Real-time management and control method and system based on intelligent environmental sanitation, medium and program product
Through real-time management and control methods based on smart sanitation, satellite maps and various technical means are used to achieve comprehensive monitoring of the dirty soil repair process, solving the problem of incomplete traditional monitoring, and improving the safety and supervision efficiency of the dirty soil repair process .
Patent Information
- Application Number
- CN202411065736.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-05
- Publication Date
- 2024-11-29
AI Technical Summary
During the process of soil remediation, traditional fixed-point video surveillance cannot fully cover the construction site, resulting in incomplete supervision and control on the construction site, which may reduce the safety of the soil remediation process.
Using a real-time management and control method based on smart sanitation, the preset range of the repaired plot is determined through satellite maps, and real-time monitoring of whether the construction process meets the preset standards, including noise sensors, surveillance videos, vehicle pass permits and driver identity identification, etc. Technical means to achieve all-round monitoring and strict control.
It improves the comprehensiveness of supervision and control at the construction site, ensures that the construction process is carried out on an environmentally friendly, safe and compliant track, prevents illegal transportation and pollution, and improves the safety and supervision efficiency of the soil restoration process.
Smart Images

Figure CN119047822A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of environmental sanitation control, and in particular to a real-time control method, system, medium and program product based on smart environmental sanitation. Background Art
[0002] There are many links involved in soil remediation, including sampling and testing, soil excavation and soil transfer, etc. In these links, improper operation may pollute other soils, which may seriously affect people's health.
[0003] Therefore, when implementing the above steps, the entire implementation process is usually monitored. The surveillance video shot by the implementation is transmitted to the monitoring terminal through the monitoring equipment at the implementation site, and then monitored and reviewed by the staff at the monitoring terminal. Once any illegal operation is found, an alarm will be immediately issued to the on-site staff and the implementation will be terminated.
[0004] However, there are many operations involved in the sampling and testing, soil excavation and soil transfer processes, and each operation may correspond to different operating specifications. Usually, on-site monitoring equipment will monitor a fixed point and will not adjust the monitoring range according to the progress of on-site implementation. The staff at the monitoring terminal may miss certain operations, resulting in a reduction in the comprehensiveness of the supervision and control of the construction site, which may in turn reduce the safety of the soil remediation process. Summary of the invention
[0005] The present application provides a real-time management and control method, system, medium and program product based on smart sanitation, which is used to improve the comprehensiveness of construction site supervision and control through real-time management and control of the entire process of contaminated soil remediation, thereby improving the safety of the contaminated soil remediation process.
[0006] In the first aspect, the present application provides a real-time control method based on smart sanitation, in which, when it is determined based on a satellite map that there are preset sensitive targets within a preset range of a restoration plot, several construction areas of the restoration plot are obtained, and the preset sensitive targets are targets in a preset table; Determine whether the construction process meets the preset standards based on the surveillance videos of all the construction areas, where the preset standards are pre-set construction rules; If the construction process does not meet the preset standards, a warning message will be sent to the on-site supervision terminal of the restoration site; When confirming receipt of the transport request sent by the on-site supervision terminal, the monitoring device is controlled to scan the transport vehicle to obtain the license plate information and cockpit information, the cockpit information includes the current driver information and escort personnel information; Determine whether the transport vehicle has a pass based on the license plate information; If there is no pass, a warning message is sent to the on-site supervision terminal; If there is a pass, the bound driver information is determined based on the license plate information to see if it is the same as the current driver information; If they are not the same, a warning message is sent to the on-site supervision terminal; If they are the same, determine whether the escort personnel information is in the preset list; If it is in the preset list, a passage permission message will be sent to the on-site supervision terminal.
[0007] By adopting the above technical solution, when there are preset sensitive targets within the preset range of the restoration plot, the construction process is monitored in real time to see if it meets the preset standards, which can effectively prevent the construction process from causing adverse effects on sensitive targets. At the same time, strict control is carried out on the transport vehicles, requiring the transport vehicles to have a pass, the driver information is consistent with the binding information, and the escort personnel are on the preset list before they are allowed to pass. This can prevent illegal transportation and illegal dumping from the source and ensure the safety of the restoration plot and the surrounding environment. When it is detected that the construction process does not meet the preset standards, the transport vehicle does not have a pass, the driver information is inconsistent, or the escort personnel are not on the preset list, a warning message will be sent to the on-site supervision terminal. This real-time information feedback mechanism allows on-site supervisors to promptly understand the abnormal conditions during construction and transportation, and take corresponding disposal measures, thereby improving the timeliness and accuracy of supervision. At the same time, the on-site supervision terminal also assumes the responsibility of interacting with the system, such as sending transportation requests, receiving permission information, etc., realizing human-machine collaboration, and improving the efficiency and operability of management and control. Through real-time control of the entire process of contaminated soil remediation, the comprehensiveness of supervision and control of the construction site is improved, thereby improving the safety of the contaminated soil remediation process.
[0008] In combination with some embodiments of the first aspect, in some embodiments, determining whether the construction process meets the preset standard based on the monitoring videos of all the construction areas specifically includes: The real-time noise of the restoration plot is obtained through the noise sensor, and it is determined whether the real-time noise is greater than the preset noise threshold; When the current time is determined to be a preset time point, the monitoring equipment is adjusted to take monitoring pictures of all the construction areas; Determine whether all construction areas are covered with waterproof tarpaulins based on all surveillance images; Determine whether there is a sprinkler truck working in the restoration area based on all surveillance images; Determine whether the cargo holds of all transport vehicles in the restoration area are covered with tarpaulins based on all surveillance images; Determine whether all vehicles are within the preset activity range based on all surveillance images; The preset standards are that the real-time noise is no greater than the preset noise threshold, all construction areas are covered with waterproof tarpaulins, there are working sprinkler trucks in the repair site, the cargo holds of all transport vehicles in the repair site are covered with tarpaulins, and all vehicles are within the preset activity range.
[0009] By adopting the above technical solutions, through noise sensors, monitoring equipment and other technical means, starting from noise, coverage, dust prevention, transportation and other aspects, the construction process is fully monitored and judged to ensure that the construction behavior is always carried out on an environmentally friendly, safe and compliant track. First, real-time monitoring of construction noise and comparison with the preset threshold can effectively control construction noise and prevent nuisance and noise pollution. Secondly, by taking photos at the preset time point to judge key indicators such as waterproof tarpaulin coverage, sprinkler operation, vehicle coverage and activity range, the construction party can be urged to implement various dust prevention and pollution prevention measures to minimize the generation and spread of construction dust and pollutants. Clear preset standards are set, including multiple specific requirements such as noise, coverage, dust prevention, transportation, etc., which provide a quantifiable and operational basis for the judgment of the construction process, and can pre-control the checkpoints to promptly discover and correct non-compliant behaviors. The comprehensiveness of supervision and control of the construction site is improved, thereby improving the safety of the contaminated soil remediation process.
[0010] In combination with some embodiments of the first aspect, in some embodiments, after sending the passage permission information to the on-site supervision terminal if the person is in the preset list, the method further includes: Obtain the recycling location information of the transport destination; Determine a number of transportation routes based on the location information of the restoration plot and the recycling location information; Delete the transport routes whose distance from the preset sensitive target is not greater than the preset safety distance from all the transport routes, and obtain several safe transport routes; The safest transportation route with the shortest distance is determined as the target transportation route, and the target transportation route is sent to the work terminal bound to the transportation vehicle.
