Processing method and device of computing power and network service, and storage medium

By collecting user experience information of terminal devices in the computing power network and analyzing it, and adjusting the computing power service routing strategy, the problem that the computing power network in the existing technology cannot effectively perceive user experience, and improves the user's experience of computing power services and resource utilization efficiency.

CN119030972APending Publication Date: 2024-11-26DATANG MOBILE COMM EQUIP CO LTD
View PDF 0 Cites 4 Cited by

Patent Information

Application Number
CN202310595020.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-05-24
Publication Date
2024-11-26

AI Technical Summary

Technical Problem

The existing computing power network is difficult to effectively perceive the user's experience of computing power services, resulting in service orchestration and policy adjustments that cannot achieve the user's expected experience.

Method used

The management center determines the initial computing power service routing strategy based on the business needs of the terminal equipment, and collects user experience information after the terminal equipment accesses the computing power service, performs measurement and analysis, and adjusts the computing power service routing strategy to improve the user experience.

Benefits of technology

It has achieved targeted improvements in user experience, optimized the utilization and allocation of computing network resources, and improved the efficiency and quality of computing power services.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119030972A_ABST
    Figure CN119030972A_ABST
Patent Text Reader

Abstract

The invention provides a computing power and network service processing method and device and a storage medium, and the method comprises the steps: determining an initial computing power service routing strategy through a management center according to the business demands of terminal equipment, and transmitting the initial computing power service routing strategy to the terminal equipment; after the terminal device accesses a corresponding initial computing power service according to the initial computing power service routing policy, receiving user experience information sent by the terminal device for the initial computing power service; and starting corresponding measurement according to the user experience information, determining an adjusted computing power service routing strategy according to a measurement result, and sending the adjusted computing power service routing strategy to the terminal equipment, or sending feedback information to the terminal equipment. By acquiring the user experience information for the initial computing power service and performing corresponding measurement, the computing power service routing strategy or feedback information is adjusted, so that the experience of the user for the computing power service is improved in a targeted manner, computing network resources are utilized more sufficiently and reasonably, resource allocation is optimized, and the value of the computing network resources is developed more efficiently.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of communication technology, and in particular to a method, device and storage medium for processing computing power and network services. Background Art

[0002] Computing power network is an information infrastructure integration solution that provides optimal computing power network allocation and computing network integration solutions for different types of user needs, and realizes flexible allocation and scheduling of computing resources, storage resources and network resources.

[0003] In the existing technology, for the service orchestration of computing power networks, the computing power network management center can perform computing power service orchestration and policy adjustment through computing power resource status perception on the business side and network resource status perception on the network side, but the computing power service orchestration and policy adjustment may not achieve the user's expected experience. Summary of the invention

[0004] The present application provides a method, device and storage medium for processing computing power and network services, so as to realize the perception of user computing power service experience data by the computing power network, make full and reasonable use of computing network resources, and further improve user service experience.

[0005] In a first aspect, the present application provides a method for processing computing power and network services, which is applied to a management center, and the method includes:

[0006] Determine an initial computing power service routing strategy according to the service requirements of the terminal device, and send the initial computing power service routing strategy to the terminal device;

[0007] After the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing policy, receiving user experience information for the initial computing power service sent by the terminal device;

[0008] Initiate corresponding measurements according to the user experience information, determine an adjusted computing power service routing strategy according to the measurement results and send it to the terminal device, or send feedback information to the terminal device.

[0009] Optionally, after the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing policy, receiving user experience information for the initial computing power service sent by the terminal device includes:

[0010] After the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing policy, sending a user experience event subscription message to the terminal device, wherein the user experience event subscription message includes a user experience event type for the initial computing power service;

[0011] Receive user experience information sent by the terminal device after the user experience event type is triggered, where the user experience information includes user experience data related to the user experience event type.

[0012] Optionally, the user experience event type includes one or more of the following:

[0013] The startup time of the application used to access the initial computing power service exceeds a first preset time period; or

[0014] The number of restarts of the application used to access the initial computing power service exceeds a first preset number; or

[0015] The number of freezes during the execution of the service by the initial computing service exceeds a second preset number; or

[0016] During the execution of the service by the initial computing service, a single freeze time exceeds a second preset time length; or

[0017] The number of execution failures during the execution of the service by the initial computing service exceeds a third preset number; or

[0018] The connection establishment delay for accessing the initial computing power service exceeds a third preset duration; or

[0019] The connection establishment success rate for accessing the initial computing power service is lower than a preset success rate; or

[0020] The frequency of connection interruptions to the initial computing power service exceeds a preset frequency.

[0021] Optionally, the user experience data includes one or more of the following:

[0022] The time when the application used to access the initial computing power service is started; or

[0023] The number of times the application used to access the initial computing service is restarted; or

[0024] The number of freezes and monitoring time periods during the execution of the service by the initial computing service; or

[0025] A single pause in the execution of a service through the initial computing service; or

[0026] The number of execution failures and monitoring time period during the execution of the service by the initial computing service; or

[0027] The delay in establishing a connection to the initial computing service; or

[0028] The success rate of establishing a connection to access the initial computing power service; or

[0029] The frequency of connection interruptions to the initial computing service.

[0030] Optionally, after the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing policy, the method further includes:

[0031] Establishing a computing power service mapping relationship, wherein the computing power service mapping relationship is a mapping relationship between one or more of an identifier of the terminal device, an identifier of an application for accessing the initial computing power service, an identifier of a computing power node where the initial computing power service is located, and an identifier of the initial computing power service;

[0032] The sending of a user experience event subscription message to the terminal device includes:

[0033] Send a user experience event subscription message to the terminal device according to the computing power service mapping relationship.

[0034] Optionally, the user experience event subscription message further includes one or more of the following:

[0035] The user experience event subscription message identifier, the identifier of the terminal device, the identifier of the application used to access the initial computing power service, and the deadline for user experience event subscription.

[0036] Optionally, the sending a user experience event subscription message to the terminal device includes:

[0037] Sending the user experience event subscription message to a radio access network RAN ​​entity, so that the RAN entity sends the user experience event subscription message to the terminal device;

[0038] The receiving the user experience information sent by the terminal device after the user experience event type is triggered includes:

[0039] Receive user experience information sent by the RAN entity, where the user experience information is sent by the terminal device to the RAN entity.

[0040] Optionally, after the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing policy, receiving user experience information for the initial computing power service sent by the terminal device includes:

[0041] After the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing strategy, receiving user experience information for the initial computing power service actively sent by the terminal device, the user experience information being the user's subjective feeling information about the initial computing power service; or

[0042] After the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing strategy, a user experience information collection request for the initial computing power service is sent to the terminal device, and the terminal device sends user experience information for the initial computing power service in response to the user experience information collection request, where the user experience information is the user's subjective feeling information about the initial computing power service.

[0043] Optionally, the receiving user experience information for the initial computing power service actively sent by the terminal device includes:

[0044] receiving user experience information sent by a RAN entity, where the user experience information is actively sent by the terminal device to the RAN entity; or

[0045] The sending a user experience information collection request for the initial computing power service to the terminal device, and receiving user experience information for the initial computing power service sent by the terminal device in response to the user experience information collection request, includes:

[0046] The user experience information collection request is sent to the RAN entity, so that the RAN entity sends the user experience information collection request to the terminal device, and receives the user experience information sent by the RAN entity, where the user experience information is sent by the terminal device to the RAN entity in response to the user experience information collection request.

[0047] Optionally, the starting corresponding measurement according to the user experience information includes:

[0048] Perform cause analysis based on the user experience information, determine a measurement task based on the analysis result, and execute the measurement task, wherein the measurement task includes at least one of the following: terminal device capability measurement, computing power node computing capability measurement, and network service quality measurement.

[0049] Optionally, performing cause analysis according to the user experience information, determining a measurement task according to the analysis result, and executing the measurement task includes:

[0050] Determining a predicted cause for triggering the user experience event type according to the user experience information, determining a measurement task corresponding to the predicted cause as a measurement task with the highest priority, and executing the measurement task with the highest priority;

[0051] After the highest priority measurement task is executed, if it is determined that the predicted cause is the actual cause that triggers the user experience event type, then the measurement task is terminated; or

[0052] If it is determined that the predicted reason is not the actual reason that triggers the user experience event type, other measurement tasks are performed.

[0053] Optionally, determining a predicted cause for triggering the user experience event type according to the user experience information includes:

[0054] If the user experience information is information related to an application used to access the initial computing power service, determining that the predicted cause of triggering the user experience event type is insufficient terminal device capability; or

[0055] If the user experience information is related to freeze or execution failure during the execution of the service by the initial computing service, then determining that the predicted cause of triggering the user experience event type is insufficient computing power of the initial computing service and / or insufficient network service quality; or

[0056] If the user experience information is a connection problem for accessing the initial computing power service, then the predicted cause for triggering the user experience event type is determined to be insufficient ability of the terminal device to access the network or mismatch of the terminal device type.

[0057] Optionally, determining the adjusted computing power service routing strategy according to the measurement result and sending the adjusted computing power service routing strategy to the terminal device, or sending feedback information to the terminal device, includes:

[0058] If it is determined according to the measurement result that the actual cause of triggering the user experience event type is a network cause, a new computing power service routing strategy to reach the initial computing power service is determined and sent to the terminal device; or

[0059] If it is determined according to the measurement result that the actual cause of triggering the user experience event type is the initial computing service cause, a new computing service is determined, a new computing service routing strategy to reach the new computing service is determined, and sent to the terminal device; or

[0060] If it is determined according to the measurement result that the actual cause of triggering the user experience event type is the terminal device, sending feedback information to the terminal device, the feedback information including the actual cause and / or solution; or

[0061] If it is determined according to the measurement results that the actual cause of triggering the user experience event type is the terminal device, a new computing service routing strategy to reach the new computing service is determined according to the terminal device capabilities, computing resource status, and network resource status, and sent to the terminal device; or

[0062] If it is determined based on the measurement results that the actual cause of triggering the user experience event type is the terminal device, and it is determined that the terminal device cannot improve its capabilities, a new computing power service with computing power lower than that of the initial computing power service is determined, a new computing power service routing strategy to reach the new computing power service is determined, and the new computing power service is sent to the terminal device.

[0063] Optionally, determining the adjusted computing power service routing strategy according to the measurement result and sending the adjusted computing power service routing strategy to the terminal device, or sending feedback information to the terminal device, includes:

[0064] Determine an adjusted computing power service routing policy according to the measurement result, and send the adjusted computing power service routing policy to the RAN entity, so that the RAN entity sends the adjusted computing power service routing policy to the terminal device; or

[0065] The feedback information is sent to a RAN entity, so that the RAN entity sends the feedback information to the terminal device.

[0066] Optionally, determining the initial computing power service routing strategy according to the service requirements of the terminal device includes:

[0067] receiving a service requirement sent by the terminal device, and determining an initial service routing strategy according to the service requirement; or

[0068] Receive a service requirement sent by a RAN entity, where the service requirement is sent by the terminal device to the RAN entity, and determine an initial service routing strategy according to the service requirement.

[0069] Optionally, sending the initial computing power service routing policy to the terminal device includes:

[0070] The initial computing power service routing policy is sent to a RAN entity, so that the RAN entity sends the initial computing power service routing policy to the terminal device.

[0071] Optionally, the method further includes:

[0072] The initial computing power service routing policy is sent to the core network entity so that the terminal device establishes a user plane path for accessing the initial computing power service corresponding to the initial computing power service routing policy according to the initial computing power service routing policy.

[0073] Optionally, sending the initial computing power service routing policy to the terminal device further includes:

[0074] The identifier of the computing power node where the initial computing power service is located and the identifier of the initial computing power service are sent to the terminal device.

[0075] In a second aspect, the present application provides a method for processing computing power and network services, which is applied to a terminal device, and the method includes:

[0076] The receiving management center determines the initial computing service routing strategy based on the business needs of the terminal device;

[0077] Access the corresponding initial computing power service according to the initial computing power service routing policy;

[0078] Sending user experience information for the initial computing power service to the management center;

[0079] Receive the adjusted computing power service routing strategy or feedback information sent by the management center, wherein the adjusted computing power service routing strategy is the computing power service routing strategy adjusted by the management center after performing corresponding measurements based on the user experience information.

[0080] Optionally, the sending user experience information for the initial computing power service to the management center includes:

[0081] Receiving a user experience event subscription message sent by the management center, wherein the user experience event subscription message includes a user experience event type for the initial computing power service;

[0082] Determine whether the user experience event type is triggered;

[0083] If it is determined that the user experience event type is triggered, user experience information for the initial computing power service is sent to the management center.

[0084] Optionally, the receiving a user experience event subscription message sent by the management center includes:

[0085] receiving the user experience event subscription message sent by the RAN entity, where the user experience event subscription message is sent by the management center to the RAN entity;

[0086] The sending of user experience information for the initial computing power service to the management center includes:

[0087] Send user experience information for the initial computing power service to the RAN entity, so that the RAN entity sends the user experience information for the initial computing power service to the management center.

[0088] Optionally, the sending user experience information for the initial computing power service to the management center includes:

[0089] Actively sending user experience information for the initial computing power service to the management center, where the user experience information is the user's subjective feeling information about the initial computing power service; or

[0090] Receive a user experience information collection request for the initial computing power service sent by the management center, and send user experience information for the initial computing power service to the management center in response to the user experience information collection request, where the user experience information is the user's subjective feeling information about the initial computing power service.

[0091] Optionally, the actively sending the user experience information for the initial computing power service to the management center includes:

[0092] Actively sending user experience information for the initial computing power service to the RAN entity, so that the RAN entity sends the user experience information for the initial computing power service to the management center; or

[0093] The receiving a user experience information collection request for the initial computing power service sent by the management center, and sending the user experience information for the initial computing power service to the management center in response to the user experience information collection request, includes:

[0094] Receive a user experience information collection request for the initial computing power service sent by a RAN entity, where the user experience information collection request is actively sent by the terminal device to the RAN entity; and in response to the user experience information collection request, send user experience information for the initial computing power service to the RAN entity, so that the RAN entity sends the user experience information of the initial computing power service to the management center.

[0095] Optionally, the method further includes:

[0096] Initiate terminal device computing capacity measurement at the management center, obtain one or more of the load size, computing resource size, and computing resource utilization rate of the terminal device, and send them to the management center; or

[0097] The management center starts measuring the ability of the terminal device to access the network, and then obtains one or more of the wireless access capability and the type of the terminal device, and sends the information to the management center.

[0098] Optionally, the receiving the adjusted computing power service routing strategy or feedback information sent by the management center includes:

[0099] Receive the adjusted computing power service routing strategy or feedback information sent by the RAN entity, where the adjusted computing power service routing strategy or feedback information is sent by the management center to the RAN entity.

[0100] Optionally, accessing the corresponding initial computing power service according to the initial computing power service routing policy includes:

[0101] An application program for accessing the initial computing power service is started, and the initial computing power service is accessed through the application program.

[0102] Optionally, before the receiving management center determines the initial computing power service routing strategy according to the service requirements of the terminal device, the method further includes:

[0103] Sending the business requirement to the management center; or

[0104] The service requirement is sent to the RAN entity, so that the RAN entity sends the service requirement to the management center.

[0105] In a third aspect, the present application provides a management center entity, including a memory, a transceiver, and a processor:

[0106] A memory for storing a computer program; a transceiver for transmitting and receiving data under the control of the processor; and a processor for reading the computer program in the memory and performing the following operations:

[0107] Determine an initial computing power service routing strategy according to the service requirements of the terminal device, and send the initial computing power service routing strategy to the terminal device;

[0108] After the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing policy, receiving user experience information for the initial computing power service sent by the terminal device;

[0109] Initiate corresponding measurements according to the user experience information, determine an adjusted computing power service routing strategy according to the measurement results and send it to the terminal device, or send feedback information to the terminal device.

[0110] Optionally, after the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing policy, when the processor receives user experience information for the initial computing power service sent by the terminal device, the processor is configured to:

[0111] After the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing policy, sending a user experience event subscription message to the terminal device, wherein the user experience event subscription message includes a user experience event type for the initial computing power service;

[0112] Receive user experience information sent by the terminal device after the user experience event type is triggered, where the user experience information includes user experience data related to the user experience event type.

