Construction method for discharging industrial wastewater by adopting embedded double-layer pipe

By adopting a pre-embedded double-layer pipe structure in industrial plants, combined with the design of support parts, thermal insulation materials and hoisting modules, the problems of low strength and difficulty in leak detection are solved, and the stability and environment of the pipe are achieved Friendly wastewater management.

CN119041540APending Publication Date: 2024-11-29珠海杰赛科技有限公司 +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411298366.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-18
Publication Date
2024-11-29

AI Technical Summary

Technical Problem

The single-story embedded pipes in existing industrial plants have low strength and lack the function of detecting leakage, which can easily lead to waste liquid pollution and structural safety risks, and may fail when building expansion and contraction changes.

Method used

Adopting a pre-embedded double-layer pipe structure, supporting parts and thermal insulation materials are installed between the outer and inner pipes, and the design of support parts and steel sleeves ensures stability of the pipeline, and using a reduced diameter tee pipe and a hoisting module to achieve it. Stable lifting and leak test through a transparent water tank.

Benefits of technology

Effectively protect the inner pipe, extend the service life of the pipeline, maintain temperature stability, improve system safety and stability, save space, control wastewater discharge, and reduce environmental impact.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119041540A_ABST
    Figure CN119041540A_ABST
Patent Text Reader

Abstract

The invention discloses a construction method for discharging industrial wastewater by adopting an embedded double-layer pipe. The construction method comprises the following steps: arranging a pipe ditch, arranging the pipe ditch in a factory building, arranging a pipe gallery in the pipe ditch, connecting the process drainage embedded double-layer pipe to an underground pipe ditch, collecting and discharging into an outdoor liquid collecting pool, arranging a supporting piece between an outer-layer pipe and an inner-layer pipe, and collecting and discharging into the outdoor liquid collecting pool; a double-layer pipe is connected with equipment, the double-layer pipe comprises an outer-layer pipe, an inner-layer pipe and a supporting piece, the supporting piece is arranged between the outer-layer pipe and the inner-layer pipe and provided with a plurality of through holes, under the condition that the equipment is connected, the input end of the double-layer pipe is vertically arranged, a drainage pipeline is inserted into the inner-layer pipe and communicated with the inner-layer pipe, a first connecting hole is formed in a pipe cap, and a plug is installed for sealing; the double-layer pipe is connected with a ground drain, under the condition of the ground drain, the input end of the double-layer pipe is vertically arranged and extends to the ground, the input end of the double-layer pipe is blocked through a floor drain, a leakage hole area is arranged on the floor drain, the space between the outer-layer pipe and the inner-layer pipe is communicated, and a plug is installed for sealing.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of pre-buried pipes, and in particular to a construction method for discharging industrial waste water by using pre-buried double-layer pipes. Background Art

[0002] Generally, the process drainage on the first floor of an industrial plant adopts a single-layer pre-buried pipe, which is laid under the ground beam and uses a U-shaped steel casing hanger to run the pipe. However, the single-layer pipe has low strength and no leakage detection function, which poses a high safety risk. If the underground pre-buried pipe is damaged, the waste liquid will seep into the soil, causing environmental pollution, and even corroding the ground piles, affecting the structural stability and causing more serious safety accidents. Summary of the invention

[0003] The present invention aims to solve at least one of the technical problems existing in the prior art. To this end, the present invention proposes a construction method for discharging industrial wastewater using a pre-buried double-layer pipe, which can ensure that no matter whether the metal casing corrodes in the future, the expansion and contraction changes of the building will not affect the double-layer pipe structure.

[0004] According to a first aspect of the present invention, a construction method for discharging industrial wastewater using a pre-buried double-layer pipe comprises:

[0005] A pipe trench is set up in the factory building, a pipe gallery is set up in the pipe trench, and after the pre-buried double-layer pipe for process drainage is connected to the underground pipe trench, it is collected and discharged into an outdoor liquid collection tank, and the support is set between the outer layer pipe and the inner layer pipe, and the process drainage is collected and discharged into the outdoor liquid collection tank;

