent to wind and power abandonment; the more significant the wind abandonment, the higher the penalty cost.

[0046] Furthermore, the constraints of the energy storage system optimization layer specifically include:

[0047] The combined output of wind power and energy storage system is:

[0048] P t WESS =P t w +P t ESS (twenty one)

[0049] Among them, P t w is the actual output power of wind power; P t ESS is the output power of the energy storage system;

[0050] The allowable range of the combined output power of wind power and energy storage system is as follows:

[0051]

[0052] in, is the installed capacity of the wind farm; γ is the ratio of the maximum allowable power deviation to the installed capacity of the wind farm, which is 15%;

[0053] The energy storage system has two operating states; the corresponding charging and discharging powers are non-negative; the output power of the energy storage system can be expressed as:

[0054]

[0055] Among them, P t dis and P t ch are the discharge and charge power of the energy storage, respectively. The energy storage system cannot charge and discharge at the same time; at any time, at least one of the charge and discharge power is 0;

[0056] The constraints of the energy storage system SOC are:

[0057] SOC t+1 =SOC t +η ch P tch Δt-P t dis Δt / η dis (twenty four)

[0058] SOC min ≤SOC t ≤SOC max (25)

[0059] Among them, SOC t is the SOC of the energy storage system at time t; η ch , η dis is the charge and discharge power, both in the range of [0, 1].

[0060] The advantages and beneficial effects of the present invention are as follows:

[0061] The present invention proposes a two-layer optimization method for the coordinated operation of wind power and energy storage systems. The two-layer optimization model effectively coordinates the operation of wind farms and energy storage systems, significantly improves the utilization rate of wind power, and reduces the phenomenon of wind power abandonment caused by insufficient grid regulation capacity or load demand fluctuations. This coordinated optimization significantly improves the utilization rate of wind power and reduces the total operating cost of the system. In addition, by comprehensively considering the volatility of wind power output and the regulation capacity of the energy storage system, the present invention reduces the penalty costs caused by wind abandonment, optimizes the scheduling of thermal power units and the use of energy storage systems, thereby reducing fuel consumption and start-up and shutdown costs during system operation, and achieving a significant reduction in the total operating cost of the system.

[0062] In the grid optimization layer, the capacity limitation and voltage stability requirements of the transmission network are taken into account to ensure that the grid can operate safely and stably under various wind power output conditions. The energy storage system improves the grid's ability to cope with wind power fluctuations by smoothing the fluctuations in wind power output and reduces the impact on grid frequency and voltage.

[0063] The energy storage system optimization layer takes into account the service life and charging and discharging efficiency of the energy storage equipment. Through reasonable charging and discharging strategies, it reduces excessive use and life loss of batteries, extends the service life of the energy storage system, and improves the economic benefits of the energy storage system.

[0064] The present invention breaks the limitation of independent optimization of traditional wind power and energy storage systems, proposes a collaborative optimization solution, and realizes the linkage scheduling of wind power and energy storage systems through the mutual cooperation of the two-layer optimization model, optimizing the operating efficiency of the overall system. In addition, through reasonable wind farm planned output and energy storage system scheduling, the present invention effectively reduces grid congestion, improves the grid's acceptance capacity for wind power, maximizes the use of wind power resources, and reduces wind abandonment losses.

[0065] The innovation of the present invention is reflected in the following aspects: by introducing a two-layer optimization model, firstly, the mixed integer linear programming (MILP) algorithm is used in the power grid optimization layer to optimize the combination and scheduling of thermal power units and wind power units, and formulate a day-ahead plan for the power grid. Then, the energy storage system optimization layer receives the planned output power of the wind farm, designs the charging and discharging strategy of the energy storage system, and optimizes the power and capacity of the energy storage system. Through multiple iterative calculations, the optimal coordinated operation of wind power and energy storage system is finally achieved. Through the synergy of the two-layer optimization model, the wind farm and the energy storage system are effectively coordinated and operated, which improves the utilization rate of wind power and reduces the phenomenon of wind abandonment caused by insufficient grid regulation capacity or load demand fluctuations. The system takes into account the capacity limitations and voltage stability requirements of the transmission network to ensure the safe and stable operation of the power grid under various wind power output conditions.

[0066] This method not only takes into account the charging and discharging characteristics of the energy storage system, but also comprehensively considers the service life and charging and discharging efficiency of the energy storage equipment. A reasonable charging and discharging strategy not only extends the service life of the energy storage system, but also improves the economic benefits.