[0011] By adopting the above technical solution, the location information of the transport destination is obtained, and several alternative transport routes are determined in combination with the location of the repair plot. This global path planning can find all possible transport routes between the starting point and the end point, providing a complete alternative plan for subsequent screening. Secondly, based on the preset sensitive targets and safety distances, all alternative routes are filtered, and high-risk routes that are too close to sensitive targets are eliminated, and the transport channel and environmentally sensitive areas are spatially isolated. After completing the safety screening, the method also selects the shortest route from several safe routes as the final transportation plan. On the one hand, the shortest route can minimize the transportation distance, reduce energy consumption and exhaust emissions during transportation, and practice the concept of green environmental protection. On the other hand, the shortest route also means the least time spent on the road, which is of great benefit to shortening the construction period and improving construction efficiency. Sending the optimal route obtained by screening to the work terminal bound to the vehicle can achieve human-vehicle collaboration and ensure the implementation of the transportation plan.
[0012] In combination with some embodiments of the first aspect, in some embodiments, after sending the passage permission information to the on-site supervision terminal if the person is in the preset list, the method further includes: When it is determined that the transport vehicle has left the restoration site, obtain the real-time location information and real-time speed of the transport vehicle; Determine whether the real-time location information is on the target transportation route; If it is not on the target transportation route, a warning message will be sent to the work terminal and the on-site supervision terminal respectively; If it is on the target transport route, determine whether the real-time speed is within the preset speed range; If it is not within the preset speed range, a warning message will be sent to the working terminal and the on-site supervision terminal respectively.
[0013] By adopting the above technical solution, the position and speed information of the vehicle can be obtained in real time after the transport vehicle leaves the repair site. On the one hand, the position information can reflect whether the vehicle deviates from the established route, while the speed information can reveal whether the vehicle has abnormal driving behaviors such as speeding or underspeed. Taking position and speed as two key indicators to characterize vehicle behavior can comprehensively characterize the dynamics of the vehicle during the transportation process and lay a data foundation for the identification of abnormal behavior. Secondly, the method compares the real-time position with the preset route and the real-time speed with the preset interval. Once it is found that the vehicle deviates from the route or the speed exceeds the standard, a warning will be immediately sent to the on-board work terminal and the on-site supervision terminal. This real-time early warning mode has significant advantages: the early warning to the on-board terminal can promptly remind the driver to correct the deviation and avoid potential accidents; the early warning to the supervision terminal can help the supervision department to grasp the dynamics of the front line in real time and respond and deal with it quickly when necessary. The concurrent push of two-way early warning information forms a closed-loop interaction between the vehicle end and the management end, which greatly improves the supervision intensity and response speed. At the same time, the preset standard route and speed interval have also become behavioral norms that constrain drivers to abide by the rules, making safe driving a basic requirement for construction transportation.
[0014] In combination with some embodiments of the first aspect, in some embodiments, obtaining the real-time noise of the restoration plot through a noise sensor, and determining whether the real-time noise is greater than a preset noise threshold, specifically includes: When the current time is in the first time interval, determining whether the real-time noise is greater than a preset first noise threshold; When the current moment is in the second time interval, it is determined whether the real-time noise is greater than a preset second noise threshold, where the preset noise threshold includes a preset first noise threshold and a preset second noise threshold.
[0015] By adopting the above technical solution, the real-time noise of the repaired plot is obtained through the noise sensor, and it is judged whether the real-time noise exceeds the corresponding preset noise threshold in different time intervals. This approach fully considers the construction noise control requirements in different time periods and has the advantage of refined management. At the construction site, noise nuisance is often one of the main reasons for complaints and social conflicts. In other time periods, the preset noise threshold can be moderately relaxed, which not only ensures the progress of construction, but also reduces unnecessary alarms and interventions. This measure makes full use of the Internet of Things sensing and real-time data analysis technology to achieve time-based, customizable and precise control of construction noise, and timely warning before the noise exceeds the standard to minimize the impact of noise.
[0016] In combination with some embodiments of the first aspect, in some embodiments, upon confirming receipt of a transport request sent by an on-site supervision terminal, controlling the monitoring device to scan the transport vehicle to obtain license plate information and cockpit information specifically includes: Control monitoring equipment to scan the transport vehicle and obtain a scanned image; Recognize the portrait information in the scanned image to obtain the driver's facial image and the escort's facial image, wherein the driver's facial image is the facial image corresponding to the person in the driver's seat, and the escort's facial image is the facial image corresponding to the person in the co-pilot's seat; Match the driver's facial image and the escort's facial image in a preset database to obtain the current driver's information and the escort's information; Identify the scanned image and get the license plate information.
[0017] By adopting the above technical solution, an automated identification method is developed to obtain license plate information and cockpit information by scanning transport vehicles through monitoring equipment. In the construction of repair plots, a large number of muck transport vehicles are often involved in the entry and exit. The manual investigation is a huge workload and easy to fatigue, and it is difficult to ensure accuracy and real-time performance. By using image recognition algorithms, the characterization information of vehicles can be automatically collected and analyzed when they pass through the gate, including license plate numbers, identity characteristics of drivers and escorts, etc., to form a structured electronic record. By comparing with the preset database, the system can automatically determine whether vehicles and personnel have the qualifications to pass. Unauthorized objects will be denied passage and trigger an alarm, which greatly avoids the risk of illegal transportation. At the same time, this method can also accurately record the transportation time, route, load and other data of each vehicle, providing a traceable and verifiable electronic ledger for the construction party and the supervisor, effectively curbing illegal behaviors such as fraud and overloading.
[0018] In combination with some embodiments of the first aspect, in some embodiments, all persons in the preset list hold corresponding professional qualification certificates and relevant skill certificates.
[0019] By adopting the above technical solution, it is stipulated that the escorts of transport vehicles must hold relevant professional qualifications and skills certificates, and the preset list reflects the strict access requirements for the sanitation transport team. It ensures that all escorts must undergo systematic pre-job training, obtain escort, loader and other qualification certificates, and master basic skills such as classified collection of sanitation waste and safe operation, thus ensuring the standardization and reliability of transportation operations from the source.
[0020] In the second aspect, an embodiment of the present application provides a real-time management and control system based on smart sanitation, the system comprising: one or more processors and a memory; the memory is coupled to one or more processors, the memory is used to store computer program code, the computer program code includes computer instructions, and one or more processors call computer instructions to enable the system to execute the method described in the first aspect and any possible implementation method of the first aspect.
[0021] In a third aspect, an embodiment of the present application provides a computer-readable storage medium, comprising instructions, which, when executed on a system, causes the system to execute the method described in the first aspect and any possible implementation of the first aspect.
[0022] In a fourth aspect, an embodiment of the present application provides a computer program product, characterized in that when the computer program product runs on a system, the system executes the method described in any possible implementation manner in the first aspect.
