Novel shield segment displacement monitoring method

By simulating and instrumenting monitoring projects in shield tunnel segment construction, combined with numerical simulation and fuzzy evaluation models, the accuracy and efficiency issues of shield tunnel segment monitoring were resolved, thus achieving safety and quality management of shield tunnels.

CN119043234APending Publication Date: 2024-11-29TIESIYUAN (HUBEI) ENG SUPERVISION CONSULTING CO LTD +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411166770.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-23
Publication Date
2024-11-29

AI Technical Summary

Technical Problem

Existing methods for monitoring tunnel segments rely on manual operation, resulting in large measurement errors and cumbersome processes. This makes it difficult to efficiently monitor the deformation of shield tunnels, especially in large-size shield machines and complex geological environments where precise control is challenging.

Method used

By acquiring monitoring data from the shield tunnel segment construction project, simulating the construction process, and combining the ground-structure method and the load-structure method for numerical simulation, the layout of measuring points was determined. Wireless vibrating wire data acquisition devices, strain gauges, multi-point displacement gauges, and grating fiber optic force sensors were used for monitoring, and a safety fuzzy comprehensive evaluation model for shield tunnel segment displacement was established.

Benefits of technology

It enables precise monitoring and control of shield tunnel segment displacement, reflects changes in real time, improves the safety and quality management efficiency of tunnel construction, and allows for timely detection and handling of problems.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119043234A_ABST
    Figure CN119043234A_ABST
Patent Text Reader

Abstract

The invention discloses a novel shield segment structure displacement monitoring method. The method belongs to the technical field of engineering construction, and comprises the following steps: obtaining a monitoring project in a shield segment construction project, carrying out numerical simulation on the construction process of the obtained shield segment construction monitoring project to obtain deformation characteristics and mechanical characteristics of mass points of a shield segment in the construction process, and calculating the mass points of the shield segment on the basis of the deformation characteristics and the mechanical characteristics. Monitoring points are arranged on the monitoring project, a monitoring instrument is arranged on the basis of a monitoring point arrangement result for monitoring, a monitoring result is obtained, the monitoring result is analyzed, and the safety and stability of the shield segment construction project are determined. According to the method, the displacement change condition of the supporting structure in the shield segment construction process can be reflected from multiple angles through multiple monitoring items, compared with a traditional monitoring method, manual operation is reduced, and the shield segment structure monitoring efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of engineering construction, and in particular relates to a novel shield segment displacement monitoring method. Background Art

[0002] The shield method has become the preferred construction method for subway tunnels due to its many advantages such as fast construction speed, low impact on the ground, high safety and reliability. However, at the same time, with the increase in the operating life of subway tunnels, a series of safety issues have also arisen. For example, with the diverse development of urban underground space, the shield tunnels built in the early days will inevitably encounter the impact of surface buildings, underpasses and adjacent construction, causing displacement and deformation of subway tunnels and surrounding soil, and the increasingly complex construction technology makes tunnel risks difficult to predict. Moreover, with the increase in operating years, the uneven settlement of shield tunnels caused by geological effects accumulates year by year, and may be further deteriorated by external construction disturbances, causing safety incidents in recent years due to inadequate operation and maintenance control and safety monitoring. The increasing tunnel burial depth year by year also makes the geological environment of subway tunnels more complex, and the impact and harm are greater.

[0003] The segment displacement monitoring method is very important in tunnel engineering. It can help engineers understand the deformation of the pipeline, ensure the safe operation of the pipeline, and prevent damage and leakage of the pipeline.

[0004] It can be seen that segment displacement monitoring is an indispensable part of shield tunnel construction. Therefore, monitoring the displacement of shield segments has also become an important part of construction project management. At present, total stations, theodolites, optical fibers and other equipment are widely used in shield segment deformation monitoring. Most of these methods require manual observation at each measuring point. Due to the inaccuracy of manual measurement, the measurement error is large. In addition, the measurement data of each measuring point is relative to the reference point. When comparing the measuring points, it is necessary to convert them through the reference point, which makes the processing process more cumbersome.

