Equipment clock monitoring method based on multivariate remote signaling data, program product, electronic equipment and storage medium
Through the equipment clock monitoring method based on multiple remote signal data, the power grid topology model is formed and the clock difference is analyzed, which solves the problem that a single signal source in clock management in the distribution network measurement system cannot perceive subtle deviations in real time, and improves the accuracy of the clock and stability, real-time clock verification between multiple systems is achieved, reducing costs and improving system portability.
Patent Information
- Application Number
- CN202410973647.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-19
- Publication Date
- 2024-11-26
AI Technical Summary
The clock management method in the existing distribution network measurement system relies on a single signal source and cannot perceive subtle clock deviations in real time, resulting in a possible decline in business accuracy in scenarios with high real-time requirements.
The equipment clock monitoring method based on multiple remote signal data is adopted to form a power grid topology model by acquiring, identifying and filtering multiple remote signal data, and the equipment that correlates the same power outage, analyzes clock differences, and detects and recognizes clock deviations.
Improves the accuracy and stability of the clock, realizes real-time clock verification between multiple systems, reduces costs, and does not require reliance on additional hardware, and is highly portable.
Smart Images

Figure CN119030131A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of electric power detection, and in particular to a device clock monitoring method based on multivariate telesignaling data, a program product, an electronic device and a storage medium. Background Art
[0002] The distribution network measurement system refers to a set of equipment and technical systems used to receive telemetering signals, monitor and manage the operating status of the power system. This system plays a key role in the energy field. It can help power companies, energy management departments and large industrial enterprises monitor the performance of the power system and ensure the stable operation of the power system.
[0003] Main components:
[0004] 1. Remote signaling and telemetry equipment, such as:
[0005] Circuit breakers: Circuit breakers monitor the current flowing through wires, and if the current exceeds a designed threshold, indicating a possible overload condition, the circuit breaker quickly shuts off the circuit to prevent overloading of wires that could cause fire or damage to equipment.
[0006] Fault Indicator: A fault indicator is a device used to monitor and indicate the presence of faults or abnormal conditions in a power system. These indicators are usually installed on the poles of power transmission lines. Their main purpose is to provide real-time fault information so that operation and maintenance personnel can quickly and accurately locate and solve the problem.
[0007] Feeder Terminal Unit: FTU is a device used for operating data monitoring and line protection of outdoor pole switches (such as vacuum circuit breakers, load switches, section switches, etc.). It has the function of remote communication with the master station to realize the "three remote" functions of distribution automation, namely remote signaling (remote reading of equipment status signals), remote measurement (remote measurement of three-phase voltage and current), and remote control (remote control of equipment opening and closing).
[0008] Intelligent fusion terminal: Intelligent fusion terminal is a secondary device that integrates the functions of power supply information collection in the distribution and use area, equipment status monitoring and communication networking, local analysis and decision-making, master station communication and collaborative computing. The device itself can realize the collection of various telemetry and telesignaling data such as load data, status data, environmental data, analog quantity, status quantity, current action protector, etc.
[0009] Smart meter: In addition to the metering function of traditional energy meters, smart meters can also realize basic functions such as energy metering, information storage and processing, measurement and monitoring, and also have functions such as user-side control, anti-theft, remote meter reading, prepayment, etc., while supporting new energy access and fault detection and alarm functions. These functions have high practical value in user electricity management.
[0010] Clock synchronization is an important part of the power measurement terminal, which aims to ensure the time synchronization between the device and the master station clock source and provide accurate time information. At present, the master station manages the terminal clock by monitoring and patrolling the terminal clock through the heartbeat mechanism and issuing instructions. The master station uses the heartbeat mechanism to regularly patrol the clock of the terminal device, regularly obtain the terminal clock information, and promptly discover and solve the clock deviation problem, thereby ensuring the accuracy of the terminal clock.