[0006] A double-layer pipe connection device, wherein the double-layer pipe comprises an outer layer pipe, an inner layer pipe and a support member, wherein the support member is arranged between the outer layer pipe and the inner layer pipe, and the support member is provided with a plurality of through holes. When the device is connected, the input end of the double-layer pipe is arranged vertically, the drainage pipe of the device is inserted into the inner layer pipe and communicated with the inner layer pipe, and then the input end of the double-layer pipe is sealed with a pipe cap, wherein a first connection hole is arranged on the pipe cap, wherein the first connection hole communicates with the space between the outer layer pipe and the inner layer pipe, a plug is installed to seal the first connection hole, and the first connection hole is used for a leak test;

[0007] A double-layer pipe ground drain, in the case of ground drain, the input end of the double-layer pipe is vertically arranged and extended to the ground, the input end of the double-layer pipe is blocked by the floor drain, a leakage hole area is arranged on the floor drain, the leakage hole area is connected with the inner layer pipe, a second connecting hole is arranged on the floor drain, the second connecting hole is connected with the space between the outer layer pipe and the inner layer pipe, the second connecting hole is sealed with a plug, and the second connecting hole is used for leakage detection test;

[0008] The double-layer pipe passes through the ground beam. The double-layer pipe is extended from its input end and then arranged horizontally, and finally the double-layer pipe is extended to the pipe trench. In the process of horizontal extension, the double-layer pipe needs to pass through the ground beam. Before pouring, the inner layer pipe is laid first, and then the support is arranged on the outer peripheral wall of the inner layer pipe, and then the outer layer pipe is arranged on the support. The steel casing is sleeved on the outer layer pipe, and a heat-insulating wooden block is clamped between the steel casing and the outer layer pipe. Then, the steel casing is welded on the steel frame of the ground beam. Several hanging modules are arranged between the ground beams, and the hanging modules are arranged at the lower end of the floor. The hanging modules are used to hang the double-layer pipe;

[0009] Connected to the underground trench, the double-layer pipe extends horizontally through the side wall of the underground trench, the outer pipe is connected to the reducing tee, the reducing tee is blocked at both ends of the double-layer pipe along the axial direction, the branch pipe of the reducing tee is connected to the collecting pipe in the trench, and the inner pipe extends and is connected to the corresponding pipe gallery in the trench.

[0010] According to an embodiment of the present invention, a construction method for discharging industrial wastewater using a pre-buried double-layer pipe has at least the following beneficial effects: the double-layer pipe can effectively protect the inner pipe and avoid erosion and damage to the pipe by the external environment, thereby extending the service life of the pipe; in the design of the double-layer pipe, the use of materials such as the insulating wood block and the steel casing helps the pipe to maintain a stable temperature during operation, which is particularly important in an environment where hot water needs to be discharged or freezing needs to be avoided; the provision of a steel frame and a lifting module of the ground beam ensures the stable lifting and fixing of the double-layer pipe, thereby improving the safety and stability of the overall system; the pre-buried pipeline system can effectively utilize underground space and avoid occupying a large amount of space on the ground, especially when arranging pipelines inside a factory building, saving limited working and production space; by collecting industrial wastewater and discharging it into an outdoor liquid collection tank, the discharge of wastewater is effectively controlled and managed, reducing the negative impact on the surrounding environment, and meeting environmental protection requirements and standards.

[0011] According to some embodiments of the present invention, the hanging module comprises a pipe clamp, a hanging rod and a connection block, the pipe clamp is connected to the steel casing, the hanging rod is connected to the lower end of the floor, the pipe clamp is connected to the outer layer pipe, the clamp hole of the pipe clamp is riveted to one end of the connection block, and the hanging rod is connected to the other end of the connection block. The pipe clamp is provided to facilitate the installation and removal of the steel casing.

[0012] According to some embodiments of the present invention, the reducing tee is provided with a first connection port, a second connection port and a third connection port, the first connection port is connected to the double-layer pipe, the second connection port is blocked with a block, the block is provided with a mounting hole, and the mounting hole is used to connect to an external pipeline. The reducing tee is convenient for diverting liquid, and the block is convenient for discharging harmful liquid.

