Electric power material integrated warehouse scheduling prediction system based on time section
Through the comprehensive warehouse scheduling and prediction system of power materials based on time sections, the Gaussian hybrid model is constructed using wavelet transformation and K-NN algorithm, which solves the problem that the demand for power materials cannot be effectively estimated in the existing technology, and achieves the accuracy of power materials demand. Prediction and warehouse scheduling optimization improve the efficiency of in-store access.
Patent Information
- Application Number
- CN202411029081.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-30
- Publication Date
- 2024-11-29
AI Technical Summary
The existing warehousing system cannot effectively estimate the demand for power and materials, resulting in congestion in warehouses at peak times and wasted time resources, and it is impossible to schedule and prepare in advance.
The comprehensive warehouse scheduling prediction system of power materials based on time sections is adopted to obtain time sections of different particle sizes through the truncation period, and the feature sequence is extracted using wavelet transform and K-NN algorithm, a Gaussian hybrid model is constructed, and the prediction model is iteratively calculated to optimize the scheduling quantity. .
It realizes a more accurate prediction of the demand for power materials, avoids warehouse congestion and ineffective waiting, and improves the throughput efficiency of inlet and exit.
Smart Images

Figure CN119047738A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of warehouse management, and in particular to a time-section-based comprehensive warehouse scheduling and prediction system for electric power materials. Background Art
[0002] The operation of the power system has significant time segment characteristics. For example, during the peak electricity consumption in summer and winter, the power system load is large and the environmental factors are unstable, so the probability of failure and the need to replace the power system hardware equipment will increase. At this time, higher requirements will be placed on the throughput and inventory level of the storage system.
[0003] During the construction of the power system, the supply and demand of power materials vary greatly in different project cycles and construction stages. During this process, when dispatching power materials, it is necessary to pre-dispatch the relevant materials in and out of the warehouse. Sometimes, there will be a temporary shortage of materials due to the hysteresis of the supply chain. The existing warehousing system cannot effectively estimate the actual material demand and cannot make dispatch preparations in advance. Therefore, it is easy to cause warehouse congestion during peak hours and fail to effectively extract materials. During off-peak hours, storage resource limitations make it impossible to make pre-dispatch preparations for the next round of storage peaks. Summary of the invention
[0004] In view of the deficiencies of the prior art, the present application provides a comprehensive warehouse scheduling prediction system for electric power materials based on time sections. The present application obtains time sections of different granularities by different truncation periods, and periodically expands the information of the time sections to effectively mine the periodic characteristics of warehouse scheduling needs, thereby providing a prediction of the scheduling needs of materials based on the periodic characteristics with a more accurate prediction model, so as to arrange warehouse inventory as early as possible to avoid warehouse congestion or ineffective waiting. The present application specifically adopts the following technical solutions.
[0005] Firstly, in order to achieve the above purpose, a time-section-based power material comprehensive warehouse scheduling prediction system is proposed, which includes: i Always on c i The demand for electricity materials of different types generates the corresponding time series (t i , c i ), truncating the time series (t i , c i ), obtain the truncated sequence T(t based on different truncation periods T i , c i ); for each of the above truncated sequences T(t i , c i ) According to the type of power materials c iThe corresponding relationship sequence between the demand and time of each type of electric power material is extracted, and each corresponding relationship sequence is expanded according to the truncation period T, and each expanded sequence is subjected to discrete wavelet transform, and the coefficient vector obtained by the transform is subjected to feature sequence extraction; each extracted feature sequence is accumulated to generate a feature peak sequence, and the K-NN algorithm is called to find the n feature sequences closest to the feature peak sequence; the Pearson correlation coefficient between the n feature sequences and the feature peak sequence is calculated respectively, and then the feature sequence with the largest correlation is screened out according to the Pearson correlation coefficient, and the coefficient vector of the discrete wavelet transform corresponding to the feature sequence is used as a benchmark to calculate the error distribution of the n feature sequences; a Gaussian mixture model is used to fit the error distribution of each feature sequence to obtain a prediction model; based on the real-time material status in the warehouse system and according to the prediction model, the dispatch quantity of each type of material with the smallest gap with the prediction model is iteratively calculated.