[0113] Optionally, the user experience event type includes one or more of the following:

[0114] The startup time of the application used to access the initial computing power service exceeds a first preset time period; or

[0115] The number of restarts of the application used to access the initial computing power service exceeds a first preset number; or

[0116] The number of freezes during the execution of the service by the initial computing service exceeds a second preset number; or

[0117] During the execution of the service by the initial computing service, a single freeze time exceeds a second preset time length; or

[0118] The number of execution failures during the execution of the service by the initial computing service exceeds a third preset number; or

[0119] The connection establishment delay for accessing the initial computing power service exceeds a third preset duration; or

[0120] The connection establishment success rate for accessing the initial computing power service is lower than a preset success rate; or

[0121] The frequency of connection interruptions to the initial computing power service exceeds a preset frequency.

[0122] Optionally, the user experience data includes one or more of the following:

[0123] The time when the application used to access the initial computing power service is started; or

[0124] The number of times the application used to access the initial computing service is restarted; or

[0125] The number of freezes and monitoring time periods during the execution of the service by the initial computing service; or

[0126] A single pause in the execution of a service through the initial computing service; or

[0127] The number of execution failures and monitoring time period during the execution of the service by the initial computing service; or

[0128] The delay in establishing a connection to the initial computing service; or

[0129] The success rate of establishing a connection to access the initial computing power service; or

[0130] The frequency of connection interruptions to the initial computing service.

[0131] Optionally, after the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing policy, the processor is further configured to:

[0132] Establishing a computing power service mapping relationship, wherein the computing power service mapping relationship is a mapping relationship between one or more of an identifier of the terminal device, an identifier of an application for accessing the initial computing power service, an identifier of a computing power node where the initial computing power service is located, and an identifier of the initial computing power service;

[0133] When the processor sends a user experience event subscription message to the terminal device, it is used to:

[0134] Send a user experience event subscription message to the terminal device according to the computing power service mapping relationship.

[0135] Optionally, the user experience event subscription message further includes one or more of the following:

[0136] The user experience event subscription message identifier, the identifier of the terminal device, the identifier of the application used to access the initial computing power service, and the deadline for user experience event subscription.

[0137] Optionally, when the processor sends a user experience event subscription message to the terminal device, it is configured to:

[0138] Sending the user experience event subscription message to a radio access network RAN ​​entity, so that the RAN entity sends the user experience event subscription message to the terminal device;

[0139] When the processor receives the user experience information sent by the terminal device after the user experience event type is triggered, it is used to:

[0140] Receive user experience information sent by the RAN entity, where the user experience information is sent by the terminal device to the RAN entity.

[0141] Optionally, after the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing policy, when the processor receives user experience information for the initial computing power service sent by the terminal device, the processor is configured to:

[0142] After the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing strategy, receiving user experience information for the initial computing power service actively sent by the terminal device, the user experience information being the user's subjective feeling information about the initial computing power service; or

[0143] After the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing strategy, a user experience information collection request for the initial computing power service is sent to the terminal device, and the terminal device sends user experience information for the initial computing power service in response to the user experience information collection request, where the user experience information is the user's subjective feeling information about the initial computing power service.

[0144] Optionally, when the processor receives the user experience information for the initial computing power service actively sent by the terminal device, it is configured to:

[0145] receiving user experience information sent by a RAN entity, where the user experience information is actively sent by the terminal device to the RAN entity; or

[0146] When the processor sends a user experience information collection request for the initial computing power service to the terminal device and receives user experience information for the initial computing power service sent by the terminal device in response to the user experience information collection request, it is used to:

[0147] The user experience information collection request is sent to the RAN entity, so that the RAN entity sends the user experience information collection request to the terminal device, and receives the user experience information sent by the RAN entity, where the user experience information is sent by the terminal device to the RAN entity in response to the user experience information collection request.

[0148] Optionally, when the processor starts corresponding measurement according to the user experience information, it is configured to:

[0149] Perform cause analysis based on the user experience information, determine a measurement task based on the analysis result, and execute the measurement task, wherein the measurement task includes at least one of the following: terminal device capability measurement, computing power node computing capability measurement, and network service quality measurement.

[0150] Optionally, the processor performs cause analysis according to the user experience information, determines a measurement task according to the analysis result, and executes the measurement task, for:

[0151] Determining a predicted cause for triggering the user experience event type according to the user experience information, determining a measurement task corresponding to the predicted cause as a measurement task with the highest priority, and executing the measurement task with the highest priority;

[0152] After the highest priority measurement task is executed, if it is determined that the predicted cause is the actual cause that triggers the user experience event type, then the measurement task is terminated; or

[0153] If it is determined that the predicted reason is not the actual reason that triggers the user experience event type, other measurement tasks are performed.

[0154] Optionally, when the processor determines, according to the user experience information, a predicted cause for triggering the user experience event type, it is configured to:

[0155] If the user experience information is information related to an application used to access the initial computing power service, determining that the predicted cause of triggering the user experience event type is insufficient terminal device capability; or

[0156] If the user experience information is related to freeze or execution failure during the execution of the service by the initial computing service, then determining that the predicted cause of triggering the user experience event type is insufficient computing power of the initial computing service and / or insufficient network service quality; or

[0157] If the user experience information is a connection problem for accessing the initial computing power service, then the predicted cause for triggering the user experience event type is determined to be insufficient ability of the terminal device to access the network or mismatch of the terminal device type.

[0158] Optionally, the processor determines an adjusted computing power service routing strategy according to the measurement result and sends it to the terminal device, or sends feedback information to the terminal device, and is used to:

[0159] If it is determined according to the measurement result that the actual cause of triggering the user experience event type is a network cause, a new computing power service routing strategy to reach the initial computing power service is determined and sent to the terminal device; or

[0160] If it is determined according to the measurement result that the actual cause of triggering the user experience event type is the initial computing service cause, a new computing service is determined, a new computing service routing strategy to reach the new computing service is determined, and sent to the terminal device; or

[0161] If it is determined according to the measurement result that the actual cause of triggering the user experience event type is the terminal device, sending feedback information to the terminal device, the feedback information including the actual cause and / or solution; or

[0162] If it is determined according to the measurement results that the actual cause of triggering the user experience event type is the terminal device, a new computing service routing strategy to reach the new computing service is determined according to the terminal device capabilities, computing resource status, and network resource status, and sent to the terminal device; or

[0163] If it is determined based on the measurement results that the actual cause of triggering the user experience event type is the terminal device, and it is determined that the terminal device cannot improve its capabilities, a new computing power service with computing power lower than that of the initial computing power service is determined, a new computing power service routing strategy to reach the new computing power service is determined, and the new computing power service routing strategy is sent to the terminal device.

[0164] Optionally, the processor determines an adjusted computing power service routing strategy according to the measurement result and sends it to the terminal device, or sends feedback information to the terminal device, and is used to:

[0165] Determine an adjusted computing power service routing policy according to the measurement result, and send the adjusted computing power service routing policy to the RAN entity, so that the RAN entity sends the adjusted computing power service routing policy to the terminal device; or

[0166] The feedback information is sent to a RAN entity, so that the RAN entity sends the feedback information to the terminal device.

[0167] Optionally, when the processor determines the initial computing power service routing strategy according to the service requirements of the terminal device, it is used to:

[0168] receiving a service requirement sent by the terminal device, and determining an initial service routing strategy according to the service requirement; or

[0169] Receive a service requirement sent by a RAN entity, where the service requirement is sent by the terminal device to the RAN entity, and determine an initial service routing strategy according to the service requirement.

[0170] Optionally, when the processor sends the initial computing power service routing policy to the terminal device, it is configured to:

[0171] The initial computing power service routing policy is sent to a RAN entity, so that the RAN entity sends the initial computing power service routing policy to the terminal device.

[0172] Optionally, the processor is further configured to:

[0173] The initial computing power service routing policy is sent to the core network entity so that the terminal device establishes a user plane path for accessing the initial computing power service corresponding to the initial computing power service routing policy according to the initial computing power service routing policy.

[0174] Optionally, when the processor sends the initial computing power service routing policy to the terminal device, it is further configured to:

[0175] The identifier of the computing power node where the initial computing power service is located and the identifier of the initial computing power service are sent to the terminal device.

[0176] In a fourth aspect, the present application provides a terminal device, including a memory, a transceiver, and a processor:

[0177] A memory for storing a computer program; a transceiver for transmitting and receiving data under the control of the processor; and a processor for reading the computer program in the memory and performing the following operations:

[0178] The receiving management center determines the initial computing service routing strategy based on the business needs of the terminal device;

[0179] Access the corresponding initial computing power service according to the initial computing power service routing policy;

[0180] Sending user experience information for the initial computing power service to the management center;

[0181] Receive the adjusted computing power service routing strategy or feedback information sent by the management center, wherein the adjusted computing power service routing strategy is the computing power service routing strategy adjusted by the management center after performing corresponding measurements based on the user experience information.

[0182] Optionally, when the processor sends the user experience information for the initial computing power service to the management center, it is configured to:

[0183] Receiving a user experience event subscription message sent by the management center, wherein the user experience event subscription message includes a user experience event type for the initial computing power service;

[0184] Determine whether the user experience event type is triggered;

[0185] If it is determined that the user experience event type is triggered, user experience information for the initial computing power service is sent to the management center.

[0186] Optionally, when the processor receives a user experience event subscription message sent by the management center, it is configured to:

[0187] receiving the user experience event subscription message sent by the RAN entity, where the user experience event subscription message is sent by the management center to the RAN entity;

[0188] When the processor sends the user experience information for the initial computing power service to the management center, it is used to:

[0189] Send user experience information for the initial computing power service to the RAN entity, so that the RAN entity sends the user experience information for the initial computing power service to the management center.

[0190] Optionally, when the processor sends the user experience information for the initial computing power service to the management center, it is configured to:

[0191] Actively sending user experience information for the initial computing power service to the management center, where the user experience information is the user's subjective feeling information about the initial computing power service; or

[0192] Receive a user experience information collection request for the initial computing power service sent by the management center, and send user experience information for the initial computing power service to the management center in response to the user experience information collection request, where the user experience information is the user's subjective feeling information about the initial computing power service.

[0193] Optionally, when the processor actively sends the user experience information for the initial computing power service to the management center, it is configured to:

[0194] Actively sending user experience information for the initial computing power service to the RAN entity, so that the RAN entity sends the user experience information for the initial computing power service to the management center; or

[0195] The processor receives a user experience information collection request for the initial computing power service sent by the management center, and sends user experience information for the initial computing power service to the management center in response to the user experience information collection request, for:

[0196] Receive a user experience information collection request for the initial computing power service sent by a RAN entity, where the user experience information collection request is actively sent by the terminal device to the RAN entity; and in response to the user experience information collection request, send user experience information for the initial computing power service to the RAN entity, so that the RAN entity sends the user experience information of the initial computing power service to the management center.

[0197] Optionally, the processor is further configured to:

[0198] Initiate terminal device computing capacity measurement at the management center, obtain one or more of the load size, computing resource size, and computing resource utilization rate of the terminal device, and send them to the management center; or

[0199] The management center starts measuring the ability of the terminal device to access the network, and then obtains one or more of the wireless access capability and the type of the terminal device, and sends the information to the management center.

[0200] Optionally, when the processor receives the adjusted computing power service routing strategy or feedback information sent by the management center, it is configured to:

[0201] Receive the adjusted computing power service routing strategy or feedback information sent by the RAN entity, where the adjusted computing power service routing strategy or feedback information is sent by the management center to the RAN entity.

[0202] Optionally, when the processor accesses the corresponding initial computing power service according to the initial computing power service routing policy, it is configured to:

[0203] An application program for accessing the initial computing power service is started, and the initial computing power service is accessed through the application program.

[0204] Optionally, before receiving the initial computing power service routing strategy determined by the management center according to the service requirements of the terminal device, the processor is further configured to:

[0205] Sending the business requirement to the management center; or

[0206] The service requirement is sent to the RAN entity, so that the RAN entity sends the service requirement to the management center.

[0207] In a fifth aspect, the present application provides a computing power and network service processing device, including:

[0208] A computing power service orchestration unit, configured to determine an initial computing power service routing strategy according to a service requirement of a terminal device, and send the initial computing power service routing strategy to the terminal device;

[0209] A user experience information acquisition unit, configured to receive user experience information for the initial computing power service sent by the terminal device after the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing policy;

[0210] A computing power service adjustment unit is used to start corresponding measurements according to the user experience information, determine the adjusted computing power service routing strategy according to the measurement results and send it to the terminal device, or send feedback information to the terminal device.

[0211] In a sixth aspect, the present application provides a computing power and network service processing device, including:

[0212] A receiving unit, used to receive an initial computing power service routing strategy determined by a management center according to a service requirement of a terminal device;

[0213] An access unit, configured to access a corresponding initial computing power service according to the initial computing power service routing policy;

[0214] A sending unit, configured to send user experience information for the initial computing power service to the management center;

[0215] The receiving unit is also used to receive the adjusted computing power service routing strategy or feedback information sent by the management center, wherein the adjusted computing power service routing strategy is the computing power service routing strategy adjusted by the management center after performing corresponding measurements based on the user experience information.

[0216] In a seventh aspect, the present application provides a non-transitory readable storage medium, wherein the non-transitory readable storage medium stores a computer program, and the computer program is used to enable a processor to execute the method described in the first aspect or the second aspect above.

[0217] The processing method, device and storage medium of computing power and network services provided in the present application determine the initial computing power service routing strategy according to the business needs of the terminal device through the management center, and send the initial computing power service routing strategy to the terminal device; after the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing strategy, receive the user experience information for the initial computing power service sent by the terminal device; start corresponding measurements according to the user experience information, determine the adjusted computing power service routing strategy according to the measurement results and send it to the terminal device, or send feedback information to the terminal device. By obtaining the user experience information for the initial computing power service and performing corresponding measurements, the computing power service routing strategy or feedback information is adjusted, thereby improving the user experience of the computing power service in a targeted manner, while making more full and reasonable use of computing network resources, optimizing resource allocation, and more efficiently exerting the value of computing network resources.

[0218] It should be understood that the contents described in the above summary of the invention are not intended to limit the key or important features of the embodiments of the present application, nor are they intended to limit the scope of the present application. Other features of the present application will become easy to understand through the following description. BRIEF DESCRIPTION OF THE DRAWINGS

[0219] In order to more clearly illustrate the technical solutions in the present application or the prior art, a brief introduction will be given below to the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative labor.

[0220] Figure 1 A schematic diagram of an application scenario of a method for processing computing power and network services provided in an embodiment of the present application;

[0221] Figure 2 A flowchart of a method for processing computing power and network services provided in an embodiment of the present application;

[0222] Figure 3A flowchart of a method for processing computing power and network services provided in another embodiment of the present application;

[0223] Figure 4 A flowchart of a method for processing computing power and network services provided in another embodiment of the present application;

[0224] Figure 5 A signaling diagram of a method for processing computing power and network services provided in an embodiment of the present application;

[0225] Figure 6 A signaling diagram of a method for processing computing power and network services provided in another embodiment of the present application;

[0226] Figure 7 A structural diagram of a management center entity provided in an embodiment of the present application;

[0227] Figure 8 A structural diagram of a terminal device provided in one embodiment of the present application;

[0228] Fig. 9 A structural diagram of a processing device for computing power and network services provided in one embodiment of the present application;

[0229] Fig.10 A structural diagram of a processing device for computing power and network services provided in another embodiment of the present application. DETAILED DESCRIPTION

[0230] The term "and / or" in this application describes the association relationship of associated objects, indicating that there may be three relationships. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. The character " / " generally indicates that the associated objects are in an "or" relationship.

[0231] In the embodiments of the present application, the term "multiple" refers to two or more than two, and other quantifiers are similar. In addition, the terms "first", "second", etc. are only used for descriptive purposes and cannot be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features.

[0232] In the existing technology, the research on computing power networks is currently mainly based on the bearer network. In the overall architecture of the computing power network, the computing network infrastructure layer is proposed as a new infrastructure layer of the computing power network. The computing power service layer, computing power routing layer and computing network orchestration management layer are used as the three core functional modules to realize the perception, controllability and manageability of the computing power network, so as to realize the perception, control and management of computing power and network resources.

[0233] The computing power network supports the perception and notification of computing power information and network information. The entry network node obtains the currently available resource status of network nodes, computing power nodes and other node devices. The network information may include network topology, bandwidth, latency, jitter, etc.; computing power information includes computing power enabling information, deployment location and status of nodes deployed in the network, which can refer to the number of service / task connections, CPU / GPU computing power, deployment form (physical, virtual), deployment location (corresponding IP address), storage capacity, storage form and other capabilities, or it can refer to the computing power abstracted from the above basic computing power resources, which is used to reflect the currently available computing power and distribution location and form of each node.