[0023] One or more technical solutions provided in the embodiments of the present application have at least the following technical effects or advantages: 1. This application provides a real-time control method based on smart sanitation. When there are preset sensitive targets within the preset range of the repair plot, the construction process is monitored in real time to see if it meets the preset standards, which can effectively prevent the construction process from causing adverse effects on sensitive targets. At the same time, strict control is exercised over transport vehicles, requiring transport vehicles to have a pass, the driver information to be consistent with the binding information, and the escort personnel to be in the preset list before they are allowed to pass. This can prevent illegal transportation and illegal dumping from the source and ensure the safety of the repair plot and the surrounding environment. When it is detected that the construction process does not meet the preset standards, the transport vehicle does not have a pass, the driver information is inconsistent, or the escort personnel are not in the preset list, a warning message will be sent to the on-site supervision terminal. This real-time information feedback mechanism allows on-site supervisors to promptly understand abnormal situations during construction and transportation, and take corresponding disposal measures, thereby improving the timeliness and accuracy of supervision. At the same time, the on-site supervision terminal also assumes the responsibility of interacting with the system, such as sending transportation requests, receiving information allowing passage, etc., realizing human-machine collaboration and improving the efficiency and operability of control. Through real-time control of the entire process of contaminated soil remediation, the comprehensiveness of construction site supervision and control is improved, thereby improving the safety of the contaminated soil remediation process.
[0024] 2. This application provides a real-time control method based on smart sanitation. Through noise sensors, monitoring equipment and other technical means, the construction process is monitored and judged from multiple aspects such as noise, coverage, dust prevention, and transportation to ensure that the construction behavior is always on an environmentally friendly, safe, and compliant track. First, real-time monitoring of construction noise and comparison with preset thresholds can effectively control construction noise and prevent nuisance and noise pollution. Secondly, by taking photos at preset time points to judge key indicators such as waterproof tarpaulin coverage, sprinkler operation, vehicle coverage, and activity range, the construction party can be urged to implement various dust prevention and pollution prevention measures to minimize the generation and spread of construction dust and pollutants. Clear preset standards are set, including multiple specific requirements such as noise, coverage, dust prevention, and transportation, which provide a quantifiable and operational basis for the judgment of the construction process, and can pre-control the checkpoints to promptly discover and correct non-compliant behaviors. The comprehensiveness of supervision and control of the construction site is improved, thereby improving the safety of the contaminated soil remediation process.
[0025] 3. This application provides a real-time control method based on smart sanitation. After the transport vehicle leaves the repair site, the location and speed information of the vehicle is obtained in real time. On the one hand, the location information can reflect whether the vehicle deviates from the established route, while the speed information can reveal whether the vehicle has abnormal driving behaviors such as speeding and low speed. Taking the position and speed as two key indicators for characterizing vehicle behavior can comprehensively characterize the dynamics of the vehicle during the transportation process and lay a data foundation for the identification of abnormal behavior. Secondly, the method compares the real-time position with the preset route and the real-time speed with the preset interval. Once it is found that the vehicle deviates from the route or the speed exceeds the standard, a warning will be immediately sent to the on-board work terminal and the on-site supervision terminal. This real-time early warning mode has significant advantages: the early warning of the on-board terminal can promptly remind the driver to correct the deviation and avoid potential accidents; the early warning of the supervision terminal can help the supervision department to grasp the dynamics of the front line in real time, and respond and deal with it quickly when necessary. The concurrent push of two-way early warning information forms a closed-loop interaction between the vehicle end and the management end, which greatly improves the supervision intensity and response speed. At the same time, the preset standard route and speed range have also become behavioral norms that constrain drivers to abide by the rules, making safe driving a basic requirement for construction transportation. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 It is a flow chart of a real-time control method based on smart sanitation in an embodiment of the present application.
[0027] Figure 2 It is another flow chart of a real-time control method based on smart sanitation in an embodiment of the present application.
[0028] Figure 3It is a schematic diagram of the physical device structure of a real-time management and control system based on smart sanitation provided in an embodiment of the present application. DETAILED DESCRIPTION
[0029] The terms used in the following embodiments of the present application are only for the purpose of describing specific embodiments, and are not intended to be used as limitations to the present application. As used in the specification and appended claims of the present application, the singular expressions "one", "a kind of", "said", "above", "the" and "this" are intended to also include plural expressions, unless there is a clear indication to the contrary in the context. It should also be understood that the term "and / or" used in the present application refers to any or all possible combinations comprising one or more listed items.
[0030] In the following, the terms "first" and "second" are used for descriptive purposes only and are not to be understood as suggesting or implying relative importance or implicitly indicating the number of the indicated technical features. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features, and in the description of the embodiments of the present application, unless otherwise specified, "plurality" means two or more.
[0031] An application scenario of an embodiment of the present application is described below: Carrying out contaminated soil remediation has important and urgent practical significance for improving environmental quality and safeguarding the national economy and people's livelihood.
[0032] However, soil remediation is a complex system project, involving many links such as site investigation, risk assessment, treatment plan selection, engineering construction, and remediation acceptance. Among them, the construction links such as sampling, testing, excavation and transportation of contaminated soil face many risks and challenges. Improper operation can easily cause secondary pollution, and toxic and harmful substances such as heavy metals and organic pollutants will be spilled and leaked, and the pollution range will spread, endangering the surrounding environment and residents' health.
[0033] In order to ensure the environmental safety and standardized operation of the entire soil remediation process, it is crucial to implement process supervision and control. By deploying intelligent equipment such as video surveillance and wireless sensors on site, real-time collection of construction data is sent back to the supervision platform, so that supervisors can promptly discover illegal operations, remotely warn and command. Once an abnormal situation occurs, the platform can automatically identify and alarm, and the on-site person in charge can quickly deal with it to avoid the problem from escalating.
[0034] However, there are still many deficiencies in the current supervision of contaminated soil remediation. Traditional fixed-point video surveillance does not cover everything and cannot cope with the dynamic changes at the construction site. The operating procedures and control priorities of different links are different, and the implementation standards are not unified. There are information barriers between on-site and remote sites, and command and dispatch are not smooth. The data of the supervision process is scattered and fragmented, and there is a lack of global analysis and optimization. All these problems restrict the scientificity, accuracy and effectiveness of soil remediation supervision.
[0035] In order to solve the above technical problems, this application provides a real-time control method, system, medium and program product based on smart sanitation, which is used to improve the comprehensiveness of construction site supervision and control through real-time control of the entire process of soil remediation, thereby improving the safety of the soil remediation process. Figure 1 , a real-time control method based on smart sanitation in an embodiment of the present application is described: See also Figure 1 , which is a flow chart of a real-time control method based on smart sanitation in an embodiment of the present application.
[0036] S101, when it is determined according to the satellite map that there is a preset sensitive target within the preset range of the restoration plot, obtaining several construction areas of the restoration plot; When the system determines that there are preset sensitive targets within the preset range of the restoration plot based on the satellite map, it obtains several construction areas of the restoration plot. The preset sensitive targets are targets in the preset table, which includes residential areas, schools, hospitals, drinking water source protection areas, and public places. The system first determines the preset range of the restoration plot based on the satellite map, and determines whether there are preset sensitive targets within the range. The so-called preset sensitive targets refer to key protected objects defined in the preset table that may be affected by the contaminated soil remediation construction, such as residential areas, schools, hospitals, drinking water source protection areas, and public places.