[0006] Optionally, a time-section-based integrated warehouse scheduling and forecasting system for electric power materials as described above, wherein the truncation period T includes: every 7 days, one month, one quarter or half a year, and the starting points of the truncation periods are sequentially connected without crossover or overlap.
[0007] Optionally, in the time-section-based integrated warehouse dispatching and forecasting system for electric power materials as described above, the step of expanding each corresponding relationship sequence according to the truncation period T includes: cyclically splicing the corresponding relationship sequence according to the truncation period T until the length of the spliced sequence reaches the same length as the original time series.
[0008] Optionally, in the time-section-based integrated warehouse dispatching and prediction system for electric power materials as described above, the step of expanding each corresponding relationship sequence according to the truncation period T includes: traversing the corresponding relationship sequence, and sequentially splicing the corresponding relationship sequence in a loop with each item in the sequence as the starting point until the length of the spliced sequence reaches the same length as the original time series.
[0009] Optionally, in any of the above-mentioned time-section-based integrated warehouse dispatch prediction systems for electric power materials, the specific steps of iteratively calculating the dispatch quantity of each type of materials with the smallest gap with the prediction model based on the real-time material status in the warehouse system and according to the prediction model include: assuming c i The dispatch quantities of the types of materials are x ci , add the dispatch quantity to the real-time material sequence in the warehouse system, and sort by power material type c iExtract the corresponding relationship sequence between the inventory of various types of power materials and time, and expand each corresponding relationship sequence according to the truncation period T, perform discrete wavelet transform on each expanded sequence, and extract the characteristic sequence from the coefficient vector obtained by the transformation; call the K-NN algorithm to find the n characteristic sequences closest to the prediction model; calculate the Pearson correlation coefficient between the n characteristic sequences and the prediction model respectively, and iteratively adjust the dispatching quantity x of each type of material ci Until the scheduling amount that maximizes the Pearson correlation coefficient is obtained.
[0010] Optionally, as described in any of the above time-section-based power material comprehensive warehouse scheduling prediction systems, wherein the system is based on t i Always on c i The outbound and inbound demand of type power materials generates the outbound time series E(t i , c i ) and the storage time series I(t i , c i ), and truncate them respectively to obtain the truncated outbound sequence E based on different truncation periods T T (t i , c i ) and truncated library sequence I T (t i , c i ); Then, for each of the above truncated outbound sequences E T (t i , c i ) and each truncated library sequence I T (t i , c i ) According to the type of power materials c i The corresponding relationship sequence between the demand and time of this type of electric power materials is extracted, and each corresponding relationship sequence is expanded according to the truncation period T. Discrete wavelet transform is performed on each expanded sequence, and the characteristic sequence extraction and fitting steps are performed on the coefficient vector obtained by the transformation, until the prediction model for the outbound time series and the prediction model for the inbound time series are obtained respectively.
[0011] Optionally, in any of the above-mentioned time-section-based integrated warehouse dispatch prediction systems for electric power materials, the specific steps of iteratively calculating the dispatch quantity of each type of materials with the smallest gap with the prediction model based on the real-time material status in the warehouse system according to the prediction model include: independently iteratively calculating the dispatch quantity of each type of materials according to the prediction model of the outbound time series for c i Type material outbound time series E(t i , c i) is scheduled, and the prediction model of the incoming time series is independently iterated to calculate the c i Type material storage time series I(t i , c i ) is obtained, and after the scheduling amount that makes the Pearson correlation coefficient the largest is obtained, the material demand corresponding to the scheduling amount is calculated to generate material demand warning information.
[0012] Optionally, in any of the above-mentioned time-section-based integrated warehouse scheduling prediction systems for electric power materials, in which, during the process of calculating the scheduling quantity, the specific step of adding the scheduling quantity to the real-time material sequence in the warehouse system includes: in the current outbound time sequence E(t i , c i ) plus the tth i+1 The outbound demand at the moment is E(t i , c i ) and the sum of the dispatched quantity; in the current storage time series I(t i , c i ) plus the tth i+1 The storage demand at time is I(t i , c i ) and the dispatching amount.