[0011] The distribution network measurement system is critically dependent on clock management, and is mainly divided into three parts: the medium and high voltage side and the low voltage side. Among them, the medium and high voltage side is equipped with a fusion terminal (TTU) and a fault indicator, which is collected by the distribution network cloud master station; the electric meter of the centralized power plant is installed, and the electric energy collection system is responsible for collecting; the circuit breaker is installed, and the dispatching automation system is responsible for collecting; the low voltage side is generally used to install concentrators and electric energy meters for collection. At present, the management methods for the clock mechanism in the distribution network measurement system mainly include three aspects: the clock source, the master station side, and the equipment side:
[0012] (1) Establish a standard clock source: The clock source is the basis of the clock mechanism. Choosing a suitable clock source is crucial to the stability of the entire system. When configuring the clock source, it is necessary to ensure that the clock source is compatible with other parts of the system and to calibrate the clock source regularly to ensure its accuracy and stability. In order to ensure the normal operation of the clock source, it is necessary to monitor it in real time by setting alarm thresholds and collecting clock source status information. For example, the system database and applications both use a scheduled standard clock source. The system regularly uses the standard clock source to calibrate the clock of the acquisition system master station, and the calibration cycle is once a day. The synchronization accuracy is better than ±0.2 microseconds to ensure that the clock error of the acquisition system master station is less than 0.1 seconds / day.
[0013] (2) Master station clock monitoring and management: The main goal of master station clock monitoring is to ensure the accuracy and stability of the system clock, thereby improving the performance and reliability of the system. In network communications, data accuracy and the collaborative work between nodes are of vital importance. If the time of each node in the system is not synchronized, the transmission, calculation and storage of data will be seriously affected, resulting in reduced system operation efficiency. By establishing a system master station clock monitoring mechanism, we can monitor the time of each node in real time and make corresponding adjustments as needed, thereby effectively improving the system operation efficiency and ensuring data accuracy and reliability. For example, the system server is configured with a unified NTP service to complete clock synchronization in real time. In addition, a software program has been developed on the web side of the system master station to classify and monitor and record the clocks of all hardware servers in the system every 15 minutes. When an abnormal situation occurs where the server and the NTP clock source deviate by more than 1 minute, the system will actively issue an alarm.
[0014] (3) Clock management on the device side. For example, the device can directly perform GPS real-time time synchronization with the Beidou satellite clock. Secondly, the device can also perform clock correction through the master station time synchronization. The device also supports automatic switching between these two modes. In terms of the acquisition master station, it performs clock correction through daily meter inspections, broadcast time synchronization, password time synchronization, and on-site settings. The meter clock is regularly called and the time synchronization task is issued. If a clock deviation occurs, the device will actively calculate and generate a clock deviation event, and at the same time use all the electricity meters that have not been collected within seven days, failed to collect, and have had a secret key time synchronization task on the same day. If the clock deviation is too large, the system will automatically generate a work order and send it to the closed-loop system for fault elimination.
[0015] However, time synchronization with a single signal source can only be performed when the clock source is accurate. When a single system clock source has a slight deviation, the system and users are often unable to perceive it in real time. For some scenarios with high real-time requirements, slight deviations will cause errors in the analysis results and reduce the accuracy of the business. Summary of the invention
[0016] The purpose of the present invention is to overcome the defects of the above-mentioned prior art and provide a device clock monitoring method based on multi-element telesignaling data, which utilizes a multi-element signal mutual verification mechanism to reduce the impact of clock errors on various types of acquisition equipment.
[0017] The purpose of the present invention can be achieved by the following technical solutions:
[0018] The present invention provides a device clock monitoring method based on multivariate telesignaling data, comprising the following steps:
[0019] S1: Obtain multivariate telesignaling data;
[0020] S2: Identify, clean and filter the multivariate telesignaling data to eliminate interference signals;
[0021] S3: Perform device mapping and completion on the power grid topology for the multivariate telesignaling data that excludes interference signals, and form a power grid topology model of the signal;
[0022] S4: Associating the multivariate telesignaling data with the power grid topology model, analyzing and judging the same power outage based on the time window and the power grid topology model, and finding associated devices of the same power outage;
[0023] S5: Analyze and determine the clock data of the upstream and downstream devices of the associated device that has suffered the same power outage, and detect and identify the device with a clock deviation based on the clock difference between different devices.
[0024] In the step S1, obtaining the multivariate remote signaling data includes obtaining power outage monitoring data and low-voltage model data in the business center.
[0025] In the step S2, identifying the multivariate remote signaling data includes: determining whether the data is abnormal, whether key information is missing, and whether the data format is correct.