[0067] The beneficial effect of the present invention is that it breaks through the limitations of the traditional independent optimization of wind power and energy storage systems, proposes a collaborative optimization solution, and realizes the coordinated scheduling of wind power and energy storage systems through the mutual cooperation of double-layer optimization models, thereby optimizing the operating efficiency of the overall system. Through reasonable planned output of wind farms and scheduling of energy storage systems, grid congestion is reduced, the grid's ability to accept wind power is improved, wind power resources are maximized, and wind abandonment losses are reduced. In addition, by smoothing the fluctuations in wind power output, the impact on grid frequency and voltage is reduced, thereby improving the grid's ability to cope with wind power fluctuations. Overall, the present invention has significant innovation and practical application value in terms of collaborative optimization of wind power and energy storage systems, economic improvement, and maximization of resource utilization. BRIEF DESCRIPTION OF THE DRAWINGS

[0068] Figure 1 It is a schematic diagram of the coordinated operation of wind power and energy storage in a double-layer optimization method for the coordinated operation of wind power and energy storage systems according to a preferred embodiment of the present invention. DETAILED DESCRIPTION

[0069] The following will describe the technical solutions in the embodiments of the present invention in detail in conjunction with the accompanying drawings in the embodiments of the present invention. The described embodiments are only part of the embodiments of the present invention.

[0070] The technical solution of the present invention to solve the above technical problems is:

[0071] The present invention proposes a two-layer optimization method for the coordinated operation of wind power and energy storage system. The operation of wind farm and energy storage system is effectively coordinated through the two-layer optimization model. Figure 1As shown in the figure. First, the upper power grid optimization layer formulates the day-ahead plan of the power grid by optimizing the combination and scheduling of thermal power units and wind power units. Then, the lower energy storage system optimization layer receives the planned output power of the wind farm, designs the charging and discharging strategy of the energy storage system, and optimizes the power and capacity of the energy storage system. Finally, the probability distribution of the joint output of wind power and energy storage system is passed to the relevant constraints of the power grid optimization layer. Through multiple iterative calculations, the optimal coordinated operation result of wind power and energy storage system is obtained.

[0072] The grid optimization is divided into two steps. The first step is to optimize the unit combination of thermal power and the maximum renewable energy output acceptable to the grid. The second step is to optimize the planned output power of the wind farm one day before using the unit combination results of the first step. After the two-step optimization, the maximum acceptable and planned output power of the wind farm is sent to the energy storage system optimization layer.

[0073] The optimization goal of the first step is to minimize the grid operation cost and maximize the use of renewable energy under the premise of safe operation, that is, to minimize the operation cost of thermal power units. The optimization goals are as follows:

[0074]

[0075] in, is the output of unit i in period t; f i (·) is the variable cost function of unit i; is the startup cost of unit i; T is 24 hours a day; N G is the number of units; y i,t is an activation state binary variable, equal to 1 if unit i is activated during period t; is the downtime cost of unit i; z i,t is the shutdown state variable. If unit i is shut down during period t, it is equal to 1; u i,t is the on / off state, which is equal to 1 if unit i is turned on during period t; is the maximum wind power output that can be absorbed.

[0076] The constraints are:

[0077]

[0078] Among them, P i G,max and P i G,min are the maximum and minimum power generation levels of unit i respectively; P i ramp is the climbing limit of unit i; P l max and P l minare the maximum and minimum active power transmission limits of line l respectively; k l,i , k l,w , k l,b is the transmission allocation factor; is the predicted power demand of bus b at time t; T i,on , T i,off are the total startup and shutdown time of unit i respectively; are the maximum number of startups and shutdowns of unit i respectively; N b is the total number of lines.

[0079] The input limit of thermal power is shown in equation (2). The ramp limit constraint is shown in equation (3). Equations (4) and (5) represent the relationship between binary variables. The minimum startup and shutdown time constraints are shown in equations (6) and (7), respectively. The maximum startup and shutdown time constraints are shown in equations (8) and (9), respectively. Equations (10) and (11) are the reserve capacity constraints, where r u,i,t 、r d,i,t are the upward and downward reserves of unit i respectively. Equation (12) is the transmission constraint. Equation (13) is the power balance constraint.

[0080] The optimal unit commitment value and the corresponding maximum acceptable renewable energy output value obtained in the first step provide a reasonable limit for optimizing the planned output power of the wind farm in the second step. In the second step of optimizing the planned output power of the wind farm, considering the acceptance capacity of the power grid, the combination of thermal power units obtained in the first step is still optimized to minimize the power grid operation cost. The optimization objectives are as follows:

[0081]

[0082] in, is the planned output power of the wind farm. The optimization objective function of this step is slightly different from that of step (1). Under the premise of minimizing the cost of thermal power, the planned output power of the wind farm is not the maximum acceptable value, but the planned output power after considering the increase in power of the thermal power units.