[0013] Optionally, a time-section-based integrated warehouse scheduling and prediction system for electric power materials as described above, wherein the system triggers iterative calculation of the scheduling quantity and demand warning information based on its current real-time material status and inbound and outbound demand information at least after completing an outbound task.
[0014] Beneficial Effects
[0015] The present application provides a comprehensive warehouse scheduling and prediction system for electric power materials based on time sections. The present application obtains the periodic characteristics of the demand for different types of electric power materials by truncating the demand information for electric power materials in different periods and then expanding it by period. The characteristic sequence of each type of electric power material can be extracted by performing a wavelet transform on the periodic characteristics to obtain the time domain and frequency domain characteristics corresponding to its in-and-out warehouse demand. Thus, the time-frequency distribution of its in-and-out warehouse demand can be effectively extracted by accumulating its characteristic sequence, thereby obtaining a prediction model that best expresses the distribution state of in-and-out warehouse demand through screening and fitting based on the K-NN algorithm and the degree of correlation. Therefore, the present application can obtain a more accurate prediction model based on the model through iterative training of historical demand, so as to effectively estimate the in-and-out warehouse demand of various types of electric power materials according to the model, so as to pre-schedule the materials and warehouse spaces inside the warehouse based on the demand to improve the in-and-out warehouse throughput efficiency.
[0016] Other features and advantages of the present application will be set forth in the following description, and in part will become apparent from the description, or may be understood by practicing the present application. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] The accompanying drawings are used to provide a further understanding of the present application and constitute a part of the specification. Together with the embodiments of the present application, they are used to explain the present application and do not constitute a limitation of the present application. In the accompanying drawings:
[0018] Figure 1 It is a flow chart of the time-section-based comprehensive warehouse scheduling prediction system for electric power materials of the present application;
[0019] Figure 2 It is a schematic diagram of the entire intelligent vertical library using the present application. DETAILED DESCRIPTION
[0020] In order to make the purpose and technical solution of the embodiment of the present application clearer, the technical solution of the embodiment of the present application will be clearly and completely described in conjunction with the drawings of the embodiment of the present application. Obviously, the described embodiment is a part of the embodiment of the present application, not all of the embodiments. Based on the described embodiment of the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0021] It will be understood by those skilled in the art that, unless otherwise defined, all terms (including technical and scientific terms) used herein have the same meaning as those generally understood by those skilled in the art to which this application belongs. It should also be understood that terms such as those defined in common dictionaries should be understood to have meanings consistent with the meanings in the context of the prior art, and will not be interpreted with idealized or overly formal meanings unless defined as herein.
[0022] The term “connection” as used in this application may mean a direct connection between components or an indirect connection between components via other components.
[0023] Figure 1 A time-section-based integrated warehouse scheduling forecasting system for power materials according to the present application is used Figure 2The warehouse shown in the figure obtains the demand information corresponding to the warehouse entry and exit through the interactive unit in the warehouse, and monitors the storage status of different types of power materials in each storage location in real time through the sensors in the warehouse, so as to predict the system throughput demand according to the following steps, so as to schedule the equipment in the warehouse to schedule the existing goods according to the predicted throughput demand, and schedule the goods predicted to be shipped out in large quantities to the cache position close to the warehouse cargo extraction port, and clear the shelf positions corresponding to the goods predicted to be shipped in large quantities and the cache positions near the warehouse cargo receiving port so as to quickly receive the newly shipped materials.