[0013] According to some embodiments of the present invention, a leakage test step of the outer layer pipe is further included, and the branch pipe is made of a transparent material. The leakage test step includes:

[0014] A. Prepare a first transparent water tank and a second transparent water tank, both of which include valves and scales, the first transparent water tank is connected to the end of the collecting pipe (310), when testing the double-layer pipe of the connecting device, the second transparent water tank is connected to the first connecting hole through a hose, and when testing the double-layer pipe of the floor drain, the second transparent water tank is connected to the second connecting hole through a hose;

[0015] B. When testing the double-layer pipe of the floor drain, first close the valve of the first transparent water tank, select one of the floor drains to connect the second connection hole through a hose, and open the valve of the first transparent water tank;

[0016] C. The collecting pipe in the underground pipe trench is connected to the liquid collecting tank, and the pipe of the second transparent water tank is connected to the liquid collecting tank;

[0017] D. standing for a predetermined time, when there is no water in the outer tube, closing the second transparent water tank, opening the valve of the first transparent water tank to start releasing a predetermined volume of water, until water appears in the second transparent water tank, closing the first transparent water tank, and observing the water level scale of the second transparent water tank;

[0018] E. After a predetermined time, the volume of water in the second transparent water tank is the same as the volume of the released water, which can prove that there is no leakage in the double-layer pipe.

[0019] According to some embodiments of the present invention, the outer diameter of the outer tube is set to 160 mm, the outer diameter of the inner tube is set to 90 mm, and the diameter of the steel casing is set to 200 mm.

[0020] According to some embodiments of the present invention, the inner tube, the support member, the outer tube and the steel casing are arranged in concentric circles.

[0021] According to some embodiments of the present invention, the thickness of the support is set to 15 mm, a plurality of the support is provided, the spacing distance between the plurality of the support is set to 1.33 m, the support is bonded to the outer layer tube and the inner layer tube, and the diameter of the steel casing is set to 200 mm. The support is provided to facilitate the isolation of the outer layer tube and the inner layer tube.

[0022] According to some embodiments of the present invention, the through hole is arranged on the outside, and the through hole is circular, a minor arc or a major arc. The through hole is arranged to facilitate the passage of liquid.

[0023] According to some embodiments of the present invention, in the step of installing a ground drain, the floor drain is formed by welding a stainless steel round plate and two sections of stainless steel pipes, the second connecting hole is used for leakage testing of the outer pipe or installation bolt sealing, the double-layer pipe is passed through the ground, the floor drain is installed, and then the lower end of the double-layer pipe is cast integrally with the concrete floor.

[0024] Additional aspects and advantages of the present invention will be given in part in the following description and in part will be obvious from the following description, or will be learned through practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] The above and / or additional aspects and advantages of the present invention will become apparent and easily understood from the description of the embodiments in conjunction with the following drawings, in which:

[0026] Figure 1 It is a structural schematic diagram of a double-layer pipe connection device according to an embodiment of the present invention;

[0027] Figure 2 A schematic diagram of a double-layer tube grounding leakage structure according to an embodiment of the present invention;

[0028] Figure 3 A schematic diagram of a floor drain structure according to an embodiment of the present invention;

[0029] Figure 4 A cross-sectional view of a floor drain structure according to an embodiment of the present invention;

[0030] Figure 5 The structure of the double-layer tube through beam of the embodiment of the present invention is schematically shown. Figure 1 ;

[0031] Figure 6 The structure of the double-layer tube through beam of the embodiment of the present invention is schematically shown. Figure 2 ;

[0032] Figure 7 This is a schematic diagram of a double-layer pipe hanging point structure according to an embodiment of the present invention;

[0033] Figure 8 is a cross-sectional view of a double-layer tube according to an embodiment of the present invention;

[0034] Fig. 9 This is a schematic diagram of the structure of a double-layer tube-connected liquid collection pool according to an embodiment of the present invention;

[0035] Fig.10 Schematic diagram of the double-layer pipe grounding underground trench structure according to an embodiment of the present invention.

[0036] Double-layer pipe 100, outer pipe 110, reducing tee pipe 111, first connecting port 111a;

[0037] A second connection port 111b, a third connection port 111c, a blocking block 111d, and a branch pipe 111e;

[0038] Inner tube 120, support member 130, through hole 131, tube cap 140;

[0039] The first connection hole 141, the floor drain 150, the leakage hole area 151, the second connection hole 152, and the stainless steel pipe 153;

[0040] Bolts 154, steel casing 160, insulation wood blocks 170, floor 180;

[0041] Hanging module 200, pipe clamp 210, hanging rod 220, connecting block 230, pipe trench 300, collecting pipe 310;

[0042] A first transparent water tank 400 , a pipeline 410 , and a second transparent water tank 500 .