[0083] The planned output power constraints of wind farm optimization in step (2) are slightly different from those in step (1). The constraints do not include reserve constraints and thermal power unit start-stop constraints. In addition, it is necessary to add wind power related constraints, including output constraints and ramp rate constraints, as follows:

[0084]

[0085] in, and are the upper and lower limits of the wind turbine climbing power respectively; P w,t is the output of the wind turbine at time t.

[0086] In particular, the model of the energy storage system optimization layer specifically includes:

[0087] In order to extend the service life of the energy storage system as much as possible, the allowable fluctuation range of the combined output of wind power and energy storage system is set to ±15% of the planned output power of the wind farm. When the combined output of wind power and energy storage system exceeds the allowable range, the over-power will be penalized and the penalty will be added to the optimization target as part of the wind farm operation cost. The optimization objective function is:

[0088]

[0089] Among them, t is the time index; and is the maximum power and capacity of the energy storage system C ESS is the equipment cost of the energy storage system; C loss The loss caused by the energy storage system due to its charging and discharging behavior; is the penalty cost; all costs are equivalent to the daily cost, D T is the total number of days.

[0090] The cost of the energy storage system consists of battery cost and converter cost. The battery cost is proportional to the installed capacity, and the converter cost is proportional to the installed power of the energy storage system. That is, the equivalent daily cost is:

[0091]

[0092] Among them, T ESS is the energy storage life; VSC is the converter cost per MW; ESS The battery cost per megawatt-hour.

[0093] The losses of the energy storage system are caused by its charging and discharging behavior and can be described as follows:

[0094]

[0095] Where, d is the daily index; P t dis and P t ch are the discharge and charge power of energy storage respectively; S SOC (d) is the state of charge of the energy storage on day d. The charge loss can be obtained by subtracting the discharge loss from the charge loss, excluding the influence of the initial and final SOC values ​​within one day, which can be converted into an economic indicator through the grid-connected electricity price.

[0096] In particular, when the combined output of wind power and energy storage systems exceeds the permitted range, a penalty will be imposed for the over-power, and the penalty cost will be calculated as follows:

[0097]

[0098] Among them, C wind is the on-grid electricity price of wind power; P t WESS It is the combined output of wind power and energy storage system; P t WESS,max and P t WESS,min They are the maximum and minimum values ​​of the combined output of wind power and energy storage systems. When the combined output power of wind power and energy storage systems is within the permitted range, there is no penalty. When the combined output power exceeds the permitted range of renewable energy, the excess power is penalized at half the grid-connected electricity price. When the combined output power exceeds the maximum acceptable power of renewable energy, the excess power is penalized at 1 times the grid-connected electricity price. This part cannot generate income, which is equivalent to wind and power abandonment. The more significant the wind abandonment, the higher the penalty cost.

[0099] In particular, the constraints of the energy storage system optimization layer specifically include:

[0100] The combined output of wind power and energy storage system is:

[0101] P t WESS =P t w +P t ESS (twenty one)

[0102] Among them, P t w is the actual output power of wind power; P t ESS is the output power of the energy storage system.

[0103] The allowable range of the combined output power of wind power and energy storage system is as follows:

[0104]

[0105] in, is the installed capacity of the wind farm; γ is the ratio of the maximum allowable power deviation to the installed capacity of the wind farm, which is 15%.

[0106] The energy storage system has two operating states. The corresponding charging and discharging powers are both non-negative. The output power of the energy storage system can be expressed as:

[0107]

[0108] Among them, P t dis and P t chare the discharge and charge powers of the energy storage, respectively. The energy storage system cannot charge and discharge at the same time. At any time, at least one of the charge and discharge powers is 0.

[0109] The constraints of the energy storage system SOC are:

[0110] SOC t+1 =SOC t +η ch P t ch Δt-P t dis Δt / η dis (twenty four)

[0111] SOC min ≤SOC t ≤SOC max (25)

[0112] Among them, SOC t is the SOC of the energy storage system at time t; η ch , η dis is the charge and discharge power, both in the range of [0, 1].

[0113] Finally, the probability distribution of the joint output of wind power and energy storage system is passed to the relevant constraints of the grid optimization layer. Through multiple iterative calculations, the optimal coordinated operation result of wind power and energy storage system is obtained.