[0024] This system can predict the throughput demand in the warehouse according to the following steps:
[0025] According to t i Always on c i The demand for electricity materials of different types generates the corresponding time series (t i , c i ), truncating the time series (t i , c i ), obtain the truncated sequence T(t based on different truncation periods T i , c i );
[0026] For each of the above truncated sequences T(t i , c i ) According to the type of power materials c i Extract the corresponding relationship sequence between the demand and time of each type of power material, expand each corresponding relationship sequence according to the truncation period T, perform discrete wavelet transform on each expanded sequence, and extract the characteristic sequence from the coefficient vector obtained by the transformation;
[0027] Accumulate the extracted characteristic sequences to generate a characteristic peak sequence, and call the K-NN algorithm to find n characteristic sequences that are closest to the characteristic peak sequence;
[0028] Calculate the Pearson correlation coefficients between the n feature sequences and the feature peak sequence respectively, then select the feature sequence with the greatest correlation according to the Pearson correlation coefficient, and calculate the error distribution of the n feature sequences based on the coefficient vector of the discrete wavelet transform corresponding to the feature sequence as a benchmark;
[0029] The Gaussian mixture model is used to fit the error distribution of each feature sequence to obtain the prediction model;
[0030] Based on the real-time material status in the warehouse system, according to the prediction model, the scheduling quantity of each type of material with the smallest gap with the prediction model is iteratively calculated. For example, when calculating the type number c iThe dispatch quantity of materials x ci When the scheduling quantity x ci Add to the real-time material sequence in the warehouse system, follow the same steps as the training process of the prediction model, and select the power material type c i The corresponding relationship sequence between the inventory of this type of power materials and time is extracted from the historical data and the preset dispatching quantity x ci Add it to the end of the sequence, then expand each corresponding relationship sequence according to the truncation period T, perform discrete wavelet transform on each expanded sequence, and extract the characteristic sequence from the coefficient vector obtained by the transformation; then, call the K-NN algorithm in the same way as the training process of the prediction model to find the n characteristic sequences closest to the prediction model; then calculate the Pearson correlation coefficient between the n characteristic sequences and the prediction model respectively, and iteratively adjust the type number to c i The dispatch quantity of materials x ci Until the scheduling amount that maximizes the Pearson correlation coefficient is obtained.
[0031] Therefore, the scheduling quantity is sent to the execution system of the warehouse, driving the forklifts, four-way vehicles and corresponding lifting devices inside the warehouse to transfer the materials that need to be shipped out to the cache storage locations near the warehouse's receiving and sending ports according to the scheduling quantity; or the cache storage locations originally near the warehouse's receiving and sending ports and the materials originally occupying the target cargo storage locations are adjusted to other locations in the warehouse according to the scheduling quantity, so as to free up storage space in advance for the entry of large quantities of materials.
[0032] Taking into account the production cycle and extraction of goods and materials, this application generally sets the truncation period T to: truncate the time series of power materials one by one at intervals of 7 days, one month, one quarter or half a year (t i , c i ). The starting points of each truncation period are connected in sequence without crossing or overlapping.
[0033] After truncating the time series, it is also necessary to expand each sequence according to the truncation period T corresponding to the truncation period, and cyclically splice the corresponding relationship sequence according to the truncation period T until the length of the spliced sequence reaches the same length as the original time series. For example, when the sequence is truncated in units of months, it is necessary to repeatedly splice the sequence of each month after truncation, and splice the sequence of the month to the truncated sequence until the length of the original sequence is reached. In this way, the Pearson correlation coefficient between the characteristic peak sequences can be compared and the correlation coefficient can be used to select the sequence that best meets the periodicity for training the prediction model.
[0034] Specifically, the corresponding relationship sequence can be expanded according to the truncation period T corresponding to each truncated sequence in the following manner: traverse each time point in the corresponding relationship sequence, and sequentially splice the sequence with the data items corresponding to each time point in the sequence as the starting point. For example, when a sequence is arranged in the order of (1,2,3,4,5,6,7), the corresponding relationship sequence is cyclically spliced with its first data item to obtain (1,2,3,4,5,6,7; 1,2,3,4,5,6,7; ... 1,2,3,4,5,6,7), and the corresponding relationship sequence is cyclically spliced with its second data item to obtain (2,3,4,5,6,7,1; 2,3,4,5,6,7,1; ... 1,2,3,4,5,6,7), until all data items are traversed and the length of the spliced sequence is adjusted to reach the same length as the original time series. Therefore, the periodic information of the scheduling of various materials can be iterated into the feature sequence through cyclic splicing, and the characteristics of the scheduling cycle can be periodically strengthened so that it can be more accurately screened and identified through wavelet changes.