[0026] The data anomalies include abnormal time format, no corresponding device, and data timeout.
[0027] In the step S3, during the device mapping completion process, if the power grid mapping cannot be obtained, such data is recorded as an exception.
[0028] In step S4, the same power outage is judged including judging whether the power outage is an operation power outage or a fault power outage, and the judgment is made through the following steps:
[0029] S41. By comparing the power outage maintenance scope, analyze whether it falls within the scope of the operation power outage;
[0030] S42. If it is not an operational power outage, then whether it is a fault power outage is determined from high voltage level to low voltage level based on whether the telesignaling data meets the power outage impact rules in the feeder and substation topology; if it is a fault power outage, the specific level of the fault in the fault power outage is determined.
[0031] Set the upload time conditions of the upload signal for the associated devices affected by the same power outage.
[0032] In a second aspect, the present invention provides a computer program product, comprising a computer program / instruction, which implements any of the above-mentioned methods when executed by a processor.
[0033] In a third aspect, the present invention provides an electronic device, comprising a memory, a processor, and a program stored in the memory, wherein the processor implements any of the above-described methods when executing the program.
[0034] In a fourth aspect, the present invention provides a storage medium having a program stored thereon, wherein the program implements any of the above-described methods when executed.
[0035] Compared with the prior art, the present invention has the following beneficial effects:
[0036] 1) The present invention utilizes multivariate telesignaling data to perform real-time clock mutual verification of acquisition devices between multiple systems, thereby improving clock accuracy and stability.
[0037] 2) The method provided by the present invention is completely implemented through program algorithms, does not rely on other hardware, reduces costs, and has high portability. BRIEF DESCRIPTION OF THE DRAWINGS
[0038] Figure 1 It is a schematic diagram of the steps of the present invention. DETAILED DESCRIPTION
[0039] The present invention is described in detail below in conjunction with the accompanying drawings and specific embodiments. This embodiment is implemented based on the technical solution of the present invention, and provides a detailed implementation method and specific operation process, but the protection scope of the present invention is not limited to the following embodiments.
[0040] Example 1
[0041] This embodiment provides a device clock monitoring method based on multi-element telesignaling data. The method is implemented by a device clock monitoring software based on multi-element telesignaling data. Figure 1 As shown, the method comprises the following steps:
[0042] S1: Obtain multivariate telesignaling data.
[0043] Specifically, it accesses the distribution network in real time and obtains multiple telesignaling data from the real-time measurement center in real time, including power outage monitoring data (such as switch, substation, household meter power outage signals and measurement data) and business mid-station low-voltage model data (including station-line-transformer-box-household file model).
[0044] S2: Identify, clean and filter the multivariate telesignaling data to eliminate interference signals.
[0045] Identify multiple telesignals to determine whether key information is missing, whether the data format is correct, and data anomalies including abnormal time format, no corresponding equipment, data timeout, etc. For unqualified data, put it into the anomaly library for subsequent processing.
[0046] S3: Perform device mapping on the power grid topology for the multivariate telesignaling data that excludes interference signals to form a topological model of the signal.
[0047] Specifically, the information of power supply points, substations and feeders in the multivariate telesignaling data is completed according to the topology service, mainly relying on the complete grid-side and user-side models of the grid resource business center. If the grid mapping cannot be obtained during the mapping completion process, such data is recorded abnormally to ensure the integrity of the data in preparation for the next step of analysis.
[0048] S4: Associate the multi-element telesignaling signals with the topological model, identify the same power outage, and analyze the equipment involved in the same power outage based on the time window and topological model.
[0049] A power outage in a power grid is usually caused by two major categories, including operational power outage and fault power outage. Other situations may also be caused by property and user operations. The present invention focuses on the two categories of operational power outage and fault power outage.
[0050] In this embodiment, the time window is set to 10 minutes, that is, the telesignal data in the same 10-minute time window are packaged and analyzed according to the same feeder and the same substation. When analyzing, first analyze whether the telesignal data belongs to the power outage scope of the operation, and compare it with the power outage scope of the maintenance plan and emergency repair work order within the current 24 hours. The equipment signals within the affected range are merged and processed, that is, it is determined whether the telesignal belongs to the current maintenance or emergency repair. After the operation power outage analysis, if it does not belong to the operation power outage, it is necessary to further determine whether it is a new fault power outage. When judging the fault power outage, it is mainly based on whether the telesignal data meets the power outage impact rules in the feeder and substation topology, and a hierarchical analysis is performed from high voltage level to low voltage level to determine whether the fault belongs to a certain layer of fault.