[0114] The systems, devices, modules or units described in the above embodiments may be implemented by computer chips or entities, or by products with certain functions. A typical implementation device is a computer. Specifically, the computer may be, for example, a personal computer, a laptop computer, a cellular phone, a camera phone, a smart phone, a personal digital assistant, a media player, a navigation device, an email device, a game console, a tablet computer, a wearable device, or a combination of any of these devices.

[0115] Computer readable media include permanent and non-permanent, removable and non-removable media that can be implemented by any method or technology to store information. Information can be computer readable instructions, data structures, program modules or other data. Examples of computer storage media include, but are not limited to, phase change memory (PRAM), static random access memory (SRAM), dynamic random access memory (DRAM), other types of random access memory (RAM), read-only memory (ROM), electrically erasable programmable read-only memory (EEPROM), flash memory or other memory technology, compact disk read-only memory (CD-ROM), digital versatile disk (DVD) or other optical storage, magnetic cassettes, magnetic tape magnetic disk storage or other magnetic storage devices or any other non-transmission media that can be used to store information that can be accessed by a computing device. As defined herein, computer readable media does not include temporary computer readable media (transitory media), such as modulated data signals and carrier waves.

[0116] It should also be noted that the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, commodity or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, commodity or device. In the absence of more restrictions, the elements defined by the sentence "comprises a ..." do not exclude the existence of other identical elements in the process, method, commodity or device including the elements.

[0117] The above embodiments should be understood to be only used to illustrate the present invention and not to limit the protection scope of the present invention. After reading the contents of the present invention, technicians can make various changes or modifications to the present invention, and these equivalent changes and modifications also fall within the scope defined by the claims of the present invention.

Claims

1. A two-layer optimization method for coordinated operation of wind power and energy storage system, characterized in that: The following steps are involved: First, the upper power grid optimization layer optimizes the combination and dispatch of thermal power units and wind power units through the mixed integer linear programming MILP optimization algorithm, and formulates the day-ahead plan of the power grid; Then, the lower energy storage system optimization layer receives the planned output power of the wind farm and designs the charging and discharging strategy of the energy storage system to optimize the power and capacity of the energy storage system; Finally, the probability distribution of the joint output of wind power and energy storage system is passed to the relevant constraints of the grid optimization layer. Through multiple iterative calculations, the optimal coordinated operation result of wind power and energy storage system is obtained.

2. A double-layer optimization method for coordinated operation of wind power and energy storage system according to claim 1, characterized in that: The upper power grid optimization layer has two steps for power grid optimization, which specifically include: (1) Optimize the thermal power and grid-acceptable renewable energy output of the generating units; (2) using the unit combination result of step (1), optimizing the planned output power of the wind farm one day before; After the two-step optimization, the maximum acceptable and planned output power of the wind farm is sent to the energy storage system optimization layer.

3. A double-layer optimization method for coordinated operation of wind power and energy storage system according to claim 2, characterized in that: The optimization goal of step (1) is to minimize the power grid operation cost and maximize the use of renewable energy under the premise of safe operation, that is, to minimize the operation cost of thermal power units. Its objective function F1 is: in, is the output of unit i in period t; f i (·) is the variable cost function of unit i; is the startup cost of unit i; T is 24 hours a day; N G is the number of units; y i,t is an activation state binary variable, equal to 1 if unit i is activated during period t; is the downtime cost of unit i; z i,t is the shutdown state variable. If unit i is shut down during period t, it is equal to 1; u i,t is the on / off state, which is equal to 1 if unit i is turned on during period t; is the maximum wind power output that can be absorbed; The constraints are: Among them, P i G,max and P i G,min are the maximum and minimum power generation levels of unit i respectively; P i ramp is the climbing limit of unit i; P l max and P l min are the maximum and minimum active power transmission limits of line l respectively; k l,i , k l,w , k l,b is the transmission allocation factor; is the predicted power demand of bus b at time t; T i,on 、T i,off are the total startup and shutdown time of unit i respectively; are the maximum number of startups and shutdowns of unit i respectively; N b is the total number of lines; The input limit of thermal power is shown in formula (2); the ramp limit constraint is shown in formula (3); formulas (4) and (5) represent the relationship between binary variables; the minimum startup and shutdown time constraints are shown in formulas (6) and (7) respectively; the maximum startup and shutdown time constraints are shown in formulas (8) and (9) respectively; formulas (10) and (11) are the reserve capacity constraints, where r u,i,t 、r d,i,t are the upward and downward reserves of unit i respectively; formula (12) is the transmission constraint; formula (13) is the power balance constraint.