[0037] Through spatial information technology, the system overlays and analyzes the geographic coordinates of the restoration site with the location of the preset sensitive targets to identify the spatial relationship between the two. Once it is found that the preset sensitive targets are distributed within the preset range of the restoration site, it means that the construction process may have a negative impact on the sensitive targets and key monitoring is required. After determining the existence of preset sensitive targets, the system further obtains several construction areas within the restoration site. Through the restoration construction plan design drawings, the spatial layout of the construction site can be clarified and divided into different construction areas such as temporary storage area for contaminated soil, contaminated soil excavation operation area, clean soil backfill area, restoration material storage area, slag transportation channel, and vehicle washing area.
[0038] Combined with high-resolution remote sensing images, the system can accurately depict the specific scope and geographical outline of each construction area. In the subsequent supervision process, each construction area can be focused on for differentiated and refined management and control. For example, a pollution remediation project for an abandoned plot of land at a chemical plant is adjacent to a residential community and a middle school. Based on Google Maps, the system superimposes the spatial position vectors of the boundaries of the chemical plant plot, the community, and the middle school, confirming that the community and the middle school are within a preset range of 1,000 meters of the plot and are preset sensitive targets.
[0039] Next, the system retrieves the CAD drawing of the site remediation construction plan, extracts the spatial geometric elements of key construction areas such as the contaminated soil temporary storage area, ex situ remediation area, stabilization and solidification treatment area, qualified soil backfill area, vehicle washing area, and environmental monitoring points, converts them into polygonal elements in the geographic information system, and constructs a vector layer of the full-element construction area, laying the foundation for full-process supervision.
[0040] S102, determining whether the construction process meets the preset standards based on the monitoring videos of all the construction areas; The system determines whether the construction process meets the preset standards based on the surveillance videos of all the construction areas. The preset standards are pre-set construction rules. Specifically: the real-time noise of the repaired plot is obtained through the noise sensor, and it is determined whether the real-time noise is greater than the preset noise threshold; When the current time is determined to be a preset time point, the monitoring equipment is adjusted to take monitoring pictures of all the construction areas; Determine whether all construction areas are covered with waterproof tarpaulins based on all surveillance images; Determine whether there is a sprinkler truck working in the restoration area based on all surveillance images; Determine whether the cargo holds of all transport vehicles in the restoration area are covered with tarpaulins based on all surveillance images; Determine whether all vehicles are within the preset activity range based on all surveillance images; The preset standards are that the real-time noise is no greater than the preset noise threshold, all construction areas are covered with waterproof tarpaulins, there are working sprinkler trucks in the repair site, the cargo holds of all transport vehicles in the repair site are covered with tarpaulins, and all vehicles are within the preset activity range.
[0041] The system uses surveillance videos from all construction areas to determine in real time whether the construction process meets the preset standards. The preset standards refer to the construction rules for contaminated soil remediation required by relevant national and local laws and regulations and industry specifications, covering construction noise control, dust pollution prevention and control, contaminated soil closed transportation, vehicle activity range control and other aspects.
[0042] In order to quantitatively evaluate the compliance of the construction process, the system uses the Internet of Things technology to deploy video surveillance, noise sensors and other intelligent sensing equipment in each construction area to dynamically collect on-site operation data. The sensor automatically collects noise values once a minute and uploads them to the management platform. The video surveillance equipment takes a high-definition picture every 10 minutes and transmits it back in real time through the 5G network.
[0043] The system compares the real-time noise data collected with the preset noise threshold (such as 70 decibels during the day and 50 decibels at night) to determine whether the noise exceeds the standard. Computer vision algorithms can also be used to intelligently analyze the returned video images to identify key indicators such as the coverage of each construction area (such as whether the waterproof tarpaulin coverage rate reaches 100%), the working conditions of the operating equipment (such as whether the sprinkler truck is in working condition), the status of the transport vehicle (such as whether the tarpaulin coverage rate of the transport vehicle cargo compartment is 100%), and the vehicle activity status (such as whether the vehicle stays within the designated driving route). Based on this, it can be judged whether the construction process meets the standards and specifications.
[0044] For example, the system detected a real-time noise level of 75 decibels in a construction area through noise sensors, which exceeded the 70-decibel threshold limit during the day and did not meet the standard. At the same time, video image analysis found that the dust net in the area was not fully covered, the cargo compartments of three transport trucks were exposed, and the sprinkler truck was not running, all of which were violations. In addition, a muck truck deviated from the established transport channel and privately traveled near the ecological protection area, which was a serious violation.
[0045] The system promptly summarizes the above problems into early warning reminders and pushes them to the on-site supervision terminal, requiring the construction party to make rectifications within a time limit. For example, if the noise exceeds the standard, it must be reduced to below the standard within 2 hours, if the dust screen is damaged, it must be repaired within 1 hour, the sprinkler truck must resume operation immediately, and the illegal muck truck must leave the ecological protection area within 1 hour. This real-time dynamic and refined management and control effectively avoids environmental safety risks during the construction process.
[0046] S103, sending a warning message to the on-site supervision terminal of the restoration site; If the construction process does not meet the preset standards, a warning message will be sent to the on-site supervision terminal of the repair site. The warning message is generated based on the actual problems found, and its specific content may be excessive noise, failure to perform watering, etc., which are not limited here.
[0047] S104, when confirming receipt of the transport request sent by the on-site supervision terminal, controlling the monitoring device to scan the transport vehicle to obtain the license plate information and cockpit information; When it is confirmed that the transportation request sent by the on-site supervision terminal is received, the control monitoring device is controlled to scan the transportation vehicle to obtain the license plate information and the cockpit information. The cockpit information includes the current driver information and the escort information. Specifically: the control monitoring device scans the transportation vehicle to obtain a scanned image; Identify the portrait information in the scanned image to obtain the driver's facial image and the escort's facial image. The driver's facial image is the facial image corresponding to the person in the driver's seat, and the escort's facial image is the facial image corresponding to the person in the co-driver's seat; Match the driver's facial image and the escort's facial image in the preset database to obtain the current driver information and the escort information; Identify the scanned image to obtain the license plate information.
[0048] In this step, after the on-site supervision terminal confirms the receipt of the transportation request, the system controls the monitoring device to scan the transportation vehicle to obtain the license plate information of the vehicle and the personnel information in the cockpit.
[0049] When the contaminated soil remediation construction reaches the stage where hazardous waste and contaminated soil need to be transported out of the site, the on-site construction person in charge will submit a transportation application to the system through the supervision terminal, informing the number of vehicles to be transported out and the estimated departure time. After the system receives the transportation request, it will automatically wake up the intelligent monitoring device at the construction site entrance and exit and enter the vehicle information collection state.
[0050] When the transportation vehicle approaches the exit checkpoint, the high-definition camera will automatically capture images of the vehicle head and the cab area. The system uses optical character recognition (OCR) technology to extract the license plate number in the image to obtain the unique identification information of the vehicle. At the same time, it also uses face detection and recognition algorithms to capture the face image behind the windshield of the cab and compare it with the preset driver and escort face databases to identify the identity information of the current driver and escort.