[0005] According to the above technology, there are too many manual operations in the shield segment monitoring process. The manpower consumption of manual survey will increase with the increase of the size of the shield machine required for excavation, and the survey efficiency will also decrease with the increase of the size of the required track, so it needs to be improved. Summary of the invention

[0006] In order to solve the above technical problems, the present invention proposes a novel shield segment displacement monitoring method to solve the above problems existing in the prior art.

[0007] To achieve the above object, the present invention provides a novel shield segment displacement monitoring method, comprising the following steps:

[0008] Obtain monitoring items during shield segment construction projects;

[0009] Simulate the construction process of the monitoring project to obtain the deformation characteristics and mechanical characteristics of the shield segment particles during the construction process;

[0010] Arrange measurement points for the monitoring items based on the deformation characteristics and mechanical characteristics;

[0011] Monitoring instruments are deployed according to the measurement point layout to obtain the shield segment displacement monitoring results.

[0012] Preferably, the monitoring items include horizontal displacement of segments, vertical displacement of segments, relative displacement of segments, rate of change of segment displacement, segment posture, particle stress, crack opening, joint opening, soil pressure, water pressure, shield tunneling speed, shield machine posture, soil improvement, settlement of surrounding buildings, settlement of surrounding roads and settlement of surrounding pipelines.

[0013] Preferably, the method for simulating the construction process of the monitoring project includes:

[0014] The horizontal displacement of the segment, the vertical displacement of the segment, the relative displacement of the segment, the displacement change rate of the segment, the posture of the segment, the crack opening and closing degree, and the joint opening and closing degree are calculated and simulated by the stratum-structure method to obtain the first deformation characteristic and mechanical characteristic; the soil pressure, water pressure, settlement of surrounding buildings, settlement of surrounding roads and settlement of surrounding pipelines are calculated and simulated by the load-structure method to obtain the second deformation characteristic, and the first deformation characteristic and the second deformation characteristic are combined to obtain the deformation characteristic.

[0015] Preferably, the method for arranging measurement points for the monitoring items includes:

[0016] The deformation characteristics and mechanical characteristics are analyzed by numerical simulation to obtain simulation results; the maximum horizontal and vertical stresses of the shield segment and the location where the maximum stress occurs in the simulation results are statistically analyzed, and measurement points are arranged based on the maximum horizontal and vertical stresses of the shield segment and the location where the maximum stress occurs.

[0017] Preferably, the method of deploying monitoring instruments for monitoring includes:

[0018] A wireless vibrating-wire sampler is used to monitor the supporting soil pressure and water pressure; a strain gauge is used to monitor the horizontal displacement, vertical displacement and relative displacement of the pipe segment; a multi-point displacement meter is used to monitor the displacement change rate of the pipe segment, the settlement of surrounding buildings, the settlement of surrounding roads and the settlement of surrounding pipelines; a grating optical fiber force sensor is used to monitor the particle stress.

[0019] Preferably, the monitoring method further comprises analyzing based on the shield segment displacement monitoring results, and the analysis method comprises:

[0020] The displacement monitoring results of the multi-point displacement meter are statistically analyzed, and the excavation and support parameters in the shield tunnel construction project are optimized based on the displacement monitoring results; the comprehensive monitoring results of the wireless vibrating wire sampler, strain gauge and grating fiber force sensor are statistically analyzed, and the influencing factors affecting the excavation and support effects and the influence weights of the influencing factors on the support effects are analyzed based on the comprehensive monitoring results.

[0021] Preferably, the method can also establish a fuzzy comprehensive evaluation model for shield tunnel excavation safety based on the shield segment displacement monitoring results for evaluation, and the evaluation method includes:

[0022] The actual measured value of each influencing indicator is counted, and then the influencing indicator score value is obtained according to the indicator scoring formula. The influencing indicator membership is obtained through the trapezoidal distribution membership function and the influencing indicator score value. The influencing indicator fuzzy relationship matrix is ​​obtained based on the influencing indicator membership. The weight of the influencing indicator is multiplied by the influencing indicator fuzzy relationship matrix to obtain the influencing indicator comprehensive evaluation matrix, and the evaluation is performed based on the influencing indicator comprehensive evaluation matrix.