4. A double-layer optimization method for coordinated operation of wind power and energy storage system according to claim 3, characterized in that: In step (2), considering the acceptance capacity of the power grid, the combination of thermal power units obtained in step (1) is still optimized to minimize the power grid operation cost. The optimization objective function is as follows: in, is the planned output power of the wind farm; under the premise of minimizing the cost of thermal power, the planned output power of the wind farm is the planned output power after considering the increased power of the thermal power units; The planned output power constraints of the wind farm optimization in step (2) do not include the reserve constraints and the start-stop constraints of the thermal power units. In addition, it is necessary to add relevant constraints of wind power, including output constraints and ramp rate constraints, as follows: in, and are the upper and lower limits of the wind turbine climbing power respectively; P w,t is the output of the wind turbine at time t.

5. A double-layer optimization method for coordinated operation of wind power and energy storage system according to claim 4, characterized in that: The model of the energy storage system optimization layer specifically includes: In order to extend the service life of the energy storage system as much as possible, the allowable fluctuation range of the combined output of wind power and energy storage system is set to ±15% of the planned output power of the wind farm; when the combined output of wind power and energy storage system exceeds the allowable range, the over-power will be penalized, and the penalty will be added to the optimization target as part of the wind farm operation cost; the optimization objective function is: Among them, t is the time index; and is the maximum power and capacity of the energy storage system, C ESS is the equipment cost of the energy storage system; C loss The loss caused by the energy storage system due to its charging and discharging behavior; is the penalty cost; all costs are equivalent to the daily cost, D T is the total number of days; The cost of the energy storage system consists of battery cost and converter cost. The battery cost is proportional to the installed capacity, and the converter cost is proportional to the installed power of the energy storage system. That is, the equivalent daily cost is: Among them, T ESS is the energy storage life; VSC is the converter cost per MW; ESS is the battery cost per MWh; The losses of the energy storage system are caused by its charging and discharging behavior, which can be described as follows: Where, d is the daily index; C wind represents the on-grid electricity price of wind power, P t dis and P t ch are the discharge and charge power of energy storage respectively; S SOC (d) is the state of charge of the energy storage on the dth day; the charge amount minus the discharge amount, excluding the influence of the initial and final SOC values ​​within one day, the charge and discharge loss can be obtained, which can be converted into an economic indicator through the grid-connected electricity price.

6. A double-layer optimization method for coordinated operation of wind power and energy storage system according to claim 5, characterized in that: When the combined output of wind power and energy storage systems exceeds the permitted range, a penalty will be imposed for the over-power. The penalty cost will be calculated as follows: Among them, C wind is the on-grid electricity price of wind power; P t WESS It is the combined output of wind power and energy storage system; P t WESS,max and P t WESS,min They are the maximum and minimum values ​​of the combined output of wind power and energy storage systems. When the combined output power of wind power and energy storage systems is within the allowable range, there is no penalty; when the combined output power exceeds the allowable range of renewable energy, the excess power will be penalized at half of the grid-connected electricity price; when the combined output power exceeds the maximum acceptable power of renewable energy, the excess power will be penalized at 1 times the grid-connected electricity price; this part cannot generate income, which is equivalent to wind and power abandonment; the more significant the wind abandonment, the higher the penalty cost.

7. A double-layer optimization method for coordinated operation of wind power and energy storage system according to claim 6, characterized in that: The constraints of the energy storage system optimization layer specifically include: The combined output of wind power and energy storage system is: P t WESS =P t w +P t ESS (21) Among them, P t w is the actual output power of wind power; P t ESS is the output power of the energy storage system; The allowable range of the combined output power of wind power and energy storage system is as follows: in, is the installed capacity of the wind farm; γ is the ratio of the maximum allowable power deviation to the installed capacity of the wind farm, which is 15%; The energy storage system has two operating states; the corresponding charging and discharging powers are non-negative; the output power of the energy storage system can be expressed as: Among them, P t dis and P t ch are the discharge and charge power of the energy storage, respectively. The energy storage system cannot charge and discharge at the same time; at any time, at least one of the charge and discharge power is 0; The constraints of the energy storage system SOC are: SOCIETY t+1 =SOC t +η ch P t ch Δt-P t dis Δt / η dis (24) SOC min ≤SOC t ≤SOC max (25) Among them, SOC t is the SOC of the energy storage system at time t; η ch , η dis is the charge and discharge power, both in the range of [0, 1].

Citation Information

Patent Citations

  • Solid heat storage and energy storage coordinated scheduling and control method for improving wind power consumption

    CN112993997A

Cited By

  • Wind power frequency modulation optimization method and system based on dynamic feedback

    CN120955717A

  • Wind power plant shutdown and energy storage cooperative operation optimization method under multiple uncertain factors

    CN121072897A