[0234] The computing network management center can perform computing service orchestration and policy adjustment through computing resource status perception on the business side and network resource status perception on the network side. However, computing service orchestration and policy adjustment lack perception of user experience. They only aim to meet the user's business needs with computing resource status and network resource status. However, the user experience may be poor and fail to achieve the user's expected experience. For example, when a user uses XR interactive services, although both computing power and network meet the user's business needs, the user's expected experience may not be achieved (for example, insufficient computing power of the user's terminal device itself, excessive service load, insufficient wireless access capability, mismatch of terminal types, etc., which cannot achieve the expected high bandwidth and low latency service effect). Since the computing network lacks perception of user experience, it cannot adjust the scheduling strategy of computing services and optimize computing resources in combination with user experience, resulting in poor user experience of computing services and unreasonable allocation of computing resources and network resources.

[0235] In a related technology, a mobile network quality evaluation study based on user experience can be conducted to evaluate voice services, video services, data services, other services, etc., and to measure key indicators related to user experience. Among them, the voice service tests the connection rate, call drop rate, call establishment time, and voice quality through the business processes of sending requests, establishing connections, maintaining calls, and ending calls. The data service tests the web page access success rate, web page first screen response time, file upload / download success rate, file upload / download time, and upload / download rate through business scenarios such as web browsing, FTP / HTTP file upload and download, and software speed testing. The video service tests the video playback success rate, first frame response time, number of freezes, and video playback quality through live video scenarios.

[0236] However, the mobile network quality evaluation based on user experience is also conducted from the perspective of the network operator. It tests the user experience indicators through testing tools and is not combined with computing power services.

[0237] In another related technology, a method for evaluating the quality of experience (QoE) is provided. QoE refers to the user's subjective feeling about the quality and performance of equipment, networks and systems, applications or services. QoE refers to the user's perceived ease of completing the entire process. The main indicators of QoE generally include: for business categories, such as connection establishment delay, connection establishment success rate, connection interruption frequency, etc., for video categories, such as freeze frequency, startup time, average bit rate, playback failure rate, etc.

[0238] QoE evaluation methods include objective evaluation methods and subjective evaluation methods:

[0239] The objective evaluation method mainly establishes a mapping method from QoE parameters to QoS (Quality of Service) parameters. There is currently no unified standard for measuring QoE parameters. The more commonly used QoE measurement methods in the industry are divided into three categories: client measurement method, network and server measurement method.

[0240] Client measurement method: Using tools on the client to directly measure the QoE of user services can provide more accurate objective data and application layer quality indicators.

[0241] Network measurement method: Network service providers can collect more and more real-time network QoS data, such as throughput, packet loss, jitter, out-of-order, etc., but this information cannot directly reflect the network QoE. The main purpose of network QoE measurement is to use network QoS indicators to predict the QoE of network video.

[0242] Server measurement method: collects each data packet on the business server and reconstructs the business session. It can analyze information such as the number of interruptions, initial startup time, freeze duration, bit rate switching frequency, etc.

[0243] The subjective evaluation method mainly reflects the user's perception of service quality through subjective evaluation methods such as user surveys and user complaint analysis.

[0244] However, the QoE evaluation method requires the use of tools on the terminal side for direct measurement. It is not integrated with the computing power network, nor does it have data perception and feedback for computing power services.

[0245] In order to solve the above technical problems, the present application provides a method for processing computing power and network services, wherein the management center determines the initial computing power service routing strategy according to the business needs of the terminal device, and sends the initial computing power service routing strategy to the terminal device; after the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing strategy, the user experience information for the initial computing power service sent by the terminal device is received; corresponding measurements are initiated according to the user experience information, and the adjusted computing power service routing strategy is determined according to the measurement results and sent to the terminal device, or feedback information is sent to the terminal device. By obtaining the user experience information for the initial computing power service and performing corresponding measurements, the computing power service routing strategy or feedback information is adjusted, thereby improving the user experience of the computing power service in a targeted manner, while making more full and reasonable use of computing network resources, optimizing resource allocation, and more efficiently exerting the value of computing network resources.

[0246] The present application embodiment is applied to Figure 1 The application scenario shown includes a terminal device, a management center, and a computing power network, wherein the terminal device can send business needs to the management center, and the management center determines the initial computing power service routing strategy based on the business needs of the terminal device and sends it to the terminal device. The terminal device accesses the corresponding initial computing power service according to the initial computing power service routing strategy, and sends user experience information for the initial computing power service to the management center. The management center initiates corresponding measurements based on the user experience information, determines the adjusted computing power service routing strategy based on the measurement results, and sends it to the terminal device, or sends feedback information to the terminal device.

[0247] The computing power and network service processing method of the present application can be applied in fixed network scenarios as well as in mobile communication network scenarios.

[0248] Among them, the mobile communication network can be any mobile communication network, including but not limited to various mobile communication network systems such as 4G network, 5G network, 6G network, such as global system of mobilecommunication (GSM) system, code division multiple access (CDMA) system, wideband code division multiple access (WCDMA) general packet radio service (GPRS) system, long term evolution (LTE) system, LTE frequency division duplex (FDD) system, LTE time division duplex (TDD) system, advanced long term evolution (LTE-A) system, universal mobile telecommunication system (UMTS), worldwide interoperability for microwave access (WiMAX) system, 5G new air interface (NewRadio, NR) system, etc.

[0249] The terminal device involved in the embodiments of the present application may be a device that provides voice and / or data connectivity to a user. In a fixed network scenario, the terminal device may be a wired terminal device or a wireless terminal device; in a mobile communication network scenario, the terminal device may be a handheld device with a wireless connection function, or other processing devices connected to a wireless modem. In different systems, the names of the terminal devices may also be different. For example, in a 5G system, the terminal device may be called a user equipment (UE). The wireless terminal device may communicate with one or more core networks (CN) via a radio access network (RAN). The wireless terminal device may be a mobile terminal device, such as a mobile phone (or a "cellular" phone) and a computer with a mobile terminal device. For example, it may be a portable, pocket-sized, handheld, computer-built-in or vehicle-mounted mobile device that exchanges language and / or data with a radio access network. For example, Personal Communication Service (PCS) phones, cordless phones, Session Initiated Protocol (SIP) phones, Wireless Local Loop (WLL) stations, Personal Digital Assistants (PDA) and other devices. Wireless terminal devices may also be referred to as systems, subscriber units, subscriber stations, mobile stations, mobile stations, remote stations, access points, remote terminal devices, access terminal devices, user terminal devices, user agents, and user devices, which are not limited in the embodiments of the present application.

[0250] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0251] Among them, the method and the device are based on the same application concept. Since the method and the device solve the problem in a similar principle, the implementation of the device and the method can refer to each other, and the repeated parts will not be repeated.

[0252] Figure 2 This is a flow chart of the method for processing computing power and network services provided in this embodiment. Figure 2 As shown, this embodiment provides a method for processing computing power and network services, and the execution entity is a management center.

[0253] The specific steps of this method are as follows:

[0254] S201. Determine an initial computing power service routing strategy according to the service requirements of the terminal device, and send the initial computing power service routing strategy to the terminal device.

[0255] In this embodiment, the terminal device may have certain business needs, such as rendering a video, and the terminal device may not have a video rendering function, so the video rendering can be achieved by accessing the computing power service. The terminal device can send the business needs to the management center, where the business needs include computing power needs, such as the required service type, the required service resource size, etc. The business needs may also include network needs, such as bandwidth requirements, delay requirements, etc.; further, the management center can allocate the initial computing power service to the terminal device according to the business needs of the terminal device, and arrange the initial computing power service routing strategy (that is, the routing path for the terminal device to access the initial computing power service), and send the initial computing power service routing strategy to the terminal device. Optionally, since the computing power service is deployed on the computing power node, and one or more computing power services may be deployed on a computing power node, the initial computing power service routing strategy can be the routing path for the terminal device to access the computing power node where the initial computing power service is located. The management center will also send the identifier of the computing power node where the initial computing power service is located and the identifier of the initial computing power service to the terminal device, so that the terminal device can access the initial computing power service according to the identifier of the initial computing power service after accessing the computing power node.

[0256] Among them, in the scenario of a fixed network, the terminal device can send business needs to the management center. After the management center receives the business needs sent by the terminal device, it determines the initial service routing strategy based on the business needs, and sends the initial computing power service routing strategy to the terminal device; in the scenario of a mobile communication network, the terminal device can send business needs to a RAN (Radio Access Network) entity, and the RAN entity sends the business needs to the management center. After the management center receives the business needs sent by the RAN entity, it determines the initial service routing strategy based on the business needs. Furthermore, the management center sends the initial computing power service routing strategy to the RAN entity, and the RAN entity sends the initial computing power service routing strategy to the terminal device.

[0257] S202: After the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing policy, receive user experience information for the initial computing power service sent by the terminal device.

[0258] In this embodiment, after receiving the initial computing power service routing strategy, the terminal device can access the corresponding initial computing power service according to the initial computing power service routing strategy. Optionally, the terminal device can access the initial computing power service through an application (APP). For different computing power services, the terminal device can use the same application (APP) to access, or can use different applications (APPs) to access, and of course can also access without using an application.

[0259] After the terminal device accesses the initial computing power service, the terminal device may send user experience information for the initial computing power service to the management center, where the user experience information for the initial computing power service may be parameter data that can reflect the user experience, such as the startup time and restart times of the application program accessing the initial computing power service, the initial computing power service freeze duration, freeze times, and failure times, the connection establishment delay, success rate, and terminal frequency for accessing the initial computing power service; or it may be user's subjective perception information of the initial computing power service, such as whether the user is satisfied with the initial computing power service, the degree of satisfaction, existing problems, whether to continue using the initial computing power service, suggestions, etc.

[0260] Among them, in the fixed network scenario, the terminal device can directly send the user experience information for the initial computing power service to the management center; in the mobile communication network scenario, the terminal device can send the user experience information for the initial computing power service to the RAN entity, and the RAN entity will send the user experience information for the initial computing power service to the management center.

[0261] S203: Initiate corresponding measurements according to the user experience information, determine an adjusted computing power service routing strategy according to the measurement results and send it to the terminal device, or send feedback information to the terminal device.

[0262] In this embodiment, after the management center receives the user experience information, it can initiate corresponding measurements based on the user experience information, where the measurements may include at least one of terminal device capability measurement, computing power node computing power measurement, and network service quality measurement; based on the measurement results, the cause of the user experience problem can be determined, and the computing power service routing strategy can be adjusted. When adjusting the computing power service routing strategy, the computing power resource status, network resource status, etc. can also be combined to finally obtain the adjusted computing power service routing strategy and send it to the terminal device, or send feedback information to the terminal device, such as the cause of the user experience problem and / or improvement suggestions.

[0263] Among them, in the fixed network scenario, the management center sends the adjusted computing power service routing strategy or feedback information to the terminal device; in the mobile communication network scenario, the management center can send the adjusted computing power service routing strategy or feedback information to the RAN entity, and the RAN entity will send the adjusted computing power service routing strategy or feedback information to the management center.

[0264] The method for processing computing power and network services of this embodiment is to determine the initial computing power service routing strategy according to the business needs of the terminal device through the management center, and send the initial computing power service routing strategy to the terminal device; after the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing strategy, receive the user experience information for the initial computing power service sent by the terminal device; start corresponding measurements according to the user experience information, determine the adjusted computing power service routing strategy according to the measurement results and send it to the terminal device, or send feedback information to the terminal device. By obtaining the user experience information for the initial computing power service and performing corresponding measurements, the computing power service routing strategy or feedback information is adjusted, thereby improving the user experience of the computing power service in a targeted manner, while making more full and reasonable use of computing network resources, optimizing resource allocation, and more efficiently exerting the value of computing network resources.

[0265] In an optional embodiment, based on any of the above embodiments, Figure 3 As shown, after the terminal device accesses the corresponding initial computing service according to the initial computing service routing policy, receiving the user experience information for the initial computing service sent by the terminal device in S202 may specifically include:

[0266] S301. After the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing policy, send a user experience event subscription message to the terminal device, wherein the user experience event subscription message includes a user experience event type for the initial computing power service;

[0267] In this embodiment, the management center can subscribe to user experience information in a subscription manner, that is, after the terminal device accesses the initial computing power service, the management center can send a user experience event subscription message to the terminal device. The user experience event subscription message includes the user experience event type for the initial computing power service. Of course, the user experience event subscription message may also include one or more of the following: a user experience event subscription message identifier, an identifier of the terminal device, an identifier of the application used to access the initial computing power service, a deadline for user experience event subscription (such as the expiration time of the computing power service, or a time point before the expiration deadline of the computing power service), etc.

[0268] Optionally, the user experience event type includes one or more of the following:

[0269] The startup time of the application used to access the initial computing power service exceeds the first preset time period; or

[0270] The number of restarts of the application used to access the initial computing power service exceeds a first preset number; or

[0271] The number of freezes during the execution of the service through the initial computing service exceeds a second preset number; or

[0272] During the execution of the service through the initial computing service, a single freeze time exceeds the second preset time length; or

[0273] The number of execution failures during the execution of the service through the initial computing service exceeds a third preset number; or

[0274] The delay in establishing a connection to the initial computing power service exceeds a third preset time period; or

[0275] The connection establishment success rate for accessing the initial computing power service is lower than the preset success rate; or

[0276] The frequency of connection interruptions to the initial computing power service exceeds the preset frequency.

[0277] Among them, in the fixed network scenario, the management center can directly send the user experience event subscription message to the terminal device; in the mobile communication network scenario, the management center can send the user experience event subscription message to the RAN entity, and the RAN entity will send the user experience event subscription message to the terminal device.

[0278] In addition, optionally, after the terminal device accesses the initial computing power service, the management center may also establish a computing power service mapping relationship, where the computing power service mapping relationship is a mapping relationship between one or more of the terminal device's identifier, the application identifier used to access the initial computing power service, the identifier of the computing power node where the initial computing power service is located, and the identifier of the initial computing power service, for easy management; and when the management center sends a user experience event subscription message to the terminal device, it can determine the information required in the user experience event subscription message based on the computing power service mapping relationship, and then send the user experience event subscription message to the terminal device.

[0279] S302: Receive user experience information sent by the terminal device after the user experience event type is triggered, where the user experience information includes user experience data related to the user experience event type.

[0280] In this embodiment, the terminal device can determine whether the user experience event type is triggered according to the user experience event subscription message, and send user experience information to the management center after the user experience event type is triggered. The user experience information includes user experience data related to the user experience event type. Optionally, the user experience data includes one or more of the following:

[0281] The time when the application used to access the Initial Computing Service is launched; or

[0282] The number of times the application used to access the Initial Compute Service is restarted; or

[0283] The number of freezes and monitoring time periods during the execution of the service through the initial computing service; or

[0284] A single pause in the execution of a service through the initial computing service; or

[0285] The number of execution failures and monitoring time periods during the execution of the service through the initial computing service; or

[0286] The connection establishment delay to access the initial computing service; or

[0287] The success rate of establishing connections to the initial computing power service; or

[0288] The frequency of connection interruptions to the initial computing power service.

[0289] Among them, in the fixed network scenario, the terminal device sends the user experience information to the management center; in the mobile communication network scenario, the terminal device sends the user experience information to the RAN entity, and the RAN entity sends the user experience information to the management center.

[0290] In another optional embodiment, based on any of the above embodiments, after the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing policy, receiving the user experience information for the initial computing power service sent by the terminal device in S202 may specifically include:

[0291] After the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing strategy, user experience information for the initial computing power service actively sent by the terminal device is received, where the user experience information is the user's subjective feeling information about the initial computing power service.

[0292] In this embodiment, after the terminal device accesses the initial computing power service, the user can actively feedback the user experience information for the initial computing power service to the management center, for example, through an application on the terminal device (such as an application for accessing the initial computing power service), a phone, a browser, etc., and the user experience information fed back by the user can be the user's subjective feeling information about the initial computing power service, such as whether the user is satisfied with the initial computing power service, the degree of satisfaction, the problems that exist (such as slow speed, unclear content, lag, audio and video out of sync, etc.), whether to continue using the initial computing power service, suggestions, etc.

[0293] Among them, in the fixed network scenario, the terminal device sends the user experience information to the management center; in the mobile communication network scenario, the terminal device sends the user experience information to the RAN entity, and the RAN entity sends the user experience information to the management center.

[0294] In another optional embodiment, based on any of the above embodiments, after the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing policy, receiving the user experience information for the initial computing power service sent by the terminal device in S202 may specifically include:

[0295] After the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing strategy, a user experience information collection request for the initial computing power service is sent to the terminal device, and the terminal device sends user experience information for the initial computing power service in response to the user experience information collection request, where the user experience information is the user's subjective feeling information about the initial computing power service.