[0023] Preferably, the calculation expression of the influence index membership is:

[0024]

[0025] In the formula, A, B, and C are constants related to the construction stratum conditions, s ij Score the indicator.

[0026] Compared with the prior art, the present invention has the following advantages and technical effects:

[0027] The present invention discloses a novel shield segment structure displacement monitoring method, comprising: obtaining monitoring items in the shield segment construction project, numerically simulating the construction process of the obtained shield segment construction monitoring items, obtaining deformation characteristics and mechanical characteristics of the shield segment particles during the construction process, arranging measurement points for the monitoring items based on the deformation characteristics and the mechanical characteristics, arranging monitoring instruments for monitoring based on the measurement point arrangement results, obtaining monitoring results, analyzing the monitoring results, and determining the safety and stability of the shield segment construction project. By adopting the above technical scheme, accurate monitoring and control of the shield segment displacement can be achieved, thereby comprehensively monitoring and managing the construction, safety and quality of the tunnel shield project; by establishing a shield segment monitoring model and arranging objects to be monitored, accurate monitoring of the shield segment displacement can be achieved, thereby reflecting the change of the shield segment displacement in real time. By controlling the monitoring equipment to perform mobile monitoring and obtaining real-time change data in mobile monitoring, the change of the shield segment displacement can be monitored in real time, and problems can be discovered and handled in time. By reflecting the real-time change data on the shield segment, the monitoring data can be converted into visual information, which can more intuitively and vividly reflect the change of the displacement of the base shield segment. A fuzzy comprehensive evaluation model for the safety of the tunnel shield segment construction project was established. In short, the invention can monitor and alarm the displacement of the tunnel shield segment in a timely manner, and improve the safety of the workers inside the tunnel. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] The drawings constituting a part of the present application are used to provide a further understanding of the present application. The illustrative embodiments and descriptions of the present application are used to explain the present application and do not constitute an improper limitation on the present application. In the drawings:

[0029] Figure 1 A schematic diagram of a method flow of an embodiment of the present invention;

[0030] Figure 2 Schematic diagram of the results of calculating stress-strain characteristics using the stratum structure method in an embodiment of the present invention: from a to h are the strain variation diagrams of the shield segment during tunnel excavation;

[0031] Figure 3 Schematic diagram of the system structure of an embodiment of the present invention. DETAILED DESCRIPTION

[0032] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present application will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.

[0033] It should be noted that the steps shown in the flowcharts of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and that, although a logical order is shown in the flowcharts, in some cases, the steps shown or described can be executed in an order different from that shown here.

[0034] Embodiment 1

[0035] like Figure 1 As shown, this embodiment provides a novel shield segment displacement monitoring method, comprising the following steps:

[0036] S1. Obtain the monitoring items in the shield segment construction project;

[0037] The monitoring items in step S1 include: horizontal displacement of the segment, vertical displacement of the segment, relative displacement of the segment, relative displacement of the segment, rate of change of segment displacement, segment posture, particle stress, crack and joint opening, soil pressure and water pressure, shield tunneling speed, shield machine posture, soil improvement, settlement of surrounding buildings, settlement of surrounding roads, and settlement of surrounding pipelines.

[0038] In this embodiment, the engineering environment around the shield tunnel, such as underground pipelines and buildings, is investigated, and the elevation and terrain profile of the shield tunnel to be built need to be obtained based on the local landmark system and on-site survey data. It is necessary to consider draining the groundwater on the site before tunnel construction, and to take drainage measures during and after construction. During the tunnel excavation process, the groundwater resources and adjacent buildings must not be damaged.