[0043] Embodiments of the present invention are described in detail below, and examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present invention, and cannot be understood as limiting the invention.

[0044] In the description of the present invention, it should be understood that descriptions involving orientations, such as up, down, front, back, left, right, etc., and orientations or positional relationships indicated are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.

[0045] In the description of the present invention, "several" means one or more, "more" means two or more, "greater than", "less than", "exceed" etc. are understood as not including the number itself, and "above", "below", "within" etc. are understood as including the number itself. If there is a description of "first" or "second", it is only used for the purpose of distinguishing the technical features, and cannot be understood as indicating or implying the relative importance or implicitly indicating the number of the indicated technical features or implicitly indicating the order of the indicated technical features.

[0046] In the description of the present invention, unless otherwise clearly defined, terms such as setting, installing, connecting, etc. should be understood in a broad sense, and technicians in the relevant technical field can reasonably determine the specific meanings of the above terms in the present invention based on the specific content of the technical solution.

[0047] Reference Figures 1 to 10 , a construction method for discharging industrial wastewater using a pre-buried double-layer pipe, comprising:

[0048] A pipe trench 300 is provided, the pipe trench 300 is provided in the factory building, a pipe gallery is provided in the pipe trench 300, after the pre-buried double-layer pipe for process drainage is connected to the underground pipe trench 300, it is collected and discharged into an outdoor liquid collecting tank, and the support member 130 is provided between the outer layer pipe 110 and the inner layer pipe 120, and is collected and discharged into an outdoor liquid collecting tank;

[0049] Double-layer pipe connection equipment, the double-layer pipe 100 includes an outer pipe 110, an inner pipe 120 and a support 130, the support 130 is arranged between the outer pipe 110 and the inner pipe 120, and the support 130 is provided with a plurality of through holes 131. When the equipment is connected, the input end of the double-layer pipe 100 is arranged vertically, the drainage pipe 410 of the equipment is inserted into the inner pipe 120 and communicated with the inner pipe 120, and then the input end of the double-layer pipe 100 is blocked with a pipe cap 140, a first connecting hole 141 is arranged on the pipe cap 140, the first connecting hole 141 communicates with the space between the outer pipe 110 and the inner pipe 120, the first connecting hole 141 is sealed with a plug, and the first connecting hole 141 is used for leak detection test;

[0050] Double-layer pipe ground drain, in the case of ground drain 150, the input end of the double-layer pipe 100 is vertically arranged and extended to the ground, the input end of the double-layer pipe 100 is blocked by the floor drain 150, a leakage hole area 151 is arranged on the floor drain 150, the leakage hole area 151 is connected with the inner layer pipe 120, a second connection hole 152 is arranged on the floor drain 150, the second connection hole 152 is connected with the space between the outer layer pipe 110 and the inner layer pipe 120, the second connection hole 152 is installed with a plug for sealing, and the second connection hole 152 is used for leakage detection test;

[0051] The double-layer pipe passes through the ground beam. The double-layer pipe 100 is extended from its input end and then arranged horizontally, and finally the double-layer pipe 100 is extended to the pipe trench 300. In the process of horizontal extension, the double-layer pipe 100 needs to pass through the ground beam. Before pouring, the inner layer pipe 120 is laid first, and then the support 130 is arranged on the outer peripheral wall of the inner layer pipe 120, and then the outer layer pipe 110 is arranged on the support 130. The steel casing 160 is sleeved on the outer layer pipe 110, and the heat insulating wood block 170 is clamped between the steel casing 160 and the outer layer pipe 110, and then the steel casing 160 is welded on the steel frame of the ground beam. A plurality of hanging modules 200 are arranged between the ground beams, and the hanging modules 200 are arranged at the lower end of the floor 180. The hanging modules 200 are used to hang the double-layer pipe 100;