[0296] In this embodiment, after the terminal device accesses the initial computing power service, the management center may send a user experience information collection request for the initial computing power service to the terminal device in real time or periodically. After receiving the user experience information collection request, the terminal device may input the user experience information and send it to the management center. The user experience information is the same as above, and may be the user's subjective feeling information about the initial computing power service, such as whether the user is satisfied with the initial computing power service, the degree of satisfaction, existing problems (such as slow speed, unclear content, lag, audio and video asynchrony, etc.), whether to continue using the initial computing power service, suggestions, etc.

[0297] Among them, in the fixed network scenario, the management center sends a user experience information collection request to the terminal device, and the terminal device sends the user experience information to the management center; in the mobile communication network scenario, the management center sends a user experience information collection request to the RAN entity, the RAN entity sends the user experience information collection request to the terminal device, the terminal device sends the user experience information to the RAN entity, and the RAN entity sends the user experience information to the management center.

[0298] On the basis of any of the foregoing embodiments, starting corresponding measurement according to the user experience information in S203 may specifically include:

[0299] Perform cause analysis based on the user experience information, determine a measurement task based on the analysis result, and execute the measurement task, wherein the measurement task includes at least one of the following: terminal device capability measurement, computing power node computing capability measurement, and network service quality measurement.

[0300] In this embodiment, after receiving the user experience information, a cause analysis can be performed based on the user experience information to determine the predicted cause for triggering the relevant user experience event type, that is, the most likely cause, and then determine the measurement task corresponding to the predicted cause to verify whether the predicted cause is accurate, where the predicted cause may be one or more of a terminal device capability problem, an initial computing power service computing capability problem, or a network service quality problem, and then execute the corresponding measurement task for verification.

[0301] More specifically, performing cause analysis according to the user experience information, determining a measurement task according to the analysis result, and executing the measurement task may include:

[0302] Determining a predicted cause for triggering the user experience event type according to the user experience information, determining a measurement task corresponding to the predicted cause as a measurement task with the highest priority, and executing the measurement task with the highest priority;

[0303] After the highest priority measurement task is executed, if it is determined that the predicted cause is the actual cause that triggers the user experience event type, then the measurement task is terminated; or

[0304] If it is determined that the predicted reason is not the actual reason that triggers the user experience event type, other measurement tasks are performed.

[0305] In this embodiment, the predicted cause is only the most likely cause for triggering the user experience event type, which is not necessarily accurate, and other causes may also trigger the user experience event type. Therefore, in this embodiment, when determining the measurement task, only the measurement task corresponding to the predicted cause is used as the measurement task with the highest priority, and the measurement task with the highest priority is executed first, that is, the predicted cause is verified first. If it is verified that the predicted cause is indeed the actual cause for triggering the user experience event type, the measurement task is terminated and there is no need to execute other measurement tasks; otherwise, if it is determined that the predicted cause is not the actual cause for triggering the user experience event type, other measurement tasks are executed to determine the actual cause for triggering the user experience event type.

[0306] Optionally, when determining the predicted cause of triggering the user experience event type according to the user experience information, it may specifically include:

[0307] If the user experience information is information related to an application used to access the initial computing power service, determining that the predicted cause of triggering the user experience event type is insufficient terminal device capability; or

[0308] If the user experience information is related to freeze or execution failure during the execution of the service through the initial computing service, it is determined that the predicted cause of triggering the user experience event type is insufficient computing power of the initial computing service (such as excessive initial computing service load) and / or insufficient network service quality (such as insufficient network bandwidth); or

[0309] If the user experience information is a connection problem for accessing the initial computing power service, then the predicted cause for triggering the user experience event type is determined to be insufficient ability of the terminal device to access the network or mismatch of the terminal device type.

[0310] On the basis of the above embodiment, the step of determining the adjusted computing power service routing strategy according to the measurement result and sending it to the terminal device, or sending feedback information to the terminal device, as described in S203, may specifically include:

[0311] If it is determined according to the measurement result that the actual cause of triggering the user experience event type is a network cause, a new computing service routing strategy for reaching the initial computing service is determined, that is, the initial computing service remains unchanged, the routing path for the terminal device to access the initial computing service is changed, a new computing service routing strategy for the terminal device to reach the initial computing service is obtained, and the new computing service routing strategy is sent to the terminal device;

[0312] Alternatively, if it is determined according to the measurement result that the actual cause of triggering the user experience event type is the initial computing power service cause, a new computing power service is determined, and a new computing power service routing strategy to reach the new computing power service is determined, that is, the new computing power service is replaced, and accordingly, the computing power service routing strategy also needs to be updated to the new computing power service routing strategy to reach the new computing power service, and the new computing power service routing strategy is sent to the terminal device;

[0313] Alternatively, if it is determined according to the measurement result that the actual cause of triggering the user experience event type is the terminal device, feedback information is sent to the terminal device, where the feedback information includes the actual cause and / or solution, so as to facilitate the user to solve the problem;

[0314] Alternatively, if it is determined according to the measurement results that the actual cause of triggering the user experience event type is the terminal device, then a new computing power service routing strategy to reach the new computing power service is determined according to the terminal device capability, computing power resource status, and network resource status. That is, in the case of insufficient terminal device capability, the management center may, according to the computing power resource status and the network resource status, arrange new computing power services and new network resources that meet the terminal device capability for the terminal device, determine a new computing power service routing strategy to reach the new computing power service, and send the new computing power service routing strategy to the terminal device;

[0315] Alternatively, if it is determined based on the measurement results that the actual reason for triggering the user experience event type is the terminal device, and it is determined that the terminal device is unable to improve its capabilities (such as monitoring the terminal device capability reporting status for a long time and finding that the terminal device capability has not changed or has not improved), then a new computing power service with computing power lower than that of the initial computing power service is determined, and a new computing power service routing strategy to reach the new computing power service is determined. That is, since the terminal device is unable to improve its capabilities, in order to avoid wasting computing network resources, a new computing power service with relatively low computing power can be arranged for the terminal device, and a new computing power service routing strategy to reach the new computing power service can be determined. The new computing power service routing strategy is sent to the terminal device, and the initial computing power service is freed up to provide to other more urgent businesses, so that computing network resources can be fully and reasonably utilized, resource overhead can be saved, and resource allocation can be optimized.

[0316] Figure 4 This is a flow chart of the method for processing computing power and network services provided in this embodiment. Figure 2As shown, this embodiment provides a method for processing computing power and network services, and the execution subject is a terminal device, which is a method embodiment of the terminal device side in the above embodiment.

[0317] The specific steps of this method are as follows:

[0318] S401, the receiving management center determines the initial computing power service routing strategy according to the business requirements of the terminal device;

[0319] S402, accessing the corresponding initial computing power service according to the initial computing power service routing policy;

[0320] S403, sending user experience information for the initial computing power service to the management center;

[0321] S404. Receive the adjusted computing power service routing strategy or feedback information sent by the management center, wherein the adjusted computing power service routing strategy is the computing power service routing strategy adjusted by the management center after performing corresponding measurements based on the user experience information.

[0322] In an optional embodiment, the sending of user experience information for the initial computing power service to the management center in S403 includes:

[0323] Receiving a user experience event subscription message sent by the management center, wherein the user experience event subscription message includes a user experience event type for the initial computing power service;

[0324] Determine whether the user experience event type is triggered;

[0325] If it is determined that the user experience event type is triggered, user experience information for the initial computing power service is sent to the management center.

[0326] Optionally, in a scenario of a mobile communication network, the receiving a user experience event subscription message sent by the management center includes:

[0327] receiving the user experience event subscription message sent by the RAN entity, where the user experience event subscription message is sent by the management center to the RAN entity;

[0328] The sending of user experience information for the initial computing power service to the management center includes:

[0329] Send user experience information for the initial computing power service to the RAN entity, so that the RAN entity sends the user experience information for the initial computing power service to the management center.

[0330] In another optional embodiment, the sending of user experience information for the initial computing power service to the management center in S403 includes:

[0331] Actively sending user experience information for the initial computing power service to the management center, where the user experience information is the user's subjective feeling information about the initial computing power service; or

[0332] Receive a user experience information collection request for the initial computing power service sent by the management center, and send user experience information for the initial computing power service to the management center in response to the user experience information collection request, where the user experience information is the user's subjective feeling information about the initial computing power service.

[0333] Optionally, in a scenario of a mobile communication network, the actively sending the user experience information for the initial computing power service to the management center includes:

[0334] Actively sending user experience information for the initial computing power service to the RAN entity, so that the RAN entity sends the user experience information for the initial computing power service to the management center; or

[0335] The receiving a user experience information collection request for the initial computing power service sent by the management center, and sending the user experience information for the initial computing power service to the management center in response to the user experience information collection request, includes:

[0336] Receive a user experience information collection request for the initial computing power service sent by a RAN entity, where the user experience information collection request is actively sent by the terminal device to the RAN entity; and in response to the user experience information collection request, send user experience information for the initial computing power service to the RAN entity, so that the RAN entity sends the user experience information of the initial computing power service to the management center.

[0337] Based on any of the above embodiments, the method further includes:

[0338] Initiate terminal device computing capacity measurement at the management center, obtain one or more of the load size, computing resource size, and computing resource utilization rate of the terminal device, and send them to the management center; or

[0339] The management center starts measuring the ability of the terminal device to access the network, and then obtains one or more of the wireless access capability and the type of the terminal device, and sends the information to the management center.

[0340] Optionally, in a scenario of a mobile communication network, the receiving the adjusted computing power service routing strategy or feedback information sent by the management center includes:

[0341] Receive the adjusted computing power service routing strategy or feedback information sent by the RAN entity, where the adjusted computing power service routing strategy or feedback information is sent by the management center to the RAN entity.

[0342] Based on any of the above embodiments, accessing the corresponding initial computing power service according to the initial computing power service routing policy includes:

[0343] An application program for accessing the initial computing power service is started, and the initial computing power service is accessed through the application program.

[0344] Based on any of the above embodiments, before the receiving management center determines the initial computing power service routing strategy according to the service requirements of the terminal device, the method further includes:

[0345] In a fixed network scenario, the terminal device sends the service demand to the management center; or

[0346] In a scenario of a mobile communication network, the terminal device sends the service demand to a RAN entity, so that the RAN entity sends the service demand to the management center.

[0347] The method embodiments on the terminal device side described above correspond to the method embodiments on the management center side. The principles and technical effects thereof can be found in the above embodiments and will not be described in detail here.

[0348] The above process of the embodiment of the present application will be described in detail below with reference to specific examples.

[0349] Example 1

[0350] like Figure 5 The signaling diagram of the processing method of computing power and network services shown in the figure is applied to a fixed network scenario, and the specific steps are as follows:

[0351] 1) The terminal device sends business requirements to the management center;

[0352] Business requirements include computing power requirements, such as the type of service required, the size of service resources required, etc. Business requirements may also include network requirements, such as bandwidth requirements, latency requirements, etc.

[0353] 2) The management center arranges initial computing services for terminal devices based on business needs;

[0354] The initial computing power service can be the computing resources of the computing power node or the application deployed on the computing power node;

[0355] 3) The management center sends the initial computing service routing strategy to the terminal device;

[0356] In addition, the management center may also send the identifier of the computing power node where the initial computing power service is located and the identifier of the initial computing power service to the terminal device;

[0357] 4) Terminal devices access initial computing power services;

[0358] Optionally, the terminal device may start an application (APP) for accessing the initial computing power service, and then access the initial computing power service through the application;

[0359] 5) The management center monitors the status of computing nodes in real time;

[0360] 6) After the management center monitors the terminal device accessing the initial computing power service, it establishes and maintains the computing power service mapping relationship;

[0361] The computing power service mapping relationship is a mapping relationship between one or more of the terminal device identifier, the application identifier for accessing the initial computing power service, the computing power node identifier where the initial computing power service is located, and the identifier of the initial computing power service;

[0362] 7) The management center sends a user experience event subscription message to the terminal device;

[0363] The subscription message includes one or more of the following information:

[0364] User experience event subscription message identifier, terminal device identifier, application identifier used to access the initial computing power service, user experience event type, and user experience event subscription deadline (event reporting deadline, such as the computing power service expiration time, or a point in time before the computing power service expiration deadline).

[0365] The user experience event type includes one or more of the following information:

[0366] The startup time of the application used to access the initial computing power service is too long (such as exceeding the first preset time, the specific time is determined according to actual management needs and is not specifically agreed upon here);

[0367] The application used to access the initial computing power service is restarted too many times (such as exceeding the second preset number, the specific number depends on the actual management needs, and no specific agreement is made here);

[0368] The initial computing service freezes too many times during the execution of the service (such as exceeding the second preset number, for example, for the initial computing service related to video processing, since the visual delay sensing speed of the human eye is greater than or equal to 40ms, when the video freeze time is greater than 40ms, it is counted as one freeze, or otherwise specified according to management needs);

[0369] The single freeze time during the execution of the initial computing service is too long (if it exceeds the second preset time, the specific time is determined according to actual management needs and is not specifically agreed upon here);

[0370] The initial computing service fails too many times during the execution of the service (such as exceeding the third preset number, for example, the number of video playback failures exceeds the third preset number, the specific number depends on the actual management needs, and no specific agreement is made here);

[0371] The connection establishment delay for accessing the initial computing power service is too long (such as exceeding the third preset time, the specific time is determined according to actual management needs, and no specific agreement is made here);

[0372] The success rate of establishing a connection to the initial computing power service is too low (the number of successful connections established during the statistical time period / the total number of connections established, the success rate is lower than the preset success rate, the specific data depends on the actual management needs, and is not agreed upon here);

[0373] The connection interruption frequency of accessing the initial computing power service is too high (if it exceeds the preset frequency, the preset frequency can be the number of interruptions per minute, the specific data depends on the actual management needs, and is not agreed upon here);

[0374] …etc;

[0375] 8) The terminal device starts status monitoring of the user experience event type according to the user experience event subscription message. When the user experience event type is triggered, the terminal device reports the user experience information to the management center;

[0376] User experience information includes user experience data related to user experience event types, and specific data includes one or more of the following information:

[0377] The application startup time used to access the initial computing power service;

[0378] The number of application restarts used to access the initial computing service;

[0379] The number of freezes and monitoring time periods during the execution of the service by the initial computing service, where the monitoring time period can be accurate to seconds;

[0380] A single pause time during the execution of the service through the initial computing power service;

[0381] The number of execution failures and monitoring time period during the execution of the service by the initial computing power service, where the monitoring time period is accurate to seconds;

[0382] The connection establishment delay for accessing the initial computing power service;

[0383] The success rate of establishing a connection to the initial computing power service;

[0384] The frequency of connection interruptions to the initial computing power service.

[0385] 9) The management center initiates corresponding measurements based on user experience information;

[0386] When the user experience data is the application startup time or restart times for accessing the initial computing power service, the analysis reason may be due to insufficient computing power of the terminal device. At this time, the terminal device capability measurement is performed on the terminal device side, such as one or more of the terminal device load, computing power resource size, computing power resource utilization, etc. If it is confirmed after measurement that it is not caused by insufficient computing power of the terminal device, measurement can be performed on the computing power node side and / or network service quality measurement.

[0387] When the user experience data is the number of freezes, single freeze time, and number of execution failures during the execution of the service through the initial computing service, the analysis reason may be insufficient network bandwidth or excessive initial computing service load, resulting in poor user experience. At this time, the computing power of the computing node is measured on the business side, such as measuring one or more of the computing node load, computing node resource utilization, and the current status of the computing service; and / or, QoS measurement is performed on the network, such as measuring one or more of the rate, bandwidth, and latency. If it is confirmed after measurement that it is not a network problem or an initial computing service problem, the measurement can be performed on the terminal device side.

[0388] When the user experience data is connection establishment delay, connection establishment success rate, and connection interruption frequency, the analysis reasons may be network access reasons or terminal device type mismatch. At this time, terminal capability measurement is performed on the terminal device side, such as testing one or more of the terminal device's network access capabilities, terminal type, etc.

[0389] 10) The management center provides user feedback based on the measurement results;

[0390] 11) The management center adjusts the computing power routing strategy based on the measurement results;

[0391] There is no strict sequence for steps 10 and 11. Step 11 may be performed first and then step 10, or both may be performed simultaneously. Alternatively, in some cases only step 10 may be performed without step 11, or in some cases only step 11 may be performed without step 10.