[0051] For example, the system obtains a high-definition image of a transport vehicle with a license plate number of "沪C12345" through exit capture. Through OCR extraction, the license plate number of the vehicle is obtained. Subsequently, the face recognition algorithm captures the face images of Zhang San in the driver's seat and Li Si in the co-driver's seat, matches them with the personnel database, and returns their ID numbers, professional qualification certificate numbers, contact information, violation records, etc.
[0052] These vehicle and personnel information can be used as the key basis for subsequent review and release. On the one hand, it ensures that the transportation vehicle holds a legal and valid road transportation permit to avoid unlicensed illegal transportation; on the other hand, it identifies whether the driver and escort are consistent with the recorded information to prevent acts such as impersonation and illegal shift replacement. Through closed-loop management and control, the process of transporting contaminated soil is standardized from the source to prevent environmental safety risks.
[0053] S105, judging whether the transport vehicle has a traffic permit according to the license plate information; In this step, the system determines whether the transport vehicle has a pass based on the license plate information obtained in S104. As special goods, hazardous waste and contaminated soil must be transported by a road transport business license issued by the relevant management department, which specifies the time period, route, destination, and other matters allowed. The system accesses the vehicle registration management database of the government department in charge, and uses the license plate number collected by S104 as the only search condition to query the road transport permit information of the vehicle. Once a matching license record is found, it means that the vehicle has been legally registered and is allowed to carry out contaminated soil transfer operations. If the corresponding license information cannot be found, it is considered that the vehicle has participated in the transfer without permission, which is an illegal act. The system will form a warning prompt to inform the on-site supervisor that the vehicle is suspected of unlicensed transportation and will not be released, and require the construction unit to interview the driver and deal with it in accordance with the law.
[0054] Assume that at a contaminated land restoration construction site undertaken by Company A, 2,000 cubic meters of heavily contaminated soil has accumulated and needs to be transported to a remote soil treatment center for disposal. The company registered four heavy-duty dump trucks in the system and obtained a transport permit.
[0055] When one of the dump trucks with license plate number Jin A98765 arrived at the site to load the soil, the intelligent monitoring equipment at the exit checkpoint automatically captured images of the front of the truck and the cab. The system extracted the license plate number through image recognition and then retrieved the registration information of the license plate from the license database.
[0056] The inquiry found that vehicle Jin A98765 holds a contaminated soil road transport license numbered "Contaminated Soil Transfer Permit No. 2023 001", which is valid from June 1 to December 31, 2023. The approved route is "X construction site-Y off-site treatment center", the operating hours are "8:30 to 17:30", the approved load capacity is "20 tons", and the driver and escort must be on duty at the same time.
[0057] This means that the transportation behavior of Jin A98765 is legal and compliant, and the system will push the release instruction to the supervision terminal, allowing it to leave the construction site and go to the designated off-site soil treatment center. However, if there is no license registration information for this vehicle, the system will prompt that it is suspected of illegal transportation without a license, and inform the supervisory personnel to conduct an inspection and interview, prohibiting the vehicle from loading contaminated soil until legal registration is completed.
[0058] S106, judging whether the bound driver information is the same as the current driver information according to the license plate information; If there is a pass, the system will determine whether the bound driver information is the same as the current driver information based on the license plate information. When applying for a road transport license, a transport company needs to provide detailed information on the vehicles it plans to use, including vehicle license plate, vehicle model, approved load capacity, vehicle photo, etc. It also needs to register the driver's ID card information, driver's license information, professional qualification certificate information, facial photo, etc. The regulatory authorities will then form record data that binds vehicles and personnel.
[0059] When the system queries the license information based on the license plate number collected by S104, it will simultaneously obtain the driver identity information bound to the license plate. Then, the identity information is compared with the current actual driver identity obtained by S104 through face recognition. If the two are completely consistent, it is considered that the driver meets the filing requirements stated in the license and is released.
[0060] If the comparison finds that the current driver is inconsistent with the registered driver, it is considered that there is a violation of the driver's unauthorized replacement. The system immediately pushes a warning message to remind the supervisor that the current driver is suspected of being "hanging on" or illegally taking over, and does not meet the traffic conditions. The transport company is required to make rectification within a time limit and restore the registered driver to work, otherwise the license will be revoked and the driver will be included in the list of dishonest persons.
[0061] S107, determining whether the escort personnel information is in the preset list; If they are the same, the system will determine whether the escort information is in the preset list. All personnel in the preset list hold corresponding professional qualification certificates and relevant skill certificates. Hazardous waste road transport drivers and escorts must obtain corresponding professional qualification certificates and work with them. Transport drivers and escorts are required to undergo professional hazardous waste loading and unloading, transportation, and emergency safety training.
[0062] After confirming that the current driver is consistent with the license registration information, this step will then determine whether the escort personnel belong to the preset qualification list. According to relevant laws and regulations, in addition to the driver, vehicles transporting hazardous waste and contaminated soil should also be equipped with full-time escort personnel who are responsible for loading and unloading, management and emergency disposal. These escort personnel must also undergo strict qualification review and training, and can only engage in escort work after obtaining a job certificate.
[0063] S108: Sending passage permission information to the on-site supervision terminal.
[0064] If it is in the preset list, the system sends a passage permission message to the on-site supervision terminal; if it is not in the preset list, step S103 is executed.
[0065] The above embodiments have the following beneficial effects: When there are preset sensitive targets within the preset range of the restoration site, real-time monitoring of whether the construction process meets the preset standards can effectively prevent the construction process from causing adverse effects on sensitive targets. At the same time, strict control of transport vehicles is carried out, requiring transport vehicles to have a pass, the driver information is consistent with the binding information, and the escort personnel are on the preset list before they are allowed to pass. This can prevent illegal transportation and illegal dumping from the source and ensure the safety of the restoration site and the surrounding environment. When it is detected that the construction process does not meet the preset standards, the transport vehicle does not have a pass, the driver information is inconsistent, or the escort personnel are not on the preset list, a warning message will be sent to the on-site supervision terminal. This real-time information feedback mechanism allows on-site supervisors to promptly understand abnormal situations during construction and transportation, and take corresponding disposal measures, thereby improving the timeliness and accuracy of supervision. At the same time, the on-site supervision terminal also assumes the responsibility of interacting with the system, such as sending transportation requests, receiving permission to pass information, etc., realizing human-machine collaboration and improving the efficiency and operability of management and control. Through real-time control of the entire process of contaminated soil remediation, the comprehensiveness of construction site supervision and control is improved, thereby improving the safety of the contaminated soil remediation process.
[0066] Through various technical means such as noise sensors and monitoring equipment, the construction process is monitored and judged from multiple aspects such as noise, coverage, dust prevention, and transportation to ensure that the construction behavior is always carried out on an environmentally friendly, safe, and compliant track. First, real-time monitoring of construction noise and comparison with preset thresholds can effectively control construction noise and prevent nuisance and noise pollution. Secondly, by taking photos at preset time points to judge key indicators such as waterproof tarpaulin coverage, sprinkler truck operation, vehicle coverage, and activity range, the construction party can be urged to implement various dust prevention and pollution prevention measures to minimize the generation and spread of construction dust and pollutants. Clear preset standards are set, including multiple specific requirements such as noise, coverage, dust prevention, and transportation, which provide a quantifiable and operational basis for the judgment of the construction process, and can pre-control the checkpoints to promptly discover and correct non-compliant behaviors. The comprehensiveness of supervision and control of the construction site is improved, thereby improving the safety of the contaminated soil remediation process.