[0052] The underground pipe trench is connected, the double-layer pipe 100 extends horizontally through the side wall of the underground pipe trench 300, the outer pipe 110 is connected to the reducing tee pipe 111, the reducing tee pipe 111 is blocked at both ends of the double-layer pipe 100 along the axial direction, the branch pipe 111e of the reducing tee pipe 111 is connected to the collecting pipe (310) in the pipe trench 300, and the inner pipe 120 extends and is connected to the corresponding pipe gallery in the pipe trench 300; the double-layer pipe 100 can be effectively protected by the inner pipe 120 to prevent the external environment from corroding and damaging the pipe 410, thereby extending the service life of the pipe 410; in the design of the double-layer pipe, the use of materials such as the heat-insulating wood block 170 and the steel casing 160 is helpful for the pipe Pipe 410 maintains a stable temperature during operation, which is particularly important in environments where hot water needs to be discharged or freezing needs to be avoided; the setting of the steel frame of the ground beam and the hanging module 200 ensures the stable hanging and fixing of the double-layer pipe, thereby improving the safety and stability of the overall system; the pre-buried pipeline 410 system can effectively utilize the underground space and avoid occupying a large amount of space on the ground, especially when arranging the pipeline 410 inside the factory building, saving limited working and production space; by collecting industrial wastewater and discharging it into an outdoor liquid collection tank, the discharge of wastewater is effectively controlled and managed, reducing the negative impact on the surrounding environment, and meeting the requirements and standards of environmental protection.

[0053] In some embodiments, the hanging module 200 includes a pipe clamp 210, a hanging rod 220 and a connection block 230. The pipe clamp 210 is clamped on the steel casing 160, the hanging rod 220 is connected to the lower end of the floor 180, the pipe clamp 210 is clamped on the outer layer pipe 110, the clamp hole of the pipe clamp 210 is riveted to one end of the connection block 230, and the hanging rod 220 is connected to the other end of the connection block 230. The provided pipe clamp 210 facilitates the installation and removal of the steel casing 160.

[0054] In some embodiments, the reducing tee 111 is provided with a first connection port 111a, a second connection port 111b and a third connection port 111c, the first connection port 111a is connected to the double-layer pipe 100, the second connection port 111b is blocked with a block 111d, the block 111d is provided with a mounting hole, and the mounting hole is used to connect the external pipeline 410. The reducing tee 111 is provided to facilitate liquid diversion, and the block 111d is provided to facilitate the discharge of harmful liquids.

[0055] In some embodiments, the outer tube 110 may be subjected to a leakage test. The branch tube 111e may be made of a transparent material. The leakage test may include:

[0056] A. Prepare a first transparent water tank 400 and a second transparent water tank 500. Both the first transparent water tank 400 and the second transparent water tank 500 include valves and scales. The first transparent water tank 400 is connected to the end of the collecting pipe 310. When testing the double-layer pipe of the connecting device, the second transparent water tank 500 is connected to the first connecting hole 141 through a hose. When testing the double-layer pipe of the floor drain, the second transparent water tank 500 is connected to the second connecting hole 152 through a hose.

[0057] B. When testing the double-layer pipe of the floor drain, first close the valve of the first transparent water tank 400, select a floor drain 150 to connect the second connection hole 152 through a hose, and open the valve of the first transparent water tank 400;

[0058] C. The collecting pipe 310 in the underground pipe trench 300 is connected to the liquid collecting tank, and the pipe 410 of the second transparent water tank 500 is connected to the liquid collecting tank;

[0059] D. After standing for a predetermined time, when there is no water in the outer tube 110, close the second transparent water tank 500, open the valve of the first transparent water tank 400 and start to release a predetermined volume of water, until water appears in the second transparent water tank 500, close the first transparent water tank 400, and observe the water level scale of the second transparent water tank 500;

[0060] E. After a predetermined time, if the volume of water in the second transparent water tank 500 is the same as the volume of the released water, it can be proved that there is no leakage in the double-layer pipe.

[0061] In some embodiments, the outer diameter of the outer tube 110 is set to 160 mm, the outer diameter of the inner tube 120 is set to 90 mm, and the diameter of the steel casing 160 is set to 200 mm.

[0062] In some embodiments, the inner tube 120, the support member 130, the outer tube 110 and the steel casing 160 are arranged in concentric circles.

[0063] In some embodiments, the thickness of the support member 130 is set to 15 mm, and there are a plurality of support members 130, and the spacing between the plurality of support members 130 is set to 1.33 m. The support member 130 is bonded to the outer layer pipe 110 and the inner layer pipe 120, and the diameter of the steel casing 160 is set to 200 mm. The support member 130 is provided to facilitate the isolation of the outer layer pipe 110 and the inner layer pipe 120.