[0392] The management center analyzes the actual reasons for the poor user experience based on the measurement results, and based on the analysis results, provides relevant feedback (which may include feedback analysis results, and / or adjusted computing power node identifiers, computing power service identifiers, etc.) or adjusts the computing power routing strategy.

[0393] When the actual reason is due to network-side reasons, resulting in poor user experience, the management center adjusts the computing power scheduling strategy in real time, does not change the initial computing power service, changes the routing path for the terminal device to access the initial computing power service, and generates a new computing power routing strategy (forwarding path) to reach the initial computing power node / initial computing power service;

[0394] When the user experience on the business side is poor due to computing power issues, the management center selects a better computing node or computing service and generates a new computing routing strategy (forwarding path) to reach the new computing node / computing service;

[0395] When the user experience is poor due to the terminal device's own reasons, such as insufficient computing power, excessive service load, insufficient wireless access capability, mismatched terminal types, etc., the reason value can be fed back to the terminal device to explain the current configuration, possible reasons for the poor user experience, and improvement suggestions; or the computing power routing strategy can be adjusted based on the computing power resource status, network resource status, and terminal device capabilities, and a new computing power node / computing power service that matches the terminal device capabilities is arranged, and a new computing power routing strategy (forwarding path) to reach the new computing power node / computing power service is generated;

[0396] Alternatively, when the user experience is poor due to the terminal device's own capabilities and the terminal device is temporarily unable to improve its capabilities (such as long-term monitoring of terminal device capability reporting and finding that the terminal device's capabilities have not changed or have not improved), the computing power scheduling strategy can be adjusted to adjust the original business to a computing power node that can meet user needs and has lower computing power, freeing up the resources of the original computing power node for other users' more urgent businesses, saving resource overhead, achieving full and reasonable utilization of computing network resources, and optimizing resource allocation.

[0397] Example 2

[0398] like Figure 6 The signaling diagram of the processing method of computing power and network services shown in the figure is applied to a mobile communication network scenario, where the UE is a UE, and the specific steps are as follows:

[0399] 1) The UE proposes service requirements; the service requirements may include computing power requirements, such as the required service type, the required service resource size, etc. The service requirements may also include network requirements, such as bandwidth requirements, delay requirements, etc.; specifically, they include:

[0400] 1-1) UE sends service requirements to RAN entity;

[0401] 1-2) RAN entity forwards service requirements to the management center;

[0402] 2) The management center arranges initial computing services for UE according to business needs;

[0403] The initial computing power service can be the computing resources of the computing power node or the application deployed on the computing power node;

[0404] 3) Business needs responded to by the management center;

[0405] 3-1) The management center sends the initial computing power service routing policy to the RAN entity; in addition, the management center may also send the identifier of the computing power node where the initial computing power service is located and the identifier of the initial computing power service to the RAN entity;

[0406] 3-2) The RAN entity forwards the data received in step 3-1 to the UE;

[0407] 3-3) The management center sends the initial computing service routing policy to the core network entity so that the UE can establish a user plane path to access the initial computing service;

[0408] 4) The UE accesses the initial computing service and establishes a session to the initial computing service;

[0409] The session from UE to the initial computing service can be composed of UE-RAN-UPF (User Plane Function)-core network-data network. The initial computing service is located in the data network, and the session establishment process can be created by the SMF (Session Management Function) entity.

[0410] Optionally, the UE may start an application (APP) for accessing the initial computing power service, and then access the initial computing power service through the application;

[0411] 5) The management center monitors the status of computing nodes in real time;

[0412] 6) After the management center monitors the UE accessing the initial computing service, it establishes and maintains the computing service mapping relationship;

[0413] The computing power service mapping relationship is a mapping relationship between one or more of the identifier of the UE, the identifier of the application used to access the initial computing power service, the identifier of the computing power node where the initial computing power service is located, and the identifier of the initial computing power service;

[0414] 7) The management center subscribes to user experience events;

[0415] 7-1) The network management center sends a user experience event subscription message to the RAN entity;

[0416] 7-2) The RAN entity forwards the user experience event subscription message to the UE; wherein the user experience event subscription message may be the same as step 7 in Example 1;

[0417] 8) The UE starts status monitoring of the user experience event type according to the user experience event subscription message. When the user experience event type is triggered, the UE reports the user experience information to the management center; the user experience information may be the same as step 8 in Example 1;

[0418] 8-1) UE sends user experience information to RAN entity;

[0419] 8-2) The RAN entity forwards the user experience information to the network management center;

[0420] 9) The management center initiates corresponding measurements based on user experience information;

[0421] When the user experience data is the application startup time or restart times for accessing the initial computing power service, the analysis reason may be due to insufficient UE computing power. At this time, UE capability measurement is performed on the UE side, such as one or more of UE load, computing power resource size, computing power resource utilization, etc. If it is confirmed after measurement that it is not caused by insufficient UE computing power, measurement can be performed on the computing power node side and / or network service quality measurement.

[0422] When the user experience data is the number of freezes, single freeze time, and number of execution failures during the execution of the service through the initial computing service, the analysis reason may be insufficient network bandwidth or excessive initial computing service load, resulting in poor user experience. At this time, the computing power of the computing node is measured on the service side, such as measuring one or more of the computing node load, computing node resource utilization, and current status of the computing service; and / or, QoS measurement is performed on the network, such as measuring one or more of the rate, bandwidth, and latency. If it is confirmed after measurement that it is not a network problem or an initial computing service problem, the measurement can be performed on the UE side.

[0423] When the user experience data is connection establishment delay, connection establishment success rate, and connection interruption frequency, the analysis reasons may be network access reasons or UE type mismatch. At this time, terminal capability measurement is performed on the UE side, such as testing one or more of the UE's network access capability, terminal type, etc.

[0424] 10) The management center provides user feedback based on the measurement results;

[0425] 10-1) The network management center sends feedback information to the RAN entity (which may include feedback analysis results, and / or adjusted computing power node identifiers, computing power service identifiers, etc.);

[0426] 10-2) The RAN entity forwards the feedback information to the UE;

[0427] 11) The management center adjusts the computing power routing strategy based on the measurement results;

[0428] There is no strict sequence for steps 10 and 11. Step 11 may be performed first and then step 10, or both may be performed simultaneously. Alternatively, in some cases only step 10 may be performed without step 11, or in some cases only step 11 may be performed without step 10.

[0429] The method for adjusting user feedback or computing power scheduling strategy is the same as steps 10-11 in Example 1.

[0430] Example 3

[0431] This example provides another method for processing computing power and network services. The difference between this example and the above-mentioned examples 1 and 2 is that the terminal device can actively send user experience information for the initial computing power service to the management center, such as through an application, phone, browser, etc. on the terminal device, or the management center sends a user experience information collection request for the initial computing power service to the terminal device in real time or regularly, and the terminal device sends the user experience information for the initial computing power service to the management center after receiving the user experience information collection request, wherein the user experience information for the initial computing power service can be the user's subjective feeling information about the initial computing power service, such as the user experience information can include one or more of the following:

[0432] Whether the user is satisfied with the initial computing power service;

[0433] The level of satisfaction with the initial computing power service (the specific level is set according to actual needs, such as 5-point system, several stars, etc.);

[0434] Problems with the initial computing service (such as slow speed, unclear content, lag, audio and video out of sync, etc.);

[0435] Whether to continue using the initial computing power service;

[0436] Suggestions on initial computing power services, etc.

[0437] In this example, the steps of the terminal device reporting business needs, the management center determining the initial computing power service routing strategy based on the business needs of the terminal device and sending it to the terminal device, and the terminal device accessing the initial computing power service are the same as steps 1-6 in the above example 1 or example 2, and the management center initiating response measurement and adjustment and / or feedback of the computing power routing strategy based on the user experience information fed back by the terminal device are the same as steps 9-11 in the above example 1 or example 2.

[0438] Figure 7 The management center entity provided in this embodiment can execute the processing flow provided in the method embodiment of the management center side, such as Figure 7 As shown, the management center entity 700 includes a memory 701 , a transceiver 702 , and a processor 703 .

[0439] Among them, Figure 7 In the embodiment, the bus architecture may include any number of interconnected buses and bridges, specifically one or more processors represented by processor 703 and various circuits of memory represented by memory 701 are linked together. The bus architecture may also link together various other circuits such as peripherals, voltage regulators, and power management circuits, which are well known in the art and are therefore not further described herein. The bus interface provides an interface. The transceiver 702 may be a plurality of components, namely, a transmitter and a receiver, providing a unit for communicating with various other devices on a transmission medium, which transmission medium may include a wireless channel, a wired channel, an optical cable, and other transmission media. The processor 703 is responsible for managing the bus architecture and general processing, and the memory 701 may store data used by the processor 703 when performing operations.

[0440] The processor 703 may be a central processing unit (CPU), an application specific integrated circuit (ASIC), a field programmable gate array (FPGA) or a complex programmable logic device (CPLD). The processor may also adopt a multi-core architecture.

[0441] The memory 701 is used to store computer programs; the transceiver 702 is used to send and receive data under the control of the processor 703; the processor 703 is used to read the computer program in the memory 701 and perform the following operations:

[0442] Determine an initial computing power service routing strategy according to the service requirements of the terminal device, and send the initial computing power service routing strategy to the terminal device;

[0443] After the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing policy, receiving user experience information for the initial computing power service sent by the terminal device;

[0444] Initiate corresponding measurements according to the user experience information, determine an adjusted computing power service routing strategy according to the measurement results and send it to the terminal device, or send feedback information to the terminal device.

[0445] Optionally, after the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing policy, when receiving user experience information for the initial computing power service sent by the terminal device, the processor 703 is configured to:

[0446] After the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing policy, sending a user experience event subscription message to the terminal device, wherein the user experience event subscription message includes a user experience event type for the initial computing power service;

[0447] Receive user experience information sent by the terminal device after the user experience event type is triggered, where the user experience information includes user experience data related to the user experience event type.

[0448] Optionally, the user experience event type includes one or more of the following:

[0449] The startup time of the application used to access the initial computing power service exceeds a first preset time period; or

[0450] The number of restarts of the application used to access the initial computing power service exceeds a first preset number; or

[0451] The number of freezes during the execution of the service by the initial computing service exceeds a second preset number; or

[0452] During the execution of the service by the initial computing service, a single freeze time exceeds a second preset time length; or

[0453] The number of execution failures during the execution of the service by the initial computing service exceeds a third preset number; or

[0454] The connection establishment delay for accessing the initial computing power service exceeds a third preset duration; or

[0455] The connection establishment success rate for accessing the initial computing power service is lower than a preset success rate; or

[0456] The frequency of connection interruptions to the initial computing power service exceeds a preset frequency.

[0457] Optionally, the user experience data includes one or more of the following:

[0458] The time when the application used to access the initial computing power service is started; or

[0459] The number of times the application used to access the initial computing service is restarted; or

[0460] The number of freezes and monitoring time periods during the execution of the service by the initial computing service; or

[0461] A single pause in the execution of a service through the initial computing service; or

[0462] The number of execution failures and monitoring time period during the execution of the service by the initial computing service; or

[0463] The delay in establishing a connection to the initial computing service; or

[0464] The success rate of establishing a connection to access the initial computing power service; or

[0465] The frequency of connection interruptions to the initial computing service.

[0466] Optionally, after the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing policy, the processor 703 is further configured to:

[0467] Establishing a computing power service mapping relationship, wherein the computing power service mapping relationship is a mapping relationship between one or more of an identifier of the terminal device, an identifier of an application for accessing the initial computing power service, an identifier of a computing power node where the initial computing power service is located, and an identifier of the initial computing power service;

[0468] When the processor 703 sends a user experience event subscription message to the terminal device, it is configured to:

[0469] Send a user experience event subscription message to the terminal device according to the computing power service mapping relationship.

[0470] Optionally, the user experience event subscription message further includes one or more of the following:

[0471] The user experience event subscription message identifier, the identifier of the terminal device, the identifier of the application used to access the initial computing power service, and the deadline for user experience event subscription.

[0472] Optionally, when the processor 703 sends a user experience event subscription message to the terminal device, it is configured to:

[0473] Sending the user experience event subscription message to a radio access network RAN ​​entity, so that the RAN entity sends the user experience event subscription message to the terminal device;

[0474] When the processor 703 receives the user experience information sent by the terminal device after the user experience event type is triggered, it is configured to:

[0475] Receive user experience information sent by the RAN entity, where the user experience information is sent by the terminal device to the RAN entity.

[0476] Optionally, after the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing policy, when receiving user experience information for the initial computing power service sent by the terminal device, the processor 703 is configured to:

[0477] After the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing strategy, receiving user experience information for the initial computing power service actively sent by the terminal device, the user experience information being the user's subjective feeling information about the initial computing power service; or

[0478] After the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing strategy, a user experience information collection request for the initial computing power service is sent to the terminal device, and the terminal device sends user experience information for the initial computing power service in response to the user experience information collection request, where the user experience information is the user's subjective feeling information about the initial computing power service.

[0479] Optionally, when the processor 703 receives the user experience information for the initial computing power service actively sent by the terminal device, it is configured to:

[0480] receiving user experience information sent by a RAN entity, where the user experience information is actively sent by the terminal device to the RAN entity; or

[0481] When the processor 703 sends a user experience information collection request for the initial computing power service to the terminal device and receives the user experience information for the initial computing power service sent by the terminal device in response to the user experience information collection request, it is configured to:

[0482] The user experience information collection request is sent to the RAN entity, so that the RAN entity sends the user experience information collection request to the terminal device, and receives the user experience information sent by the RAN entity, where the user experience information is sent by the terminal device to the RAN entity in response to the user experience information collection request.

[0483] Optionally, when the processor 703 starts corresponding measurement according to the user experience information, it is configured to:

[0484] Perform cause analysis based on the user experience information, determine a measurement task based on the analysis result, and execute the measurement task, wherein the measurement task includes at least one of the following: terminal device capability measurement, computing power node computing capability measurement, and network service quality measurement.

[0485] Optionally, the processor 703 performs cause analysis according to the user experience information, determines a measurement task according to the analysis result, and executes the measurement task, for:

[0486] Determining a predicted cause for triggering the user experience event type according to the user experience information, determining a measurement task corresponding to the predicted cause as a measurement task with the highest priority, and executing the measurement task with the highest priority;

[0487] After the highest priority measurement task is executed, if it is determined that the predicted cause is the actual cause that triggers the user experience event type, then the measurement task is terminated; or

[0488] If it is determined that the predicted reason is not the actual reason that triggers the user experience event type, other measurement tasks are performed.

[0489] Optionally, when the processor 703 determines, according to the user experience information, a predicted reason for triggering the user experience event type, it is configured to:

[0490] If the user experience information is information related to an application used to access the initial computing power service, determining that the predicted cause of triggering the user experience event type is insufficient terminal device capability; or

[0491] If the user experience information is related to freeze or execution failure during the execution of the service by the initial computing service, then determining that the predicted cause of triggering the user experience event type is insufficient computing power of the initial computing service and / or insufficient network service quality; or

[0492] If the user experience information is a connection problem for accessing the initial computing power service, then the predicted cause for triggering the user experience event type is determined to be insufficient ability of the terminal device to access the network or mismatch of the terminal device type.

[0493] Optionally, the processor 703 determines an adjusted computing power service routing strategy according to the measurement result and sends it to the terminal device, or sends feedback information to the terminal device, and is used to:

[0494] If it is determined according to the measurement result that the actual cause of triggering the user experience event type is a network cause, a new computing power service routing strategy to reach the initial computing power service is determined and sent to the terminal device; or

[0495] If it is determined according to the measurement result that the actual cause of triggering the user experience event type is the initial computing service cause, a new computing service is determined, a new computing service routing strategy to reach the new computing service is determined, and sent to the terminal device; or

[0496] If it is determined according to the measurement result that the actual cause of triggering the user experience event type is the terminal device, sending feedback information to the terminal device, the feedback information including the actual cause and / or solution; or

[0497] If it is determined according to the measurement results that the actual cause of triggering the user experience event type is the terminal device, a new computing service routing strategy to reach the new computing service is determined according to the terminal device capabilities, computing resource status, and network resource status, and sent to the terminal device; or

[0498] If it is determined based on the measurement results that the actual cause of triggering the user experience event type is the terminal device, and it is determined that the terminal device cannot improve its capabilities, a new computing power service with computing power lower than that of the initial computing power service is determined, a new computing power service routing strategy to reach the new computing power service is determined, and the new computing power service is sent to the terminal device.