[0051] S5: For the same power outage, including operational power outage and fault power outage, the devices affected by the power outage, including upstream and downstream devices, are analyzed and judged for clock data, and the influence of factors such as conventional data reporting delays are considered to detect and identify devices with clock deviations.
[0052] Specifically, the device clock monitoring method in step S5 is as follows:
[0053] After analyzing the power outage in the same time window, based on the reporting timeliness of the multiple signals themselves and according to different fault types, the signal message time between the power outage equipment and the upstream and downstream is verified and analyzed to remind the output of the clock deviation of related equipment, providing a governance basis and means for clock management.
[0054] The following two power outage scenarios are used as examples to illustrate the main judgment basis and methods for clock detection and identification.
[0055] (1) When all substations in the power grid are shut down, the main meter and household meters in the same substation will report a power outage signal, and the reporting process takes about 1 minute. After the above filtering and analysis, the power outage event data of the substation main meter and the power outage event data of the household meters in the substation during the same power outage are analyzed. During a power outage, the reporting time of the household meter is the concentrator clock, and the sequence of the power outage clocks of all household meters is the time reported by the concentrator. Therefore, the clock difference between the main meter in the substation and its concentrator can be obtained by comparing and analyzing the clock message in the power outage event. In general, the main meter and the concentrator are connected to the master station for time calibration, so the clock deviation between the main meter and the concentrator cannot be greater than 2 minutes.
[0056] When power is restored, the time reported by the household meter is the meter's own clock. Therefore, by analyzing the power restoration time, the clock deviation between the master meter and the household meter in the area, as well as the clock deviation between multiple household meters, can be verified. Generally, the signal clock deviation between the master meter and the household meter cannot exceed 5 minutes, and the clocks between household meters should also be within 5 minutes.
[0057] (2) When a feeder-level tripping and power outage occurs in the power grid, the outgoing line switch, the substation master meter and the user meter will report the telesignaling data. Under normal circumstances, the reporting signal itself is about 1 minute. The outgoing line switch tripping signal is reported and forwarded by the dispatching automation system, and the master meter and user meter signals are reported by the power consumption information collection system. After analysis within the time window, the tripping signal, master meter power outage and user meter power outage signals involved in a tripping fault are merged, and the telesignaling time scale is further analyzed at this time. The deviation between the tripping signal and the user-side signal is analyzed to determine whether there is a shortage of equipment clocks in the dispatching automation system or the power consumption information collection system. The tripping signal and the master meter and user meter time of the power outage are averaged and analyzed. The clock deviation on both sides is within 3 minutes. If it exceeds the deviation, the tripping signal situation needs to be checked. When it is within the deviation, the clock deviation in the user meter can also be analyzed for this power outage, so as to find out the situation of inaccurate clocks of individual meters.
[0058] After merging and calculating the analysis services, various signals are associated with independent power outage faults and identified as the same power outage. The occurrence of the same power outage is triggered based on the principle of electricity, and the action on the power grid is within seconds. Based on such characteristics, clock monitoring of signal data in the same power outage is the key basis and effective method of this method.
[0059] The accuracy and efficiency of the analysis are closely related to time, so the signals uploaded by different systems must be reported in accordance with the corresponding business rules. In order to accurately process the clock of the multivariate telesignaling data, the signals in the equipment need to be uploaded in a timely manner. The time conditions for uploading are as follows:
[0060] 1. The concentrator signal and the meter signal should be uploaded synchronously within 10 seconds to ensure the real-time nature of the data.
[0061] 2. The trip signal and fault indicator signal should be uploaded within 3 minutes to enable timely response to fault conditions.
[0062] 3. For power outages at the substation level, the reporting time interval between the main meter signal and the household meter signal should be controlled within 1 minute.
[0063] 4. For feeder-level power outages, the reporting time interval between the tripping signal and the household meter signal should be controlled within 2 minutes.
[0064] 5. For the power restoration signal of the household meter, the power restoration time should be later than the power outage time to ensure the correctness of power supply restoration.