[0067] An automated identification method that obtains license plate information and cockpit information by scanning transport vehicles with monitoring equipment. In the construction of repair plots, a large number of muck transport vehicles are often involved in the in and out, and manual investigation is a huge workload and prone to fatigue, making it difficult to ensure accuracy and real-time performance. By using image recognition algorithms, the characterization information of vehicles can be automatically collected and analyzed when they pass through the gate, including license plate numbers, identity characteristics of drivers and escorts, etc., to form a structured electronic record. By comparing with the preset database, the system can automatically determine whether vehicles and personnel have the qualifications to pass. Unauthorized objects will be denied passage and trigger an alarm, greatly avoiding the risk of illegal transportation. At the same time, this method can also accurately record the transportation time, route, and load of each vehicle, providing a traceable and verifiable electronic ledger for the construction party and the supervisor, effectively curbing illegal behaviors such as fraud and overloading.
[0068] It is stipulated that the escort personnel of transport vehicles must hold relevant professional qualification certificates and skill certificates, and the preset list reflects the strict access requirements for the sanitation transport team. It ensures that all escort personnel must undergo systematic pre-job training, obtain qualification certificates such as escort personnel and loaders, and master basic skills such as classified collection of sanitation waste and safe operation, thus ensuring the standardization and reliability of transportation operations from the source.
[0069] After the permission to pass information is sent to the on-site supervision terminal in step S108 of the above embodiment, the transport vehicle will carry out the transport task. Since the transported soil may cause pollution to the area along the road, it is necessary to plan a route away from the preset sensitive target. Figure 2 , describe how to plan the transportation route: See also Figure 2 , is another flow chart of a real-time control method based on smart sanitation in an embodiment of the present application.
[0070] S201, obtaining the recycling location information of the transport destination; After allowing the transport vehicles to pass, the system needs to further obtain the location information of the transport destination, that is, the specific location coordinates of the waste soil recovery and treatment site. Generally, the site selection of waste soil recovery sites needs to comprehensively consider environmental capacity, transportation convenience, land use planning and other factors, and try to stay away from densely populated areas and ecologically sensitive areas. The system can obtain recovery location information in a variety of ways, such as directly retrieving it from the database of the sanitation management department, connecting with the information system of the recovery site, and uploading the destination coordinates from the vehicle-mounted positioning device.
[0071] Assume that the destination of this transportation of contaminated soil is a designated recycling site on the outskirts of the city, which is located at 120°12'34" east longitude and 30°56'78" north latitude. The system successfully obtained this geographic coordinate information by connecting with the management system of the recycling site, providing the end point parameters for the planning of subsequent transportation routes. In the process of obtaining the end point location information, the system can also synchronously obtain dynamic data such as the recycling site's contaminated soil receiving capacity, remaining storage capacity, and operating hours, which is used to grasp the real-time status of the recycling site. If necessary, the contaminated soil can be deployed to other alternative recycling points. In addition, the system should also have the ability to standardize the parsing of location information, and be able to uniformly convert location expressions in different formats and different coordinate systems into standard longitude and latitude coordinates to facilitate subsequent path calculations.
[0072] S202, determining a number of transportation routes according to the location information of the restoration plot and the recycling location information; After mastering the location information of the starting point (i.e., the remediation site) and the end point (i.e., the recycling site) of the soil transportation, the system needs to plan several alternative transportation routes. Generally speaking, there are multiple roads to choose from between the starting point and the end point, and what the system needs to do is to find all these alternatives. Commonly used path planning algorithms include Dijkstra algorithm, A* algorithm, Floyd algorithm, etc. These algorithms can search for several paths connecting the starting point and the end point in the road network topology. At the same time, path planning must also consider the traffic conditions of the road, such as whether trucks are allowed to pass, whether there are vehicle height and weight restrictions, whether there is traffic control, etc.
[0073] Still taking the above-mentioned repair plot and recycling yard as an example, assume that the system has initially found three alternative routes by analyzing the road network: Route 1: Industrial Avenue - Outer Ring Expressway - Recycling Yard Lane, 25 kilometers in total; Route 2: Xinhua Road - Guangming Road - Zhenxing Road - Recycling yard dedicated lane, a total of 28 kilometers, passing through schools, hospitals and other sensitive areas; Route 3: Industrial Avenue - Qingshan Road - Outer Ring Expressway - Recycling Yard Lane, a total of 26 kilometers, passing through residential areas.
[0074] S203, deleting the transport routes whose distance from the preset sensitive target is not greater than the preset safety distance from all the transport routes, to obtain several safe transport routes; After generating several alternative transport routes, the system needs to evaluate the environmental risks of each route and eliminate those routes that are too close to sensitive targets, so as to obtain several safe transport routes. The so-called sensitive targets refer to areas or places that are vulnerable to pollution hazards, such as schools, hospitals, residential areas, drinking water sources, nature reserves, etc. The system generally pre-stores the location information of these sensitive targets in the database and sets a safety distance threshold. When screening the paths, the system will calculate the closest distance between each alternative route and all sensitive targets one by one, and those routes with distances less than the safety threshold will be considered high-risk routes and deleted.
[0075] For the above three alternative routes, assuming that the system preset safety distance is 500 meters, through spatial distance analysis, it is found that: The closest sensitive target on route 1 is a reservoir, with a minimum distance of 1,000 meters, which meets the safety distance requirement; The closest sensitive target on route 2 is a middle school, and the closest distance is only 100 meters, which is less than the safety distance threshold; The nearest sensitive target on Route 3 is a residential area, with the closest distance being 800 meters, which meets the safety distance requirement.
[0076] Therefore, the system removes Route 2 from the candidate set, leaving Route 1 and Route 3 as safe transportation routes. In practical applications, the setting of the safety distance threshold needs to comprehensively consider the physical and chemical properties of pollutants, the fragility of environmental factors, emergency response capabilities, and other aspects, in order to maximize the safety of sensitive targets while avoiding excessive restrictions that affect normal transportation. In addition, the system should also leave a certain margin to cope with the increase in the scope of pollution diffusion in unexpected situations such as bad weather.
[0077] S204: Determine the safest transportation route with the shortest distance as the target transportation route, and send the target transportation route to the work terminal bound to the transportation vehicle.
[0078] After obtaining several safe transportation routes, the system needs to select the best route as the target transportation route for this transportation task. Usually, the shortest distance is used as the optimization criterion, because a shorter distance means less time cost, lower fuel consumption and less environmental impact. Of course, the system can also set other optimization rules according to actual needs, such as selecting the best road conditions, the lowest fees, the most convenient supply along the way, etc.
[0079] For the above-selected routes 1 and 3, the system calculates that their distances are 25 kilometers and 26 kilometers respectively. Obviously, the distance of route 1 is shorter, so the system determines that route 1 is the target route for this transportation. Next, the system sends the detailed information of the route (such as the name of the road passing through, the direction of travel, the estimated mileage and time, etc.) to the work terminal bound to the transport vehicle (usually the mobile phone or vehicle-mounted device carried by the driver), so that the driver can obtain route navigation in time and carry out transportation work. At the same time, the system will also synchronize the target transportation route to the on-site supervision terminal, so that the supervisor can grasp the transportation dynamics and implement necessary process monitoring.
