Method for land reclamation by using bare rock in stony desertification area
The method addresses the instability and erosion issues in rocky desertification areas by creating a stable, leak-proof land structure using rock chipping and graded slag, enhancing agricultural productivity and reducing costs.
Patent Information
- Application Number
- CN202411461460.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-18
- Publication Date
- 2024-12-03
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Current methods for land reclamation in rocky desertification areas are time-consuming, costly, and result in unstable soil structures prone to erosion, limiting agricultural productivity and mechanized operations due to the scattered distribution of bare rocks and steep slopes.
A method involving land clearing, topsoil stripping, rock chipping, adjusting slopes, building stone ridges, filling gaps with graded slag, and soil recovery to create a stable, leak-proof structure that supports agricultural machinery and prevents soil erosion.
The method enhances land stability, prevents soil erosion, increases arable land area, and improves crop yields by utilizing local materials, reducing resource waste and treatment costs, while promoting vegetation growth and sustainable land use.
Smart Images

Figure CN119054455A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of land reclamation, in particular to a method for land reclamation in rocky desertification areas using bare rocks. Background Art
[0002] Rocky desertification, also known as stony desertification, refers to the land degradation process in which the contradiction between man and land becomes prominent, vegetation is destroyed, soil and water loss occurs, land productivity declines or is lost, and the surface presents a desert-like landscape, with large areas of bedrock exposed on the surface (or gravel accumulation) due to unreasonable human social and economic activities. It is difficult for any vegetation to survive on the exposed rocks, which seriously restricts the development of agriculture.
[0003] At present, the main way to manage the land in rocky desertification areas is to cover the rocky desertification land with foreign soil, fill the exposed rocks, and then plant plants suitable for the local environment to improve the soil structure and maintain water and soil. However, this management method is time-consuming and costly, and the new covered foreign soil has poor stability and is easily washed away by rainwater, resulting in soil erosion, which in turn leads to extremely unstable land management effects. Especially in the hilly and mountainous areas in my country, due to the fragmented plots, steep slopes, and thin soil layers in the hilly and mountainous areas, surface runoff is easily formed under heavy rainfall, aggravating soil erosion and causing the bedrock to be easily exposed to the surface again, which in turn makes the land fragmented and the soil quality poor, seriously affecting crop yields, seriously restricting mechanized operations, and affecting agricultural production efficiency. Summary of the invention
[0004] The invention provides a method for land reclamation using bare rocks in rocky desertification areas, which can solve the problems of scattered distribution of bare rocks in cultivated land, fragmented and irregular plots, low agricultural production efficiency and low crop yield in rocky desertification areas in hilly and mountainous areas.
[0005] This application provides the following technical solutions:
[0006] A method for land reclamation using bare rock in a rocky desertification area comprises the following steps:
[0007] S1. Land clearing;
[0008] S2, stripping the topsoil;
[0009] S3, rock chipping: Chiseling exposed rocks to obtain stones and slag;
[0010] S4, adjust the slope;
[0011] S5, building field ridges: using the stones obtained in step S3, building stone ridges;
[0012] S6, slag filling: fill the gaps between rocks with the slag obtained in step S3;
[0013] S7. Soil recovery.
[0014] Beneficial effects: In view of the scattered distribution of bare rocks in the rocky desertification areas in hilly and mountainous areas, the slope of the land is adjusted by chiseling rocks, the slope of the hilly and mountainous areas is reduced, and the ground is flattened, so that the cultivated land formed after the treatment is suitable for agricultural machinery operations, thereby improving the efficiency of crop production. At the same time, make full use of stones, slag and other stone materials obtained by chiseling rocks, realize the on-site transportation and reuse of stones within the scope of land treatment, use local materials, effectively reduce resource waste, significantly reduce treatment costs, and avoid the generation of construction waste. Use stones to build field ridges to enhance the structural stability of the land. By blocking and fixing the soil, the speed of surface runoff can be slowed down, the scouring effect of water flow on the soil can be reduced, and soil erosion can be effectively prevented; fill the gaps between rocks with slag to form a leak-proof isolation layer, which blocks soil leakage and prevents soil erosion in the vertical direction. It can enhance the stability of the soil, prevent soil sliding or collapse, and ensure that the thickness of the soil after treatment does not decrease. The cultivated land treated by this technical solution can be used continuously, and the "non-grainization" of cultivated land can be effectively prevented. After land reclamation in rocky desertification areas through this technical solution, the effective arable land area has been increased, the degree of arable land contiguousness has been increased, and the problem of "large population and small arable land" in karst landform areas has been solved.