[0035] Therefore, the system can extract the time-frequency information of the demand for various types of materials by performing discrete wavelet transform on each expanded sequence, obtain the demand timing and demand frequency of various types of materials, and add the time-frequency information to the generated characteristic peak sequence through feature sequence extraction, so as to judge the weighted status of the time-frequency information of the demand for various types of materials by weighting the characteristic sequence corresponding to each truncation period by the peak sequence, and then find out the n characteristic sequences that meet the time-frequency requirements through the K-NN algorithm, and select the characteristic sequence with the largest correlation by calculating the Pearson correlation coefficient between the n characteristic sequences and the characteristic peak sequence, and then calculate the error distribution of the other n characteristic sequences based on the coefficient vector of the discrete wavelet transform corresponding to the characteristic sequence as a benchmark, and obtain the video distribution of material demand and its change pattern. Therefore, by fitting the error distribution of each characteristic sequence through the Gaussian mixture model, a prediction model that can be used to guide the expected value of the demand for various types of power materials in the future can be obtained based on the demand for various types of power materials in historical data. Based on this model, by bringing in existing inventory information and forecast values, we can obtain the demand for specific materials that the warehouse system will generate, thereby effectively adjusting the status of materials in the warehouse in a timely manner to facilitate the prediction of material inflows and outflows.
[0036] Considering that in some warehouses, the receiving area for materials and the picking area for materials are set up separately, therefore, the present application preferably sets the system to be respectively based on t i Always on c i The outbound and inbound demand of type power materials generates the outbound time series E(t i , c i ) and the storage time series I(ti , c i ), and truncate the in-and-out sequences respectively to obtain truncated out-and-out sequences E based on different truncation periods T T (t i , c i ) and truncated library sequence I T (t i , c i );
[0037] And thus the above-mentioned truncated outbound sequences F T (t i , c i ) and each truncated library sequence I T (t i , c i ) According to the above method, according to the type of power material c i The corresponding relationship sequence between the demand and time of this type of electric power materials is extracted, and each corresponding relationship sequence is expanded according to the truncation period T. The expanded outgoing and incoming sequences are subjected to discrete wavelet transform respectively, and the characteristic sequence extraction and fitting steps are performed on the transformed cargo input coefficient vector and each cargo output coefficient vector respectively, until the prediction model for the outgoing time series and the prediction model for the incoming time series are independently obtained.
[0038] Therefore, based on the real-time material status in the warehouse system, the application can iteratively calculate the dispatch quantity of each type of material with the smallest gap with the prediction model according to the prediction model of the outbound time series and the prediction model of the inbound time series.
[0039] According to the forecast model of the outbound time series, the independent iterative calculation for c i Type material out of warehouse time series E(t i , c i ) is scheduled, and the prediction model of the incoming time series is independently iterated to calculate the c i Type material storage time series I(t i , c i ) is obtained, and after obtaining the scheduling volume that makes the Pearson correlation coefficient the largest, the outbound material demand and the inbound material demand corresponding to the scheduling volume are calculated. Therefore, when the outbound quantity of a certain category of goods in the outbound material demand is greater than its inbound quantity and the current inventory of such materials in the warehouse, it is necessary to generate material demand warning information to trigger the warehouse management party to prepare such materials in advance, so that the outbound can be completed in time when a large number of pick-up demands emerge, avoiding long waiting for the pick-up party.