[0039] S2. Numerical simulation is performed on the construction process of the shield segment construction monitoring project to obtain the deformation characteristics and mechanical characteristics of the particles during the construction process (characteristic diagram as shown in Figure 2 shown);

[0040] Step S2 includes: calculating and simulating the horizontal displacement of the segment, the vertical displacement of the segment, the relative displacement of the segment, the relative displacement of the segment, the displacement change rate of the segment, the posture of the segment, the opening and closing degree of the cracks and joints through the stratum-structure method to obtain the mechanical characteristics; calculating and simulating the soil pressure and water pressure, the settlement of surrounding buildings, the settlement of surrounding roads, and the settlement of surrounding pipelines through the load-structure method to obtain the deformation characteristics.

[0041] In this embodiment, numerical simulation is used to calculate the displacement of shield segments during tunnel excavation. According to the characteristics of the monitoring project, numerical calculations are performed according to the stratum-structure method and the load-structure method. The horizontal displacement of the segment, the vertical displacement of the segment, the relative displacement of the segment, the relative displacement of the segment, the displacement change rate of the segment, the attitude of the segment, the opening and closing degree of cracks and joints are determined by referring to the calculation results of the stratum-structure method; the soil pressure and water pressure, the settlement of surrounding buildings, the settlement of surrounding roads, and the settlement of surrounding pipelines are determined by referring to the calculation results of the load-structure method.

[0042] Furthermore, when the stratum-structure method is used to simulate the shield tunnel construction process, the procedures are as follows: model establishment, constitutive model selection, soil parameter selection, boundary condition determination, initial geostress balance, and model excavation.

[0043] Furthermore, the mechanical characteristics of the shield segments during the tunnel excavation process calculated by the stratum-structure method were statistically analyzed, and the maximum horizontal and vertical stresses on the excavation surface and their corresponding positions after the excavation process was completed were statistically analyzed.

[0044] S3. Arrange measurement points for monitoring items based on deformation characteristics and mechanical characteristics.

[0045] Step S3 includes: using a numerical simulation method to analyze the deformation characteristics and the mechanical characteristics to obtain simulation results; counting the maximum horizontal and vertical stresses of the excavation surface in the simulation results and the corresponding occurrence positions, and arranging the measuring points.

[0046] S4. Based on the measurement point arrangement results, monitoring instruments are deployed to perform monitoring and obtain monitoring results.

[0047] Step S4 includes: using a wireless vibrating string sampler to monitor the supporting soil pressure and water pressure; using a strain gauge to monitor the horizontal displacement of the pipe segment, the vertical displacement of the pipe segment, and the relative displacement of the pipe segment; using a multi-point displacement meter to monitor the displacement change rate of the pipe segment, the settlement of surrounding buildings, the settlement of surrounding roads, and the settlement of surrounding pipelines; using a grating optical fiber force sensor to monitor the particle stress.

[0048] S5. Analyze the monitoring results to determine the safety and stability of the tunnel construction project.

[0049] Step S5 includes: collecting statistics on the monitoring results of the multi-point displacement meter to optimize the excavation and support parameters in the shield tunnel construction project; collecting statistics on the monitoring results of the wireless vibrating wire sampling instrument, the strain gauge, and the grating optical fiber force sensor to analyze the factors affecting the excavation and support effects and the weights of the factors affecting the support effects;

[0050] In this embodiment, further, a fuzzy comprehensive evaluation model for shield tunnel excavation safety may be established based on the monitoring results.

[0051] Specifically, the influencing factors of surrounding rock stability during shield tunnel excavation are determined, the actual measured values ​​of each influencing factor are counted, and then the scoring value (s) is obtained according to the indicator scoring formula, and then the membership degree (f) is obtained through the trapezoidal distribution membership function, and then the fuzzy relationship matrix (R) is obtained. Then, the weight of the influencing indicator (W) is multiplied by the fuzzy relationship matrix to obtain its comprehensive evaluation matrix (B) (called fuzzy matrix synthesis), and finally the quantitative solution of the evaluation is obtained.

[0052] The indicator scoring formula generally adopts the common weighted average method, and the calculation formula is:

[0053]

[0054] Among them, w i is the weight of the ith indicator, s i is the score of the ith indicator, and n is the total number of indicators.