[0015] Furthermore, the slag described in step S3 is divided into three types: large, medium and small; when the slag is used to fill the gaps between the rocks in step S6, the filling order is large slag at the bottom, medium slag in the middle, and small slag at the top to form a leak-proof isolation layer.
[0016] Beneficial effects: By utilizing slag in a graded manner, the layering and density of gap filling are ensured, the soil leakage prevention effect is improved, vertical soil and water loss is effectively prevented, the stability of the land structure is enhanced, and the sustainable utilization period of cultivated land is extended.
[0017] Furthermore, in step S3, the thickness of the stone is greater than or equal to 20 cm, the length is 20-80 cm, and the width is 20-40 cm; the slag is divided into three types: large, medium and small. The length, width and thickness of the large slag are all 10-20 cm, the length, width and thickness of the medium slag are all 5-10 cm, and the length, width and thickness of the small slag are all less than 5 cm, so as to facilitate the subsequent use of the slag.
[0018] Beneficial effects: Stones of the above sizes can provide sufficient structural support when building field ridges, enhance the stability of the land, and prevent soil erosion. The combination of stone slag of different sizes can improve the air permeability and water permeability of the soil. The leak-proof isolation layer formed can maintain soil moisture, promote vegetation growth, and accelerate vegetation recovery.
[0019] Furthermore, the slope is adjusted in step S4 to a slope less than or equal to 10°.
[0020] Beneficial effects: Makes the ground smoother, facilitates mechanized operations, and improves crop production efficiency; at the same time, it is conducive to irrigation and drainage, reduces soil erosion, and improves the soil's ability to retain water and fertilizer.
[0021] Furthermore, in step S5, the stone step has a height of 1-1.5 m, a top width of 30 cm or more, and an outer slope ratio of 1:0.2-0.5.
[0022] Furthermore, in step S5, the front side of the stone step is a sloped surface, and the rear side of the stone step is a vertical surface.
[0023] Beneficial effects: The design of the stone step ensures that it has sufficient supporting force, ensures the stability of the stone step structure, can effectively block and fix the soil, slow down the speed of surface runoff, reduce the scouring effect of water on the soil, and facilitate vegetation planting and ecological protection.
[0024] Furthermore, in step S7, the soil is covered and the soil thickness is greater than or equal to 40 cm.
[0025] Beneficial effects: The soil layer above 40 cm can form a relatively complete soil structure, improve the air permeability and water permeability of the soil, and is conducive to the growth and development of plant roots.
[0026] Furthermore, in step S7, the ground is leveled after the soil is returned, and the ground levelness reaches ±3 cm.
[0027] Beneficial effects: Level ground helps to drain water evenly, preventing waterlogging that can lead to soil salinization and crop root diseases. By finely leveling the ground, soil stability can be further enhanced, reducing the risk of soil sliding or collapse.
[0028] Furthermore, the ground is leveled and then plowed.
[0029] Beneficial effects: Tillage helps improve soil structure, increase soil porosity, improve soil air permeability and water permeability, and effectively increase crop yields.
[0030] Furthermore, in step S7, the soil is fertilized after recovery.
[0031] Beneficial effects: Through fertilization treatment, the organic matter and key nutrients (such as nitrogen, phosphorus, and potassium) in the soil are increased, the soil fertility is improved, sufficient nutrients are provided for crop growth, the rapid growth of crops is promoted, and the yield and quality of crops are improved. BRIEF DESCRIPTION OF THE DRAWINGS
[0032] Figure 1The present invention is a flow chart of a method for land reclamation using bare rocks in rocky desertification areas.
[0033] Figure 2 The present invention is a structural schematic diagram of a method for land reclamation using bare rocks in rocky desertification areas.
[0034] Figure 3 This is the distribution map of rocky desertified farmland in the experimental area to be rehabilitated in Experimental Example 1.
[0035] Figure 4 This is the distribution map of rocky desertified farmland after the land reclamation in the experimental area of Experimental Example 1.
[0036] Figure 5 The soil erosion intensity distribution map of the test area of Experimental Example 2 before and after remediation, where (a) is the soil erosion intensity distribution map before remediation, and (b) is the soil erosion intensity distribution map after remediation.
[0037] Figure 6 This is a map of the rocky desertification status of the experimental area before remediation.