[0499] Optionally, the processor 703 determines an adjusted computing power service routing strategy according to the measurement result and sends it to the terminal device, or sends feedback information to the terminal device, and is used to:

[0500] Determine an adjusted computing power service routing policy according to the measurement result, and send the adjusted computing power service routing policy to the RAN entity, so that the RAN entity sends the adjusted computing power service routing policy to the terminal device; or

[0501] The feedback information is sent to a RAN entity, so that the RAN entity sends the feedback information to the terminal device.

[0502] Optionally, when the processor 703 determines the initial computing power service routing strategy according to the service requirements of the terminal device, it is configured to:

[0503] receiving a service requirement sent by the terminal device, and determining an initial service routing strategy according to the service requirement; or

[0504] Receive a service requirement sent by a RAN entity, where the service requirement is sent by the terminal device to the RAN entity, and determine an initial service routing strategy according to the service requirement.

[0505] Optionally, when the processor 703 sends the initial computing power service routing policy to the terminal device, it is configured to:

[0506] The initial computing power service routing policy is sent to a RAN entity, so that the RAN entity sends the initial computing power service routing policy to the terminal device.

[0507] Optionally, the processor 703 is further configured to:

[0508] The initial computing power service routing policy is sent to the core network entity so that the terminal device establishes a user plane path for accessing the initial computing power service corresponding to the initial computing power service routing policy according to the initial computing power service routing policy.

[0509] Optionally, when the processor 703 sends the initial computing power service routing policy to the terminal device, it is further configured to:

[0510] The identifier of the computing power node where the initial computing power service is located and the identifier of the initial computing power service are sent to the terminal device.

[0511] The management center entity provided in the embodiment of the present application can be specifically used to execute the method embodiment of the above-mentioned management center side, and the specific functions will not be repeated here.

[0512] Figure 8 The terminal device provided in this embodiment can execute the processing flow provided in the terminal device side method embodiment, such as Figure 8 As shown, the terminal device 800 includes a memory 801 , a transceiver 802 , and a processor 803 .

[0513] Among them, Figure 8 In the embodiment, the bus architecture may include any number of interconnected buses and bridges, specifically one or more processors represented by processor 803 and various circuits of memory represented by memory 801 are linked together. The bus architecture may also link together various other circuits such as peripherals, voltage regulators, and power management circuits, which are well known in the art and are therefore not further described herein. The bus interface provides an interface. The transceiver 802 may be a plurality of components, namely, a transmitter and a receiver, providing a unit for communicating with various other devices on a transmission medium, which transmission medium may include a wireless channel, a wired channel, an optical cable, and other transmission media. The processor 803 is responsible for managing the bus architecture and general processing, and the memory 801 may store data used by the processor 803 when performing operations.

[0514] The processor 803 may be a central processing unit (CPU), an application specific integrated circuit (ASIC), a field programmable gate array (FPGA) or a complex programmable logic device (CPLD). The processor may also adopt a multi-core architecture.

[0515] The memory 801 is used to store computer programs; the transceiver 802 is used to send and receive data under the control of the processor 803; the processor 803 is used to read the computer program in the memory 801 and perform the following operations:

[0516] The receiving management center determines the initial computing service routing strategy based on the business needs of the terminal device;

[0517] Access the corresponding initial computing power service according to the initial computing power service routing policy;

[0518] Sending user experience information for the initial computing power service to the management center;

[0519] Receive the adjusted computing power service routing strategy or feedback information sent by the management center, wherein the adjusted computing power service routing strategy is the computing power service routing strategy adjusted by the management center after performing corresponding measurements based on the user experience information.

[0520] Optionally, when the processor 803 sends the user experience information for the initial computing power service to the management center, it is configured to:

[0521] Receiving a user experience event subscription message sent by the management center, wherein the user experience event subscription message includes a user experience event type for the initial computing power service;

[0522] Determine whether the user experience event type is triggered;

[0523] If it is determined that the user experience event type is triggered, user experience information for the initial computing power service is sent to the management center.

[0524] Optionally, when the processor 803 receives a user experience event subscription message sent by the management center, it is configured to:

[0525] receiving the user experience event subscription message sent by the RAN entity, where the user experience event subscription message is sent by the management center to the RAN entity;

[0526] When the processor 803 sends the user experience information for the initial computing power service to the management center, it is used to:

[0527] Send user experience information for the initial computing power service to the RAN entity, so that the RAN entity sends the user experience information for the initial computing power service to the management center.

[0528] Optionally, when the processor 803 sends the user experience information for the initial computing power service to the management center, it is configured to:

[0529] Actively sending user experience information for the initial computing power service to the management center, where the user experience information is the user's subjective feeling information about the initial computing power service; or

[0530] Receive a user experience information collection request for the initial computing power service sent by the management center, and send user experience information for the initial computing power service to the management center in response to the user experience information collection request, where the user experience information is the user's subjective feeling information about the initial computing power service.

[0531] Optionally, when the processor 803 actively sends the user experience information for the initial computing power service to the management center, it is configured to:

[0532] Actively sending user experience information for the initial computing power service to the RAN entity, so that the RAN entity sends the user experience information for the initial computing power service to the management center; or

[0533] The processor 803 receives a user experience information collection request for the initial computing power service sent by the management center, and sends the user experience information for the initial computing power service to the management center in response to the user experience information collection request, and is configured to:

[0534] Receive a user experience information collection request for the initial computing power service sent by a RAN entity, where the user experience information collection request is actively sent by the terminal device to the RAN entity; and in response to the user experience information collection request, send user experience information for the initial computing power service to the RAN entity, so that the RAN entity sends the user experience information of the initial computing power service to the management center.

[0535] Optionally, the processor 803 is further configured to:

[0536] Initiate terminal device computing capacity measurement at the management center, obtain one or more of the load size, computing resource size, and computing resource utilization rate of the terminal device, and send them to the management center; or

[0537] The management center starts measuring the ability of the terminal device to access the network, and then obtains one or more of the wireless access capability and the type of the terminal device, and sends the information to the management center.

[0538] Optionally, when the processor 803 receives the adjusted computing power service routing strategy or feedback information sent by the management center, it is configured to:

[0539] Receive the adjusted computing power service routing strategy or feedback information sent by the RAN entity, where the adjusted computing power service routing strategy or feedback information is sent by the management center to the RAN entity.

[0540] Optionally, when the processor 803 accesses the corresponding initial computing power service according to the initial computing power service routing policy, it is configured to:

[0541] An application program for accessing the initial computing power service is started, and the initial computing power service is accessed through the application program.

[0542] Optionally, before receiving the initial computing power service routing strategy determined by the management center according to the service requirements of the terminal device, the processor 803 is further configured to:

[0543] Sending the business requirement to the management center; or

[0544] The service requirement is sent to the RAN entity, so that the RAN entity sends the service requirement to the management center.

[0545] The terminal device provided in the embodiment of the present application can be specifically used to execute the method embodiment on the above-mentioned terminal device side, and the specific functions will not be repeated here.

[0546] Fig. 9 The structure diagram of the computing power and network service processing device provided in the embodiment of the present application. The computing power and network service processing device provided in this embodiment can execute the processing flow provided in the method embodiment of the management center side, such as Fig. 9 As shown, the computing power and network service processing device 900 includes: a computing power service orchestration unit 901, a user experience information acquisition unit 902, and a computing power service adjustment unit 903.

[0547] The computing power service arrangement unit 901 is used to determine the initial computing power service routing strategy according to the service requirements of the terminal device, and send the initial computing power service routing strategy to the terminal device;

[0548] The user experience information acquisition unit 902 is used to receive the user experience information for the initial computing power service sent by the terminal device after the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing policy;

[0549] The computing power service adjustment unit 903 is used to start corresponding measurements according to the user experience information, determine the adjusted computing power service routing strategy according to the measurement results and send it to the terminal device, or send feedback information to the terminal device.

[0550] Optionally, after the terminal device accesses the corresponding initial computing service according to the initial computing service routing policy, when receiving the user experience information for the initial computing service sent by the terminal device, the user experience information acquiring unit 902 is used to:

[0551] After the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing policy, sending a user experience event subscription message to the terminal device, wherein the user experience event subscription message includes a user experience event type for the initial computing power service;

[0552] Receive user experience information sent by the terminal device after the user experience event type is triggered, where the user experience information includes user experience data related to the user experience event type.

[0553] Optionally, the user experience event type includes one or more of the following:

[0554] The startup time of the application used to access the initial computing power service exceeds a first preset time period; or

[0555] The number of restarts of the application used to access the initial computing power service exceeds a first preset number; or

[0556] The number of freezes during the execution of the service by the initial computing service exceeds a second preset number; or

[0557] During the execution of the service by the initial computing service, a single freeze time exceeds a second preset time length; or

[0558] The number of execution failures during the execution of the service by the initial computing service exceeds a third preset number; or

[0559] The connection establishment delay for accessing the initial computing power service exceeds a third preset duration; or

[0560] The connection establishment success rate for accessing the initial computing power service is lower than a preset success rate; or

[0561] The frequency of connection interruptions to the initial computing power service exceeds a preset frequency.

[0562] Optionally, the user experience data includes one or more of the following:

[0563] The time when the application used to access the initial computing power service is started; or

[0564] The number of times the application used to access the initial computing service is restarted; or

[0565] The number of freezes and monitoring time periods during the execution of the service by the initial computing service; or

[0566] A single pause in the execution of a service through the initial computing service; or

[0567] The number of execution failures and monitoring time period during the execution of the service by the initial computing service; or

[0568] The delay in establishing a connection to the initial computing service; or

[0569] The success rate of establishing a connection to access the initial computing power service; or

[0570] The frequency of connection interruptions to the initial computing service.

[0571] Optionally, after the terminal device accesses the corresponding initial computing service according to the initial computing service routing policy, the computing service orchestration unit 901 is further configured to:

[0572] Establishing a computing power service mapping relationship, wherein the computing power service mapping relationship is a mapping relationship between one or more of an identifier of the terminal device, an identifier of an application for accessing the initial computing power service, an identifier of a computing power node where the initial computing power service is located, and an identifier of the initial computing power service;

[0573] When the user experience information acquisition unit 902 sends a user experience event subscription message to the terminal device, it is used to:

[0574] Send a user experience event subscription message to the terminal device according to the computing power service mapping relationship.

[0575] Optionally, the user experience event subscription message further includes one or more of the following:

[0576] The user experience event subscription message identifier, the identifier of the terminal device, the identifier of the application used to access the initial computing power service, and the deadline for user experience event subscription.

[0577] Optionally, when the user experience information acquisition unit 902 sends a user experience event subscription message to the terminal device, it is used to:

[0578] Sending the user experience event subscription message to a radio access network RAN ​​entity, so that the RAN entity sends the user experience event subscription message to the terminal device;

[0579] When receiving the user experience information sent by the terminal device after the user experience event type is triggered, the user experience information acquiring unit 902 is used to:

[0580] Receive user experience information sent by the RAN entity, where the user experience information is sent by the terminal device to the RAN entity.

[0581] Optionally, after the terminal device accesses the corresponding initial computing service according to the initial computing service routing policy, when receiving the user experience information for the initial computing service sent by the terminal device, the user experience information acquiring unit 902 is used to:

[0582] After the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing strategy, receiving user experience information for the initial computing power service actively sent by the terminal device, the user experience information being the user's subjective feeling information about the initial computing power service; or

[0583] After the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing strategy, a user experience information collection request for the initial computing power service is sent to the terminal device, and the terminal device sends user experience information for the initial computing power service in response to the user experience information collection request, where the user experience information is the user's subjective feeling information about the initial computing power service.

[0584] Optionally, when receiving the user experience information for the initial computing power service actively sent by the terminal device, the user experience information acquiring unit 902 is configured to:

[0585] receiving user experience information sent by a RAN entity, where the user experience information is actively sent by the terminal device to the RAN entity; or

[0586] When the user experience information acquisition unit 902 sends a user experience information collection request for the initial computing power service to the terminal device and receives the user experience information for the initial computing power service sent by the terminal device in response to the user experience information collection request, it is used to:

[0587] The user experience information collection request is sent to the RAN entity, so that the RAN entity sends the user experience information collection request to the terminal device, and receives the user experience information sent by the RAN entity, where the user experience information is sent by the terminal device to the RAN entity in response to the user experience information collection request.

[0588] Optionally, when starting corresponding measurement according to the user experience information, the computing power service adjustment unit 903 is used to:

[0589] Perform cause analysis based on the user experience information, determine a measurement task based on the analysis result, and execute the measurement task, wherein the measurement task includes at least one of the following: terminal device capability measurement, computing power node computing capability measurement, and network service quality measurement.

[0590] Optionally, when the computing power service adjustment unit 903 performs cause analysis according to the user experience information, determines a measurement task according to the analysis result, and executes the measurement task, it is configured to:

[0591] Determining a predicted cause for triggering the user experience event type according to the user experience information, determining a measurement task corresponding to the predicted cause as a measurement task with the highest priority, and executing the measurement task with the highest priority;

[0592] After the highest priority measurement task is executed, if it is determined that the predicted cause is the actual cause that triggers the user experience event type, then the measurement task is terminated; or

[0593] If it is determined that the predicted reason is not the actual reason that triggers the user experience event type, other measurement tasks are performed.

[0594] Optionally, when determining a predicted cause of triggering the user experience event type according to the user experience information, the computing power service adjustment unit 903 is configured to:

[0595] If the user experience information is information related to an application used to access the initial computing power service, determining that the predicted cause of triggering the user experience event type is insufficient terminal device capability; or

[0596] If the user experience information is related to freeze or execution failure during the execution of the service by the initial computing service, then determining that the predicted cause of triggering the user experience event type is insufficient computing power of the initial computing service and / or insufficient network service quality; or

[0597] If the user experience information is a connection problem for accessing the initial computing power service, then the predicted cause for triggering the user experience event type is determined to be insufficient ability of the terminal device to access the network or mismatch of the terminal device type.

[0598] Optionally, when the computing power service adjustment unit 903 determines the adjusted computing power service routing strategy according to the measurement result and sends it to the terminal device, or sends feedback information to the terminal device, it is used to:

[0599] If it is determined according to the measurement result that the actual cause of triggering the user experience event type is a network cause, a new computing power service routing strategy to reach the initial computing power service is determined and sent to the terminal device; or

[0600] If it is determined according to the measurement result that the actual cause of triggering the user experience event type is the initial computing service cause, a new computing service is determined, a new computing service routing strategy to reach the new computing service is determined, and sent to the terminal device; or

[0601] If it is determined according to the measurement result that the actual cause of triggering the user experience event type is the terminal device, sending feedback information to the terminal device, the feedback information including the actual cause and / or solution; or

[0602] If it is determined according to the measurement results that the actual cause of triggering the user experience event type is the terminal device, a new computing service routing strategy to reach the new computing service is determined according to the terminal device capabilities, computing resource status, and network resource status, and sent to the terminal device; or

[0603] If it is determined based on the measurement results that the actual cause of triggering the user experience event type is the terminal device, and it is determined that the terminal device cannot improve its capabilities, a new computing power service with computing power lower than that of the initial computing power service is determined, a new computing power service routing strategy to reach the new computing power service is determined, and the new computing power service is sent to the terminal device.

[0604] Optionally, when the computing power service adjustment unit 903 determines the adjusted computing power service routing strategy according to the measurement result and sends it to the terminal device, or sends feedback information to the terminal device, it is used to:

[0605] Determine an adjusted computing power service routing policy according to the measurement result, and send the adjusted computing power service routing policy to the RAN entity, so that the RAN entity sends the adjusted computing power service routing policy to the terminal device; or

[0606] The feedback information is sent to a RAN entity, so that the RAN entity sends the feedback information to the terminal device.

[0607] Optionally, when determining the initial computing service routing strategy according to the service requirements of the terminal device, the computing service orchestration unit 901 is used to:

[0608] receiving a service requirement sent by the terminal device, and determining an initial service routing strategy according to the service requirement; or

[0609] Receive a service requirement sent by a RAN entity, where the service requirement is sent by the terminal device to the RAN entity, and determine an initial service routing strategy according to the service requirement.

[0610] Optionally, when sending the initial computing service routing policy to the terminal device, the computing service orchestration unit 901 is configured to:

[0611] The initial computing power service routing policy is sent to a RAN entity, so that the RAN entity sends the initial computing power service routing policy to the terminal device.

[0612] Optionally, the computing service orchestration unit 901 is further used to:

[0613] The initial computing power service routing policy is sent to the core network entity so that the terminal device establishes a user plane path for accessing the initial computing power service corresponding to the initial computing power service routing policy according to the initial computing power service routing policy.