[0055] The calculation formula of membership degree (f) is:

[0056]

[0057] Among them, A, B, and C are constants related to the construction stratum conditions; s ij Score the indicator;

[0058] Membership synthesis fuzzy key matrix (R):

[0059]

[0060] Indicator weight calculation:

[0061]

[0062] Among them, x0 is the value of the surrounding rock in the most stable state, which is determined according to field tests, and x i is the monitoring value of each sensor. The more the monitoring value deviates from x0, the greater the weight of the monitoring item.

[0063] Comprehensive evaluation matrix:

[0064] B i =W i ×R i

[0065] Among them, W i is the weight matrix.

[0066] Embodiment 2

[0067] like Figure 3As shown, in this embodiment, a novel shield segment displacement monitoring system is also disclosed, including: a project determination module, a numerical simulation module, a measurement point determination module, a monitoring module and an analysis module;

[0068] The project determination module is used to obtain monitoring projects in shield tunnel construction projects.

[0069] The monitoring items include: horizontal displacement of segments, vertical displacement of segments, relative displacement of segments, relative displacement of segments, rate of change of segment displacement, segment posture, particle stress, crack and joint opening, soil pressure and water pressure, shield excavation speed, shield machine posture, soil improvement, settlement of surrounding buildings, settlement of surrounding roads, and settlement of surrounding pipelines.

[0070] The numerical simulation module is used to numerically simulate the construction process of the shield tunnel construction monitoring project and obtain the deformation characteristics and mechanical characteristics of the particles during the construction process.

[0071] The process of the numerical simulation module includes: calculating and simulating the horizontal displacement of the segment, the vertical displacement of the segment, the relative displacement of the segment, the relative displacement of the segment, the displacement change rate of the segment, the posture of the segment, the opening and closing degree of the cracks and joints through the stratum-structure method to obtain the mechanical and deformation characteristics; calculating and simulating the soil pressure and water pressure, the settlement of surrounding buildings, the settlement of surrounding roads, and the settlement of surrounding pipelines through the load-structure method to obtain the deformation characteristics.

[0072] The measuring point determination module uses a numerical simulation method to analyze the deformation characteristics and the mechanical characteristics to obtain simulation results, calculates the maximum horizontal and vertical stresses of the excavation surface in the simulation results and the corresponding locations, and arranges the measuring points.

[0073] The monitoring module is used to deploy monitoring instruments based on the measurement point layout results to perform monitoring and obtain monitoring results.

[0074] The process and tools used in the monitoring module include: using a wireless vibrating string sampler to monitor the supporting soil pressure and water pressure; using a strain gauge to monitor the horizontal displacement of the pipe segment, the vertical displacement of the pipe segment, the relative displacement of the pipe segment, and the relative displacement of the pipe segment; using a multi-point displacement meter to monitor the relative displacement of the pipe segment, the rate of change of the pipe segment displacement, the settlement of surrounding buildings, the settlement of surrounding roads, and the settlement of surrounding pipelines; using a grating fiber optic force sensor to monitor the particle stress.

[0075] The analysis module analyzes the monitoring results to determine the safety and stability of the shield tunnel construction project.

[0076] The process of the analysis module includes: collecting statistics on the monitoring results of the multi-point displacement meter to optimize the excavation and support parameters in the shield tunnel construction project; collecting statistics on the monitoring results of the wireless vibrating wire sampling instrument, the strain gauge, and the grating optical fiber force sensor to analyze the factors of the excavation and support effects and the weight of the influence of the factors on the support effect;

[0077] The above are only preferred specific implementations of the present application, but the protection scope of the present application is not limited thereto. Any changes or substitutions that can be easily thought of by a person skilled in the art within the technical scope disclosed in the present application should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.