[0038] Figure 7 It is a soil status map of the test area plot after being rehabilitated by the method of the present invention for land reclamation using bare rock in rocky desertification areas. DETAILED DESCRIPTION
[0039] The following is further described in detail through specific implementation methods:
[0040] The symbols in the drawings of the specification include: rock 1, stone step 2, leakage-proof isolation layer 3, and tillage layer 4.
[0041] Example
[0042] like Figure 1 , Figure 2 As shown, a method for land reclamation using bare rock in rocky desertification areas includes the following specific steps:
[0043] S1. Land cleaning: Determine the scope of land to be renovated and clean up the land within the scope of renovation. Cleaning can be done by mechanical clearing, manual felling, etc.
[0044] The land to be rehabilitated is located in the limestone exposed desertification concentrated area, including non-desertification area, mild desertification area, moderate and above desertification area. The soil thickness in the non-desertification area is more than 40-50cm, which can be used for growing crops. The soil thickness in the mild, moderate and above desertification areas is thin, generally less than 30cm. There are rocks under the soil layer, and there is less soil and more stones. If it is determined that there are long-term abandoned shrubs, abandoned orchards and a small number of tree forests with low land utilization rates within the scope of the land to be rehabilitated, the land will be mechanically cleared, and the debris will be processed in a centralized manner after being reduced. It should not be piled at the edge of the field to avoid affecting farming. If it is determined that there are inefficient gardens, abandoned gardens, tall trees, etc. within the scope of the land to be rehabilitated, the trees will be manually dug out.
[0045] S2. Stripping of topsoil: Use a bulldozer to take up the topsoil within the scope of the land to be renovated, push it to a designated location and pile it up, with a bulldozer distance of 10-20m. The thickness of the topsoil to be stripped is based on the non-rocky desertification area within the scope of the land to be renovated, and 40-50cm of topsoil is stripped, so that the rocks in the light, moderate and above rocky desertification areas are fully exposed.
[0046] S3. Rock chipping: Mechanically chip the rocks 1 exposed on the surface, and break the discarded rocks into small pieces with a thickness of not less than 20 cm, a length of 20-80 cm, and a width of 20-40 cm, so as to facilitate the subsequent use of the rocks. Classify the finely crushed slag produced in the process of chipping and breaking the discarded rocks into three types: large, medium, and small. The length, width, and thickness of large slag are all 10-20 cm, the length, width, and thickness of medium slag are all 5-10 cm, and the length, width, and thickness of small slag are all less than 5 cm, so as to facilitate the subsequent use of slag.
[0047] S4. Adjust the slope: adjust the slope of the land surface, and make the land surface wider than 6m and with a slope of less than or equal to 10°. In the rock area, the slope is adjusted by controlling the chiseling height of the rock 1, and in the soil area, the slope is adjusted by moving the soil and digging high and filling low. In hilly and mountainous areas, the slope is very steep. The height difference between the rocks at high places and the rocks at low places can be reduced by chiseling the rocks at high places, thereby reducing the slope of the bottom of the land.
[0048] S5, constructing field ridges: according to the land topography within the scope of the regulation, the field is trimmed into a square or long strip shape, and the stones obtained in step S3 are used to build a dry stone ridge 2 to avoid horizontal soil erosion in the regulated area. The height of the stone ridge 2 is 1-1.5m, the width of the top of the stone ridge 2 is greater than or equal to 30cm, and the outer slope ratio of the stone ridge 2 is 1:0.2-0.5. The excess abandoned stones can also be used to pave the mechanized farming roadbed and build intercepting drainage ditches.
[0049] Specifically, in hilly and mountainous areas, the upper land bottom surface is higher than the lower land bottom surface, the front side of the stone step 2 is opposite to the lower land bottom surface, and the rear side of the stone step 2 is opposite to the upper land bottom surface. The front side of the stone step 2 is a slope surface, and the slope of the slope surface is 1:0.2; the rear side of the stone step 2 is a vertical surface. The height L of the stone step 2 relative to the lower land bottom surface is ≥1.0m, the height T of the stone step 2 relative to the upper land bottom surface is ≥0.5m, and the height D of the stone step 2 relative to the renovated land surface is ≥0.1m.
[0050] S6, slag filling: fill the slag into the gaps between the rocks remaining at the bottom of the land after the chiseling in step 3, and the filling order is large slag at the bottom, medium slag in the middle, and small slag at the top, to form a leak-proof isolation layer 3, to prevent soil leakage in the rock gaps, to absorb fine particles, to prevent soil and water loss in the vertical direction, and to drain excess rainwater through the leak-proof isolation layer 3.