[0614] Optionally, when sending the initial computing service routing policy to the terminal device, the computing service orchestration unit 901 is further configured to:

[0615] The identifier of the computing power node where the initial computing power service is located and the identifier of the initial computing power service are sent to the terminal device.

[0616] The computing power and network service processing device provided in the embodiment of the present application can be specifically used to execute the method embodiment on the management center side mentioned above, and the specific functions will not be repeated here.

[0617] Fig.10 The structure diagram of the computing power and network service processing device provided in the embodiment of the present application. The computing power and network service processing device provided in this embodiment can execute the processing flow provided in the method embodiment on the terminal device side, such as Fig.10 As shown, the computing power and network service processing device 1000 includes: a receiving unit 1001, an access unit 1002, and a sending unit 1003.

[0618] The receiving unit 1001 is used to receive an initial computing power service routing strategy determined by the management center according to the service requirements of the terminal device;

[0619] An access unit 1002 is used to access the corresponding initial computing power service according to the initial computing power service routing policy;

[0620] A sending unit 1003 is used to send user experience information for the initial computing power service to the management center;

[0621] The receiving unit 1001 is also used to receive the adjusted computing power service routing strategy or feedback information sent by the management center, wherein the adjusted computing power service routing strategy is the computing power service routing strategy adjusted by the management center after performing corresponding measurements based on the user experience information.

[0622] Optionally, when sending the user experience information for the initial computing power service to the management center, the sending unit 1003 is used to:

[0623] Receiving, by the receiving unit 1001, a user experience event subscription message sent by the management center, wherein the user experience event subscription message includes a user experience event type for the initial computing power service;

[0624] Determine whether the user experience event type is triggered;

[0625] If it is determined that the user experience event type is triggered, user experience information for the initial computing power service is sent to the management center.

[0626] Optionally, when receiving a user experience event subscription message sent by the management center, the receiving unit 1001 is configured to:

[0627] receiving the user experience event subscription message sent by the RAN entity, where the user experience event subscription message is sent by the management center to the RAN entity;

[0628] When the sending unit 1003 sends the user experience information for the initial computing power service to the management center, it is used to:

[0629] Send user experience information for the initial computing power service to the RAN entity, so that the RAN entity sends the user experience information for the initial computing power service to the management center.

[0630] Optionally, when sending the user experience information for the initial computing power service to the management center, the sending unit 1003 is used to:

[0631] Actively sending user experience information for the initial computing power service to the management center, where the user experience information is the user's subjective feeling information about the initial computing power service; or

[0632] A user experience information collection request for the initial computing power service sent by the management center is received through the receiving unit 1001, and user experience information for the initial computing power service is sent to the management center in response to the user experience information collection request, wherein the user experience information is the user's subjective feeling information about the initial computing power service.

[0633] Optionally, when the sending unit 1003 actively sends the user experience information for the initial computing power service to the management center, it is used to:

[0634] Actively sending user experience information for the initial computing power service to the RAN entity, so that the RAN entity sends the user experience information for the initial computing power service to the management center; or

[0635] The sending unit 1003 receives the user experience information collection request for the initial computing power service sent by the management center through the receiving unit 1001, and sends the user experience information for the initial computing power service to the management center in response to the user experience information collection request, and is used to:

[0636] A user experience information collection request for the initial computing power service sent by the RAN entity is received through the receiving unit 1001, and the user experience information collection request is actively sent by the terminal device to the RAN entity; in response to the user experience information collection request, user experience information for the initial computing power service is sent to the RAN entity, so that the RAN entity sends the user experience information of the initial computing power service to the management center.

[0637] Optionally, the sending unit 1003 is further configured to:

[0638] Initiate terminal device computing capacity measurement at the management center, obtain one or more of the load size, computing resource size, and computing resource utilization rate of the terminal device, and send them to the management center; or

[0639] The management center starts measuring the ability of the terminal device to access the network, and then obtains one or more of the wireless access capability and the type of the terminal device, and sends the information to the management center.

[0640] Optionally, when receiving the adjusted computing power service routing strategy or feedback information sent by the management center, the receiving unit 1001 is used to:

[0641] Receive the adjusted computing power service routing strategy or feedback information sent by the RAN entity, where the adjusted computing power service routing strategy or feedback information is sent by the management center to the RAN entity.

[0642] Optionally, when accessing the corresponding initial computing power service according to the initial computing power service routing policy, the access unit 1002 is used to:

[0643] An application program for accessing the initial computing power service is started, and the initial computing power service is accessed through the application program.

[0644] Optionally, before the receiving management center determines the initial computing power service routing strategy according to the service requirements of the terminal device, the sending unit 1003 is further used to:

[0645] Sending the business requirement to the management center; or

[0646] The service requirement is sent to the RAN entity, so that the RAN entity sends the service requirement to the management center.

[0647] The computing power and network service processing device provided in the embodiment of the present application can be specifically used to execute the method embodiment on the above-mentioned terminal device side, and the specific functions will not be repeated here.

[0648] It should be noted that the division of units in the above embodiments of the present application is schematic and is only a logical function division. There may be other division methods in actual implementation. In addition, each functional unit in each embodiment of the present application may be integrated into a processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above integrated units may be implemented in the form of hardware or in the form of software functional units.

[0649] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a processor-readable storage medium. Based on this understanding, the technical solution of the present application is essentially or the part that contributes to the prior art or all or part of the technical solution can be embodied in the form of a software product, and the computer software product is stored in a storage medium, including a number of instructions to enable a computer device (which can be a personal computer, server, or network device, etc.) or a processor (processor) to perform all or part of the steps of the method described in each embodiment of the present application. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (Read-Only Memory, ROM), random access memory (Random Access Memory, RAM), disk or optical disk and other media that can store program codes.

[0650] An embodiment of the present application provides a computer-readable storage medium, which stores a computer program. The computer program is used to enable a processor to execute the above method embodiment.

[0651] Among them, the computer-readable storage medium can be any available medium or data storage device that can be accessed by the processor, including but not limited to magnetic storage (such as floppy disks, hard disks, magnetic tapes, magneto-optical disks (MO), etc.), optical storage (such as CD, DVD, BD, HVD, etc.), and semiconductor storage (such as ROM, EPROM, EEPROM, non-volatile memory (NANDFLASH), solid-state drive (SSD)), etc.

[0652] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage and optical storage, etc.) that contain computer-usable program code.

[0653] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer executable instructions. These computer executable instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0654] These processor executable instructions may also be stored in a processor readable memory that can direct a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the processor readable memory produce an article of manufacture including an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0655] These processor-executable instructions may also be loaded onto a computer or other programmable data processing device so that a series of operational steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for executing on the computer or other programmable device to implement the process. Figure 1 A process or multiple processes and / or boxes Figure 1 A step that specifies a function in one or more boxes.

[0656] Obviously, those skilled in the art can make various changes and modifications to the present application without departing from the spirit and scope of the present application. Thus, if these modifications and variations of the present application fall within the scope of the claims of the present application and their equivalents, the present application is also intended to include these modifications and variations.

Claims

1. A method for processing computing power and network services, characterized in that: Applied to a management center, the method includes: Determine an initial computing power service routing strategy according to the service requirements of the terminal device, and send the initial computing power service routing strategy to the terminal device; After the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing policy, receiving user experience information for the initial computing power service sent by the terminal device; Initiate corresponding measurements according to the user experience information, determine an adjusted computing power service routing strategy according to the measurement results and send it to the terminal device, or send feedback information to the terminal device.

2. The method according to claim 1, characterized in that After the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing policy, receiving user experience information for the initial computing power service sent by the terminal device includes: After the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing policy, sending a user experience event subscription message to the terminal device, wherein the user experience event subscription message includes a user experience event type for the initial computing power service; Receive user experience information sent by the terminal device after the user experience event type is triggered, where the user experience information includes user experience data related to the user experience event type.

3. The method according to claim 2, characterized in that The user experience event types include one or more of the following: The startup time of the application used to access the initial computing power service exceeds a first preset time period; or The number of restarts of the application used to access the initial computing power service exceeds a first preset number; or The number of freezes during the execution of the service by the initial computing service exceeds a second preset number; or During the execution of the service by the initial computing service, a single freeze time exceeds a second preset time length; or The number of execution failures during the execution of the service by the initial computing power service exceeds a third preset number; or The connection establishment delay for accessing the initial computing power service exceeds a third preset time duration; or The connection establishment success rate for accessing the initial computing power service is lower than a preset success rate; or The frequency of connection interruptions to the initial computing power service exceeds a preset frequency.

4. The method according to claim 3, characterized in that The user experience data includes one or more of the following: The startup time of the application used to access the initial computing power service; or The number of restarts of the application used to access the initial computing power service; or The number of freezes and monitoring time periods during the execution of the service by the initial computing service; or A single freeze time during the execution of the service by the initial computing power service; or The number of execution failures and monitoring time period during the execution of the service by the initial computing service; or The delay in establishing a connection to the initial computing service; or The success rate of establishing a connection to access the initial computing power service; or The frequency of connection interruptions to the initial computing service.

5. The method according to claim 2, characterized in that: After the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing policy, the method further includes: Establishing a computing power service mapping relationship, wherein the computing power service mapping relationship is a mapping relationship between one or more of an identifier of the terminal device, an identifier of an application for accessing the initial computing power service, an identifier of a computing power node where the initial computing power service is located, and an identifier of the initial computing power service; The sending of a user experience event subscription message to the terminal device includes: Send a user experience event subscription message to the terminal device according to the computing power service mapping relationship.

6. The method according to claim 2, characterized in that The user experience event subscription message may also include one or more of the following: The user experience event subscription message identifier, the identifier of the terminal device, the identifier of the application used to access the initial computing power service, and the deadline for user experience event subscription.

7. The method according to any one of claims 2 to 6, characterized in that: The sending of a user experience event subscription message to the terminal device includes: Sending the user experience event subscription message to a radio access network RAN ​​entity, so that the RAN entity sends the user experience event subscription message to the terminal device; The receiving the user experience information sent by the terminal device after the user experience event type is triggered includes: Receive user experience information sent by the RAN entity, where the user experience information is sent by the terminal device to the RAN entity.

8. The method according to claim 1, characterized in that After the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing policy, receiving user experience information for the initial computing power service sent by the terminal device includes: After the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing strategy, receiving user experience information for the initial computing power service actively sent by the terminal device, the user experience information being the user's subjective feeling information about the initial computing power service; or After the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing strategy, a user experience information collection request for the initial computing power service is sent to the terminal device, and the terminal device sends user experience information for the initial computing power service in response to the user experience information collection request, where the user experience information is the user's subjective feeling information about the initial computing power service.

9. The method according to claim 8, characterized in that The receiving the user experience information for the initial computing power service actively sent by the terminal device includes: receiving user experience information sent by a RAN entity, where the user experience information is actively sent by the terminal device to the RAN entity; or The sending a user experience information collection request for the initial computing power service to the terminal device, and receiving user experience information for the initial computing power service sent by the terminal device in response to the user experience information collection request, includes: The user experience information collection request is sent to the RAN entity, so that the RAN entity sends the user experience information collection request to the terminal device, and receives the user experience information sent by the RAN entity, where the user experience information is sent by the terminal device to the RAN entity in response to the user experience information collection request.

10. The method according to claim 1, characterized in that The starting corresponding measurement according to the user experience information includes: Perform cause analysis based on the user experience information, determine a measurement task based on the analysis result, and execute the measurement task, wherein the measurement task includes at least one of the following: terminal device capability measurement, computing power node computing capability measurement, and network service quality measurement.

11. The method according to claim 10, characterized in that The performing cause analysis according to the user experience information, determining a measurement task according to the analysis result, and executing the measurement task includes: Determining a predicted cause for triggering the user experience event type according to the user experience information, determining a measurement task corresponding to the predicted cause as a measurement task with the highest priority, and executing the measurement task with the highest priority; After the highest priority measurement task is executed, if it is determined that the predicted cause is the actual cause that triggers the user experience event type, then the measurement task is terminated; or If it is determined that the predicted reason is not the actual reason that triggers the user experience event type, other measurement tasks are performed.

12. The method according to claim 11, characterized in that The determining, according to the user experience information, a predicted reason for triggering the user experience event type includes: If the user experience information is information related to an application used to access the initial computing power service, determining that the predicted cause of triggering the user experience event type is insufficient terminal device capability; or If the user experience information is related to freeze or execution failure during the execution of the service by the initial computing service, then determining that the predicted cause of triggering the user experience event type is insufficient computing power of the initial computing service and / or insufficient network service quality; or If the user experience information is a connection problem for accessing the initial computing power service, then the predicted cause for triggering the user experience event type is determined to be insufficient ability of the terminal device to access the network or mismatch of the terminal device type.

13. The method according to claim 11, characterized in that The determining the adjusted computing power service routing strategy according to the measurement result and sending it to the terminal device, or sending feedback information to the terminal device, includes: If it is determined according to the measurement result that the actual cause of triggering the user experience event type is a network cause, a new computing power service routing strategy to reach the initial computing power service is determined and sent to the terminal device; or If it is determined according to the measurement result that the actual cause of triggering the user experience event type is the initial computing service cause, a new computing service is determined, a new computing service routing strategy to reach the new computing service is determined, and sent to the terminal device; or If it is determined according to the measurement result that the actual cause of triggering the user experience event type is the terminal device, sending feedback information to the terminal device, the feedback information including the actual cause and / or solution; or If it is determined according to the measurement results that the actual cause of triggering the user experience event type is the terminal device, a new computing service routing strategy to reach the new computing service is determined according to the terminal device capabilities, computing resource status, and network resource status, and sent to the terminal device; or If it is determined based on the measurement results that the actual cause of triggering the user experience event type is the terminal device, and it is determined that the terminal device cannot improve its capabilities, a new computing power service with computing power lower than that of the initial computing power service is determined, a new computing power service routing strategy to reach the new computing power service is determined, and the new computing power service is sent to the terminal device.

14. The method according to claim 1, characterized in that The determining the adjusted computing power service routing strategy according to the measurement result and sending it to the terminal device, or sending feedback information to the terminal device, includes: Determine an adjusted computing power service routing policy according to the measurement result, and send the adjusted computing power service routing policy to the RAN entity, so that the RAN entity sends the adjusted computing power service routing policy to the terminal device; or The feedback information is sent to a RAN entity, so that the RAN entity sends the feedback information to the terminal device.

15. The method according to claim 1, characterized in that Determining the initial computing power service routing strategy according to the service requirements of the terminal device includes: receiving a service requirement sent by the terminal device, and determining an initial service routing strategy according to the service requirement; or Receive a service requirement sent by a RAN entity, where the service requirement is sent by the terminal device to the RAN entity, and determine an initial service routing strategy according to the service requirement.

16. The method according to claim 1, characterized in that The sending the initial computing power service routing strategy to the terminal device includes: The initial computing power service routing policy is sent to a RAN entity, so that the RAN entity sends the initial computing power service routing policy to the terminal device.

17. The method according to claim 16, characterized in that Also includes: The initial computing power service routing policy is sent to the core network entity so that the terminal device establishes a user plane path for accessing the initial computing power service corresponding to the initial computing power service routing policy according to the initial computing power service routing policy.

18. The method according to claim 1, characterized in that The sending the initial computing power service routing strategy to the terminal device also includes: The identifier of the computing power node where the initial computing power service is located and the identifier of the initial computing power service are sent to the terminal device.

19. A method for processing computing power and network services, characterized in that: Applied to a terminal device, the method comprises: The receiving management center determines the initial computing service routing strategy based on the business needs of the terminal device; Access the corresponding initial computing power service according to the initial computing power service routing policy; Sending user experience information for the initial computing power service to the management center; Receive the adjusted computing power service routing strategy or feedback information sent by the management center, wherein the adjusted computing power service routing strategy is the computing power service routing strategy adjusted by the management center after performing corresponding measurements based on the user experience information.

20. The method according to claim 19, characterized in that The sending of user experience information for the initial computing power service to the management center includes: Receiving a user experience event subscription message sent by the management center, wherein the user experience event subscription message includes a user experience event type for the initial computing power service; Determine whether the user experience event type is triggered; If it is determined that the user experience event type is triggered, user experience information for the initial computing power service is sent to the management center.

21. The method according to claim 20, characterized in that The receiving a user experience event subscription message sent by the management center includes: receiving the user experience event subscription message sent by the RAN entity, where the user experience event subscription message is sent by the management center to the RAN entity; The sending of user experience information for the initial computing power service to the management center includes: Send user experience information for the initial computing power service to the RAN entity, so that the RAN entity sends the user experience information for the initial computing power service to the management center.