[0064] In some embodiments, the through hole 131 is arranged on the outside, and the through hole 131 is circular, a minor arc, or a major arc. The through hole 131 is arranged to facilitate the passage of liquid.

[0065] In some embodiments, in the step of installing a ground drain 150, the floor drain is made of a stainless steel round plate welded with two sections of stainless steel pipes 153. The second connecting hole is used for leakage testing of the outer pipe or for sealing with installation bolts 154. The double-layer pipe is passed through the ground to install the floor drain, and then the lower end of the double-layer pipe is cast integrally with the concrete floor.

[0066] The embodiments of the present invention are described in detail above in conjunction with the accompanying drawings, but the present invention is not limited to the above embodiments, and various changes can be made within the knowledge scope of ordinary technicians in the relevant technical field without departing from the purpose of the present invention.

Claims

1. A construction method for discharging industrial wastewater using a pre-buried double-layer pipe, characterized in that: include: A pipe trench is provided, a pipe trench (300) is provided in a factory building, a pipe gallery is provided in the pipe trench (300), a double-layer pipe is pre-buried underground in the factory building, after the double-layer pipe is connected to the pipe gallery of the underground pipe trench (300), wastewater is collected in the pipe gallery through the double-layer pipe row and discharged into an outdoor liquid collection tank; A double-layer pipe connection device, wherein the double-layer pipe (100) comprises an outer layer pipe (110), an inner layer pipe (120) and a support member (130), wherein the support member (130) is arranged between the outer layer pipe (110) and the inner layer pipe (120), and wherein the support member (130) is provided with a plurality of through holes (131). When the device is connected, the input end of the double-layer pipe (100) is arranged vertically, and the drainage pipe (410) of the device is inserted into the inner layer pipe (120) and communicated with the inner layer pipe (120), and then the input end of the double-layer pipe (100) is blocked by a pipe cap (140), wherein a first connection hole (141) is provided on the pipe cap (140), wherein the first connection hole (141) communicates with the space between the outer layer pipe (110) and the inner layer pipe (120), and wherein a plug is installed to seal the first connection hole (141), and the first connection hole (141) is used for a leak detection test; A double-layer pipe ground drain, in the case of a ground drain (150), the input end of the double-layer pipe (100) is vertically arranged and extended to the ground, the input end of the double-layer pipe (100) is blocked by the floor drain (150), a leakage hole area (151) is arranged on the floor drain (150), the leakage hole area (151) is connected to the inner layer pipe (120), a second connection hole (152) is arranged on the floor drain (150), the second connection hole (152) is connected to the space between the outer layer pipe (110) and the inner layer pipe (120), the second connection hole (152) is sealed with a plug, and the second connection hole (152) is used for leakage detection test; A double-layer pipe passing through a ground beam, wherein the double-layer pipe (100) is extended from its input end and then arranged horizontally, and finally the double-layer pipe (100) is extended to the pipe trench (300). During the horizontal extension process, the double-layer pipe (100) needs to pass through the ground beam. Before pouring, the inner layer pipe (120) is first laid, and then the support member (130) is arranged on the outer peripheral wall of the inner layer pipe (120), and then the outer layer pipe (110) is arranged on the support member (130). 0), a steel casing (160) is sleeved on the outer layer pipe (110), a heat insulating wood block (170) is sandwiched between the steel casing (160) and the outer layer pipe (110), and then the steel casing (160) is welded on the steel frame of the ground beam, and a plurality of hanging modules (200) are arranged between the ground beams, and the hanging modules (200) are arranged at the lower end of the floor (180), and the hanging modules (200) are used to hang the double-layer pipe (100); With reference to an underground pipe trench, a double-layer pipe (100) extends horizontally through a side wall of the underground pipe trench (300), the outer-layer pipe (110) is connected to a reducing tee pipe (111), the reducing tee pipe (111) is sealed at both ends of the double-layer pipe (100) along the axial direction, a branch pipe (111e) of the reducing tee pipe (111) is connected to a collecting pipe (310) in the pipe trench (300), and the inner-layer pipe (120) extends and is connected to a corresponding pipe gallery in the pipe trench (300).