[0051] S7, soil backfill: backfill the soil peeled and piled in step 2, with a soil thickness of 40 cm or more, to form a tillage layer 4. For fields with a soil thickness less than 40 cm, cover with imported soil until the requirement is met. The imported soil source can be the abandoned soil generated by surrounding construction projects or the soil of surrounding unused land.
[0052] S8. Leveling the ground: Detailed leveling can be done manually, evenly paving and leveling the ground to ensure that the ground flatness reaches ±3cm, and eliminate the traces of mechanical use. The land within the scope of the remediation is plowed for later maintenance and cultivation.
[0053] S9. Fertilization treatment: The land within the remediation area shall be fertilized with commercial organic fertilizer at a standard of 500-1000kg / mu to improve soil fertility for later cultivation and maintenance.
[0054] Test Example 1
[0055] A plot of land with exposed limestone and rocky desertification was designated as a test area in the urban and county areas of Chongqing. The area of the rocky desertification land to be rehabilitated in the test area is about 504.30 mu, including 0 mu of stable cultivated land, 364.92 mu of light rocky desertification area, and 139.38 mu of moderate and above rocky desertification area (as shown in Table 1 below, see Figure 3 ). In stable cultivated land areas, the rock exposure rate is 0, the vegetation and soil coverage rate is 100%, the soil cover is continuous, and the soil layer thickness is more than 40cm; in mild desertification areas, the rock exposure rate is ≤30%, the vegetation and soil coverage rate is ≥70%, the soil cover is basically continuous, and the soil layer thickness is 20-30cm; in moderate and above desertification areas, the rock exposure rate is >30%, the vegetation and soil coverage rate is <70%, the soil cover is discontinuous, the soil layer thickness is generally <20cm, and soil erosion is obvious.
[0056] Table 1 Statistical table of cultivated land distribution area before renovation in the experimental area
[0057] Stable cultivated land (mu) Mild rocky desertification area (mu) Moderate and above rocky desertification area (mu) Total (mu) 0.00 364.92 139.38 504.30
[0058] Table 2 Statistics of economic benefits of the experimental area before remediation
[0059]
[0060] Note: Cost includes seed cost, fertilizer cost, pesticide cost and labor cost.
[0061] As shown in Table 2, before the land in the experimental area was renovated, it was severely desertified and the arable land was fragmented. Machinery could not be used and only manual labor could be used. The labor intensity was high, the agricultural production efficiency was low, the crop yield was low, and the economic benefits were low.
[0062] Table 3 Statistical table of cultivated land distribution area after renovation in the experimental area
[0063] Stable cultivated land (mu) Mild rocky desertification area (mu) Moderate and above rocky desertification area (mu) Total (mu) 504.30 0 0 504.30
[0064] Table 4 Statistics of economic benefits of the experimental area before remediation
[0065]
[0066] Note: Cost includes seed cost, fertilizer cost, pesticide cost and labor cost.
[0067] As shown in Table 3 and Table 4 (see Figure 4 ), the plots in the experimental area have been effectively managed after being rehabilitated by the land reclamation method of this technical solution, with stable cultivated land reaching 504.30 mu, 0 mu of light rocky desertification area, and 0 mu of moderate and above rocky desertification area. The effective cultivated land area has been greatly increased, the soil cover is continuous, the ground is relatively flat, and mechanical operations can be used, which greatly reduces the intensity of manual operations, improves agricultural production efficiency, and has high crop yields and high economic benefits.
[0068] Test Example 2
[0069] According to the land type data, slope, and forest and grass coverage of the test area, combined with the soil erosion degree classification index table (such as Table 5) and the soil erosion intensity classification standard table in the southwestern rocky mountainous area (such as Table 6), the soil erosion intensity of the test area was judged, and the soil erosion intensity distribution map of the test area before remediation was prepared (such as Table 6). Figure 5 (a)). After the plots in the test area were rehabilitated using the land remediation method of this technical solution, a soil erosion intensity distribution map of the plots in the test area after remediation was produced (e.g. Figure 5 (b)), and the statistical table of soil erosion intensity before and after land remediation in the experimental area (as shown in Table 7 below).
[0070] Table 5 Soil erosion degree classification index table
[0071]
[0072] Table 6 Soil erosion intensity classification standard
[0073]
[0074] Table 7 Changes in soil erosion intensity and area before and after land remediation in the experimental area
[0075]
[0076] Note: Mild and above levels are considered as water and soil erosion areas, slight levels are considered as no erosion.