22. The method according to claim 19, characterized in that The sending of user experience information for the initial computing power service to the management center includes: Actively sending user experience information for the initial computing power service to the management center, where the user experience information is the user's subjective feeling information about the initial computing power service; or Receive a user experience information collection request for the initial computing power service sent by the management center, and send user experience information for the initial computing power service to the management center in response to the user experience information collection request, where the user experience information is the user's subjective feeling information about the initial computing power service.

23. The method according to claim 22, characterized in that The actively sending the user experience information for the initial computing power service to the management center includes: Actively sending user experience information for the initial computing power service to the RAN entity, so that the RAN entity sends the user experience information for the initial computing power service to the management center; or The receiving a user experience information collection request for the initial computing power service sent by the management center, and sending the user experience information for the initial computing power service to the management center in response to the user experience information collection request, includes: Receive a user experience information collection request for the initial computing power service sent by a RAN entity, where the user experience information collection request is actively sent by the terminal device to the RAN entity; and in response to the user experience information collection request, send user experience information for the initial computing power service to the RAN entity, so that the RAN entity sends the user experience information of the initial computing power service to the management center.

24. The method according to any one of claims 19 to 23, characterized in that: The method further comprises: Initiate terminal device computing capacity measurement at the management center, obtain one or more of the load size, computing resource size, and computing resource utilization rate of the terminal device, and send them to the management center; or The management center starts measuring the ability of the terminal device to access the network, and then obtains one or more of the wireless access capability and the type of the terminal device, and sends the information to the management center.

25. The method according to any one of claims 19 to 23, characterized in that: The receiving the adjusted computing power service routing strategy or feedback information sent by the management center includes: Receive the adjusted computing power service routing strategy or feedback information sent by the RAN entity, where the adjusted computing power service routing strategy or feedback information is sent by the management center to the RAN entity.

26. The method according to any one of claims 19 to 23, characterized in that: The accessing the corresponding initial computing power service according to the initial computing power service routing policy includes: An application program for accessing the initial computing power service is started, and the initial computing power service is accessed through the application program.

27. The method according to any one of claims 19 to 23, characterized in that: Before the receiving management center determines the initial computing power service routing strategy according to the service requirements of the terminal device, it also includes: Sending the business requirement to the management center; or The service requirement is sent to the RAN entity, so that the RAN entity sends the service requirement to the management center.

28. A management center entity, characterized in that: Including memory, transceiver, processor: A memory for storing a computer program; a transceiver for transmitting and receiving data under the control of the processor; and a processor for reading the computer program in the memory and performing the following operations: Determine an initial computing power service routing strategy according to the service requirements of the terminal device, and send the initial computing power service routing strategy to the terminal device; After the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing policy, receiving user experience information for the initial computing power service sent by the terminal device; Initiate corresponding measurements according to the user experience information, determine an adjusted computing power service routing strategy according to the measurement results and send it to the terminal device, or send feedback information to the terminal device.

29. The management center entity according to claim 28, characterized in that: The processor, when receiving user experience information for the initial computing power service sent by the terminal device after the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing policy, is used to: After the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing policy, sending a user experience event subscription message to the terminal device, wherein the user experience event subscription message includes a user experience event type for the initial computing power service; Receive user experience information sent by the terminal device after the user experience event type is triggered, where the user experience information includes user experience data related to the user experience event type.

30. The management center entity according to claim 29, characterized in that: The user experience event types include one or more of the following: The startup time of the application used to access the initial computing power service exceeds a first preset time period; or The number of restarts of the application used to access the initial computing power service exceeds a first preset number; or The number of freezes during the execution of the service by the initial computing service exceeds a second preset number; or During the execution of the service by the initial computing service, a single freeze time exceeds a second preset time length; or The number of execution failures during the execution of the service by the initial computing power service exceeds a third preset number; or The connection establishment delay for accessing the initial computing power service exceeds a third preset time duration; or The connection establishment success rate for accessing the initial computing power service is lower than a preset success rate; or The frequency of connection interruptions to the initial computing power service exceeds a preset frequency.

31. The management center entity according to claim 30, characterized in that: The user experience data includes one or more of the following: The startup time of the application used to access the initial computing power service; or The number of restarts of the application used to access the initial computing power service; or The number of freezes and monitoring time periods during the execution of the service by the initial computing service; or A single freeze time during the execution of the service by the initial computing power service; or The number of execution failures and monitoring time period during the execution of the service by the initial computing service; or The delay in establishing a connection to the initial computing service; or The success rate of establishing a connection to access the initial computing power service; or The frequency of connection interruptions to the initial computing service.

32. The management center entity according to claim 29, characterized in that: The processor is further configured to: after the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing policy: Establishing a computing power service mapping relationship, wherein the computing power service mapping relationship is a mapping relationship between one or more of an identifier of the terminal device, an identifier of an application for accessing the initial computing power service, an identifier of a computing power node where the initial computing power service is located, and an identifier of the initial computing power service; When the processor sends a user experience event subscription message to the terminal device, it is used to: Send a user experience event subscription message to the terminal device according to the computing power service mapping relationship.

33. The management center entity according to claim 29, characterized in that: The user experience event subscription message may also include one or more of the following: The user experience event subscription message identifier, the identifier of the terminal device, the identifier of the application used to access the initial computing power service, and the deadline for user experience event subscription.

34. The management center entity according to any one of claims 29 to 33, characterized in that: When the processor sends a user experience event subscription message to the terminal device, it is used to: Sending the user experience event subscription message to a radio access network RAN ​​entity, so that the RAN entity sends the user experience event subscription message to the terminal device; When the processor receives the user experience information sent by the terminal device after the user experience event type is triggered, it is used to: Receive user experience information sent by the RAN entity, where the user experience information is sent by the terminal device to the RAN entity.

35. The management center entity according to claim 28, characterized in that: The processor, when receiving user experience information for the initial computing power service sent by the terminal device after the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing policy, is used to: After the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing strategy, receiving user experience information for the initial computing power service actively sent by the terminal device, the user experience information being the user's subjective feeling information about the initial computing power service; or After the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing strategy, a user experience information collection request for the initial computing power service is sent to the terminal device, and the terminal device sends user experience information for the initial computing power service in response to the user experience information collection request, where the user experience information is the user's subjective feeling information about the initial computing power service.

36. The management center entity according to claim 35, characterized in that: When the processor receives the user experience information for the initial computing power service actively sent by the terminal device, it is used to: receiving user experience information sent by a RAN entity, where the user experience information is actively sent by the terminal device to the RAN entity; or When the processor sends a user experience information collection request for the initial computing power service to the terminal device and receives user experience information for the initial computing power service sent by the terminal device in response to the user experience information collection request, it is used to: The user experience information collection request is sent to the RAN entity, so that the RAN entity sends the user experience information collection request to the terminal device, and receives the user experience information sent by the RAN entity, where the user experience information is sent by the terminal device to the RAN entity in response to the user experience information collection request.

37. The management center entity according to claim 28, characterized in that: When the processor starts corresponding measurement according to the user experience information, it is used to: Perform cause analysis based on the user experience information, determine a measurement task based on the analysis result, and execute the measurement task, wherein the measurement task includes at least one of the following: terminal device capability measurement, computing power node computing capability measurement, and network service quality measurement.

38. The management center entity according to claim 37, characterized in that: The processor performs cause analysis according to the user experience information, determines a measurement task according to the analysis result, and executes the measurement task, for: Determining a predicted cause for triggering the user experience event type according to the user experience information, determining a measurement task corresponding to the predicted cause as a measurement task with the highest priority, and executing the measurement task with the highest priority; After the highest priority measurement task is executed, if it is determined that the predicted cause is the actual cause that triggers the user experience event type, then the measurement task is terminated; or If it is determined that the predicted reason is not the actual reason that triggers the user experience event type, other measurement tasks are performed.

39. The management center entity according to claim 38, characterized in that: When the processor determines, according to the user experience information, a predicted cause for triggering the user experience event type, it is configured to: If the user experience information is information related to an application used to access the initial computing power service, determining that the predicted cause of triggering the user experience event type is insufficient terminal device capability; or If the user experience information is related to freeze or execution failure during the execution of the service by the initial computing power service, determining that the predicted cause of triggering the user experience event type is insufficient computing power of the initial computing power service and / or insufficient network service quality; or If the user experience information is a connection problem for accessing the initial computing power service, then the predicted cause for triggering the user experience event type is determined to be insufficient ability of the terminal device to access the network or mismatch of the terminal device type.

40. The management center entity according to claim 38, characterized in that: The processor determines the adjusted computing power service routing strategy according to the measurement result and sends it to the terminal device, or sends feedback information to the terminal device, and is used to: If it is determined according to the measurement result that the actual cause of triggering the user experience event type is a network cause, a new computing power service routing strategy to reach the initial computing power service is determined and sent to the terminal device; or If it is determined according to the measurement result that the actual cause of triggering the user experience event type is the initial computing service cause, a new computing service is determined, a new computing service routing strategy to reach the new computing service is determined, and sent to the terminal device; or If it is determined according to the measurement result that the actual cause of triggering the user experience event type is the terminal device, feedback information is sent to the terminal device, where the feedback information includes the actual cause and / or solution; or If it is determined according to the measurement results that the actual cause of triggering the user experience event type is the terminal device, a new computing service routing strategy to reach the new computing service is determined according to the terminal device capability, computing resource status, and network resource status, and sent to the terminal device; or If it is determined based on the measurement results that the actual cause of triggering the user experience event type is the terminal device, and it is determined that the terminal device cannot improve its capabilities, a new computing power service with computing power lower than that of the initial computing power service is determined, a new computing power service routing strategy to reach the new computing power service is determined, and the new computing power service is sent to the terminal device.

41. The management center entity according to claim 28, characterized in that: The processor determines the adjusted computing power service routing strategy according to the measurement result and sends it to the terminal device, or sends feedback information to the terminal device, and is used to: Determine an adjusted computing power service routing strategy according to the measurement result, and send the adjusted computing power service routing strategy to the RAN entity, so that the RAN entity sends the adjusted computing power service routing strategy to the terminal device; or The feedback information is sent to a RAN entity, so that the RAN entity sends the feedback information to the terminal device.

42. The management center entity according to claim 28, characterized in that: When the processor determines the initial computing power service routing strategy according to the service requirements of the terminal device, it is used to: Receiving the service demand sent by the terminal device, and determining an initial service routing strategy according to the service demand; or Receive a service requirement sent by a RAN entity, where the service requirement is sent by the terminal device to the RAN entity, and determine an initial service routing strategy according to the service requirement.

43. The management center entity according to claim 28, characterized in that: When the processor sends the initial computing power service routing strategy to the terminal device, it is used to: The initial computing power service routing policy is sent to a RAN entity, so that the RAN entity sends the initial computing power service routing policy to the terminal device.

44. The management center entity according to claim 43, characterized in that: The processor is further configured to: The initial computing power service routing policy is sent to the core network entity so that the terminal device establishes a user plane path for accessing the initial computing power service corresponding to the initial computing power service routing policy according to the initial computing power service routing policy.

45. The management center entity according to claim 28, characterized in that: When the processor sends the initial computing power service routing strategy to the terminal device, it is also used to: The identifier of the computing power node where the initial computing power service is located and the identifier of the initial computing power service are sent to the terminal device.

46. ​​A terminal device, characterized in that: Including memory, transceiver, processor: A memory for storing a computer program; a transceiver for transmitting and receiving data under the control of the processor; and a processor for reading the computer program in the memory and performing the following operations: The receiving management center determines the initial computing service routing strategy based on the business needs of the terminal device; Access the corresponding initial computing power service according to the initial computing power service routing policy; Sending user experience information for the initial computing power service to the management center; Receive the adjusted computing power service routing strategy or feedback information sent by the management center, wherein the adjusted computing power service routing strategy is the computing power service routing strategy adjusted by the management center after performing corresponding measurements based on the user experience information.

47. The terminal device according to claim 46, characterized in that: When the processor sends the user experience information for the initial computing power service to the management center, it is used to: Receiving a user experience event subscription message sent by the management center, wherein the user experience event subscription message includes a user experience event type for the initial computing power service; Determine whether the user experience event type is triggered; If it is determined that the user experience event type is triggered, user experience information for the initial computing power service is sent to the management center.

48. The terminal device according to claim 47, characterized in that: When the processor receives the user experience event subscription message sent by the management center, it is used to: receiving the user experience event subscription message sent by the RAN entity, where the user experience event subscription message is sent by the management center to the RAN entity; When the processor sends the user experience information for the initial computing power service to the management center, it is used to: Send user experience information for the initial computing power service to the RAN entity, so that the RAN entity sends the user experience information for the initial computing power service to the management center.

49. The terminal device according to claim 46, characterized in that: When the processor sends the user experience information for the initial computing power service to the management center, it is used to: Actively sending user experience information for the initial computing power service to the management center, where the user experience information is the user's subjective feeling information about the initial computing power service; or Receive a user experience information collection request for the initial computing power service sent by the management center, and send user experience information for the initial computing power service to the management center in response to the user experience information collection request, where the user experience information is the user's subjective feeling information about the initial computing power service.

50. The terminal device according to claim 49, characterized in that: When the processor actively sends the user experience information for the initial computing power service to the management center, it is used to: Actively sending user experience information for the initial computing power service to the RAN entity, so that the RAN entity sends the user experience information for the initial computing power service to the management center; or The processor receives a user experience information collection request for the initial computing power service sent by the management center, and sends user experience information for the initial computing power service to the management center in response to the user experience information collection request, and is used to: Receive a user experience information collection request for the initial computing power service sent by a RAN entity, where the user experience information collection request is actively sent by the terminal device to the RAN entity; and in response to the user experience information collection request, send user experience information for the initial computing power service to the RAN entity, so that the RAN entity sends the user experience information of the initial computing power service to the management center.

51. The terminal device according to any one of claims 46 to 50, characterized in that: The processor is further configured to: Initiate terminal device computing capacity measurement at the management center, obtain one or more of the load size, computing resource size, and computing resource utilization rate of the terminal device, and send them to the management center; or The management center starts measuring the ability of the terminal device to access the network, and then obtains one or more of the wireless access capability and the type of the terminal device, and sends the information to the management center.

52. The terminal device according to any one of claims 46 to 50, characterized in that: When the processor receives the adjusted computing power service routing strategy or feedback information sent by the management center, it is used to: Receive the adjusted computing power service routing strategy or feedback information sent by the RAN entity, where the adjusted computing power service routing strategy or feedback information is sent by the management center to the RAN entity.

53. The terminal device according to any one of claims 46 to 50, characterized in that: When the processor accesses the corresponding initial computing power service according to the initial computing power service routing policy, it is used to: An application program for accessing the initial computing power service is started, and the initial computing power service is accessed through the application program.

54. The terminal device according to any one of claims 46 to 50, characterized in that: Before receiving the initial computing power service routing strategy determined by the management center according to the service requirements of the terminal device, the processor is further used to: Sending the business requirement to the management center; or The service requirement is sent to the RAN entity, so that the RAN entity sends the service requirement to the management center.

55. A computing power and network service processing device, characterized in that: include: A computing power service orchestration unit, configured to determine an initial computing power service routing strategy according to a service requirement of a terminal device, and send the initial computing power service routing strategy to the terminal device; A user experience information acquisition unit, configured to receive user experience information for the initial computing power service sent by the terminal device after the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing policy; A computing power service adjustment unit is used to start corresponding measurements according to the user experience information, determine an adjusted computing power service routing strategy according to the measurement results and send it to the terminal device, or send feedback information to the terminal device.

56. A computing power and network service processing device, characterized in that: include: A receiving unit, used to receive an initial computing power service routing strategy determined by a management center according to a service requirement of a terminal device; An access unit, configured to access a corresponding initial computing power service according to the initial computing power service routing policy; A sending unit, configured to send user experience information for the initial computing power service to the management center; The receiving unit is also used to receive the adjusted computing power service routing strategy or feedback information sent by the management center, wherein the adjusted computing power service routing strategy is the computing power service routing strategy adjusted by the management center after performing corresponding measurements based on the user experience information.

57. A non-transitory readable storage medium, characterized in that: The non-transitory readable storage medium stores a computer program, and the computer program is used to enable a processor to execute the method according to any one of claims 1 to 27.

Citation Information

Cited By

  • A resource allocation method based on event response

    CN119759586A

  • A resource allocation method based on event response

    CN119759586B

  • Computing power and network service processing method, apparatus, and storage medium

    EP4723598A1

  • Computing power and network service processing method, apparatus, and storage medium

    WO2024239900A1