[0040] Specifically, in the process of calculating the scheduling quantity required for warehouse throughput for the inbound port and the outbound port separately, the application can specifically add the scheduling quantity to the real-time material sequence in the warehouse system to calculate its optimal value according to the following steps:
[0041] When you need to calculate the c i When the dispatch quantity required for the outbound delivery of a certain type of material is equal to the outbound delivery time series E(t i , c i ) plus the tth i+1 The outbound demand at the time is recorded as E(t i , c i ) and the dispatching quantity x ci The sum of the two, and then the sequence is divided into the power material type c i The corresponding relationship sequence between the inventory of each type of power material and time is extracted, and each corresponding relationship sequence is expanded according to the truncation period T. The expanded sequences are subjected to discrete wavelet transform respectively, and the coefficient vector obtained by the transformation is subjected to feature sequence extraction. Then the K-NN algorithm is called to find the n feature sequences closest to the prediction model, and then the Pearson correlation coefficients between the n feature sequences and the prediction model are calculated respectively, and the dispatching quantity x of this type of material is iteratively adjusted. ci Until the dispatching amount that maximizes the Pearson correlation coefficient is obtained;
[0042] When you need to calculate the c i When the scheduling quantity of a type of material is required for storage, the storage time series I(t i , c i ) plus the tth i+1 The storage demand at the time is recorded as I(t i , c i ) and the dispatching quantity x ci Then, the sequence is divided into the power material type c i The corresponding relationship sequence between the inventory of each type of power material and time is extracted, and each corresponding relationship sequence is expanded according to the truncation period T. The expanded sequences are subjected to discrete wavelet transform respectively, and the coefficient vector obtained by the transformation is subjected to feature sequence extraction. Then the K-NN algorithm is called to find the n feature sequences closest to the prediction model, and then the Pearson correlation coefficients between the n feature sequences and the prediction model are calculated respectively, and the dispatching quantity x of this type of material is iteratively adjusted. ci Until the scheduling amount that maximizes the Pearson correlation coefficient is obtained.
[0043] The above calculation of the scheduling quantity can be automatically calculated on a weekly or monthly basis according to the scheduling cycle of each type of material, or the system can be set to trigger instructions so that the system, at least after each outbound task, triggers the iterative calculation based on its current real-time material status and outbound and inbound demand information to obtain the upcoming scheduling quantity, and triggers the sending of early warning information to the coordination terminal when the inventory plus the preset inbound quantity cannot meet the outbound demand based on the scheduling quantity and the real-time inventory status in the warehouse, so that the coordination terminal can promptly transfer goods to other warehouses or make purchases in time to fill potential inventory gaps.
[0044] Therefore, through the iterative scheduling of the present application, the warehouse can calculate the throughput demand faced by the warehouse in real time according to its internal inventory status and historical information, so as to optimize the inventory distribution within the warehouse, make up for the outbound demand in time, avoid congestion of goods when entering the warehouse, and at the same time, avoid unnecessary delays and waiting due to incomplete goods when a large amount of materials are shipped out of the warehouse.
[0045] The above is only an implementation method of the present application, and its description is relatively specific and detailed, but it cannot be understood as limiting the scope of the patent of the present application. It should be pointed out that for ordinary technicians in this field, several variations and improvements can be made without departing from the concept of the present application, which all belong to the protection scope of the present application.
Claims
1. A time-section-based comprehensive warehouse scheduling prediction system for power materials, characterized in that: include: According to t i Always on c i The demand for electricity materials of different types generates the corresponding time series (t i , c i ), truncating the time series (t i , c i ), obtain the truncated sequence T(t based on different truncation periods T i , c i ); For each of the above truncated sequences T(t i , c i ) According to the type of power materials c i Extract the corresponding relationship sequence between the demand and time of each type of power material, expand each corresponding relationship sequence according to the truncation period T, perform discrete wavelet transform on each expanded sequence, and extract the characteristic sequence from the coefficient vector obtained by the transformation; Accumulate the extracted characteristic sequences to generate a characteristic peak sequence, and call the K-NN algorithm to find n characteristic sequences that are closest to the characteristic peak sequence; Calculate the Pearson correlation coefficients between the n feature sequences and the feature peak sequence respectively, then select the feature sequence with the greatest correlation according to the Pearson correlation coefficient, and calculate the error distribution of the n feature sequences based on the coefficient vector of the discrete wavelet transform corresponding to the feature sequence as a benchmark; The Gaussian mixture model is used to fit the error distribution of each feature sequence to obtain the prediction model; Based on the real-time material status in the warehouse system, according to the prediction model, the dispatch quantity of each type of material with the smallest gap with the prediction model is iteratively calculated.
2. The time-section-based comprehensive warehouse scheduling prediction system for electric power materials according to claim 1 is characterized in that: The truncation period T includes: every 7 days, every month, every quarter or every half year, and the starting points of the truncation periods are sequentially connected without crossing or overlapping.