[0065] The software's analysis service is based on the data in the signal pool, and merges the signals according to feeders and substations. By setting a time window (10 minutes), it obtains and processes events reported in the same window. According to the feeder or substation affiliation of the event in the power grid topology, it automatically aggregates and calculates key information such as fault type, faulty equipment, and impact range.
[0066] Example 2
[0067] This embodiment provides a computer program product, namely, a device clock monitoring software based on multivariate telesignaling data, including a computer program / instruction, and the software is used to implement the method mentioned in the above embodiment.
[0068] This embodiment provides an electronic device, including a memory, a processor, and a program stored in the memory, and the processor implements the method mentioned in the above embodiment when executing the program.
[0069] This embodiment provides a storage medium on which a program is stored, and when the program is executed, the method mentioned in the above embodiment is implemented. The same content as in Example 1 is not repeated here. The difference from Example 1 is that this embodiment provides a hardware device, which is an important carrier for implementing the method of Example 1, wherein the storage medium includes: a U disk, a mobile hard disk, a read-only memory (ROM), a random access memory (RAM), a disk or an optical disk, and other media that can store program codes.
[0070] The preferred specific embodiments of the present invention are described in detail above. It should be understood that a person skilled in the art can make many modifications and changes based on the concept of the present invention without creative work. Therefore, any technical solution that can be obtained by a person skilled in the art through logical analysis, reasoning or limited experiments based on the concept of the present invention on the basis of the prior art should be within the scope of protection determined by the claims.
Claims
1. A device clock monitoring method based on multivariate telesignaling data, It is characterized in that The following steps are involved: S1: Acquire multivariate telesignaling data; S2: Identify, clean and filter the multivariate telesignaling data to eliminate interference signals; S3: Perform device mapping and completion on the power grid topology for the multivariate telesignaling data that excludes interference signals, and form a power grid topology model of the signal; S4: Associating the multivariate telesignaling data with the power grid topology model, analyzing and judging the same power outage based on the time window and the power grid topology model, and finding associated devices of the same power outage; S5: Analyze and determine the clock data of the upstream and downstream devices of the associated device that has suffered the same power outage, and detect and identify the device with a clock deviation based on the clock difference between different devices.
2. According to claim 1, a device clock monitoring method based on multivariate remote signaling data, It is characterized in that In the step S1, obtaining the multivariate remote signaling data includes obtaining power outage monitoring data and low-voltage model data in the business center.
3. According to claim 1, a device clock monitoring method based on multivariate remote signaling data, It is characterized in that In the step S2, identifying the multivariate remote signaling data includes: determining whether the data is abnormal, whether key information is missing, and whether the data format is correct.
4. A device clock monitoring method based on multivariate telesignaling data according to claim 3, It is characterized in that The data anomalies include abnormal time format, no corresponding device, and data timeout.
5. The device clock monitoring method based on multivariate remote signaling data according to claim 1, It is characterized in that In the step S3, during the device mapping completion process, if the power grid mapping cannot be obtained, such data is recorded as an exception.
6. The device clock monitoring method based on multivariate remote signaling data according to claim 1, It is characterized in that In step S4, the same power outage is judged including judging whether the power outage is an operation power outage or a fault power outage, and the judgment is made through the following steps: S41. By comparing the power outage maintenance scope, analyze whether it falls within the scope of the operation power outage; S42. If it is not an operational power outage, then whether it is a fault power outage is determined from high voltage level to low voltage level based on whether the telesignaling data meets the power outage impact rules in the feeder and substation topology; if it is a fault power outage, the specific level of the fault in the fault power outage is determined.
7. The device clock monitoring method based on multivariate remote signaling data according to claim 1, It is characterized in that Set the upload time conditions of the upload signal for the associated devices affected by the same power outage.
8. A computer program product comprising a computer program / instructions, It is characterized in that When the computer program / instructions are executed by a processor, the method according to any one of claims 1 to 7 is implemented.
9. An electronic device comprising a memory, a processor, and a program stored in the memory, It is characterized in that When the processor executes the program, the method according to any one of claims 1 to 7 is implemented.
10. A storage medium having a program stored thereon, It is characterized in that When the program is executed, the method according to any one of claims 1 to 7 is implemented.