[0080] In addition, after the transport vehicle starts transporting, it is necessary to monitor the transport vehicle in real time to prevent it from deviating from the transport route and to determine whether the real-time location information is on the target transport route; If it is not on the target transportation route, a warning message will be sent to the work terminal and the on-site supervision terminal respectively; If it is on the target transport route, determine whether the real-time speed is within the preset speed range; If it is not within the preset speed range, a warning message will be sent to the working terminal and the on-site supervision terminal respectively.
[0081] The above embodiments have the following beneficial effects: The location information of the transport destination is obtained, and several alternative transport routes are determined in combination with the location of the repair plot. This global path planning can find all possible transport routes between the starting point and the end point, providing a complete alternative plan for subsequent screening. Secondly, based on the preset sensitive targets and safety distances, all alternative routes are filtered, and high-risk routes that are too close to sensitive targets are eliminated, and the transport channel and environmentally sensitive areas are spatially isolated. After completing the safety screening, the method also selects the shortest route from several safe routes as the final transportation plan. On the one hand, the shortest route can minimize the transportation distance, reduce energy consumption and exhaust emissions during transportation, and practice the concept of green environmental protection. On the other hand, the shortest route also means the least time spent on the road, which is of great benefit to shortening the construction period and improving construction efficiency. Sending the optimal route obtained by screening to the work terminal bound to the vehicle can achieve human-vehicle collaboration and ensure the implementation of the transportation plan.
[0082] After the transport vehicle leaves the repair site, the vehicle's location and speed information are obtained in real time. On the one hand, the location information can reflect whether the vehicle deviates from the established route, while the speed information can reveal whether the vehicle has abnormal driving behaviors such as speeding or underspeed. Taking the location and speed as two key indicators to characterize vehicle behavior can comprehensively characterize the dynamics of the vehicle during the transportation process and lay a data foundation for the identification of abnormal behavior. Secondly, the method compares the real-time location with the preset route and the real-time speed with the preset interval. Once it is found that the vehicle deviates from the route or the speed exceeds the standard, a warning will be immediately sent to the on-board work terminal and the on-site supervision terminal. This real-time early warning mode has significant advantages: the early warning to the on-board terminal can promptly remind the driver to correct the deviation and avoid potential accidents; the early warning to the supervision terminal can help the supervision department to grasp the dynamics of the front line in real time and respond and deal with it quickly when necessary. The concurrent push of two-way early warning information forms a closed-loop interaction between the vehicle end and the management end, which greatly improves the supervision intensity and response speed. At the same time, the preset standard route and speed interval have also become behavioral norms that constrain drivers to abide by the rules, making safe driving a basic requirement for construction transportation.
[0083] The real-time noise of the repaired plot is obtained through noise sensors, and it is judged whether the real-time noise exceeds the corresponding preset noise threshold in different time intervals. This approach fully considers the construction noise control requirements in different time periods and has the advantage of refined management. At the construction site, noise nuisance is often one of the main causes of complaints and social conflicts. In other time periods, the preset noise threshold can be moderately relaxed, which not only ensures the progress of construction, but also reduces unnecessary alarms and interventions. This measure makes full use of the Internet of Things sensing and real-time data analysis technology to achieve precise control of construction noise in different time periods and in a customizable manner, and timely warns before the noise exceeds the standard to minimize the impact of noise.
[0084] The following describes the system in the embodiment of the present invention from the perspective of hardware processing. Figure 3 , which is a schematic diagram of the physical device structure of a real-time management and control system based on smart sanitation provided in an embodiment of the present application.
[0085] It should be noted that Figure 3 The structure of the system shown is only an example and should not bring any limitation to the functions and scope of use of the embodiments of the present invention.
[0086] like Figure 3As shown, the system includes a central processing unit (CPU) 301, which can perform various appropriate actions and processes according to the program stored in the read-only memory (ROM) 302 or the program loaded from the storage part 308 to the random access memory (RAM) 303, such as executing the method in the above embodiment. Various programs and data required for system operation are also stored in RAM 303. CPU 301, ROM 302 and RAM 303 are connected to each other through a bus 304. Input / output (I / O) interface 305 is also connected to bus 304.
[0087] The following components are connected to the I / O interface 305: an input section 306 including a camera, an infrared sensor, etc.; an output section 307 including a liquid crystal display (LCD) and a speaker, etc.; a storage section 308 including a hard disk, etc.; and a communication section 309 including a network interface card such as a LAN (Local Area Network) card, a modem, etc. The communication section 309 performs communication processing via a network such as the Internet. A drive 310 is also connected to the I / O interface 305 as needed. A removable medium 311, such as a magnetic disk, an optical disk, a magneto-optical disk, a semiconductor memory, etc., is installed on the drive 310 as needed so that a computer program read therefrom is installed into the storage section 308 as needed.
[0088] In particular, according to an embodiment of the present invention, the process described above with reference to the flowchart can be implemented as a computer software program. For example, an embodiment of the present invention includes a computer program product, which includes a computer program carried on a computer-readable medium, and the computer program includes a computer program for executing the method shown in the flowchart. In such an embodiment, the computer program can be downloaded and installed from a network through the communication part 309, and / or installed from a removable medium 311. When the computer program is executed by the central processing unit (CPU) 301, various functions defined in the present invention are performed.
[0089] It should be noted that the computer-readable medium shown in the embodiment of the present invention may be a computer-readable signal medium or a computer-readable storage medium or any combination of the above two. The computer-readable storage medium may be, for example, but not limited to, an electrical, magnetic, optical, electromagnetic, infrared, or semiconductor system, device or device, or any combination of the above. More specific examples of computer-readable storage media may include, but are not limited to: an electrical connection with one or more wires, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM), a flash memory, an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the above. In the present invention, a computer-readable storage medium may be any tangible medium containing or storing a program, which may be used by or in combination with an instruction execution system, device or device. In the present invention, a computer-readable signal medium may include a data signal propagated in a baseband or as part of a carrier wave, which carries a computer-readable computer program. Such a propagated data signal may take a variety of forms, including but not limited to electromagnetic signals, optical signals, or any suitable combination of the foregoing.
[0090] The flowcharts and block diagrams in the accompanying drawings illustrate the possible architecture, functions and operations of the systems, methods and computer program products according to various embodiments of the present invention. Among them, each box in the flowchart or block diagram can represent a module, a program segment, or a part of the code, and the above-mentioned module, program segment, or a part of the code contains one or more executable instructions for implementing the specified logical function. It should also be noted that in some alternative implementations, the functions marked in the box can also occur in a different order from the order marked in the accompanying drawings. For example, two boxes represented in succession can actually be executed substantially in parallel, and they can sometimes be executed in the opposite order, depending on the functions involved. It should also be noted that each box in the block diagram or flowchart, and the combination of boxes in the block diagram or flowchart, can be implemented with a dedicated hardware-based system that performs a specified function or operation, or can be implemented with a combination of dedicated hardware and computer instructions.