3. The time-section-based comprehensive warehouse scheduling prediction system for electric power materials according to claim 2 is characterized in that: The step of extending each corresponding relationship sequence according to the truncation period T includes: cyclically splicing the corresponding relationship sequence according to the truncation period T until the length of the spliced sequence reaches the same length as the original time series.
4. The time-section-based comprehensive warehouse scheduling prediction system for electric power materials according to claim 2 is characterized in that: The step of expanding each corresponding relationship sequence according to the truncation period T also includes: traversing the corresponding relationship sequence, and sequentially cyclically splicing the corresponding relationship sequence with each item in the sequence as a starting point until the length of the spliced sequence reaches the same length as the original time series.
5. The time-section-based comprehensive warehouse scheduling prediction system for electric power materials according to claim 1, characterized in that: Based on the real-time material status in the warehouse system, the specific steps of iteratively calculating the dispatch quantity of each type of material with the smallest gap with the forecast model according to the forecast model include: Let c i The dispatch quantities of the types of materials are x ci , add the dispatch quantity to the real-time material sequence in the warehouse system, and sort by power material type c i The corresponding relationship sequences between the inventory of various types of power materials and time are extracted, and each corresponding relationship sequence is expanded according to the truncation period T. The expanded sequences are subjected to discrete wavelet transform respectively, and the coefficient vectors obtained by the transformation are subjected to feature sequence extraction; Calling K-NN algorithm to find n feature sequences that are closest to the prediction model; Calculate the Pearson correlation coefficient between the n feature sequences and the prediction model respectively, and iteratively adjust the scheduling quantity x of each type of material c i until the scheduling amount that maximizes the Pearson correlation coefficient is obtained.
6. The time-section-based comprehensive warehouse scheduling prediction system for electric power materials according to claim 1 is characterized in that: The system is based on t i Always on c i The outbound and inbound demand of type power materials generates the outbound time series E(t i , c i ) and the storage time series I(t i , c i ), and truncate them respectively to obtain the truncated outbound sequence E based on different truncation periods T T (t i , c i ) and truncated library sequence I T (t i , c i ); Then, for each of the above truncated outbound sequences E T (t i , c i ) and each truncated library sequence I T (t i , c i ) According to the type of power materials c i The corresponding relationship sequence between the demand and time of this type of electric power materials is extracted, and each corresponding relationship sequence is expanded according to the truncation period T. Discrete wavelet transform is performed on each expanded sequence, and the characteristic sequence extraction and fitting steps are performed on the coefficient vector obtained by the transformation, until the prediction model for the outbound time series and the prediction model for the inbound time series are obtained respectively.
7. The time-section-based comprehensive warehouse scheduling prediction system for electric power materials according to claim 6 is characterized in that: Based on the real-time material status in the warehouse system, the specific steps of iteratively calculating the dispatch quantity of each type of material with the smallest gap with the forecast model according to the forecast model include: According to the forecast model of the outbound time series, the independent iterative calculation for c i Type material out of warehouse time series E(t i , c i ) is scheduled, and the prediction model of the incoming time series is independently iterated to calculate the c i Type material storage time series I(t i , c i ) is obtained, and after the scheduling amount that makes the Pearson correlation coefficient the largest is obtained, the material demand corresponding to the scheduling amount is calculated to generate material demand warning information.
8. The time-section-based comprehensive warehouse scheduling prediction system for electric power materials according to claims 1-6, characterized in that: In the process of calculating the scheduling quantity, the specific steps of adding the scheduling quantity to the real-time material sequence in the warehouse system include: In the outbound time series E(t i , c i ) plus the tth i+1 The outbound demand at the moment is E(t i , c i ) and the sum of the dispatching amount; In the current storage time series I(t i , c i ) plus the tth i+1 The storage demand at time is I(t i , c i ) and the dispatching amount.
9. The time-section-based comprehensive warehouse scheduling prediction system for electric power materials according to claims 1-8, characterized in that: The system triggers iterative calculation of the scheduling quantity and demand warning information according to the current real-time material status and the outbound and inbound demand information at least each time the outbound task is completed.