2. A construction method for discharging industrial wastewater using a pre-buried double-layer pipe according to claim 1, characterized in that: The hanging module (200) comprises a pipe clamp (210) and a hanging rod (220), one end of the hanging rod (220) is connected to the lower end of the floor (180), the pipe clamp (210) is clamped on the outer layer pipe (110), and the pipe clamp (210) is connected to the other end of the hanging rod (220).

3. A construction method for discharging industrial wastewater using a pre-buried double-layer pipe according to claim 2, characterized in that: The hanging module (200) further comprises a connecting block (230), wherein the connecting block (230) is rotatably connected to the other end of the hanging rod (220), and the pipe clamp (210) is connected to the connecting block (230).

4. A construction method for discharging industrial wastewater using a pre-buried double-layer pipe according to claim 1, characterized in that: In the step of grounding the underground pipe trench, the reducing tee pipe (111) is provided with a first connection port (111a), a second connection port (111b) and a third connection port (111c), the first connection port (111a) is connected to the outer layer pipe (110), a block (111d) is sealed between the second connection port (111b) and the inner layer pipe (120), and the outlet end of the inner layer pipe (120) is used for an external pipe gallery.

5. A construction method for discharging industrial wastewater using a pre-buried double-layer pipe according to claim 4, characterized in that: The method further comprises a leakage testing step, wherein the third connection port (111c) is connected to the branch pipe (111e), and the branch pipe (111e) is made of a transparent material. The leakage testing step comprises: S1, prepare a first transparent water tank (400) and a second transparent water tank (500), wherein the first transparent water tank (400) and the second transparent water tank (500) both comprise valves and scales, wherein the first transparent water tank (400) is connected to the end of the collecting pipe (310), and when testing the double-layer pipe of the connecting device, the second transparent water tank (500) is connected to the first connecting hole (141) through a hose, and when testing the double-layer pipe of the floor drain, the second transparent water tank (500) is connected to the second connecting hole (152) through a hose; S2, when testing the double-layer pipe of the floor drain, first close the valve of the first transparent water tank (400), open the valve of the second transparent water tank (500), and after observing that water appears in the first transparent water tank (400), immediately close the valve of the second transparent water tank (500), and then open the valve of the first transparent water tank (400) to drain the excess water in the collection pipe (310); S3, connecting the collecting pipe (310) in the underground pipe trench (300) to the liquid collecting pool, and connecting the pipe (410) of the second transparent water tank (500) to the liquid collecting pool; S4, standing for a predetermined time, when there is no water in the outer tube (110), closing the second transparent water tank (500), opening the valve of the first transparent water tank (400) to start releasing a predetermined volume of water, until water appears in the second transparent water tank (500), closing the first transparent water tank (400), and observing the water level scale of the second transparent water tank (500); S5, after a predetermined time, the volume of water in the second transparent water tank (500) is the same as the volume of the released water, which proves that there is no leakage in the double-layer pipe.

6. A construction method for discharging industrial wastewater using a pre-buried double-layer pipe according to claim 1, characterized in that: The outer diameter of the outer layer tube (110) is set to 160 mm, the outer diameter of the inner layer tube (120) is set to 90 mm, and the diameter of the steel casing (160) is set to 200 mm.

7. A construction method for discharging industrial wastewater using a pre-buried double-layer pipe according to claim 1, characterized in that: The inner layer tube (120), the support member (130), the outer layer tube (110) and the steel casing (160) are coaxially arranged.

8. The construction method for discharging industrial wastewater using a pre-buried double-layer pipe according to claim 1 is characterized in that: The thickness of the support member (130) is set to 15 mm, and there are a plurality of support members (130). The spacing distance between the plurality of support members (130) is set to 1.33 m. The support member (130) is bonded between the outer layer tube (110) and the inner layer tube (120), and the diameter of the steel casing (160) is set to 200 mm.

9. The construction method for discharging industrial wastewater using a pre-buried double-layer pipe according to claim 1 is characterized in that: The through hole (131) is arranged on the outside, and the through hole (131) is circular, a minor arc, or a major arc.

10. A construction method for discharging industrial wastewater using a pre-buried double-layer pipe according to claim 1, characterized in that: The floor drain (150) is made of stainless steel, the second connection hole (152) is sealed with a mounting bolt (154), and the double-layer pipe (100) is passed through the ground to install the floor drain (150) or the pipe cap (140).