[0091] As another aspect, the present invention further provides a computer-readable storage medium, which may be included in the system described in the above embodiment; or may exist independently without being assembled into the system. The above storage medium carries one or more computer programs, and when the above one or more computer programs are executed by a processor of a system, the system implements the method provided in the above embodiment.
[0092] As described above, the above embodiments are only used to illustrate the technical solutions of the present application, rather than to limit them. Although the present application has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present application.
[0093] As used in the above embodiments, the term "when..." may be interpreted to mean "if..." or "after..." or "in response to determining..." or "in response to detecting...", depending on the context. Similarly, the phrases "upon determining..." or "if (the stated condition or event) is detected" may be interpreted to mean "if determining..." or "in response to determining..." or "upon detecting (the stated condition or event)" or "in response to detecting (the stated condition or event)", depending on the context.
[0094] In the above embodiments, it can be implemented in whole or in part by software, hardware, firmware or any combination thereof. When implemented using software, it can be implemented in whole or in part in the form of a computer program product. The computer program product includes one or more computer instructions. When the computer program instructions are loaded and executed on a computer, the process or function described in the embodiment of the present application is generated in whole or in part. The computer may be a general-purpose computer, a special-purpose computer, a computer network, or other programmable device. The computer instructions may be stored in a computer-readable storage medium, or transmitted from one computer-readable storage medium to another computer-readable storage medium. For example, the computer instructions may be transmitted from a website site, computer, server or data center to another website site, computer, server or data center by wired (e.g., coaxial cable, optical fiber, digital subscriber line) or wireless (e.g., infrared, wireless, microwave, etc.) means. The computer-readable storage medium may be any available medium that a computer can access or a data storage device such as a server or data center that includes one or more available media integrated. The available medium may be a magnetic medium (e.g., a floppy disk, a hard disk, a tape), an optical medium (e.g., a DVD), or a semiconductor medium (e.g., a solid-state hard disk), etc.
[0095] Those skilled in the art can understand that to implement all or part of the processes in the above-mentioned embodiments, the processes can be completed by computer programs to instruct related hardware, and the programs can be stored in computer-readable storage media. When the programs are executed, they can include the processes of the above-mentioned method embodiments. The aforementioned storage media include: ROM or random access memory RAM, magnetic disk or optical disk and other media that can store program codes.
Claims
1. A real-time control method based on smart sanitation. It is characterized in that include: When it is determined according to the satellite map that there are preset sensitive targets within the preset range of the restoration plot, a number of construction areas of the restoration plot are obtained, wherein the preset sensitive targets are targets in a preset table; Determining whether the construction process meets preset standards based on the surveillance videos of all the construction areas, where the preset standards are pre-set construction rules; If the construction process does not meet the preset standard, a warning message is sent to the on-site supervision terminal of the restoration site; Upon confirming receipt of the transport request sent by the on-site supervision terminal, controlling the monitoring device to scan the transport vehicle to obtain license plate information and cockpit information, wherein the cockpit information includes current driver information and escort personnel information; Determining whether the transport vehicle has a pass according to the license plate information; If there is no such pass, sending the warning message to the on-site supervision terminal; If the license is available, determining whether the bound driver information is the same as the current driver information based on the license plate information; If they are not the same, sending the warning message to the on-site supervision terminal; If they are the same, determine whether the escort information is in the preset list; If it is in the preset list, a passage permission message is sent to the on-site supervision terminal.
2. The method according to claim 1, It is characterized in that The determining whether the construction process meets the preset standards based on the monitoring videos of all the construction areas specifically includes: Acquire the real-time noise of the restoration plot through a noise sensor, and determine whether the real-time noise is greater than a preset noise threshold; When determining that the current time is the preset time point, adjusting the monitoring equipment to take monitoring pictures of all the construction areas; Determining whether all of the construction areas are covered by waterproof tarpaulins based on all of the monitoring images; Determine whether there is a working sprinkler truck in the restoration site based on all the monitoring images; Determine whether the cargo holds of all transport vehicles in the restoration plot are covered with tarpaulins based on all the monitoring images; Determine whether all vehicles are within the preset activity range based on all the monitoring images; The preset standards are that the real-time noise is not greater than the preset noise threshold, all of the construction areas are covered with waterproof tarpaulins, there are working sprinkler trucks on the repair site, the cargo holds of all the transport vehicles on the repair site are covered with tarpaulins, and all of the vehicles are within the preset activity range.
3. The method according to claim 1, It is characterized in that After sending the passage permission information to the on-site supervision terminal if the user is in the preset list, the method further includes: Obtain the recycling location information of the transport destination; Determine a plurality of transportation routes according to the location information of the restoration plot and the recovery location information; Deleting the transport routes whose distance from the preset sensitive target is not greater than the preset safety distance from all the transport routes, to obtain a plurality of safe transport routes; The safest transportation route with the shortest distance is determined as the target transportation route, and the target transportation route is sent to the working terminal bound to the transportation vehicle.
4. The method according to claim 1 or 3, It is characterized in that After sending the passage permission information to the on-site supervision terminal if the user is in the preset list, the method further includes: When it is determined that the transport vehicle has left the restoration site, obtaining real-time location information and real-time speed of the transport vehicle; Determining whether the real-time location information is on the target transportation route; If it is not on the target transportation route, sending the warning information to the working terminal and the on-site supervision terminal respectively; If on the target transport route, determining whether the real-time speed is within a preset speed range; If it is not within the preset speed range, the warning information is sent to the working terminal and the on-site supervision terminal respectively.
5. The method according to claim 2, It is characterized in that The step of obtaining the real-time noise of the restoration plot through a noise sensor and determining whether the real-time noise is greater than a preset noise threshold specifically includes: When the current moment is in the first time interval, determining whether the real-time noise is greater than a preset first noise threshold; When the current moment is in the second time interval, it is determined whether the real-time noise is greater than a preset second noise threshold, where the preset noise threshold includes the preset first noise threshold and the preset second noise threshold.
6. The method according to claim 1, It is characterized in that When confirming receipt of the transport request sent by the on-site supervision terminal, controlling the monitoring device to scan the transport vehicle to obtain the license plate information and the cockpit information specifically includes: Controlling the monitoring device to scan the transport vehicle to obtain a scanned image; Recognize the portrait information in the scanned image to obtain the driver's facial image and the escort's facial image, wherein the driver's facial image is the facial image corresponding to the person in the driver's seat, and the escort's facial image is the facial image corresponding to the person in the co-pilot's seat; Match the driver's facial image and the escort's facial image in a preset database to obtain current driver information and escort information; The scanned image is identified to obtain the license plate information.
7. The method according to claim 1, It is characterized in that All persons in the preset list hold corresponding professional qualification certificates and relevant skill certificates.
8. A real-time control system based on smart sanitation, It is characterized in that The electronic device comprises: One or more processors and a memory; the memory is coupled to the one or more processors, the memory is used to store computer program code, the computer program code includes computer instructions, and the one or more processors call the computer instructions to enable the electronic device to execute the method as described in any one of claims 1-7.
9. A computer-readable storage medium comprising instructions, It is characterized in that When the instructions are executed on an electronic device, the electronic device is caused to execute the method as claimed in any one of claims 1 to 7.
10. A computer program product, It is characterized in that When the computer program product is executed on an electronic device, the electronic device is enabled to execute the method according to any one of claims 1 to 7.