Claims

1. A new shield segment displacement monitoring method, characterized in that: The following steps are involved: Obtain monitoring items during shield segment construction projects; Simulate the construction process of the monitoring project to obtain the deformation characteristics and mechanical characteristics of the shield segment particles during the construction process; Arrange measurement points for the monitoring items based on the deformation characteristics and mechanical characteristics; Monitoring instruments are deployed according to the measurement point layout to obtain the shield segment displacement monitoring results.

2. The novel shield segment displacement monitoring method according to claim 1 is characterized in that: The monitoring items include horizontal displacement of segments, vertical displacement of segments, relative displacement of segments, displacement change rate of segments, segment posture, particle stress, crack opening degree, joint opening degree, soil pressure, water pressure, shield excavation speed, shield machine posture, soil improvement, settlement of surrounding buildings, settlement of surrounding roads and settlement of surrounding pipelines.

3. The novel shield segment displacement monitoring method according to claim 2 is characterized in that: The method for simulating the construction process of the monitoring project includes: The horizontal displacement of the segment, the vertical displacement of the segment, the relative displacement of the segment, the displacement change rate of the segment, the posture of the segment, the crack opening and closing degree, and the joint opening and closing degree are calculated and simulated by the stratum-structure method to obtain the first deformation characteristic and mechanical characteristic; the soil pressure, water pressure, settlement of surrounding buildings, settlement of surrounding roads and settlement of surrounding pipelines are calculated and simulated by the load-structure method to obtain the second deformation characteristic, and the first deformation characteristic and the second deformation characteristic are combined to obtain the deformation characteristic.

4. The novel shield segment displacement monitoring method according to claim 1 is characterized in that: The method for arranging measuring points for the monitoring project includes: The deformation characteristics and mechanical characteristics are analyzed by numerical simulation to obtain simulation results; the maximum horizontal and vertical stresses of the shield segment and the location where the maximum stress occurs in the simulation results are statistically analyzed, and measurement points are arranged based on the maximum horizontal and vertical stresses of the shield segment and the location where the maximum stress occurs.

5. The novel shield segment displacement monitoring method according to claim 1 is characterized in that: Methods for deploying monitoring instruments for monitoring include: A wireless vibrating-wire sampler is used to monitor the supporting soil pressure and water pressure; a strain gauge is used to monitor the horizontal displacement, vertical displacement and relative displacement of the pipe segment; a multi-point displacement meter is used to monitor the displacement change rate of the pipe segment, the settlement of surrounding buildings, the settlement of surrounding roads and the settlement of surrounding pipelines; a grating optical fiber force sensor is used to monitor the particle stress.

6. The novel shield segment displacement monitoring method according to claim 1 is characterized in that: The monitoring method further includes analyzing based on the shield segment displacement monitoring results, and the analysis method includes: The displacement monitoring results of the multi-point displacement meter are statistically analyzed, and the excavation and support parameters in the shield tunnel construction project are optimized based on the displacement monitoring results; the comprehensive monitoring results of the wireless vibrating wire sampler, strain gauge and grating fiber force sensor are statistically analyzed, and the influencing factors affecting the excavation and support effects and the influence weights of the influencing factors on the support effects are analyzed based on the comprehensive monitoring results.

7. The novel shield segment displacement monitoring method according to claim 6 is characterized in that: The method can also establish a fuzzy comprehensive evaluation model for shield tunnel excavation safety based on the shield segment displacement monitoring results for evaluation. The evaluation method includes: The actual measured value of each influencing indicator is counted, and then the influencing indicator score value is obtained according to the indicator scoring formula. The influencing indicator membership is obtained through the trapezoidal distribution membership function and the influencing indicator score value. The influencing indicator fuzzy relationship matrix is ​​obtained based on the influencing indicator membership. The weight of the influencing indicator is multiplied by the influencing indicator fuzzy relationship matrix to obtain the influencing indicator comprehensive evaluation matrix, and the evaluation is performed based on the influencing indicator comprehensive evaluation matrix.

8. The novel shield segment displacement monitoring method according to claim 7 is characterized in that: The calculation expression of the influence index membership is: In the formula, A, B, and C are constants related to the construction stratum conditions, s ij Score the indicator.