[0077] As shown in Table 7, the area of soil erosion before the land reclamation in the test area was 448.02 mu (i.e., the area of mild erosion and above), and the area of soil erosion after the land reclamation in the test area was reduced to 192.16 mu, and the area of soil erosion decreased by 255.86 mu. Moreover, from the perspective of soil erosion intensity, after the land reclamation in the test area, although the area of mild erosion increased by 42.11 mu, the area of moderate and strong erosion decreased to 0, and the area of moderate and strong erosion decreased by 214.84 mu and 83.13 mu respectively. The increase in the area of mild erosion was mainly due to the transformation of moderate and strong erosion to mild erosion. After the land reclamation in the test area through this technology, the area of soil erosion was significantly reduced, and the intensity of soil erosion was significantly reduced, thereby effectively preventing soil erosion, ensuring the stability and reliability of the entire land management effect, and ensuring crop yields.
[0078] According to the soil erosion intensity classification standard table in Table 6, the erosion modulus corresponding to the mild, moderate and severe erosion of the test area are 250, 1500, 3750 and 6500 t / (km 2 ﹒ a), the average erosion modulus before land remediation was calculated by weighted average method to be 3143.29t / (km 2 a) The average erosion modulus after land reclamation is 726.31t / (km 2 a) After land reclamation by the land reclamation method of this technical solution, the average soil erosion modulus of the test area was reduced by 2416.98t / (km 2 a). After the land was renovated by this technology, the average soil erosion modulus of the plots in the test area was significantly reduced, which effectively prevented and controlled soil erosion and ensured the soil source for crops.
[0079] The above are only embodiments of the present invention. The invention is not limited to the field involved in this implementation case. The common knowledge such as the known specific structure and characteristics in the scheme is not described in detail here. It should be pointed out that for those skilled in the art, without departing from the structure of the present invention, several deformations and improvements can be made, which should also be regarded as the protection scope of the present invention, and these will not affect the effect of the implementation of the present invention and the practicality of the patent. The scope of protection required by this application shall be based on the content of its claims, and the specific implementation methods and other records in the specification can be used to interpret the content of the claims.
Claims
1. A method for land reclamation using bare rock in rocky desertification areas, characterized in that: The steps include: S1. Land clearing; S2, stripping the topsoil; S3, rock chipping: Chiseling exposed rocks to obtain stones and slag; S4, adjust the slope; S5, building field ridges: using the stones obtained in step S3, building stone ridges; S6, slag filling: fill the gaps between rocks with the slag obtained in step S3; S7. Soil recovery.
2. The method according to claim 1, characterized in that: The slag described in step S3 is divided into three types: large, medium and small. When the slag is used to fill the gaps between the rocks in step S6, the filling order is large slag at the bottom, medium slag in the middle, and small slag at the top to form a leak-proof isolation layer.
3. The method according to claim 2, characterized in that: In step S3, the thickness of the stone is greater than or equal to 20 cm, the length is 20-80 cm, and the width is 20-40 cm; the slag is divided into three types: large, medium and small. The length, width and thickness of the large slag are all 10-20 cm, the length, width and thickness of the medium slag are all 5-10 cm, and the length, width and thickness of the small slag are all less than 5 cm, so as to facilitate the subsequent use of the slag.
4. The method according to claim 3, characterized in that: The step S4 is to adjust the slope to a slope less than or equal to 10°.
5. The method according to claim 4, characterized in that: The stone step in step S5 has a height of 1-1.5 m, a top width of 30 cm or more, and an outer slope ratio of 1:0.2-0.
5.
6. The method according to claim 5, characterized in that: In step S5, the front side of the stone step is a sloped surface, and the rear side of the stone step is a vertical surface.
7. The method according to claim 6, characterized in that: In step S7, the soil is covered and the soil thickness is greater than or equal to 40 cm.
8. The method according to claim 7, characterized in that: In step S7, the ground is leveled after the soil is returned, and the ground levelness reaches ±3 cm.
9. The method according to claim 8, characterized in that: After the ground is leveled, ploughing is performed.
10. The method according to claim 9, characterized in that: In step S7, the soil is fertilized after recovery.
Citation Information
Patent Citations
Gentle slope modification method for land reclamation in hilly and mountainous region
CN109451905A
Ecological restoration method for geological environment of coal mine
CN113875344A
Method for improving large-gap block stone soil in ecological restoration area of mine by using biological carbon cushion layer
CN117099530A
